Responsibility of stakeholders for voltage dips
Math BollenEnergy Markets Inspectorate
Eskilstuna, Sweden
![Page 2: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/2.jpg)
Frankfurt (Germany), 6-9 June 2011
The compatibility gap
Immunity of installations and processes
Continuity of supply regulation
Duration of the dip
Res
idua
l vol
tage
Math Bollen – Sweden – S2a
![Page 3: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/3.jpg)
Frankfurt (Germany), 6-9 June 2011
Bridging the gap – immunity
CIGRE/CIRED/UIE working group C4.110 Process immunity time as a tool for improving
the immunity of an industrial process Equipment with higher immunity is slowly
entering the market Fault-ride-through for wind turbines
No developments in standardization
Math Bollen – Sweden – S2a
![Page 4: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/4.jpg)
Frankfurt (Germany), 6-9 June 2011
Bridging the gap - emission
EMC directive: the power system is an installation Voltage dips are emission by the power system to
the customer No IEC standards on voltage-dip emission EN 50160 gives no information either European regulators took up the issue in their
”voltage quality conclusion paper”
Math Bollen – Sweden – S2a
![Page 5: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/5.jpg)
Frankfurt (Germany), 6-9 June 2011
Responsibility sharing curve
Installations should tolerate these dips
Voltage-quality regulation
Duration of the dip
Res
idua
l vol
tage
Math Bollen – Sweden – S2a
![Page 6: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/6.jpg)
Frankfurt (Germany), 6-9 June 2011
South Africa
0.15s 0.6s
70%
85%80%
Math Bollen – Sweden – S2a
![Page 7: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/7.jpg)
Frankfurt (Germany), 6-9 June 2011
France
70%
0.6s
Math Bollen – Sweden – S2a
![Page 8: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/8.jpg)
Frankfurt (Germany), 6-9 June 2011
Working group C4.110
0.2s 0.5s 1s
40%
70%
80%
50%
2s
Math Bollen – Sweden – S2a
Class C Class A
![Page 9: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/9.jpg)
Frankfurt (Germany), 6-9 June 2011
Voltage dips: Swedish regulation
Installations should tolerate these dips
A reasonable number of dips is acceptable
Dips are unacceptable
Duration of the dip
Res
idua
l vol
tage
Math Bollen – Sweden – S2a
![Page 10: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/10.jpg)
Frankfurt (Germany), 6-9 June 2011
How to choose the curves?
Dips, up to 45 kV CIGRE/CIRED/UIE working group C4.110
Dips, above 45 kV Discussion between the stakeholders
Swells, up to 1 kV Protection requirements microgeneration Highest overvoltages during earthfaults Experiments on equipment damage
Math Bollen – Sweden – S2a
![Page 11: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/11.jpg)
Frankfurt (Germany), 6-9 June 2011
The resulting limits
0.2s 0.5s 1s 5s
40%
70%
90%
60s
80%
Math Bollen – Sweden – S2a
Red: above 45 kVGreen: 45 kV and less
![Page 12: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/12.jpg)
Frankfurt (Germany), 6-9 June 2011
What is a reasonable number of events?
South Africa: 95% of sites France: comparing with previous years Sweden
comparing with similar networks elsewhere In case of a disagreement the network operator
has to convince the regulator that the number of dips is reasonable
Experience with this to be gained in the coming years
Area B is also to be defined in contracts
![Page 13: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/13.jpg)
Frankfurt (Germany), 6-9 June 2011
Stakeholder Responsibility
Network Operator Prevent dips in Area C Limit the number of dips in Area B
Customer Process to be immute to dips in Area A Impact of dips in Area B to be limited
![Page 14: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/14.jpg)
Frankfurt (Germany), 6-9 June 2011
Stakeholder Responsibility (2)
Equipment manufacturer Equipment to be immune to dips in Area A Different classes of equipment immunity to
cover Area B Standard-setting organisation
New standardization to cover Area A and B Consider immunity of processing, not just of
equipment Consider balanced and unbalanced dips
![Page 15: Responsibility of stakeholders for voltage dips](https://reader035.fdocuments.net/reader035/viewer/2022062422/56812f4a550346895d94d9f8/html5/thumbnails/15.jpg)
Frankfurt (Germany), 6-9 June 2011
What next?
Gaining experience What is a reasonable number of events? How to do the measurements? Can simulations be used?
Extending to balanced and unbalanced dips In area B
Power-quality contracts
Math Bollen – Sweden – S2a