RETAINING WALL REPLACEMENT REGNART ROAD

6
DIRECTOR OF PUBLIC WORKS SIGNATURE DIRECTOR OF PUBLIC WORKS TIMM BORDEN APPROVED BY: RCE 45512 DATE 1 TS01 TITLE SHEET 2 IP01 RETAINING WALL PLAN AND PROFILE 3 NT01 CONSTRUCTION NOTES AND DETAILS 4 S01 RETAINING WALL DETAILS 5 S02 STRUCTURAL SPECIAL PROVISIONS 6 EC01 CONSTRUCTION BEST MANAGEMENT PRACTICES U U CA: 811 E D R D N U O R G N U L L A C E C I V R E S L A E G I D T S A R O B F E E R O Y S:\PROJECTS\489300\489304 - REGNART RET WALL\PW\PLOT DRAWINGS\489304TS.DWG N RETAINING WALL REPLACEMENT REGNART ROAD PROJECT NO. 2017-12 CUPERTINO, CALIFORNIA SHEET INDEX SHEET NO. TITLE DRAWING HORIZONTAL CONTROL PROJECT BENCHMARK WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING UNAUTHORIZED CHANGES & USES: THE ENGINEER PREPARING THESE PLANS SITE MAP LOCATION MAP SHEET OF REVISIONS MONTH YEAR IMPROVEMENT PLANS FOR RETAINING WALL REPLACEMENT REGNART ROAD File: Scale: Proj. Engr: Checked: Drawn: Designed: Date: AUGUST 16, 2017 JC LMG BB Land Use Entitlements Land Planning Landscape Architecture Civil Engineering Utility Design Land Surveying Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com R E E N I G N E L A N O I S S E F O R P D E R E T S I G E R C A L I F O R N I A F O E T A T S V I L I C No. 82825 6 1 PROJECT SITE LMG NO SCALE TS01 CP NORTHING EASTING ELEVATION DESCRIPTION 2 1,934,312.45 6,107,888.25 100.00 2.5" BD IN WELL "CITY OF CUPERTINO" 100 1,934,507.91 6,107,988.28 97.79 2.5" BD IN WELL "CITY OF CUPERTINO" 107 1,934,582.73 6,108,031.78 100.45 SET HUB AND TACK PROJECT TEMPORARY BENCHMARK (TBM): PT 2 = 100.00, 2.5" BD IN WELL WITH PUNCH "CITY OF CUPERTINO", ASSUMED ELEVATION. 489304TS01.DWG N PROJECT LOCATION

Transcript of RETAINING WALL REPLACEMENT REGNART ROAD

DIRECTOR OF PUBLIC WORKS
3 NT01 CONSTRUCTION NOTES AND DETAILS
4 S01 RETAINING WALL DETAILS
5 S02 STRUCTURAL SPECIAL PROVISIONS
6 EC01 CONSTRUCTION BEST MANAGEMENT PRACTICES
U
U
S : \ P
R O
J E
C T
S \ 4 8 9 3 0 0 \ 4 8 9 3 0 4 - R
E G
N A
R T
S . D
W G
HORIZONTAL CONTROL
PROJECT BENCHMARK
WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO
AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING
UNAUTHORIZED CHANGES & USES: THE ENGINEER PREPARING THESE PLANS
SITE MAP
LOCATION MAP
SHEET OF
R E
CP NORTHING EASTING ELEVATION DESCRIPTION
2 1,934,312.45 6,107,888.25 100.00 2.5" BD IN WELL "CITY OF CUPERTINO"
100 1,934,507.91 6,107,988.28 97.79 2.5" BD IN WELL "CITY OF CUPERTINO"
107 1,934,582.73 6,108,031.78 100.45 SET HUB AND TACK
PROJECT TEMPORARY BENCHMARK (TBM):
PT 2 = 100.00, 2.5" BD IN WELL WITH PUNCH "CITY OF CUPERTINO", ASSUMED ELEVATION.
489304TS01.DWG
N
PROJECT
LOCATION
REMOVE TREE
REMOVE TREE
1
No.
2
3
4
2
3
4
5
E
N
D
C
O
N
C
B
A
R
R
(SEE 8" WALL DRAIN DETAIL, SHEET NT01)
8" WALL DRAIN WITH GRATE
(SEE 8" WALL DRAIN DETAIL, SHEET NT01)
LIMIT OF PAVEMENT (TYP)
LIMIT OF PAVEMENT (TYP)
C / L O
LENGTH
SCALE: 1" = 10' H
1
0
3
9
8
1
0
4
1
0
3
BOTTOM OF BARRIER (TYPE 60D)
8" PVC OUTLET
(GUTTER WALL DRAIN)
8" PVC OUTLET
(GUTTER WALL DRAIN)
SEE BURIED CONCRETE BARRIER
1
1
LENGTH
SCALE: 1" = 10' H
1
0
3
9
8
1
0
4
1
0
3
BOTTOM OF BARRIER (TYPE 60D)
8" PVC OUTLET
(GUTTER WALL DRAIN)
8" PVC OUTLET
(GUTTER WALL DRAIN)
SEE BURIED CONCRETE BARRIER
1
1
R E
No. 82825
REGNART ROAD
S : \ P
R O
J E
C T
S \ 4 8 9 3 0 0 \ 4 8 9 3 0 4 - R
E G
N A
R T
0 1 . D
REGNART ROAD
NO SCALE
REGNART ROAD
SAWCUT / CONFORM
D E
STANDARD SPECIFICATIONS
BEG BEGIN
FG FINISHED GRADE
FL FLOW LINE
GB GRADE BREAK
S : \ P
R O
J E
C T
S \ 4 8 9 3 0 0 \ 4 8 9 3 0 4 - R
E G
N A
R T
T 0 1 . D
W G
1. All work shall be in accordance with the State of California Department of Transportation Standard Specifications and Standard Plans (latest edition, as amended unless
otherwise noted) and City of Cupertino Standard Details. The Contractor shall perform the work described in the specification, as shown on the drawings, and to the
satisfaction of the City Engineer.
2. It shall be the responsibility of the Contractor to ensure the approved plans or the latest revised plans are furnished to its subcontractors, and to ensure the latest
approved plans are onsite at all times during construction.
3. The Contractor shall notify the City of Cupertino Public Works Inspector two (2) working days prior to requiring an inspection. Call (650) 333-0831 to schedule Public
Works inspections.
4. Construction area traffic control devices shall be installed prior to beginning of work. Contractor shall secure approval of a traffic control plan from the city prior to work
that affects traffic.
5. The Contractor shall locate underground facilities in the area of work. The Contractor shall contact Underground Service Alert (USA) at 811 two (2) working days in
advance of any work for location of the underground facilities.
6. Storm drain lines installed as part of the work on these plans shall be cleared of all debris and obstructions prior to final acceptance.
7. Tree roots or foreign matter in existing right-of-way shall be removed to a depth of two (2) feet below subgrade and disposed of per Caltrans Standards. In the case of
live tree roots from trees, Contractor shall contact the City for field observation and determination of removal.
8. Existing pavement that is removed or damaged by construction shall be replaced as required by the City Engineer.
9. Concrete for use in non structural concrete structures shall conform to California Department of Transportation Standard Specifications Section 90. Inlets and gutters
shall contain 590 lbs. of cement per cubic yard and shall attain a minimum strength of 3,000 psi in 28 days.
10. New City standard street monuments and other permanent monuments disturbed during construction shall be replaced before acceptance of the improvements by the
City Engineer. Attention is directed to Section 8771 of the California Business and Professions Code for the requirements concerning survey monuments. Existing survey
monuments shall be located and referenced by or under the direction of a licensed land surveyor or qualified registered civil engineer prior to construction operations,
and a corner record or record of survey shall be filed with the County Surveyor of the County of Santa Clara. Existing survey monuments shall be reset to finish grade,
and a corner record or record of survey shall be filed with the County Surveyor of the County of Santa Clara prior to the recording of the certificate of completion for the
project.
11. Construction survey stakes or marks (control stakes) to establish lines and grades shall be set by the Contractor's surveyor or qualified registered civil engineer.
12. Notify the City Inspector two (2) working days in advance of requiring services for checking field staking. Three (3) copies of the cut sheets shall be furnished to the City
Inspector.
13. Contractor is responsible for dust control and ensuring the area adjacent to the work is left in a clean condition.
14. Contractor shall review City Detail 6-4 on tree protection prior to accomplishing any work or removing any trees.
15. Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for ANY activity, which disturbs the soil.
16. Contractor shall replace in full all paint markings and stripes affected by construction. Placement and removal of paint striping shall be in accordance with Caltrans 2010
Standard Specifications section 84-3 - Traffic Stripes and Pavement Markings and section 15-2.02C - Remove Traffic Stripe and Pavement Markings, respectively.
17.
which preserves the root structure of the tree and surrounding vegetation.
18.
Specifications Section 39.
19. Contractor shall install jute mesh in accordance with Caltrans 2010 Standard Specifications Sections 21-1.020(2) and 21-1.030, Caltrans 2010 Standard Plan H52, and
per the manufacturer's recommendations on all exposed slopes.
HP HIGH POINT
PCC PORTLAND CEMENT CONCRETE
STA STATION
STD STANDARD
R E
T
O
P
O
F
R
E
T
W
A
L
L
E
L
E
V
A
T
I
O
N
T
O
P
O
F
B
A
R
R
I
E
R
WITH 8" PVC DOWN DRAIN
INSTALL FRAME AND GRATE, ANGLED, AS SHOWN
NOTE: TOP OF INLET SHALL NOT
EXCEED TOP OF WALL ELEVATION
RETAINING WALL GUTTER
FLOW LINE OF GUTTER (SEE PROFILE, SHEET IP01)
8" PVC DOWN DRAIN (TYP)
NOT TO SCALE
FLOW LINE
AC PLUG DETAIL
NOT TO SCALE
VARIES
FACE OF BARRIER
OR AC DIKE
1.3' TO 3.5'
6" MIN FDAC
(SEE SHEET IP01)
NOT TO SCALE
EQUAL SPACING
(SEE SHEET S01)
CONCRETE BARRIER (TYPE 60)
AC DIKE (TYPE A)
(SEE SECTION A-A)
(SEE SECTION A-A)
(3) 3" DIA PVC OUTLETS
TOP OF CONCRETE BARRIER (TYPE 60)
FACE OF BARRIER (TYPE 60D)
BACK OF RETAINING WALL
FACE OF AC DIKE SHALL BE FLUSH
WITH FACE OF BARRIER (TYPE 60D)
AC DIKE NOT SHOWN FOR CLARITY
(SEE PLAN VIEW)
1
1.5
3" DIA PVC OUTLET
(E) AC
SHEET OFREVISIONS
Landscape Architecture Civil Engineering
Utility Design Land Surveying
Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com
2017146(2017146S01)
RKY
DM
Landscape Architecture Civil Engineering
Utility Design Land Surveying
Stormwater Compliance 1570 Oakland Road (408) 487-2200 San Jose, CA 95131 HMHca.com
2017146(2017146S02)
RKY
DM
S : \ P
R O
J E
C T
S \ 4 8 9 3 0 0 \ 4 8 9 3 0 4 - R
E G
N A
R T
C 0 1 . D