REQUEST FOR PROPOSALS (RFP) FOR SOLAR PHOTOVOLTAIC ...

14
REQUEST FOR PROPOSALS (RFP) FOR SOLAR PHOTOVOLTAIC MICROGRID PROJECT Addendum No. 1 October 22, 2020 Pre-Proposal Webinar Registrants and Site Walk Attendees Name Organization E-mail Address Brian Brogan Centrica [email protected] John Burdette SitelogIQ [email protected] Adam Burton CEG Solutions [email protected] Katie Cafouros EDF Renewables [email protected] Benjamin Deletetsky Solar Technologies [email protected] John Gajan Centrica [email protected] Jackie Huynh Go Electric [email protected] Walid Ismail Saft America [email protected] Phillip Kelly Endelos Energy [email protected] Scott Laskey Sandbar Solar [email protected] Nick Maurer CORE Construction [email protected] Andrew Thiel CORE Construction [email protected] Greg Weyl Go Electric [email protected] Christi White Winston Engineering [email protected] Anthony Winston III Winston Engineering [email protected]

Transcript of REQUEST FOR PROPOSALS (RFP) FOR SOLAR PHOTOVOLTAIC ...

REQUEST FOR PROPOSALS (RFP)

FOR SOLAR PHOTOVOLTAIC MICROGRID PROJECT

Addendum No. 1 October 22, 2020

Pre-Proposal Webinar Registrants and Site Walk Attendees

Name Organization E-mail Address

Brian Brogan Centrica [email protected]

John Burdette SitelogIQ [email protected]

Adam Burton CEG Solutions [email protected]

Katie Cafouros EDF Renewables [email protected]

Benjamin Deletetsky Solar Technologies [email protected]

John Gajan Centrica [email protected]

Jackie Huynh Go Electric [email protected]

Walid Ismail Saft America [email protected]

Phillip Kelly Endelos Energy [email protected]

Scott Laskey Sandbar Solar [email protected]

Nick Maurer CORE Construction [email protected]

Andrew Thiel CORE Construction [email protected]

Greg Weyl Go Electric [email protected]

Christi White Winston Engineering [email protected]

Anthony Winston III Winston Engineering [email protected]

Addendum No. 1 RFP - Solar Photovoltaic Microgrid Project

Page 2 or 2

Gregory Young Clean Coalition [email protected]

Randy Arntson Endelos Energy [email protected]

Patricia Eichberger Baker Electric [email protected]

Phillip Kelly Endelos Energy [email protected]

Grant Matsumoto BFSE [email protected]

Rachel Miller Emera Technologies [email protected]

Lori Nelson SOLON America [email protected]

Brian Quock CleanSpark [email protected]

Ben Schwartz Clean Coalition [email protected]

Dawnna Tate Endelos Energy [email protected]

Andrea Marr Willdan [email protected]

CITY HALL SOLAR MICROGRID RFP: PRE-PROPOSAL WEBINAR

October 21, 2020

Presentation by:Cindy Moore, Sustainability CoordinatorSam Hill-Cristol & Maddie Julian, Optony, Inc.

Presentation Overview1. Introductions 2. Overview of the City of Goleta3. Feasibility Assessment4. RFP Approach 5. Submittal Requirements6. Required Forms7. Other RFP Requirements8. Timeline9. Contact Information

2

Team Overview

3

• Cindy Moore, Sustainability Coordinator• Karina Takemoto, CivicSpark Fellow• Optony Inc.

• Jonathan Whelan, Director of Operations• Sam Hill-Cristol, Energy Program Manager• Maddie Julian, Energy Storage Program Specialist

2. City of Goleta• Incorporated 2002

• Geographically located at end of SCE transmission Lines

• 100% Renewable Energy GoalsStrategic Energy Plan

Implementation

• Seeking distributed energy resources at City Hall to support RE goals and improve Resilience

4

3. Solar Potential

5

C4

C1

RecommendedPV System Size 174 kW-DC

Expected Output 285,277 kWh/year

ESS Power Rating 45 kW

ESS Duration 4 hours

Electrical Meter & Generator

4. ApproachA. Focus on maintaining optionality in RFP

Soliciting proposals for a: Solar-only system that is microgrid ready with EV

conduit A microgrid (using existing generator) with EV

conduit EV charging stations

6

5. Submittal RequirementsA. Section 3 of RFP:

Executive Summary Qualifications References Proposed System Design Microgrid Architecture Resilience Analysis Financial Analysis Alternative Financing Mechanisms (optional) Project Schedule Contractor’s License Cost Proposal (Attachment D) Template PPA

7

6. Required FormsA. Attachment D: Pricing Form

8

7. Other RFP RequirementsA. Other RFP Requirements

Key contract terms Mandate City REC Ownership Mandate City right to Low Carbon Fuel Standard

Credits System Technical Requirements (Att. B)

B. Other Information Potential for increased electrical load City pursuing structural analysis, may not be

complete prior to proposal due date

9

8. RFP Schedule (subject to revision)

10/13: Issue RFP 10/21: RFP vendor meeting 10/22: Optional site walk-through 11/12: RFP proposal due date Week of 11/16: Vendor Interviews 11/24: Selection of preferred vendor for pursuing

contract negotiations 12/15: Negotiated contract brought to Council for

approval

10

8. RFP Schedule (subject to revision)

10/22: Optional site walk-through COVID-19 Precautions Required: Temperature Check & Completion of a

Health Self-Certification Questionnaire Check-in at Entrance on North Side of City Hall

11

12

Questions?

Email: [email protected]

City of Goleta Solar Microgrid RFP Webinar