RF Technical ReviewDesign Layout
Alan Grant, STFC
![Page 2: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/2.jpg)
Overview
• RF Layout• Coax distribution• Coax supports• Amplifiers• Services• Access & Egress• AFC Access• Clashes• Summary
2
![Page 3: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/3.jpg)
RF Layout• At the beginning of the year it was unclear whether we could
fit the RF system in the MICE hall due to the space constraints.
• Many systems already in place - shield wall, power supplies & racks, mezzanine floors, false floor support structures. All of which we have had to work around.
• A design requirement was also to maintain full access to AFC modules without the need to remove any of the RF system components when moving the AFC modules into the parked position.
• Obviously - produce a layout addressing all the requirements of the RF engineers to provide a full working system.
3
![Page 4: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/4.jpg)
RF Layout – view behind shield wall
4
![Page 5: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/5.jpg)
RF Layout – view from cooling channel side
5
![Page 6: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/6.jpg)
4” Coax Distribution
6
![Page 7: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/7.jpg)
4” Coax Distribution – Far Side
7
RF tuners. These represented by bellows units. Total travel 60mm
To ease installation will consider splitting coax’s at this point before cooling channel false floor
![Page 8: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/8.jpg)
4” Coax Distribution – Far Side
8
Cooling channel false floor
Concrete Ramp, /access walkway
Coax support
![Page 9: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/9.jpg)
4” Coax Distribution – Near Side
9
Coax length compensation to far side.
RF tuners. These represented by bellows units. Total travel 60mm
![Page 10: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/10.jpg)
4” Coax Distribution – Near Side
10
Cover plates over coax for protection from accidental damage
![Page 11: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/11.jpg)
4” Coax Distribution – Near Side
11
Very congested in this area. Will need to modify some steelwork.
![Page 12: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/12.jpg)
Coax Supports
12
Rotation
VerticalLongitudinal
Horizontal
CLAMP
TEE SLOT RAILS
![Page 13: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/13.jpg)
Coax Sections – Installation/Removal Concerns
13
~55mm required to clear mating flange
~35mm to clear copper coax tube
Currently rigid system ~ no flexible sections
Rely on adjustment in clamp system.
Need to speak with supplier to discuss installation options
![Page 14: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/14.jpg)
Amplifiers
14
4616 Amplifiers
TH116 CERN Amplifier
TH116 Refurbished Amplifier
3” coax
![Page 15: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/15.jpg)
TH116 Amplifiers - Refurbished
15
Hybrids
Dummy Loads
TH116 Refurbished Amplifier has 3 hybrids & 3 dummy loads
6” coax from amplifier
![Page 16: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/16.jpg)
TH116 Amplifier - CERN
16
Dummy Loads
Hybrids
TH116 CERN Amplifier has 2 hybrids & 2 dummy loads
6” coax from amplifier
![Page 17: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/17.jpg)
RF Delivery System behind wall
17
![Page 18: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/18.jpg)
Services
18
4616 Services feed into bottom of amp
Water flow & return main pipe run
Water flow & return ‘T’s into main run for both 4616’s and TH116’s
Similar arrangement will be used for the dummy loads on the shield wall
![Page 19: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/19.jpg)
Services
19
4616 services run under access platform
4616 access for commissioning
![Page 20: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/20.jpg)
Access & Egress
20
Discussed access & egress with Fire Safety Officer. Agreed this arrangement would be acceptable.
![Page 21: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/21.jpg)
AFC Access
21
AFC’s are moved out of the page on rolling platform into parked position to change absorbers.
Clear pathway is available but AFC module 2 is close.
![Page 22: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/22.jpg)
AFC Module 2
22
This line is projected from edge of rolling platform
![Page 23: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/23.jpg)
Clashes
23
Steelwork ClashPossible solution ?Remove small section and add another support leg.
Additional support leg
![Page 24: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/24.jpg)
Clashes
24
Clash with steelwork, local relieve or rework required
![Page 25: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/25.jpg)
RF waveguide clash with the false floor vertical support columns
25185
Clash with foot
![Page 26: RF Technical Review Design Layout](https://reader035.fdocuments.net/reader035/viewer/2022062222/56815ef1550346895dcdb350/html5/thumbnails/26.jpg)
Summary
• Firstly, we believe it is possible to fit the RF system within the MICE hall.
• There are some clashes with some steel work on both the cooling channel false floor and the parked position false floor – none of which are show stoppers but will need to be resolved.
• Installation will be tricky especially mating the coax lines with no appreciable bellows units or flexible coax’s in the current design. – currently relying on degrees of freedom in coax supports. Suppliers may have other suggestions to ease installation and removal of coax tubes.
• Will need to survey and check positions of components very closely during installation.
• Fire officer has been consulted and agreed that what is proposed causes no access problems or issues.
26