RESUME FAIS 8 2016 PIC H
-
Upload
mohdfais-nadzir -
Category
Documents
-
view
110 -
download
2
Transcript of RESUME FAIS 8 2016 PIC H
1
RESUME
NAME : MOHD FAIS BIN MOHD NADZIR
ADDRESS : NO 4322, LORONG TENGGIRI 1,
TAMAN DESA PERMAI,
71000 PORT DICKSON,
NEGERI SEMBILAN DARULKHUSUS,
MALAYSIA
I/C NO : 821004-06-5679
DATE OF BIRTH : 04 OCTOBER 1982
STATUS : MARRIED
EDUCATION : CERTIFICATE OF CIVIL ENGINEERING
(POLITECHNIC PORT DICKSON)
(DECEMBER 2004 )
SIJIL PELAJARAN MALAYSIA
SECOND GRADE,
(DECEMBER 1999)
CURRENT STUDY : UNIVERSITY TECHNOLOGY MALAYSIA
EXECUTIVE DIPLOMA IN OPERATION AND PRODUCTION
MANAGEMENT (2014-PRESENT)
CONTACT NUMBER : +60192572523 / +601123756036
EMAIL ADDRESS : [email protected]
CERTIFICATION SKILLS : CRANE INSPECTION (ABM/CIDB)
LIFTING SUPERVISOR (ABM/CIDB)
SLINGGING AND RIGGING (ABM/CIDB)
AESP (NIOSH)
2
COURSE ATTENDED :
ATTEND SLINGGING AND RIGGING CORSE BY ABN/CIDB
ATTEND LIFTING SUPERVISOR COURSE BY ABN / CIDB
ATTEND CRANE INSPECTOR COURSE BY ABN /CIDB
ATTEND AUTHORISED ENTRANT AND STANDBY PERSON FOR CONFINED SPACE BY NIOSH
ATTEND CONSTRUCTION OF PRESSURE VESSEL ASME
DEVISION 1 (COVERED DESIGN, FABRICATION, TESTING
AND STAMPING )BY ABS CONSULTAN
ATTENDED BASIC WELDING REQUIREMENTS TO
FABRICATION PROCESS. BY KNM.
ATTENDED ERP SYSTEM BY KNM.
ATTENDED 3 DAYS CIVIL ENGINEERING COURSE
BY IKRAM. ( SUB SOIL DRAINAGE SYSTEM )
ATTENDED 1 DAY CIVIL ENGINEERING COURSE
LAND SURVEYOR ( KADASTRA & TOPOGRAFI )
BY JUPEM.
ATTENDED 4 DAYS CIVIL ENGINEERING COURSE
OF SEPTIC TANK HANDLING AND SERVICE AT GLORY BEACH RESORT, PORT DICKSON.
CONDUCT BY INDAH WATER.
ATTENDED 14 DAYS JATIDIRI COURSE BY IKBN
ULU SEPRI, REMBAU NEGERI SEMBILAN.
CAREER OBJECTIVES
To gain an entry-level position in a progressive and established organization that offers
valuable experience, training and career enhancement in the related field.
PERSONAL TRAITS
I am positive thinking person, a quick learner in any field, willing to work hard,
ambitious, highly motivated and have leadership qualities. I can work under pressure
& very low supervision .
3
SKILLS
Communication
Bahasa Malaysia - Excellent in speaking and writing
English - Fair in speaking and Fair in writing
Computer
Microsoft Office
(Word, PowerPoint, Excel, Access and Publisher)- good
Microsoft Project
(Literate)
Software Engineering
( AutoCAD ) - Fair
Skills • Excellent in supervision & sequence of tank erection/ pressure vessel / piping/ skid
and structural fabrication. • Good in managing site construction.
• Good in Lifting and Jacking process
• Good skill for Theodolite & Levelling measure equipment.
• Specialist in fabrication of heavy wall vessel & others equipment for oil & gas / mining process equipment.
• Good experience for bore cladded nozzle welding overlay • Well known in Lead Lining to plate surfaces
• Familiars with ASME/BS & AS fabrication code
• Familiars with U/U2 code • Very familiar to performed & monitoring Post Weld Heat Treatment (PWHT) /
Dehydrogenation • Heat Treatment after welding for welds in P4 and P5 materials.( DHT)
/Intermediate stress relieving
• (ISR). • Familiar to witness Hydro test
• Very Good Knowledge in Welding Procedures & Sequences. • Experience in bolt tensioning activities
• Familiar with ISO 9001 • Knowledge with ISO 14000 & ISO 18000
Good knowledge in NDE requirement & application
4
WORKING EXPERIENCE
05/2012- present MMC TEPAT TEKNIK SDN.BHD
MAY 2012 – PRESENT
SITE MANAGER
07/2014 PRESENT
ASSISTANT OPERATION, MANAGER
05/2012 TO 06/2014
• To act as the management representative for production both internally and
externally.
• To initiate, coordinate and advise on the planning for the use of preferred
practices between QA / QC and production supervisors.
• To maintain an effective communication system for the Management system
throughout the company.
• To manage manpower resources including allocation of manpower to
projects, planning and forecasting future requirement, identifying and recruiting
suitable candidates to maintain or increase staff levels as required.
• To define and implement department’s goals for improved capability and
quality including standardization, improved work practices and procedures.
• To undertake work planning for all tasks to ensure adequate resources and
timely completion.
• To acquire knowledge on fabrication techniques through publications,
training or other means and implement the latest fabrication techniques to the
company in order to control the cost fabrication.
• To recommend new ideas for improvement as necessary to enable the
company to have better competitive edge over competitors.
5
05/2005 – 05/2012 KNM PROCESS SYSTEM,
ACT. PRODUCTION HEAD
• Planned, lead and organized operational and strategic action associated with successfully delivering the project to practical completion and achieving the targeted
project profitability.
• Performed & manage all production works as per company’s approved procedures. • Reviewed all related production reports and to communicate to various department.
• Ensured that production schedule completed on time and at the same time follow the
quality requirement • Responsible to handle Client representative for any requirement during meeting & job
running. • Monitoring of project budget during fabrication & operation to ensure project
running in smooth condition & maximize project profit margin.
PRODUCTION SUPERVISOR,
• Responsible to control & supervise the review fabrication drawings & revert to
engineering department.
• Responsible to control, supervise & monitoring of each project production
schedule to ensure timely completion.
• Responsible to control & supervise planning & monitoring of each project
resources requirements eg: Materials, manpower, facilities & equipment’s.
• Responsible to control, supervise & coordinate the timely delivery of finished
products with logistic, Material Controller, & quality control section.
• Responsible to control & supervise the productivity & optimizing production
cost.
• Strictly adhere to the ISO9001 QA Manual and procedure.
• Performed production works as per company’s approved procedures.
• Prepared all related production reports and to communicate to various
department.
• Ensured that production schedule completed on time and at the same time
follow the quality requirement.
6
PROJECT INVOLVED MMC TEPAT TEKNIK:
1 Project : HIBISCUS PETRONAS BASF PROJECT
Client : WORLEY PARSON Equipment : Storage Tank ( 2 unit)
2 Project : Terengganu Gas Terminal (TGAST) Client : Samsung Engineering Co. Ltd
Equipment : Storage Tank ( 7 unit)
3 Project : New Maintenance Workshop Pelabuhan Tanjung Pelepas Client : MMC Engineering and Services
Equipment : Structural and Mechanical work
4 Project : TNB Jana Manjung 4 Client : Alstom Services Sdn Bhd
Equipment : Storage Tank
5 Project :Sabah Oil & Gas Terminal (SOGT) Client : Emerson Process Management Asia Pacific
Pte Ltd Equipment : Crude Oil Metering Skid & Condensate Metering Skid
6 Project :Sabah Oil & Gas Terminal (SOGT) Client : Emerson Process Management Asia Pacific Pte Ltd
Equipment : Gas Metering Skid
7 Project : Manjung Power Plant Unit 4
Client : Alstom Services Sdn Bhd Equipment : Air and Gas Ducts
8 Project : Stainless Steel Mill - Phase 2
Client : Andritz Power Sdn Bhd Equipment : Furnace Chamber
9 Project : Cendor Phase 2 Develpoment Client : Citech Energy Recovery Systems UK Ltd
Equipment : WHRU Casing
10 Project : Tanjung Bin 4
Client : Alstom Services Sdn Bhd Equipment : Main Cooling Water (MCW) Pipe & Pumphouse Header
11 Project : Sabah Ammonia Urea (SAMUR) Client : Mitsubhishi Heavy Industries Ltd
Equipment : Non Pressure Tanks
12 Project : New Engineering Workshop, PTP
Client : MMC Engineering & Construction Sdn Bhd Equipment : Structural Steel Works
13 Project : Kuantan Resin Project Client : Flexsys Chemical (M) Sdn Bhd
Equipment : Storage Tanks
7
PROJECT INVOLVED KNM
10/2008-05/2015 Supervised production schedule and progress on
4 Heavy Wall Vessel ( AUTOCLAVES ), for PUBLO VIEJO
PROJECT , DOMINICAN REPUBLIC. K0605070 –
Client : HATCH. Owner: BARRICK GOLD MINNING.
Material – SA 516 Gr 70N + 10mm lead linning
Thickness – 100mm
Acceptance Criteria – U Stamp Vessel
WEIGHT : 850 TON PER UNIT
06/2008-12/2008 Supervised production schedule and progress on
8 Heavy Wall Vessel & 2 Bullet Tank, for Peru LNG Export
Facility Project, PERU. K0611029 – Client : Southern Tropic
Material Supply.Co/ CB&I. Owner: PERU LNG S.R.L.
Material – SA 516 Gr 70N
Thickness – 105mm, 50mm, 70mm, 85mm
Acceptance Criteria – U Stamp Vessel
02/2007-06/2008 Supervised production schedule and progress on
Fushon Project, China. K050732- Alberta Taciuk
Processing. The client is Polysius AG.
Material –SA240-321H ( STAINLESS STEEL ) +
SA 387 Gr 11 CL.2 (Chromoly) + EN 10028-3-P275 NL1.
Thickness – 105mm, 50mm, 70mm, 85mm
Acceptance Criteria – ASME VIII Div 1 App 12/ PD 5500
11/2006 – 04/2007 Supervised production schedule and progress on
Dong Quat Refinery Project (DQR), Vietnam
K 051260 – Heavy Naphtha Stripper & LCO Stripper
Debutaniser. The client is JGC and the owner is Vietnam
Oil & Gas Corp.
Material – SA 516 Gr 60 + SA 106 Gr B
Thickness – 13mm to 42mm
Acceptance Criteria – ASME VIII Div 1 App 12
11/2006 – 08/2007 Supervised production schedule and progress on Air
Separation Unit For Mega Methanol Plant Labuan
K 050965. The client is Air Liquide and owner is Petronas
Methanol Labuan
Material – SA 516 Gr 70N
Thickness – 36mm
Acceptance Criteria – ASME VIII Div 1 2004 edition +
2005 addenda
11/2006 – 06/2007 Supervised production schedule and progress on
Petronas Methanol Labuan Project K 051110 – R 01004
Seconday Reformer. The client is LURGI and the owner is
Petronas Methanol Labuan.
Material – SA 387 Gr 11 CL.2 (Chromoly)
Thickness – 50mm, 58mm, 72mm, 82mm
Acceptance Criteria – ASME VIII Div 1 App 12/ PD 5500
8
10/2006 – 11/2007 Supervised production schedule and progress on
ABB/LUMMUS/TOYO ENG CORP. Project K 051115 –
C11022 (Cautic/Water Wash Tower), C11401
(Deethanizer), C11402 (Ethlylene Fractionator), C11405
(Propylene Fractionator), C13201 (Ed Column) & C11301
(Demethaniser). The owner is Shell Eastern Petroleum
Pte Ltd
Material – P355 NL2 / SA516GR60N
Thickness – 22mm, 26mm, 28mm, 42mm
Acceptance Criteria – PD 5500:2103 Table 5.7.2 / ASME
VIII Div 1
10/2006 – 04/2007 Supervised production schedule and progress on
Dong Quat Refinery Project K 050774 – T 2103
Propane/Propylene Splitter. The owner is Vietnam Oil &
Gas Corporation.
Material – A 516 Gr 70
Thickness – 50mm
Acceptance Criteria – ASME VIII Div 1 App 12 2004
edition / TCVN 6008-1995
09/2006 – 05/2007 Supervised production schedule and progress on 2 HP
Absorbers for OGD III Onshore Gas Development
Project K 050421. The client is Eastern Bechtel (EBCL)
and the owner of the project is GASCO, Abu Dhabi Gas
Industries Ltd.
Material – SA 516M Gr 450N
Thickness – 147mm
Acceptance Criteria – ASME VIII Div 2 Article 9-3, ASME
Sect. V Ed. 2004 Addenda 2006, Code Case 2235-9
05/2006 – 11/2006 Supervised production schedule and progress on 4
Heavy Wall SS Vessel for North West Shelf (NWS) Project
K 050365 LNG Australia. The client is Foster Wheeler
UK/Woodside Energy LTD
Material – SA 240 TP 304 / SA 182F 304 / BS1501-304S61 /
BS1503-304S61 / SA 312 TP 304
Thickness – 29mm, 68mm, 72mm , 90mm
Acceptance Criteria – AS 4037 + AS 1210
02/2006 – 06/2006 Supervised production schedule and progress on Acid
Settler–Alky Revap Project K 04270 for Valero
Wilmington SA, USA Fluor. The owner is Valero
Wilmington Refinery.
Material – SA 516 Gr 70N
Thickness – 12mm, 12.7mm, 15mm
Acceptance Criteria – ASME VIII Div 1 2004 edition
03/2006 – 04/2006 Supervised production schedule and progress on G3
Alcan Gove Expansion Project K 04914 – 30 Units Vessels
(Flash, Digestors, Conical, Decanters – Vessels). The
client is Alcan Gove Development Pty Ltd.
Material – A 516 Gr 70 / A 106 Gr B / A 105
Thickness – 25mm
Acceptance Criteria – ASME VIII Div 1 App 12 2004
edition
9
01/2006 – 04/2006 Supervised production schedule and progress on Acid
Dump Tank-Alky Revap Project K 050516 for Valero
Wilmington SA, USA Fluor. The owner is Valero
Wilmington Refinery.
Material – SA 516 Gr 70N
Thickness – 25.4mm , 29mm, 34mm
Acceptance Criteria – ASME VIII Div 1
01/2006 – 04/2006 Supervised production schedule and progress on 2
Large Towers for Sohar Fertilizer Project K 041074, Oman.
The owner is Mitsubishi Heavy Industries (MHI).
Material – SA 516 Gr 70N
Thickness – 33mm, 38mm, 62+3mmt
Acceptance Criteria – ASME VIII Div 1
12/2004 – 05/2005 ZANORSHA CONSTRUCTION S.B
SITE SUPERVISOR
To monitor & involved all technical work at site.
To follow up whatever material for on going project.
To record daily progress and manpower on going
project.
To make sure the progress follow the monthly schedule.
PROJECT INVOLVED
04– 05/2005 PROJEK KERJA-KERJA MENAIKTARAF JALAN KAMPONG
DI KAMPONG PASIR PANJANG, PORT DICKSON NEGERI
SEMBILAN.
TENDER : JABATAN KERJA RAYA
NILAI PROJEK : RM 75,000.00
02 – 03/2005 PROJEK KERJA-KERJA MEMBINA DAN MEYIAPKAN
SEBUAH BALAIRAYA BERUKURAN 70’ x 40’ DI KAMPONG
PAYA LAMA, PORT DICKSON NEGERI SEMBILAN.
TENDER : PEJABAT DAERAH PORT DICKSON.
NILAI PROJEK : RM 125,000.00
02 – 04/2005 PROJEK KERJA-KERJA MEMBINA DAN MEYIAPKAN
SEBUAH RUMAH JANAKUASA UNTUK INSTITUT LATIHAN
FAMA, PORT DICKSON, NEGERI SEMBILAN.
TENDER : FAMA
NILAI PROJEK : RM 113,000.00
12/2004 – 03/2005 PROJEK KERJA-KERJA MENAIKTARAF SISTEM PERPARITAN
DI SUNGAI HJ.ALI, MUKIM LUKUT, PORT DICKSON NEGERI
SEMBILAN.
TENDER : JABATAN PENGAIRAN DAN SALIRAN
NILAI PROJEK : RM 217,000.00
10
01/2001 – 06/2002 AWALUDDIN ENTERPRISE.
CLERK OF WORK
To follow up whatever material for on going project.
To record daily progress and manpower on going
project.
To make sure the progress follow the monthly schedule.
PROJECT INVOLVED
01/2001 – 06/2002 PROJEK KERJA-KERJA MEMBINA DAN MEYIAPKAN
SEBUAH MAKMAL SAINS DUA TINGKAT, SEBUAH BILIK
KEBAL DAN SEBUAH BLOK BILIK DARJAH 3 TINGKAT DI
SEKOLAH MENEGAH RAJA JUMAAT, LUKUT NEGERI
SEMBILAN D.K.
TENDER : JABATAN KERJA RAYA MALAYSIA.
NILAI PROJEK : RM 2,136,000.00
11
REFERENCE
MR. GHANI HASAN
COO
MMC TEPAT TEKNIK SDN BHD
0196643837
RANO ARIFF MUSA
SR PROJECT MANAGER
MMC TEPAT TEKNIK SDN BHD
0123608684
HARIRI ABD GHANI
PROJECT MANAGER
MMC TEPAT TEKNIK SDN BHD
0192736240
MR. AZLAN GOH / MR. WONG KING
WORKS MANAGER ,
KNM PROCESS SYSTEM.
09-5838340/44/46
MR. BRUNO VERKOTER
PRODUCTION MANAGER ,
KNM PROCESS SYSTEM.
09-5838340/44/46
MR. LEO BANIAS BERNASOL
PRODUCTION HEAD ,
KNM PROCESS SYSTEM.
09-5838340/44/46
MR. ZAMRI BIN SHARIFF,
MANAGING DIRECTOR,
PEMBINAAN ZANORSHA S.B.
06-6517844