RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 ·...

16
RESTORE

Transcript of RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 ·...

Page 1: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

RESTORE

Page 2: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition
Page 3: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

RESTORE DSA Encore’s Surgical Decommissioning Services

SURGICAL DECOMMISSIONING. WE DIDN’T JUST INVENT IT. WE PERFECTED IT.

Page 4: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 5: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

7 Weeks

9,800 Man Hours of Labor

75,000 sq. ft. of Raised Floor removed

650,000 lbs. of Misc. Debris

30 Dumpsters of metal, drywall and other demo’d Building Materials

40 truckloads of equipment, batteries, and other items for disposal or recycling

…AND WE WROTE THE CLIENT A CHECK FOR

$82,000

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 6: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

RESTORE DSA Encore’s Surgical Decommissioning Services

Surgical Decommissioning: The art

and science of dismantling and

removing equipment or an entire

facility; restoring that facility to its

original condition with minimal risk.

RESTORE

Page 7: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

RESTORE DSA Encore’s Surgical Decommissioning Services

There comes a time when your data center - the whole thing or just a single piece of equipment - reaches the end of its lifespan. Then what? Does the equipment have value to someone else? Does your lease necessitate returning a data center to its original condition or an empty shell? That’s where DSA comes in. By utilizing the most experienced data center decommissioning team in the country, we can help you recapture the remaining value of your assets and, if required, restore your entire site to its original condition with minimal risk. We’ve decommissioned hundreds of critical sites for the world’s leading companies with a precision that’s unique to the industry. Our decommissioning, rigging and demolition teams are deeply experienced in the removal of infrastructure and equipment without compromising ongoing operations. Through our vigilant, precise execution, we’re able to surgically remove anything that might have value.

AFTER

RESTORE

BEFORE

Page 8: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 9: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

RESTORE DSA Encore’s Surgical Decommissioning Services

Our experience constructing data centers gives us the know-how to dismantle them; whether it’s dealing with sensitive data, hazardous materials or security clearances for on-site personnel, DSA’s experience will never let you down.

Page 10: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

DSA Encore’s surgical decommissioning services help commercial real estate owners, tenants and managers dispose of their data center infrastructure equipment using EPA certified methods that maximize return on investment while mitigating risks. We are experts in the removal of sensitive data and hazardous materials and our rigging and demolition teams will return and property to pristine condition in record time.

• FullRestorationforOptimizedReturns

• CompleteSiteDecommissioningandDemolition

• ExpertEquipmentHandling&Processing

• EPACertifiedHazardousWasteDisposal

• Brokerage,StorageandEquipmentRemanufacturingOptions

• EnvironmentallyConsciousDisposalorRecyclingofMaterials

• Facilityrestoration-thecompletedecommissioningoftheentiredatacenter

• Riskmanagementattheforefrontofalloursurgicaldecommissioningprojects

• Oneoftheindustry’smostexperiencedteamswithmorethan100yearsofdecommissioning

experience

• Wellestablishedprogramthatincludestherequirementsnecessarytoworkintoday’srisk

adverseenvironment

• Ourbusinessallowsustoprovidefairmarketvalueforexistingequipmentthatcouldbecredited

againstthecostoftherestorationprogram

• Environmentalservicesincluderecyclingprogramsspearheadedbyexperiencedproject

managers-ultimatelyminimizingscrapanddeposalcosts.Allowingyoumarketingpeopleto

supportearthfriendlyandrecyclinginitiatives

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 11: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

01Requirementidentified

06Projectcommencement

05Scheduling&projectcoordination

04Approvalprocess,deliverassetpurchaseagreementanddecommissioningprojectcontract

03Presentprojectparameters&proposal

02Scopedefinitionprocess:Projectspecificationcollectionandscopeofworkdefinitionprocesses&pre-bidsitevisit

THE PROCESS

07Projectexecution

08Finalsiterestorationcompletionandsign-off

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 12: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

Savvis Inc. SC3 locationSanta Clara, CA

• Removed(12)2MegawattGenerators,(30)500kvaUPS’s,(100)PDU/STS’s,100,000sq/ftofraisedfloor,1

millionpoundsofcopper,300,000poundsofbatteries,50CRACunitsandcondensers,(2)20,000gallonUST’s.

Alloftheequipmentrequiredover100tractortrailerstotransport.Whenequipmentwasremoved,wehadto

demolishthe50,000sq/ftgenerator/UPSbuilding.Thebuildingwasa2storybuildingandthespacehadtobe

returnedtoaparkinglotwithlandscaping

XO Communications Secaucus, NJ

• Removed(2)2MegawattGenerators,severalCRAC’s,UPSandSwitchgear.

• Facilitywas10,000sq/ftandleftbroomcleanforfutureofficeuse.

Credit Suisse

Princeton, NJ

• Removed(4)500kvaUPSmodules,Switchgearand45,000lbsofwetcellbatteries.

CitibankLong Island, NY

• Removed(2)2MegawattGenerators,(20)CRAC’s,(4)UPS’sandSwitchgear,andtheChillerPlantandsteel

deckingfromtheroof.

• Facilitywas20,000sq/ftandleftbroomcleanforfutureofficeuse.

A Sampling of Recent Surgical Decommissioning Projects

Some of the largest data center owners have entrusted DSA Encore with some of the largest and most complicated surgical decommissioning projects.

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 13: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

Structuretone NASD locationRockville, MD

• Removed(2)1MegawattGenerators,severalCRAC’s,UPSandSwitchgear.

• Facilitywas7,500sq/ftandleftbroomcleanforfutureofficeuse.

CBREWatertown, MA

• Removed(4)750kvaUPSmodulesincludingtheSystemControlCabinets,

• (18)225kvaHarmonicsLimitedtransformersandthemediumvoltagesubstationandassociatedswitchgear.

Teleglobe Chantilly, VA

• Removed(1)1MegawattGenerator,severalCRAC’s,UPSandSwitchgear.

• Facilitywas7,500sq/ftandleftbroomcleanforfutureofficeuse.

Jones Lang LasalleAddison, TX

• Removed(2)1MegawattGenerators,severalCRAC’s,UPSandSwitchgear.

• Facilitywas7,500sq/ftandleftbroomcleanforfutureofficeuse.

Equinix

Santa Clara, CA

• Removed(1)500kwGenerator,severalCRAC’s,UPS’sandSwitchgear.

• Facilitywas5,000sq/ftandleftbroomcleanforfutureofficeuse.

Sabey Data CentersSeattle, WA

• Removed50,000sq/ftraisedfloor,10tractorstrailersofcaging,(20)6’x6’exhaustfans

• andseveralPDU’s.25tractortrailersanddumpsterstocompletejobin2weeks.

CingularPleasanton, CA

• Removed(1)500kwGenerator,severalCRAC’s,UPS’sandSwitchgear.

• Facilitywas5,000sq/ftandleftbroomcleanforfutureofficeuse.

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 14: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

Reuters Boston, MA

• Removed(2)500kwGenerators,severalCRAC’s,UPS’sandSwitchgear.

• Facilitywas10,000sq/ftandleftbroomcleanforfutureofficeuse.

AT&T Piscataway, NJ

• Removed(30)CRAC’s,(4)UPS’sandSwitchgearand300,000lbsofcopper.Facilitywas50,000sq/ftandleft

broomcleanforfuturedatacenterbuildoutforDLR.

JP Morgan Chase Carlstadt, NJ

• Removedallswitchgearandparallelinggearfora6megawattsystemfornewbuildoutofdisasterrecoverycenter.

Raytheon

Waltham, MA

• Removed(1)500kvaUPS,severalCRAC’s,2,500sq/ftofraisedfloor.• Spacewasleftbroomcleanforfutureofficeuse.

Lord AbbottJersey City, NJ

• Removed(2)1MegawattGenerators,severalCRAC’s,UPSandSwitchgear.• Facilitywas7,500sq/ftandleftbroomcleanforfutureofficeuse.

Blackrock Financial New York, NY

• Removed(3)500kvaUPSmodules,(11)PDU’sand(17)CRACunitsfrom8thfloorindowntownNYCalongwith30,000lbsofwetcellbatteries.

Citibank New York, NY

• Removed(3)300kvaUPSmodulesandbatterycabinetsfrom11thfloorindowntownNYC.

WAMUSeattle, WA

• Removeda2MegawattgeneratoronatraileroutofparkinggarageindowntownSeattle.

• Workhadtobeperformedoffhoursontheweekend.

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 15: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

THE DSA DIFFERENCE

WE KNOW TECHNOLOGY FROM THE INSIDE OUT.WhatsetsDSAEncoreapartinthiscrowdedfieldofinfrastructuretechnology,maintenanceandsupport?The

extraordinaryedgethatthreedecadesofexperienceequippingdatacenters,engineeringsolutions,and

re-manufacturingequipment-literallyfromtheframeup-hasbroughtourteam.We’veaccumulatedvaluable

insight,overtheyears,bylisteningtoourclientsandweputthisknowledgetoworkeverydaydelivering

solutionstosatisfytheelectrical,environmental,serviceandmonitoringneedsofourhigh-techclients.

Innovationisatthecenterofourculture.Wetransformacquiredknowledgeintointelligent,integratedand

individualizedsolutionsandsuperiorfieldservice.Ourintuitive,motivatedstaffisdriventodeliverexceptional

performanceandtooutfitdatacenteroperatorswiththemeanstopowerupandproactivelymanagetheir

infrastructureenvironmentforoptimum,reliableperformance.

RESTORE DSA Encore’s Surgical Decommissioning Services

Page 16: RESTORE - PRWebww1.prweb.com/.../2012/05/30/9558296/RESTORE_PDF_FINAL.pdf · 2012-05-30 · decommissioning project contract 03 Present project parameters & proposal 02 Scope definition

LIFECYCLE SOLUTIONS FOR DATACENTER INFRASTRUCTURE

DSA Encore | 50 Pocono Rd, Brookfield, CT 06804 To find out more about us go to: www.dsaencore.com