Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

13
Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract

Transcript of Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Page 1: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted

CP Programme – Print CategoryPreparation to On-boarding the PVP contract

Page 2: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 2

Introduction - Preparation for on-boarding• This document aims to give guidance on key areas for consideration prior to

joining the PVP central contract, including resources and issues/risks. It is based on the experiences of teams who have already started to implement. Williams Lea will be asking similar questions in greater depth and early consideration can lead to the following benefits:

• Benefits of preparing

•Accelerated on-boarding will accelerate the achievement of savings

•Ensure business continuity

•Become part of an ERG approved vehicle

•Early identification of potential blockers

The objective is to build a detailed understanding of the current state and your requirements

Page 3: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 3

Onboarding Process- Department and Williams Lea

Define Preparation phaseEstablish a project framework and governanceEstablish resource requirements and contacts for Dept and within ALBs Agree scope of activityCommence contractual / cost model discussions

Discover Fact finding phaseReview and establish the current stateBaseline processes and proceduresEstablish current supply arrangement – identify potential TUPEIdentify SLAs and KPIsBaseline current cost baseMeet with key stakeholders

Design Tailor the solution to meet the existing business requirements Outline activity required to transfer serviceIdentify opportunities for service enhancement or cost reductionPresent solution definition document for sign off by Procurement BoardJointly build implementation plan

Deliver (go-live)Onboard existing supply chain – TUPE considerations establishedEstablish account management structure and teamFinalise commercial modelBuild and implement technology interfacesTest all processes and proceduresGo-live and transfer activity

Page 4: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 4

Departmental Overall Resources

1. Implementation Team:

• Liaising with Williams Lea

• Responsible for collecting print assets, specifications

• Liaising with stakeholders and incumbent suppliers

• Reporting issues to their GP Client Relationship Manager

• IT expert with experience of working with your department’s technology (P2P system, catalogues, Procserve, Government e Marketplace - GeM)

2. Maintain Print Business-As-Usual activities

• Responsible for ongoing activities prior to ‘go live’

The size of these teams will depend on the intensity of your operations – in smaller departments where print spend is minimal there may be overlap between on-boarding and BAU.

Page 5: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 5

Resources for Onboarding

• Define – This is the most resource intensive phase, but is an invaluable investment as it will greatly shorten the discovery phase. The work needed here is similar to preparing for a tender (without the later work of going through the tender process) .

• Discover – More work undertaken at the define stage means much less resources are required here and the benefit is that the timeframe for this stage is shortened.

• Design – WL will lead, however, they will need continued access to, and support from, the relevant people, the resources will depend on the IT system in place and how you currently transact.

• Deliver – Resource required here is for facilitating the back end processes such as ordering, invoicing, catalogues associated processes, including developing, improving and testing.

Page 6: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 6

Collect/Establish

Establish Baseline spend – includes unit prices and forecasted volumes.Think about how you will get this information, what sources, will it be accurate? An accurate baseline will ensure accurate savings are recorded and the supplier is remunerated accordingly. You will be provided with a cost model template which will include the principles of how the cost model works.

Collect product specifications/artworkIdentify and begin to collect this information - from current suppliers/internal teams – experience has shown that this can be resource intensive.

Testing RequirementsThink about what testing requirements you may have particularly around the IT/catalogues.

Page 7: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 7

Collect/Establish

Establish MI requirementsA standard MI template has been agreed with Williams Lea which aims to be useful for making both tactical and strategic decisions. This structure can be replicated for other departments or tailored to reflect department nuances.

Establish SLAs/KPIsGPS can provide examples of SLAs/KPIs which have already been agreed with on-boarding departments. Alternatively, Departments have the flexibility to propose their own.

Internal Gateways/GovernanceIf you have any internal gateways or Governance processes these need to be considered and addressed as soon as possible.

Page 8: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 8

Internal Considerations • Establish number/details of all connected ALB’s/Departments and their

spend.

• Within each ALB - Establish Key Stakeholders• Business Owners

• Technology

• Finance

• In house design or print• Consider holding initial stakeholder meetings – slides can be provided for

you

• Establish the location of stakeholders who own/manage the budget.

• Consider end to end process of print requirement (see slide 10)

• Establish Department IT stance i.e. electronic catalogues, P2P, security . considerations, outline of department’s requirements for Procserve (GeM).

• Identify planned work, trends, amount of short deadline work – this will . . ensure that important work is not overlooked

Page 9: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 9

External Considerations – Current Suppliers

Williams Lea will ask for the following when they perform their in depth ‘Discover’ stage. Having this information available at an early stage will help ensure business continuity.

• Identify Key suppliers by large spend or complexity/security (inc. values)

• Identify all remaining suppliers (inc. values)

• Details of any frameworks or direct contracts used

• Product profile – types of print product (reports /leaflets etc), volumes, related services

• Stock/Warehousing (what’s in current contract re stock)

• Stock Management (who owns stock, value, where is it kept)

Page 10: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 10

RequirementPre press

ProductionPrint & publishing

FulfilmentHard copy or digital distribution

Inbound

Basic Design Layout / Artwork / Typesetting / Translation (exc. Creative and Advertising Services)

Print & Finishing

e-Comms / On-line / Multi-media

Paper Supply

Personalisation / Mail

Envelope Supply

Post Management – RM / DSA

Warehousing Distribution –

Pick ‘n’ Pack

Archiving

Scanning

Data / Database Management

Digital Asset Mgt

Brand Management

Toolkits / Templates

Delivery

Logistics / Transport

Overarching end 2 end process management & delivery

Orderline / Helpdesk

On-line

Publication

End 2 End process

Key: Level of requirements High Medium Low

OR entry/delivery at any point(s) in process

Page 11: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 11

Contract Structure• Formal Contract Document containing:• Form of Agreement• Terms & Conditions• Schedules: A HMRC Specification of RequirementsB HMRC Pricing SchedulesC HMRC Specific Responsibilities of the PartiesD Governance and Contract Management (applies to all Departments)E Management InformationF Service Levels and KPIsG Exit ManagementH Certificates and additional Information (applies to all Departments)I Security PlanJ Variation of Contract FormThe Contract will be novated to the Government Procurement service The Contract will then be ‘varied’ to incorporate an Enabling Agreement for each

Department as a new Schedule (see next slide)

Page 12: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 12

Department Enabling Agreement

Comprises:• Form of Agreement• Incorporation – to explain that T&Cs of the Contract form part of the Enabling

Agreement• Additional T&Cs required by Departments. (N.B. These are restricted). • Annexes containing:

• Specification of Requirements

• Cost Model Principles and Agreement

• Specific Responsibilities of the Parties

• Management Information

• SLA’s/KPI’s

• TUPE Declaration by the Enabling Authority

• Security Plan

• Exit Management Plan

..

Page 13: Restricted CP Programme – Print Category Preparation to On-boarding the PVP contract.

Restricted Project Name: HMRC v1.8 | 12/02/2007 | 13

Process

The PVP contract will go through three phases:

1. Transfer

2. Transition

3. Transform

1. It was agreed with the Procurement Executive Board (PEB) that during the first stage ‘Transfer’ the existing requirement would be replicated - ‘as is’ state - an almost seamless process.

Therefore, you only need to focus on what is needed to ‘go live’

2. Improvements such as standardisation and rationalisation changes – the ‘to be’ – will come in the ‘Transition’ stage.

3. ‘Transform’ will focus on the longer term strategy and transforming print requirements. This will result in continuous and sustainable savings.

4. Following ‘go live’ you must consider how the scope of the PVP aligns with your print strategy to move into the transition and transform stages.