Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130...

154
APPENDIX A GGNS ISI LINE LIST GRAND GULF NUCLEAR STATION LINE CLASS HCB INSERVICE INSPECTION PROGRAM REVISION 13 DESIGN RATING SERVICE LINE *CRITICAL SERVICES NO. / P DWG NO. 001 CONDENSATE FROM HEADER HCB-9 TO HBB-19. P-1065 P-1086 002 TEST CONNECTION FROM HCB-1 TO HCD-2. P-1 086 008 CONDENSATE FROM HCB-9 TO HBB-57. P-1065 P-1083A 009 CONDENSATE HEADER FROM HCD 383SECTION OF HEADER WITHIN THE DIKE AREA. P-1065 009 VENT/DRAIN LINE. P-1065 009 CONDENSATE HEADER PORTION FROMTHE DIKE AREA TO HPCS & RCIC PUMP SUCTION. P-1065 009 VENT/DRAIN LINE. P-1065 010 SODIUM PENTABORATE FROM 3-HCB- 150 150 10 TO 6-HCB-11. P-1082 010 SODIUM PENTABORATE FROM 150 150 STORAGE TANK AOO1 TO 6-HCB-10. P-1082 011 SODIUM PENTABORATE FROM 6-HCB- 150 150 11 TO PUMPS CO01A-A & C001 B-B. P-1082 011 SLCPUMPSCOO1A-A&B-B 150 150 SUCTION FROM HCB-10 TO VALVES FOOlA&B. P-1 082 011.: SODIUM PENTABORATE FROM 150 150 VALVES FOOIA&B TO 3-HCB-011. P-1082 SERVICE CONDITIONS NORMAL MAXIMUM SYS. PSIG TEMP PSIG TEMP PSIG TEMP NO. 150 150 S I z E THK. IN. M A T V 0 L 20 110 50 130 P11 18.000 0.25 SS 100 140 75 80 100 140 P11 0.750 0.15 SS 150 150 20 110 50 130 Pll 6.000 0.13 SS 150 150 20 110 50 130 Pll 20.000 0.25 SS 150 150 20 110 50 130 Pll 1.000 0.13 SS 150 150 20 110 50 130 Pll 20.000 0.25 SS 150 150 20 110 50 130 P1l 0.750 0.15 SS 60 110 150 120 C41 6.000 0.13 SS 60 110 150 120 C41 3.000 0.12 SS 30 110 150 120 C41 3.000 0.12 SS 30 110 150 120 C41 6.000 0.13 SS 30 110 150 120 C41 6.000 0.13 S U R V T I V T 2 V T 3 CODE OTHER EXEMPT EXAM REF. NOTES X IWC-1222(c) X IWC-1222(a) X IWC-1222(c) NO ISI OR PT REQ. SEE NOTE 2 NO ISI OR PT REQ. SEE NOTE 2 X IWC-1222(c) NO ISI OR PT REQ. SEE NOTE 2 X IWC-1222(c) X IWC-1222(a) X IWC-1222(a) X IWC-1222(c) X IWC-1222(c) SS PAGE NO HCB 1

Transcript of Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130...

Page 1: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

GRAND GULF NUCLEAR STATION LINE CLASS HCB

INSERVICE INSPECTION PROGRAM REVISION 13

DESIGN RATINGSERVICE

LINE *CRITICAL SERVICES NO. / P DWG NO.

001 CONDENSATE FROM HEADER HCB-9 TO HBB-19. P-1065 P-1086

002 TEST CONNECTION FROM HCB-1 TO HCD-2. P-1 086

008 CONDENSATE FROM HCB-9 TO HBB-57. P-1065 P-1083A

009 CONDENSATE HEADER FROM HCD383SECTION OF HEADER WITHIN THE DIKE AREA. P-1065

009 VENT/DRAIN LINE. P-1065

009 CONDENSATE HEADER PORTION FROMTHE DIKE AREA TO HPCS & RCIC PUMP SUCTION. P-1065

009 VENT/DRAIN LINE. P-1065

010 SODIUM PENTABORATE FROM 3-HCB- 150 150 10 TO 6-HCB-11. P-1082

010 SODIUM PENTABORATE FROM 150 150 STORAGE TANK AOO1 TO 6-HCB-10.

P-1082

011 SODIUM PENTABORATE FROM 6-HCB- 150 150 11 TO PUMPS CO01A-A & C001 B-B.

P-1082

011 SLCPUMPSCOO1A-A&B-B 150 150 SUCTION FROM HCB-10 TO VALVES FOOlA&B. P-1 082

011.: SODIUM PENTABORATE FROM 150 150 VALVES FOOIA&B TO 3-HCB-011.

P-1082

SERVICE CONDITIONS

NORMAL MAXIMUM SYS.

PSIG TEMP PSIG TEMP PSIG TEMP NO.

150 150

S I

z E

THK. IN.

M A T

V 0 L

20 110 50 130 P11 18.000 0.25 SS

100 140 75 80 100 140 P11 0.750 0.15 SS

150 150 20 110 50 130 Pll 6.000 0.13 SS

150 150 20 110 50 130 Pll 20.000 0.25 SS

150 150 20 110 50 130 Pll 1.000 0.13 SS

150 150 20 110 50 130 Pll 20.000 0.25 SS

150 150 20 110 50 130 P1l 0.750 0.15 SS

60 110 150 120 C41 6.000 0.13 SS

60 110 150 120 C41 3.000 0.12 SS

30 110 150 120 C41 3.000 0.12 SS

30 110 150 120 C41 6.000 0.13 SS

30 110 150 120 C41 6.000 0.13

S U R

V T I

V T 2

V T 3

CODE OTHER EXEMPT EXAM REF.

NOTES

X IWC-1222(c)

X IWC-1222(a)

X IWC-1222(c)

NO ISI OR PT REQ. SEE NOTE 2

NO ISI OR PT REQ. SEE NOTE 2

X IWC-1222(c)

NO ISI OR PT REQ. SEE NOTE 2

X IWC-1222(c)

X IWC-1222(a)

X IWC-1222(a)

X IWC-1222(c)

X IWC-1222(c)SS

PAGE NO HCB 1

Page 2: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

LINE CLIAS HCB REVISION 13

SERVICE

LINE *CRITICAL SERVICES

NO. / P DWG NO.

012 CROSSTIE BETWEEN HCB-11.

P-1 082

013 SODIUM PENTABORATE DRAINS FROMHCB-11 TO HCB-14.

P-1 082

014 SODIUM PENTABORATE DRAIN HEADER FROM HCB-13 TO HBD-565.

P-1082

015 SODIUM PENTABORATE FROM PSV F029A & B TO HCB-1 1.

P-1082

016 MAKEUP WATER FROM HCD-16 TO HCB-11.

P-1082

017 VALVE BYPASS FROM HCD-17 TO HCB-16. P-1082

019 CHEMICAL WASTE FROM HCD-31 TP HCD-32. CTMT. PEN. #84. P-1094E

020 DRYWELL CHEMICAL WASTE FROM HCD-33 TO HCD-34. DRYWELL PEN. #364.

P-1094E

026 SUPPRESSION POOL MAKEUP FROM UPPER CONTAINMENT POOL TO HBB-162. P-1096

027 DRAIN FROM HBB-1 76 TO DRW.

P-1097

028 DRAIN FROM GBB-125 TO HCB-27.

P-1097

030 REACTOR WELL DRAIN TO HCC-39.

P-1088C

DESIGN RATING

SERVICE CONDITIONS S

NORMAL MAXIMUM SYS. Z

PSIG TEMP PSIG TEMP PSIG TEMP NO. E

150 150 30 110 150 120 C41 6.000

150 150 30 110 150 120 C41 1.000

150 150 30 110 150 120 C41 1.000

150 150 30 110 150 120 C41 2.000

150 150 30 110 150 120 C41 6.000

150 150 30 110 150 120 C41 1.000

150 150 30 135 35 135 P45 3.000

150 150 30 135 35 135 P45 1.500

20 125

150

150

190

200

500

150

THK. IN.

0.13

0.13

0.13

0.15

0.13

0.13

0.12

0.14

M V S V V VA T

SS

SS

SS

SS

SS

SS

SS

SS

0 U T T L R 1 2

X

X

X

X

X

X

9 80 9 80 E30 30.000 0.37 SS

5

5

30

196

300

110

35

35

80

196

350

150

E32

E32

G41

0.750

0.750

3.000

0.15

0.15

0.ý12

SS

SS

SS

T 3

CODE EXEMPT

IWC-1222(c)

IWC-1222(a)

IWC-1222(a)

IWC-1222(a)

IWC-1222(c)

IWC-1222(a)

IWC-1222(a)

IWC-1222(a)

X IWC-1222(c)

IWC-5230(e)

IWC-1222(d)

IWC-5222

IWC-1222(d)

IWC-5222

IWC-1222(d)

IWC-5222

OTHER

EXAM REF.

NOTES

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

OPEN ENDED PIPE

OPEN ENDED PIPE

OPEN ENDED PIPE

PAGE NO HCB 2

Page 3: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

LINE CLASS HCB

REVISION 13

SERVICE LINE *CRITICAL SERVICES NO. / P DWG NO.

032 SENSING LINE FOR SUPPRESSION POOL PRESSURE AND LEVEL. P-1096

033 SAMPLE LINE FROM DRYWELL TO DRYWELL HYDROGEN ANALYZER. P-1091

034 DRYWELL RADIATION MONITOR SAMPLE LINE FROM VALVE F591 TO F592 AT PEN. 109A & 444C. P-1110A

034 DRYWELL RADIATION MONITOR SAMPLE LINE FROM DRYWELL TO VALVE Q1 D23F591. P-1110A

035 INSTRUMENT PIPING TO DRYWELL AT PENETRATION #438A. P-1111A

036 INSTRUMENT PIPING TO CONTAINMENT AT PENETRATION #11OA. P-1111A

037 INSTRUMENT PIPING TO CONTAINMENT AT PENETRATION #1 10F. P-1111A

038 INSTRUMENT PIPING TO CONTAINMENT AT PENETRATION #1 10C. P-1111A

039 DRYWELL PRESSURE INSTRUMENTS. P-1078A

040 SENSING LINES FROM HBD-1389 AND HBD-1329 TO FT-N079A-F. P-1072B

041 PNEUMATIC AIR SUPPLY TO TV-530 AND TV-531. P-1 072B

DESIGN RATING

SERVICE CONDITIONS S

I

NORMAL MAXIMUM SYS. Z

SIG TEMP PSIG TEMP PSIG TEMP NO. E

50 350 5 135 50 350 E30 0.750

30 330 0 275 30 330 E61 0.750

50 375 2 150 30 330 M71 0.750

M

THK. A

IN. T

0.15 SS

0.15 SS

0.15 SS

V 0 L

SV V UT T R1 2

x

X

50 375 2 150 30 330 M71 0.750 0.15 SS

150

150

150

150

150

200

1

195

195

195

350

125

100

100

100

100

0

140

120

100

120

120

135

75

125

125

125

125

10

170

120

120

120

120

330

100

M61

M61

M61

M61

B33

P44

1.000

1.000

1.000

1.000

0.750

0.750

0.13

0.13

0.13

0.13

0.15

0.15

SS

SS

SS

SS

SS

SS

20 70 10 70 15 70 P44 0.750 0.15 SS

V T 3

CODE EXEMPT

IWC-1222(d)

IWC-1222(a)

IWC-1222(a)

IWC-1222(d)

IWC-5222

IWC-1222(a)

IWC-1222(a)

IWC-1222(a)

IWC-1222(a)

X IWC-1222(d)

IWC-1222(a)

IWC-1222(a)

OTHER

EXAM REF.

NOTES

ISI REQ. PT NOT REQ. SEE NOTE 4

OPEN ENDED PIPE

ISI REQ. PT NOT

REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

PAGE NO HCB 3

P•

Page 4: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS IS LINE LIST

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

LINE CLAo6, HCB REVISION 13

SERVICE

LINE *CRITICAL SERVICES

NO. / P DWG NO.

044 INSTRUMENT AIR FROM VALVE F003 TO 1-HCB-44. P-1 067A

044 INSTRUMENT AIR SUPPLY FROM 1.5-HBC-44 TO VALVE F006.

P-1067A

046 DRYWELL PRESSURE INSTRUMENT.

P-1078A

047 TEST CONNECTION LINES FOR VALVES F010 & F011.

P-1097

048 BORON SOLUTION MAKEUP FROM OUTSIDE CTMT.

P-1082

049 TEST CONNECTION FOR BORON MAKEUP FROM OUTSIDE CTMT.

P-1082

050 TEST CONNECTION FROM HCB-51.

P-1067A

051 INSTRUMENT AIR FOR D/W FROM HCD-536 TO HCD-533, D/W PENETRATION #335.

P-1067A

052 TEST CONNECTION FROM HCB-44 TO HCC-77.

P-1067A

DESIGN RATING

SERVICE CONDITIONS

NORMAL

PSIG TEMP PSIG TEMP

275 330 250 110

MAXIMUM SYS.

PSIG TEMP NO.

265 330 P53

275 330 250 110 265 330 P53

150 350

S

z E

1.500

THK. IN.

0.15

M A T

SS

1.000 0.13 SS

0 135 10 330 B33 0.750 0.15 SS

150 200 5 196 35 196 E32 0.750 0.15 SS

150 150 0 0 0 0 C41 2.000 0.15 SS

150 150 0 0 0 0 C41 0.750 0.15 SS

150 160 100 100 150 120 P53 0.750 0.15 SS

150 150 100 100 150 120 P53 2.000 0.15 SS

275 150 180 110 265 150 P53 0.750 0.15 SS

V 0 L

S V V U T T R 1 2

V T 3

CODE OTHER EXEMPT EXAM REF.

IWC-1222(a)

IWC-1222(a)

NOTES

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

X IWC-1222(d)

IWC-1222(d)

IWC-5222

IWC-1222(a)

IWC-1222(a)

IWC-1222(a)

IWC-1222(a)

IWC-1222(a)

OPEN ENDED PIPE

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ., SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

ISI REQ. PT NOT REQ. SEE NOTE 4

PAGE NO HCB 4

Page 5: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

SERVICE

LINE *CRITICAL SERVICES

NO. / P DWG NO.

001 REACTOR WELL WATER FROM SKIMMERS TO 4-HCC-1.

P-1088C

001 REACTOR WELL WATER FROM 3-HCC1 TO HEADER HCC-3.

P-1 088C

002 TRANSFER POOL WATER FROM SKIMMERS TO HEADER HCC-3.

P-1088C

003 FUEL POOL WATER HEADER FROM 6-HCC-003 TO VALVE F266.

P-1 088C

003 FUEL POOL WATER FROM VALVE F266 TO VALVE F044.

P-1088C

003 FUEL POOL WATER HEADER FROM HCC-2 TO 8-HCC-3. P-1088C

004 TRANSFER POOL SCUPPERS TO HEADER HCC-3.

P-1088C

005 REACTOR WELL DRAIN TO HCC-39.

P-1088C

006 REACTOR WELL DRAINS TO HCC-7.

P-1088C

007 REACTOR WELL DRAIN TO REFUELING WATER STORAGE TANK FROM DRAIN TO VALVE F215.

P-1088C

007 REACTOR WELL DRAINS TO REFUELING WATER STORAGE TANK, FROM VALVE F215 TO VALVE F201.

P-1088C

008 DRAIN FROM CASK STORAGE POOL TO VALVE F032.

P-1 088E

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

DESIGN RATING

SERVICE CONDITIONS

NORMAL MAXIMUM SYS. Qlft TM:AD D 'lI-- TIFPAP NO.

S I

z THK. IN.

M A T

1o5lr 150D D 110E5 150 G41i3.0000.12 S

15 150 5 110 5 150 G41 3.000 0.12 SS

15 150 5 110 5 150 G41 4.000 0.12 SS

15 150 5 110 5 150 G41 4.000 0.12 SS

15 150 5 110 5 150 G41 8.000 0.14 SS

15 150 5 110 5 150 G41 8.000 0.14 SS

15 150 5 110 5 150 G41 6.000 0.13 SS

15 150 5 110 5 150 G41 2.000 0.15 SS

85 150 30 110 80 150 G41 3.000 0.12 SS

85 330 50 110 80 150 G41 12.000 0.25 SS

85 150 30 110 80 150 G41 12.000 0.25 SS

85 150 30 110 80 150 G41 12.000 0.25

80 150 20 85 80 120 G41 12.000 0.25 0

V 0 L

S V V U T T R 1 2

V T 3

CODE OTHER EXEMPT EXAM REF.

LINE CLASS HCC REVISION 13

NOTES

X IWD-1220(a)(1

X IWD-1220(a)(i

X IWD-1220(a)(1

X IWD-1220(c)

X IWD-1220(c)

X IWD-1220(c)

X .' IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(c)

X IWD-1220(c)

X IWD-1220(c)

X IWD-1220(c)

SS

SS

PAGE NO HCC 1

DQIP- Tr-I•AD I)

Page 6: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

I,

APPENDIX A GGNS ISI LINE LIST

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

LINE CLASS HCC REVISION 13

SERVICE

LINE *CRITICAL SERVICES NO. / P DWG NO.

008 WATER FROM CASK STORAGE POOL FROM VALVE F032 TO VALVE F033. P-1088E

009 2 INCH LINE FROM 8-HCC-9 TO' CAP.

P-1088E

009 WATER FEED LINES TO SPENT FUELPOOL FROM HBC-39. P-1088E

011 TRANSFER CANAL WATER FROM HBC-293 TO DIFFUSER. P-1088E

012 CASK STORAGE POOL WATER FROM HBC-47 TO DIFFUSER. P-1088E

013 AUX. BLDG. POOL RETURN HEADER FROM CASK STORAGE POOL TO 8HCC-13. P-1088E

013 AUX. BLDG. POOL RETURN HEADER FROM 6-HCC-13 TO 10-HCC-13. P-1088E

013 AUX. BLDG. POOL RETURN HEADER FROM 8-HCC-13 TO VALVE F255. P-1088E

014 SPENT FUEL POOL WATER FROM SKIMMERS TO HEADER HCC-13. P-1088E

015 WATER FROM SPENT FUEL POOL SCUPPERS TO FUEL POOL DRAIN TANK A001. P-1088E

016 CONDENSATE FROM HBC-50 TO FUEL STORAGE POOL.

.P-1088C

DESIGN RATING

SERVICE CONDITIONS

NORMAL MAXIMUM SYS. Z

SIG TEMP PSIG TEMP PSIG TEMP NO. E

80 150 20 85 80 120 G41 12.000

80 150 50 105 75 150 G41 2.000

80 150 50 105 75 150 G41 8.000

80 150 50 105 75 150 G41 6.000

80 150 50 105 60 150 G41 6.000

15 150 5 125 10 150 G41 6.000

15

15

15

15

150

150

150

150

5

5

5

5

125

125

125

110

10

10

10

5

150

150

150

150

G41

G41

G41

G41

8.000

10.000

6.000

2.000

0.14

0.16

0.13

0.10

V 0 L

SS

SS

SS

SS

I

X

X

X

x

OTHER EXAM REF.

NOTES

M

THK. A

IN. T

0.25 SS

0.15 SS

0.14 SS

0.13 SS

0.13 SS

0.13 SS

IWD-1220(c)

IWD-1220(c)

IWD-11220(c)

IWD-1220(a)(1

A

80 150 40 100 60 130 G41 3.000 0.12 SS IWD-1220(a)(1

IWD-5222(e)

OPEN ENDED PIPE SEE NOTE 6

PAGE NO HCC 2

f

O

S V V V U T T T CODE R 1 2 3 EXEMPT

X IWD-1220(c)

IWD-1220(a)(1

IWD-5240

IWD-1220(c)

IWD-5240

IWD-1220(c)

IWD-5240

IWD-1220(c)

IWD-5240

X IWD-1220(c)

OPEN ENDED PIPE SEE NOTE 6

OPEN ENDED PIPE 'SEE NOTE 6

OPEN ENDED PIPE SEE NOTE 6

OPEN ENDED PIPE SEE NOTE 6

P•

Page 7: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

DESIGN RATING

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

SERVICE

LINE *CRITICAL SERVICES

NO. I P DWG NO.

017 CONDENSATE FROM HBC-51 TO REACTOR WELL.

P-1088C

019 TRANSFER CANAL WATER FROM SKIMMER TO HEADER HCC-13.'

P-1 088E

020 CASK STORAGE POOL WATER FROM SKIMMER TO HEADER HCC-1 3.

P-1088E

021 TRANSFER POOL WATER FROM HBC-209 TO DIFFUSERS.

P-1088C

021 FUEL STORAGE POOL WATER FROM HBC-209 TO DIFFUSERS.

P-1 088C

024 WATER HEADER FROM SPENT FUEL POOL TO 18-HCC-24.

P-1i088E

024 WATER HEADER FROM SPENT FUEL POOL FROM 20-HCC-24 TO HBC229. P-1088E

025 AUX. BLDG. PENETRATION #25 FROM HCD-10 TO HCD-9.

P-1065

026 WATER FROM HBC-208 TO SPENT FUEL POOL.

P-1088E

027 REACTOR WELL WATER FROM HBC294 TO DIFFUSERS.

P-1088C

028 CAPPED LINE FROM HCC-21.

P-1088C

028 CAPPED LINE FROM HBC-210 & HCC-36.

P-1088C

SERVICE CONDITIONS S

NORMAL MAXIMUM SYS. Z

SIG TEMP PSIG TEMP PSIG TEMP NO. E

80 150 40 100 60 130 G41 3.000

15 150 5 125 10 150 G41 6.000

15 150 5 125 10 150 G41 6.000

80

80

80

80

250

80

80

80

80

150

150

150

150

150

150

150

150

150

50

50

50

50

105

105

105

105

60 110

50 105

50 105

50 105

50 105

60

60

60

60

150

60

60

60

60

150

150

150

150

130

150

150

150

150

G41

G41

G41

G41

Pll

G41

G41

G41

G41

6.000

8.000

20.000

18.000

12.000

14.000

4.000

0.500

2.000

P•

M VSVVVOUTTT LR1 23

X

X

THK. IN.

0.12

0.13

0.13

0.13

0.14

0.25

0.25

0.25

0.25

0.12

0.14

0.15

A T

SS

SS

SS

SS

SS

SS

SS

IWD-1220(c)

IWD-5240

IWD-1220(a)(1

IWD-5222(e)

IWD-1220(a)(1

IWD-5222(0

IWD-1220(a)(1

IWD-5222(f)

OTHER EXAM REF.

X

X

SS

SS

SS

SS

Ss

LINE CLASS HCC REVISION 13

NOTES

OPEN ENDED PIPE SEE NOTE 6

CODE EXEMPT

IWD-1220(a)(1

IWD-5222(e)

IWD-1220(c)

IWD-1220(c)

IWD-1220(c)

IWD-5222(e)

IWD-1220(c)

IWD-5222(e)

IWD-1220(c)

IWD-1220(c)

PAGE NO HCC 3

OPEN ENDED PIPE SEE NOTE 6

OPEN ENDED PIPE SEE NOTE 6

NO ISI OR PT REQ. SEE NOTE 3

OPEN ENDED PIPE SEE NOTE 6

OPEN ENDED PIPE SEE NOTE 6

OPEN ENDED PIPE SEE NOTE 6

OPEN ENDED PIPE SEE NOTE 6

Page 8: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

SERVICE

LINE *CRITICAL SERVICES

NO. / P DWG NO.

032 CHEMICAL WASTE FROM HCD-51 TO MISC. CHEMICAL WASTE RECEIVER TANK.

P-1094C

033 INSTRUMENT AIR FROM ACCUMULATORS A001A, B, C & D TO VALVE CONTROL SYSTEM.

P-1077A P-1077D

034 INSTRUMENT AIR FROM ACCUMULATORS A002A, B, C & D TO VALVE CONTROL SYSTEM. P-1077A P-1077D

035 CRW DRAIN AND TEST CONNECTION LINE FROM HCC-7. P-1088C

035 CRW DRAIN AND TEST CONNECTION.

P-1088C

036 FUEL POOL WATER FOR REACTOR WELL FROM HBC-210 TO HCC-37.

P-1088C

037 FUEL POOL WATER FOR REACTOR WELL FROM HCC-36 TO DIFFUSERS. P-1088C

039 DRAIN LINE FROM REFUELING CAVITY TO HCC-7.

P-1088C

040 MAKEUP WATER FROM JCD-29 TO JCD-30. AUX. BLDG. PENETRATION

P-0033B

042 TEST CONNECTION FROM HCC-3.

P-1088C

043 DRYWELL HEAD RING DRAIN TO HCC-39.

P-1088C

DESIGN RATING

SERVICE CONDITIONS S

NORMAL MAXIMUM SYS. z

PSIG TEMP PSIG TEMP PSIG TEMP NO. E

150 150 20 40 30 130 P45 3.000

THK. IN.

0.12

M A T

SS

V 0 L

150 150 100 105 150 120 B21 1.000 0.13 SS

150 150 100 105 150 120 B21 1.000 0.13 SS

85 330

85

80

330

150

50 110 80 150 G41 2.000 0.15 SS

50 110

60 140

80

60

150

150

G41

G41

0.750

12.000

0.15

0.25

S V V V U T T T R 1 2 3 CODE OTHER

EXEMPT EXAM REF.

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

IWD-1220(c)

IWD-5222(e)

IWD-1220(c)

IWD-5222(e)

X IWD-1220(a)(1

SS

SS

80 150 60 140 60 150 G41 12.000 0.25 SS

85 150 30 110 80 150 G41 3.000 0.12 SS

100 100 45 65 55 80 P21 4.000 0.12 SS

15

85

150

150

5 110

30 100

5

80

150

150

G41

G41

0.750

2.000

0.15

0.15

SS

SS

APPENDIX A GGNS ISI LINE LIST

OPEN ENDED PIPE SEE NOTE 6

OPEN ENDED PIPE SEE NOTE 6

NO ISI OR PT REQ. SEE NOTE 3

X

X

IWD-1220(a)(1

IWD-1220(a)(1

PAGE NO HCC 4

LINE CLASS HCC REVISION 13

NOTES

NO ISI OR PT REQ. SEE NOTE 3

Page 9: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

SERVICE

LINE *CRITICAL SERVICES

NO. I P DWG NO.

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

DESIGN RATING

PSIG TEMP

047 AIR INLET LINE FRON NON-ADS AIR 225 330

ACCUMMULATORS TO PSV F125.

P-1077C

047 AIR INLET LINE FROM ADS VALVE AIR 225 330 ACCUMULATORS PSV F125.

P-1077C

225 330048 AIR INLET LINE FROM ADS VALVE AIR ACCUMULATOR A003 TO PSV F124.

P-1077C

048 AIR INLET LINE FROM VALVE F125C&G FOR ACCUM. A004S&J.

P-1077C

049 A/S FROM ADS VALVES AIR RECEIVERS TO ADS ACCUMULATORS HEADER. P-1077C

049 A/S FROM 2-HCC-49 AND JCD-104 TO NON-ADS ACCUMMULATORS. P-1077C

049 A/S TO ADS ACCUMMULATORS FROM 2-HCC-049 TO ACCUMMULATORS.

P-1077C

050 FROM JCD-107 AND JCD-106 TO AIR ACCUMULATOR.

P-1077A P-1077D

051 AIR ACCUMMULATOR DRAINS. NON-ADS ACCUMMULATORS.

P-1077C

051 ADS ACCUMMULATOR DRAINS.

P-1077C

051 MSIV AIR ACCUMULATOR DRAINS.

P-1077A P-1077D

051 ADS AIR RECEIVER DRAINS.

P-1077C

052 MISC. VENTS AND DRAINS FOR FPC 80 150 AND CU SYSTEM.

P-1088E

SERVICE CONDITIONS S

NORMAL MAXIMUM SYS. Z

PSIG TEMP PSIG TEMP NO. E

180 100 190 330 B21 1.000

180 100 190 330 B21

180 100 190 330 B21

225 330 180 100 190 330 B21

225 330 180 130 190 330 B21

200 330

225 330

150 150

M THK. A

IN. T

0.13 SS

V 0 L

S U R

V T 1

1.000 0.13 SS

1.000 0.13 SS

1.000 0.15 SS

2.000 0.15 SS

100 130 190 240' B21 1.000 0.15 SS

180 130 190 330 B21 1.000 0.13 SS

100 105 150 120 B21 1.000 0.13 SS

200 330 180 130 190 240 B21 0.500 0.14 SS

225 330 180 130 190 330 B21 0.500 0.14 SS

200 330 180 130 190 240 B21

225 330 180 130 190 330 B21

0.500 0.13 SS

2.000 0.15 SS

20 125 80 150 G41 1.000 0.13 SS

V

LINE CLASS HCC REVISION 13

V

I T CODE 2 3 EXEMPT

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(a)(1

X IWD-1220(1)(a

X IWD-1220(a)(1

X IWD-1220(a)(1

PAGE NO HCC 5

OTHER EXAM REF.

NOTES

Page 10: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

,.1rID\11c"r I

LINE CLASS HCC REVISION 13

r�I� II�NI

SERVICE

LINE *CRITICAL SERVICES NO. / P DWG NO.

054 VENT LINE FROM HBC-389 TO SUPPRESSION POOL. P-1077E

055 SENSING LINE FOR INSTRUMENTS IP41-FT-NO18A & B. P-1061A

056 AIR FROM 36"X 36"DUCT 125 150 BLANKED.

P-0049

057 AIR FROM 36" X 36" DUCT CAPPED. 125 150

P-0049

058 SENSING LINE FOR INSTRUMENTS 180 150 N016A & B.

P-1061A

059 INSTRUMENT AIR FROM 1/2-HCC-59 225 330 TO VALVES F130A & B. P-1077C

059 INSTRUMENT AIR FROM HCB-44 TO 2- 225 330 HCC-59.

P-1067A P-1077C

059 INSTRUMENT AIR FROM VALVES 225 330 F130A & B TO ADS VALVES AIR RECEIVERS.

P-1077C

RATING CONDITIONS SM IM

NORMAL MAXIMUM SYS. Z THK. A

PSIG TEMP PSIG TEMP PSIG TEMP NO. E IN. T

150 150 10 80 15 150 B21 2.000 0.15 SS

180 150 90 130 165 140 P41 0.750 0.15 SS

.0 95 0 110 Z51 1.000 0.13 SS

0 95 0 110 Z51 1.000 0.13 SS

140 90 165 90 P41 0.750 0.15 SS

250 130 250 330 B21 2.000 0.15 SS

250 130 250 330 P53 0.750 0.15 SS

250 130 250 330 B21 2.000 0.15 SS

V 0 L

SVVV UTTT R1 23 CODE OTHER

EXEMPT EXAM REF.

IWD-1220(a)(1

IWD-5222(f)

NOTES

NO ISI OR PT REQ. SEE NOTE 1

OPEN ENDED PIPE SEE NOTE 6

NO ISI OR PT REQ. SEE NOTE 1

NO ISI OR PT REQ. SEE NOTE 1

X IWD-1220(a)(1

NO ISI OR PT REQ. SEE NOTE 1

NO ISI OR PT REQ SEE NOTE 1

X IWD-1220(a)(1

060 TEST CONNECTION FROM HCC-59.

P-1067A

061 MAKEUP WATER LINE FROM 1HCC-61 TO J.W. STANDPIPE.

P-1070A P-1070B

061 MAKEUP WATER LINE TO 1 1/2 HCC-61.

P-1070A P-1070B

225 330 250 110 265 330 P53 0.750 0.15 SS

100 100 65 65 75 85 P75 1.500 0.14 SS

100 100

NO ISI OR PT REQ. SEE NOTE 1

NO ISI OR PT REQ. SEE NOTE 2

NO ISI OR PT REQ. SEE NOTE 2

65 65 75 85 P75 1.000 0.13 SS

062 AJS BRANCH FROM HCC-49 (ADS A/S 225 330 TO F051D ACCUMULATOR (NON ADS).

P-1077C

180 130 190 330 B21 1.000 0.13 SS X IWD-1220(a)(1

PAGE NO HCC 6

Page 11: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

SERVICE LINE *CRITICAL SERVICES NO. / P DWG NO.

DESIGN RATING

PSIG TEMP P

063 A/S FROM SRV ACCUMMULATORS TO 200 330 NON-ADS ACCUMMULATORS.

P-1 077C

063 A/S FROM SRV ACCUMULATORS TO 225 330 ADS SRV SOLENOID VALVES.

P-1077C

064 WATER FROM HBC-41 TO SPENT 150 150 FUEL POOL.

P-1088E

065 DOMESTIC WATER FROM JDG-24 TO 250 150 JDG-54.

P-0034B

066 CONDENSATE FROM HCD-445 TO 250 150 12-HCC-66 WITH RUPTURE DISC.

P-1065

066 CONDENSATE FROM 10-HCC-066 TO 250 150 12-HCC-25.

P-1065

067 A/S TO AIR RECEIVERS. 150 120

P-1 102A

068 AIR RECEIVER TO SGT PANELS. 150 120

P-1102A

069 AIR RECEIVER DRAINS. 150 120

P-1 102A

070 FROM VALVES F034 & F035 TO AIR 150 120 RECEIVERS.

P-1 102A

074 VENT LINE FROM HBC-503. 15 100

P-1061A

074 VENT LINE FROM HBC-503. 15 100

P-1061A

077 ADS RECEIVER MAKEUP 190 150 CONNECTIONFROM HBC-52.

P-1067A

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

SERVICE CONDITIONS S

NORMAL MAXIMUM SYS. Z

=SIG TEMP PSIG TEMP NO. E

100 130 190 240 B21 2.000

180 130 190 330 B21

M

THK. A

IN. T

0.15 SS

V 0 L

S V U T R 1

2.000 0.15 SS

40 110 60 150 G41 3.000 0.12 SS

165 105 210 150 P66 3.000 0.12 SS

20 110 150 130 Pl1 10.000 0.25 SS

20 110 150 130 Pll 12.000 0.16 SS

100

100

100

100

1

1

90

90

90

90

70

70

150

150

150

150

-11

-11

120

120

120

120

90

90

T48

T48

T48

T48

P41

P41

1.000

1.000

1.000

1.000

0.750

2.000

0.13

0.13

0.13

0.13

0.15

0.15

SS

SS

Ss

Ss

SS

SS

170 110 190 150 P53 0.750 0.15 SS

V

LINE CLASS HCC

REVISION 13

VT T CODE 2 3 EXEMPT

X IWD-1220(a)(1

X IWD-1220(a)(1

OTHER

EXAM REF.

IWD-1220(a)(1

IWD-5222(e)

IWD-1220(a)(1

IWD-5222(f)

IWD-1220(a)(1

IWD-5222(o

IWD-1220(a)(1

NOTES

OPEN ENDED PIPE SEE NOTE 6

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 1

NO ISI OR PT REQ. SEE NOTE 1

NO ISI OR PT REQ. SEE NOTE 1

NO ISI OR PT REQ. SEE NOTE 1

OPEN ENDED PIPE SEE NOTE 6 OPEN ENDED PIPE SEE NOTE 6

ISI REQ. PT NOT REQ. SEE NOTE 4

PAGE NO HCC 7

Page 12: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS IS[ LINE LIST

SERVICE

LINE *CRITICAL SERVICES

NO. / P DWG NO.

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

DESIGN RATING

SERVICE CONDITIONS

NORMAL MAXIMUM SYS.

PSIG TEMP PSIG TEMP PSIG TEMP NO.

S I

z E

M THK. A

IN. T

VSVVV OUTTT LR1 23 CODE

EXEMPTOTHER

EXAM REF.

LINE CLASS HCC REVISION 13

NOTES

PAGE NO HCC 8

Page 13: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

SERVICE

LINE *CRITICAL SERVICES

NO. / P DWG NO.

001 SSW LOOPS A&B RETURN HEADERS 180 150 FROM HNC-2 TO SSW COOLING TOWER SPRAY NOZZLES

P-1061A

002 SSW LOOPS A&B RETURN HE4DERS 180 150 FROM HNC-3 TO HNC-1

P-1 061A

003 SSW LOOPS A&B RETURN HEADERS 180 150 FROM HNC-4 TO HNC-2

P-1061A

004 SSW LOOPS A&B RETURN HEADERS 180 150 FROM HBC-82 TO HNC-3

P-1061A

SERVICE CONDITIONS

NORMAL MAXIMUM SYS.

PSIG TEMP PSIG TEMP PSIG TEMP NO.

90 130 165 140 P41

90 130 165 140 P41

90 130 165 140 P41

90 130 165 140 P41

S I Z E

THK. IN.

1.500

4.000

12.000

16.000

M A T

CS

CS

CS

CS

V S O U L R

V T 1

V V T T 2 3

CODE OTHER EXEMPT EXAM REF.

X IWD-1220(a)(1

X IWD-1220(a)(1

X

XX

IWD-5222(f)

LINE CLASS HNC REVISION 13

NOTES

FLOW VERIFICATION REQUIRED IN LIEU OF HYDRO, IWD5222(e)

FLOW VERIFICATION REQUIRED IN LIEU OF HYDR•O, IWD5222(e)

FLOW VERIFICATION REQUIRED IN LIEU OF HYDRO, IWD5222(e)

FLOW VERIFICATION REQUIRED IN LIEU OF HYDRO, IWD5222(e)

PAGE NO HNC 1

APPENDIX A GGNS ISI LINE LIST

DESIGN RATING

Page 14: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

SERVICE

LINE *CRITICAL SERVICES NO. / P DWG NO.

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

DESIGN RATING

SERVICE CONDITIONS

NORMAL MAXIMUM SYS.

PSIG TEMP PSIG TEMP PSIG TEMP NO.

S I

Z E

M

THK. A

IN. T

V S V V V 0 U T T T L R 1 2 3 CODE

EXEMPT

LINE CLASS MSA

REVISION 13

OTHER

EXAM REF.

NOTES

001 MAIN STEAM LINE FROM RPV NOZZLE TO FIRST ELBOW.

P-1077A P-1077D

001 FROM MAIN STEAM LINE TO MAIN STEAM RELIEF VALVE FLANGE.

P-1077A P-1077D

002 MAIN STEAM LINE FROM FIRST ELBOW TO FIRST ISOLATION VALVE P-1077A P-1077D

003 MAIN STEAM LINE FROM FIRST ISOLATION VALVE TO SECOND ISOLATION VALVE.

P-1077A P-1077D

1250 575 1060 555 1100 560 B21 28.000 1.50 CS X X

1250 575 1060 555 1100 560 B21 8.000 0.52 CS X X

1250 575 1060 555 1100 560 B21 28.000 1.42 CS X X

1250 575 1060 555 1100 560 B21 28.000 1.42 CS X X

X

X

X

X

LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

PAGE NO MSA 1

Page 15: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

LINE CLASS MSC REVISION 13

SERVICE

LINE *CRITICAL SERVICES NO. I P DWG NO.

DESIGN RATING

SERVICE CONDITIONS

.NORMAL MAXIMUM SYS.

PSIG TEMP PSIG TEMP PSIG TEMP NO.

S

z THK. E IN.

M V S V V V A O U T T T T L R 1 2 3

CODE OTHER EXEMPT EXAM REF.

001 MAIN STEAM RELIEF VALVE DISCHARGE SPOOL PIECE FROM VALVE DISCHARGE TO FLANGE.

P-1 077E

570 470 550 470 550 480 B21 10.000 0.36 CS NO ISI OR PT REQ., SEE NOTE I

PAGE NO MSC 1

NOTES

Page 16: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

SERVICE

LINE *CRITICAL SERVICES

NO. / P DWG NO.

001 REACTOR RECIRC. SUCTION FROM RPV TO RECIRC. PUMP INLET.

P-1078A P-1078E

002 REACTOR RECIRC. DISCHARGE FROM PUMP OUTLET TO VAL\4E F067.

P-1078A P-1078E

003 REACTOR RECIRC. DISCHARGE FROMVALVE F067 TO 24 X 16 REDUCER IN HEADER.

P-1078A P-1 078E

004 REACTOR RECIRC. DISCHARGE HEADER.

P-1078A P-1078E

005 REACTOR RECIRC. DISCHARGE RISER FROM HEADER TO RPV NOZZLES.

P-1078A P-1 078E

006 REACTOR RECIRC. PUMP INLET ANDDISCHARGE DECONTAMINATION DRAINS.

P-1078A P-1078E

007 REACTOR WATER TEST CONNECTION FROM RECIRC. PIPE TO VALVE F059.

P-1078A P-1078E

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

DESIGN RATING

SERVICE CONDITIONS

NORMAL MAXIMUM SYS.

PSIG TEMP PSIG TEMP PSIG TEMP NO.

1250 575 1060 528

1250 575 1060 528

1250 575 1060 528

1250 575 1060 528

1250 575 1060 528

1250 575 1060 528

1250 575 1060 528

1375 565 B33

1375 565 B33

S

Z E

THK. IN.

24.000 1.00

24.000 1.27

1375 565 B33 24.000 1.42

1375 565 B33

1375 565 B33

1375 565 B33

1100 560 B33

M A T

V 0 L

S U R

V T 1

SS X X

SS X X

SS X X

16.000 0.99 SS X X

12.000 0.70 SS X X

4.000

0.750

SS X X

SS

V T 2

X

X

X

V T 3

CODE OTHER EXEMPT EXAM REF.

VOL IGSCC

LINE CLASS RRA REVISION 13

NOTES

LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

VOL IdSCC LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

VOL IGSCC LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

VOL IGSCC LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

VOL IGSCC LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

X

X

X VOL IGSCC

X IWB-1220(b)(1

LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

LINE NUMBER ASSIGNED FOR ISI LINE LIST USE ONLY.

PAGE NO RRA 1

Page 17: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

APPENDIX A GGNS ISI LINE LIST

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

LINE CLASS SBB REVISION 13

SERVICE

LINE *CRITICAL SERVICES NO. / P DWG NO.

DESIGN RATING

DQIfl- TI:rIAD D

SERVICE CONDITIONS

NORMAL MAXIMUM SYS. Qltl' TrI-AD DO l(lr. TF:KA0 NO.

S

z E

M THK. A

IN. T

VSVVV OUTTT LR1 23 CODE OTHER

EXEMPT EXAM REF.

001 SPOOL PIECE # Q1M41GO01815. FROM VALVE F012 TO SCREEN.

P-1100A

002 SPOOL PIECE # Q1M41GO0380$. SPOOL PIECE FROM DRYWELL/CTMT.PURGE LINE TO VALVE F011. P-1 100A

003 SPOOL PIECE # Q1M41G003804. SPOOL PIECE FROM VALVE F035 TOCTMT. VENT EXHAUST FANS LINE.

P-1 100A

004 SPOOL PIECE # Q1M41GOO 1802. SPOOL PIECE FROM VALVE F034 TOSCREEN.

P-1100A

005 SPOOL PIECE # Q1M41GOO1814. SPOOL PIECE UPSTREAM OF VALVE E61F056.

P-1100B

006 SPOOL PIECE # QIM41GOO3801. SPOOL PIECE DOWNSTREAM OF VALVE E61F057. P-1 100B

15 185 0 100 0 100 M41 20.000 0.37 CS

15 185 0 100 0 100 M41 20.000 0.37 CS

15 185 0 100 0 150 M41 20.000 0.37 CS

15 185 0 100 0 150 M41 20.000 0.37 CS

15 185 0 100 0 150 M41 6.000 0.28 CS

15 185 0 100 0 150 M41 6.000 0.28 CS

IWC-1222(c)

IWC-1222(c)

IWC-1222(c)

IWC-1222(c)

IWC-1222(c)

IWC-1222(c)

ISI REQ. PT NOT REQ., SEE NOTE 4

ISI REQ. PT NOT REQ., SEE NOTE 4

ISI REQ. PT NOT REQ., SEE NOTE 4

ISI REQ. PT NOT REQ., SEE NOTE 4

ISI REQ. PT NOT REQ., SEE NOTE 4

ISI REQ. PT NOT REQ., SEE NOTE 4

PAGE NO SBB 1

NOTES

F 01 •l.• I Ii--lVl [ l •11 •,B I I--IVll [ •l I '•I I L.,.IVI !

Page 18: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX A GGNS ISI LINE LIST

LINE NO.

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

SERVICE *CRITICAL SERVICES

I P DWG NO.

001 SPOOL PIECE # QiM41G003812. SPOOL PIECE FROM VALVE F007 TOINLET STRUCTURE. P-1 IOOA

002 SPOOL PIECE # QIM41G003809, SPOOL PIECE BETWEEN VALVES F007 AND F008. P- 1100A

003 SPOOL PIECE # Q1M41G003810. SPOOL PIECE FROM VALVE F008 TOPLENUM.

P-1100A

004 SPOOL PIECE # Qi M41 G00381 1. SPOOL PIECE FROM VALVE F037 TOEXAUST STRUCTURE.

P-O1100A

005 SPOOL PIECE # Q1M41G003806. SPOOL PIECE BETWEEN VALVES F036 AND F037.

P-1100A

006 SPOOL PIECE # QIM41G003807. SPOOL PIECE UPSTREAM OF VALVE F036.

P-1100A

007 SPOOL PIECE # QIT42G004800. SPOOL PIECE DOWNSTREAM OF VALVE F019. P-1 104A

008 SPOOL PIECE # QIT42G004801. SPOOL PIECE UPSTREAM OF VALVE F020.

P-1 104A

009 SPOOL PIECE # Q1T42G005805. SPOOL PIECE DOWNSTREAM OF VALVE F01o.

P-1 104A

DESIGN RATING

SERVICE CONDITIONS

NORMAL MAXIMUM SYS.

PSIG TEMP PSIG TEMP PSIG TEMP NO.

S I

z E

M

THK. A IN. T

0 0 0 0 0 0 M41 20.000 0.37

0 0 0 0 0 0 M41 20.000 0.37

0 0 0 0 0 0 M41 20.000 0.37

0 0 0 0 0 0 M41 20.000 0.37

CS

CS

CS

CS

0 0 0 0 0 0 M41 20.000 0.37 CS

V 0 L

S V V V U T T T R 1 2 3

LINE CLASS SBC REVISION 13

CODE OTHER EXEMPT EXAM REF.

NOTES

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISt OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

0 0 0 0 0 0 M41 20.000 0.37 CS

5 150 0 95 0 100 T42 36.000 0.37 CS

5 150 0 95 0 100 T42 36.000 0.37 CS

5 150 0 95 0 100 T42 8.000 0.32 CS

PAGE NO SBC 1

Page 19: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF NUCLEAR STATION INSERVICE INSPECTION PROGRAM

SERVICE

LINE *CRITICAL SERVICES

NO. / P DWG NO.

010 SPOOL PIECE # Q1T42G005803. SPOOL PIECE UPSTREAM OF VALVE F012.

P-1 104A

011 SPOOL PIECE # Q1T42G005800. SPOOL PIECE UPSTREAM OF \tALVE F003.

P-1 104A

012 SPOOL PIECE # Q1T42G005802. SPOOL PIECE UPSTREAM OF VALVE F004.

P-1 104A

013 SPOOL PIECE # Q1T41G006800. SPOOL PIECE UPSTREAM OF VALVE F006.

P-1 103A

014 SPOOL PIECE# Q1T41G006801. SPOOL PIECE BETWEEN VALVES F006 AND F007.

P-1 103A

015 SPOOL PIECE# Q1T41G006802. SPOOL PIECE DOWNSTREAM OF VALVE F007. P-1 103A

SERVICE CONDITIONS

NORMAL MAXIMUM SYS.

PSIG TEMP PSIG TEMP PSIG TEMP NO.

5 150 0 95 0 100 T42

S I

z E

M

THK. A IN. T

8.000 0.32

5 150 0 110 0 110 T42 44.000 0.37

5 150 0 110 0 110 T42 44.000 0.37

CS

CS

CS

V 0 L

S V V V U T T T R 1 2 3

LINE CLASS SBC

REVISION 13

CODE OTHER EXEMPT EXAM REF.

NOTES

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

NO ISI OR PT REQ. SEE NOTE 3

0 0 0 0 0 0 T41 24.000 0.37 CS

0 0 0 0 0 0 T41 24.000 0.37 CS

0 0 0 0 0 0 T41 24.000 0.37 CS

PAGE NO SBC 2

APPENDIX A GGNS 151 LINE LIST

DESIGN RATING

Page 20: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX 13 PERIOD 1 EXAMS

Program Section No.: GGNS-M-489. I Revision No.: 13 Page No.: A

PAGE NO,

A

1

2

3

4

5

6

7

8

9

10

II

12

13

14

15

16

17

18

19

20

21 -o

22

23

24

REVISION STATUS SHEET

REVISION PAGE NO.

13 25

13 26

13 27

13 28

13 29

13 30

13 31

13 32

13 33

13 34

13 35

13 36

13 37

13 38

13 39

13 40

13

13

13

13

13

13

13

13

13

REVISION

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

Page 21: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B13 REACTOR PRESSURE VESSEL

Examination Category: B-A Code Class: 1

Item No: B01.011

ITEM ID DESCRIPTION

AA • C/SH SIDE

AB CISH-SH

AC C/SH-SH

AD C/SH-SH

Item No: B01.012

ITEM ID DESCRIPTION

BD L/SH-SH

BH L/SH-SH

BM LJSH-SH

BN L/SH-SH

Item No: B01.022

ITEM ID DESCRIPTION

DA MD/HD-HD

DB MD/HD-HD

DC MD/HD-HD

DD MD/HD-HD

Item No: B01.030

ITEM ID DESCRIPTION

AE C/SH-F

Examination Category: B-D Code Class: 1

GGNS-M-489.1

SIZE

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

SIZE

N/A

LINE NO.

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

LINE NO.

N/A

ISI DRAWING NO.

RPV-1 1-01

RPV-1 1-01

RPV-11-01

RPV-11-01

ISI DRAWING NO.

RPV-11-01

RPV-11-01

RPV-I 1-01

RPV-11-01

ISI DRAWING NO.

RPV-1 1-01

RPV-I 1-01

RPV-1 1-01

RPV-1 1-01

ISI DRAWING NO.

RPV-11-01

EXAM METHOD

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

Page No: I Revision: 13

NOTES

64

64

64

64

NOTES

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

NOTES

22,60

Page 22: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B13 REACTOR PRESSURE VESSEL

Item No: B03.090

ITEM ID DESCRIPTION

N02B-KA NZ

N02C-KA NZ

N02D-KA NZ

N02E-KA NZ

N03A-KA NZ

N03B-KA NZ

NO4A-KA NZ

N04B-KA NZ

NO6A-KA NZ

N07-KA NZ

N08-KA NZ

Item No: B03.100

ITEM ID DESCRIPTION

N02B-IR NIR

N02C-IR NIR

NO2D-IR NIR

N02E-IR NIR

N03A-IR NIR

N03B-IR NIR

N06A-IR NIR

N07-IR NIR

N08-IR NIR

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

ISI DRAWING NO.

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-1 1-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-1 1-01

RPV-I 1-01

RPV-11-01

RPV-11-01

ISI DRAWING NO.

RPV- 11-01

RPV-1 1-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-11-0,1

RPV-11-01

GGNS-M-489.1

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

Page No: 2 Revision: 13

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Page 23: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B13 REACTOR PRESSURE VESSEL

N09B-IR NIR

N16-IR NIR

Examination Category: B-F Code Class: 1

Item No: B05.010

ITEM ID DESCRIPTION

N02B-KB C/Z-SE

NO2C-KB C/Z-SE

N02D-KB C/Z-SE

N02E-KB C/Z-SE

N04A-KB C/Z-SE

N04B-KB C/Z-SE

N06A-KB C/Z-SE

N09B-KB C/Z-SE

Examination Category: B-G-i Code Class: 1

Item No: B06.010

ITEM ID DESCRIPTION

NUT 1-25 BG

Item No: B06.020

ITEM ID DESCRIPTION

STUD 1-25 BT

Item No: B06.030

ITEM ID DESCRIPTION

STUD 1-25 BT

STUD 26-50 BT

N/A N/A

N/A N/A

SIZE

12.0

12.0

12.0

12.0

12.0

12.0

12.0

04.0

SIZE

N/A

SIZE

N/A

SIZE

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A

RPV-11-01

RPV-I 1-01

ISI DRAWING NO.

RPV-11-01

RPV-I 1-01

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV-1 1-01

ISI DRAWING NO.

RPV- 11-0'4

RPV-11-01

GGNS-M-489.1

VOL

VOL

EXAM METHOD

VOL/SUR

VOIJSUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOLJSUR

VOL/SUR

EXAM METHOD

VT-i

EXAM METHOD

VOL

EXAM METHOD

VOL/SUR

VOI/SUR

Page No: 3 N/A

N/A

Revision: 13

NOTES

28

28

28

28

28

28

28

28

NOTES

N/A

NOTES

45,55

NOTES

45,56

45,56

Page 24: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B13 REACTOR PRESSURE VESSEL

STUD 51-76 BT

Item No: B06.040

ITEM ID DESCRIPTION

FLG LIG 1-25 THF

FLG LIG 26-50 THF

FLG LIG 5 1-76 THF

Item No: B06.050

ITEM ID DESCRIPTION

WASH. 1-25 BG

Examination Category: B-G-2 Code Class: 1

Item No: B07.010

ITEM ID DESCRIPTION

N07 NOZZLE BLT

Item No: B07.080

ITEM ID DESCRIPTION

CRD CAP SCREWS BLT

Examination Category: B-J Code Class: I

Item No: B09.011

ITEM ID DESCRIPTION

N03A-KB CIZ-SE

N03B-KB C/Z-SE

N06A-KC C/SE-SX

N09B-KC C/SE-SX

Examination Category: B-N-1 Code Class: 1

N/A

SIZE

N/A

N/A

N/A

SIZE

N/A

SIZE

N/A

SIZE

N/A

SIZE

28.0

28.0

12.0

12.0

N/A

LINE NO.

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A

N/A

N/A

RPV-11-01

ISI DRAWING NO.

RPV-I 1-01

RPV- 11-01

RPV-I 1-01

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV- 11-05

ISI DRAWING NO.

RPV-1 1-01

RPV-11-01

RPV-11-01

RPV- 1 -01

GGNS-M-489.1

VOL/SUR

EXAM METHOD

VOL

VOL

VOL

EXAM METHOD

VT-I

EXAM METHOD

VT-I

EXAM METHOD

VT-1

EXAM METHOD

VOL/SUR

VOUSUR

VOL/SUR

VOL/SUR

Page No: 4

45,56

Revision: 13

NOTES

35

35

35

NOTES

N/A

NOTES

N/A

NOTES

58,59

NOTES

N/A

N/A

28

28

Page 25: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: B13 REACTOR PRESSURE VESSEL

Item No: B13.010

ITEM ID DESCRIPTION

B13DO01 - RPV RPV ACCESS SU

Examination Category: B-O Code Class: 1

Item No: B14.010

ITEM ID DESCRIPTION

CRD HOUSING WELDS CRD HSG. WELD

Examination Category: X-AUG Code Class: N/A

Item No: B07.080

ITEM ID DESCRIPTION

CRD CAP SCREWS BLT

Item No: N/A

ITEM ID DESCRIPTION

N04A-IR NIR

N04B-IR NIR

N04C-IR NIR

N04D-IR NIR

N04E-IR NIR

N04F-IR NIR

SIZE

N/A

SIZE

N/A

SIZE

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV-I 1-05

ISI DRAWING NO.

RPV- 11-05

ISI DFLAWING NO.

RPV-11-01

RPV-l 1-01

RPV-11-01

RPV-11-01

RPV-1 1-01

RPV-1 1-01

GGNS-M-489.1

EXAM METHOD

VT-3

EXAM METHOD

VOL OR SUR

EXAM METHOD

VOL

EXAM METHOD

VOUSUR

VOL/SUR

VOIJSUR

VOL/SUR

VOL/SUR

VOL/SUR

Page No: 5 Revision: 13

NOTES

25

NOTES

30,65

NOTES

62

NOTES

24

24

24

24

24

24

Page 26: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B13 REACTOR PRESSURE VESSEL GGNS-M-489.1 Page No: 6 Revision: 13

Examination Notes for System: B13

22 Examine 1/3 of circumference each period

24 Examination required per NUREG 0619, See Section 11 for details

25 Examination required at approximately 3 year intervals (every 2nd refuel outage)

28 GL 88-01, IGSCC Category C, Reference SIL-455, See Section 11 for details

30 May defer until end of interval

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

45 Reference SIL-055, See Section 11 for details

55 Examination performed when in place

56 Examination performed when removed (maximum of once per interval)

58 CRD bolting examination required only when connection is disassembled

59 Reference SIL-483, See Section 11 for details

60 May be examined during the 1st and 3rd period provided at least 50% is completed in the 1st period

62 See Section 9 for successive examination requirements

64 Examination may be deferred until RF- 11, Reference Relief Request 1-2-00001

65 Examine 10% of peripheral housings. There are 36 peripheral housings, 4 require examination.

Page 27: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B21 NUCLEAR BOILER SYSTEM

Examination Category: B-G-1 Code Class: I

Item No: B06.210

ITEM ID DESCRIPTIOIs

IB21FO28A BT

IB21FO28B BT

IB21FO28C BT

1B21F028D BT

1B21F022A BT

1B21F022B BT

1B21F022C BT

1B21F022D BT

Item No: B06.220

ITEM ID DESCRIPTIONx

1B21F028A FS

IB21FO28B FS

1B21F028C FS

IB21FO28D FS

1B21F022A FS

1B21F022B FS

1.B21 F022C FS

IB21FO22D FS

Item No: B06.230

ITEM ID DESCRIPTIOGI

1B21F028A BG

GGNS-M-489.1

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

LINE NO.

MSA-003

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

MSA-003

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

MSA-003

1SI DRAWING NO.

MS-08-01

MS-08-02

MS-08-03

MS-08-04

MS-I 1-03

MS-i 1-06

MS- 11-09

MS-i 1-12

ISI DRAWING NO.

MS-08-01

MS-08-02

MS-08-03

MS-08-04

MS-i 1-03

MS- 11-06

MS-11-09

MS-11-12

ISI DRAWING NO.

MS-08-01

Page No: 7 Revision: 13

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VT-I

VT-I

VT-1

VT-i

VT-I

VT-i

VT-I

VT-I

EXAM METHOD

VT-1

NOTES

31

31

31

31

31

31

31

31

NOTES

31,35

31,35

31,35

31,35

31,35

31,35

31,35

31,35

NOTES

31

Page 28: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B21 NUCLEAR BOILER SYSTEM

1B21F028B BG

1B21FO28C BG

1B21F028D BG

IB21F022A BG

IB21F022B BG

1B21F022C BG

IB21F022D BG

Examination Category: B-G-2 Code Class: 1

Item No: B07.050

ITEM ID DESCRIPTIO]

FLG CONN WI BLT

Item No: B07.070

ITEM ID DESCRIPTIOIW

1B21F032A

1B21F032B

IB21FO41A

1B21F041E

1B21F047A

1B21FO51A

IB21FO41B

IB21FO41F

IB21FO41K

"IB21FO51B

BLT

BLT

BLT

BLT

BLT

BLT

BLT

BLT

BLT

BLT

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A4

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

DBA-019

SIZE LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

DBA-013

DBA-013

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MS-08-02

MS-08-03

MS-08-04

MS-11-03

MS-I 1-06

MS- 11-09

MS-I1-12

ISI DRAWING NO.

MS-11-14

ISI DRAWING NO.

FW-08-02

FW-08-04

RV-11-01

RV-1 1-01

RV-1 1-01

RV-1 1-01

RV-i 1-05

RV-I 1-05

RV- 11-05

RV- 11-05,

GGNS-M-489.1

VT-1

VT-I

VT-1

VT-I

VT-i

VT-1

VT-I

EXAM METHOD

VT-i

EXAM METHOD

VT-I

VT-I

VT-i

VT-I

VT-i

VT-I

VT-1

VT-I

VT-I

VT-1

N/A MSA-001 RV-I 1-05 VT-I

Revision: 13Page No: 8

31

31

31

31

31

31

31

NOTES

N/A

NOTES

31

31

31

31

31

31

31

31

31

31

311IB21F051F BLT

Page 29: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: B21 NUCLEAR BOILER SYSTEM

IB21FO51K BLT

IB21FO41C BLT

1B21F041G BLT

IB21F047C BLT

1B21F047G BLT

1B21F047L BLT

IB21FO51C BLT

1B21FO41D BLT

1B21F047D BLT

1B21F047H BLT

IB21FO51D BLT

Examination Category: B-J Code Class: I

Item No: B09.011

ITEM ID DESCRIPTION

1B2 1G030W23 C/V-P

1B21G030W36 C/V-P

1B21G026WI C/P-H

1 B21G026W2 C/H-P

11B21G026W3 C/P-V

1B21G026W36 C/P-V

11B21G026W4 C/V-P

1B21G026W17 C/P-H

11B21G026W18 C/H-P

11B21G031W38 C/H-V

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

24.0

24.0

24.0

24.0

24.0

24.0

24.0

24.0

24.0

28.0

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

LINE NO.

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

MSA-003

RV- 11-05

RV-11-11

RV-11-11

RV-11-11

RV-1 1-11

RV-1 1-11

RV-11-11

RV-11-16

RV-I1-16

RV-11-16

RV-I 1-16

ISI DRAWING NO.

FW-08-02

FW-08-04

FW-l 1-01

FW-11-01

FW-11-01

FW-11-01

FW-1 1-01

FW- 11-07

FW- 11-07

MS-08-01

GGNS-M-489.1

VT-i

VT-1

VT-1

VT-I

VT-1

VT-1

VT-1

VT-I

VT-1

VT-1

VT-i

EXAM METHOD

VOL/SUR

VOL/SUR

VOIJSUR

VOL/SUR

VOL/SUR

VOL/SUR

VOLJSUR

VOI/SUR

VOUSUR

VOL/SUR

Revision: 13Page No: 9

31

31

31

31

31

31

31

31

31

31

31

NOTES

23

23

23

23

23

23

23

23

23

23

Page 30: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B21 NUCLEAR BOILER SYSTEM

1B21G3-AI-A C/P-E

1B21G001W4 C/E-V

1B21G12-AI-A C/P-H

1B21G3-B1-A C/P-E

1B2IG3-CI-A C/P-E

IB21G3-D1-A CIP-E

Item No: B09.012

ITEM ID DESCRIPTIO

IB21G001WI-L-U L

1B21G3-A1-A-LA-D L

1B21G3-AI-A-LB-D L

IB21GOOW6-L-U L

11B21G3-B11-A-L-A-D L

1B21G3-BI-A-L-B-D L

1B21GO01WI-L-U L

I B21G3-CI-A-L-A-D L

1B21G3-CI-A-L-B-D L

1B21G001W6-L-U L

IB21G3-D1-A-L-A-D L

IB21G3-D1-A-L-B-D L

Item No: B09.021

ITEM ID DESCRIPTIC

1B21GI53WI0 C/V-P

1B21G153W13 C/P-W

28.0

28.0

28.0

28.0

28.0

28.0

SIZE

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

SIZE

02.0

02.0

N

)N

MSA-001

MSA-002

MSA-003

MSA-001

MSA-001

MSA-001

LINE NO.

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

LINE NO.

DBA-021

DBA-021

MS-I 1-01

MS-11-03

MS- 11-03

MS-i 1-04

MS-I 1-07

MS-11-10

ISI DRAWING NO.

MS-11-01

MS-11-01

MS-11-01

MS-11-04

MS-i 1-04

MS- 1"-04

MS- 11-07

MS- 11-07

MS-i 1-07

MS-I1-10

MS-11-10

MS-11-10

ISI DRAWING NO.

MS-I 1-13,

MS-11-13

GGNS-M-489.1

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOLJSUR

VOL/SUR

VOL/SUR

VOUSUR

VOLJSUR

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

SUR

Revision: 13Page No: 10

N/A

23

23

N/A

N/A

N/A

NOTES

34

34

34

34

34

34

34

34

34

34

34

34

NOTES

N/A

N/A

Page 31: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: B21 NUCLEAR BOILER SYSTEM

1B21G153W21 C/P-V

1B21GI53W24 C/V-P

IB21GI53W25 C/P-V

1B21G153W9 C/P-V

Item No: B09.032

ITEM ID DESCRIPTIO

IB21G030-5-8-1 B

Item No: B09.040

ITEM ID DESCRIPTIO

1B21G116W15 SW

IB21Gl16WI7 SW

Examination Category: B-M-2 Code Class:

Item No: B12.050

ITEM ID DESCRIPTIC

1B21F032A VB

IB21F032B VB

IB21FO10A VB

1B21FO11A VB

1B21F010B VB

1B21FO1 1B VB

1B21F028A VB

1B21F028B VB

1B21F028C VB

1B21F028D VB

)N

N

1

)N

02.0

02.0

02.0

02.0

SIZE

01.5

SIZE

01.5

02.0

SIZE

24.0

24.0

24.0

24.0

24.0

24.0

28.0

28.0

28.0

28.0

DBA-019

DBA-019

DBA-019

DBA-021

LINE NO.

DBA-087

LINE NO.

DBA-025

DBA-025

LINE NO.

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

MSA-003

MSA-003

MSA-003

MSA-003

MS-I1-13

MS-11-13

MS-11-13

MS-I 1-13

ISI DRAWING NO.

FW-08-02

ISI DRAWING NO.

MS-08-05

MS-08-05

ISI DRAWING NO.

FW-08-02

FW-08-04

FW-1 1-01

FW-11-01

FW- 11-07

FW-1 1-07

MS-08-01

MS-08-02

MS-08-03,

MS-08-04

GGNS-M-489.1

SUR

SUR

SUR

SUR

EXAM METHOD

SUR

EXAM METHOD

SUR

SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

Revision: 13Page No: 11

N/A

N/A

N/A

N/A

NOTES

23

NOTES

23

23

NOTES

31

31

31

31

31

31

31

31

31

31

Page 32: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B21 NUCLEAR BOILER SYSTEM

IB21F022A VB

1B21F022B VB

1B21F022C VB

1B21F022D VB

IB21FO41A

1B21FO41E

1B21FO47A

IB21F051A

IB21FO41B

IB21FO41F

IB21FO41K

IB21FO51B

1B21FO51F

IB21FO51K

IB21F041C

1B21F041G

1B21F047C

1B21F047G

1B21F047L

1B21F051C

1B21FO41D

1B21F047D

1B21F047H

1B21FO51D

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

GGNS-M-489.1

28.0

28.0

28.0

28.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

MSA-002

MSA-002

MSA-002

MSA-002

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MS-I 1-03

MS-I 1-06

MS-i 1-09

MS-11-12

RV-11-01

RV-11-01

RV-11-01

RV-1 1-01

RV-1 1-05

RV- 11-05

RV-1 1-05

RV-11-05

RV- 11-05

RV-1 1-05

RV-1 1-11

RV-11-1.1

RV-11-11

RV-11-11

RV-1 1-11

RV-1 1-11

RV-1 1-16

RV-1 1-16

RV-11-16

RV-1 1-16

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

Revision: 13Page No: 12

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

Page 33: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B21 NUCLEAR BOILER SYSTEM

Examination Category: C-F-2 Code Class:

Item No: C05.051

ITEM ID DESCRIPTIO

1B21G030W20 C/E-P

Examination Category: D-A Code Class:

Item No: D01.020

ITEM ID DESCRIPTIC

Q1B21G022C01 A

Q1B21GO23R1O A

Q1B213G023R11 A

Q1132IG022H02 A

Q1B21G025A01 A

Examination Category: F-A Code Class:

Item No: F01.010

ITEM ID DESCRIPTIC

Q1B21GO26HO0 SC

Q1B21G163H01 SBI

Q1B21G163R02 SB2

Item No: FO1.030

ITEM ID DESCRIPTI(

Q1B21GO22CO1 SB1-A

Q1B21GO23R11 SB2-A

Q1B21GO25AO1 SB1-A

Examination Category: X-AUG Code Class:

GGNS-M-489.1

2

N

3

)N

1

)N

SIZE

24.0

SIZE

N/A

N/A

N/A

N/A

N/A

SIZE

18.0

01.5

01.5

SIZE

12.0

10.0

10.0

LINE NO.

DBB-073

LINE NO.

GBC-010

GBC-010

GBC-010

GBC-010

GBC-010

LINE NO.

DBA-013

DCA-003

DCA-003

LINE NO.

GBC-010

GBC-010

GBC-010

ISI DRAWfNG NO.

FW-08-01

ISI DRAWING NO.

RV-l 1-07

RV-11-08

RV-11-08

RV- 11-09

RV-11-15

ISI DRAWING NO.

FW- 11-02

SP-11-01

SP-11-01

ISI DRAWING NO.

RV- 11-07

RV-1 1-08

RV-11-15,

EXAM METHOD

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

N

N/A

Page No: 13 Revision: 13

NOTES

23

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

Page 34: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: B21 NUCLEAR BOILER SYSTEM

Item No: N/A

ITEM ID

1B21GO30DI00A-5

1B21G030W18

1B21G030W21

1 B21G030W22

1B21G030W33

1B21G030W67

1 B21G030W68

1 B21G030W70

1B21G230WI6

1B21G031-28-8-1

IB2 1G031-29-8-1

IB21G03 lW39

1B21G031W40

IB21G031W41

IB21G03lW20

1B21G8-A1-B-L-A-U

IB21G8-AI-B-L-B-U

1821G9-C1-B-L-A-U

IB21G9-C1-B-L-B-U

1B2IG001W4

1B21G11-D1-B-L-A-U

1B21GI I-DI-B-L-B-U

DESCRIPTION

CITS-P

C/V-P

C/P-P

C/P-V

C/P-P

C/P-V

C/V-P

C/TS-P

C/P-W

C/P-P

C/P-P

C/V-P

C/P-V

C/V-P

C/V-P

L

L

L

L

C/E-V

L

L

SIZE LINE NO.

30.0

24.0

24.0

24.0

24.0

24.0

24.0

24.0

01.5

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

28.0

DBB-073

DBB-141

DBB-073

DBB-073

DBB-073

DBB-073

DBB-073

DBB-073

DBA-087

DBB-023

DBB-023

DBB-023

DBB-023

DBB-023

DBB-023

MSA-002

MSA-002

MSA-002

MSA-002

MSA-002

MSA-002

MSA-002

ISI DRAWING NO.

FW-08-01

FW-08-01

FW-08-02

FW-08-02

FW-08-03

FW-08-04

FW-08-04

FW-08-04

FW-08-05

MS-08-01

MS-08-01

MS-08-01

MS-08-01

MS-08-01

MS-08-04

MS-11-02

MS-11-02

MS- 11-08

MS-I1-08

MS-I 1-09

MS-11-11

MS-11-11

GGNS-M-489.1

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

SUR

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

Page No: 14

NOTES

23,34

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23,34

23,34

23,34

23,34

23

23,34

23,34

Revision: 13

Page 35: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B21 NUCLEAR BOILER SYSTEM

IB21GO21WI0 C/H-P

IB21GO21Wl1 C/P-V

IB21G021W9 C/P-H

GGNS-M-489.1 Page No: 15

03.0

03.0

03.0

DBA-023

DBA-023

DBA-023

SD-08-01

SD-08-01

SD-1 1-02

SUR

SUR

SUR

Revision: 13

23

23

23

Examination Notes for System: B21

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

34 Examination includes that portion within the examination volume of tie intersecting circumferential weld (Reference Code Case N-524)

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

Page 36: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B33 REACTOR RECIRCULATION SYSTEM

Examination Category: B-G-I Code Class: I

Item No: B06.180

ITEM ID DESCRIPTION SIZE

IB33C001A BT N/A

1B33CO01B BT N/A

Item No: B06.190

ITEM ID DESCRIPTION SIZE

IB33COO1A FS N/A

IB33CO01B FS N/A

Item No: B06.200

ITEM ID DESCRIPTION SIZE

1B33C001A BG N/A

1B33C001B BG N/A

Examination Category: B-G-2 Code Class: 1

Item No: B07.050

ITEM ID DESCRIPTION SIZE

FLG (DOWNSTREAM) BLT N/A

FLG (UPSTREAM) BLT N/A

Item No: B07.060

ITEM ID DESCRIPTION SIZE

1B33C001A BLT N/A

IB33CO01B BLT N/A

GGNS-M-489.1

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-006

RRA-006

LINE NO.

RRA-002

RRA-002

ISI DRAWING NO.

RR- 11-02

RR- 11-09

ISI DRAWING NO.

RR-I 1-02

RR- 11-09

ISI DRAWING NO.

RR- 11-02

RR-11-09

ISI DRAWING NO.

RR- 11-09

RR- 11-09

ISI DRAWING NO.

RR- 11-02

RR- 11-09

EXAM METHOD

VOL

VOL

EXAM METHOD

VT-1

VT-I

EXAM METHOD

VT-I

VT-I

EXAM METHOD

VT-I

VT-I

EXAM METHOD

VT-I

VT-I

Page No: 16 Revision: 13

NOTES

31

31

NOTES

31,35

31,35

NOTES

31

31

NOTES

N/A

N/A

NOTES

31

31

Page 37: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: B33 REACTOR RECIRCULATION SYSTEM

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1B33F023A BLT N/A

IB33FO60A kBLT N/A

1B33F067A BLT N/A

1B33F023B BLT N/A

I B33F060B BLT N/A

1B33F067B BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

IB33G001W20 CIW-P 12.0

1B33G001W21 C/P-Z 12.0

1B33G001W22 C/W-P 12.0

1B33G001W23 C/P-Z 12.0

1B33G001W13 C/P-Z 12.0

1B33G001W19 C/P-Z 12.0

IB33G001W15 C/P-Z 12.0

IB33G001W17 C/P-Z 12.0

1B33G001W34 C/P-T 24.0

1B33GI0-BI-A C/T-P 16.0

1B33G10-B1-B CIT-P 16.0

1B33G024-51-11-1 C/P-E 04.0

1B33G024-51-11-2 C/E-P 04.0

LINE NO.

RRA-001

RRA-002

RRA-002

RRA-001

RRA-002

RRA-002

LINE NO.

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

RRA-003

RRA-004

RRA-004

DCA-001

DCA-001

ISI DRAWING NO.

RR-I 1-01

RR- 11-02

RR-I 1-03

RR-I 1-08

RR- 11-09

RR-1 1-10

ISI DRAWING NO.

RR-I 1-05

RR- 11-05

RR-11-05

RR-11-05

RR- 11-06

RR- 11-06

RR- 11-07

RR- 11-07

RR-11-11

RR-11-11

RR-11-11

RR-11-17,

RR-1 1-17

GGNS-M-489.1

EXAM METHOD

VT-1

VT-I

VT-I

VT-I

VT-i

VT-I

EXAM METHOD

VOL/SUR

VOL/SUR.

VOL/SUR

VOL/SUR

VOLJSUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

Page No: 17 Revision: 13

NOTES

31

31

31

31

31

31

NOTES

26

26

26

26

26

26

26

26

27

27

27

26

26

Page 38: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

{

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B33 REACTOR RECIRCULATION SYSTEM

1B33G024-51-11-3 C/P-T 04.0

1B33G024-51-11-4 C/T-P 04.0

Item No: B09.012

ITEM ID DESCRIPTION SIZE

IB33G001W20-L-D

1B33G001W22-L-D

IB33G11-A26-B-L-U

1B33G 1-A5 1-B-L-U

IB33G11-Al02-B-L-U

IB33G1 I -A77-B-L-U

1B33G 1-AI28-B-L-U

1B33G1 I-AI53-B-L-U

1B33G9-B I-B-L-U

1B33G10-BL-A-L-D

1B33G10-B1-B-L-D

Item No: B09.021

ITEM ID

I B33G024W67

Item No: B09.031

ITEM ID

IB33G10-B1-F

IB33G10-B1-G

lB33GI0-BI-H

Examination Category: B-L-2

L

L

L

L

L

L

L

L

L

L

L

DESCRIPTION

C/T-P

DESCRIPTION

B

B

B

Code Class: 1

DCA-001

DCA-001

LINE NO.

12.0 RRA-005

12.0

12.0

12.0

12.0

12.0

12.0

12.0

24.0

16.0

16.0

SIZE

02,0

SIZE

12.0

12.0

12.0

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

RRA-003

RRA-004

RRA-004

LINE NO.

DCA-024

LINE NO.

RRA-004

RRA-004

RRA-004

RR- 11-17

RR-I 1-17

1SI DRAWING NO.

RR-I 1-05

RR- 11-05

RR- 11-05

RR-1 1-05

RR-I 1-06

RR- 11-06

RR- 11-07

RR- 11-07

RR-11-10

RR-I 1-11

RR-11-11

ISI DRAWING NO.

RR-11-17

ISI DRAWING NO.

RR-11-11

RR-11-11

RR-11-11,

GGNS-M-489.1

VOL/SUR

VOL/SUR

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOIJSUR

EXAM METHOD

SUR

EXAM METHOD

VOL/SUR

VOLJSUR

VOUSUR

Page No: 18 26

26

NOTES

26,34

26,34

26,34

26,34

26,34

26,34

26,34

26,34

26,34

26,34

26,34

NOTES

N/A

NOTES

26

26

26

Revision: 13

Page 39: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: B33 REACTOR RECIRCULATION SYSTEM

Item No: B12.020

ITEM ID DESCRIPTION SIZE

IB33COOIA PC 24.0

IB33CO01B PC 24.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1B33F023A VB 24:0

1B33F060A VB 24.0

1B33F067A VB 24.0

1B33F023B VB 24.0

1B33F060B VB 24.0

1B33F067B VB 24.0

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1B33G002H305A SC-A 24.0

Q1B33G002H306A SC 24.0

Q1B33G024R04 SB1 04.0

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE

1B33COOIA SUCT SPLITTER N/A

1B33CO01B SUCT SPLITTER N/A

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-001

RRA-002

RRA-002

RRA-001

RRA-002

RRA-002

LINE NO.

RRA-001

RRA-001

DBA-0 11

LINE NO.

RRA-002

RRA-002

ISI DRAWING NO.

RR- 11-02

RR-1 1-09

ISI DRAWING NO.

RR-11-01

RR- 11-02

RR- 11-03

RR- 11-08

RR-11-09

RR-1 1-10

ISI DRAWING NO.

RR-11-01

RR-11-01

RR-11-19

ISI DRAWING NO.

RR- 11-02,

RR- 11-09

GGNS-M-489.1

EXAM METHOD

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

Page No: 19 Revision: 13

NOTES

31

31

NOTES

31

31

31

31

31

31

NOTES

N/A

N/A

N/A

NOTES

57

57

Page 40: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: B33 REACTOR RECIRCULATION SYSTEM GGNS-M-489.1 Page No: 20 Revision: 13

1B33G9-B I-B CIE-P 24.0 RRA-003 RR-1 1-10 VOL/SUR 27

Examination Notes for System: B33

26 GL 88-01, IGSCC Category A, See Section 11 for details

27 GL 88-01, IGSCC Category B, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

34 Examination includes that portion within the examination volume of the intersecting circumferential weld (Reference Code Case N-524)

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

57 Reference SIL-415, See Section 11 for details

! IL

Page 41: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: Cll CONTROL ROD DRIVE HYDRAULIC SYSTE

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE LINE NO.

IC11GI010-40 C/P-T 08.0 DVB-001

1CI1GIOIOW61 C/P-T 10.0 DVB-001

Examination Category: F-A Code Class: 2

Item No: F01.020

ITEM ID DESCRIPTION SIZE LINE NO.

QICI1ASP1O SB1 08.0 DVB-001

Q1CIIASP9 SBI 08.0 DVB-001

GGNS-M-489.1 Page No: 21

ISI DRAWING NO.

RD-i 1-01

RD-11-01

ISI DRAWING NO.

RD- 11-02

RD-I 1-02

EXAM METHOD

VOL/SUR

VOI-SUR

EXAM METHOD

VT-3

VT-3

Examination Notes for System: C11

Revision: 13

NOTES

N/A

N/A

NOTES

N/A

N/A

Page 42: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: C41 STANDBY LIQUID CONTROL SYSTEM

Examination Category: B-K-I Code Class: 1

Item No: B10.010

ITEM ID DESCRIPTION SIZE

IC41GI20Wl1 A N/A

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1C4IG124R04 SB1 01.5

QIC41G117RO1 SB2 01.5

GGNS-M-489.1 Page No: 22

LINE NO.

DCA-002

LINE NO.

DCA-002

DCA-002

ISI DRAWING NO.

LC- 11-08

ISI DRAWING NO.

LC- 11-07

LC- 11-09

EXAM METHOD

SUR

EXAM METHOD

VT-3

VT-3

Examination Notes for System: C41

Revision: 13

NOTES

N/A

NOTES

N/A

N/A

Page 43: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION SIZE

IE12FO41A OBLT N/A

IE12FO41B BLT N/A

1E12FO41C BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

IE12G012W40 C/P-V 20.0

1E12G012W41 C/V-P 20.0

1E12G012W49 C/P-V 20.0

1E12G015W52 C/E-H 14.0

IE12G015W53 C/P-H 14.0

Examination Category: B-K-1 Code Class: 1

Item No: B10.010

ITEM ID DESCRIPTION SIZE

IE12G012H19 A N/A

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1E12F019 VB 06.0

1E12F023 VB 06.0

IEI2F008 VB 20.0

GGNS-M-489.1

LINE NO.

DBA-029

DBA-028

DBA-038

LINE NO.

DBA-064

DBA-064

DBA-064

DBA-028

DBA-028

LINE NO.

DBA-064

LINE NO.

DBA-032

DBA-032

DBA-064

ISI DRAWING NO.

RH-11-03

RH- 11-04

RH- 11-05

ISI DRAWING NO.

RH-11-01

RH-1 1-01

RH-11-01

RH-11-10

RH-1i1-10

EXAM METfiOD

VT-I

VT-I

VT-I

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

ISI DRAWING NO. EXAM METHOD

RH-11-01 SUR

ISI DRAWING NO. EXAM METHOD

RH-08-08 VT-3

RH-08-08, VT-3

RH-I1-01 VT-3

Page No: 23

NOTES

31

31

31

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

NOTES

31

31

31

Revision: 13

Page 44: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

1E12F009 VB 20.0

1E12FO10 VB 20.0

IE12F039A VB 14.0

IE12FO41A VB 14.0

IE12F039B VB 14.0

1E12FO41B VB 14.0

1E12F039C VB 12.0

IE12F041C VB 12.0

IE12F042C VB 12.0

1E12F042A VB 14.0

1E12F042B VB 14.0

Examination Category: C-A Code Class: 2

Item No: C01.030

ITEM ID DESCRIPTION SIZI

1E12B0O1A-C-1 HD N/A

Examination Category: C-B Code Class: 2

Item No: C02.021

ITEM ID DESCRIPTION SIZI

1E12BOO1A-N4 NZ N/A

Item No: C02.022

ITEM ID

LE12BOO1A-N4

Examination Category: C-C

DESCRIPTION

NIR

Code Class: 2

SIZE

N/A

DBA-064

DBA-064

DBA-029

DBA-029

DBA-029

DBA-029

DBA-038

DBA-038

DBA-038

DBA-029

DBA-028

LINE NO.

GBB-018

LINE NO.

GBB-018

LINE NO.

GBB-018

RH-I 1-01

RH-11-01

RH- 11-03

RH- 11-03

RH- 11-04

RH- 11-04

RH- 11-05

RH- 11-05

RH- 11-08

RH- 11-09

RH-II-11

1SI DRAWING NO.

RH-07-19

ISI DRAWING NO.

RH-07-19

ISI DRAWING NO.

RH-07-19

GGNS-M-489.1

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL

EXAM METHOD

VOL/SUR

EXAM METHOD

VOL/SUR

Page No: 24

31

Revision: 13

31

31

31

31

31

31

31

31

31

31

NOTES

N/A

NOTES

N/A

NOTES

N/A

E

E

Page 45: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

Item No: C03.020

ITEM ID DESCRIPTION SIZE

QIE12G012H15 A N/A

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

1E12G009-8-7-1 C/P-E 18.0

IE12G009-9-7-1 C/P-E 18.0

1E12G009-9-7-2 C/E-P 18.0

1E12G009W22 C/E-P 18.0

IE12G009W5 C/P-E 18.0

1E12G009W6 C/E-R 18.0

1E12G021-9-8-1 C/E-P 06.0

1E12G014-15-8-6 C/E-P 14.0

IE12G014W23 C/V-P 18.0

1E12G014W30 C/P-V 14.0

Item No: C05.081

ITEM ID DESCRIPTION SIZE

1E12GO10-7-8-5 B 18.0

LINE NO.

GBB-018

LINE NO.

GBB-019

GBB-019

GBB-019

GBB-019

GBB-019

GBB-019

DBB-071

GBB-096

GBB-089

GBB-096

LINE NO.

GBB-073

ISI DRAWING NO.

RH-07-16

ISI DRAWING NO.

RH-07-22

RH-07-22

RH-07-22

RH-07-22

RH-07-22

RH-07-22

RH-08-02

RH-08-19

RH-08-19

RH-08-19

ISI DRAWING NO.

RH-08-12

GGNS-M-489.1

EXAM METHOD

SUR

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOI/SUR

VOL/SUR

VOUSUR

VOUSUR

VOL/SUR

VOUSUR

VOUSUR

EXAM METHOD

SUR

Examination Category: C-G

Item No: C06.010

ITEM ID

IE12CO02B-DH-2

Code Class: 2

DESCRIPTION

PC

SIZE

N/A

LINE NO.

GBB-074

ISI DRAWING NO.

RH-08-12,

EXAM METHOD

SUR

N/A GBB-074 RH-08-12 SUR

Page No: 25 Revision: 13

NOTES

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

23

N/A

N/A

N/A

NOTES

N/A

NOTES

N/A

1E 12C002B-DH-3 PC N/A

Page 46: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

IE12CO02B-DH-4 PC N/A

1E12CO02B-DH-5 PC N/A

Examination Category: F-A Code Class: 2

Item No: F01.020

ITEM ID DESCRIPTION SIZE

Q1E12GO13HO1 SA 18.0

Q1E12GO12H15 SC-A 18.0

Q1E12GO08ROI SBI 24.0

Q1E12GO15RO3 SB1 18.0

Q1E12GO15R20 SB2 18.0

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE

1E12G021-DO1l-A-1 C/T-P 06.0

1E12G021-9-8-2 C/P-E 06.0

1E12G021-9-8-3 C/E-P 06.0

1E12G021-9-8-4 C/P-E 06.0

1E12G021-9-8-5 C/E-P 06.0

IEI2G021W54 C/P-P 06.0

1E12G02IW62 C/P-E 06.0

1E12G021-DO11B-1 C/T-P 06.0

1E12G021-21-8-1 C/E-P 06.0

1E12G021-21-8-2 C/P-E 06.0

1E 12G021-21-8-3 C/E-P 06.0

GBB-074

GBB-074

LINE NO.

GBB-020

GBB-018

GBB-062

GBB-020

GBB-118

LINE NO.

DBB-071

DBB-071

DBB-071

DBB-071

DBB-071

DBB-071

DBB-071

DBB-088

DBB-088

DBB-088

DBB-088

RH-08-12

RH-08-12

ISI DRAWING NO.

RH-07-09

RH-07-16

RH-10-06

RH- 11-12

RH-I 1-17

ISI DRAWING NO.

RH-08-01

RH-08-02

RH-08-02

RH-08-02

RH-08-02

RH-08-02

RH-08-02

RH-08-03

RH-08-05

RH-08-05,

RH-08-05

GGNS-M-489.1

SUR

SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

Revision: 13Page No: 26

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

23

23

23

23

23

23

23

23

23

23

23

Page 47: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

1E12G021-21-8-4 C/P-E 06.0

IE12G021-21-8-5 C/E-P 06.0

1E12G021-21-8-6 C/P-E 06.0

IE12G021W66 C/P-P 06.0

DBB-088

DBB-088

DBB-088

DBB-088

RH-08-05

RH-08-05

RH-08-05

RH-08-05

GGNS-M-489.1 Page No: 27

VOL 23

VOL 23

VOL 23

VOL 23

Revision: 13

Examination Notes for System: E12

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page 48: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: E21 LOW PRESSURE CORE SPRAY SYSTEM

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1 E21F006 BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E21G002W13 C/V-P 14.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1E21F007 VB 14.0

1 E21F006 VB 14.0

IE21F005 VB 14.0

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

1E21GO01-8-9-1 C/F-P 16.0

Examination Category: C-G Code Class: 2

Item No: C06.010

ITEM ID DESCRIPTION SIZE

IE21CO01-DH-1 PC N/A

1E21COO1-DH-2 PC N/A

1E21CO01-DH-3 PC N/A

GGNS-M-489.1

LINE NO.

DBA-001

LINE NO.

DBA-001

LINE NO.

DBA-001

DBA-001

DBA-001

LINE NO.

GBB-007

LINE NO.

GBB-007

GBB-007

GBB-007

ISI DRAWING NO.

LP-11-02

ISI DRAWING NO.

LP- 11-02

ISI DRAWING NO.

LP-1 1-01

LP- 11-02

LP- 11-04

EXAM METHOD

VT-I

EXAM METHOD

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

ISI DRAWING NO. EXAM METHOD

LP-09-04 VOL/SUR

ISI DRAWING NO. EXAM METHOD

LP-09-04 SUR

LP-09-04 SUR

LP-09-04 SUR

Page No: 28 Revision: 13

NOTES

N/A

NOTES

N/A

NOTES

31

31

31

NOTES

N/A

NOTES

N/A

N/A

N/A

Page 49: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E21 LOW PRESSURE CORE SPRAY SYSTEM

IE21COO1-DH-4 PC N/A

1E21COO1-DH-5 PC N/A

1E21COO1-SB-1 PC N/A

GBB-007

GBB-007

GBB-007

LP-09-04

LP-09-04

LP-09-04

GGNS-M-489.1 Page No: 29

SUR N/A

SUR N/A

SUR N/A

Revision: 13

Examination Notes for System: E21

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page 50: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

CC

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E22 HIGH PRESSURE CORE SPRAY SYSTEM

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1E22F004 BLT N/A

1E22F005 BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E22G003W10 C/P-V 14.0

1E22G003W8 C/P-V 14.0

1E22G003W9 C/P-V 14.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

IE22F004 VB 12.0

1E22F005 VB 14.0

IE22F036 VB 14.0

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

1E22G001W5 CIP-V 16.0

1E22G001W73 C/F-F 16.0

Examination Category: C-G Code Class: 2

GGNS-M-489.1

LINE NO.

DBA-005

DBA-005

LINE NO.

DBA-005

DBA-005

DBA-005

LINE NO.

DBA-005

DBA-005

DBA-005

LINE NO.

DBB-008

DBB-008

ISI DRAWING NO.

HP-08-01

HP-I1-01

ISI DRAWING NO.

HP-11-01

HP-11-01

HP-1 1-01

ISI DRAWING NO.

HP-08-01

HP-i1-01

HP-I 1-01

ISI DRAWING NO.

HP-08-10

HP-08-10

EXAM METHOD

VT-I

VT-i

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

VOL/SUR

VOL/SUR

Page No: 30 Revision: 13

NOTES

31

31

NOTES

N/A

N/A

N/A

NOTES

31

31

31

NOTES

N/A

N/A

Page 51: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E22 HIGH PRESSURE CORE SPRAY SYSTEM

Item No: C06.010

ITEM ID DESCRIPTION SIZE

1E22C001-DH-1 PC N/A

1E22C001-DH-2 PC N/A

1E22C001-DH-3 PC N/A

1E22C001-DH-4 PC N/A

1E22C001-SB-3 PC N/A

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1E22GO03HO0 SBI 14.0

Item No: F01.020

ITEM ID DESCRIPTION SIZE

Q1E22G002R01 SB1 18.0

LINE NO.

DBB-008

DBB-008

DBB-008

DBB-008

DBB-008

LINE NO.

DBA-005

LINE NO.

HBB-019

ISI DRAWING NO.

HP-08-10

HP-08-10

HP-08-10

HP-08-10

HP-08-10

ISI DRAWING NO.

HP- 11-03

ISI DRAWING NO.

HP-08-13

GGNS-M-489.1

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

EXAM METHOD

VT-3

EXAM METHOD

VT-3

Examination Notes for System: E22

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page No: 31 Revision: 13

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

NOTES

N/A

/ 1

Page 52: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E32 MSIV LEAKAGE CONTROL SYSTEM GGNS-M-489.1 Page No: 32 Revision: 13

Examination Category: B-J Code Class: 1

Item No: B09.021

ITEM ID DESCRIPTION SIZE LINE NO. ISI DRAWING NO. EXAM METHOD NOTES

1E32G121W1 CIT-P 01.5 DBA-069 IV-08-01 SUR 23

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE LINE NO. ISI DRAWING NO. EXAM METHOD NOTES

IE32G121W32 C/P-V 01.5 DBA-069 IV-08-01 SUR 23

Examination Notes for System: E32

23 No Break Zone, See Section II for details

Page 53: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

.

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E51 REACTOR CORE ISOLATION COOLING SY

Examination Category: B-G-2 Code Class: I

Item No: B07.070

ITEM ID DESCRIPTION SIZE

IE51 F066 BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E51G001W40 C/V-E 06.0

1E51G001W505 C/V-P 06.0

IE51G001W506 C/P-V 06.0

1E51G001W502 C/V-E 06.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

IE51F064 VB 10.0

1E51F063 VB 10.0

IE51F066 VB 06.0

1E12F395 VB 06.0

1E12F394 VB 06.0

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

I E5 IG004-7-8-5 C/R-P 06.0

1 E5 IG004-7-8-6 C/T-P 10.0

GGNS-M-489.1

LINE NO.

DBA-030

LINE NO.

DBA-030

DBA-030

DBA-030

DBA-030

LINE NO.

DBA-024

DBA-024

DBA-030

DBA-030

DBA-030

LINE NO.

DBB-057

DBB-056

ISI DRAWING NO.

RI-11-04

ISI DRAWING NO.

RI- 11-04

RI-11-06

RI-i 1-06

RI-1 1-07

ISI DRAWING NO.

RI-08-01

RI-i 1-02

RI- 11-04

RI- 11-06

RI- 11-07

ISI DRAWING NO.

RI-08-01

RI-08-01

EXAM METHOD

VT-i

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL/SUR

VOL/SUR

Page No: 33 Revision: 13

NOTES

31

NOTES

N/A

N/A

N/A

N/A

NOTES

31

31

31

31

31

NOTES

23

23

Page 54: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: E51 REACTOR CORE ISOLATION COOLING SY

1E51G004W19 C/R-P 08.0

1E51G003W54 C/R-T 16.0

1E51G003W55 CIT-P 16.0

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

QIE51GOOR16 SB1 06.0

Item No: F01.020

ITEM ID DESCRIPTION SIZE

Q 1 E51G004RO4 SB1-A 06.0

Item No: F01.040

ITEM ID DESCRIPTION SIZE

Q1E51COOI-S1 EQS 06.0

Q1E51COO1-S2 EQS 06.0

Q1E51COO1-$3 EQS 06.0

Q1E51CO01-S4A EQS 06.0

Q1E51CO01-S4B EQS 06.0

QIE51COOI-$4C EQS 06.0

QIE51C001-S4D EQS 06.0

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE

1E51G004-7-8-4 C/T-R 10.0

1E51G004-7-8-7 C/P-T 10.0

DBB-087

HBB-053

HBB-053

LINE NO.

DBA-030

LINE NO.

DBB-057

LINE NO.

DBB-044

DBB-044

DBB-044

DBB-044

DBB-044

DBB-044

DBB-044

LINE NO.

DBB-056

DBB-056

RI-08-01

RI-08-19

RI-08-19

ISI DRAWING NO.

RI-11-05

ISI DRAWING NO.

RI-08-03

ISI DRAWING NO.

RI-08-12

RI-08-12

RI-08-12

RI-08-12

RI-08-12

RI-08-12

RI-08-12

ISI DRAWING NO.

RI-08-01,

RI-08-01

GGNS-M-489.1

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

EXAM METHOD

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL

VOL

Page No: 34

23

N/A

N/A

NOTES

N/A

NOTES

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

23

23

Revision: 13

Page 55: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: E51 REACTOR CORE ISOLATION COOLING SY

IE51G004-7-8-8 C/T-R 10.0 DBB-056

IE51G004-7-8-9 C/T-R 10.0 DBB-056

IE51GO04W11 C/P-E 06.0 DBB-057

IE51G004W29 C/R-P 08.0 DBB-087

1E51G004W8 C/F-P 10.0 DBA-024

1E51G004W9 C/P-V i0.0 DBA-024

1E51G004-8-8-1 C/E-E 06.0 DBB-057

1E51G004-8-8-2 C/E-P 06.0 DBB-057

IE51G004-15-8-1 C/E-E 08.0 DBB-087

1E51G004-15-8-3 C/E-P 08.0 DBB-087

1E51G004-15-8-4 C/P-E 08.0 DBB-087

1E51G004-15-8-6 C/P-P 08.0 DBB-087

IE51G004W20 C/E-P 08.0 DBB-087

1E51GO04W7 C/P-H 10.0 DBA-024

Examination Notes for System:

RI-08-01

RI-08-01

RI-08-01

RI-08-01

RI-08-01

RI-08-01

RI-08-02

RI-08-02

RI-08-05

RI-08-05

RI-08-05

RI-08-05

RI-08-05

RI-11-03

GGNS-M-489.1 Page No: 35

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

E51

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Revision: 13

( (

Page 56: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: G33 REACTOR WATER CLEANUP SYSTEM

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1G33G011-3-11-3 C/P-E 06.0

IG33G011-3-11-4 C/E-P 06.0

Item No: B09.021

ITEM ID DESCRIPTION SIZE

1G33G002W151 C/T-P 02.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1G33F004 VB 06.0

IG33F102 VB 06.0

1G33F001 VB 06.0

1G33F250 VB 06.0

1G33F251 VB 06.0

1G33F252 VB 06.0

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1G33G002H09 SC 04.0

QIG33GO11HOI SC 06.0

Examination Category: X-AUG Code Class: N/A

GGNS-M-489.1

LINE NO.

DBA-089

DBA-089

LINE NO.

DBA-012

LINE NO.

DBA-009

DBA-009

DBA-009

DBA-089

DBA-089

DBA-090

LINE NO.

DBA-010

DBA-089

ISI DRAWING NO.

CU-11-10

CU-I1-10

ISI DRAWING NO.

CU-I 1-07

ISI DRAWING NO.

CU-08-05

CU-I11-02

CU- 11-03

CU-II-10

CU-II-I1

CU-11-12

ISI DRAWING NO.

CU-I 1-04

CU- 11-09

EXAM METHOD

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

Page No: 36 Revision: 13

NOTES

23

23

NOTES

N/A

NOTES

31

31

31

31

31

31

NOTES

N/A

N/A

:

Page 57: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: G33 REACTOR WATER CLEANUP SYSTEM GGNS-M-489.1 Page No: 37 Revision: 13

Item No: N/A

ITEM ID DESCRIPTION SIZE LINE NO. ISI DRAWING NO. EXAM METHOD NOTES

1G33G002W174 C/V-P 06.0 DBC-002 CU-08-05 VOL 23

1G33G002W20 • C/P-V 06.0 DBA-009 CU-08-05 VOL 23

1G33G002-26-8-1 C/P-E 08.0 DBC-001 CU-08-06 VOL 23

IG33G002-26-8-2 C/E-P 08.0 DBC-001 CU-08-06 VOL 23

1G33G002-26-8-3 C/E-E 08.0 DBC-001 CU-08-06 VOL 23

IG33G002-26-8-4 C/P-E 08.0 DBC-001 CU-08-06 VOL 23

1G33G002-62-8-1 C/R-P 08.0 DBC-001 CU-08-06 VOL 23

IG33G002-62-8-3 C/E-P 08.0 DBC-001 CU-08-06 VOL 23

1G33G002-62-8-4 C/P-E 08.0 DBC-001 CU-08-06 VOL 23

IG33G002W175 C/P-R 06.0 DBC-001 CU-08-06 VOL 23

1G33G002W176 C/P-E 08.0 DBC-001 CU-08-06 VOL 23

IG33G002W22 C/E-P 08.0 DBC-001 CU-08-06 VOL 23

IG33G002W179 C/P-E 04.0 DBC-002 CU-08-07 SUR 23

IG33G010W7 C/V-P 06.0 DBZ-104 CU-1 1-05 VOL 23

IG33G010W8 C/V-P 06.0 DBB-104 CU-11-05 VOL 23

IG33G002W53 C/H-P 04.0 DBB-103 CU-I 1-08 SUR 23

1G33G002W54 C/P-V 04.0 DBB-103 CU-I 1-08 SUR 23

1G33G011-3-11-1 C/P-E 06.0 DBA-089 CU-11-10 VOL 23

IG33G011-3-11-2 C/E-P 06.0 DBA-089 CU-11-10 VOL 23

1G33G011W4 C/P-V 06.0 DBA-089 CU-11-10 VOL 23

1G33G012-26-11-1 C/P-E 06.0 DBB-140 CU-11-13 VOL 23,37

IG33G012-26-11-2 C/E-P 06.0 DBB-140 CU-11-13 VOL 23,37

Page 58: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 1

System: G33 REACTOR WATER CLEANUP SYSTEM

1G33G012-26-11-3 CIP-E 06.0

IG33G012W56 C/V-P 06.0

DBB-140

DBB-140

CU-i1-13

CU-11-13

GGNS-M-489.1 Page No: 38

VOL 23,37

VOL 23,37

Revision: 13

Examination Notes for System: G33

k

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

37 Maintained and ISI performed to Class I requirements, reference MAEC 87/0330

,

Page 59: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

K

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: P41 STANDBY SERVICE WATER SYSTEM

Examination Category: D-A Code Class: 3

Item No: D01.020

ITEM ID DESCRIPTION SIZE

Q1P41GO08C11 A N/A

Examination Category: F-A Code Class: 3

Item No: F01.030

ITEM ID DESCRIPTION SIZE

QIP41G001H01 SBI 20.0

QIP41GOO5RO1 SBI 12.0

QIP41GO05AO1 SB1-A 08.0

Q1P41GO08C1I SBI-A 10.0

Q1P41GO11C11 SBI-A 24.0

Item No: F01.040

ITEM ID DESCRIPTION SIZE

Q1P41C0O1A-SI EQS 24.0

Q1P41CO02-S1 EQS 10.0

GGNS-M-489.1

LINE NO.

HBC-084

LINE NO.

HBC-082

HBC-086

HBC-198

HBC-084

HBC-079

LINE NO.

HBC-079

HBC-083

ISI DRAWING NO.

WS-12-04

ISI DRAWING NO.

WS-07-03

WS-09-03

WS-09-06

WS-12-04

WS-YD-03

ISI DRAWING NO.

WS-YD-02

WS-YD-04

EXAM METHOD

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

Examination Notes for System: P41

Page No: 39 Revision: 13

NOTES

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

Page 60: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

K

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD I

System: P81 HPCS DIESEL GENERATOR SYSTEM

Examination Category: D-A

Item No: D01.010

GGNS-M-489.1 Page No: 40

Code Class: 3

ITEM ID

QIP81BOO1A-SIA

DESCRIPTION

A

SIZE

N/A

LINE NO.

HBC-083

ISI DRAWING NO.

HDG-12-01

EXAM METHOD

VT-3

Examination Notes for System: P81

Revision: 13

NOTES

Page 61: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX C PERIOD 2 EXAMS

PAGE NO.

A

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21 t _

22

23

24

25

Program Section No.: GGNS-M-489. I

Revision NO.: 13

Page No.: A

REVISION STATUS SHEET

REVISION PAGE NO.

13 26

13 27

13 28

13 29

13 30

13 31

13 32

13 33

13 34

13 35

13 36

13 37

13 38

13 39

13 40

13 41

13 42

13

13

13

13

13

13

13

13

13

REVISION

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

Page 62: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B13 REACTOR PRESSURE VESSEL

Examination Category: B-A Code Class: 1

Item No: B01.011

ITEM ID DESCRIPTION

AA C/SH SIDE

AB C/SH-SH

AC C/SH-SH

AD C/SH-SH

Item No: B01.012

ITEM ID DESCRIPTION

BB L/SH-SH

BC L/SH-SH

BE L/SH-SH

BI L/SH-SH

BP L/SH-SH

Item No: B01.022

ITEM ID DESCRIPTION

DH MD/HD-HD

DJ MD/HD-HD

DK MD/HD-HD

Item No: B01.030

ITEM ID DESCRIPTION

AE C/SH-F

Examination Category: B-D Code Class: 1

GGNS-M-489.1

SIZE

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

SIZE

N/A

LINE NO.

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

LINE NO.

N/A

ISI DRAWING NO.

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-11-01

ISI DRAWING NO.

RPV-I 1-01

RPV-1 1-01

RPV-11-01

RPV-11-01

RPV-11-01

ISI DRAWING NO.

RPV-1 1-01

RPV-11-01

RPV-I 1-01

ISI DRAWING NO.

RPV-1 1-01

Page No: 1 Revision: 13

EXAM METHOD VOL

VOL

VOL

VOL

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

VOL

VOL

EXAM METHOD

VOL

NOTES 64

64

64

64

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

NOTES

22,60

Page 63: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B13 REACTOR PRESSURE VESSEL

Item No: B03.090

ITEM ID DESCRIPTION

NOIB-KA NZ

N02F-KA NZ

N02G-KA NZ

N02H-KA NZ

N02J-KA NZ

N04C-KA NZ

N04D-KA NZ

N05A-KA NZ

N06B-KA NZ

N06C-KA NZ

N09A-KA NZ

Item No: B03.100

ITEM ID DESCRIPTION

NOIB-IR NIR

N02F-IR NIR

N02G-IR NIR

N02H-IR NIR

N02J-IR NIR

N04A-IR NIR

N04B-IR NIR

N04C-IR NIR

N05A-IR NIR

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

ISI DRAWING NO.

RPV-1 1-01

RPV-1 1-01

RPV-1 1-01

RPV-I1-01

RPV-11-01

RPV-11-01

RPV-l 1-01

RPV-11-01

RPV-11-01

RPV-I 1-01

RPV-11-01

ISI DRAWING NO.

RPV-11-01

RPV-1 1-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-I 1-01

RPV-11-01

RPV-11-(1

RPV-11-01

GGNS-M-489.1

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

Page No: 2 Revision: 13

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

24

24

24

N/A

Page 64: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B13 REACTOR PRESSURE VESSEL

N06B-IR NIR

N06C-IR NIR

N09A-IR NIR

Examination Category: B-F Code Class: 1

Item No: 1105.010

ITEM ID DESCRIPTION

NO 1B-KB C/Z-SE

N02F-KB C/Z-SE

N02G-KB C/Z-SE

N02H-KB C/Z-SE

N02J-KB C/Z-SE

N04C-KB C/Z-SE

N04D-KB C/Z-SE

N05A-KB C/Z-SE

N06B-KB C/Z-SE

N06C-KB C/Z-SE

Examination Category: B-G-1 Code Class: 1

Item No: B06.010

ITEM ID DESCRIPTION

NUT 26-50 BG

Item No: B06.020

ITEM ID DESCRIPTION

STUD 26-50 BT

N/A

N/A

N/A

SIZE

24.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

SIZE

N/A

SIZE

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

RPV-11-01

RPV-1 1-01

RPV-11-01

ISI DRAWING NO.

RPV-1 1-01

RPV-11-01

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-11-01

RPV-11-01

RPV-11-01

RPV-1 1-01

RPV-11-01

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV-1 1-01

GGNS-M-489.1

VOL

VOL

VOL

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOLJSUR

VOL/SUR

VOUSUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-I

EXAM METHOD

VOL

Revision: 13Page No: 3

N/A

N/A

N/A

NOTES

28

28

28

28

28

28

28

28

28

28

NOTES

N/A

NOTES

45,55

//

Page 65: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B13 REACTOR PRESSURE VESSEL

Item No: B06.030

ITEM ID DESCRIPTION

STUD 1-25 BT

STUD 26-50 4BT

STUD 51-76 BT

Item No: B06.040

ITEM ID DESCRIPTION

FLG LIG 1-25 THF

FLG LIG 26-50 THF

FLG LIG 51-76 THF

Item No: B06.050

ITEM ID DESCRIPTION

WASH. 26-50 BG

Examination Category: B-G-2 Code Class: 1

Item No: B07.010

ITEM ID DESCRIPTION

N08 NOZZLE BLT

Item No: B07.080

ITEM ID DESCRIPTION

CRD CAP SCREWS BLT

SIZE

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

SIZE

N/A

SIZE

N/A

SIZE

N/A

LINE NO.

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

ISI DRAWING NO.

RPV-1 1-01

RPV-I1-01

RPV-1 1-01

ISI DRAWING NO.

RPV-I 1-01

RPV-11-01

RPV- 11-01

ISI DRAWING NO.

RPV-I 1-01

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV- 11-05

GGNS-M-489.1

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VOL

VOL

VOL

EXAM METHOD

VT-I

EXAM METHOD

VT-I

EXAM METHOD

VT-I

Examination Category: B-J

Item No: B09.011

ITEM ID

Code Class: 1

DESCRIPTION EXAM METHOD NOTES

Page No: 4 Revision: 13

NOTES

45,56

45,56

45,56

NOTES

35

35

35

NOTES

N/A

NOTES

N/A

NOTES

58,59

i

ISI DRAMVING NO.SIZE LINE NO.

Page 66: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B13 REACTOR PRESSURE VESSEL

N03D-KB C/Z-SE

N05A-KC C/SE-SX

N06B-KC C/SE-SX

NO6C-KC C/SE-SX

NO9A-KC C/SE-SX

Examination Category: B-N-I Code Class: 1

Item No: B13.010

ITEM ID DESCRIPTION

BI3DOO1 - RPV RPV ACCESS S

Examination Category: B-O Code Class: 1

Item No: B14.010

ITEM ID DESCRIPTION

CRD HOUSING WELDS CRD HSG. WEI

Examination Category: X-AUG Code Class: N1

Item No: B07.080

ITEM ID DESCRIPTION

CRD CAP SCREWS BLT

Item No: N/A

ITEM ID DESCRIPTION

N04A-IR NIR

N04B-IR NIR

N04C-IR NIR

N04D-IR NIR

N04E-IR NIR

U

-D

/A

28.0

12.0

12.0

12.0

12.0

SIZE

N/A

SIZE

N/A

SIZE

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-11-01

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV- 11-05

ISI DRAWING NO.

RPV-1 1-05

ISI DRAWING NO.

RPV-I 1-01

RPV-I 1-01

RPV-11-01

RPV-1 1-01

RPV-11-01

GGNS-M-489.1

VOL/SUR

VOLJSUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

EXAM METHOD

VOL OR SUR

EXAM METHOD

VOL

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOI/SUR

VOUSUR

Revision: 13Page No: 5 N/A

28

28

28

28

NOTES

25

NOTES

30,65

NOTES

62

NOTES

24

24

24

24

24

Page 67: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B13 REACTOR PRESSURE VESSEL GGNS-M-489.1 Page No: 6 Revision: 13

N04F-IR NIR N/A N/A RPV-11-01 VOL/SUR 24

Examination Notes for System: B13

22 Examine 1/3 of circumference each period

24 Examination required per NUREG 0619, See Section 11 for details

25 Examination required at approximately 3 year intervals (every 2nd refuel outage)

28 GL 88-01, IGSCC Category C, Reference SIL-455, See Section 11 for details

30 May defer until end of interval

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

45 Reference SIL-055, See Section 11 for details

55 Examination performed when in place

56 Examination performed when removed (maximum of once per interval)

58 CRD bolting examination required only when connection is disassembled

59 Reference SIL-483, See Section 11 for details

60 May be examined during the 1st and 3rd period provided at least 50% is completed in the 1st period

62 See Section 9 for successive examination requirements

64 Examination may be deferred until RF-l 1, Reference Relief Request 1-2-00001

65 Examine 10% of peripheral housings. There are 36 peripheral housings, 4 require examination.

Page 68: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B21 NUCLEAR BOILER SYSTEM

Examination Category: B-G-i Code Class: 1

GGNS-M-489.1 Page No: 7 Revision: 13

Item No: B06.210

ITEM ID

IB21F028A

1B21F028B

1B21F028C

IB21F028D

IB21F022A

1B21F022B

1B21F022C

1 B21F022D

Item No: B06.220

ITEM ID

1B21F028A

1B21F028B

1B21F028C

1B21F028D

1B21F022A

1B21F022B

1B21F022C

1B21F022D

Item No: B06.230

ITEM ID

1B21F028A

DESCRIPTION

BT

BT

BT

BT

BT

BT

BT

BT

DESCRIPTION

FS

FS

FS

FS

FS

FS

FS

FS

DESCRIPTION

BG

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

LINE NO.

MSA-003

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

MSA-003

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

MSA-003

ISI DRAWING NO.

MS-08-01

MS-08-02

MS-08-03

MS-08-04

MS-1 1-03

MS-11-06

MS-11-09

MS-11-12

ISI DRAWING NO.

MS-08-01

MS-08-02

MS-08-03

MS-08-04

MS-11-03

MS- 11-06

MS-11-09

MS-11-12

ISI DRAWING NO.

MS-08-01

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VT-1

VT-1

VT-1

VT-1

VT-i

VT-1

VT-1

VT-1

EXAM METHOD

VT-1

NOTES

31

31

31

31

31

31

31

31

NOTES

31,35

31,35

31,35

31,35

31,35

31,35

31,35

31,35

NOTES

31

Page 69: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B21 NUCLEAR BOILER SYSTEM

1B21F028B BG

1B21F028C BG

1B21F028D BG

1B21F022A BG

1B21F022B BG

IB21FO22C BG

1B21F022D BG

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION

IB21FO32A BLT

1B21F032B BLT

IB2IFO41A BLT

IB21FO41E BLT

1B21F047A BLT

1B21FO51A BLT

IB21FO41B BLT

IB21FO41F BLT

IB21FO41K BLT

IB21FO51B BLT

1B21FO51F BLT

IB21FO51K BLT

1B21FO41C BLT

1B21FO4IG BLT

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

DBA-013

DBA-013

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MS-08-02

MS-08-03

MS-08-04

MS-i 1-03

MS- 11-06

MS-I 1-09

MS-11-12

IS1 DRAWING NO.

FW-08-02

FW-08-04

RV-11-.01

RV-11-01

RV-1 1-01

RV-1 1-01

RV- 11-05

RV- 1i-05

RV- 11-05

RV- 11-05

RV- 11-05

RV- 11-05

RV-11-11l

RV-1 1-11

GGNS-M-489.1

VT-I

VT-I

VT-I

VT-i

VT-i

VT-I

VT-i

EXAM METHOD

VT-I

VT-I

VT-i

VT-I

VT-i

VT-i

VT-I

VT-I

VT-i

VT-I

VT-I

VT-i

VT-i

VT-I

Revision: 13Page No: 8

31

31

31

31

31

31

31

NOTES

31

31

31

31

31

31

31

31

31

31

31

31

31

31

(

Page 70: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B21 NUCLEAR BOILER SYSTEM

1B21F047C BLT

IB21FO47G BLT

1B21F047L BLT

IB21F051C BLT

1B21FO41D BLT

1B21F047D BLT

1B21F047H BLT

1 B21F051D BLT

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID

1B21G026-3-11-2

1B21G026-3-11-4

11B21G026W6

1B21G026-4-11-2

1B21G026W39

11B21G026W13

11B21G026W19

1B21G026W20

1B21G026W37

1B21GO31WI

1B21G12-B1-A

IB21G00IW9

1B21G12-D1-A

DESCRIPTION

C/T-R

C/T-P

C/V-P

C/T-R

C/T-P

C/P-Z

C/P-V

C/V-P

C/P-V

C/H-V

C/P-H

C/E-V

C/P-H

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-00 1

MSA-001

SIZE LINE NO.

24.0

12.0

24.0

18.0

12.0

12.0

24.0

24.0

24.0

28.0

28.0

28.0

28.0

DBA-013

DBA-017

DBA-013

DBA-013

DBA-017

DBA-017

DBA-013

DBA-013

DBA-013

MSA-003

MSA-003

MSA-002

MSA-003

RV-11-11

RV-11-11

RV-11-11

RV-1 1-11

RV-1 1-16

RV-11-16

RV-I 1-16

RV-1 1-16

ISI DRAWING NO.

FW- 11-02

FW-11-02

FW- 11-02

FW- 11-03

FW- 11-03

FW- 11-04

FW-I 1-07

FW-1 1-07

FW-1 1-07

MS-08-02

MS- 11-06

MS-11-12

MS-11-12

GGNS-M-489.1

VT-1

VT-1

VT-1

VT-I

VT-1

VT-1

VT-I

VT-1

EXAM METHOD

VOL/SUR

VOLJSUR

VOL/SUR

VOIJSUR

VOL/SUR

VOL/SUR

VOUSUR

VOL/SUR

VOL/SUR

VOL/SUR

VOLUSUR

VOL/SUR

VOL/SUR

Revision: 13Page No: 9

31

31

31

31

31

31

31

31

NOTES

N/A

N/A

23

N/A

N/A

N/A

23

23

23

23

23

23

23

Page 71: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B2l NUCLEAR BOILER SYSTEM

Item No: B09.012

ITEM ID DESCRIPTIC

IB21GI1-D1-B-L-A-U L

IB21G11-D1-B-L-B-U L

Item No: B09.021

ITEM ID DESCRIPTIC

1B21G230-02-08-10 C/P-T

1 B21G230-02-08-15 C/T-P

IB21G116-IG-08-10 C/T-P

1B21G116-1G-08-5 C/P-T

1B21G116W20 C/P-T

IB21G117-IF-08-11 C/P-E

1B21G117-IF-08-12 C/E-P

IB21G117W19 C/P-T

1B21G117W20 C/T-P

1B21G114-1G-08-10 C/T-P

IB21G114-1G-08-5 C/P-T

IB2IG1G15-1G-08-11 C/P-E

1B21G115-1G-08-12 C/E-P

1B21G115-1G-08-13 C/P-T

1B21G115-1G-08-14 C/T-P

1B21G115W20 C/T-P

Item No: B09.032

ITEM ID

iN

DESCRIPTION

SIZE

28.0

28.0

SIZE

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

0o05

01.5

01.5

01.5

01.5

01.5

01.5

LINE NO.

MSA-002

MSA-002

LINE NO.

DBA-087

DBA-087

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

SIZE LINE NO.

ISI DRAWING NO.

MS-11-11

MS-11-11

ISI DRAWING NO.

FW-08-05

FW-08-05

MS-08-05

MS-08-05

MS-08-05

MS-08-06

MS-08-06

MS-08-06

MS-08-06

MS-08-07

MS-08-07

MS-08-08

MS-08-08

MS-08-08

MS-08-08

MS-08-08

ISI DRAWING NO.

GGNS-M-489.1

EXAM METHOD

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

EXAM METHOD

Page No: 10

NOTES

23,34

23,34

NOTES

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

NOTES

Revision: 13

•b

N

Page 72: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B21 NUCLEAR BOILER SYSTEM

IB21G030-18-8-1 B

Item No: B09.040

ITEM ID DESCRIPTIO

IB21GI14WI SW

1B21G115W17 SW

1B21G154W1l SW

Examination Category: B-K-1 Code Class:

Item No: BI0.010

ITEM ID DESCRIPTIO

1B21G11-DI-P A

Examination Category: B-M-2 Code Class:

Item No: B12.050

ITEM ID DESCRIPTIO

1B21F032A VB

1B21F032B VB

IB21FO10A VB

IB21FO11A VB

IB21FO1OB VB

1B21FO11B VB

1B21F028A VB

1B21F028B VB

1B21F028C VB

1B21F028D VB

01.5

SIZE

02.0

01.5

02.0

SIZE

N/A

N

1

N

DBA-087

LINE NO.

DBA-025

DBA-025

DBA-022

LINE NO.

MSA-002

FW-08-04

ISI DRAWING NO.

MS-08-07

MS-08-08

SD-11-06

ISI DRAWING NO.

MS-I1-11

GGNS-M-489.1

SUR

EXAM METHOD

SUR

SUR

SUR

EXAM METHOD

SUR

1

'N SIZE

24.0

24.0

24.0

24.0

24.0

24.0

28.0

28.0

28.0

28.0

LINE NO.

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

MSA-003

MSA-003

MSA-003

MSA-003

ISI DRAWING NO.

FW-08-02

FW-08-04

FW-1 1-01

FW-1 1-01

FW- 11-07

FW-I 1-07

MS-08-01

MS-08-02

MS-08-03

MS-08-04

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

28.0 MSA-002 MS-1 1-03 VT-3

Page No: 11

23

Revision: 13

NOTES

23

23

N/A

NOTES

N/A

NOTES

31

31

31

31

31

31

31

31

31

31

1IB21F022A V13 31

Page 73: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B21 NUCLEAR BOILER SYSTEM

1B21F022B VB

1B21F022C VB

1B21F022D VB

1B21FO41A VB

1B21FO41E VB

1B21F047A VB

IB21FO51A VB

IB21FO41B VB

IB21FO41F VB

IB21FO41K VB

IB21FO51B VB

IB21FO51F VB

1B21FO51K VB

1B21FO41C VB

IB21FO41G VB

1B21F047C VB

1B21F047G VB

IB21F047L VB

IB21FO51C VB

IB21F041D VB

1B21F047D VB

IB21F047H VB

I1B21FO51D VB

Examination Category: C-F-2 Code Class: 2

28.0

28.0

28.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

MSA-002

MSA-002

MSA-002

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MS-11-06

MS-11-09

MS-i1-12

RV-11-01

RV-11-01

RV-11-01

RV-11-01

RV- 11-05

RV- 11-05

RV- 11-05

RV- 11-05

RV- 11-05

RV- 11-05

RV-11-11

RV-11-11

RV-11-11

RV-11-11

RV-11-11

RV-11-11

RV-11-16

RV-11-16

RV-11-16

RV-11-16

GGNS-M-489.1

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

Revision: 13Page No: 12

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

Page 74: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B21 NUCLEAR BOILER SYSTEM

Item No: C05.051

ITEM ID DESCRIPTIO

1B21G030W69 C/P-TS

IB321G031W4 C/V-P

Examination Category: D-A Code Class:

Item No: D01.020

ITEM ID DESCRIPTIC

Q1B21G022A02 A

Q11B21G023H02 A

Q11B21G032R06 A

Examination Category: F-A Code Class:

Item No: F01.010

ITEM ID DESCRIPTIC

QIB21G002H11C-A & B SC

Q1B21G152R02 SB1

QIB21G021C03 SB1

Item No: FO1.030

ITEM ID DESCRIPTIC

Q1B21GO24AO1 SB1-A

Q11B21G022A02 SB1-A

Q1B21G023H02 SC-A

Q1B21G023RI9 SBI-A

Item No: F01.040

ITEM ID DESCRIPTI(

GGNS-M-489.1

)N

3

)N

1

)N

)N

)N

SIZE

24.0

28.0

SIZE

N/A

N/A

N/A

SIZE

28.0

02.0

03.0

SIZE

10.0

10.0

12.0

10.0

LINE NO.

DBB-073

DBB-023

LINE NO.

GBC-010

GBC-010

GBC-010

LINE NO.

MSA-002

DBA-019

DBA-023

LINE NO.

GBC-010

GBC-010

GBC-010

EBC-001

SIZE LINE NO.

ISI DRAWING NO. EXAM METHOD

FW-08-04 VOL/SUR

MS-08-02 VOL/SUR

ISI DRAWING NO.

RV-1 1-07

RV- 11-08

RV-1 1-13

ISI DIKAWING NO.

MS-I 1-08

MS-i 1-14

SD- 11-02

ISI DRAWING NO.

RV- 11-04

RV- 11-07

RV- 11-08

RV-1 1-17

ISI DRAWING NO.

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

Page No: 13

NOTES

23

23

NOTES

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

NOTES

Revision: 13

Page 75: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B21 NUCLEAR BOILER SYSTEM

QIB21AIO1V3-S1 EQS-A

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION

IB21G030W19

1B21G030W43

1B21G030W57

1B2 IG030W31

1B21G030W32

I B21GO30DIOOB-4

IB21GO30D100B-5

IB21G030W35

1 B21G230W9

1B21G031-1-8-1

IB21G031-2-8-1

1B21G03lW2

1 B21G031W3

1B21G031-14-8-1

IB21G116-IG-08-3

1B21GI16-1G-08-4

IB21G116W18

IB21G117-1F-08-13

IB21GI14-IG-08-2

C/V-P

C/E-TS

C/P-E

C/P-V

C/V-P

C/TS-P

C/TS-P

C/P-V

C/V-P

C/P-P

C/P-P

C/V-P

C/P-V

C/P-P

C/E-R

C/R-P

C/P-E

C/P-T

C/P-E

IB21G114-1G-08-3 C/E-R

10.0 EBC-001

SIZE LINE NO.

24.0 DBB-073

24.0

24.0

24.0

24.0

30.0

30.0

24.0

01.5

28.0

28.0

28.0

28.0

28.0

02.0

01.5

02.0

01.5

DBB-073

DBB-073

DBB-141

DBB-073

DBB-073

DBB-073

DBB-073

DBA-087

DBB-023

DBB-023

DBB-023

DBB-023

DBB-023

DBA-025

DBA-025

DBA-025

DBA-025

02.0 DBA-025

02.0 DBA-025

RV- 11-06

ISI DRAWING NO.

FW-08-O 1

FW-08-01

FW-08-OI

FW-08-03

FW-08-03

FW-08-04

FW-08-04

FW-08-04

FW-08-05

MS-08-02

MS-08-02

MS-08-02

MS-08-02

MS-08-04

MS-08-05

MS-08-05

MS-08-05

MS-08-06

MS-08-07

MS-08-07

GGNS-M-489.1

VT-3

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

SUR

VOL

VOL

VOL

VOL

VOL

SUR

SUR

SUR

SUR

SUR

SUR

Page No: 14

N/A

Revision: 13

NOTES

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

Page 76: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B21 NUCLEAR BOILER SYSTEM

1B21G114-1G-08-4 C/R-P

IB21GI14W15 SW

IB21Gl14WI7 C/P-T

IB21G001W5 C/V-P

1B21GIOF-B1-A-L-D L

1B21G1OF-B1-A-L-U L

1B21GO01Wl0 C/V-P

1B21G001WI2 C/E-V

1B21G021WI2 C/V-P

1B21G021-4-8-1 C/P-E

IB21G021W13 C/E-P

I B21G021W72 C/P-P

01.5

01.5

01.5

28.0

28.0

28.0

28.0

28.0

03.0

03.0

03.0

03.0

DBA-025

DBA-025

DBA-025

MSA-003

MSA-002

MSA-002

MSA-003

MSA-002

DBD-031

DBD-031

DBD-031

DBD-031

MS-08-07

MS-08-07

MS-08-07

MS- 11-03

MS- 11-05

MS-I 1-05

MS-11-06

MS-11-06

SD-08-01

SD-08-02

SD-08-02

SD-08-02

GGNS-M-489.1

SUR

SUR

SUR

VOL

VOL

VOL

VOL

VOL

SUR

SUR

SUR

SUR

Page No: 15

23

23

Revision: 13

23

23

23,34

23,34

23

23

N/A

23

23

N/A

Examination Notes for System: B21

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

34 Examination includes that portion within the examination volume of the intersecting circumferential weld (Reference Code Case N-524)

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

Page 77: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B33 REACTOR RECIRCULATION SYSTEM

Examination Category: B-G-1 Code Class: 1

Item No: B06.180

ITEM ID DESCRIPTION SIZE

IB33COOlA BT N/A

IB33CO01B BT N/A

Item No: B06.190

ITEM ID DESCRIPTION SIZE

IB33C001A FS N/A

IB33CO01B FS N/A

Item No: B06.200

ITEM ID DESCRIPTION SIZE

IB33C001A BG N/A

1B33C001B BG N/A

Examination Category: B-G-2 Code Class: 1

Item No: B07.050

ITEM ID DESCRIPTION SIZE

FLG (DOWNSTREAM) BLT N/A

FLG (UPSTREAM) BLT N/A

Item No: B07.060

ITEM ID DESCRIPTION SIZE

1B33COO1A BLT N/A

.11B33C001B BLT N/A

GGNS-M-489.1

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-006

RRA-006

LINE NO.

RRA-002

RRA-002

ISI DRAWING NO.

RR- 11-02

RR- 11-09

ISI DRAWING NO.

RR- 11-02

RR-1 1-09

ISI DRAWING NO.

RR- 11-02

RR-11-09

ISI DRAWING NO.

RR- 11-02

RR-1 1-02

ISI DRAWING NO.

RR- 11-02

RR-11-09

EXAM METHOD

VOL

VOL

EXAM METHOD

VT-I

VT-l

EXAM METHOD

VT-i

VT-1

EXAM METHOD

VT-1

VT-i

EXAM METHOD

VT-I

VT-i

Page No: 16 Revision: 13

NOTES

31

31

NOTES

31,35

31,35

NOTES

31

31

NOTES

N/A

N/A

NOTES

31

31

Page 78: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B33 REACTOR RECIRCULATION SYSTEM

Item No: B07.070

ITEM ID DESCRIPTION SIZE

IB33F023A BLT N/A

IB33F060A BLT N/A

IB33F067A BLT N/A

1B33F023B BLT N/A

1B33F060B BLT N/A

1B33F067B BLT N/A

Examination Category: B-J Code Class: I

Item No: B09.011

ITEM ID DESCRIPTION SIZE

IB33G2-A1-A CIP-E 24.0

iB33G2-A1-B CIE-P 24.0

1B33GO01W~l C/P-T 24.0

IB33GI0-Al-A C/T-P 16.0

1B33G10-A1-B C/T-P 16.0

1B33G2-B1-A C/P-E 24.0

1B33G024-50-11-5 C/P-T 04.0

IB33G024-50-11-6 C/T-P 04.0

IB33G024-50-11-9 C/P-P 04.0

Item No: B09.012

ITEM ID DESCRIPTION SIZE

IB33GOO1W1-L-U L 24.0

IB33G2-AI-A-LA-D L 24.0

LINE NO.

RRA-001

RRA-002

RRA-002

RRA-001

RRA-002

RRA-002

LINE NO.

RRA-001

RRA-001

RRA-003

RRA-004

RRA-004

R.RA-001

DCA-001

DCA-001

DCA-001

LINE NO.

RRA-001

RRA-001

ISI DRAWING NO.

RR-1 1-01

RR- 11-02

RR- 11-03

RR-1 1-08

RR-1 1-09

RR-1 1-10

ISI DRAWING NO.

RR-11-01

RR-11-01

RR- 11-04

RR- 11-04

RR- 11-04

RR-1 1-08

RR- I1-16

RR-11-16

RR- 11-16

ISI DRAWING NO.

RR-11-01,

RR-I 1-01

GGNS-M-489.1

EXAM METHOD

VT-1

VT-I

VT-1

VT-I

VT-1

VT-i

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VOL/SUR

VOL/SUR

Page No: 17 Revision: 13

NOTES

31

31

31

31

31

31

NOTES

26

26

27

27

27

26

26

26

26

NOTES

26,34

26,34

Page 79: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B33 REACTOR RECIRCULATION SYSTEM

IB33G2-AI-A-LA-U L 24.0

IB33G2-A1-A-LB-D L 24.0

1B33G2-A1-A-LB-U L 24.0

1B33G2-AI-B-L-D L 24.0

1B33G8-AI-B-L-U L 24.0

IB33G10-AI-A-L-D L 16.0

IB33GI0-A1-B-L-D L 16.0

1B33G001W24-L-U L 24.0

1B33G2-BI-A-LA-D L 24.0

1B33G2-B1-A-LB-D L 24.0

Item No: B09.021

ITEM ID DESCRIPTION SIZE

IB33G024W68 C/P-T 02.0

IB33G108W10 C/V-P 02.0

1B33G108W13 C/P-V 02.0

IB33G108W3 C/P-V 02.0

Item No: B09.031

ITEM ID

1B33G10-A1-F

1B33G10-A1-G

1B33G10-Al-H

Examination Category: B-K-I

Item No: B10.020

ITEM ID

DESCRIPTION

B

B

B

Code Class: I

DESCRIPTION

SIZE

12.0

12.0

12.0

RRA-001

RRA-001

RRA-001

RRA-001

RRA-003

RRA-004

RRA-004

RRA-001

RRA-001

RRA-001

LINE NO.

DCA-024

DCA-024

DCA-024

DCA-024

LINE NO.

RRA-005

RRA-005

RRA-005

SIZE LINE NO.

RR-1 1-01

RR-11-01

RR-11-01

RR-11-01

RR- 11-03

RR-I 1-04

RR-I 1-04

RR-I 1-08

RR-1 1-08

RR-11-08

ISI DRAWING NO.

RR-11-16

RR- 11-21

RR-I 1-21

RR-I 1-21

ISI DRAWING NO.

RR-I 1-04

RR-1 1-04

RR-1 1-04

GGNS-M-489.1

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOLJSUR

VOL/SUR

VOLUSUR

EXAM METHOD

SUR

SUR

SUR

SUR

EXAM METHOD

VOUSUR

VOL/SUR

VOL/SUR

ISI DRAWING NO. EXAM METHOD

Page No: 18 26,34

26,34

26,34

26,34

26,34

26,34

26,34

26,34

26,34

26,34

NOTES

N/A

N/A

N/A

N/A

NOTES

26

26

26

NOTES

Revision: 13

Page 80: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B33 REACTOR RECIRCULATION SYSTEM

IB33COOIB-C5 A N/A

1B33C001B-C6 A N/A

Examination Category: B-L-2 Code Class: 1

Item No: B12.020

ITEM ID DESCRIPTION SIZE

1B33COO1A PC 24.0

IB33CO01B PC 24.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

IB33F023A VB 24.0

1B33F060A VB 24.0

1B33F067A VB 24.0

IB33F023B VB 24.0

1B33F060B VB 24.0

IB33F067B VB 24.0

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1B33G002H355A SC 24.0

Q1B33G002H302B SC 24.0

Q1B33G024H03 SBI 04.0

Examination Category: X-AUG Code Class: N/A

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-001

RRA-002

RRA-002

RRA-001

RRA-002

RRA-002

LINE NO.

RRA-003

RRA-002

DBA-01 1

RR- 11-09

RR- 11-09

ISI DRAWING NO.

RR- 11-02

RR- 11-09

ISI DRAWING NO.

RR-1 1-01

RR- 11-02

RR-1 1-03

RR-1 1-08

RR-11-09

RR-11-10

ISI DRAWING NO.

RR- 11-03

RR- 11-09

RR-1 1-19

GGNS-M-489.1

SUR

SUR

EXAM METHOD

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

Revision: 13Page No: 19

N/A

N/A

NOTES

31

31

NOTES

31

31

31

31

31

31

NOTES

N/A

N/A

N/A

/

Page 81: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: B33 REACTOR RECIRCULATION SYSTEM

Item No: N/A

ITEM ID DESCRIPTION SIZE

IB33COO1A SUCT SPLITTER N/A

IB33G10-Al-E C/T-X 24.0

1B33CO01B SUCT SPLITTER N/A

IB33G001W33 C/V-P 24.0

LINE NO.

RRA-002

RRA-003

RRA-002

RRA-003

ISI DRAWING NO.

RR-l 1-02

RR- 11-04

RR- 11-09

RR-11-10

GGNS-M-489.1

EXAM METHOD

VT-3

VOL/SUR

VT-3

VOL/SUR

Page No: 20

NOTES

57

27

57

27

Examination Notes for System: B33

26 GL 88-01, IGSCC Category A, See Section 11 for details

27 GL 88-01, IGSCC Category B, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

34 Examination includes that portion within the examination volume of the intersecting circumferential weld (Reference Code Case N-524)

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

57 Reference SIL-415, See Section 11 for details

Revision: 13

Page 82: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: C11 CONTROL ROD DRIVE HYDRAULIC SYSTE

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

GGNS-M-489.1 Page No: 21

ITEM ID

ICI 1G1OIOW30

Examination Category: F-A

Item No: F01.020

ITEM ID

Q1Cl1ASP4

DESCRIPTION

C/T-P

Code Class: 2

DESCRIPTION

SBI

SIZE

10.0

SIZE

10.0

LINE NO.

DVB-001

LINE NO.

DVB-001

ISI DRAWING NO.

RD- 11-02

ISI DRAWING NO.

RD-I 1-02

EXAM METHOD

VOL/SUR

EXAM METHOD

VT-3

Examination Notes for System: C11

Revision: 13

NOTES

N/A

NOTES

N/A

Page 83: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: C41 STANDBY LIQUID CONTROL SYSTEM

Examination Category: B-J Code Class: 1

Item No: B09.040

ITEM ID DESCRIPTION SIZE

IC41G136W504 SW 01.5

1C41G136W505 SW 01.5

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1C41GI24HOI SBI 01.5

GGNS-M-489.1 Page No: 22

LINE NO.

DCA-002

DCA-002

LINE NO.

DCA-002

ISI DRAWING NO.

LC-11-13

LC-I 1-13

ISI DRAWING NO.

LC-1 1-07

EXAM METHOD

SUR

SUR

EXAM METHOD

VT-3

Examination Notes for System: C41

Revision: 13

NOTES

N/A

N/A

NOTES

N/A

(J

Page 84: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

Examination Category: B-G-2 Code Class: I

Item No: B07.070

ITEM ID DESCRIPTION SIZE

TE12FO41A BLT N/A

IE12F041B BLT N/A

IE12FO41C BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

IE12G015W23 C/P-Z 12.0

1E12GO15W71 C/E-P 12.0

IE12G015-17-11-2 C/P-E 12.0

1E12G015-17-11-3 C/E-P 12.0

IE12G015W59 C/P-Z 12.0

1E12G016W21 C/P-E 12.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1E12F019 VB 06.0

IEl2F023 VB 06.0

1E12F008 VB 20.0

1E12FO09 VB 20.0

1E12FO10 VB 20.0

1E12F039A VB 14.0

GGNS-M-489.1

LINE NO.

DBA-029

DBA-028

DBA-038

LINE NO.

DBA-029

DBA-029

DBA-028

DBA-028

DBA-028

DBA-038

LINE NO.

DBA-032

DBA-032

DBA-064

DBA-064

DBA-064

DBA-029

ISI DRAWING NO.

RH-l 1-03

RH- 11-04

RH-1 1-05

ISI DRAWING NO.

RH- 11-02

RH-1 1-02

RH- 11-04

RH-I 1-04

RH- 11-04

RH-1 1-08

ISI DRAWING NO.

RH-08-08

RH-08-08

RH-11-01

RH-I 1-01

RH-11-01,

RH-1 1-03

EXAM METHOD

VT-1

VT-I

VT-1

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOUSUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3.

Page No: 23 Revision: 13

NOTES

31

31

31

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

31

31

31

31

31

31

,

Page 85: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

IE12FO41A VB 14.0

IE12FO39B VB 14.0

IE12FO41B VB 14.0

IE12F039C VB 12.0

IE12FO41C VB 12.0

1E12F042C VB 12.0

1E12F042A VB 14.0

1E12F042B VB 14.0

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

IEI2GO13WI8

IE12GO09WI

IE12G009WI7

1E12G021W59

1E12G021W60

IE12G021W503

1E12G020W48

1E12G020W33

1E12G009-3-8-1

IEl2G009-3-8-2

1 E 12G009-4-8-2

IEI2GO09W 11

IE12G009W12

C/T-P

C/Z-P

C/P-P

C/P-T

C/P-T

C/P-V

C/V-P

C/P-V

C/P-E

C/E-P

C/E-P

C/V-P

C/P-E

DBA-029

DBA-029

DBA-029

DBA-038

DBA-038

DBA-038

DBA-029

DBA-028

LINE NO:

18.0 GBB-020

20.0

20.0

12.0

12.0

06.0

08.0

08.0

18.0

18.0

18.0

18.0

18.0

GBB-019

GBB-019

DBB-068

DBB-068

DBB-088

GBB-022

GBB-076

GBB-078

GBB-078

GBB-078

GBB-078

GBB-078

RH- 11-03

RH- 11-04

RH- 11-04

RH-I 11-05

RH-11-05

RH- 11-08

RH- 11-09

R-i-1-11

ISI DRAWING NO.

RH-07-09

RH-07-23

RH-07-23

RH-08-03

RH-08-03

RH-08-05

RH-08-06

RH-08-07

RH-08-30

RH-08-30

RI-t-08-30

RH-08-30

RH-08-30

GGNS-M-489.1

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOLJSUR

VOUSUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOUSUR

VO_/SUR

VOL/SUR

Revision: 13Page No: 24

31

31

31

31

31

31

31

31

NOTES

N/A

N/A

N/A

23

23

23

N/A

N/A

N/A

N/A

N/A

N/A

N/A

(

Page 86: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

1E12G009WI3 C/E-R 18.0

1E12G009W27 C/P-E 18.0

Examination Category: C-G Code Class: 2

Item No: C06.010

ITEM ID DESCRIPTION SIZE

IE12CO02B-DH-1 PC N/A

1E12CO02B-DH-25 PC N/A

1EI2C002B-DH-6 PC N/A

1E12CO02B-DH-7 PC N/A

1E12C002B-SB-1 PC N/A

1E12CO02B-SB-7 PC N/A

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1E12GO15H04 SC 14.0

Q1E12GO16RO4 SB1 12.0

Q1E12GO15HO8 SB1 14.0

QIEI2GO15H14 SB1 14.0

Item No: F01.020

ITEM ID DESCRIPTION SIZE

Q1E12GO12HO8 SC 24.0

Q1E12GO12RO3 SBI 18.0

QIE12GO10H13 SBI-A 18.0

Q1E12GO07CO5 SBI 18.0

GBB-078

GBB-078

LINE NO.

GBB-074

GBB-074

GBB-074

GBB-074

GBB-074

GBB-074

LINE NO.

DBA-029

DBA-038

DBA-028

DBA-028

LINE NO.

GBB-030

GBB-018

GBB-074

GBB-058

RH-08-30

RH-08-30

ISI DRAWING NO.

RH-08-12

RH-08-12

RH-08-12

RH-08-12

RH-08-12

RH-08-12

ISI DRAWING NO.

RH-1 1-03

RH-1 1-07

RH-11-11

RH-I1-11

ISI DRAWING NO.

RH-07-04

RH-07-16

RH-08-24,

RH-10-03

GGNS-M-489.1

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

Revision: 13Page No: 25

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

!

Page 87: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E12

Q1E12G015

Item No: F01.0

ITEM ID

Q1E12BOOl

QIEI2BOO0

QIE12BOO0

QIE12BOO0

Q1E12BOO0

Q1E12BOO1

QIE12BOO0

QIE12BOO

QIE12C00O

Q1E12COO

Examination Ca

Item No: N/A

ITEM ID

1E12G021

1E12G0212

1E12GO21

1E12G021

IE12GO21

IE12G021'

RESIDUAL HEAT REMOVAL SYSTEM

5R26 SBI 18.0

40

DESCRIPTION SIZI

1A-SIA , EQS 18.0

LA-SIB EQS 18.0

IA-SIC EQS 18.0

IA-SID EQS 18.0

1A-S2A EQS 18.0

LA-S2B EQS 18.0

1A-S2C EQS 18.0

IA-S2D EQS 18.0

2B-S1 EQS N/A

2B-S2 EQS N/A

ategory: X-AUG Code Class: N/A

DESCRIPTION SIZ

-19-8-1 C(E-P 12.0

W58 C/P-P 06.0

W71 C/P-E 12.0

W73 C/P-E 12.0

W74 C/E-P 12.0

W504 C/V-P 06.0

GBB-052

LINE NO.

GBB-018

GBB-018

GBB-018

GBB-018

GBB-018

GBB-018

GBB-018

GBB-018

GBB-074

GBB-074

LINE NO.

DBB-068

DBB-088

DBB-068

DBB-068

DBB-068

DBB-088

E

RH- 11-12

ISI DRAWING NO.

RH-07-19

RH-07-19

RH-07-19

RH-07-19

RH-07-19

RH-07-19

RH-07-19

RH-07-19

RH-08-12

RH-08-12

ISI DRAWING NO.

RH-08-03

RH-08-03

RH-08-03

RH-08-03

RH-08-03

RH-08-05

GGNS-M-489.1

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

Page No: 26

N/A

Revision: 13

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

23

23

23

23

23

23

Page 88: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E12 RESIDUAL HEAT REMOVAL SYSTEM GGNS-M-489.1 Page No: 27 Revision: 13

Examination Notes for System: El2

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page 89: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E21 LOW PRESSURE CORE SPRAY SYSTEM

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1 E21F006 BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E21G002W14 C/P-V 14.0

1E21G002WI5 C/V-P 14.0

IE21GO02WI6 C/R-Z 12.0

Examination Category: B-M-2 Code Class: I

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1E21F007 VB 14.0

1 E21F006 VB 14.0

1 E21F005 VB 14.0

Examination Category: C-C Code Class: 2

Item No: C03.020

ITEM ID DESCRIPTION SIZE

Q1E21G00IH05 A N/A

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

IE21GO01-14-9-1 C/T-P 16.0

GGNS-M-489.1

LINE NO.

DBA-001

LINE NO.

DBA-001

DBA-001

DBA-001

LINE NO.

DBA-001

DBA-001

DBA-001

LINE NO.

GBB-007

LINE NO.

GBB-007

ISI DRAWING NO. EXAM METHOD

LP- 11-02 VT-I

ISI DRAWING NO.

LP-1 1-01

LP-11-01

LP-1 1-01

ISI D1RAWING NO.

LP-11-01

LP- 11-02

LP-1 1-04

ISI DRAWING NO.

LP-09-08

ISI DRAWING NO.

LP-09-08

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

SUR

EXAM METHOD

VOL/SUR

Page No: 28

NOTES

N/A

NOTES

N/A

N/A

N/A

NOTES

31

31

31

NOTES

N/A

NOTES

N/A

Revision: 13

((

Page 90: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E21 LOW PRESSURE CORE SPRAY SYSTEM

IE21G001-15-9-2 C/P-F 16.0

Examination Category: C-G Code Class: 2

Item No: C06.010

ITEM ID DESCRIPTION SIZE

1E21CO01-DH-27 PC N/A

IE21CO01-DH-6 PC N/A

IE21C001-DH-7 PC N/A

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1E21G002H03 SBI 14.0

Item No: F01.020

ITEM ID DESCRIPTION SIZE

Q1E21GOO1C04 SBI-A 24.0

QlE21G001H05 SB1-A 16.0

GBB-007

LINE NO.

GBB-007

GBB-007

GBB-007

LINE NO.

DBA-001

LINE NO.

HBB-008

GBB-007

LP-09-08

ISI DRAWING NO.

LP-09-04

LP-09-04

LP-09-04

ISI DRAWING NO.

LP- 11-04

ISI DRAWING NO.

LP-09-03

LP-09-08

GGNS-M-489.1

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

EXAM METHOD

VT-3

EXAM METHOD

VT-3

VT-3

Examination Notes for System: E21

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page No: 29

N/A

Revision: 13

NOTES

N/A

N/A

N/A

NOTES

N/A

NOTES

N/A

N/A

Page 91: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E22 HIGH PRESSURE CORE SPRAY SYSTEM

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1E22F004 • BLT N/A

1E22F005 BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E22G001W14 C/P-H 14.0

1E22G003W4 C/H-P 14.0

Examination Category: B-M-2 Code Class: i

Item No: B12.050

ITEM ID DESCRIPTION SIZE

IE22F004 VB 12.0

1E22F005 VB 14.0

IE22F036 VB 14:0

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

IE22G001W20 C/P-V 12.0

1E22G002W25 C/P-V 18.0

Examination Category: C-G Code Class: 2

Item No: C06.010

ITEM ID DESCRIPTION SIZE

GGNS-M-489.1

LINE NO.

DBA-005

DBA-005

LINE NO.

DBA-005

DBA-005

LINE NO.

DBA-005

DBA-005

DBA-005

LINE NO.

DBB-016

HBB-019

LINE NO.

ISI DRAWING NO.

HP-08-0 1

HP-I1-01

ISI DRAWING NO.

HP-08-01

HP-i 1-03

ISI DRAWING NO.

HP-08-01

HP-11-01

HP-11-01

ISI DRAWING NO.

HP-08-03

HP-08-13

EXAM METHOD

VT-I

VT-i

EXAM METHOD

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

VOL/SUR

VOL/SUR

ISI DRAWING NO. EXAM METHOD

Page No: 30 Revision: 13

NOTES

31

31

NOTES

N/A

N/A

NOTES

31

31

31

NOTES

N/A

N/A

NOTES

Page 92: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E22 HIGH PRESSURE CORE SPRAY SYSTEM

IE22C001-DH-19 PC N/A

1E22C001-DH-6 PC N/A

IE22C001-DH-7 PC N/A

1E22C001-SB-1 PC N/A

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1E22G003H04 SC 14.0

Item No: F01.020

ITEM ID DESCRIPTION SIZE

Q1E22G001R03 SB1 14.0

Item No: F01.040

ITEM ID DESCRIPTION SIZE

Q1E22C001-S1 EQS N/A

DBB-008

DBB-008

DBB-008

DBB-008

LINE NO.

DBA-005

LINE NO.

DBB-016

LINE NO.

DBB-008

HP-08-10

HP-08-10

HP-08-10

HP-08-10

ISI DRAWING NO.

HP- 11-02

ISI DRAWING NO.

HP-08-03

ISI DRAWING NO.

HP-08-10

GGNS-M-489.1

SUR

SUR

SUR

SUR

EXAM METHOD

VT-3

EXAM METHOD

VT-3

EXAM METHOD

VT-3

Page No: 31 N/A

N/A

N/A

N/A

NOTES

N/A

NOTES

N/A

NOTES

N/A

Examination Notes for System: E22

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Revision: 13

Page 93: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

I,

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E32 MSIV LEAKAGE CONTROL SYSTEM

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION S1

Q1E32G121C02 SB1 01.

QIE32GI22H01 SBI 01.

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SE

1E32G121-01-08-2 C/P-E 01.

1E32G121-01-08-3 C/E-P 01.

1E32G121-01-08-4 C/P-E 01.

1E32G121-01-08-5 C/E-P 01.

IE32G121W20 C/E-P 01.

1E32G121W21 C/P-E 01.

1E32G121W29 C/P-P 01.

1E32G121W30 C/P-E 01.

1E32G121W31 C/P-E 01.

1E32G122-01-08-2 C/P-E 01.

1E32G122-01-08-3 C/E-P 01.

1E32G122W1 CIT-P 01.

IE32G122W32 C/P-V 01.

IE32G119W36 C/P-P 01.

GGNS-M-489.1

5E

5

5

LINE NO.

DBA-069

DBA-069

LINE NO.

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

E

5

5

5

5

5

5

5

5

5

5

5

5 5

ISI DRAWING NO.

IV-08-01

IV-08-02

ISI DRAWING NO.

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-02

IV-08-02

IV-08-02

IV-08-02

IV-08-03

EXAM METHOD

VT-3

VT-3

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

Page No: 32 Revision: 13

NOTES

N/A

N/A

NOTES

23

23

23

23

23

23

23

23

23

23

23

23

23

23

Page 94: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E32 MSIV LEAKAGE CONTROL SYSTEM GGNS-M-489.1 Page No: 33 Revision: 13

Examination Notes for System: E32

23 No Break Zone, See Section 11 for details

Page 95: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E51 REACTOR CORE ISOLATION COOLING SY

Examination Category: B-G-2 Code Class: 1

Item No: B07.050

ITEM ID DESCRIPTION SIZE LINE NO.

FLG N7 TO 28-11-1 BLT N/A DBA-030

Item No: B07.070

ITEM ID DESCRIPTION SIZE LINE NO.

1 E51 F066 BLT N/A DBA-030

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE LINE NO.

IE51G001W503 C/P-V 06.0 DBA-030

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE LINE NO.

1 E51 F064 VB 10.0 DBA-024

1E51F063 VB 10.0 DBA-024

1E51F066 VB 06.0 DBA-030

1EI2F395 VB 06.0 DBA-030

1E12F394 VB 06.0 DBA-030

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE LINE NO.

IE51GO04-8-8-4 C/P-E 06.0 DBB-057

1E5 1G004-9-8-2 C/P-E 06.0 DBB-057

GGNS-M-489.1

ISI DRAWING NO.

RI-1 1-04

ISI DRAWING NO.

RI-1 1-04

ISI DRAWING NO.

RI- 11-07

ISI DRAWING NO.

RI-08-01

RI-i 1-02

RI- 11-04

RI-1 1-06

RI-1 1-07

ISI DRAWING NO.

RI-08-02'

RI-08-02

EXAM METHOD

VT-I

EXAM METHOD

VT-i

EXAM METHOD

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL/SUR

VOL/SUR

Page No: 34 Revision: 13

NOTES

N/A

NOTES

31

NOTES

N/A

NOTES

31

31

31

31

31

NOTES

23

23

Page 96: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E51 REACTOR CORE ISOLATION COOLING SY

1 E51G004W12

Examination Category: F-A

Item No: FO1.010

ITEM ID

QIE51GO01HI0

Item No: F01.020

ITEM ID

Q 1 E51G004HO3

Examination Category: X-AUG

Item No: N/A

ITEM ID

1E51G004-7-8-3

1E51G004W10

I E51G004W13

1E51G004-15-8-2

1E51G004-16-8-2

1 E5 1G004-16-8-3

1 E51G004W4

1 E51G004W52

1E51G004W6

C/E-P

Code Class: 1

DESCRIPTION

SB1

DESCRIPTION

SBI

Code Class: N/A

DESCRIPTION

C/P-T

C/V-P

C/E-P

C/P-E

C/E-P

C/P-E

C/P-V

C/V-P

C/P-P

06.0 DBB-057

SIZE

06.0

SIZE

06.0

SIZE

10.0

10.0

06.0

08.0

08'0

08.0

10.0

10.0

10.0

LINE NO.

DBA-030

LINE NO.

DBB-057

LINE NO.

DBB-056

DBB-056

DBB-057

DBB-087

DBB-087

DBB-087

DBA-024

DBA-024

DBA-024

RI-08-02

ISI DRAWING NO.

RI-I 1-07

ISI DRAWING NO.

RI-08-02

ISI DRAWING NO.

RI-08-01

RI-08-01

RI-08-02

RI-08-05

RI-08-06

RI-08-06

RI-i 1-02

RI-i 1-02

RI- 11-02

GGNS-M-489.1

VOL/SUR

EXAM METHOD

VT-3

EXAM METHOD

VT-3

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

Page No: 35 Revision: 13

23

NOTES

N/A

NOTES

N/A

NOTES

23

23

23

23

23

23

23

23

23

Page 97: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: E51 REACTOR CORE ISOLATION COOLING SY GGNS-M-489.1 Page No: 36 Revision: 13

Examination Notes for System: E51

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page 98: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: G33 REACTOR WATER CLEANUP SYSTEM

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

IG33G011-2-11-1 C/E-P 06.0

IG33GO11-2-11-2 C/P-E 06.0

IG33GOI1-2-11-3 C/E-P 06.0

1G33G011-2-11-4 C/P-E 06.0

IG33G011-2-11-5 C/E-P 06.0

1G33G011Wl C/P-P 06.0

1G33G011W2 C/P-E 06.0

IG33G012-28-11-1 C/P-E 06.0

1G33G012-28-11-2 C/E-P 06.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1G33F004 VB 06.0

IG33F102 VB 06.0

IG33F001 VB 06.0

1G33F250 VB 06.0

IG33F251 VB 06.0

IG33F252 VB 06.0

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

GGNS-M-489.1

LINE NO.

DBA-089

DBA-089

DBA-089

DBA-089

DBA-089

DBA-089

DBA-089

DBA-090

DBA-090

LINE NO.

DBA-009

DBA-009

DBA-009

DBA-089

DBA-089

DBA-090

LINE NO.

ISI DRAWING NO.

CU-i 1-09

CU-i 1-09

CU-1 1-09

CU-1 1-09

CU-i 1-09

CU-I 1-09

CU- 11-09

CU-11-12

CU-I 1-12

ISI DRAWING NO.

CU-08-05

CU- 11-02

CU-1 1-03

CU-I 1-10

CU-I1-11

CU-i 1-12

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

ISI DRAWING NO. EXAM METHOD

Page No: 37 Revision: 13

NOTES

23

23

23

23

23

23

23

23

23

NOTES

31

31

31

31

31

31

NOTES

,, .

Page 99: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: G33 REACTOR WATER CLEANUP SYSTEM

Q1G33G002RI5 SBl 04.0

QIG33GO11RO1 SBI 06.0

QIG33G0I1R05 SBI 06.0

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE

IG33G001-10-8-1

1G33G001-10-8-2

IG33G001-10-8-3

1G33GO01WI0

1G33G001W24

IG33G001W25

1G33G001W6

1G33G001W7

1G33G001W8

1G33G001W9

1G33G002WI30

1G33G002W131

1G33G002W52

1G33G002-6-8-1

IG33G002-6-8-2

1G33G002-6-8-3

1G33G002W177

IG33G002W178

C/T-P

C/T-P

C/P-T

C/V-P

C/P-V

C/P-V

C/V-P

C/P-V

C/V-P

C/P-V

CIP-V

C/V-P

C/P-H

CIE-P

C/P-E

C/E-P

C/P-P

C/P-P

DBA-01 1

DBA-089

DBA-089

LINE NO.

06.0 DBB-104

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

04.0

04.0

04.0

04.0

04.0

04.0

04.0

04.0

DBB-104

DBB-104

DBB-104

DBB-104

DBB-104

DBB-104

DBB-104

DBB-104

DBB-104

DBC-002

DBB-103

DBB-103

DBC-002

DBC-002

DBC-002

DBC-002

DBC-002

CU-I 1-07

CU- 11-09

CU-I 1-10

ISI DRAWING NO.

CU-08-01

CU-08-01

CU-08-01

CU-08-01

CU-08-01

CU-08-01

CU-08-01

CU-08-01

CU-08-01

CU-08-01

CU-08-03

CU-08-03

CU-08-03

CU-08-07

CU-08-07

CU-08-07

CU-08-07

CU-08-07

GGNS-M-489.1

VT-3

VT-3

VT-3

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

Revision: 13Page No: 38

N/A

N/A

N/A

NOTES

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

Page 100: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: G33 REACTOR WATER CLEANUP SYSTEM GGNS-M-489.1 Page No: 39 Revision: 13

IG33G011-1-11-1 C/P-E 06.0 DBA-089 CU-11-09 VOL 23

1G33G011-1-11-2 C/E-P 06.0 DBA-089 CU-1 1-09 VOL 23

1G33G011-2-11-6 C/P-E 06.0 DBA-089 CU-11-09 VOL 23

IG33G011W3 C/E-P 06.0 DBA-089 CU- 11-09 VOL 23

1G33G012-27-11-1 C/E-P 06.0 DBA-090 CU-11-12 VOL 23

1G33G012-27-11-2 C/P-E 06.0 DBA-090 CU-11-12 VOL 23

1G33G012-28-11-3 C/P-E 06.0 DBA-090 CU-11-12 VOL 23

1G33G012-28-11-4 C/E-P 06.0 DBA-090 CU-11-12 VOL 23

1G33G012W57 C/P-V 06.0 DBA-090 CU-11-12 VOL 23

1G33G012W58 C/P-E 06.0 DBA-090 CU-I 1-12 VOL 23

1G33G012W73 C/E-P 06.0 DBA-090" CU-11-12 VOL 23

Examination Notes for System: G33

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page 101: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: G41 FUEL POOL COOLING AND CLEANUP SYST GGNS-M-489.1 Page No: 40 Revision: 13

Examination Category: D-A Code Class: 3

Item No: D01.020

ITEM ID DESCRIPTION SIZE LINE NO. ISI DRAWING NO. EXAM METHOD NOTES

QIG41GO09AO1 A N/A HBC-278 FC-07-01 VT-3 N/A

Examination Notes for System: G41

Page 102: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: P41 STANDBY SERVICE WATER SYSTEM

Examination Category: D-A Code Class: 3

Item No: D01.020

ITEM ID DESCRIPTION SIZE

Q1P41GO10CO3 A N/A

Q2P41GO11C04 A N/A

Examination Category: F-A Code Class: 3

Item No: F01.030

ITEM ID

Q1P41GO09RO6

QIP41GO10CO3

Q2P41G010AOI

Q2P41G011C04

QIP41GO13CO3

Q2P41GO13AO1

QSP41GO13CO3

QSP41G013C05

QSP41GO13HO3

Q1P41GO14CO5

Q2P41GO14C1O

QIP41G01 IR05

DESCRIPTION

SB1

SB1-A

SB1

SB1-A

SBI-A

SBI

SB1-A

SBI-A

SA

SB1-A

SBI-A

SB1

GGNS-M-489.1

LINE NO.

HBC-505

HBC-079

SIZE LINE NO.

10.0

08.0

24.0

24.0

24.0

24.0

20.0

20.0

20.0

24.0

10.0

10.0

HBC-086

HBC-505

HBC-079

HBC-079

HBC-505

HBC-079

HBC-171

HBC-171

HBC-171

HBC-079

HBC-079

HBC-084

ISI DRAWING NO.

WS-YD-02

WS-YD-03

1SI DRAWING NO.

WS-12-02

WS-YD-02

WS-YD-02

WS-YD-03

WS-YD-09

WS-YD-09

WS-YD-10

WS-YD-10

WS-YD-10

WS-YD- 11

WS-YD- 1I

WS-YD-13

EXAM METHOD

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

Page No: 41 Revision: 13

NOTES

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Page 103: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 2

System: P41 STANDBY SERVICE WATER SYSTEM GGNS-M-489.1 Page No: 42 Revision: 13

Examination Notes for System: P41

(

Page 104: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

APPENDIX D PERIOD 3 EXAMS

PAGE NO

A

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

Program Section No.: GGNS-M-489.1 Revision No.: 13 Page No.: A

REVISION STATUS SHEET

REVISION PAGE NO.

13 28

13 29

13 30

13 31

13 32

13 33

13 34

13 35

13 36

13 37

13 38

13 39

13 40

13 41

13 42

13 43

13 44

13 45

13 46

13 47

13 48

13 49

13 50

13

13

13

13

13

REVISION

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

13

Page 105: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

Examination Category: B-A Code Class: 1

Item No: B01.011

ITEM ID DESCRIPTION

AA C/SH SIDE

AB C/SH-SH

AC C/SH-SH

AD CISH-SH

Item No: B01.012

ITEM ID DESCRIPTION

BA LJSH-SH

BF L/SH-SH

BG L/SH-SH

BK L/SH-SH

BR LJSH-SH

Item No: BO1.021

ITEM ID DESCRIPTION

AH C/HD-HD

Item No: B01.022

ITEM ID DESCRIPTION

DM MD/HD-HD

DN MD/HD-HD

DP MD/HD-HD

Item No: B01.030

ITEM ID DESCRIPTION

GGNS-M-489.1

SIZE

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

SIZE

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A

N/A

SIZE LINE NO.

ISI DRAWING NO.

RPV-11-01

RPV-11-01

RPV-1 1-01

RPV-1 1-01

ISI DRAWING NO.

RPV-11-01

RPV-11-01

RPV-I1-01

RPV-11-01

RPV-11-01

ISI DRAWING NO.

RPV-1 1-01

ISI DRAWING NO.

RPV-11-01

RPV-11-01

RPV-11-01

S

ISI DRAWING NO.

EXAM METHOD

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

EXAM METHOD

VOL

VOL

VOL

Page No: I Revision: 13

NOTES

64

64

64

64

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

NOTES

N/A

N/A

N/A

EXAM METHOD NOTES

,

Page 106: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

N02K-IR NIR

N02M-IR NIR

N02N-IR NIR

N03C-IR NIR

N03D-IR NIR

N04D-IR NIR

N04E-IR NIR

N04F-IR NIR

N05B-IR NIR

N1O-IR NIR

Examination Category: B-F Code Class: 1

Item No: B05.010

ITEM ID DESCRIPTION

NOIA-KB C/Z-SE

N02A-KB C/Z-SE

N02K-KB C/Z-SE

N02M-KB C/Z-SE

N02N-KB C/Z-SE

N04E-KB C/Z-SE

N04F-KB C/Z-SE

N05B-KB C/Z-SE

N09A-KB C/Z-SE

NI1-KB C/Z-SE

Examination Category: B-G-1 Code Class: 1

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

24.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

04.0

04.0

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-I 1-01

RPV-l 1-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-I 1-01

RPV-1 1-01

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

ISI DRAWING NO.

RPV-1 1-01

RPV-1 1-01

RPV-1 1-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-I 1-01

RPV-11-01 6

GGNS-M-489.1

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOLJSUR

VOL/SUR

VOL/SUR

VOL/SUR

VOLJSUR

Revision: 13Page No: 3

N/A

N/A

N/A

N/A

N/A

24

24

24

N/A

N/A

NOTES

28

28

28

28

28

28

28

28

28

N/A

Page 107: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

AE C/SH-F

Item No: B01.040

ITEM ID DESCRIPTION

AG C/HD-F

Examination Category: B-D Code Class: 1

Item No: B03.090

ITEM ID DESCRIPTION

NOIA-KA NZ

N02A-KA NZ

N02K-KA NZ

N02M-KA NZ

N02N-KA NZ

N03C-KA NZ

N03D-KA NZ

N04E-KA NZ

N04F-KA NZ

N05B-KA NZ

N09B-KA NZ

N10-KA NZ

N16-KA NZ

Item No: B03.100

ITEM ID DESCRIPTION

NOIA-IR NIR

NO2A-IR NIR

N/A N/A

SIZE

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

RPV-1 1-01

LINE NO.

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

ISI DRAWING NO.

RPV-1 1-01

ISI DRAWING NO.

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-1 1-01

.RPV- 1-01

RPV-11-01

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-1 1-01

RPV-11-01

RPV-11-01

ISI DRAWING NO.

RPV-11-01

RPV-1 1-01

GGNS-M-489.1

VOL

EXAM METHOD

VOL/SUR

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VOL

VOL.

Page No: 2

22,60

Revision: 13

NOTES

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

Page 108: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

Item No: B06.010

ITEM ID

NUT 51-76

Item No: B06.020

ITEM ID

STUD 51-76

Item No: B06.030

ITEM ID

STUD 1-25

STUD 26-50

STUD 51-76

Item No: B06.040

ITEM ID

FLG LIG 1-25

FLG LIG 26-50

FLG LIG 51-76

Item No: B06.050

ITEM ID

WASH. 51-76

Examination Category: B-G-2

Item No: B07.010

ITEM ID

N 16 NOZZLE

DESCRIPTION

BG

DESCRIPTION

BT

DESCRIPTION

BT

BT

BT

DESCRIPTION

THF

THF

THF

DESCRIPTION

BG

Code Class: 1

DESCRIPTION

BLT

SIZE

N/A

SIZE

N/A

SIZE

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A N/A

N/A N/A

SIZE

N/A

LINE NO.

N/A

N/A N/A

N/A N/A

SIZE

N/A

SIZE

N/A

LINE NO.

N/A

LINE NO.

N/A

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV-I 1-01

RPV-1 1-01

RPV-11-01

ISI DRAWING NO.

RPV-1 1-01

RPV-11-01

RPV-1 1-01

ISI DRAWING NO.

RPV-11-01

GGNS-M-489.1

EXAM METHOD

VT-i

EXAM METHOD

VOL

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VOL

VOL

VOL

EXAM METHOD

VT-i

ISI DRAWING NO. EXAM METHOD

RPV-11-61 VT-i

Page No: 4

NOTES

N/A

NOTES

45,55

NOTES

45,56

45,56

45,56

NOTES

35

35

35

NOTES

N/A

NOTES

N/A

Revision: 13

Page 109: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

LPRMISRM/IRMCAPSCRE BLT

Item No: B07.080

ITEM ID DESCRIPTION

CRD CAP SCREWS BLT

Examination Category: B-H Code Class: 1

Item No: B08.010

ITEM ID DESCRIPTION

CG C/RV-SK

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION

N03C-KB C/Z-SE

N05B-KC C/SE-SX

NIO-KC C/SE-X

Examination Category: B-N-1 Code Class: 1

Item No: B13.010

ITEM ID DESCRIPTION

B13DO01 - RPV RPV ACCESS S

Examination Category: B-N-2 Code Class: 1

Item No: B13.020

ITEM ID DESCRIPTION

.B13D001 - JPRO0A JP RISR TO RV

B13DO01 - JPROIB JP RISR TO RV

B13D001 - JPR02A JP RISR TO RV

N/A

SIZE

N/A

SIZE

N/A

SIZE

28.0

12.0

04.0

SIZE

U N/A

SIZE

N/A

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A

N/A

RPV-1 1-05

ISI DRAWING NO.

RPV-I 1-05

ISI DRAWING NO.

RPV-1 1-01

ISI DRAWING NO.

RPV-11-01

RPV-11-01

RPV-1 1-01

ISI DRAWING NO.

RPV-11-01

ISI DRAWING NO.

RPV-1 1-02

RPV-11-02

RPV-1 1-02

GGNS-M-489.1

VT-i

EXAM METHOD

VT-I

EXAM METHOD

SUR

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

EXAM METHOD

VT-i

VT-I

VT-I

Page No: 5

N/A

Revision: 13

NOTES

58,59

NOTES

N/A

NOTES

N/A

28

N/A

NOTES

25

NOTES

N/A

N/A

N/A

( L

Page 110: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

B13DO01 -JPR02B

B13DO01 - JPR03A

B13DO01 - JPR03B

B13DO01 - JPR04A

B13DO01 - JPR04B

B13DO01 - JPR05A

B13DO01 - JPR05B

B 13DOO - JPR06A

B 13DOOI - JPR06B

B13DO01 - JPR07A

B13DO01 - JPR07B

B13DOO1 - JPR08A

B13DOO - JPR08B

B13DO01 -JPR09A

B13DO01 -JPR09B

B13DO01 -JPRIOA

B13DO01 - JPRIOB

B13DO01 - JPRI IA

B13DO01 - JPRI IB

B13DO01 - JPR12A

B13DO01 - JPR12B

BI3DO01 - SHO0A

"B13D001 - SHOIB

B13DO01 - SHOIC

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

JP RISR TO RV

SAMPLE UPPER

SAMPLE UPPER

SAMPLE LOWER

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

RPV-1 1-02

RPV- 11-02

RPV- 11-02

RPV-1 1-02

RPV- 11-02

RPV- 11-02

RPV-I 1-02

RPV-I 1-02

RPV-1 1-02

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV-I 1-02

RPV- 11-02

RPV-1 1-02

RPV-1 1-02

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV-1 1-02

RPV- 11-02

GGNS-M-489.1

VT-I

VT-I

VT-1

VT-I

VT-I

VT-I

VT-I

VT-1

VT-I

VT-i

VT-1

VT-I

VT-1

VT-1

VT-1

VT-1

VT-i

VT-1

VT-I

VT-1

VT-I

VT-1

VT-I

VT-I

Revision: 13Page No: 6

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Page 111: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

B13DO01 - SH02A SAMPLE UPPER

B13DO01 - SH02B SAMPLE UPPER

B13D001 - SH02C SAMPLE LOWER

BI3D001 - SH03A SAMPLE UPPER

B13D001 - SH03B SAMPLE UPPER

B13D001 - SH03C SAMPLE LOWER

Item No: B13.030

ITEM ID DESCRIPTION

B13D001 -CS1L CS SPARGER BC

B13DO01 - CSIU CS SPARGER BC

B13D001 - CS2L CS SPARGER BC

B13D001 - CS2U CS SPARGER BC

B13D001 - CS3L CS SPARGER BC

B13D001 - CS3U CS SPARGER BC

B13D001 - CS4L CS SPARGER BC

B13DO01 - CS4U CS SPARGER BC

B13D001 - CS5L CS SPARGER BC

B13DO01 - CS5U CS SPARGER BC

B13DOO1 - CS6L CS SPARGER BC

B13DO01 - CS6U CS SPARGER BC

B13DO01 - FW01 FW SPARGER B

B13DO01 - FW02 FW SPARGER B

B13D001 - FW03 FW SPARGER B

B13D00I - FW04 FW SPARGER B

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV-I 1-02

RPV- 11-02

RPV-1 1-02

ISI DRAWING NO.

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV-1 1-02

RPV-1 1-02

RPV- 11-02

RPV-1 1-02

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV- 11-02

RPV-1 1-02

RPV-1 1-02

RPV-1 1-02

RPV- 11-02

GGNS-M-489.1

VT-I

VT-I

VT-I

VT-i

VT-I

VT-I

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

Revision: 13Page No: 7

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Page 112: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

B13DO01 - FW05 FW SPARGER B

B13DO01 - FW06 FW SPARGER B

B13D001 - FW07 FW SPARGER B

BI3D001 - FW08 FW SPARGER B

B13DO01 - FW09 FW SPARGER B

B13DO01 - FWIO FW SPARGER B

BI3DO01 - FWl I FW SPARGER B

B13DO01 - FW12 FW SPARGER B

B13DO01 -GB01

B13DO01 -GGB02

B13DO01 - SHDO0

B13DO01 - SHD02

B13DO01 - SHD03

B13DO01 - SHD04

B13DO01 - SHD05

BI3DO01 - SHD06

B13DO01 - SLOI

B13DOO1 -SLO2

B13DOO1 - SL03

B13DO01 - SL04

B13DO01 - SL05

B13D001 -SL06

B13DO01 - SHV01

B13DO01 - SS01

GUIDE BRACKE

GUIDE BRACKE

STM DR HD DW

STM DR HD DW

STM DR HD DW

STM DR HD DW

STM DR HD DW

STM DR HD DW

STM DRY SUP B

STM DRY SUP B

STM DRY SUP B

STM DRY SUP B

STM DRY SUP B

STM DRY SUP B

SHROUD TO RP

SHROUD SUP ST

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

RPV- 11-02

RPV-1 1-02

RPV- 11-02

RPV-1 1-02

RPV-1 1-02

RPV-I 1-02

RPV- 11-02

RPV-11-02

RPV-1 1-02

RPV-1 1-02

RPV- 11-02

RPV-I 1-02

RPV-1 1-02

RPV- 11-02

RPV- 11-02

RPV-1 1-02

RPV- 11-02

RPV-1 1-02

RPV- 11-02

RPV-1 1-02

RPV-1 1-02

RPV-1 1-02

RPV-1 1-03

RPV-1 1-03

GGNS-M-489.1

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

Revision: 13Page No: 8

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Page 113: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

B13D001 - SS02 SHROUD SUP ST

B13D001 - SS03 SHROUD SUP ST

BI3DO01 - SS04 SHROUD SUP ST

B13D001 - SS05 SHROUD SUP ST

B13DO01 - SS06 SHROUD SUP ST

BI3DOO - SS07 SHROUD SUP ST

B13D001 - SS08 SHROUD SUP ST

B13DO01 - SS09 SHROUD SUP ST

B13D001 - SSIO SHROUD SUP ST

B13D001 - SS11 SHROUD SUP ST

B13D001 -SS12 SHROUD SUP ST

BI3DO01 - SS13 SHROUD SUP ST

B13D001 - SS14 SHROUD SUP ST

Item No: B13.040

ITEM ID DESCRIPTION

CORE SUPPORT STRUCT. ACCESS. SURF.

Examination Category: B-O Code Class: 1

Item No: B14.010

ITEM ID DESCRIPTION

CRD HOUSING WELDS CRD HSG. WELD

Examination Category: F-A Code Class: 1

Item No: F01.040

ITEM ID DESCRIPTION

B13D003S1 EQS

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

SIZE

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

L[NE NO.

N/A

RPV- 11-03

RPV-11-03

RPV-1 1-03

RPV- 11-03

RPV- 11-03

RPV-1 1-03

RPV- 11-03

RPV- 11-03

RPV-1 1-03

RPV-1 1-03

RPV-l 1-03

RPV-1 1-03

RPV-I 1-03

ISI DRAWING NO.

RPV-1 1-03

ISI DRAWING NO.

RPV-I 1-05

ISI DRAWING NO.

RPV- 11-04

GGNS-M-489.1

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

EXAM METHOD

VOL OR SUR

EXAM METHOD

VT-3

, (

Revision: 13Page No: 9

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

NOTES

30,65

NOTES

N/A

Page 114: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL

Examination Category: X-AUG Code Class: N/A

Item No: B07.080

ITEM ID DESCRIPTION

CRD CAP SCREWS BLT

Item No: N/A

ITEM ID DESCRIPTION

NO4A-IR NIR

N04B-IR NIR

N04C-IR NIR

N04D-IR NIR

N04E-IR NIR

NO4F-IR NIR

GGNS-M-489.1

SIZE

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

LINE NO.

N/A

LINE NO.

N/A

N/A

N/A

N/A

N/A

N/A

ISI DRAWING NO.

RPV-1 1-05

ISI DRAWING NO.

RPV-11-01

RPV-1 1-01

RPV-I 1-01

RPV-11-01

RPV-11-01

RPV-11-01

EXAM METHOD

VOL

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

Page No: 10 Revision: 13

NOTES

62

NOTES

24

24

24

24

24

24

(

Page 115: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B13 REACTOR PRESSURE VESSEL GGNS-M-489.1 Page No: 11 Revision: 13

Examination Notes for System: B13

22 Examine 1/3 of circumference each period

24 Examination required per NUREG 0619, See Section 11 for details

25 Examination required at approximately 3 year intervals (every 2nd refuel outage)

28 GL 88-01, IGSCC Category C, Reference SIL-455, See Section 11 for details

30 May defer until end of interval

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

45 Reference SIL-055, See Section 11 for details

55 Examination performed when in place

56 Examination performed when removed (maximum of once per interval)

58 CRD bolting examination required only when connection is disassembled

59 Reference SIL-483, See Section 11 for details

60 May be examined during the 1 st and 3rd period provided at least 50% is completed in the 1st period

62 See Section 9 for successive examination requirements

64 Examination may be deferred until RF- 11, Reference Relief Request 1-2-00001

65 Examine 10% of peripheral housings. There are 36 peripheral housings, 4 require examination.

Page 116: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

Examination Category: B-G-I Code Class: I

Item No: B06.210

ITEM ID DESCRIPTIOiN

1B21F028A BT

1B21F028B BT

1B21F028C BT

1B21F028D BT

1B21F022A BT

1B21F022B BT

1B21F022C BT

1B21F022D BT

Item No: B06.220

ITEM ID DESCRIPTIOb

1B21F028A FS

1B21F028B FS

IB21FO28C FS

1B211F028D FS

1B21F022A FS

IB21FO22B FS

1B21F022C FS

1B21F022D FS

Item No: B06.230

ITEM ID DESCRIPTIOI

1B21F028A BG

GGNS-M-489.1

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

LINE NO.

MSA-003

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

MSA-003

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

MSA-003

ISI DRAWING NO.

MS-08-01

MS-08-02

MS-08-03

MS-08-04

MS- 11-03

MS-I 1-06

MS-1 1-09

MS-11-12

ISI DRAWING NO.

MS-08-01

MS-08-02

MS-08-03

MS-08-04

MS-11-03

MS-11-06

MS-I 1-09

MS-11-12

ISI DRAWING NO.

MS-08-01

Page No: 12 Revision: 13

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

EXAM METHOD

VT-1

VT-1

VT-I

VT-I

VT-I

VT-i

VT-1

VT-i

EXAM METHOD

VT-I.

,l/

NOTES

31

31

31

31

31

31

31

31

NOTES

31,35

31,35

31,35

31,35

31,35

31,35

31,35

31,35

NOTES

31

Page 117: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

1B21F028B BG

1B21F028C BG

1B21F028D BG

1B21F022A BG

1B21F022B BG

IB21F022C BG

IB21FO22D BG

Examination Category: B-G-2 Code Class: 1

Item No: B07.050

ITEM ID DESCRIPTIOD

FLG CONN W8,W9 BLT

Item No: B07.070

ITEM ID DESCRIPTIOt

1B21F032A BLT

1B21F032B BLT

1B21FO41A BLT

IB21FO41E BLT

1B21F047A BLT

IB21FO51A BLT

1B21FO41B BLT

IB21FO41F BLT

IB21FO41K BLT

IB21FO51B BLT

IB21FO51F BLT

4

4-

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

N/A

SIZE

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MSA-002

MSA-002

LINE NO.

DBA-019

LINE NO.

DBA-013

DBA-013

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MS-08-02

MS-08-03

MS-08-04

MS-I 1-03

MS-i 1-06

MS-1 1-09

MS-I 1-12

ISI DRAWING NO.

MS-11-14

1S DRAWING NO.

FW-08-02

FW-08-04

RV-11-01

RV-11-01

RV-11-01

RV-11-01

RV- 11-05

RV-i 1-05

RV- 11-05

RV- 11-05

RV- 11-05

GGNS-M-489.1

VT-I

VT-I

VT-I

VT-I

VT-i

VT-I

VT-I

EXAM METHOD

VT-i

EXAM METHOD

VT-1

VT-i

VT-I

VT-1

VT-I

VT-I

VT-I

VT-i

VT-I

VT-I

VT-I

Revision: 13Page No: 13

31

31

31

31

31

31

31

NOTES

N/A

NOTES

31

31

31

31

31

31

31

31

31

31

31

Page 118: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

IB21FO51K BLT

IB21FO41C BLT

1B21FO41G BLT

1B21F047C BLT

1B21F047G BLT

1B21F047L BLT

1B21FO51C BLT

1B21FO41D BLT

1B21F047D BLT

1B21F047H BLT

1B21FO51D BLT

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION

11B21G026W16 C/P-Z

1B21G026W10 C/P-Z

1B21G026-13-11-1 C/P-T

1B21G026-13-11-4 C/T-P

11B21G026W22 C/V-P

IB21G026-14-11-1 C/P-T

11B21G026W30 C/P-P

11B21G026W29 C/P-Z

1B21G026W32 C/P-Z

11B21G026W26 C/P-Z

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

SIZE

12.0

12.0

24.0

12.0

24.0

18.0

12.0

12.0

12.0

12.0

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

LINE NO.

DBA-017

DBA-017

DBA-013

DBA-017

DBA-013

DBA-013

DBA-017

DBA-017

DBA-017

DBA-017

RV- 11-05

RV-11-11

RV-1 1-11

RV-11-11

RV-1 1-11

RV-11-11

RV-1 1-11

RV-1 1-16

RV-11-16

RV-11-16

RV-I 1-16

ISI DRAWING NO.

FW- 11-05

FW- 11-06

FW-11-08

FW-11-08

FW-1 1-08

FW- 11-09

FW- 11-09

FW-11-10

FW-11-11

FW-1 1-12

GGNS-M-489.1

VT-I

VT-I

VT-I

VT-I

VT-1

VT-I

VT-I

VT-I

VT-I

VT-i

VT-I

EXAM METHOD

VOLUSUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VO1JSUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

Revision: 13Page No: 14

31

31

31

31

31

31

31

31

31

31

31

NOTES

N/A

N/A

N/A

N/A

23

N/A

N/A

N/A

N/A

N/A

Page 119: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

1i

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

1B21G03IW54 C/H-V

IB21G031W19 C/H-V

1B21GI2-C1-A C/P-H

Item No: B09.021

ITEM ID DESCRIPTION

IB21G230-01-08-2 C/P-T

1B21G230-01-08-7 C/T-P

1B21G230W8 C/P-W

1B21G116-IF-08-11 C/P-E

1B21G116-1F-08-12 C/E-P

1B21G116-1F-08-13 C/P-T

1B21G116-1F-08-14 C/T-P

IB21G116W21 C/T-P

IB21G117-IG-08-10 C/T-P

IB21G117-IG-08-5 C/P-T

IB21G114-1H-08-11 C/P-E

1B21GI14-1H-08-12 C/E-P

1B21G114-1H-08-13 C/P-T

1B21G114-1H-08-14 C/T-P

1B21G115-1F-08-10 C/T-P

IB21G115-1F-08-5 C/P-T

IB21GI15W19 C/P-T

Item No: B09.031

ITEM ID DESCRIPTION

28.0

28.0

28.0

SIZE

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

01.5

MSA-003

MSA-003

MSA-003

LINE NO.

DBA-087

DBA-087

DBA-087

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

SIZE LINE NO.

MS-08-03

MS-08-04

MS-I 1-09

ISI DRAWING NO.

FW-08-05

FW-08-05

FW-08-05

MS-08-05

MS-08-05

MS-08-05

MS-08-05

MS-08-05

MS-08-06

MS-08-06

MS-08-07

MS-08-07

MS-08-07

MS-08-07

MS-08-08

MS-08-08

MS-08-08

ISI DRAWING NO.

GGNS-M-489.1

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

EXAM METHOD

Revision: 13Page No: 15

23

23

23

NOTES

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

NOTES

(

Page 120: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

C

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

IB21G8-AI-F B

Item No: B09.040

ITEM ID DESCRIPTIO

1B21G117W17 SW

IB21G115W1 SW

IB21GI57W6 SW

IB21GI55W8 SW

1B21GI56W9 SW

Examination Category: B-M-2 Code Class:

Item No: B12.050

ITEM ID DESCRIPTIO

1B21F032A

1 B21F032B

1B21FO10A

IB21FO11A

1B21FOlOB

IB21FO11B

IB21FO28A

1B21F028B

1B21F028C

1B21F028D

11B21F022A

1B21F022B

08.0 MSA-002

SIZE

02.0

02.0

02.0

02.0

02.0

N

1

'N

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

VB

LINE NO.

DBA-025

DBA-025

DBA-022

DBA-022

DBA-022

SIZE LINE NO.

24.0

24.0

24.0

24.0

24.0

24.0

28.0

28.0

28.0

28.0

28.0

28.0

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

DBA-013

MSA-003

MSA-003

MSA-003

MSA-003

MSA-002

MSA-002

MS-I 1-02

ISI DRAWING NO.

MS-08-06

MS-08-08

SD-11-03

SD-I 1-04

SD-I 1-05

ISI DRAWING NO.

FW-08-02

FW-08-04

FW-11-01

FW-11-01

FW- 11-07

FW- 11-07

MS-08-01

MS-08-02

MS-08-03

MS-08-04

MS-1 1-03

MS-I 1-0§

GGNS-M-489.1

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

28.0 MSA-002 MS- 11-09 VT-3

,.

Page No: 16

N/A

Revision: 13

NOTES

23

23

N/A

N/A

N/A

NOTES

31

31

31

31

31

31

31

31

31

31

31

31

1IB21 F022C VB 31

Page 121: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

1B21F022D VB

1B21FO41A VB

1B21FO41E VB

1B21F047A VB

IB21FO51A VB

1B21FO41B VB

IB21FO41F VB

IB21F041K VB

IB21FO51B VB

1B21FO51F VB

IB21FO51K VB

IB21FO41C VB

1B21FO41G VB

1B21F047C VB

1B21F047G VB

1B21F047L VB

IB21FO51C VB

IB21F041D VB

1B21F047D VB

1B21F047H VB

1B21FO51D VB

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION

28.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

08.0

MSA-002

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MSA-001

MS-11-12

RV-11-01

RV-1 1-01

RV-11-01

RV-11-01

RV-11-05

RV-11-05

RV-11-05

RV- 11-05

RV- 11-05

RV- 11-05

RV-1 1-11

RV-1 1-11

RV-11-11

RV-1 1-11

RV-11-11

RV-11-11

RV-1 1-16

RV-11-16

RV-1 1-16

RV-11-16

GGNS-M-489.1

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

0

ISI DRAWING NO. EXAM METHOD

Page No: 17

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

31

Revision: 13

l

SIZE LINE NO. NOTES

Page 122: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

1B21G03lW57 C/V-P

Examination Category: D-A Code Class: 3

Item No: D01.020

ITEM ID DESCRIPTION

Q11B21G024A02 A

Q1B21GO22AO0 A

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION

QIB21GO02H101A-A & B SC

Q1B21GI53C02 SC, B3

QIB21GI53HO1 SB1

Q1B21G156RO0 SB1

Item No: F01.020

ITEM ID DESCRIPTIOQI

QIB21GO30HO1 SC

Item No: F01.030

ITEM ID DESCRIPTIOb

Q11B21G024A02 SB1-A

Examination Category: X-AUG Code Class: 1•

Item No: N/A

ITEM ID DESCRIPTIO1•

1B21G030-2-8-6 C/P-E

1 B2 1G030-2-8-7 C/P-E

28.0 DBB-023

SIZE

N/A

N/A

[/A

SIZE

28.0

02.0

02.0

02.0

SIZE

24.0

SIZE

10.0

SIZE

24.0

24.0

LINE NO.

GBC-010

GBC-010

LINE NO.

MSA-002

DBA-019

DBA-019

DBA-022

LINE NO.

DBB-073

LINE NO.

GBC-010

LINE NO.

DBB-073

DBB-073

MS-08-03

ISI DRAWING NO.

RV- 11-03

RV-1 1-09

ISI DRAWING NO.

MS- 11-02

MS-11-13

MS-11-13

SD-1 1-05

ISI DRAWING NO.

FW-08-04

ISI DRAWING NO.

RV- 11-03

ISI DRAWING NO.

FW-08-01o

FW-08-01

GGNS-M-489.1

VOL/SUR

EXAM METHOD

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

EXAM METHOD

VT-3

EXAM METHOD

VOL

VOL

Page No: 18

23

Revision: 13

NOTES

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

NOTES

N/A

NOTES

N/A

NOTES

23

23

,I

Page 123: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

1 B2 1GO30D 100A-4 C/TS-P

11B21G030W42 C/E-TS

IB21G030-15-8-1 C/P-E

1B21G030-15-8-2 C/P-E

1 B21G030W61 C/P-E

1B21G030W75 C/E-P

lB21G030W76 C/P-E

IB21G230W1 C/V-P

1B21G031-38-8-1 C/P-P

1B21G031-39-8-1 C/P-P

1B21G031W55 C/V-P

1B21G031W56 C/P-V

1B21G031-15-8-1 C/P-P

1B21G031W21 C/P-V

1B21G031W22 C/V-P

1B21G117-1F-08-14 C/T-P

IB21G117-1G-08-2 C/P-E

1B21G117-1G-08-3 C/E-R

1B21G117-1G-084 C/R-P

1B21G117W15 SW

IB21Gl14WI8 C/T-P

IB21G115-1F-08-2 C/P-E

1B21G115-1F-08-3 C/E-R

1B21G115-1F-08-4 C/R-P

30.0

24.0

24.0

24.0

24.0

24.0

24.0

01.5

28.0

28.0

28.0

28.0

28.0

28.0

28.0

01.5

02.0

02.0

01.5

01.5

01.5

02.0

02.0

01.5

DBB-073

DBB-073

DBB-073

DBB-073

DBB-073

DBB-073

DBB-073

DBA-087

DBB-023

DBB-023

DBB-023

DBB-023

DBB-023

DBB-023

DBB-023

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

DBA-025

FW-08-01

FW-08-01

FW-08-03

FW-08-03

FW-08-03

FW-08-03

FW-08-03

FW-08-05

MS-08-03

MS-08-03

MS-08-03

MS-08-03

MS-08-04

MS-08-04

MS-08-04

MS-08-06

MS-08-06

MS-08-06

MS-08-06

MS-08-06

MS-08-07

MS-08-08

MS-08-08

MS-08-08

GGNS-M-489.1

VOL

VOL

VOL

VOL

VOL

VOL

VOL

SUR

VOL

VOL

VOL

VOL

VOL

VOL

VOL

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

Revision: 13Page No: 19

23,34

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

Page 124: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B21 NUCLEAR BOILER SYSTEM

IB21GO01W1l C/E-P

IB21G1O-B1-B-L-A-U L

IB21G1O-B1-B-L-B-U L

1B21GOOIW5 C/V-P

1B21GO01W10 C/V-P

1B21G021-5-8-1 C/P-E

IB21GO21-5-8-2 C/E-P

1B21G021W73 C/P-P

1B21G021W3 C/P-V

1B21G021W4 C/V-P

Examination Notes for System:

28.0

28.0

28.0

28.0

28.0

03.0

03.0

03.0

03.0

03.0

MSA-002

MSA-002

MSA-002

MSA-003

MSA-003

DBD-031

DBD-031

DBD-031

DBA-023

DBA-023

MS- 11-05

MS-i 1-05

MS- 11-05

MS-I 1-09

MS-I 1-12

SD-08-02

SD-08-02

SD-08-02

SD-1 1-02

SD- 11-02

GGNS-M-489.1

VOL

VOL

VOL

VOL

VOL

SUR

SUR

SUR

SUR

SUR

B21

23 No Break Zone, See Section II for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

34 Examination includes that portion within the examination volume of the intersecting circumferential weld (Reference Code Case N-524)

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

Revision: 13Page No: 20

23

23,34

23,34

23

23

23

23

23

23

23

Page 125: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B33 REACTOR RECIRCULATION SYSTEM

Examination Category: B-G-1 Code Class: 1

Item No: B06.180

ITEM ID DESCRIPTION SIZE

1B33C001A %BT N/A

1B33C001B BT N/A

Item No: B06.190

ITEM ID DESCRIPTION SIZE

1B33C001A FS N/A

IB33CO01B FS N/A

Item No: B06.200

ITEM ID DESCRIPTION SIZE

1B33COO1A BG N/A

1B33CO01B BG N/A

Examination Category: B-G-2 Code Class: 1

Item No: B07.060

ITEM ID DESCRIPTION SIZE

1B33C001A BLT N/A

1B33CO01B BLT N/A

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1B33F023A BLT N/A

1B33F060A BLT N/A

1B33F067A BLT N/A

1B33F023B BLT N/A

GGNS-M-489.1

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

LINE NO.

RRA-001

RRA-002

RRA-002

RRA-001

ISI DRAWING NO.

RR-I 1-02

RR- 11-09

ISI DRAWING NO.

RR- 11-02

RR- 11-09

ISI DRAWING NO.

RR- 11-02

RR-1 1-09

ISI DRAWING NO.

RR- 11-02

RR-1 1-09

ISI DRAWING NO.

RR-11-01

RR- 11-02

RR- 11-03'

RR-1 1-08

EXAM METHOD

VOL

VOL

EXAM METHOD

VT-1

VT-I

EXAM METHOD

VT-I

VT-1

EXAM METHOD

VT-1

VT-1

EXAM METHOD

VT-1

VT-i

VT-1

VT-I

Page No: 21 Revision: 13

NOTES

31

31

NOTES

31,35

31,35

NOTES

31

31

NOTES

31

31

NOTES

31

31

31

31

Y ,

Page 126: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B33 REACTOR RECIRCULATION SYSTEM

IB33F060B BLT N/A

1B33F067B BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID

1B33GO01WI

1B33G001W24

1B33G001W38

1B33G001W40

1B33G001W36

1B33G001 W42

1B33G001W44

1B33G00 IW46

IB33G023W116

IB33G023W117

1B33G023W37

Item No: B09.012

ITEM ID

IB33GO01Wl-L-D

IB33G001W24-L-D

1B33G 11-B206-B-L-U

1B33G 11-B231-B-L-U

IB33G 11-B257-B-L-U

I B33GI I -B282-B-L-U

DESCRIPTION

C/Z-P

C/Z-P

c/P-z

C/P-Z

C/P-Z

c/P-Z

C/P-Z

C/P-z

C/P-E

C/E-P

C/T-P

DESCRIPTION

L

L

L

L

L

L

RRA-002

RRA-002

SIZE LINE NO.

24.0

24.0

12.0

12.0

12.0

12.0

12.0

12.0

20.0

20.0

20.0

SIZE

24.0

24.0

12.0

12.0

12.0

12.0

RRA-001

RRA-001

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

RRA-005

DCA-025

DCA-025

DCA-025

LINE NO.

RRA-001

RRA-001

RRA-005

RRA-005

RRA-005

RRA-005

RR-1 1-09

RR-11-10

IS1 DRAWING NO.

RR-I 1-01

RR- 11-08

RR-1 1-12

RR-1 1-12

RR-11-13

RR-I 1-13

RR-1 1-14

RR-I 1-14

RR-I 1-15

RR-1 1-15

RR-11-15

ISI DRAWING NO.

RR-11-01

RR-1 1-08

RR-1 1-12

RR-I1-12

RR-11-14

RR-11-13

GGNS-M-489.1

VT-1

VT-1

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOUSUR

VOUSUR

VOLJSUR

VOL/SUR

VOUSUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VOL/SUR

VOL/SUR

VOUSUR

VOL/SUR

VOL/SUR

VOL/SUR

Revision: 13Page No: 22

31

31

NOTES

26

26

26

26

26

26

26

26

26

26

26

NOTES

26,34

26,34

26,34

26,34

26,34

26,34

Page 127: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B33 REACTOR RECIRCULATION SYSTEM

1B33GII-B308-B-L-U L 12.0

IB33GII-B333-B-L-U L 12.0

Item No: B09.021

ITEM ID DESCRIPTION SIZE

1B33GI05WI4 C/P-V 02.0

1B33G105WI6 C/P-V 02.0

1B33G105W17 C/V-P 02.0

Item No: B09.031

ITEM ID DESCRIPTION SIZE

1B33G10-AI-J B 12.0

1B33G10-BI-J B 12.0

1B33G10-BI-K B 12.0

Examination Category: B-K-I Code Class: 1

Item No: B10.020

ITEM ID DESCRIPTION SIZE

1B33C001B-B3LUG1 A N/A

1B33COOB-B4LUG4 A N/A

1B33C001B-B5LUG5 A N/A

1B33C001B-B6LUG6 A N/A

Examination Category: B-L-2 Code Class: 1

Item No: B12.020

ITEM ID DESCRIPTION SIZE

1B33COOA PC 24.0

IB33CO01B PC 24.0

RRA-005

RRA-005

LINE NO.

DCA-024

DCA-024

DCA-024

LINE NO.

RRA-005

RRA-004

RRA-004

LINE NO.

RRA-002

RRA-002

RRA-002

RRA-002

LINE NO.

RRA-002

RRA-002

RR-I 1-14

RR-I 1-14

ISI DRAWING NO.

RR-1 1-22

RR-1 1-22

RR-1 1-22

ISI DRAWING NO.

RR- 11-04

RR-11-11

RR-11-11

ISI DRAWING NO.

RR-I 1-09

RR- 11-09

RR- 11-09

RR- 11-09

ISI DRAWING NO.

RR-1 1-02

RR- 11-09

GGNS-M-489.1

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

SUR

EXAM METHOD

VT-3

VT-3

Revision: 13Page No: 23

26,34

,26,34

NOTES

N/A

N/A

N/A

NOTES

26

26

26

NOTES

N/A

N/A

N/A

N/A

NOTES

31

31

Page 128: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B33 REACTOR RECIRCULATION SYSTEM

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1B33F023A VB 24.0

1B33F060A VB 24.0

1B33F067A VB 24.0

IB33F023B VB 24.0

IB33F060B VB 24.0

1B33F067B VB 24.0

Examination Category: F-A Code Class: I

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1B33G002H305B SC-A 24.0

QIB33G002H306B SC 24.0

Q1B33G002H304B SC 24.0

Q1B33G024C03 SB1 04.0

QIB33G105CO1 SC,1B3 02.0

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE

IB33COO1A SUCT SPLITTER N/A

1B33G001W4 C/P-V 24.0

IB33CO01B SUCT SPLITTER N/A

1B33G001W29 C/M-P 24.0

GGNS-M-489.1

LINE NO.

RRA-001

RRA-002

RRA-002

RRA-001

RRA-002

RRA-002

LINE NO.

RRA-001

RRA-001

RRA-002

DBA-0 1I

DCA-024

LINE NO.

RRA-002

RRA-001

RRA-002

RRA-002

ISI DRAWING NO.

RR-1 1-01

RR- 11-02

RR- 11-03

RR- 11-08

RR- 11-09

RR-11-10

ISI DRAWING NO.

RR- 11-08

RR-1 1-08

RR- 11-09

RR-11-19

RR- 11-22

ISI DRAWING NO.

RR- 11-02

RR- 11-02

RR-11-09

RR- 11-09

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VOLJSUR

VT-3

VOL/SUR

(

Page No: 24 Revision: 13

NOTES

31

31

31

31

31

31

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

57

27

57

27

Page 129: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: B33 REACTOR RECIRCULATION SYSTEM GGNS-M-489.1 Page No: 25 Revision: 13

1B33G10-BI-C C/P-X 16.0 RRA-004 RR-11-11 VOL/SUR 27

Examination Notes for System: B33

26 GL 88-01, IGSCC Category A, See Section 11 for details

27 GL 88-01, IGSCC Category B, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

34 Examination includes that portion within the examination volume of the intersecting circumferential weld (Reference Code Case N-524)

35 Flange surface examination required only when connection is disassembled, bushings may be inspected in place

57 Reference SIL-415, See Section 11 for details

Page 130: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: Cl1 CONTROL ROD DRIVE HYDRAULIC SYSTE

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE LINE NO.

IC11G101O-10 C/P-T 08.0 DVB-001

1C11GIO1OW85 C/T-E 12.0 DVB-001

Examination Category: F-A Code Class: 2

Item No: F01.020

ITEM ID DESCRIPTION SIZE LINE NO.

QIC11BSP1O SBI 08.0 DVB-001

GGNS-M-489.1 Page No: 26

ISI DRAWING NO.

RD-I 1-02

RD- 11-02

ISI DRAWING NO.

RD-I 1-01

EXAM METHOD

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

Examination Notes for System: C11

Revision: 13

NOTES

N/A

N/A

NOTES

N/A

(

Page 131: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: C41 STANDBY LIQUID CONTROL SYSTEM

Examination Category: B-J Code Class: 1

Item No: B09.021

ITEM ID DESCRIPTION SIZE

1C41GI36W510 C/P-E 01.5

1C41G136W511 C/E-P 01.5

Examination Category: F-A Code Class: I

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1C41GI20CO2 SB1 01.5

GGNS-M-489.1 Page No: 27

LINE NO.

DCA-002

DCA-002

LINE NO.

DCA-002

ISI DRAWING NO. EXAM METHOD

LC-11-13 SUR

LC-11-13 SUR

ISI DRAWING NO. EXAM METHOD

LC- 11-08 VT-3

Examination Notes for System: C41

Revision: 13

NOTES

N/A

N/A

NOTES

N/A

(

Page 132: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1E12F041A BLT N/A

1E12FO41B BLT N/A

IE12F041C BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E12G014W45 C/P-V 06.0

IE12G016-9-11-2 C/E-P 12.0

1EI2GO16W16 C/P-Z 12.0

IE12G016W23 C/P-P 12.0

1E12G016-3-11-1 C/E-P 12.0

IE12GO16WI0 C/E-P 12.0

1E12G015W16 C/P-H 14.0

IE12G015W98 C/P-H 14.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1E12F019 VB 06.0

1E12F023 VB 06.0

IE12F008 VB 20.0

1E12F009 VB 20.0

GGNS-M-489.1

LINE NO.

DBA-029

DBA-028

DBA-038

LINE NO.

DBA-032

DBA-038

DBA-038

DBA-038

DBA-038

DBA-038

DBA-029

DBA-029

LINE NO.

DBA-032

DBA-032

DBA-064

DBA-064

ISI DRAWING NO.

RH-I 1-03

RH- 11-04

RH- 11-05

ISI DRAWING NO.

RH-08-08

RH- 11-05

RH- 11-05

RH-i 1-06

RH-i 1-07

RH- 11-07

RH-i 1-09

RH-I 1-09

ISI DRAWING NO.

RH-08-08

RH-08-08

RH-I 1-01,

RH-I 1-01

EXAM METHOD

VT-I

VT-I

VT-I

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOUSUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

Page No: 28 Revision: 13

NOTES

31

31

31

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

31

31

31

31

(/ JL

Page 133: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

IE12FO10 VB 20.0

IE12F039A VB 14.0

IE12FO41A VB 14.0

IE12F039B VB 14.0

IE12FO41B VB 14.0

1E12F039C VB 12.0

IE12FO41C VB 12.0

1E12F042C VB 12.0

IE12F042A VB 14.0

IE12F042B VB 14.0

Examination Category: C-A Code Class: 2

Item No: C01.020

ITEM ID DESCRIPTION SIZE

IE12BO01A-C-4 HD N/A

Examination Category: C-B Code Class: 2

Item No: C02.021

ITEM ID DESCRIPTION SIZE

1EI2B001A-N3 NZ N/A

Item No: C02.022

ITEM ID DESCRIPTION SIZE

1E12B0O1A-N3 NIR N/A

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

DBA-064

DBA-029

DBA-029

DBA-029

DBA-029

DBA-038

DBA-038

DBA-038

DBA-029

DBA-028

LINE NO.

GBB-018

LINE NO.

GBB-018

LINE NO.

GBB-018

LINE NO.

RH-I 1-01

RH-111-03

RH- 11-03

RH- 11-04

RH- 11-04

RH-i 1-05

RH- 11-05

RH-11-08

RH-I 1-09

RH-11-11

ISI DRAWING NO.

RH-07-19

ISI DRAWING NO.

RH-07-19

ISI DRAWING NO.

RH-07-19

GGNS-M-489.1

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL

EXAM METHOD

VOL/SUR

EXAM METHOD

VOLJSUR

ISI DRAWING NO. EXAM METHOD

Revision: 13Page No: 29

31

31

31

31

31

31

31

31

31

31

NOTES

N/A

NOTES

N/A

NOTES

N/A

NOTES

(

Page 134: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

IE12G012WI22 C/E-V 18.0

IE12G012W35 C/Z-R 18.0

1EI2G021W55 CIT-P 12.0

IEI2G021W56 CIT-P 12.0

1E12G021W501 C/P-V 06.0

IE12G012W53 C/R-P 18.0

IE12G012W56 C/P-V 18.0

1E12GO10-8-8-1 C/P-F 24.0

1E12GO07W501 C/P-T 18.0

IE12G007W502

IEl2G007W503

1E12G008-5-10-1

IE12G008-5-10-2

1E12G008-5-10-3

Item No: C05.081

ITEM ID

IE12G014W501

Examination Category: C-G

Item No: C06.010

ITEM ID

1E12CO02B-SB-2

1E12C002B-SB-3

"1E12CO02B-SB-4

1El 2C002B-SB-5

C/T-P

C/T-P

C/P-E

C/E-P

C/P-F

DESCRIPTION

B

Code Class: 2

DESCRIPTION

PC

PC

PC

PC

18.0

18.0

24.0

24.0

24.0

SIZE

06.0

SIZE

N/A

N/A

N/A

N/A

GBB-021

GBB-018

DBB-072

DBB-072

DBB-071

GBB-031

GBB-031

GBB-073

GBB-058

GBB-058

GBB 1142

GBB-062

GBB-062

GBB-062

LINE NO.

GBB-090

LINE NO.

GBB-074

GBB-074

GBB-074

GBB-074

RH-07-16

RH-07-19

RH-08-01

RH-08-01

RH-08-02

RH-08-09

RH-08-09

RH-08-12

RH-10-03

RH-10-03

RH-10-03

RH-10-06

RH-10-06

RH-10-06

ISI DRAWING NO.

RH-08-17

ISI DRAWING NO.

RH-08-12

RH-08-12

RH-08-1ý

RH-08-12

GGNS-M-489.1

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOI/SUR

VOIJSUR

VOI/SUR

VOLJSUR

VOU/SUR

EXAM METHOD

SUR

EXAM METHOD

SUR

SUR

SUR

SUR

Revision: 13Page No: 30

N/A

N/A

23

23

23

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

NOTES

N/A

N/A

N/A

N/A

(!i (

Page 135: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

,

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

1E12C002B-SB-6 PC N/A

Item No: C06.020

ITEM ID DESCRIPTION SIZE

IE12F416 VB 08.0

Examination Category: D-A Code Class: 3

Item No: D01.020

ITEM ID DESCRIPTION SIZE

Q1E12GO50RO5 A N/A

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

QIE12G016H02 SBI 12.0

QIE12GO16HO3 SBI 12.0

Q1E12GO16COI SB2 12.0

Item No: F01.020

ITEM ID DESCRIPTION SIZE

QIE12GO12H21 SBI 24.0

Q1E12GO12RI7 SB1-A 24.0

QIE12GO13ROI SB1 18.0

Q1E12GO12HO2 SC 18.0

QIEI2GO12HO3 SC 18.0

Q1E12GO21HOI SB1-A 18.0

Q1E12GO14CO4 SC, B3 12.0

GBB-074

LINE NO.

GBB 1142

LINE NO.

GBC-024

LINE NO.

DBA-038

DBA-038

DBA-038

LINE NO.

GBB-030

GBB-030

GBB-051

GBB-018

GBB-018

DBB-072

DBB-068

RH-08-12

ISI DRAWING NO.

RH-10-11

ISI DRAWING NO.

RH-10-12

ISI DRAWING NO.

RH- 11-07

RH- 11-07

RH-1 1-08

ISI DRAWING NO.

RH-07-03

RH-07-03

RH-07-10

RH-07-19

RH-07-19

RH-08-01

RH-08-20

GGNS-M-489.1

SUR

EXAM METHOD

SUR

EXAM METHOD

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

Page No: 31

N/A

NOTES

N/A

NOTES

N/A

NOTES

N/A

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Revision: 13

U

Page 136: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E12 RESIDUAL HEAT REMOVAL SYSTEM

Item No: F01.030

ITEM ID DESCRIPTION SIZE

QIE12GO50RO5 SB1-A 10.0

Item No: F01.040

ITEM ID DESCRIPTION SIZE

Q1E12BO03A&B-SIA EQS 10.0

Q1EI2BO03A&B-S1B EQS 10.0

Q1E12BO03A&B-S2A EQS 10.0

QIE12B003A&B-S2B EQS 10.0

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE

1E12G021-6-8-1 C/E-P 12.0

1E12G021W14 C/P-E 12.0

1E12GO21WI5 C/P-T 12.0

1E12G02lW44 C/P-P 12.0

1E12G02IW64 C/P-P 12.0

1E12G021W65 C/P-P 12.0

1E12G021W502 C/V-P 06.0

LINE NO.

GBC-024

LINE NO.

GBC-024

GBC-024

GBC-024

GBC-024

LINE NO.

DBB-072

DBB-072

DBB-072

DBB-072

DBB-072

DBB-072

DBB-071

ISI DRAWING NO.

RH-10-12

ISI DRAWING NO.

RH-10-11

RH-10-11

RH-10-11

RH-10-1 I

ISI DRAWING NO.

RH-08&01

RH-08-01

RH-08-01

RH-08-01

RH-08-0 1

RH-08-01

RH-08-02

GGNS-M-489.1

EXAM METHOD

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

Page No: 32 Revision: 13

NOTES

N/A

NOTES

N/A

N/A

N/A

N/A

NOTES

23

23

N/A

23

23

23

23

/

Page 137: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E12 RESIDUAL HEAT REMOVAL SYSTEM GGNS-M-489.1 Page No: 33 Revision: 13

Examination Notes for System: E12

23 No Break Zone, See Section 11 for details

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page 138: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E21 LOW PRESSURE CORE SPRAY SYSTEM

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1E21F006 BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E21GOO2W1O C/H-E 14.0

1E21G002W23 C/P-H 14.0

IE21G002W3 C/P-H 14.0

1E21G002W4 C/H-P 14.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1E21F007 VB 14.0

1E21F006 VB 14.0

1E21F005 VB 14.0

Examination Category: C-D Code Class: 2

Item No: C04.030

ITEM ID DESCRIPTION SIZE

BOLTING (E21COO1) BT 02.3

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

GGNS-M-489.1

LINE NO.

DBA-001

LINE NO.

DBA-001

DBA-001

DBA-001

DBA-00i

LINE NO.

DBA-001

DBA-001

DBA-001

LINE NO.

GBB-007

LINE NO.

ISI DRAWING NO.

LP- 11-02

ISI DRAWING NO.

LP-I 1-03

LP-11-03

LP- 11-04

LP-1 1-04

ISI DRAWING NO.

LP-11-01

LP- 11-02

LP- 11-04

EXAM METHOD

VT-I

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

ISI DRAWING NO. EXAM METHOD

LP-09-03 VOL

ISI DRAWING NO. EXAM METHOD

Page No: 34 Revision: 13

NOTES

N/A

NOTES

N/A

N/A

N/A

N/A

NOTES

31

31

31

NOTES

N/A

NOTES

Page 139: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E21 LOW PRESSURE CORE SPRAY SYSTEM

1E21GO01-7-9-1 C/F-P 24.0

IE21GO02W1 C/P-V 14.0

Examination Category: C-G Code Class: 2

Item No: C06.010

ITEM ID DESCRIPTION SIZE

1E21COOI-SB-2 PC N/A

1E21COOI-SB-3 PC N/A

1E21COO1-SB-4 PC N/A

1E21COOI-SB-5 PC N/A

IE21COO1-SB-6 PC N/A

1E21COO1-SB-7 PC N/A

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1E21GO02HO1 SC 14.0

Item No: F01.040

ITEM ID DESCRIPTION SIZE

Q1E21COO1-S1 EQS N/A

Q1E21COO1-S2 EQS N/A

HBB-008

GBB-007

LINE NO.

GBB-007

GBB-007

GBB-007

GBB-007

GBB-007

GBB-007

LINE NO.

DBA-001

LINE NO.

GBB-007

GBB-007

LP-09-03

LP- 11-04

ISI DRAWING NO.

LP-09-04

LP-09-04

LP-09-04

LP-09-04

LP-09-04

LP-09-04

ISI DRAWING NO.

LP- 11-02

ISI DRAWING NO.

LP-09-04

LP-09-04

GGNS-M-489.1

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

SUR

EXAM METHOD

VT-3

EXAM METHOD

VT-3

VT-3

Revision: 13Page No: 35

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

NOTES

N/A

N/A

Page 140: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E21 LOW PRESSURE CORE SPRAY SYSTEM GGNS-M-489.1 Page No: 36 Revision: 13

Examination Notes for System: E21

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page 141: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

C

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E22 HIGH PRESSURE CORE SPRAY SYSTEM

Examination Category: B-G-2 Code Class: 1

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1E22F004 BLT N/A

1E22F005 BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E22G003W11 C/R-Z 12.0

1E22G003W22 C/P-E 14.0

1E22G003W25 C/P-E 14.0

Item No: B09.032

ITEM ID DESCRIPTION SIZE

1E22G003W28 B 03.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1E22F004 VB 12.0

1E22F005 VB 14.0

1E22F036 VB 14.0

Examination Category: C-C Code Class: 2

Item No: C03.030

ITEM ID DESCRIPTION SIZE

IE22C001-SB-15 A N/A

GGNS-M-489.1

LINE NO.

DBA-005

DBA-005

LINE NO.

DBA-005

DBA-005

DBA-005

LINE NO.

DBA-007

LINE NO.

DBA-005

DBA-005

DBA-005

LINE NO.

DBB-008

ISI DRAWING NO.

HP-08-01

HP-I1-01

ISI DRAWING NO.

HP-1 1-01

HP-I 1-01

HP-i 1-01

ISI DRAWING NO.

HP-1 1-01

ISI DRAWING NO.

HP-08-01

HP-11-01

HP-11-01

ISI DRAWING NO.

HP-08-10

EXAM METHOD

VT-I

VT-1

EXAM METHOD

VOLJSUR

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

EXAM METHOD

VT-3

VT-3

VT-3

EXAM METHOD

SUR •

Page No: 37 Revision: 13

NOTES

31

31

NOTES

N/A

N/A

N/A

NOTES

N/A

NOTES

31

31

31

NOTES

N/A

Page 142: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

{

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E22 HIGH PRESSURE CORE SPRAY SYSTEM

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

IE22G001W30 C/P-V 10.0

IE22G001W40 C/P-V 24.0

Examination Category: C-G Code Class: 2

Item No: C06.010

ITEM ID DESCRIPTION SIZE

1E22C001-DH-28 PC N/A

1E22C001-SB-2 PC N/A

1E22C00I-SB-4 PC N/A

1E22C001-SB-5 PC N/A

IE22C001-SB-6 PC N/A

1E22C00I-SB-7 PC N/A

Examination Category: F-A Code Class: 2

Item No: F01.040

ITEM ID DESCRIPTION SIZE

Q1E22C001-$2 EQS N/A

GGNS-M-489.1

LINE NO.

DBB-018

HBB-021

LINE NO.

DBB-008

DBB-008

DBB-008

DBB-008

DBB-008

DBB-008

LINE NO.

DBB-008

ISI DRAWING NO.

HP-08-04

HP-08-12

ISI DRAWING NO.

HP-08-10

HP-08-10

HP-08-10

HP-08- 10

HP-08-10

HP-08-10

ISI DRAWING NO.

HP-08-10

EXAM METHOD

VOL/SUR

VOL/SUR

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

SUR

EXAM METHOD

VT-3

Examination Notes for System: E22

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Page No: 38 Revision: 13

NOTES

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

NOTES

N/A

z

Page 143: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E32 MSIV LEAKAGE CONTROL SYSTEM

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION S12

Q1E32G121HO0 SBI 01.:

QIE32G120C01 SBI 01.:

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION S12

1E32G121WI8 C/E-P 01..

IE32G121W19 C/P-E 01.

IE32G121W22 C/P-E 01.

1E32G121W23 C/E-P 01..

IE32GI21W24 C/P-E 01.

IE32G121W25 C/E-P 01..

IE32G122W31 C/P-P 01..

IE32G122W33 C/P-P 01,.

1E32G122W34 C/P-P 01.

IE32G119W32 C/T-P 01.

1E32G119W37 C/V-P 01.

1E32G120-1F-08-13 C/P-E 01.

1E32G120W1 C/T-P 01.

1E32GI20W34 C/E-P 01.

1E32G120W35 C/P-V 01.

E

5

5

GGNS-M-489.1

LINE NO.

DBA-069

DBA-069

LINE NO.

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

DBA-069

E

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

1SI DRAWING NO.

IV-08-01

IV-08-04

ISI DRAWING NO.

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-01

IV-08-02

IV-08-02

IV-08-02

IV-08-03

IV-08-03

IV-08-04

IV-08-04

IV-08-04

IV-08-04,

EXAM METHOD

VT-3

VT-3

EXAM METHOD

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

SUR

Page No: 39 Revision: 13

NOTES

N/A

N/A

NOTES

23

N/A

23

23

23

23

23

23

23

23

23

23

23

23

23

( (

Page 144: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E32 MSIV LEAKAGE CONTROL SYSTEM GGNS-M-489.1 Page No: 40 Revision: 13

Examination Notes for System: E32

23 No Break Zone, See Section 11 for details

Page 145: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

1

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E38 FEEDWATER LEAKAGE CONTROL SYSTE

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1E38GI02C03 SB1 01.5

GGNS-M-489.1 Page No: 41

LINE NO.

DBA-087

ISI DRAWING NO.

FWLC-08-01

EXAM METHOD

VT-3

Examination Notes for System: E38

Revision: 13

NOTES

N/A

/ \

Page 146: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E51 REACTOR CORE ISOLATION COOLING SY

Examination Category: B-G-2 Code Class: 1

Item No: B07.050

ITEM ID DESCRIPTION ' SIZE

FLG W85 TO 16-11-1 BLT N/A

FLG W38 TO 35-11-1 BLT N/A

Item No: B07.070

ITEM ID DESCRIPTION SIZE

1 E5 F066 BLT N/A

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1E51G001W35 C/V-P 06.0

1E51GO01-28-11-1 C/E-F 06.0

IE51G001-28-11-4 C/P-E 06.0

IE51GO01-28-11-5 C/E-P 06.0

1E51G001W39 C/P-V 06.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

1E51F064 VB 10.0

1E51F063 VB 10.0

1 E51 F066 VB 06.0

1E12F395 VB 06.0

1E12F394 VB 06.0

GGNS-M-489.1

LINE NO.

DBA-030

DBA-030

LINE NO.

DBA-030

LINE NO.

DBA-030

DBA-030

DBA-030

DBA-030

DBA-030

LINE NO.

DBA-024

DBA-024

DBA-030

DBA-030

DBA-030

ISI DRAWING NO.

RI- 11-04

RI-i 1-05

IS! DRAWING NO.

RI-i 1-04

ISI DRAWING NO.

RI-08-10

RI-1 1-04

RI-11-04

RI-1 1-04

RI-1 1-04

ISI DRAWING NO.

RI-08-01

RI-1 1-02

RI- 11-04

RI-1 1-06,

RI-11-07

EXAM METHOD

VT-I

VT-1

EXAM METHOD

VT-1

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3.

Page No: 42 Revision: 13

NOTES

N/A

N/A

NOTES

31

NOTES

N/A

N/A

N/A

N/A

N/A

NOTES

31

31

31

31

31

Page 147: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E51 REACTOR CORE ISOLATION COOLING SY

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

1E51G004-21-8-6 C/P-P 08.0

Examination Category: F-A Code Class: 1

Item No: F01.010

ITEM ID DESCRIPTION SIZE

Q1E51G004H07 SC 10.0

Q1E5lG001H07 SC 06.0

Item No: F01.020

ITEM ID DESCRIPTION SIZE

QIE51GO04AO0 SBI-A 08.0

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE

1E51G004-21-8-2 C/P-E 08.0

1E51G004-21-8-3 C/E-P 08.0

1E51G004-21-8-4 C/P-E 08.0

1E51G004-21-8-5 C/E-E 08.0

1 E5 IG004-22-8-2 C/P-E 08.0

1E51G004-22-8-3 C/E-P 08.0

IE51G004W30 C/E-P 08.0

GGNS-M-489.1

LINE NO.

DBB-087

LINE NO.

DBA-024

DBA-030

LINE NO.

DBB-087

LINE NO.

DBB-087

DBB-087

DBB-087

DBB-087

DBB-087

DBB-087

DBB-087

ISI DRAWING NO.

RI-08-07

ISI DRAWING NO.

RI-11-01

RI- 11-05

ISI DRAWING NO.

RI-08-07

ISI DRAWING NO.

RI-08-07

RI-08-07

RI-08-07

RI-08-07

RI-08-07

RI-08-07

RI-08-07

EXAM METHOD

VOL/SUR

EXAM METHOD

VT-3

VT-3

EXAM METHOD

VT-3

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

Page No: 43 Revision: 13

NOTES

23

NOTES

N/A

N/A

NOTES

N/A

NOTES

23

23

23

23

23

23

23

(

Page 148: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: E51 REACTOR CORE ISOLATION COOLING SY GGNS-M-489.1 Page No: 44 Revision: 13

Examination Notes for System: E51

23 No Break Zone, See Section 11 for details

31 Inspection is only req ired when the component is disassembled and inspected under category B-L-2 or B-M-2

Page 149: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: G33 REACTOR WATER CLEANUP SYSTEM

Examination Category: B-J Code Class: 1

Item No: B09.011

ITEM ID DESCRIPTION SIZE

1G33G002-56-11-1 CIT-P 06.0

1G33G002W1 12 C/P-T 06.0

1G33G002-57-11-1 C/T-P 06.0

1G33G002W113 C/T-P 06.0

IG33G002W143 C/P-T 06.0

1G33G002W18 C/P-H 06.0

1G33G002W19 C/H-P 06.0

1G33G011-4-11-1 C/P-E 06.0

Examination Category: B-M-2 Code Class: 1

Item No: B12.050

ITEM ID DESCRIPTION SIZE

IG33F004 VB 06.0

1G33F102 VB 06.0

1G33FOOl VB 06.0

IG33F250 VB 06.0

IG33F251 VB 06.0

1G33F252 VB 06.0

Examination Category: C-F-2 Code Class: 2

Item No: C05.051

ITEM ID DESCRIPTION SIZE

lG33G001-11-8-2 C/P-E 06.0

GGNS-M-489.1

LINE NO.

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-089

LINE NO.

DBA-009

DBA-009

DBA-009

DBA-089

DBA-089

DBA-090

LINE NO.

DBB-104

ISI DRAWING NO.

CU-1 1-02

CU-i 1-02

CU- 11-03

CU-1 1-03

CU- 11-03

CU- 11-03

CU-1 1-03

CU-11-11

ISI DRAWING NO.

CU-08-05

CU- 11-02

CU-i 1-03

CU-11-10

CU-I 1-11

CU-1 1-12

ISI DRAWING NO.

CU-08-02

EXAM METHOD

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

VOL/SUR

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

EXAM METHOD

VOLJSUR

Page No: 45 Revision: 13

NOTES

23

23

23

23

23

23

23

23

NOTES

31

31

31

31

31

31

NOTES

23

(

Page 150: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: G33 REACTOR WATER CLEANUP SYSTEM

1G33G001-11-8-3 C/E-P 06.0

Examination Category: X-AUG Code Class: N/A

Item No: N/A

ITEM ID DESCRIPTION SIZE

IG33G001-11-8-1

IG33G001-11-8-4

1G33G001-11-8-5

IG33G001-12-8-1

1G33GO01WI

IG33G001W2

1G33G001W3

1G33G001W4

IG33G001W5

1G33G002-20-1 1-1

IG33G002-20-11-2

IG33G002-20-11-3

IG33G002-20-11-5

IG33G002W14

IG33G002W15

1G33G002W78

1G33G002W79

IG33G002W114

IG33G002W16

1G33G002W17

C/F-P

C/P-E

C/E-P

C/P-F

C/P-H

C/H-P

C/P-V

C/V-P

C/P-V

C/E-P

C/P-E

C/E-P

C/P-P

C/P-E

C/P-P

C/P-P

C/P-P

C/P-E

C/V-P

C/E-P

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

06.0

DBB-1 04

LINE NO.

DBB- 104

DBB- 104

DBB-104

DBB-104

DBB-104

DBB-104

DBB-104

DBB-104

DBB-104

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

DBA-009

CU-08-02

ISI DRAWING NO.

CU-08-02

CU-08-02

CU-08-02

CU-08-02

CU-08-02

CU-08-02

CU-08-02

CU-08-02

CU-08-02

CU- 11-02

CU- 11-02

CU-I 1-02

CU- 11-02

CU- 11-02

CU-I 1-02

CU- 11-02

CU-I 1-02

CU- 11-03

CU-i 1-03

CU- 11-03

GGNS-M-489.1

VOL/SUR

EXAM METHOD

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

VOL

Page No: 46

23

Revision: 13

NOTES

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

23

Page 151: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: G33 REACTOR WATER CLEANUP SYSTEM

1G33G011-5-11-1 C/P-E 06.0

1G33G011-5-11-2 C/E-P 06.0

1G33G011W5 C/V-P 06.0

IG33G01 IW6 C/E-H 06.0

IG33GO1 IW7 C/H-P 06.0

lG33GOI IW8 C/P-V 06.0

Examination Notes for System: G33

23 No Break Zone, See Section 11 for details

DBA-089

DBA-089

DBA-089

DBA-089

DBA-089

DBA-089

CU-I l-lI1 CU-11-11

CU-I1-11

CU-11-11

CU-il-1l

CU-1l-11

GGNS-M-489.1 Page No: 47

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

VOL 23

31 Inspection is only required when the component is disassembled and inspected under category B-L-2 or B-M-2

Revision: 13

f

Page 152: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: P41 STANDBY SERVICE WATER SYSTEM

Examination Category: D-A Code Class: 3

Item No: D01.020

ITEM ID DESCRIPTION SIZ

Q1P41GO04CO0 A N/A

QlP41G008A02 A N/A

Examination Category: F-A Code Class: 3

Item No: F01.030

ITEM ID DESCRIPTION SIZ

Q1P41GO04AO0 SB1-A 12.(

QlP41GO04CO6 SBI 12.(

Q1P41GO04CI3 SBI 20.(

QlP41GO04CO1 SBI-A 12.(

QlP4lG008A02 SBI-A 10.(

Q1P41GO09HOI SC-A 10.(

Q2P41G013C02 SB1 24.(

Q1P41GO50HO1 SB1 10.

GGNS-M-489.1

E LINE NO.

HBC-087

HBC-083

LINE NO.

HBC-086

HBC-086

HBC-079

HBC-087

HBC-083

HBC-087

HBC-079

HBC-084

E

)

ISI DRAWING NO.

WS-10-04

WS-12-05

ISI DRAWING NO.

WS-10-01

WS-10-01

WS-10-01

WS-10-04

WS-12-05

WS-12-06

WS-YD-09

WS-YD-13

EXAM METHOD

VT-3

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

VT-3

Examination Notes for System: P41

Page No: 48 Revision: 13

NOTES

N/A

N/A

NOTES

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

(

Page 153: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

1(

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: P75 STANDBY DIESEL GENERATOR SYSTEM

Examination Category: D-A Code Class: 3

Item No: D01.010

ITEM ID DESCRIPTION SIZE

Q1P75B004B-SIA A N/A

Examination Category: F-A Code Class: 3

Item No: F01.040

ITEM ID DESCRIPTION SIZE

Q1P75B004B-S1 EQS N/A

Q1P75B004B.-S2 EQS N/A

Q1P75B004B-S3 EQS N/A

GGNS-M-489.1 Page No: 49

LINE NO.

HBC-086

LINE NO.

HBC-086

HBC-086

HBC-086

ISI DRAWING NO.

SDG-12-11

ISI DRAWING NO.

SDG-12-11

SDG-12-11

SDG-12-11

EXAM METHOD

VT-3

EXAM METHOD

VT-3

VT-3

VT-3

Examination Notes for System: P75

Revision: 13

NOTES

N/A

NOTES

N/A

N/A

N/A

Page 154: Revision 13 of Grand Gulf Inservice Inspection Program · 2012. 11. 17. · 150 150 20 110 50 130 pll 1.000 0.13 ss 150 150 20 110 50 130 pll 20.000 0.25 ss 150 20 110 50 130 p1l

GRAND GULF INSERVICE INSPECTION REQUIREMENTS - PERIOD 3

System: P81 HPCS DIESEL GENERATOR SYSTEM

Examination Category: F-A Code Class: 3

Item No: F01.040

ITEM ID DESCRIPTION S12

Q1P81BOOIB-S1 tEQS N/I

Q1P81BOO1 B-S2 EQS N/8

GGNS-M-489.1 Page No: 50

LINE NO.

HBC-083

HBC-083

ISI DRAWING NO. EXAM METHOD

HDG-12-01 VT-3

HDG-12-01 VT-3

Examination Notes for System: P81

Revision: 13

NOTES

N/A

•E