Residents of the Mill Road area presentation to the ZBA 2/20/14

13
Residents’ Evaluation 276 Mill Road

description

 

Transcript of Residents of the Mill Road area presentation to the ZBA 2/20/14

Page 1: Residents of the Mill Road area presentation to the ZBA 2/20/14

Residents’ Evaluation 276 Mill Road

Page 2: Residents of the Mill Road area presentation to the ZBA 2/20/14

This Project is Not in Chelmsford’s Best Interest!

• Violates 40B selection criteria.• Does not conform to Town’s housing and master plans. • Traffic and Safety hazards abound• Ignores Health concerns• Stormwater run-off • Risk loss of Global businesses headquartered in Chelmsford !

Page 3: Residents of the Mill Road area presentation to the ZBA 2/20/14

The Affordable Housing Plan not valid! Needs to be revised…

Gone

Gone

Gone

384 Aspen 40B Units

15+ acres of UML West NEVER part of plan!

120 units120 units

Page 4: Residents of the Mill Road area presentation to the ZBA 2/20/14

Impact on Town Plans

• Master Plan – Commercial land is gone– IA best use for JOBS or other technical purpose– It is NOT residential use for a reason

• Affordable Housing Plan– Needs to be revised using more current data

– It no longer reflects reality

• Town wide Water and Sewer – Safety issues with BOTH water and sewer

– State has limited our well water draw NOW!

– Emergency water restrictions in place NOW!

– Town sewer is at capacity, location is as well

Page 5: Residents of the Mill Road area presentation to the ZBA 2/20/14

Site Health and Safety Issues

• Health Department is Opposed!

• 13% slope from top to Mill Road – Ice Storm anyone?

• Driveways and building access not optimum for fire trucks

• Do you want children to wait for the bus here?

• Town liability when first resident claims illness

Reviewer comment, I used to drive this street, but there’s too much traffic now

Page 6: Residents of the Mill Road area presentation to the ZBA 2/20/14

Adjacent Safety/Environmental Issues

Many unsecured mechanical items . Okay for IA… NOT for families!

Page 7: Residents of the Mill Road area presentation to the ZBA 2/20/14

Fire Safety• The site will not allow 360 degree access to two buildings

• It CAN happen in Chelmsford and it has… with deadly effect

Page 8: Residents of the Mill Road area presentation to the ZBA 2/20/14

Traffic will Not Get Better

• Mill Rd: abused ‘scenic road’... already sees heavy traffic.

• Project outlet is near a hazardous turn.

• Zoll traffic will be competing and queuing at same turn.

• There are frequent road obstructions in GOOD weather.

Page 9: Residents of the Mill Road area presentation to the ZBA 2/20/14

Project will adversely affect abutters with Global presence !Interruptions to manufacturing and increased site liabilities.

Will damage the marketing of limited IA space in Chelmsford.

Page 10: Residents of the Mill Road area presentation to the ZBA 2/20/14

There are Alternatives!

1. Revise AHMP to include all viable areas to meet Chelmsford’s affordable housing goals and new residents requirements …

2. Mill Rd is a prime location for a Megawatt scale solar development !!!

Page 11: Residents of the Mill Road area presentation to the ZBA 2/20/14

There are Alternatives!

3. The 34 acres of the abandoned UMASS Lowell West campus is the PRIME location to create phased development to meet

ALL 40B requirements for Chelmsford!

Page 12: Residents of the Mill Road area presentation to the ZBA 2/20/14

There are Alternatives

An Abandoned Fire Hazard with full infrastructure and excellent topography ready to go!!

Page 13: Residents of the Mill Road area presentation to the ZBA 2/20/14

Send a message! Deny this project now