REPUBLIC OF UGANDA
THE THREE YEAR CAPACITY BUILDING PLAN FOR MINISTRY OF FOREIGN
AFFAIRS
JUNE 2
i
TABLE OF CONTENTS CHAPTER ONE ............................................................................................................................ v
1.0 INTRODUCTION ................................................................................................................. 1
1.1 Background and Context ..................................................................................................... 1
1.2 Mandate, Vision, Mission .................................................................................................... 2
1.3 Functions of the Ministry ..................................................................................................... 2
1.4 Structure and Staffing/Number of Employees at the Ministry ............................................ 3
1.5 History of Capacity Building Initiatives .............................................................................. 3
CHAPTER TWO ......................................................................................................................... 5
2.0 PROCESS OF DEVELOPING THE CAPACITY BUILDING PLAN ............................ 5
2.1 Background to the Exercise ................................................................................................. 5
2.2 The Needs Assessment Exercise ......................................................................................... 6
2.3 Linkage Between CBP and Strategic Planning Process ...................................................... 7
2.4 Elaborate How the TNA Findings were Integrated ............................................................. 7
2.5 The Nature of Support Provided .......................................................................................... 7
2.6 Lessons Learnt ..................................................................................................................... 7
CHAPTER THREE ..................................................................................................................... 9
3.0 SITUATIONAL ANALYSIS ................................................................................................ 9
3.1 An Overview of Ongoing HRD Initiatives .......................................................................... 9
3.2 Capacity Building Policies ................................................................................................ 10
3.2.1 Public Service Training Policy ................................................................................ 10
3.3 Departmental and Mission Capacity Gaps ........................................................................ 12
3.3.1 Departmental Capacity Gaps .......................................................................................... 12
3.3.2 Mission Capacity Gaps ................................................................................................... 14
3.4 Current Resources Available for Capacity Building both Short, Long-term and Medium15
3.4.1 Ministry of Foreign Affairs Budget ................................................................................ 15
3.4.2 Donors ............................................................................................................................. 15
3.4.3 Scholarships .................................................................................................................... 15
3.5 SWOT Analysis of MoFA Training and Development Function ...................................... 15
3.5.1 Strategies for Addressing Weaknesses ........................................................................... 16
3.5.2 Strategies for Tapping Opportunities .............................................................................. 16
3.5.3 Strategies for Averting Threats ....................................................................................... 16
ii
CHAPTER FOUR ..................................................................................................................... 17
4.0 CAPACITY BUILDING PLAN AND BUDGET .............................................................. 17
4.1 HRD Vision ....................................................................................................................... 17
4.2 HRD Development Goal .................................................................................................... 17
4.3 Specific objectives ............................................................................................................. 17
4.4 Linkage between the HRD Plan and Strategic Plan .......................................................... 17
4.5 Activities Showing the Linkage between Proposed Activity and Results of the Capacity
Need Assessment. .................................................................................................................... 17
4.5.1 KEY SKILLS IDENTIFIED DURING TNA ............................................................. 18
4.5.2 Capacity Gaps Identified During TNA ....................................................................... 18
4.6 Summary of the Annual Training Plan .............................................................................. 21
4.7 Monitoring and Evaluation Strategy .................................................................................. 23
4.7.1 Monitoring and Evaluation Methods .............................................................................. 23
Focus Groups .................................................................................................................... 24
4.7.2 Results Chain Logic ........................................................................................................ 24
4.7.3 Roles and Responsibilities in Monitoring and Evaluation System of CBP .................... 26
4.8 Summary of the Budget for the First Year Activities Derived from the Activity Profiles 28
4.9 Risk and Mitigation Measures ........................................................................................... 30
4.9.1 Risk Management Matrix ............................................................................................... 30
CHAPTER FIVE ....................................................................................................................... 32
5.0 INSTITUTIONAL PERFORMANCE ENHANCEMENT STRATEGIES ................... 32
5.1 Issues that Hinder Performance ......................................................................................... 32
5.2 Summary of the Three Year Training Plan ........................................................................ 34
5.3 Summary of the Three Year Capacity Building Work plan and Budget ........................... 37
CHAPTER SIX .......................................................................................................................... 39
6.0 HRD ACTIVITY PROFILES ............................................................................................ 39
ANNEX 1. APPROVED MACRO STRUCTURE .................................................................. 64
ANNEX 11 QUESTIONNARES THAT WERE USED FOR DATA COLLECTION ....... 65
iii
LIST OF ABBREVIATIONS /ACROYNMS CBP Capacity Building Plan
CSCU Civil Service College Uganda
DP Development Partners
F&A Finance and Administration
FY Financial Year
HOD Heads of Department
HOM Heads of Mission
HRM Human Resources Management
JICA Japan International Cooperation Agency
KOICA Korea International Cooperation Agency
M&E Monitoring and Evaluation
MoES Ministry of Education and Sports
MoFA Ministry of Foreign Affairs
MoPS Ministry of Public Service
MoU Memorandum of Understanding
MOVs Means of Verification
MPR Monthly Progress Reports
OVIs Objective Verifiable Indicators
QPR Quarterly Progress Reports
R&D Research and Development
SMM Senior Management Meeting
SP Strategic Plan
TRs Travel Reports
UBOS Uganda Bureau of Statistics
UIDIA Uganda Institute of Diplomacy and International Affairs
iv
FOREWORD The Ministry of Foreign Affairs is mandated to promote and protect Uganda’s interests abroad
and to undertake programs that underpin the development, implementation and management of
Uganda’s Foreign Policy.
For the Ministry to realize the above mandate, the Ministry will rely on competent Human
Resource as the key driving factor in the effective implementation of Uganda’s Foreign Policy.
It therefore follows that a Training Needs Assessment was necessary to identify the competence
gaps among the staff which has facilitated the development of a Three Year Capacity Building
Plan that Iam presenting to you today.
You may also wish to note that; the Ministry is in its second year of implementing a new
thematic Staff establishment structure which came with a number of new assignments that are to
a reasonable extent different from those that were being performed by officers in the old
Geographical Staff Establishment Structure. This necessitated undertaking a Human Resource
Audit that would ascertain the available competences in the Ministry and the gap to be
addressed through the conventional and Non-conventional training interventions which have
been proposed in the Three Year Plan.
The implementation of the Three Year Training Plan will therefore go a long way in
contributing to the attainment of the Ministry’s Strategic Plan II which focuses on achieving the
following Strategic Objectives; Promotion of Regional and International Peace and Security,
Promotion of Economic/Commercial Diplomacy, Fast tracking Regional Integration, Promotion
of International Law and Commitments, Promotion of Uganda’s Public Diplomacy and
enhancement of her image abroad, Provision of Diplomatic, Protocol and Consular services at
home and abroad, Mobilization and empowerment of Ugandan Diaspora for National
Development and Strengthening Institutional capacity of the Ministry and its affiliated
Institutions.
The capacity gaps in the Plan were arrived at using consultative and participatory approaches
involving all stakeholders at the Ministry. This involved administering questionnaires, One-on-
One interviews with senior managers, review of staff performance appraisals as well as focus
group discussions with the Senior Management Team of the Ministry.
Finally, I wish to thank all the stakeholders for their support in providing valuable information
in the development of this Plan.
v
EXECUTIVE SUMMARY
This Capacity building Plan is a result of a capacity needs assessment that was conducted by the
Human Resource Department to assess existing capacity and needs of staff in the Ministry. It is
a requirement under the performance management cycle that after developing performance
plans, an assessment of the competencies of staff is undertaken to establish whether staff have
got capacity to implement what has been planned. In addition the Ministry developed a five year
strategic plan and majority of the interventions contained therein would require implementation
through training hence the development of the capacity building plan.
According to the Public Service Standing Orders 2010, Government is required to support staff
training and development of public officers as a way of maintaining a competent workforce.
The aim of staff training and development is to make the public service an effective and
efficient Government organ that is capable of initiating and executing appropriate public
policies for rapid, balanced and sustainable economic and social development. In order to do
this,Government ensures ensure that:
(a) Staff training and development is provided in a systematic manner for all levels of staff
through training programmes based on identified current or projected training needs;
(b) Necessary research is carried out to enable Government monitor staff development activities
with a view to ensuring continuous improvement to staff training and development
programmes; and
(c) Training and development programmes are adequately funded.
The capacity needs assessment which informed the development of this Three Year Capacity
Building Plan, covered staff at both the Ministry Headquarters and Missions abroad taking into
consideration employees at the lowest level to the top and Officers from entry level to the
Permanent Secretary. Ambassadors/Heads of Mission for Uganda Missions abroad were also
covered. The three major categories of junior/entry, supervisory and managerial staff
vi
requirements were assessed. The Permanent Secretary, Directors and Heads of Department
provided competence requirements for developing a critical mass as well as at strategic level for
the Ministry.
Historically the Ministry has been collaborating with the following entities for training; Uganda
Management Institute for Post-Graduate trainings in management, Austrian Embassy training
for junior diplomats, World Trade Organization for training on trade policy, Federal Republic of
Germany for Executive Seminar for Diplomats, Egypt, China, India, Kenya and South Korea
for Diplomatic Training.
The table below presents a summary of the individual capacity gaps identified and the proposed
training; the training identified are short-term and long-term, non-training interventions have
been proposed to address unique capacity gaps.
Summary of Individual Capacity Needs and Proposed Training Interventions
GAP IDENTIFIED PROPOSED SHORT TERM TRAININGS
1 Inadequate orientation of staff in Public
Service generally and Foreign Service in
particular
Undertake Induction at CSCU for new
officers
Undertake professional induction into
the Foreign Service
2 Reporting skills
Analytical skills
Interpersonal skills
Administrative skills
Management skills improvement
3 Financial management Financial Management Training for Non-
Financial Managers
4 Lobbying and negotiation
Negotiation, drafting and adopting UN
resolutions
Conference diplomacy and multilateral
negotiation
Negotiation skills and techniques
vii
5 Rare skills in the following languages
French, Germany, Swahili, Arabic
and Chinese
Train officers to obtain a second
international Language
6 Effective writing in multilateral
diplomacy, Speech writing skills,
Memos, Loose minutes Report
writing, Briefs, Talking points and
computer skills
Public Relations and Strategic Communication
7 Marketing skills Training in Commercial and Economic
Diplomacy
8 Conflict management
Managing change
Innovations
Leadership and Change Management
9 Research skills Research and Data Analysis
10 Peace and Security Peace and Security studies
11 Cross-cultural Diversity Management Cross-cultural Diversity Management
12 Referencing, Filling, utilization of Black
and Red minutes
Records Management
13 Limited usage of HR Data HR Analytics Training
14 Evaluation of trainings Return on investment training
15 Limited skills in Mentoring and Coaching
Performance planning
Rewards and sanctions
Training in performance management
16 Inadequate skills in managing diplomatic,
protocol and etiquette
Training in diplomatic, protocol and etiquette
17 Stakeholder analysis engagement and
coordination
Training in project planning and management
18 Effective handling of consular and
immigration services
Training in consular and immigration services
viii
b) Long-term Trainings
PROPOSED LONGTERM TRAININGS
1 Masters in International relations 6. Master’s in Business
Administration
2 Masters in International Law 7. Monitoring and Evaluation
3 Training in Migration and Human
Trafficking Control
8. Public Administration and
Management
4 Master’s Degree in Diplomacy 9. Peace and Security Studies
5 Masters Degree in Trade Policy and
Law
10. PhDs (Diplomatic studies
and Public Policy)
The non-conventional training methods proposed will include and not limited to Job rotation,
attachments, tour of the country to understand investment and tourism, quarterly performance
reviews and a robust reward and sanctions system.
The capacity needs assessment covered the organizational capacity gaps that affect performance
and table II below presents the factors affecting performance together with the proposed
strategies to address the gaps.
Summary of Institutional Factors Affecting Performance and Proposed Intervention
S/N Factors Intervention
1 Lack of adequate office
equipment
Prioritize procurement of equipment
Engage development partners for
support
2 Lack of tools and skills for
research
Provide training and formulate a
framework for research
Subscription to e- libraries
3 Poor records management at
departmental and organizational
Provide training to users
Retooling the records department
ix
level Develop standardized records
management manual for Missions
4 Lack of service delivery standards Develop service delivery standards for each
function
5 Poor performance management
system
Train in Performance Management
Develop a Performance Management
framework
6 Absence of a clear reward and
sanctions system
Operationalize the rewards and
sanctions framework
7 Budget cuts Engage parliament, Finance and
Cabinet
Write proposals to supplement
resources allocated by the Ministry of
Finance, Planning and Economic
Development
8 Attitude of officers towards work Training in leadership
Develop motivation schemes
9 Insufficient mentoring and
coaching
Train managers in coaching and mentoring
10 Limited specialized training Do needs analysis
Create a critical mass of specialized teams
11 Inadequate staffing Redeploy
Lobby resources for implementing the structure
12 Lack of baby day care center in
the Ministry and Missions
Put in place a day care center
13 Mismatch between planning and
budget allocation/execution
Involve managers in all the planning and
budgeting stages
14 Insufficient induction( Foreign
Service Ethos) and training of
new staff
Undertake specialized induction for Foreign
Service Officers
Develop a customized induction manual for
Foreign Service Officers
15 Weak linkages and lack of
adequate coordination with other
Undertake stakeholder analysis, develop
strategy and implement it
x
stakeholders
16 Communication gap between
missions and headquarters
Assign an FSO in Public Diplomacy to manage
critical correspondences to and from Missions
17 Training policy not clearly
understood by staff
Sensitise and circulate the training policy and
scheme of service
18 Limited Monitoring and
evaluation
Implement the M&E framework as contained
in the strategic plan
19 Weak information management
system
Appraise the current system, develop a strategy
and implement it.
20 Lack of adequate team building
activities
Regular staff meetings
Directorate and departmental meetings
Staff SACCO
Staff orientation
End of year party
21 Lack of timely promotion of staff Lobby for resources
22 Limited number of missions
across the globe
Liase with the President to open new Missions
23 Limited institutional memory due
to failure to tap from retired
ambassadors and poor records
management
Exit interviews
Encourage retired Ambassadors to tell
their story and maintain linkage with
them
24 Officers are not deployed
according to their qualifications
Undertake an organizational assessment for all
missions to identify areas of concentration for
the benefit of Ugandans
The following strategies to tap into the available opportunities to support implementation of this
Three Year Capacity Building Plan have been suggested.
Reach out to development partners for support to implement training plans
Resubmit UDIA bill to Cabinet for approval and Parliamentary adoption
Conclude MoUs with training partners
Engage other MDAs for technical support
xi
Sourcing for more tailor made scholarships and fully utilize the available ones
Prioritize the training budget within the Ministry
A total budget of Two Billions Six Hundred and Thirty Millions (2, 630,000,000) an equivalent
of USD 700,000 is required to implement this three year capacity building plan and details are
broken down in the table below
Summary of the Three Year Capacity Building Work plan and Budget
KEY RESULT
AREAS
ACTIVITIES INPUTS Cost in Millions
Y1 Y2 Y3 Totals
Adequate
resources
mobilized to
support
implementation
of the identified
training
interventions
Reach out to development
partners to support with
clear training development
plans.
Hospitality, per
diem, sitting
allowances
stationary, air
tickets,
telecommunicati
on costs,
transport costs
and
refreshments,
fuel
Conclude MoUs with
training partners
20 20 20 60
Engage other MDAs for
technical support
Sourcing for more tailor
made scholarships and
fully utilizing available
ones
15 15 15 45
Policy to support
sustainable
capacity
enhancement
developed
Resubmit UIDIA bill for
cabinet and parliamentary
adoption.
Sitting
allowances,
printing and
stationery
15 15 15 45
Organizational
needs based
training
interventions
annually
implemented
Undertake needs analysis
Enforce compliance of
timely appraisal.
Perdiem, sitting
allowances,
stationery and
printing, fuel
20 20 20 60
Staff coached,
mentored and
equipped with
Support staff to undertake
long term trainings of 9 to
2 years
Tuition fees,
Out of pocket
30 50 50 150
xii
knowledge for
long term career
development
Book allowance
On job training to
regularly enhance
skills of staff
undertaken
1-2 weeks short-term skills
enhancement trainings
undertaken
Consultancy
fees, tuition
fees, perdiem,
out of pocket,
venue hire,
meals and
refreshments,
stationery
200 300 350 950
Non-conventional
training methods
utilized to
support practical
learning
Job-rotations, attachments,
study tours, regular
performance reviews and
conferences organized
Perdiem, fuel,
conference hire,
sitting
allowance,
meals and
refreshments
400 400 400 1,200
Staff provided
with the required
tools for
enhanced
productivity
Procure computers and
related protective gear
Laptops, IPad
and desk top
computers
Subscription to
e-libraries
30 40 50 120
Total Budget
requirement
2,630
1
CHAPTER ONE
1.0 INTRODUCTION This Capacity building Plan is a result of a capacity needs assessment that was conducted by the
Human Resource Department to assess existing capacity and needs of staff in the Ministry. It is
a requirement under the performance management cycle that after developing performance
plans, an assessment of the competencies of staff is undertaken to establish whether staff have
got capacity to implement what has been planned. In addition the Ministry developed a five year
strategic plan and majority of the interventions contained therein would require implementation
through training hence the development of the capacity building plan.
This plan therefore, comprises of the Background to the Ministry of Foreign Affairs, the process
of developing the plan, situational analysis, capacity building plan and budget, institutional
performance enhancement strategies and HRD activity profiles.
1.1 Background and Context
The Government of the Republic of Uganda set out development goals as envisioned in various
programs including but not limited to; The NRM Manifesto 2016-2021, African Union Agenda
2063, The United Nations Sustainable Development Goals, Vision 2040 and the National
Development Plan (NDP II).
To realize the above development goals, Government will rely on competent Public Service
human resources as the key driving factor in its quest to transform the Country to a Middle
Income Status.
The Ministry of Foreign Affairs is responsible for managing the implementation of Uganda’s
Foreign Policy through promotion of; Regional and International peace and Security,
Commercial and Economic Diplomacy, Regional Integration and International Law relating to
commitments/obligations. In addition, the Ministry provides diplomatic, protocol and consular
services at home and abroad. It also mobilizes and empowers Ugandans in the Diaspora to
participate in National development as well as promoting Public Diplomacy and enhancing the
country’s image abroad
2
It should also be noted that the review of the Foreign Policy framework for Uganda in addition
to that of MDA structures taking into account the rapidly changing International Economic and
Political environments recommended that Ministry of Foreign Affairs transforms from a
Geographical to a Functional thematic Staff Establishment Structure. Implementation of the
New Functional Structure started in Financial Year 2017/18 and a number of competence
challenges have been experienced thus the critical need for a Skills audit.
1.2 Mandate, Vision, Mission
1.2.1 Mandate
The Ministry is mandated to Promote and Protect Uganda’s interests abroad and undertakes
programs that underpin the implementation and management of Uganda’s Foreign Policy.
1.2.2 Vision
“A Secure Nation with Prosperous People”
1.2.3 Mission
To promote and Protect Uganda’s National Interests Abroad.
1.3Functions of the Ministry
1. To promote Regional and International Peace and Security
2. To promote Commercial/Economic Diplomacy
3. To promote Regional Integration
4. To promote International Law and related Commitments/obligations
5. To provide Diplomatic, Protocol and Consular Services at home and abroad
6. To mobilize and empower Uganda's Diaspora for national development
7. To promote Uganda's Public Diplomacy and enhance her image abroad
8. To strengthen Institutional Capacity of the Ministry and its affiliated institutions
3
1.4Structure and Staffing/Number of Employees at the Ministry
The Ministry is implementing a new Functional thematic Staff Establishment Structure
following the review of both the Foreign Policy framework and structures of MDAs by
Government.
The political Head of the Ministry is a cabinet Minister assisted by two Ministers of State; One
for International Cooperation and another for Regional Cooperation. These give policy direction
to the Ministry.
The technical team is headed by the Permanent Secretary and comprises of three (3)
Directorates and eleven (11) Departments. In addition, the Ministry superintends over thirty five
(35) Missions/Embassies abroad. The Missions/Embassies are treated as separate votes for
purposes of planning and budgeting and are headed by an Ambassador/Head of Mission assisted
by technical staff.
The total number of positions both at Ministry Headquarters and Missions abroad stands at 412
with 334 filled hence representing a vacancy rate of 28% employees as per the approved
structure.
Refer to Annex I for the Macro Structure of the Ministry and annex two showing staff and
their qualifications
1.5 History of Capacity Building Initiatives
The work done in the Foreign Service is not taught in a number of Universities. A degree in
international relations is a recent initiative. Staff recruited in the Foreign Service require a lot of
on job training and post graduate training in international relations that was until recently
obtainable abroad. The Ministry has consistently planned capacity development for its staff on
an annual basis. The Ministry has relied on support from its development partners to support
trainings in the following areas Executive training for junior diplomats, training in trade policy,
executive seminar for diplomats from Africa, and management studies.
The following partnership are still vibrant; Austrian Embassy, World Trade Organization,
Federal Republic of Germany, Egypt, China, India and KOICA.
4
The Ministry used to attach Foreign Service Officers to institutions that perform related
functions of the mandate of the Ministry of Foreign Affairs and as such the officers would be
able to learn Uganda’s Economic Strategy, Tourism, Investment, and immigration policies and
regulations.
Planning for training has always been done on an annual basis, it is only of late that an effort
has been taken to develop a three year capacity building plan.
5
CHAPTER TWO
2.0 PROCESS OF DEVELOPING THE CAPACITY BUILDING PLAN
2.1 Background to the Exercise
According to MoFA draft Foreign Policy, It is observed that the rapidly changing international
economic and political environments make it imperative that the Ministry is prepared to fit in
the new world order. The changes in the international environment have been in the areas of
demography; innovation; new media and social networks; environment (climate change); high
demand for scarce resources; and changing nature of conflicts and insecurity. These changes
provide Uganda with challenges and opportunities.
For some time now, Uganda has recognized and embraced economic and commercial
diplomacy as a central part of its foreign policy. Day-by-day, policy makers are concerned with
ways to attract more investors and tourists to the country, as well as how to improve the
country’s export base. While the major challenge remains the limited financial base to
effectively support efforts on promoting commercial diplomacy, the institutional set up also
needs to be changed to better reflect the current reality and maximization of benefits.
The draft Foreign Policy recommends the need for Capacity building for research and
development, policy development, training, and publications, Promoting a professional, well
trained, equipped and motivated career Foreign Service, Recruitment, training and career
advancement based on competence profiling, Promoting at least a second AU / UN language,
other than English, Promoting Uganda and Ugandans to regional and international positions. In
order to achieve the strategic interventions as contained in the Draft Foreign Policy, there is
need for an elaborate capacity building plan that will support achievement of the above
engagement.
According to the Public Service Standing Orders 2010, Government is required to support staff
training and development of public officers as a way of maintaining a competent workforce.
The aim of staff training and development is to make the public service an effective and
efficient Government organ that is capable of initiating and executing appropriate public
policies for rapid, balanced and sustainable economic and social development. In order to do
this,Government ensures ensure that:
6
(a) Staff training and development is provided in a systematic manner for all levels of staff
through training programmes based on identified current or projected training needs;
(b) Necessary research is carried out to enable Government monitor staff development activities
with a view to ensuring continuous improvement to staff training and development
programmes; and
(c) Training and development programmes are adequately funded.
The MoFA Strategic Plan II has targeted to achieve the following outcome:
i. Improved Regional and International Peace and Security,
ii. Improved Commercial Diplomacy
iii. Enhanced National Well being accrued from Regional Integration,
iv. Diaspora,Bilateral and multilateral resources mobilized for National development,
v. Enhanced Benefits accrued from Adherence to International law and Commitments,
vi. Diplomatic, Protocol and Consular Services provided at home and abroad,
vii. Enhance National Image Abroad
viii. Strengthened Institutional Capacity
The above ambitions cannot be achieved without building capacity of staff to deliver at the
highest level possible.
2.2 The Needs Assessment Exercise
The assessment covered staff at both the Ministry Headquarters and Missions abroad taking into
consideration employees at the lowest level to the top and Officers from entry level to the
Permanent Secretary. Ambassadors/Heads of Mission for Uganda Missions abroad were also
covered.
The 3 major categories of junior/entry, supervisory and managerial staff requirements were
assessed.
The permanent Secretary, Directors and Heads of Department provided competence
requirements for developing a critical mass as well as at strategic level for the Ministry.
7
The MoFA Association Whatapp forum was used to validate the critical capacity gaps for the
Ministry and the responses were not far from the results of the training needs assessment
exercise.
2.3 Linkage BetweenCBP and Strategic Planning Process
The key strategic interventions of this plan will be captured in the strategic plan of the Ministry
during its annual review. In addition the activities in this plan have taken into consideration the
required competencies for implementation of the strategic direction of the Ministry.
2.4 Elaborate How the TNA Findings were Integrated
The findings from TNA informed the identification of the strategic interventions that have
generated activities for the Three Year plan and the annual training plan. The findings enabled
us to identify factors affecting performance both institutional and individual. The analysis hence
has enabled us to come up with appropriate interventions for addressing the gaps
2.5 The Nature of Support Provided
The Heads of Department were able to accord us an opportunity to interview them. The
individual staff filled the questionnaires. The members of Senior Management Team accorded
us an opportunity to make a presentation of findings to the team and critical feedback was
provided.
The Training Committee together with officers from the Policy and Planning Division was
funded to analyze the findings in order to develop themes for training and non-training
interventions.
2.6 Lessons Learnt
The exercise needs to be started early enough otherwise staff take long to provide response to
questionnaires.
Face to Face interview is the most appropriate method for engaging Heads of Department
Analysis from appraisal forms is hard to be relied on since most of the appraisals are completed
in September yet the plan must be ready before the start of the new Financial Year.
8
There is limited write up on the capacity building interventions undertaken over the last three
years.
The Social media especially whatsapp generated information that was used to validate the TNA
findings. This will in future be captured and planned for as a methodology for data collection.
9
CHAPTER THREE
3.0 SITUATIONAL ANALYSIS
3.1 An Overview of Ongoing HRD Initiatives
SN TRAINING PURPOSE
UMI
1 PGD(PAM),PGD(Mgt Studies) Career Development
2 Masters(MMS,PAM) Career Dev’t
AUSTRIAN EMBASSY
1 Executive Training for junior
diplomats
short skills enhancement trainings
WTO
1 Training on Trade policy Skills enhancement short raining
FEDERAL REPUBLIC OF
GERMANY
1 Executive Seminar for Diplomats
from Africa
Short skills enhancement training
EGYPT
1 Diplomatic trainings Short skills enhancement courses
CHINA
1 Diplomatic trainings Short skills enhancement courses
2 Seminars Exposure workshops and visits to
different organizations
INDIA
1 Diplomatic Trainings Short skills enhancement courses
2 Other trainings Short courses in the areas of ICT,
HRM, Environment.
KOICA
10
1 Korea Language & Culture Short training
2 Country Specific group trainings
KENYA
1 Public Policy training Short course
2 Negotiation and mediation Short skills enhancement training
PROFESSIONAL DEVELOPMENT WORKSHOPS
1 Annual Accountants workshop Workshop for professional
Accountants
2 HR-NET Conference and workshops
3 Secretarial cadre Annual workshop
4 Induction Short training for newly recruited
officers
3.2 Capacity Building Policies
3.2.1 Public Service Training Policy
a) Identification of Training Needs
Identification of training needs at individual employee level is done as part of the performance
appraisal process, where, the appraiser and the appraise agree on specific areas of training needs
that need to be addressed in order to improve the performance of the individual.
Training needs at Departmental level are identified as part of the departmental planning process.
This is compiled from the assessment done during performance appraisal of the various
members of staff in the department. The Head of Department assign one officer from the
department to undertake this assignment.
Training needs at organisational level are identified as part of the planning, monitoring and
evaluation process by Senior Management and the Head of Human Resource.
3.2.2 Categorisation of Trainings
11
a) Induction Training
The majority of officers that are recruited annually into the Uganda Public Service take up their
new positions and begin work with very little knowledge and understanding of the Public Service
ethos and their role as public officers in service delivery and economic growth.
Induction enables new public officers to understand the Public Service and the expectations of
their jobs, but also build their confidence to contribute more effectively to quality service
delivery and transformation of the Public Service. It provides an opportunity tocreate common
ethos and shared values and start building an efficient and ethical Public Service.The Policy
requires all Government Officials to be inducted into their new jobs in order to orientate them to
the values and culture of the Public Service as well as equip them with knowledge, skills and
attitudes to do their work and handle the challenges of their new jobs/responsibilities.
b) Professional Development Training.
Each Parent Ministry shall review/develop schemes of service of its professional cadres (in
liaison with the Professional Development Committees and the Ministry responsible for Public
Service), within which professional development training shall be identified.
The reviewed schemes of service must be approved by the Ministry responsible for Public
Service.
The identified professional development training shall be mandatory i.e. every officer shall be
required to undertake such training at an appropriate institution, to enhance current and future
performance.
c) Performance Enhancement Training
It is the role of each Public Service Organisation to plan for implementation of performance
enhancement training of its staff as part of its annual training plan.
Continuous learning and development is a prerequisite to performance improvement in the
Uganda Public Service. It is stated in the Public Service Training Policy that every public officer
12
should undergo at least one performance improvement training programme every three years.
Performance improvement training programmes shall:
a) Enable public officers to acquire competencies that will help them to adapt to changes in
the Uganda Public Service policy and work environment and embrace transformation,
b) Narrow performance gaps and reduce disparities in competencies of public servants,
c) Re-shape public servants attitudes and inculcate values of professionalism, integrity, time
management and teamwork among others that will improve service delivery and foster
economic growth, and
d) Improve and enhance public officers’ performance.
e) Pre-Retirement Training
Retirement means significant changes to a life of a public officer. The Public Service Training
Policy states that the Ministry of Public Service should plan and coordinate the implementation
of pre-retirement training programmes to prepare public officers for life after active public
service.
3.3 Departmental and Mission Capacity Gaps
This section segments capacity gaps as experienced in each Department, it further segments the
Mission Capacity gaps as collected from the TNA questionnaires, an input from Senior
Management team was obtained in order to validate the findings from the training needs
assessment.
3.3.1 Departmental Capacity Gaps
S/N DEPARTMENT GAPS
1 Consular Services Customer Care and Public Relations
Report writing
Drafting Diplomatic Notes
Data collection
Team work
Absence of HoD
13
Performance Management
Office equipment’s (Computers) (3
computers required and additional printers
Limited knowledge in Diplomacy
2 Regional Peace and Security Peace and security skills
Negotiation
Language skills
3 International Political
Cooperation
Writing skills
Speech writing
Office equipment (computer)
4 Regional Economic Cooperation Commercial and Economic Diplomacy
Negotiation
Language
5 International Economic
Cooperation
Commercial and Economic Diplomacy
Staffing gaps at Senior level
WTO
6 Protocol Services Fleet
Protocol and etiquette
Staffing at Senior level
Interpersonal skills
Cross Cultural Diversity Management
7 International Legal and Social
Affairs
International law
Drafting, Cabinet papers and MoUs,
agreements
8 Public Diplomacy Skills in journalism and public relations
Office equipment (Cameras and computers)
ICT
14
9 Diaspora Training in Commercial Diplomacy
Innovation
Absence of Diaspora Policy
3.3.2 Mission Capacity Gaps
Inadequate capacity to manage protocol and etiquette
Fewer international Languages
Inadequate negotiation skills
Limited understanding of diplomacy
Conflict resolution skills
Peace and Security( Juba, New York, Addis-Ababa, Nairobi, Kinshasha and
Brussels
Cross cultural Diversity Management
Economic Diplomacy
Financial management for non-financial
Leadership and management skills
Mentoring and coaching
Governance and accountability for HoM
Staffing
Uganda’s resources and awareness
Stakeholder analysis
Performance management
Records management
15
3.4 Current Resources Available for Capacity Building both Short, Long-term
and Medium
3.4.1 Ministry of Foreign Affairs Budget
The MoFA budget has resources that support mandatory trainings that is trainings that are
required before an individual is promoted to the next level. The challenge is that most of the
critical skills trainings are not budgeted for and hence not consistently and timely provided.
This kind of arrangement has affected practical skills development; staff have academic
qualifications but with limited skills to deliver
3.4.2 Donors
The Ministry despite its central position has not been able to attract donors. The ministry
however, has received offers from a number of Missions that are willing to support the
establishment of Uganda Institute for Diplomacy and International Affairs (UIDIA). This angle
can be exploited to seek for support for funding of other programmes as well.
3.4.3 Scholarships
The Ministry has continued to receive support from the following Missions and Development
Partners; KOICA, Austrian Embassy, Federal Republic of Germany, Egypt, China and India.
3.5 SWOT Analysisof MoFA Training and Development Function
STRENGTHS WEAKNESSES
Department of HR substantially staffed
Existence of a functional Training
Committee
Existence of a budget for staff training
Availability of a resource pool that can
mentor others
Timely dissemination of scholarship
opportunities to staff
The training budget is meagre
The training budget is wrongly located
in F&A
Limited engagement with top
management on training matters
Limited and outdated office equipment
Supporting trainings which are not
linked to organizational needs
Absence of long term training plans
Delayed appraisal of staff to inform
training needs
16
OPPORTUNITIES THREATS
Willingness of development partners to
support capacity building activities
Establishment of Uganda Institute of
Diplomacy and International Affairs
Training partners (CSCU and UMI)
Technical support from other (MDAs)
Access to scholarships
Limited stakeholder support to
establishment of UDIA
Competition for scholarships with
other stakeholders
Competing priorities for national
resources
3.5.1 Strategies for Addressing Weaknesses
Lobby finance for more funding
Prioritize the training function within the budget
Solicit SMM to support transferring the staff training budget from F&A to HRM
Sensitize and continue engaging top management on the training function
Retooling the Ministry
Develop a needs based training Plan
Develop a medium term capacity building plan
Enforce compliance of timely appraisal
3.5.2 Strategies for Tapping Opportunities
Reach out to development partners for support to implement training plans
Resubmit UDIA bill for Cabinet and Parliamentary adoption
Conclude MoUS with training partners
Engage other MDAs for technical support
Sourcing for more tailor made scholarships and fully utilize the available ones
3.5.3 Strategies for Averting Threats
Undertake stakeholder analysis and engage them for buy in
Source for more and utilize them effectively
Engage development partners and GoU to support capacity development in the Ministry
17
CHAPTER FOUR
4.0 CAPACITY BUILDING PLAN AND BUDGET
4.1 HRD Vision
A competent and a professional Foreign Service that is able to promote and Protect Uganda’s
National Interests Abroad.
4.2 HRD Development Goal
Enhance knowledge, skills and attitude of staff to deliver services effectively and efficiently for
improved service delivery
4.3 Specific objectives
To identify knowledge and skill gaps among employees.
To identify relevant training conventional and non-convention training interventions for
staff
To integrate the HRD plans and Programme with strategies of the Ministry.
To identify institutional factors affecting performance and suggest intervention
strategies
To support employees to acquire knowledge, skills and attitude required to perform their
jobs.
To provide information that will support retooling of the Ministry Departments and
Missions
4.4 Linkage between the HRD Plan and Strategic Plan
The interventions in the capacity building plan are meant to develop competencies of staff to
achieve the strategic interventions of the Ministry. This plan is hence linked to the strategic plan
pillar that is meant to strengthen the institutional capacity of the Ministry.
4.5 Activities Showing the Linkage between Proposed Activity and Results of the
Capacity Need Assessment.
This section links the performance gaps identified and compared with the required
competencies of the Foreign Service. Table 4.5.1 and 4.5.2 provides the linkage.
18
4.5.1 KEY SKILLS IDENTIFIED DURING TNA
SKILLS IDENTIFIED COMPETENCES IN SCHEME OF SERVICE
Financial management Effective Communication
Multi-tasking Negotiation and Mediation Skills
Multi-lingual ICT skills
Interpersonal Financial Management
Organizational Judgment, Decision Making and Problem
Solving skills
Coordination Networking and Marketing Skills
Analytical Political acuity/ingenuity
Marketing Public Relations and Customer care
Reporting Teamwork
Administration Strategic thinking
Negotiation Leadership Skills
Change Management skills
Time management
Ethics and Integrity
4.5.2 Capacity Gaps Identified During TNA
GAP IDENTIFIED PROPOSED SHORT TERM TRAININGS
1 Inadequate orientation of staff in Public
Service generally and Foreign Service in
particular
Undertake Induction at CSCU for new
officers
Undertake professional induction into
the Foreign Service
2 Reporting skills
Analytical skills
Interpersonal skills
Management skills improvement
19
Administrative skills
3 Financial management Financial Management Training for Non-
Financial Managers
4 Lobbying and negotiation
Negotiation, drafting and adopting UN
resolutions
Conference diplomacy and multilateral
negotiation
Negotiation skills and techniques
6 Rare skills in the following languages
French
Swahili
Arabic
Train officers to obtain a second
international Language
7 Effective writing in multilateral
diplomacy
Speech writing skills
Memos
Loose minutes
Report writing
Briefs
Talking points
Public Relations and Strategic Communication
9 Marketing skills Training in Commercial and Economic
Diplomacy
10 Conflict management
Managing change
Innovations
Leadership and Change Management
11 Research skills Research and Data Analysis
12 Peace and Security Peace and Security studies
13 Cross-cultural Diversity Management Cross-cultural Diversity Management
14 Records Management Referencing
20
Filling
Black vs red minutes
15 Limited usage of HR Data HR Analytics
16 Evaluation of trainings Return on investment training
17 Mentoring and Coaching and counselling Train in mentoring and coaching
18 Practical training on diplomatic, protocol
and etiquette
Training in diplomatic, protocol and etiquette
19 Stakeholder analysis engagement and
coordination
Training in project planning and management
21 Effective handling of consular and
immigration services
Training in consular and immigration services
b) Long-term Trainings
PROPOSED LONGTERM TRAININGS
1 Masters in International relations 5. Master’s in Business
Administration
2 Masters in International Law 6. Monitoring and Evaluation
3 Training in Migration and Human
Trafficking Control
7. Public Administration and
Management
4 Master’s Degree in Diplomacy 8. Peace and Security Studies
5 Masters in Trade Policy and Law 9. PhD in Diplomatic studies,
PhD in Public Policy
21
4.6 Summary of the Annual Training Plan
MODULE TARGET TYPE OF
ACTIVIT
Y
M F QI Q2 Q3 Q4
Public Service Induction
for new officers
All new
officers
Professional Induction All new
officers
Financial management for
non-financial managers
HoD
HoM
HoD
Budget
focal
persons
AOs
&HoD
Communication in the
Diplomatic Service
(Memos, dip notes Speech
writing and reports and
briefs)
FSO V & VI
Customer care and public
relations
Consular
Protocol
Personal
Secretaries
Pre-retirement training all staff 55 and
above
Defensive Driving Drivers
Training in economic and
commercial diplomacy
Focal Persons
IEC & REC
Training in languages All staff
(French)
22
Performance management All staff
Mentoring, coaching and
Counselling
HoD
Peace and security studies
HR Analytics Course C-HRM
PHRO
Evaluation of trainings SHRO &
Training
Committee
Records management Secretaries and
Records
Assistant
CAREER DEVELOPMENT
Masters in Diplomacy and
International Relations
All FSOs
Post graduate Diploma in
Public Administration
All FSOs
Post Graduate in Public
Policy
Policy Analyst
Monitoring and Evaluation
Certificate in
Administrative Law
Assistant
Secretaries
Non-Conventional Skills Training Interventions
Development ofcritical
masses on strategic
Competencies
(Negotiators, Multi-
lingual, International
Trade/WTO,
FSO VI, V, IV,
III and II
Pre-posting orientation FSOs and
Administrative
Attaches
Job-rotation FSO VI
Attachments FSO VI
23
Study tour of the country All
Reward and recognition
Team building activities
Ambassadors Conference FSOI
AO
HoM
4.7 Monitoring and Evaluation Strategy
Monitoring the implementation of this plan will be done through systematic tracking of
activities and actions to assess progress. Progress will be measured against specific targets and
schedules included in the implementation plan. This will be followed by analyzing and
reporting of information to various users. Effective monitoring will help to identify difficulties
and problem areas, and to take immediate remedial action, thereby ensuring that targets are
achieved.
4.7.1 Monitoring and Evaluation Methods
There are different methods for collecting data as per the nature of the indicators taken into
account. But keeping in view the nature of the CB program, we have selected the following
methods in terms of their appropriateness for operationalization and practical applicability in the
field:
Interviews
Structured, semi-structured and unstructured
Questionnaires
Open ended questionnaires and closed ended questionnaires
General staff Meetings
Formal and informal staff meetings
Ranking
Useful, most useful and least useful
Rating scales
Agree, partially agree, disagree, strongly disagree, etc.
Audio Visual aids
24
Pictures, movies, audio tapes, stories, role plays, photographs and presentations, etc.
Focus Groups
Generally six to twelve (6-12) people are arranged to sit together and a component
interviewer asks the topic focused questions on the specific topic
Observation
Inspection, field visits to agencies to which MoFA staff are attached, process synthesis,
implementation mechanism
Documentation Reviews
Already available material, training documents, etc.
Direct measurement
Remote sensing, and digital measurement equipment, etc.
4.7.2 Results Chain Logic
The Capacity Building program will adopt a logic model based results chain approach for
eventually realizing the objectives and contributing to the overarching goal. The output
monitoring matrix would be used to measure progress on a day-to-day basis against the
deliverables that further contribute towards these strategic objectives.
And these conditions hold true
This results chain is nothing but a cause and effect linkage. This framework states simply an
“IF” and “THEN” approach to planning and implementation for different components of the
CBP.
Results in the framework are linked to each other. These “Ifs” and “Thens” are usually based on
an in-depth understanding of the political situation, economy, law and order, social and
demographic factors, and potential factors outside the project’s context that may affect
If If If If If
Inputs Activities Outputs Immed. Effects
Outcomes Impacts
Results Implementation
Then Then The n Then Then
25
achievement of development outcomes. The results framework will be clearer from the
following framework example:
RESULT CHAIN LOGIC/STRATEGY
INPUTS/PROCESSES (RESOURCES, PROCESSES, AND METHODS UTILIZED)
CBP components funding made available
Base line data is made available
Head of Departments established in the target program
Staff hiring process completed
Training of newly inducted staff members completed
CBP staff needs identified
Grey areas of stakeholders identified
Initial contacts with major stake holders developed
Potential partners organizations identified to be engaged in the Capacity development process in
the Ministry
Strategies developed by the training committee
Implementation mechanism of CBP finalized
Informational materials developed for different components of the CBP
Potential implementing partners engaged with partnership deeds/MoUs
Guidelines and working protocols developed and communicated to partners organizations
All these steps are leading to…………………………
OUTPUTS (SHORT-TERM CHANGE, EFFECTS, AND RESULTS SOUGHT)
Increased outreach of CBP to MoFA staff
Expansion of service delivery of CBP components
Increased presence of CBP to all staff
Operationalization of CBP components to all staff
Stakeholders involved in the different components of CBP
Start of information flow within the CBP
Increased activities to all staff under the CBP
Enhanced capacity and skills of the CBP partners
Enhanced communication between the CBP and its partners
Better understanding of CBP fostered (Within MoFA and Missions abroad)
All these steps are leading to…………………………
OUTCOMES (INTERMEDIATE CHANGE EFFECTS AND RESULTS SOUGHT)
26
Increased proportion of staff covered by program interventions leading to:
Changed/improved attitudes towards embracing staff training etc
Improved attitudes towards the implementation mechanism of the CBP
Satisfied Donor and partners
Improved socio-economic conditions of all stakeholders (staff and non-staff)
Improved systems
Improved practices
All these steps are leading to…………………………
IMPACTS (LONG-TERM CHANGE, EFFECTS, AND RESULTS SOUGHT)
Improved capacity building of the MoFA staff
Increased partnerships among the different stake holders of CBP
4.7.3Roles and Responsibilities in Monitoring and Evaluation System of CBP
The success of any strategy largely depends on defining the roles and responsibilities in
advance. The CBP’s M&E strategy is also aimed to draw lines of roles and responsibilities as
the CBP moves towards implementation.
Though the roles and responsibilities mentioned here are expected to remain the same during
the whole life span of the project but they are tailored in such a way that they are ready to
accommodate any major change or shift of role or responsibility from one to another. The
details of roles and responsibilities are given as under:
Members Roles and Responsibilities of M&E
Top Management
and Senior
Management
Policy making, Management Decisions, donor relations, general
oversight among others
C-HRM CBP component reporting and coordination with key stakeholders
Training
Coordinator
CBP component management and administration, ensuring M&E
implementation at project level and streamlining, effective coordination
and participation of stakeholders
Training
committee
Review of CBP components and monitor implementation strategy
27
M&E Officer
Assist and carry out project planning, internal or external monitoring
and evaluation along with tracking the progress of components of CBP
and close coordination with other staff members of CBP. Ensuring the
work plan implementation is planned
Partnership
organizations
Ensuring the M&E activities at project level (activity wise)
Consultants Expert opinion and advice on technical matters
MoFA Staff Active participation in monitoring and evaluation activities of the CBP
and providing genuine views, observations and perceptions to project
M&E practitioners
28
4.8 Summary of the Budget for the First Year Activities Derived from the Activity
Profiles
MODULE TARGET Total DURATIO
N
UNIT COST BUDGET
Financial management for
non-financial managers
HoD
HoM
HoD
Budget
focal
persons
AOs
&HoD
15 1 Week 1,380,000 20,700,000
Communication in the
Diplomatic Service
(Memos, dip notes Speech
writing and reports and
briefs)
FSO V & VI 25 1 Week 1,380,000 34,500,000
Customer care and public
relations
Consular,
Protocol
Personal
Secretaries
25 1 Week 1,380,000 34,500,000
Pre-retirement training all staff 55 and
above
15 1 Week 1,380,000 20,700,000
Defensive Driving Drivers 5 2 weeks 500,000 5,000,000
Training in economic and
commercial diplomacy
Focal Persons
IEC & REC
20 1 week 1,380,000 27,600,000
Training in languages All staff (French) 25 6 Months 2,000,000 12,000,000
Performance management Middle & Senior
level
25 1 Week 1,380,000 34,500,000
29
Mentoring, coaching and
Counseling
HoD 15 1 week 1,380,000 20,700,000
HR Analytics Course C-HRM
1 1 Week $2,600(9,880,
000)
9,880,000
Evaluation of trainings PHRO,SHRO &
Training
Committee
10 1 week 1,380,000 13,800,000
Records management Secretaries and
Records Assistant
18 1 Week 1,380,000 24,840,000
SUB TOTAL 199 258,720,000
Long-term Trainings
Masters in Diplomacy and
International Relations
All FSOs 3 1 Year 6,000,000 18,000,000
Post graduate Diploma in
Public Administration
All FSOs 10 1 Year 4,000,000 40,000,000
Certificate in
Administrative Law
Assistant
Secretaries
2 1 Month 3,000,000 6,000,000
Training Needs
Assessment
All staff 4 2 Months 5,000,000 5,000,000
SUB TOTAL 19 69,000,000
Job-rotation FSO VI 25 1 Year Nil Nil
Attachments FSO VI 20 Nil Nil
Study tour of the country FSOs & Others 25 1 Week 1,380,000 34,500,000
Team building activities 120 1 Year 6,000,000 24,000,000
SUB TOTAL 190 58,500,000
Ambassadors Conference FSOI
AO
HoM
100 300,000,000
GRAND TOTAL 686,220,000
30
4.9 Risk and Mitigation Measures
There are several risks to the implementation of this Plan. All risks must be considered and
measures put in place to mitigate them. Some of the risks/risk factors to be considered are:
Resource Availability
Resources are essential for implementation of this Plan. Inadequate financial, human and other
resources may negatively impact the implementation of the planned activities.
Information Flow
Lack of effective flow of information may result in delay in decision-making which in turn leads
to delays in the implementation of the Plan.
Cooperation of Stakeholders
Timely and positive response from key stakeholders such as the Missions abroad is crucial to the
implementation of some strategies and activities in this plan.
Top Management Goodwill and Commitment
Goodwill is necessary for the implementation of this Plan, it is the gateway to the resources
The matrix below (Table 5) gives a list of the risks, level of risk and suggested mitigation
strategies.
4.9.1 Risk Management Matrix
No. Risk factor Level of risk Mitigation measures
1 Availability of
resources
High Proper annual work plans aligned to
the annual budget and procurement plan
2 Information flow Medium Prepare and implement a communication
strategy to ensure effective information
flow
3 Management of High Maintaining the goodwill of stakeholders
31
expectations of
stakeholders
through participation in consultative
meetings & preparation and
implementation of an effective
communication
strategy
4 Top Management
goodwill
High Lobbying for goodwill and issue-based
decisions
32
CHAPTER FIVE
5.0 INSTITUTIONAL PERFORMANCE ENHANCEMENT STRATEGIES
5.1 Issues that Hinder Performance
Performance is rated at 30%
S/N Factors Intervention Responsible Center
1 Lack of adequate office
equipment
Prioritize procurement of
equipment
Engage development
partners
US
2 Lack of tools and skills for
research
Provide training HRM
3 Poor records management
at departmental and
organizational level
Provide training
Retooling the records
department
Develop standardized
records management
manual for Missions
HRM
4 Lack of service delivery
standards
Develop service delivery standards
for each function
All HoD
5 Poor performance
management system
Train in PM
Develop a PM framework
HRM
6 Absence of a clear reward
and sanctions system
Operationalize the rewards
and sanctions framework
HRM
7 Budget cuts Engage parliament,
Finance and Cabinet
Write proposals
Planning and Policy
Analysis Division
8 Attitude of officers
towards work
Training in leadership
Develop motivation schemes
HRM
9 Insufficient mentoring and Training in coaching HRM
33
coaching
10 Limited specialized
training
Do needs analysis
Train
HRM
11 Inadequate staffing Redeploy
Lobby resources for implementing
the structure
HRM
12 Lack of baby day
care center in the
Ministry and
Missions
Put in place a day care centre F&A
13 Mismatch between
planning and
budget
allocation/executio
n
Policy and Planning
14 Insufficient
induction( Foreign
Service Ethos) and
training of new
staff
Undertake specialized induction
for Foreign Service Officers
Develop a customized induction
manual for Foreign Service
Officers
HRM
15 Weak linkages and
lack of adequate
coordination with
other stakeholders
Undertake stakeholder analysis
Develop coordination mechanism
HRM
16 Communication
gap between
missions and
headquarters
Assign an FSO in Public
Diplomacy to manage critical
correspondences to and from
Missions
HRM
17 Training policy not
clearly understood
by staff
Sensitise and circulate the training
policy and scheme of service
HRM
18 Limited
Monitoring and
evaluation
Implement the M&E framework as
contained in the strategic plan
Policy and Planning
34
19 Weak information
management system
Improve records, introduce e
electronic management system
ICT
20 Lack of adequate
team building
activities
Regular staff meetings
Directorate and departmental
meetings
Staff SACCO
Staff orientation
End of year party
HRM
21 Lack of timely promotion
of staff
Lobby for resources HRM
22 Limited number of
missions across the globe
Open new Missions PS
23 Limited and outdated
office equipment
Procure new office equipments ICT
24 Limited institutional
memory due to failure to
tap from retired
ambassadors and poor
records management
Exit interviews
Encourage retired
Ambassadors to tell their
story and maintain linkage
with them
HRM
25 Officers are not deployed
according to their
qualifications
Skills audit HRM
5.2 Summary of the Three Year Training Plan
ACTIVITY TARGET NOS M F YRI YR2 YR3
SKILLS TRAINING
Public service induction FSO VI
Professional induction FSO VI
Financial management for
non-financial managers
HOM,
AOs,HOD
35
Communication in the
Diplomatic Service
(Memos, dip notes Speech
writing and reports and
briefs)
FSO V and
VI
Customer care and public
relations
Consular,
Protocol
and
Personal
Secretaries
Pre-retirement training All staff 55
and above
Defensive driving
International law
International relations
Training in economic and
commercial diplomacy
Procurement and Contract
Management
Training in languages
Management and leadership
training
Research
Negotiation skills
Performance management
Mentoring, coaching and
Counselling
Peace and security studies
HR Analytics Course
Evaluation of trainings
Information and
Communication
Technology
36
Records management
Public Diplomacy
Protocol and Etiquette
Oil and Gas Diplomacy
Environment and Climate
Change Diplomacy
CAREER DEVELOPMENT
Masters in Diplomacy and
International Relations
Post graduate Diploma in
Public Administration
Administrative Law
Non-Conventional Skills Training
Development of critical
masses on strategic
Competencies (Negotiators,
Multi-lingual, International
Trade/WTO,
Job-rotation
Pre-posting orientation
Attachments
Retooling
Study tour of the country
Reward and recognition
Benchmarking Tours
Team building activities
37
5.3 Summary of the Three Year Capacity Building Work plan and Budget
KEY RESULT
AREAS
ACTIVITIES INPUTS Cost in Millions
Y1 Y2 Y3 Totals
Adequate
resources
mobilized to
support
implementation
of the identified
training
interventions
Reach out to development
partners to support with clear
training development plans.
Hospitality, per
diem, sitting
allowances
stationary, air
tickets,
telecommunication
costs, transport
costs and
refreshments, fuel
Conclude MoUs with training
partners
20 20 20 60
Engage other MDAs for
technical support
Sourcing for more tailor made
scholarships and fully utilizing
available ones
15 15 15 45
Policy to support
sustainable
capacity
enhancement
developed
Resubmit UIDIA bill for cabinet
and parliamentary adoption.
Sitting allowances,
printing and
stationery
15 15 15 45
Organizational
needs based
training
interventions
annually
implemented
Undertake needs analysis
Enforce compliance of timely
appraisal.
Perdiem, sitting
allowances,
stationery and
printing, fuel
20 20 20 60
Staff coached,
mentored and
equipped with
knowledge for
long term career
development
Support staff to undertake long
term trainings of 9 to 2 years
Tuition fees,
Out of pocket
Book allowance
30 50 50 150
On job training to
regularly enhance
skills of staff
undertaken
1-2 weeks short-term skills
enhancement trainings
undertaken
Consultancy fees,
tuition fees,
perdiem, out of
pocket, venue hire,
meals and
refreshments,
stationery
200 300 35
0
950
Non-conventional Job-rotations, attachments, study Perdiem, fuel, 400 400 40 1,200
38
training methods
utilized to
support practical
learning
tours, regular performance
reviews and conferences
organized
conference hire,
sitting allowance,
meals and
refreshments
0
Staff provided
with the required
tools for
enhanced
productivity
Procure computers and related
protective gear
Laptops, IPad and
desk top computers
30 40 50 120
Total Budget
requirement
2,630
39
CHAPTER SIX
6.0 HRD ACTIVITY PROFILES
ACTIVITY PROFILES
Directorate
Department
Finance and Administration
Activity title
Financial Management for non-financial managers
Description/nature of the activity
Skills training
Objectives of the activity
Equip Heads of Department and Mission Accounting Officers with basic knowledge in financial
management
Justification of the activity
A number of FSOs are appointed as AOs
Head of Missions and Heads of Department (HOD) are required to supervise the use of
resources under their jurisdiction.
Budget focal point officers support HOD in financial management
Funding Required
$ 7,500
Funding Secured
$ 3,000
Deficit
$ 4,500
Source of funding
GoU/Development partners
Trainer/Service provider
CSCU
40
MoFPED
Directorate
Protocol and Public Diplomacy
Department
Public Diplomacy
Activity title
Communication in the Diplomatic service
Description/nature of the activity
Skills training
Objectives of the activity
To equip officers with skills in report writing, development of country briefs, speech writing and
other diplomatic correspondences in addition to protocol and Etiquette
Justification of the activity
All FSOs are required to regularly prepare reports, briefs and various correspondences in
the correct format.
The Ministry has recruited new FSOs who require the knowledge and skills in protocol
and Etiquette
Funding Required
$ 8,000
Funding Secured
$ 3,000
Deficit
$ 5,000
Source of funding
GoU/Partners
Trainer/Service provider
MoFA resource pool/Partners
41
Directorate
Regional and International Peace & Security
Department
International Legal & Social Issues
Activity title
Training in International Law and International Relations
Description/nature of the activity
Knowledge & Skills training
Objectives of the activity
To equip junior Diplomats with basic Knowledge and skill in International Law and International
relations
Justification of the activity
Newly recruited officers join the Foreign Service with various qualifications/knowledge
training backgrounds which are not necessarily related to the duties they are expected to
perform on the job. It therefore becomes necessary to equip them with the basics of their
duties.
Funding Required
$ 12,000
Funding Secured
$ 3,000
Deficit
$ 9,000
Source of funding
GoU/ Partners
Trainer/Service provider
MoFA resource pool and Consultants
42
Directorate
Regional & International Economic Affairs
Department
Regional Economic Cooperation/International Economic Cooperation
Activity title
Training in Oil and Gas Diplomacy
Description/nature of the activity
Knowledge & Skills training
Objectives of the activity
To equip Diplomats with Knowledge and skill in Oil and Gas diplomacy as the Country prepares
to start Oil production.
Justification of the activity
Uganda will be joining the league of Oil producing Countries thus becoming a member of
OPEC and other International petroleum Organizations .It is therefore important to equip
Diplomats with the necessary skills to effectively engage in the above forums.
Funding Required
$ 35,000
Funding Secured
$ 5,000
Deficit
$ 30,000
Source of funding
GoU /Development partners
Trainer/Service provider
Consultants
Directorate
43
Regional & International Economic Affairs
Department
International Economic Cooperation
Activity title
Training in Commercial and Economic Diplomacy
Description/nature of the activity
Skills training
Objectives of the activity
To enhance FSOs’ Knowledge and competences in promoting tourism, trade, investment,
technology transfer and development resource mobilization.
Justification of the activity
The government/Ministry of Foreign Affairs has prioritized Commercial and Economic
Diplomacy as a strategy to propel economic transformation and attainment of Vision 2040.
Funding Required
$ 35,000
Funding Secured
$ 5,000
Deficit
$ 30,000
Source of funding
GoU/Partners
Trainer/Service provider
Consultancy
Directorate
Office of the Permanent Secretary
Department
44
Human Resource Management
Activity title
Customer care and Public Relations training
Description/nature of the activity
Skills training
Objectives of the activity
To enhance customer care and public relations of staff in the frontline departments
Justification of the activity
Staffs in the frontline departments frequently interact with the general public/clients and
impact greatly on the corporate image of the Ministry and Uganda Missions abroad.
Funding Required
$ 3,000
Funding Secured
Yes
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
CSCU
Directorate
Office of the Permanent Secretary
Department
F&A/Policy and Planning Unit
Activity title
45
Training in monitoring and evaluation of projects
Description/nature of the activity
Skills training
Objectives of the activity
The Ministry is embarking on the development of Bankable projects to enhance its effectiveness
in service delivery. It is therefore important that a clear project management framework is
established.
Justification of the activity
Monitoring and evaluation of projects is key in project management and implementation which
necessitates equipping officers with skills in the area.
Funding Required
$ 2,000
Funding Secured
$ 2,000
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
Consultancy
Directorate
Office of the Permanent Secretary
Department
Human Resource Management
Activity title
Management and leadership training
46
Description/nature of the activity
Skills training
Objectives of the activity
To equip senior and middle level officers with knowledge and skills in management and
leadership
Justification of the activity
The Ministry and especially Uganda Missions abroad have experienced conflicts and other
challenges sometimes attributed to inadequate management and leadership skills of the
supervisors. The training in management and leadership is one of the avenues in eliminating
conflicts especially in Missions.
Funding Required
$ 35,500
Funding Secured
$5,500
Deficit
$ 30,000
Source of funding
GoU
Trainer/Service provider
CSCU
Directorate
Department
Activity title
Training in languages
Description/nature of the activity
Skills training
Objectives of the activity
47
To equip officers with at least one extra international language i.e French, Arabic and Kiswahili,
Spanish, Chinese, Russian etc
Justification of the activity
It is a requirement in the scheme of service for the Foreign Service and in effective engagements
in bi-lateral and multi-lateral negotiations.
It is a vital competence in the diplomatic practice.
Funding Required
$ 35,000
Funding Secured
$ 5,000
Deficit
$ 30,000
Source of funding
GoU and Development partners
Trainer/Service provider
Consultancy
Directorate
Office of the Permanent Secretary
Department
All
Activity title
Training in Research
Description/nature of the activity
Skills training
Objectives of the activity
To equip FSOs and other officers with Knowledge and skills in research for purposes of
collecting useful data for promoting Economic and Commercial Diplomacy and Diplomatic
intelligence gathering.
Justification of the activity
48
In promoting and protecting Uganda’s image abroad, officers require skills in collecting and
analyzing data from the host Countries to inform the engagements in both Economic and
commercial as well as bi-lateral and multi-lateral relations.
Funding Required
$ 13,500
Funding Secured
$ 3,500
Deficit
$ 10,000
Source of funding
GoU/Partners
Trainer/Service provider
Consultancy/MoFA resource pool.
Directorate
Office of the Permanent Secretary
Department
F&A/ICT & Communication
Activity title
Basic Computer training
Description/nature of the activity
Skills training
Objectives of the activity
To equip officers with basic Knowledge and skills in computer applications
Justification of the activity
A number of officers have inadequate skills in the use of computer applications which is key in
effective performance of their duties. This includes preparing reports, presentations,
correspondences and data analysis. Therefore training in computer skills is expected to improve
on the overall performance of officers.
49
Funding Required
$ 2,500
Funding Secured
$ 2,500
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
Consultancy/MoFA Resource Pool
Directorate
Protocol and Public Diplomacy
Department
Public Diplomacy
Activity title
Public and Digital diplomacy
Description/nature of the activity
Skills training
Objectives of the activity
To equip officers with basic Knowledge and skills in managing communication in the diplomatic
and digital world
Justification of the activity
Communication in the diplomatic world is extremely sensitive and if not professionally handled
can affect relationships of Countries. It is also evident that digital diplomacy is being commonly
used to communicate official Country postions.This makes it necessary to equip our diplomats
with skills and competences that enable them to engage effectively.
Funding Required
50
$ 25,000
Funding Secured
$ 5,000
Deficit
$ 20,000
Source of funding
GoU/Partners
Trainer/Service provider
Consultancy
Directorate
Office of the Permanent Secretary
Department
Human Resource Management
Activity title
Performance management
Description/nature of the activity
Skills training
Objectives of the activity
To equip officers with Knowledge, skills necessary in implementing the performance
management framework for effective and efficient service delivery.
Justification of the activity
Performance management is necessary for improved service delivery and accountability as
envisaged in the Public Service reform program
A number of performance management initiatives have been developed and most officers are not
conversant with the tools (performance agreements, Organisational and Individual performance
planning, Pearl of Africa performance score cards, rewards and sanctions framework and Client
Charter etc).
Funding Required
51
$ 2,000
Funding Secured
$ 2,000
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
HRM Department & Policy & Planning Unit
Directorate
Office of the Permanent Secretary
Department
Human Resource Management
Activity title
Mentoring, coaching and counselling
Description/nature of the activity
Skills enhancement
Objectives of the activity
Equip Senior Managers with skills in mentoring, coaching and counseling of subordinates
Justification of the activity
Performance gaps have been identified among junior staff that may not require
conventional trainings
There is a skills gap in transfer of knowledge and skills from the Senior to the junior
staff.
Funding Required
$ 1,500
Funding Secured
$ 1,500
Deficit
52
Nil
Source of funding
GoU
Trainer/Service provider
Consultancy
Directorate
Office of the Permanent Secretary
Department
Human Resource Management
Activity title
HR Analytics
Description/nature of the activity
Skills training
Objectives of the activity
To equip HR Officers with Analytical technical skills for talent data
Justification of the activity
Human Resource Planning and management greatly relies on data. Therefore for any HR Officer
to effectively execute his/her role, they require HR Analytical skills.
Funding Required
$ 3,000
Funding Secured
$ 3,000
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
Consultancy
53
Directorate
Office of the Permanent Secretary
Department
Activity title
Evaluation of Trainings
Description/nature of the activity
Skills training
Objectives of the activity
-To enhance capacity of HR officers in managing training activities and ensure they meet their
intended goal
Justification of the activity
The Ministry has undertaken a Training needs assessment and identified skills and
competence gaps that will require conducting trainings
The Ministry has also developed a Three Year Capacity Building Plan which will require
designing training programs that address the skills and competence deficiencies
identified.
Funding Required
$ 2,500
Funding Secured
$ 2,500
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
CSCU/Consultancy
54
Directorate
Office of the Permanent Secretary
Department
Human Resource Management
Activity title
Records Management
Description/nature of the activity
Skills enhancement
Objectives of the activity
To develop skills for better records management among the secretarial staff and records
assistants
Justification of the activity
The records assistants and secretarial staff manage records on a daily basis
The records management systems at the Ministry and Uganda Missions abroad require
strengthening
Funding Required
$ 2,500
Funding Secured
Not yet
Deficit
$ 2,500
Source of funding
GoU and development partners
Trainer/Service provider
CSCU
55
Directorate
Office of the Permanent Secretary
Department
Human Resource Department
Activity title
Pre- retirement training
Description/nature of the activity
Skills training
Objectives of the activity
To support officers due for retirement to develop realistic retirement plans
Justification of the activity
A number of officers who are approaching the mandatory retirement age and therefore they need
to be guided on how to make a safe transition.
Funding Required
$ 1,500
Funding Secured
$ 1,500
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
CSCU
Directorate
Office of the Permanent Secretary
Department
Finance and Administration
56
Activity title
Defensive driving
Description/nature of the activity
Skills training
Objectives of the activity
To equip the Ministry’s drivers with skills in defensive driving
Justification of the activity
The drivers in the Ministry are regularly assigned to VIPs who have a timely schedule
Funding Required
$ 2,000
Funding Secured
$ 2,000
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
Consultancy firm
Directorate
All
Department
All
Activity title
57
Job rotation
Description/nature of the activity
Non-conventional training intervention
Objectives of the activity
To enable officers to multitask
Justification of the activity
Newly recruited FSOs need to be exposed to all the functions of the Ministry.
On posting, FSOs are required to perform all functions of the Foreign Service hence they need to
expose them to all functions while still at headquarters.
Funding Required
Nil
Funding Secured
Deficit
Source of funding
N/A
Trainer/Service provider
HRM and Directors
Directorate
Department
Activity title
Attachments
Description/nature of the activity
Non-conventional training intervention
Objectives of the activity
58
To acquire knowledge and networks in a specialized area of expertise
Justification of the activity
FSOs require a working knowledge of various MDAs whose mandate affects the achievement of
MoFA’s objectives.
Funding Required
Nil
Funding Secured
N/A
Deficit
N/A
Source of funding
N/A
Trainer/Service provider
MDAs
Directorate
Department
Activity title
Study tour of the country
Description/nature of the activities
Non-conventional skills training enhancement
Objectives of the activity
To raise officers’ knowledge and awareness of their country
Justification of the activity
59
FSOs are expected market their country in terms of tourist, trade and investment potential.
Funding Required
$ 30,000
Funding Secured
Nil
Deficit
$ 30,000
Source of funding
GoU/Development partners
Trainer/Service provider
UTB and UWA
Directorate
Office of the Permanent Secretary
Department
Human Resource Management
Activity title
Reward and Recognition
Description/nature of the activity
Non-conventional training intervention
Objectives of the activity
To enhance productivity of staff.
Justification of the activity
Staff require motivation to sustain a required level of performance. This intervention if
effectively implemented can encourage innovation by the staff.
Funding Required
60
$ 2,000
Funding Secured
$ 2,000
Deficit
Nil
Source of funding
GoU
Trainer/Service provider
Rewards and Sanctions committee
Directorate
Department
Activity title
Team building activities
Description/nature of the activity
Non-conventional training intervention
Objectives of the activity
To enhance cohesion and teamwork among staff
Justification of the activity
Achieving the organizational mandate requires individual and teams to work together.
Building high performing teams requires regular formal and informal interactions among staff
hence the need for deliberate team building activities such as regular staff meeting, fitness
sessions, sports, end of year parties, performance review retreats and farewell parties.
Funding Required
$ 78,000 in 3 Years
Funding Secured
$ 6,700
Deficit
$ 71,300
61
Source of funding
GoU
Trainer/Service provider
HRM
Directorate
Office of the Permanent Secretary
Department
Human Resource Management
Activity title
Ambassadors’ conference
Description/nature of the activity
Non-conventional training intervention
Objectives of the activity
To review performance of the Ministry and Missions in the key sector outputs
To communicate emerging Government policy issues
Justification of the activity
Missions have Charters whose implementation requires regular review.
This conference is required to guide Missions in strategic direction of government.
Heads of Missions share best practices and build working relations.
Funding Required
$ 160,000 in 3 Years
Funding Secured
62
$ 79,000
Deficit
$ 81,000
Source of funding
GoU
Trainer/Service provider
MoFA and MDAs
63
64
ANNEX 1. APPROVED MACRO STRUCTURE
MISSIONS ABROAD
1) NEW YORK 2) LONDON 3) ADDIS ABABA 4) GENEVA 5) WASHINGTON 6) BRUSSELS 7) PRETORIA 8) ROME 9) NEW DELHI 10) COPEN HAGEN 11) NAIROBI 12) DAR ES SALAAM 13) RIYADH 14) BEIJING 15) CAIRO 16) TOKYO 17) OTTAWA 18) KINSHASHA 19) TRIPOLI/Algiers 20) ABUJJA 21) KIGALI 22) KHARTOUM 23) BERLIN 24) TEHRAN 25) MOSCOW 26) PARIS 27) JUBA 28) ABUDHABI 29) GHANGZHOU 30) MOMBASA 31) ANKARA 32) KUALA LUMPUR 33) CANBERRA
DIRECTORATE OF REGIONAL &
INTERNATIONAL ECONOMIC
AFFAIRS
DIRECTORATE OF
PROTOCOL AND
PUBLIC DIPLOMACY
PUBLIC DIPLOMACY
DEPARTMNET REGIONAL ECONOMIC
COOPERATION
DEPARTMENT
PROTOCOL
SERVICES
DEPARTMNET
INTERNATIONAL
ECONOMIC COOPERATION
DEPARTMENT
CONSULAR SERVICES
DEPARTMENT DIASPORA DEPARTMENT
PERMANENT
SECRETARY
DIRECTORATE OF REGIONAL
& INTERNATIONAL POLITICAL
AFFAIRS
REGIONAL PEACE &
SECURITY
DEPARTMNET
INTERNATIONAL
POLITICAL
COOPERATION
DEPARTMNET
INTERNATIONAL
LEGAL & SOCIAL
ISSUES
DEPARTMNET
HUMAN
RESOURCES
DEPARTMNET
FINANCE &
ADMINISTRATION
DEPARTMENT
PROCUREMENT
UINT
INTERNAL AUDIT
UINT
MINISTER
ICT & COMMUNICATIONS
DIVISION
MINISTER OF STATE FOR
INTERNATIONAL COOPERATION
MINISTER OF STATE FOR
REGIONAL COOPERATION
PLANNING AND POLICY
ANALYSIS DIVISION
PROPERTY
MANAGEMENT UINT
65
ANNEX 11 QUESTIONNARES THAT WERE USED FOR DATA COLLECTION
MINISTRY OF FOREIGN AFFAIRS
TRAINING NEEDS ASSESSMENT QUESTIONNAIRE
Part 1: Background Information of Respondent
1. Name……………………………………………………..Sex………………………
2. Date of birth…………………………………………………………………………
3. Designation (Job title)…………………………Department/Mission….………………
4. Date appointed to it……………………………………………………………………........
5. Number of years in service at the Ministry of Foreign Affairs? ………………………….
6. Highest level of education………………............................................................................
7. Qualifications acquired before joining the Ministry of Foreign Affairs?
No Qualification Award Year of Award
1
2
8. Qualification acquired after joining the Ministry of Foreign Affairs?
No Qualification Award Year of Award
1
2
3
4
9. Are you currently undergoing any training course(s)?
Yes............................No........................................
66
10. If your answer to question 9 is yes, name on-going training/courses, the institution and its
duration
…………………………………………………………………………………………………
…………………………………………………………………………………………………
Part 2: Individual Level Training Needs
11. Briefly describe the major tasks/duties/responsibilities of your current job
…………………………………………………………………………………………………
…………………………………………………………………………………………………
What key skills are of great help to you in performing your job or would one require
performing the job effectively?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
13. Of the skills in (12) above, which one(s) do you feel less competent in, while performing
your tasks? (Please rank them in order of importance to you).
…………………………………………………………………………………………………
…………………………………………………………………………………………………
14. Suggest the training(s) that you need to improve your performance in view of the gaps in 13
above:
(Immediately to one year)
…………………………………………………………………………………………………
…………………………………………………………………………………………………
Short run/course (One to two years)
…………………………………………………………………………………………………
…………………………………………………………………………………………………
Long run/course (Two to five years)
………………………………………………………………………………………………………………
……………………………………………………………………………………………………
15. What are your career aspirations?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………
16. What training or development do you need to help make this happen (eg, external degree
study, formal meeting procedures, leadership training, etc)?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
67
What are the major challenges/constraints or problems that you find in executing your
duties?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
……………………………………………………………………………………
17. Suggest strategies for overcoming the above challenges.
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
……………………………………………………………………………
18. Do you think your co-workers in your department/division/Mission and others give you all
the required support in performing your duties?
Yes……………….No………………………….
19. If no, what training area(s) would you recommend for your colleagues in order to improve on
the overall performance of the Department?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………
20. In performing your roles and responsibilities, what group/category (ies) of the Ministry-other
than those in your department- do you interact with?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
………………………………………………………………………………………
In your opinion, are there skills/performance gaps that you have identified from the category
(ies) of staff in 21 above that directly or indirectly affect your performance? If yes, identify
the gaps and suggest the required training to address the gap(s)
Category of staff Gaps Proposed training to address
the gap
68
Part 3: Organizational/Institutional Level Training Needs
21. List the capacity strengths of the Ministry of Foreign Affairs?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
……………………………………………………………………………………
22. What are the major capacity weaknesses of the Ministry of Foreign Affairs?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
………………………………………………………………………………
23. How can the above weaknesses be addressed?
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
……………………………………………………………………………
69
TRAINING NEEDS ASESMENT
FOCUS GROUP DISCUSSION GUIDE
1. What is your perception on the general performance of the Ministry of Foreign Affairs?
On a scale of 1 to 10, how would you rate the performance of the Ministry in terms of
timeliness of reporting, quality of reporting, adherence to procedures (methodology) and
general impact? Why?
2. Objective one of the Ministry’s Strategic plan and Foreign Policy is geared towards
promoting Regional and International peace and Security. What actions and
competencies are required to achieve this objective?
3. Objective two of the Ministry’s Strategic Plan focuses on promotion of Commercial and
Economic Diplomacy. List the key requirements to achieve this objective.
4. Objective three of the Strategic Plan talks of promoting Regional Integration.
(a). To what extent does the Ministry of Foreign Affairs ensure that Uganda’s obligations
to EAC and other regional bodies are fulfilled.
(b). what skills does the Ministry require to promote Regional Integration?
5. Objective four of the Ministry’s Strategic Plan is Promotion of International Law and
Commitments. List the key requirements to achieve this objective
6. Objective six is to provide Diplomatic, Protocol and Consular services at home and
abroad. List the key requirements for achieving this objective.
7. Objective seven is Promotion of Uganda’s Public Diplomacy and enhancement of her
image abroad. What actions and competences are required to achieve this objective.
8. Objective 8 is to mobilize and empower the Ugandan Diaspora for National
Development. Mention the key requirements and competences for realisation of this
objective
9. Objective Nine is to Strengthen Institutional Capacity of the Ministry and its affiliated
Institutions. Describe how best this can be achieved.