Rethinking and utilising the value in the city's waste

6
Cover with focus picture 1 Cover with focus picture 2 Cover with focus picture 3 Rethinking and utilising the value in the city's waste Base Birmingham 2013

description

Rethinking and utilising the value in the city's waste. Base Birmingham 2013. Technology neutral Key UK contracts Cambridgeshire PFI – 188,000tpa North Yorkshire and the City of York residual waste PFI – start 2016, 320,000tpa - PowerPoint PPT Presentation

Transcript of Rethinking and utilising the value in the city's waste

Page 1: Rethinking  and utilising the value in the city's  waste

Cover with focus picture 1 Cover with focus picture 2 Cover with focus picture 3

Rethinking and utilising the value in the city's waste

Base Birmingham 2013

Page 2: Rethinking  and utilising the value in the city's  waste

Introduction to AmeyCespa

• Technology neutral• Key UK contracts

• Cambridgeshire PFI – 188,000tpa• North Yorkshire and the City of York

residual waste PFI – start 2016, 320,000tpa

• Milton Keynes residual waste contract - start 2016, 132,000tpa

40 Years of Experience

14,000 Employees in Waste

7,500,000 tonnes per year

795 Local Authority Clients

90 Facilities across Europe

Page 3: Rethinking  and utilising the value in the city's  waste

How can Birmingham drive more value out of its waste?

Page 4: Rethinking  and utilising the value in the city's  waste

Birmingham – performance to date

• Focused on recovery of energy

• £60Mpa to collect and dispose of 400,000 tonnes a year

• Recycling rate of 29.5%

Page 5: Rethinking  and utilising the value in the city's  waste

Increasing value from Birmingham’s waste

Increased

Material Value

Target the right materials

Collect in an

efficient way Make

sure people

participate

Page 6: Rethinking  and utilising the value in the city's  waste

Challenges for the future

• Charging for waste?

• Should we focus efforts on getting recyclers to recycle more and forget about persistent non recyclers?

• Communal collections?