Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ......

83
Results Oriented Reliability and Maintenance Consulting and Training WWW.IDCON.COM Results Oriented Reliability and Maintenance

Transcript of Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ......

Page 1: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

Results Oriented

Reliability and Maintenance

Consulting and Training

WWW.IDCON.COM

Results Oriented Reliability and Maintenance

Page 2: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

IDCON Staff

• Oli Håkansson• Michael Lippig• Tor Idhammar

Page 3: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

• Originated in Sweden 1972 as Idhammar Konsult AB.

• Established in USA 1985.

IDCON, INC.

Page 4: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

To help our clients Improve Overall Reliability and Lower

Manufacturing and Maintenance Costs.

IDCON Mission

Page 5: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

What Do We Do?

Open Training Seminars

In Plants

Reliability & Maintenancefor process industry•Advice•Leadership Organization•Assessments•Planning & Scheduling•Preventive Maintenance•Root Cause Problem Elimination•Spare parts Management•Technical Database

Page 6: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

IDCON Books

Page 7: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

IDCON

Client CriticalPeriod

CommitmentOwnership

Outside Support Phases out as your Organization Takes over Ownership

Page 8: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

Results Oriented

Reliability and Maintenance

Consulting and Training

WWW.IDCON.COM

AwarenessCost Vs. Reliability

Page 9: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Reality for Plants

Page 10: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Which Cost is Most Importan?

Maintenance Cost?Maintenance Cost per Ton?

Total Cost per Ton?Total Cost?

Page 11: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Three ways to reduce maintenance costs

1. Cut the cost

2. Reduce the need for maintenance

3. Execute remaining maintenance more efficiently.

Deferred maintenance leads toshort term savings and long term higher costs.

Procurement based on Life Cycle Cost.Maintenance Prevention

Lubrication, Alignment, Balancing, Operating practices.

Inspect, Prioritize, Plan, Schedule, Record, Analyze, Improve.

Page 12: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

CUT COSTNO OTHER

IMPROVEMENT

Wrong Turn

1. Cut Cost2. Less Repairs and

PM* are Executed3. Reliability will slowly

falter4. Reliability will falter

quicker5. Maintenance repairs

become reactive6. Cost of repairs, lost

production , and spares go up

7. Reliability become worse due to completely reactive work cycle

8. Cost go up even more*PM = Preventive Maintenance

Page 13: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Right Strategy 1. Inspect equipment better

2. Failures are identified before break down

3. More lead time to plan & schedule

4. Reliability improves

5. Cost may go up due to repairing more for a while

6. Reliability goes up

7. Cost follows due to fewer break downs

Page 14: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Case study 1 -Focusing on COST

Reduction.

Justifying Investment in Reliability

Page 15: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

0

10

20

30

40

50

60

70

80

90

100

Year 0 Year 2 Year 4 Year 6 Year 8 Year 10

Maint. Cost Million $0000 tons prodReliability

Ten years effect of two years cost cutting focus

Page 16: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

0

100

200

300

400

500

600

700

Year 0 Year 2 Year 4 Year 6 Year 8 Year 10

Maint. Cost Million $Lost Revenue Million $

Ten years effect of two years cost cutting focus

Page 17: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Case study 2Focusing on Reliability

Improvement

Justifying Investment in Reliability

Page 18: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Ten years effect of reliability improvement focus.

0

10

20

30

40

50

60

70

80

90

100

Year 0 Year 2 Year 4 Year 6 Year 8 Year 10

Maint. Cost Million $0000 tons prodReliability

Page 19: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Ten years effect of reliability improvement focus.

0

5

10

15

20

25

30

35

40

45

Year 0 Year 2 Year 4 Year 6 Year 8 Year 10

Maint. Cost Million $Increased Revenue Million $

Page 20: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Average Market Price: $595 per tonLess Variable Cost/ unit: $296 per tonContribution tocover fixed costs= $299 per ton.

Production 2006: 329,000 tons / year

One percent increase in output is 1% * 329,000 = 3290 tons

Additional PROFIT for 1% increase is: 3290 * 299 = $984,000 ANNUALLY!

Value of lost Production for your plant – Actual Example Product X

Profit (or lost profit) / Hour = 329,000 tons/ 8760 hrs = 37.55 tons/ hr299 * 11.76 = $11,229/ hr

Page 21: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

$0

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

$8,000,000

0% 1% 2% 3% 4% 5% 6% 7%

Value of increasedReliability

Leverage of Increased Reliability andReduced Maintenance Costs Product X

Page 22: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Cost vs Reliability

• Your Maintenance and Storeroom cost is about 60 Millions Year.

• How would you reduce this cost?• What happens to that cost if reliability improves

Page 23: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

Results Oriented

Reliability and Maintenance

Consulting and Training

WWW.IDCON.COMProduction Reliability

Maintenance-Equipment Reliability

Operations-Process Reliability

Engineering-Life Cycle Cost

Page 24: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

OVERALL PRODUCTION EFFICIENCY (OPE)

Q - % Prime Quality Volume

S - Operation Rate or Speed

Time Up x 100

Time Up + Time Down

Prime Quality Volume x 100

Prime Quality Volume + Rejects

Actual Capacity x 100

Actual Capacity + Speed Losses

OPE = %A x %Q x %S

A - % Availability or Time Up

Page 25: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

Results Oriented

Reliability and Maintenance

Consulting and Training

WWW.IDCON.COM

Create & CommunicateVision – Where are we going? (Paint the picture)

Page 26: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Predictive maintenance

Planned maintenance

RCM

TPM AMCBM

Build up

Break throughIdentifyBest Practices*

* About 286 elements

Lean Maintenance

Page 27: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Do We Know Exactly Where We are Going?

TIME

Reliability Performance

CURRENT

Where Plant Wants to be

•Must Be CLEAR•SIMPLE•Well Communicated

Page 28: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Identify the Gap

Actual

• How good are we?

Best Practices in Reliability and Maintenance

• How good could we be?

Page 29: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 30: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 31: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

IDCON Definition - Preventive Maintenance / Essential Care and Condition Monitoring ( PM/ECCM )

Essential Care/ FTMPrevents Failures

Condition MonitoringDetects Failures

•Lubrication•Alignment•Balancing•Detailed Cleaning•Operating Practices•Installation Practices•Filtration •Adjustments•Fixed Time Maintenance

LookListenFeelSmell

MeasuringPressureFlowCurrent, VoltageDistanceVibration TemperatureSound level

UsingInfrared CamerasVibration SensorsShock Pulse MeasurementUltrasonic Thickness TestUltrasonic Listening (leaks)Oil AnalysisGauges, etc

ObjectiveProvides a comparable reading

SubjectiveProvides no reading

Page 32: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

How well you are doing is sometimes very visual

Page 33: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 34: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 35: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 36: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 37: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 38: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 39: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

72” 1200 HP- Single Drive Raw Coal – The Gearbox

Proposed Gearbox Inspection (example)

Noise, Temperature, Bolts, Vibration, Oil Leaks, Oil Level, Breather, Base & Foundation

• CMS117R – Gear Reducer

Page 40: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Preventive Maintenance 72” 1200 HP- Single Drive Raw Coal -The Motor

Air Intake, Detailed Cleaning, Water/ Humidity, Temperature, Vibration, Noise, Base/ foundation/ hold down bolts, Electrical Cables and Junction Box

• CMS100R – AC Motor

Page 41: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

CMS Overview

Basic Principle of Operation

Why this Task is Important

Describes the Inspection Task

Reference Key to Inspection

Page 42: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Centrifugal Fan – Example for Using CMS

CMS 142R Fan – Air Centrifugal

CMS129R Bearings

CMS 137R Belt Drive

CMS 100R Motor AC

Page 43: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Paper Route Example

Page 44: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Fahrenheit

Handheld Example

Page 45: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Where to Start Improving PM and Operator Involvement?Typical Priority – process industry?

1. Basic Lubrication (rotes & oil changes)2. Inspections: Mechanical, Electrical ,Instrumentation, Operations

On-the-run & off-line (incl. vibr/ infrared/ ultrasound/ NDT)3. Cleaning & Operator Practices4. Alignment (if you have a lot of rotating equipment)5. Precision Installation6. Improved Lubrication (oil analysis, cleanliness, storage etc)7. Balancing & Design

Page 46: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 47: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

* Waiting for instructions ______min.

* Looking for supervisors for the next job ______min.

* Planning job ______min.

* Trips for material, tools, manpower ______min.

* Waiting on other trades ______min.

* Waiting for operations to release equipment ______min.

* Research for technical documentation ______min.

* Late starts / Early quits ______min.

* Personal ______min.

* Travel Time ______min.

* 480 minutes per day Total ______min.

Fill in Blanks: Planning & Scheduling Optimizes Time!

Page 48: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 49: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 50: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

PLANNED REPAIR UNPLANNED REPAIR Comments

work order 37309 work order 44699

Price of Component $124,000.00 Price of Component $189,755.00 Repair and Return vs. Exchange cost

Additional repair cost $0.00 Additional repair cost $32,555.70 Additional damage from failure

Hot Shots 0 Hot Shots 3

Cost Of Hotshots 0 Cost Of Hotshots $750.00R&R Gearcase -Labor Hrs 68.5

R&R Gearcase - Labor Hrs 101.5

Maint Labor Cost $1,678.25 Maint Labor Cost $2,486.75

Down Time 0 Down Time 4.58 hrs Lost Production to swap out miners

Cost of Down Time $0.00 Cost Of Down Time $85,091.82

Total Cost of Repair $125,678.25 Total Cost of Repair $310,639.27

Page 51: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Exercise Definitions

• What is Planning?• What is Scheduling?

Page 52: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Planning – What, Why, Where, & How

Identification and documentationof work to be done including:

• Symptom description Initiating Work• Job duration & Job Work Steps• Cost Estimate for Job• Physical and environmental constraints• Lock Out Tag Out, Safety precautions, Permits• Resource Requirements

•People•Skills•Lifting equipment, tools, parts, material

• Impact on Production

Page 53: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Scheduling – When & Who

53

Identification and Documentationof:

•When Work Will Be Done• Who Will Do It• How Much Time Is Required

Page 54: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Work Request and Priority Guidelines

Priority Example of Failure or Incident Maximal time in backlog

Is the job necessary to do? Yes No On Hold

1 Immediate safety risk Immediate risk of environmental damage Immediate risk of quality losses. Critical equipment down Short failure developoing period

Immediately. Will break other less important ongoing work.

2 Critical equipment is running at reduced speed Critical equipment is running in manual mode Manageable safety risk PM activity Mandatory inspections Failure developing more than 1 week

1 day - 1 week

3 Critical equipment running on spare equipment Failures that need correction Spare equipment out of function Leaks Failure development more than 1 month

1 week – 1 month

4 Improvement work - expense. Improvement work - capital

> 1 month

Page 55: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

STOP

WHAT?

Find the RightPeople

To Fix Prblm.

Find Parts andTools Repair

Down TimeUp Time

STOP

Find the RightPeople

To Fix Prblm.

Find Parts and

Tools

Repair

TestAndStart

INSPECTION

PLAN, SCHEDULE

RepairTestAndStart

Operate To Break Down

Only Plan

Inspect, Plan,Schedule

TestAndStart

Page 56: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Scheduled Shut Down

Inspect/Problem Found

Plan, Schedule

Execute

Coordinate Production and Maintenance Plans.Utilize all scheduled and Unscheduled Shut Downs

Page 57: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Collecting Failures for Shutdown

= Inspection Cut off time

Area

or P

lant

Shu

tdow

n/

Turn

arou

nd

Page 58: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

•Equipment Number and Equipment Name•Bill of Materials•Inventory Record Accuracy (IRA)•Work Order History•Condition Monitoring History•Standard Job Plans

Technical Database & Spare Parts

Page 59: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Your Store Room?

Page 60: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Your Store Room?

Page 61: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 62: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Root Cause Failure Analysis

TO

Root Cause Problem Elimination

Record and Analyze

Page 63: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Morning meeting: Motor tripped out causing production loss!

Maintenance Operations

Mechanical E / I

Electrical Instrumentation

WHO

Root Cause Problem Elimination – is not

Page 64: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Results Oriented Reliability and Maintenance

Most OrganizationsKNOW

What to do

Best OrganizationsDo it.

Page 65: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Do Work

Even with good skills, people can not be more productive than the system they work in allows them to be.

People’s performance is often limited -not so often by their skills - but more often by the system they work in.

Page 66: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Reliability and Maintenance Improvement Process

It is the responsibility ofMANAGEMENT

to develop, institute and continuously improve systems and

procedures.

Page 67: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

PRODUCTIVE or NOT?

Busy people are not necessary PRODUCTIVE

PRODUCTIVE people are busy with the Right Thing.

Page 68: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

- Maintenance Crafts People?- Spare Parts Management?- Project Engineers?- Maintenance Managers?- Operation Managers?

You do not get what you ask for.You get what you recognize.

How do you recognize (reward) work done by?

Recognition

Page 69: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Page 70: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Designate some of your resources to PM

Management team

Supervisor

Front Line Supervisor

Page 71: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

We have created lubrication standards, alignment standards,

and inspection routes,But they aren’t used in the plant

5% creating documentation95% get people to use it

Many knows howBest performers do it

Engineers

Page 72: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Workforce

Workload?

Time

Effo

rt h

ours

1

2

3

“The Mountain” – Management team

Page 73: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

$100$102

$79.00

$161

$111

313,893

299,000292,000281,209

347,085

$40

$60

$80

$100

$120

$140

$160

$180

0 2 5 8 11

185,000

235,000

285,000

335,000

385,000

Reactive- Run to failure- Fix when broke- Very unpredictable

Preventive Maintenance done at predetermined intervals to reduce likelihood of failure

Predictive Measured and monitored against standards i.e. - vib. analysis - thermography - tribology - ultrasonic

Condition Based Know equipment condition Focus on corrective actions Optimize economic life of equipment, tanks, vessels Information integration

Reliability Centered Optimize all maintenance, engineering, and operational techniques to meet predetermined equipment reliability goals and performance standards

Production Tons

Maintenance Cost per Ton

Manufacturing Reliability Evolution at Irving Pulp and PaperManufacturing Reliability Evolution at Irving Pulp and Paper

Years

Page 74: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

Results Oriented

Reliability and Maintenance

Consulting and Training

WWW.IDCON.COM

Selling Maintenance to Management

Reliability

Page 75: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Revenuefrom sales

-VariableCosts

Contribution

FixedCosts

- Results

•Sold and deliveredQuality Production

Volumex

Price

•Raw Material•Energy•Media

•Contractors•Maintenance material?

•Salaries•Financial costs

•Depreciation•Rent/leasing

Page 76: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Revenue from sales$ 300.000,000

-Variable Costs$ 190,000,000

Contribution$ 110,000,000

Fixed Costs $ 92,000,000

-Operating

Results$ 18,000,000

•88% Overall Production Reliability

•500,000 tons/yearX $ 600/ton

•500,000 tons/yearX $ 380/ton

•Salaries•Financial costs

•Depreciation•Rent/leasing$92,000,000

Page 77: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Revenuefrom sales

$300,000,000

-VariableCosts

$190,000,000

Contribution$110,000,000

FixedCosts

$92,000,000

-Operating

Results$18,000,000

/LiquidAssets

FixedAssets

+Total

Assets

ReturnOn Assets•Cash

•Account Receivable•Finished goods

•Buildings•Equipment•Material •Product in Process

Page 78: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Revenuefrom sales

$300,000,000

-VariableCosts

$190,000,000

Contribution$110,000,000

FixedCosts

$92,000,000

-Operating

Results$18,000,000

/LiquidAssets

75,000,000

FixedAssets

280,000,000

+Total

Assets355,000,000

ReturnOn Assets

5.1%•Cash•Account Receivable•Finished goods

•Buildings•Equipment•Material •Product in Process

Page 79: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Revenue from sales$ 320,500,000

-Variable Costs$ 200,250,000

Contribution$120,250,000

Fixed Costs $ 92,000,000

-Operating

Results$ 28,250,000

•94% Overall Production Reliability

•534,000 tons/yearX $ 600/ton

•534,000 tons/yearX $ 375/ton

•Salaries•Financial costs

•Depreciation•Rent/leasing$19,000,000

Maintenance costs reduced from $45 to $40/ton

Increase Reliability 6% from 88% to 94%

Page 80: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Revenuefrom sales

$320,500,000-

VariableCosts

$ 200,250,000

Contribution$120,250,000

FixedCosts

$92,000,000

-Operating

Results$28,250,000

/Liquid Assets$ 75,000,000

Fixed Assets$ 280,000,000

+Total Assets$355,000,000

ReturnOn Assets

8.0%•Cash•Account Receivable - Debt•Finished goods

•Buildings•Equipment•Material •Product in Process

Increase Reliability 6% - ROI

Page 81: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Revenuefrom sales

$352,440,000

-VariableCosts

$200,250,000

Contribution$152,190,000

FixedCosts

$92,000,000

-Operating

Results$60,190,000

/Liquid Assets$ 75,000,000

Fixed Assets$ 280,000,000

+Total Assets$355,000,000

ReturnOn Assets

17.0%•Cash•Account Receivable - Debt•Finished goods

•Buildings•Equipment•Material •Product in Process

Market price Increases 10% AND 6 % Reliability

Page 82: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCONwww.idcon.com

Page 83: Results Oriented Reliability and Maintenance, Results ... · Reliability and Maintenance ... schedule 4. Reliability improves 5. Cost may go up ... Electrical ,Instrumentation, Operations

WWW.IDCON.COM© Copyright IDCON

Accounting