    Process Industry Practices

    Electrical

    PIP ELSGS01D

    Data Sheet For Design and Fabrication of High

    Resistance Grounding System

    (Wye System, 600 Volts or Below)

  • 8/13/2019 Resistance Grounding System

    2/3

    PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

    In an effort to minimize the cost of process industry facilities, this Practice

    has been prepared from the technical requirements in the existing standards of major

    industrial users, contractors, or standards organizations. By harmonizing these technical

    requirements into a single set of Practices, administrative, application, and engineering

    costs to both the purchaser and the manufacturer should be reduced. While this Practice

    is expected to incorporate the majority of requirements of most users, individual

    applications may involve requirements that will be appended to and take precedence over

    this Practice. Determinations concerning fitness for purpose and particular matters or

    application of the Practice to particular project or engineering situations should not be

    made solely on information contained in these materials. The use of trade names from

    time to time should not be viewed as an expression of preference but rather recognized as

    normal usage in the trade. Other brands having the same specifications are equally

    correct and may be substituted for those named. All practices or guidelines are intended

    to be consistent with applicable laws and regulations including OSHA requirements. To

    the extent these practices or guidelines should conflict with OSHA or other applicablelaws or regulations, such laws or regulations must be followed. Consult an appropriate

    professional before applying or acting on any material contained in or suggested by the

    Practice.

    Process Industry Practices (PIP), Construction Industry Institute, The University of

    Texas at Austin, 3208 Red River Street, Suite 300, Austin, Texas 78705. PIP member

    companies may copy this practice for their internal use.

    3pr96

    2pr96

    Not printed with state funds.

  • 8/13/2019 Resistance Grounding System

    3/3

    PIP ELSGS01Data Sheet for Design and Fabrication of High Resistanc

    October 1995 Grounding System (Wye System, 600 Volts or Below

    Process Industry Practices Page 1 of

    Client: Engineering Org. Spec. No.

    Project title Location Date

    Project location Contract No. Equip. No.

    Proj. No. Specifier Name Tele. No.P.O. No.

    Refer to Specification No. ELSGS01 For General Requirements

    Applicable State & Local Codes:___________________________________________________________

    Data Provided By: n Buyer l Seller With Proposal t Seller After Order

    Site Conditions:

    Altitude ___________ Ft Seismic Zone ___________

    Area Class ______ Div _____Group ____________________

    Non Hazardous

    Gas Ignition Temp ___________

    C

    Ambient Temperature: Max ________ F Min________F

    Other ____________________________________________

    120 Volt AC Control Power /Heater Source:

    Internal Source Furnished by Vendor (Part of System)

    or

    Exernal Source Furnished by Buyer l VA Required ____

    Entry:Top Bottom Side Other ______________

    Enclosure:

    Mfr.s Standard lType _______________________

    Steel Aluminum

    Outdoor NEMA 3R Outdoor NEMA 4

    Outdoor NEMA 4X

    Indoor NEMA 1 Indoor NEMA 12

    Within switchgear or MCC Lineup

    Space Heaters:

    Not Required Required

    Thermostat Not Required

    tSpace Heater Load _________ Watts @ __________Volts

    Painting:

    Mfr.s Std ANSI 61 Other ________________

    Per Paint Spec _______________________________

    Other ____________________________

    Portable Detectors

    Quantity required: None One Two

    Shop Inspection & Tests:

    nMFR. Standard Tests Witnessed Not Witnessed

    Preshipment Shop Witness Inspection

    Other ______________________________________

    Documentation:

    lElectronic Document Format . DXF Other _____

    Manufacturer to provide:

    1 reproducible plus

    ________ number of copies of all documentation plus

    ________ copies of the operating manuals.

    Other Requirements: