Rework Production Order

download Rework Production Order

of 25

Transcript of Rework Production Order

  • 7/30/2019 Rework Production Order

    1/25

    REWORK PRODUCTION ORDER

    Creating the trigger points:

    Co31 T.CODE:

  • 7/30/2019 Rework Production Order

    2/25

    Put the cursor on create order with ref and go to parameters.

  • 7/30/2019 Rework Production Order

    3/25

    Then go to ca02

  • 7/30/2019 Rework Production Order

    4/25

    Select one operation - go to trigger points overview

  • 7/30/2019 Rework Production Order

    5/25

  • 7/30/2019 Rework Production Order

    6/25

  • 7/30/2019 Rework Production Order

    7/25

    Then create and confirm the production order with rework Qty then automatically

    rework order creates.

    COFIGURATION SETTINGS FOR REWORK ORDER:

    1)OPJH T.CODE:

  • 7/30/2019 Rework Production Order

    8/25

  • 7/30/2019 Rework Production Order

    9/25

    Go to number range general

  • 7/30/2019 Rework Production Order

    10/25

    2) OPL8 T.CODE:

  • 7/30/2019 Rework Production Order

    11/25

    MASTER DATA FOR REWORK ORDER

    CA11 T.CODE:

  • 7/30/2019 Rework Production Order

    12/25

  • 7/30/2019 Rework Production Order

    13/25

    THEN GO TO OPERATIONS

  • 7/30/2019 Rework Production Order

    14/25

    TRANSACTION DATA

    CO01 T.CODE:

  • 7/30/2019 Rework Production Order

    15/25

    THEN CONFIRM THE OPERATIONS ONE BY ONE.

    CO11N OR CO15 T.CODE:

  • 7/30/2019 Rework Production Order

    16/25

    THEN CREAT THE REWORK ORDER FOR 100-100 MATERIAL FOR

    REWORK QTY 5 PC.

    CO07 T.CODE:

  • 7/30/2019 Rework Production Order

    17/25

  • 7/30/2019 Rework Production Order

    18/25

  • 7/30/2019 Rework Production Order

    19/25

  • 7/30/2019 Rework Production Order

    20/25

    Then execute .

    Go to spro and give scheduling parameters.

    Then again create the order in co07.

  • 7/30/2019 Rework Production Order

    21/25

    Go back and assign a material which is required for rework and press

    enter.Then it will ask for operation allocation then assign the 0020

    operation.

  • 7/30/2019 Rework Production Order

    22/25

    Then save the rework order.

    Then do the confirmation for the rework order. then you will get theerror

    Then maintain the confirmation parameters.

  • 7/30/2019 Rework Production Order

    23/25

    Save

    Then maintain the checking rules for KP03.

    Then confirm the rework order.

    Then do GR to header order & settlement will take place to header order only not to re-work order

    Note:

    a) For rework work, GR will not take place

    b) It is not possible to carry out an automatic goods receipt for operations that are marked as rework

    operations.

    FAQS:

    REWORK

    Generally in the Shop floor, rework happen frequently, In SAP rework is done by different ways

    Automatic triggering of rework order when we enter rework qty in confirmation screen.If rework has to be done immediately after entering in to rework qty in the confirmation screen beforeproceeding next operation, by done by control key with rework option and enter the time inoperational detail and operation quantity.

  • 7/30/2019 Rework Production Order

    24/25

    Create a reference operation set and create a rework order with rework order type and settle therework order into main production order.

    If the order quantity is 100, and have 5 oprn, in the second operation rework happened meansconfirm the operation with partial confirmation with entering yield and rework quantity, and create arework order, in the rework order confirm the quantity with Final operation. Again in main productionorder, in the 2 nd operation confirm the rework quantity with out entering any activity in theconfirmation with final confirmation.

    Rework Thru Trigger Point

    How to map the scenario for Production order confirmation, Rework order create automatic with help of

    trigger points?

    By: Faisal

    First check in Tcode OPJF for the selection id a Priority is defined for the Task list type S with usage 1 and

    status 4 and then Proceed as follows:

    1. Create a Reference op set in tcode Ca11.Enter the plant,Description , usage and status for the ref op set Enter lotsize and unit of measure.Enter the op as 0010 / workcenter/op control key/Description for the op Enter the standard values and save.

    2. Create a Standard trigger point in CO31.(Ex Production)

    Enter the Trigger Point usage /Group as FERT.

    3. Tick the Trigger Point Functions.

    4. Enable the indicator create order with Reference.

    5. Enter the system status as PCNF.

    6. Enter change as +.

    7. Enable the indicator once.

    8 . Now place the cursor on the create order with reference.

    9. Goto Parameters.

    10. In the Parameter enter in the group the created Reference op set group no.

    11. Order type as PP01 and group counter as 1 and save the Trigger Point.

    12. Now goto the Routing for your Material.

    13. Choose the last op to assign the Trigger point.

    14. Select the OP ----> Goto ---> Trigger Point overview.

    15. Enter the Trigger Point usage as FERT.

  • 7/30/2019 Rework Production Order

    25/25

    16. Now choose that line ,select the Details---> Trigger Point

    17. The system will says standard trigger point exists from which you can select the created Trigger Point (EXx

    Production)and save.

    18. MD02/MD04.

    19. Convert the Planned Order into Production Order and Release the order.

    20. Now confirm th ops.

    21. For the last op enter the yield and rework qty and set the status as PCNF.

    22. If the status of last op is PCNF then in the system a POP UP will appear as Activited by Trigger Point/Create order with reference/order number/sequence and op number which trigger point works and enter.