SR 89 Fanny Bridge Community Revitalization Project Request for MOA Approval Department of Public Works October 26, 2021 Presented to the Placer County Board of Supervisors

Transcript of Request for MOA Approval

Page 1: Request for MOA Approval

SR 89 Fanny Bridge Community Revitalization Project

Request for MOA Approval

Department of Public WorksOctober 26, 2021

Presented to the Placer County Board of Supervisors

Page 2: Request for MOA Approval

Fanny Bridge Project BackgroundLocation:

• Downtown Tahoe City over the Truckee River; adjacent to the Tahoe City dam.

Project Goals:• Provide second Truckee River bridge crossing• Improve pedestrian mobility• Improve traffic circulation and transit connections• Rebuild Fanny Bridge and provide ‘complete

street’ district

Page 3: Request for MOA Approval

Data collection location- North

Data collection location- South

SR 28 (N. Lake Boulevard)

Renderings showing remaining project elements to construct including roundabout at ‘wye’ intersection and Fanny Bridge rebuild/enhancement

Page 4: Request for MOA Approval

Project Status (Oct 2021)Remaining Project Elements and EE Cost ($15.47M):• Fanny Bridge (Bid Schedule A) ~ $6.495M• Wye Roundabout (Option X) ~ $5.59M• West Lake Blvd / A-Line (Option Y) ~ $2.35M• Lighting/Landscaping (Option Z) ~ $1.03M

Page 5: Request for MOA Approval

Data collection location- North

Data collection location- South

SR 28 (N. Lake Boulevard)

Potential A-Line or West Lake Blvd ‘complete street’ modifications

Project Schedule2022: Complete design and advertise for construction

2023-24: Construction

Page 6: Request for MOA Approval