Residential New Construction Montana House: UES Measure Update
Adam HadleyRegional Technical Forum
April 14, 2015
2
Overview
Today, we are seeking RTF approval of:• updated measure specifications• revised measure savings• revised measure costs
3
Measure OverviewMeasure Specification(link to: Proposed Specification)
Construction of and installation of lighting and appliances in single family residences built in Montana in accordance with the Montana House 2 Program Specification.
Measure Developers Flathead Electric, Ravalli Electric, Missoula Electric, RTF
CAT Review Adam Hadley
Tech Sub-Com Review D. Bopp, J. Maunder, D. Rogers, A. Hadley
R&E Sub-Com Review n/a
Notes • June 2011: Measure approved (updated from the first MT House version)
• July 2014: Measure put Under Review, sunset set to October 2014
• October 2014: Sunset date extended to April 2015• MT hadn’t yet adopted a new state code. (Montana
adopted as its code the 2012 IECC with amendments in November 2014. link to summary)
4 Measure Specification Changes/Updates(listed in approximate order of impact on measure)
Link to: Proposed Measure Specification, tracked changes
1. Added a “Flash and Fill” optional prescriptive path– Wall Insulation (less efficient): 2x6 standard framing with 2 inches of spray foam,
then filled with cellulose– Windows (more efficient): U–0.28– Envelope Tightness (more efficient): 3.0 ACH50
2. Added airflow requirement for air source heat pump CC&S– Also, edited section to align with RTF CC&S spec
3. Now require ducts inside4. Removed water heater efficiency requirements
– Previous spec had a minimum EF table for electric resistance tanks, now covered in the baseline under the new federal standards
5. Mechanical ventilation section removed– Now required per code
6. Removed requirement for utility to test envelope tightness on 10% of houses– Reason: Envelope tightness should be covered under delivery verification
7. Skylight area maximum of 2% of floor area
5
Energy Savings Updates(listed in approximate order of impact on savings)
Link to: Proposed Measure Workbook, and SEEM Runs1. Used latest version of SEEM, latest calibration2. Add savings from new ducts inside requirement
– RTF Judgment Required: Baseline set at “PTCS” tightness levels to approximate code duct sealing and testing requirements• Code: “… leakage to the outdoors must be equal to or less than 4 cfm per 100 sq.ft. of conditioned
floor area…”)• SEEM baseline inputs:
3. Now including savings for air source heat pump CC&S– CAT Recommendation: Set ASHP measures to “Planning” category, and use the CC&S
research strategy
4. Baseline updated to match MT code– Windows: U-0.33 U-0.32– Lighting: 50% efficient 75% efficient
5. Add dishwasher savings– Existing measure UES does not include water heater and dishwasher savings (claimed
separately)
2200c 2200s 2688bSuppl y Duct 6% 6% 1%Ret ur n Duct 3% 3% 2%
Leakage Fr act i on
Pr ot ot ype2200c 2200s 2688b
Suppl y Duct Cr awl At t i c I nRet ur n Duct At t i c At t i c At t i c
Duct Locat i on
Pr ot ot ype
Existing ProposedProposed F&F path
(previous)2011 Code
(current)2014 Code
MT House 2:Path A
MT House 2: Path B
Attic InsulationWall Insulation R-21 Int.+ R-5 Flash & FillFloor Insulation
Slab Insulation (unheated)
Slab Insulation (heated)Basement Wall
Sealed Crawlspace Wall
Windows U - 0.33 U - 0.32 U - 0.30 U - 0.28Skylights U - 0.60 U - 0.55Max Glazing AreaExterior Doors U - 0.33 U - 0.32
Ventilation N/AWhole House
and Spot
Envelope Tightness YesVisual or 4.0
ACH50 Tested4.0 ACH50
Tested4.0 ACH50, 10%
tested3.0 ACH50, 10%
testedHeat Pump HSPFHeat Pump CC&S NoAir ConditionerDuct Leakage NoDuct InsulationLighting 50% CFL 75% CFL
Water HeaterOld Fed. Minimum
New Fed. Minimum
Dishwasher No
R-10 perimeter, 4'
Component
R-19 (R-15 Continuous)
R-21 ContinuousR-19 (R-15 Continuous)
N/A (Meet Code)
U - 0.16
NoNoYes
No
Efficient-Case
R-15 perimeter, 4' R-15 perim. 4' + R-10 full + R-5 TB
U - 0.50
R-60 Advanced FramingR-21R-30 R-38
R-49
R-10 full w/ R-5 TB
Baseline
no requirement
Federal Minimum Federal Minimumno requirement
Federal Minimum 8.5
15% of Floor Area (2%skylights)
400 CFM/ton, 35 deg F ODT, 30 deg
R-21
No
Yes
Included in Savings?
YesYesYes
Yes
NoYes
Yes
NoYes
No
YesYes
Yes
Yes
Ducts InsideDucts Inside
N/A (Meet Fed. Minimum)
Federal Minimum ENERGY STAR
R-6 (R-8 attic supply)Sealed and Tested
90% CFL
No
6
Blue Text: Change or addition to the MT House Specification. Red Strikeout Text: Removed from MT House Specification.
7
0
1000
2000
3000
4000
5000
6000
ZonalEl FAFelec ASHtPmp GSHtPmp
Hea
ting
Ener
gy S
avin
gs (k
Wh/
yr)
Heating Zone 3
VCrawl FlashnFill
VCrawl R5exterior
VCrawl existing
UCrawl FlashnFill
UCrawl R5exterior
UCrawl existing
Basemt FlashnFill
Basemt R5exterior
Basemt existing
SlabOG FlashnFill
SlabOG R5exterior
SlabOG existing
Difference between “R-5 Exterior Sheathing” and “Flash and Fill” paths is insignificant. Proposal: Take the average and do not have “prescriptive path” as a measure identifier.
VCrawl = Ventilated CrawlspaceUCrawl = Un-ventilated Crawlspace (i.e. Sealed Crawlspace)
8
Total Savings includes: heating, cooling, lighting, and dishwasher savings
0
1000
2000
3000
4000
5000
6000
ZonalEl FAFelec ASHtPmp GSHtPmp
Tota
l Ele
ctric
Ene
rgy
Savi
ngs
(kW
h/yr
(Heating Zone 3 (Cooling Zone 1) - Total Measure Savings
VCrawl Proposed
VCrawl Existing
UCrawl Proposed
UCrawl Existing
Basemt Proposed
Basemt Existing
SlabOG Proposed
Slab OG Existing
9
$-
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
ZonalEl FAFelec ASHtPmp GSHtPmp
Incr
emen
tal C
apita
l Cos
tHeating Zone 3 (Cooling Zone 1) - Measure Cost
VCrawl Proposed
VCrawl Existing
UCrawl Proposed
UCrawl Existing
Basemt Proposed
Basemt Existing
SlabOG Proposed
Slab OG Existing
Proposed costs are the same as existing costs, except: CFL costs were zeroed out (Baseline cost = Efficient-case cost) and dishwasher costs were added (per ResDishwasher_v2_2.xlsm; only $5).
10
-
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
ZonalEl FAFelec ASHtPmp GSHtPmp
Bene
fit/C
ost R
atio
Heating Zone 3 (Cooling Zone 1) - Regional Cost-Effectivenes Test
VCrawl Proposed
VCrawl Existing
UCrawl Proposed
UCrawl Existing
Basemt Proposed
Basemt Existing
SlabOG Proposed
Slab OG Existing
Not Cost-Effective
11
Proposed Motion
“I _________ move, for the Residential New Construction Montana House 2 UES measure, the RTF:
• Adopt the revised specifications, costs, and savings• Set the sunset date to April 2018• Keep the Status at ActiveFor non-ASHP heating systems:• Keep the Category at ProvenFor ASHP heating systems:• Set the Category to Planning• Adopt the CC&S UES measure’s Research Strategy (link, slide
19)”