  • Residential Electrical Inspections - FL Author: David Burtt

    Residential Electrical Inspections - FL

    Introduction Activity

    Start Your Day Activity

    Question 1: Start Your Day Question.Question ID#: 2827.0

    Question 1: According to your handout, which of the following is one of the most common violations on arough-in inspection?

    A: 300.4(A) Nailplates.B: 110.7 Installation free from short circuits.C: 110.3(B) Staples installed correctly.D: 410.116 Recessed luminaire clearance.

    Question 2: Start Your Day Question.Question ID#: 2828.0

    Question 2: According to your handout, which of the following is one of the most common violations on a FINALinspection?

    A: 230.66 Listed service equipment.B: 250.28 Main bonding jumper.C: 210.52 Improper location of receptacles.D: 110.14(B) Proper splices for equipment grounds.

    Question 3: Start Your Day Question.Question ID#: 2829.0

    Question 3: Which of the following installations is a Code violation?

    A: A permanently installed fire alarm system supplied by a non-GFCI protected outlet.B: A non-GFCI protected receptacle installed in a living room behind a sofa.C: A non-GFCI protected receptacle installed in a garage behind a freezer.D: A GFCI-protected receptacle installed outdoors 10 ft. away from an HVAC compressor.

    Question 4: Start Your Day Question.Question ID#: 2830.0

    Question 4: In the morning, a coworker was asking you about a commercial job. According to 2011 NEC section450.14, which of the following is now required to be marked on the transformer when the disconnecting means isnot within sight?

    Page 1 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    A: Location of the disconnecting means.B: Type of disconnecting means.C: Voltage of circuit.D: Location of the transformer.

    Question 5: Start Your Day Question.Question ID#: 2831.0

    Question 5: According to 2011 NEC section 590.4(D), which of the following is true about old service polereceptacle covers?

    A: They do not need to be replaced.B: They need to be replaced if installed before 2002.C: They need to be replaced with tamper-resistant type receptacle covers.D: They need to be replaced with the extra-duty type receptacle covers.

    Creekside Dr. Inspection - Temporary Service Activity

    Question 6: Creekside Dr. Inspection - Temporary Service Question.Question ID#: 2833.0

    Question 6: Which of the following is true about your first inspection of the temporary service?

    A: Approved.B: Disapproved for multiple violations.C: Disapproved for one violation.D: Not enough information to approve or disapprove.

    Question 7: Creekside Dr. Inspection - Temporary Service Question.Question ID#: 2834.0

    Question 7: Which of the following sections of the 2011 NEC covers "Unused Openings" for a temporary serviceinstallation?

    A: 110.12(A).B: 110.22(A).C: 200.6.D: 230.24.

    Question 8: Creekside Dr. Inspection - Temporary Service Question.Question ID#: 2835.0

    Question 8: Which of the following sections of the 2011 NEC covers "Identification of Disconnecting Means" forthe temporary service installation?

    A: 110.12(A).B: 110.22(A).C: 200.6.D: 230.24.

    Page 2 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    Question 9: Creekside Dr. Inspection - Temporary Service Question.Question ID#: 2836.0

    Question 9: Which of the following sections of the 2011 NEC covers clearances of overhead service conductorsfor the temporary service installation?

    A: 200.6.B: 230.24.C: 230.42.D: 240.4.

    Question 10: Creekside Dr. Inspection - Temporary Service Question.Question ID#: 2837.0

    Question 10: Which of the following sections of the 2011 NEC covers "Ground Rod Installation" for the temporaryservice installation?

    A: 250.110.B: 250.25.C: 250.53(G).D: 250.92.

    Mill St. Inspection - Rough-In Inspection Activity

    Question 11: Mill St. Inspection - Rough-In Inspection Question.Question ID#: 2839.0

    Question 11: Which of the following is true about your inspection on Mill St.? This was a rough-in inspection.

    A: Approved.B: Disapproved for multiple violations.C: Disapproved for one violation.D: Not enough information to approve or disapprove.

    Question 12: Mill St. Inspection - Rough-In Inspection Question.Question ID#: 2840.0

    Question 12: Which of the following sections of the 2011 NEC covers "Proper Location/Spacing of ReceptacleOutlet(s) (Countertops)" for the rough-in inspection?

    A: 210.52(C).B: 210.52(F).C: 210.52(H).D: 210.52(I).

    Question 13: Mill St. Inspection - Rough-In Inspection Question.Question ID#: 2841.0

    Question 13: Which of the following sections of the 2011 NEC covers "Cables Stapled Flat" for the rough-in

    Page 3 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    inspection?

    A: 334.23.B: 334.30.C: 334.40(A).D: 300.1.

    Question 14: Mill St. Inspection - Rough-In Inspection Question.Question ID#: 2842.0

    Question 14: Which of the following sections of the 2011 NEC covers "Branch Circuits- Proper Rating forLocation" for the rough-in inspection?

    A: 210.11(A).B: 210.11(C).C: 210.52(F).D: 300.4(A)(1).

    Question 15: Mill St. Inspection - Rough-In Inspection Question.Question ID#: 2843.0

    Question 15: Which of the following sections of the 2011 NEC covers "Closet Luminaire Clearance" for therough-in inspection?

    A: 410.10.B: 410.12.C: 410.16.D: 440.10.

    Pine St. Inspection - Rough-In Inspection Activity

    Question 16: Pine St. Inspection - Rough-In Inspection Question.Question ID#: 2845.0

    Question 16: Which of the following is true about your inspection on Pine St.? This inspection was a rough-ininspection.

    A: Approved.B: Disapproved for multiple violations.C: Disapproved for one violation.D: Not enough information to approve or disapprove.

    Question 17: Pine St. Inspection - Rough-In Inspection Question.Question ID#: 2846.0

    Question 17: Which of the following sections of the 2011 NEC covers "Cable in Unfinished Basement/CrawlSpace" for the rough-in installation?

    A: 334.17.B: 334.27(C).

    Page 4 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    C: 334.23.D: 334.15(C).

    Question 18: Pine St. Inspection - Rough-In Inspection Question.Question ID#: 2847.0

    Question 18: Which of the following sections of the 2011 NEC covers "Nail Plates Where Required" for therough-in inspection?

    A: 300.4(A)(1).B: 300.14.C: 334.30(A).D: 314.23.

    Question 19: Pine St. Inspection - Rough-In Inspection Question.Question ID#: 2848.0

    Question 19: Which of the following sections of the 2011 NEC covers "Proper Splices for Equipment Grounds" forthe rough-in inspection?

    A: 110.3(B).B: 110.12.C: 110.14(B).D: 250.110.

    Question 20: Pine St. Inspection - Rough-In Inspection Question.Question ID#: 2849.0

    Question 20: Which of the following sections of the 2011 NEC covers "Device/Outlet Box Required Cubic Inches"for the rough-in inspection?

    A: 300.14.B: 314.4.C: 314.16.D: 314.27.

    Kenmore Ct. Inspection - Final Inspection Activity

    Question 21: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2851.0

    Question 21: Which of the following is true about your inspection on Kenmore Ct.? This was a final stageinspection.

    A: Approved.B: Disapproved for multiple violations.C: Disapproved for one violation.D: Not enough information to approve or disapprove.

    Page 5 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    Question 22: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2852.0

    Question 22: Which of the following sections of the 2011 NEC covers "Branch Circuits - Proper Rating forLocation" for the final inspection?

    A: 210.11(C).B: 210.52(C).C: 210.50(C).D: 230.70(A)(1).

    Question 23: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2853.0

    Question 23: Which of the following sections of the 2011 NEC covers "Device Covers Seated Against Wall" for thefinal inspection?

    A: 405.4.B: 406.5.C: 406.6.D: 408.4.

    Question 24: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2854.0

    Question 24: Which of the following sections of the 2011 NEC covers "Proper Location of Receptacle Outlet(s)" (Bathroom) for the final inspection?

    A: 210.52(D).B: 210.11(C).C: 210.70.D: 210.52(I).

    Question 25: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2855.0

    Question 25: Which of the following sections of the 2011 NEC covers "Gaps at Edge of Box" for the finalinspection?

    A: 312.22.B: 314.21.C: 314.15.D: 314.23.

    Question 26: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2856.0

    Question 26: Which of the following sections of the 2011 NEC covers "Closet Luminaire Clearance" for the finalinstallation?

    A: 410.16.B: 410.14.C: 410.48.D: 410.160.

    Page 6 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    Question 27: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2857.0

    Question 27: Which of the following sections of the 2011 NEC covers "Service Panel Labeled Properly" for thefinal inspection?

    A: 404.8.B: 405.6.C: 406.5.D: 408.4.

    Question 28: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2858.0

    Question 28: Which of the following sections of the 2011 NEC covers "Intersystem Bonding Means" for the finalinspection?

    A: 250.50.B: 250.53.C: 250.94.D: 250.120.

    Question 29: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2859.0

    Question 29: Which of the following sections of the 2011 NEC covers "Outside HVAC Disconnecting Means" forthe final inspection?

    A: 210.63.B: 440.14.C: 440.22.D: 440.64.

    Question 30: Kenmore Ct. Inspection - Final Inspection Question.Question ID#: 2860.0

    Question 30: Which of the following sections of the 2011 NEC covers "Receptacle Outlet if Applicable" (Heating,Air-Conditioning, Refrigeration Equipment) for the final inspection?

    A: 210.90.B: 210.70.C: 210.63.D: 210.11(B).

    Dell Dr. Inspection - Final Inspection Activity

    Question 31: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2862.0

    Page 7 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    Question 31: Which of the following is true about your inspection on Dell Dr.? This was a final inspection.

    A: Approved.B: Disapproved for multiple violations.C: Disapproved for one violation.D: Not enough information to approve or disapprove.

    Question 32: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2863.0

    Question 32: Which of the following sections of the 2011 NEC covers "Proper Location of Receptacles Outlet(s)(Front)" for the final inspection?

    A: 210.63.B: 210.52(E).C: 210.70.D: 230.90(A).

    Question 33: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2864.0

    Question 33: Which of the following sections of the 2011 NEC covers "Receptacles GFCI Protected" for the finalinspection?

    A: 210.70.B: 210.60.C: 210.12(A).D: 210.8(A).

    Question 34: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2865.0

    Question 34: Which of the following sections of the 2011 NEC covers "Proper Location & Clearance" for the finalinspection?

    A: 110.24.B: 110.26(A).C: 110.26(C).D: 110.26(F).

    Question 35: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2866.0

    Question 35: Which of the following sections of the 2011 NEC covers panelboard "Overcurrent Protection" for thefinal inspection?

    A: 408.36.B: 408.16.C: 408.6.D: 408.4.

    Question 36: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2867.0

    Page 8 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    Question 36: Which of the following sections of the 2011 NEC covers "Receptacles Grounded Properly" for thefinal inspection?

    A: 406.8.B: 406.5.C: 406.4(A).D: 406.2(A).

    Question 37: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2868.0

    Question 37: Which of the following sections of the 2011 NEC covers "Branch Circuits AFCI Protected" for thefinal inspection?

    A: 210.8.B: 210.12.C: 210.19.D: 210.23.

    Question 38: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2869.0

    Question 38: Which of the following sections of the 2011 NEC covers "Proper Location of Receptacle Outlet(s)"(Appliances) for the final inspection?

    A: 210.21.B: 210.50(C).C: 210.60(A).D: 210.52(C).

    Question 39: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2870.0

    Question 39: Which of the following sections of the 2011 NEC covers "Grounding of Equipment" for the finalinspection?

    A: 250.53.B: 250.94.C: 250.110.D: 250.120.

    Question 40: Dell Dr. Inspection - Final Inspection Question.Question ID#: 2871.0

    Question 40: Which of the following sections of the 2011 NEC covers "Metal Boxes & Covers Grounded" for thefinal inspection?

    A: 314.23.B: 314.21.C: 314.20.D: 314.4.

    Page 9 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    Cheswick Dr. Inspection - Final Inspection Activity

    Question 41: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2873.0

    Question 41: Which of the following is true about your inspection on Cheswick Dr.? This was a final inspection.

    A: Approved.B: Disapproved for multiple violations.C: Disapproved for one violation.D: Not enough information to approve or disapprove.

    Question 42: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2874.0

    Question 42: Which of the following sections of the 2011 NEC covers "Outside HACR Service Receptacle" for thefinal inspection?

    A: 210.52.B: 210.63.C: 406.9.D: 230.70(A)(1).

    Question 43: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2875.0

    Question 43: Which of the following sections of the 2011 NEC covers "Grounding Electrode System Installation"for the final inspection?

    A: 210.52.B: 250.110.C: 250.53.D: 250.50.

    Question 44: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2876.0

    Question 44: Which of the following sections of the 2011 NEC covers "Receptacle Mounting" for the finalinspection?

    A: 406.9.B: 406.6.C: 406.5.D: 404.5.

    Question 45: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2877.0

    Question 45: Which of the following sections of the 2011 NEC covers "Grounding of Equipment" for the finalinspection?

    A: 250.110.

    Page 10 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    B: 250.50.C: 250.1.D: 250.120.

    Question 46: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2878.0

    Question 46: Which of the following sections of the 2011 NEC covers "Service Conductors Proper Ampacity" forthe final inspection?

    A: 210.8(A).B: 230.70(A).C: 230.90(A).D: 210.52(A).

    Question 47: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2879.0

    Question 47: Which of the following sections of the 2011 NEC covers "Circuits Labeled Properly" for the finalinspection?

    A: 404.4.B: 406.5.C: 408.4.D: 422.31.

    Question 48: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2880.0

    Question 48: Which of the following sections of the 2011 NEC covers "Receptacles GFCI Protected if Required"for the final inspection?

    A: 210.5.B: 210.8(A).C: 200.6(A).D: 210.12.

    Question 49: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2881.0

    Question 49: Which of the following sections of the 2011 NEC covers "Correct Depth for Outlet Box" for the finalinspection?

    A: 314.20.B: 314.4.C: 314.21.D: 314.27(C).

    Question 50: Cheswick Dr. Inspection - Final Inspection Question.Question ID#: 2882.0

    Question 50: Which of the following codes covers "Smoke Alarm Proper Location" for the final inspection?

    A: NFPA 70.

    Page 11 2013 JADE Learning, Inc.

  • Residential Electrical Inspections - FL Author: David Burtt

    B: NFPA 70E.C: NFPA 72.D: NFPA 79.

    Wrap Up Your Day Activity

    Question 51: Wrap Up Your Day Question.Question ID#: 2884.0

    Question 51: Which of the following sections of the 2011 NEC covers "Hydromassage Tub Access/ReceptacleBox Location" for the final inspection?

    A: 680.60B: 680.62C: 680.70D: 680.73

    Page 12 2013 JADE Learning, Inc.