Request Letter

2
Mapua Institute of Technology School of Civil, Environmental and Geological Engineering Muralla St., Intramuros, Manila, Metro Manila February 19, 2016 Department of Public Works and Highways Bonifacio Drive, Port Area, Manila Dear: Sir/Madam: I, Laurean Aquino, together with my group mates Arvin Ray Arizobal, Daniel Aromin and Alvin Bandoquilo, students of Mapua Institute of Technology, are conducting a report about the feasibility study of Agno River Flood Control Project, Phase III. This letter is requesting permission to have a copy of the feasibility study, in order to complete the requirement in our subject. We would like to appreciate your response and support. Thank you for your consideration. Sincerely,

description

ce40

Transcript of Request Letter

Mapua Institute of TechnologySchool of Civil, Environmental and Geological Engineering

Muralla St., Intramuros, Manila, Metro Manila

February 19, 2016

Department of Public Works and HighwaysBonifacio Drive, Port Area, Manila

Dear: Sir/Madam:

I, Laurean Aquino, together with my group mates Arvin Ray Arizobal, Daniel Aromin and Alvin Bandoquilo, students of Mapua Institute of Technology, are conducting a report about the feasibility study of Agno River Flood Control Project, Phase III. This letter is requesting permission to have a copy of the feasibility study, in order to complete the requirement in our subject.

We would like to appreciate your response and support.

Thank you for your consideration.

Sincerely,

Laurean Aquino Arvin Ray Arizobal Daniel Aromin Alvin Bandoquilo

Noted By:

Engr. Charity Hope Gayatin

Adviser