REPUBLIC OF THE PHILIPPINES TABLE -...
Transcript of REPUBLIC OF THE PHILIPPINES TABLE -...
-
PERSPECTIVE VIEW, TABLE OF CONTENTS
GROUND, TYP. 2nd & 3rd FLOOR PLAN, FINISHES
FRONT, REAR ELEVATIONS
TOILETS, STAIRS & RAMP DETAIL
RIGHT, LEFT ELEV., LONGITUDINAL & CROSS SECTION
TOILET SECTION DETAILS, FACADE PEDIMENTS
PERSPECTIVE VIEW & TABLE OF CONTENTSA-1
A-2
A-3
A-6
A-5
A-4
A-7
S-1
S-2
S-3
S-4
1A-1 SCALE : N T S
P-1
P-2
THIRD FLOOR REFLECTED CEILING & ROOF PLAN
STAIR, HANDRAIL & MISC. DETAILSA-8
E-1 GENERAL NOTES, SINGLE LINE DIAGRAM,
LOAD SCHEDULE, LEGEND & RISER
DIAGRAM
E-2 GROUND & TYP. 2nd & 3rd FLOOR POWER
LAYOUT
E-3 GROUND & TYP. 2nd & 3rd FLOOR LIGHTING
LAYOUT
P-5 SEPTIC TANK, CATCH BASIN & COVER
DETAILS, NOTES, LEGEND, DESIGN CRITERIA
FOUNDATION PLAN, DET. OF FOOTING, TIE
BEAM, STAIR ON GRADE & RAMP, ELEV. OF
COL. SCH. FOOTING & COLUMN
2nd & 3RD FLOOR FRAMING PLAN, TYP. DET.
OF BEAM & SLAB, SCH. OF BEAMS & SLABS
STAIR PLAN & SECTION DETAIL, MISC. DETAILS
ROOF FRAMING PLAN, TRUSS DIAGRAM DETAILS
OF STEEL CONNECTION
DOOR & WINDOW SCHEDULE, DETAIL OF STEEL
CASEMENT
A-9
DRAINAGE AND SANITARY SYSTEM LAYOUT
DARINAGE AND SANITARY SYSTEM
ISOMETRIC VIEW
WATER SYSTEM ISOMETRIC DIAGRAM
WATER SYSTEM LAYOUTP-3
P-4
CHIEF, PFSED-OPS
OLIVER R. HERNANDEZ
DepED
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED UNDERSECRETARY
RAMON C. BACANI
DepED
150 mm CDP sloped @ 2%
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
SEPTIC TANKLINE
150 mm CDP sloped @ 2%
100mm PVCSP
150 mm CDP sloped @ 2%
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB CB
RAMP
UP
150 mm
C
DP
sloped @ 2%
FD
COCO75mm PVCWP
SD
10
0m
m
PV
CW
P
RISER
CO
CO
FDWCFD
WCSS
CO
LAV
WCFD
150 mm CDP sloped @ 2%
CB CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
150 mm CDP sloped @ 2%
C O R R I D O R
CB
UP
CB
150 mm CDP sloped @ 2%
100mmCO
CO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
150 mm
C
DP
sloped @ 2%
150 mm CDP sloped @ 2%
RAMP
UP
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB
FD
CO
100mm PVCWP
HE
150 mm CDP sloped @ 2%
100mm PVCSP
LAV
FDWC
CO
NCR
CSCO
URWC
FD
CO
RISER
50mm PVCBV
50mm PVCBV
50mm PVCBV
50
mm
P
VC
BV
CB
CBCBCBCBCBCB
CO
FDFD
DS
DS
100mm PVCWS
100mm PVCSS
CS CSCS CS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
150 mm CDP sloped @ 2%
100mm PVCVS
100mm PVCVS
LINESEPTIC TANK
CB CB CB CB
CB CB CB CB CB
100mm PVCSP
150 mm CDP sloped @ 2%
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
2000 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CBCB
UP
RAMP
CB
100mm PVCHD
150 mm CDP sloped @ 2%
FD
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
SD
75mm PVCHD COCO
CB
SLFD
WCFD
WCFD
CO
CO
RISER
10
0m
m
PV
CH
D
100mm PVCSP
FD WC
CO
CS CS
LAV
50mm PVCVP
50mm PVCVP
150 mm CDP sloped @ 2%
CB
1
P-1 SCALE :
CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
C O R R I D O R
150 mm CDP sloped @ 2%
CB
UP
1 : 100 METERS
CB
150 mm CDP sloped @ 2%
CO
100mmCO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
100mm PVCVS
100mm PVCVS
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCHD75
mm
P
VC
HD
75mm PVCHD
FDWC FD
CSCSCS50mm PVCVP
50mm PVCVP
100mm PVCVS
100mm PVCVS
CB CB
CB
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
UP
RAMP
2000
mm
C
DP
slo
ped
@ 2
%
TO MAIN DRAINSYSTEM
CBCB
HE
100mm PVCHD
CO
FD
100mm PVCSP
150 mm CDP sloped @ 2%
NCR
CO
WC FD
10
0m
m
PV
CH
D
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
CO
RISER
CO
FDWC
URLAV
CSCSCS
50mm PVCVP
50
mm
P
VC
VP
100mm PVCVS
100mm PVCVS
DN
CO
UR
CO
CO
CO
75mm PVCHD
100mm PVCHD
75
mm
P
VC
HD
RISER
FD
WC WC
CSCS
50mm PVCVP
50
mm
P
VC
VP
50mm PVCVP
DS DSDS DSDS DS DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
100mm PVCWS
100mm PVCSS
FDCO
CO
WC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
HD
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCWS
100mm PVCSS
DN
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
WP
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCVSTR
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV2ND FLR3RD FLR
CB
CB
CB CB CB CB CB CB CB
CB
DRANAIGE & SANITARY SYSTEM
ISOMETRIC VIEW
P-25
75mm PVCMVSPVCVTR
75mm PVCDS
VSTR
PIPE CHASEPIPE CHASE PIP[E CHASEPIP[E CHASE
75mm PVCMVS
CO
FDFD
DS
CO
FDFD
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
150 mm
C
DP
sloped @ 2%
ISOMETRIC VIEWDEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
TABLEOF ENGINEER/BUILDING OFFICIAL
OFFICE OF THE CITY/MUNICIPAL
REPUBLIC OF THE PHILIPPINES
CONTENTS
DISTRICT/CITY/MUNICIPALITY
-
SCALE :
1
A-2 1 : 100 METERS
2A-2 SCALE : 1 : 100 METERS
C O R R I D O R
UP UP
C O R R I D O R
GROUND, 2nd & 3rd TYPICAL FLOOR PLAN, FINISHES
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
4500 4500
CLASSROOM
1
4500 4500
CLASSROOM
2
4500 4500
CLASSROOM
4
4500 4500
CLASSROOM
5
C O R R I D O R
WF2WF2 WF2
WF2WF2 WF2
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
25mm
DEP
WF1
25mm
DEP
FL1
BLACKBOARD BASE
WF1
FL1
W
1
W
1
W
2
W
2
D1
D1
CONCRETE SUNBREAKER
LINE OF SUNBREAKER
A-6
3
LINE OF ROOF FOR
THIRD FLOOR
A-6
2
A-6
4
A-6
1
A-7
1
A-8
10
9000
LANDING LANDING
LANDINGLANDING
163
STO STO
7000
9500
1500
2500
DN
1090
1400
600
200x200mm
VITRIFIED FLOOR
TILES (UNGLAZED)
4500
960 960 1200
SHE
SINK COUNTER D-2
D-2
D-4
W
3
D-4 D-4
STO
W
4
955
7000
9500
1500
DN
2500
4500
1000 10002075
SINK COUNTER
W
3
HED-4
D-2
2000
WCURINAL
D-4
600
200x200mm
VITRIFIED UNGLAZED
FLOOR TILES
WC
1400
7000
3850
RAMP
1200
3600 1700
2500
UP
D-3a
1500UP
2000
3150
4500
W
4
D-3
NCR
W
3
HE
SINK COUNTER
D-4
URINAL
LAVWC WC
D-2
W
3
SINK COUNTER
1750
1700
SD
1400
200x200mm VITRIFIED
FLOOR TILES
(UNGLAZED)
3625
3600
UP
RAMP
1200
1500
D-3a
UP
850 850
WF3
W
4
D-3SHE
D-4D-4
2000
1200
1525
A-4
3
A-4
4
A-4
3
A-4
4
650
4500 4500
4500
1700 850
54000
CLASSROOM3
WITH GROOVES
SCHEDULE OF FINISHES
- PLAIN CEMENT FLOOR FINISH
- PLAIN CEMENT FLOOR ROUGH
( UNGLAZED )
- 200X200 VITRIFIED FLR TILES
WF2
WF1
WF3
WALLS :
FL3
FLOORS :
FL1
FL2
- 100 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT) 50mm G.I. PIPE FOR HANDRAIL
- 200X200 VITRIFIED WALL TILES
(GLAZED)
- 150 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT)
FL1
4500 4500
CLASSROOM
6
WF1
FL1
4500 4500
CLASSROOM
7
WF1
FL1
4500 4500
CLASSROOM
8
WF1
FL1
4500 4500
CLASSROOM
9
WF1
FL1
4500 4500
CLASSROOM
10
WF1
54000
1750
SS
HCR
425
425425
PIPE CHASE
PIPE CHASE
PIPE CHASE
PIPE CHASE
425 650773
A-7
1
3850
2500
3150
9500
CHIEF, PFSED-OPS
OLIVER R. HERNANDEZ
DepED
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED UNDERSECRETARY
RAMON C. BACANI
DepED
150 mm CDP sloped @ 2%
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
SEPTIC TANKLINE
150 mm CDP sloped @ 2%
100mm PVCSP
150 mm CDP sloped @ 2%
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB CB
RAMP
UP
150 mm
C
DP
sloped @ 2%
FD
COCO75mm PVCWP
SD
10
0m
m
PV
CW
P
RISER
CO
CO
FDWCFD
WCSS
CO
LAV
WCFD
150 mm CDP sloped @ 2%
CB CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
150 mm CDP sloped @ 2%
C O R R I D O R
CB
UP
CB
150 mm CDP sloped @ 2%
100mmCO
CO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
150 mm
C
DP
sloped @ 2%
150 mm CDP sloped @ 2%
RAMP
UP
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB
FD
CO
100mm PVCWP
HE
150 mm CDP sloped @ 2%
100mm PVCSP
LAV
FDWC
CO
NCR
CSCO
URWC
FD
CO
RISER
50mm PVCBV
50mm PVCBV
50mm PVCBV
50
mm
P
VC
BV
CB
CBCBCBCBCBCB
CO
FDFD
DS
DS
100mm PVCWS
100mm PVCSS
CS CSCS CS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
150 mm CDP sloped @ 2%
100mm PVCVS
100mm PVCVS
LINESEPTIC TANK
CB CB CB CB
CB CB CB CB CB
100mm PVCSP
150 mm CDP sloped @ 2%
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
2000 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CBCB
UP
RAMP
CB
100mm PVCHD
150 mm CDP sloped @ 2%
FD
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
SD
75mm PVCHD COCO
CB
SLFD
WCFD
WCFD
CO
CO
RISER
10
0m
m
PV
CH
D
100mm PVCSP
FD WC
CO
CS CS
LAV
50mm PVCVP
50mm PVCVP
150 mm CDP sloped @ 2%
CB
1
P-1 SCALE :
CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
C O R R I D O R
150 mm CDP sloped @ 2%
CB
UP
1 : 100 METERS
CB
150 mm CDP sloped @ 2%
CO
100mmCO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
100mm PVCVS
100mm PVCVS
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCHD75
mm
P
VC
HD
75mm PVCHD
FDWC FD
CSCSCS50mm PVCVP
50mm PVCVP
100mm PVCVS
100mm PVCVS
CB CB
CB
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
UP
RAMP
2000
mm
C
DP
slo
ped
@ 2
%
TO MAIN DRAINSYSTEM
CBCB
HE
100mm PVCHD
CO
FD
100mm PVCSP
150 mm CDP sloped @ 2%
NCR
CO
WC FD
10
0m
m
PV
CH
D
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
CO
RISER
CO
FDWC
URLAV
CSCSCS
50mm PVCVP
50
mm
P
VC
VP
100mm PVCVS
100mm PVCVS
DN
CO
UR
CO
CO
CO
75mm PVCHD
100mm PVCHD
75
mm
P
VC
HD
RISER
FD
WC WC
CSCS
50mm PVCVP
50
mm
P
VC
VP
50mm PVCVP
DS DSDS DSDS DS DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
100mm PVCWS
100mm PVCSS
FDCO
CO
WC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
HD
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCWS
100mm PVCSS
DN
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
WP
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCVSTR
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV2ND FLR3RD FLR
CB
CB
CB CB CB CB CB CB CB
CB
DRANAIGE & SANITARY SYSTEM
ISOMETRIC VIEW
P-25
75mm PVCMVSPVCVTR
75mm PVCDS
VSTR
PIPE CHASEPIPE CHASE PIP[E CHASEPIP[E CHASE
75mm PVCMVS
CO
FDFD
DS
CO
FDFD
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
150 mm
C
DP
sloped @ 2%
ISOMETRIC VIEWDEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
-
9925
THIRD FLOOR LEVEL
NAT. GRD. LN.
GROUND FLOOR LEVEL
3200
325
3200
1 : 100 METERS
2
A-3 SCALE :
APEX LINE OF TRUSS
TOP OF ROOF BEAM
2500
1 : 100 METERS
SCALE : A-3
1
D-1
W-2
D-1
W-2
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
GM
A
CA RE
S
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
GM
A
CA RE
S
SECOND FLOOR LEVEL
3200
FRONT, REAR ELEVATIONS
CONCRETE SUN BREAKER
(SEE DETAIL)
PLAIN CEMENT PLASTER
PAINT FINISH
GA#26 PL. G.I. GUTTER ON12x300mm FIBER CEMENT
FASCIA BD. (PAINT FINISH)
GA#26 CORR. G.I. ROOFINGSHEET (PAINT FIN.)
GA. #26 CORR. G.I.ROOFING SHEET (PAINTFINISH)
GA. #26 PLAIN G.I.GUTTER ON
12x300mm FIBER
CEMENT FASCIA BD.
(PAINT FINISH)
100 MM THK. CHB
RAILING W/50mm G.I. PIPE RAILING
32mm G.I. PIPE
HANDRAIL WITH 32mm
VERT. SUPPORT @ 600mm
O.C. (PAINT FINISH)
D-2
D-2
D-2
9925
SECOND FLOOR LEVEL
NAT. GRD. LN.
GROUND FLOOR LEVEL
3200
325
3200
APEX LINE OF TRUSS
TOP OF ROOF BEAM
2500
THIRD FLOOR LEVEL
3200
D-2
D-2
D-2
W
3
W
3
W
4
W
4W
3
W
4W
3
W
4W
3
2985
W
3
815
D-3A D-3A
- 100 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT) 50mm G.I. PIPE FOR HANDRAIL
- 200X200 VITRIFIED WALL TILES
(GLAZED)
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W
1
W
1
W
1
W
1
W
1
W
1
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W
1
W
1
W
1
W
1
W
1
W
1
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W
1
W
1
W
1
W
1
W
1
W
1
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W
1
W
1
W
1
W
1
W
1
W
1
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W
1
W
1
W
1
W
1
W
1
W
1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
W-2
D-1
OLIVER R. HERNANDEZ
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED
RAMON C. BACANI
CHIEF, PFSED-OPS
DepED
UNDERSECRETARY
DepED
150 mm CDP sloped @ 2%
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
SEPTIC TANKLINE
150 mm CDP sloped @ 2%
100mm PVCSP
150 mm CDP sloped @ 2%
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB CB
RAMP
UP
150 mm
C
DP
sloped @ 2%
FD
COCO75mm PVCWP
SD
10
0m
m
PV
CW
P
RISER
CO
CO
FDWCFD
WCSS
CO
LAV
WCFD
150 mm CDP sloped @ 2%
CB CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
150 mm CDP sloped @ 2%
C O R R I D O R
CB
UP
CB
150 mm CDP sloped @ 2%
100mmCO
CO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
150 mm
C
DP
sloped @ 2%
150 mm CDP sloped @ 2%
RAMP
UP
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB
FD
CO
100mm PVCWP
HE
150 mm CDP sloped @ 2%
100mm PVCSP
LAV
FDWC
CO
NCR
CSCO
URWC
FD
CO
RISER
50mm PVCBV
50mm PVCBV
50mm PVCBV
50
mm
P
VC
BV
CB
CBCBCBCBCBCB
CO
FDFD
DS
DS
100mm PVCWS
100mm PVCSS
CS CSCS CS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
150 mm CDP sloped @ 2%
100mm PVCVS
100mm PVCVS
LINESEPTIC TANK
CB CB CB CB
CB CB CB CB CB
100mm PVCSP
150 mm CDP sloped @ 2%
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
2000 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CBCB
UP
RAMP
CB
100mm PVCHD
150 mm CDP sloped @ 2%
FD
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
SD
75mm PVCHD COCO
CB
SLFD
WCFD
WCFD
CO
CO
RISER
10
0m
m
PV
CH
D
100mm PVCSP
FD WC
CO
CS CS
LAV
50mm PVCVP
50mm PVCVP
150 mm CDP sloped @ 2%
CB
1
P-1 SCALE :
CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
C O R R I D O R
150 mm CDP sloped @ 2%
CB
UP
1 : 100 METERS
CB
150 mm CDP sloped @ 2%
CO
100mmCO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
100mm PVCVS
100mm PVCVS
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCHD75
mm
P
VC
HD
75mm PVCHD
FDWC FD
CSCSCS50mm PVCVP
50mm PVCVP
100mm PVCVS
100mm PVCVS
CB CB
CB
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
UP
RAMP
2000
mm
C
DP
slo
ped
@ 2
%
TO MAIN DRAINSYSTEM
CBCB
HE
100mm PVCHD
CO
FD
100mm PVCSP
150 mm CDP sloped @ 2%
NCR
CO
WC FD
10
0m
m
PV
CH
D
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
CO
RISER
CO
FDWC
URLAV
CSCSCS
50mm PVCVP
50
mm
P
VC
VP
100mm PVCVS
100mm PVCVS
DN
CO
UR
CO
CO
CO
75mm PVCHD
100mm PVCHD
75
mm
P
VC
HD
RISER
FD
WC WC
CSCS
50mm PVCVP
50
mm
P
VC
VP
50mm PVCVP
DS DSDS DSDS DS DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
100mm PVCWS
100mm PVCSS
FDCO
CO
WC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
HD
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCWS
100mm PVCSS
DN
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
WP
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCVSTR
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV2ND FLR3RD FLR
CB
CB
CB CB CB CB CB CB CB
CB
DRANAIGE & SANITARY SYSTEM
ISOMETRIC VIEW
P-25
75mm PVCMVSPVCVTR
75mm PVCDS
VSTR
PIPE CHASEPIPE CHASE PIP[E CHASEPIP[E CHASE
75mm PVCMVS
CO
FDFD
DS
CO
FDFD
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
150 mm
C
DP
sloped @ 2%
DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
-
12425
3200
2500
3200
NAT. GRD. LN.
GROUND FLOOR LEVEL
325
3200
SECOND FLOOR LEVEL
4A-4 SCALE : 1 : 100 METERS
THIRD FLOOR LEVEL
NAT. GRD. LN.
GROUND FLOOR LEVEL
9925
3200
325
3200
CLASSROOM
A-4
3
1 CORRIDOR
1 : 100 METERSSCALE :
CLASSROOM
W-1
W-1
10 CORRIDOR
D-1
APEX OF TRUSS
600
THIRD FLOOR LEVEL
TOP OF TRUSS
TOP OF ROOF BEAM
7000
95001000
2500
SEE TRUSS DETAIL
1A-4 SCALE : 1 : 100 METERS
9925
3200
3200
325
NAT. GRD. LN.
GROUND FLR. LVL.
SECOND FLR. LVL.
TOP OF ROOF BEAM
APEX LINE OF TRUSS
1100
1000
2A-4 SCALE : 1 : 100 METERS
1000
2500
TOP OF ROOF BEAM
CLASSROOM
W-1
6 CORRIDORSECOND FLOOR LEVEL
3200
3200
THIRD FLR. LVL.
RIGHT & LEFT SIDE ELEV., LONGITUDINAL & CROSSSECTION
2 3
THIRD FLOOR LEVEL
NAT. GRD. LN.
GROUND FLOOR LEVEL
9925
3200
325
3200
TOP OF TRUSS
TOP OF ROOF BEAM
SECOND FLOOR LEVEL
3200
600
SEE STRUCTURAL DETAIL
W
3
W
4
200x200mm
VITRIFIED WALL
TILES (GLAZED)
CONCRETE
SUNBREAKER (SEEDETAIL)
32mm GI PIPE HANDRAIL
w/32mm VERT. SUPPORT@600mm O.C. (PAINT FIN.)
GA#26 CORR. G.I.ROOFING SHEET
(PAINT FIN.)
GA#26 PLAIN G.I. GUTTERON 12x300mm FIBER
CEMENT FASCIA BOARD
(PAINT FIN.)
PLAIN CEMENT PLASTER
WALL PAINT FIN.
CONCRETE
SUNBREAKER (SEEDETAIL)
GA#26 CORR. G.I.ROOFING SHEET
(PAINT FIN.)
GA#26 G.I. GUTTERON 12x300mm
FIBER CEMENT
FASCIA BOARD
(PAINT FIN.)
PLAIN CEMENT PLASTER
WALL PAINT FIN.
38mm G.I. PIPE
HANDRAIL
w/32mm VERT.SUPPORT @600mm
O.C. (PAINT FIN.)
GA#26 CORR. G.I.ROOFING SHEET
(PAINT FIN.)
CONCRETE
SUNBREAKER
(SEE DETAIL)
FEMALE
TOILET
FEMALE
TOILET
FEMALE
TOILET
STORAGE
STORAGE
W
3W
4
W
3W
4
MALE
TOILET
MALE
TOILET
MALE
TOILET
W
4
200x200mm
VITRIFIED WALL
TILES (GLAZED)
W
3
W
3
EXPOSED CEILING UNDER
SLAB PAINT FIN.
EXPOSED CEILING UNDER
SLAB PAINT FIN.
WC WCCS
LAV
3mm THK. FASCIAL
MIRROR ON AL.
FRAME
50mm G.I. PIPE
RAILING PAINT FIN.
1100
D-1
D-1
840
900
200
900
900
W
3
6mm THK. MARINE PLYWOOD
CEILING FOR ALL TOILET ON
50x50mm CEILING JOIST
@600mm ON CENTER
BOTHWAYS w/10mm BARHANGER @1200mm OC.
BOTHWAYS EMBEDDED ON
CONC. SLAB
300
3200
3200
3225
TOP OF ROOF BEAM
3rd FLOOR TOILET LEVEL
2nd FLOOR TOILET LEVEL
GROUND FLOOR TOILET
LEVEL
1100 200200
CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W
1
W
1
W
1
W
1
W
1
W
1 CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W
1
W
1
W
1
W
1
W
1
W
1 CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W
1
W
1
W
1
W
1
W
1
W
1 CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W
1
W
1
W
1
W
1
W
1
W
1 CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W
1
W
1
W
1
W
1
W
1
W
1
11
6
1
12
7
13
8
14
9
4
15
10
5
2500
815
2500
10
A-8
OLIVER R. HERNANDEZ
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED
RAMON C. BACANI
CHIEF, PFSED-OPS
DepED
UNDERSECRETARY
DepED
150 mm CDP sloped @ 2%
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
SEPTIC TANKLINE
150 mm CDP sloped @ 2%
100mm PVCSP
150 mm CDP sloped @ 2%
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB CB
RAMP
UP
150 mm
C
DP
sloped @ 2%
FD
COCO75mm PVCWP
SD
10
0m
m
PV
CW
P
RISER
CO
CO
FDWCFD
WCSS
CO
LAV
WCFD
150 mm CDP sloped @ 2%
CB CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
150 mm CDP sloped @ 2%
C O R R I D O R
CB
UP
CB
150 mm CDP sloped @ 2%
100mmCO
CO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
150 mm
C
DP
sloped @ 2%
150 mm CDP sloped @ 2%
RAMP
UP
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB
FD
CO
100mm PVCWP
HE
150 mm CDP sloped @ 2%
100mm PVCSP
LAV
FDWC
CO
NCR
CSCO
URWC
FD
CO
RISER
50mm PVCBV
50mm PVCBV
50mm PVCBV
50
mm
P
VC
BV
CB
CBCBCBCBCBCB
CO
FDFD
DS
DS
100mm PVCWS
100mm PVCSS
CS CSCS CS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
150 mm CDP sloped @ 2%
100mm PVCVS
100mm PVCVS
LINESEPTIC TANK
CB CB CB CB
CB CB CB CB CB
100mm PVCSP
150 mm CDP sloped @ 2%
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
2000 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CBCB
UP
RAMP
CB
100mm PVCHD
150 mm CDP sloped @ 2%
FD
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
SD
75mm PVCHD COCO
CB
SLFD
WCFD
WCFD
CO
CO
RISER
10
0m
m
PV
CH
D
100mm PVCSP
FD WC
CO
CS CS
LAV
50mm PVCVP
50mm PVCVP
150 mm CDP sloped @ 2%
CB
1
P-1 SCALE :
CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
C O R R I D O R
150 mm CDP sloped @ 2%
CB
UP
1 : 100 METERS
CB
150 mm CDP sloped @ 2%
CO
100mmCO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
100mm PVCVS
100mm PVCVS
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCHD75
mm
P
VC
HD
75mm PVCHD
FDWC FD
CSCSCS50mm PVCVP
50mm PVCVP
100mm PVCVS
100mm PVCVS
CB CB
CB
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
UP
RAMP
2000
mm
C
DP
slo
ped
@ 2
%
TO MAIN DRAINSYSTEM
CBCB
HE
100mm PVCHD
CO
FD
100mm PVCSP
150 mm CDP sloped @ 2%
NCR
CO
WC FD
10
0m
m
PV
CH
D
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
CO
RISER
CO
FDWC
URLAV
CSCSCS
50mm PVCVP
50
mm
P
VC
VP
100mm PVCVS
100mm PVCVS
DN
CO
UR
CO
CO
CO
75mm PVCHD
100mm PVCHD
75
mm
P
VC
HD
RISER
FD
WC WC
CSCS
50mm PVCVP
50
mm
P
VC
VP
50mm PVCVP
DS DSDS DSDS DS DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
100mm PVCWS
100mm PVCSS
FDCO
CO
WC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
HD
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCWS
100mm PVCSS
DN
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
WP
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCVSTR
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV2ND FLR3RD FLR
CB
CB
CB CB CB CB CB CB CB
CB
DRANAIGE & SANITARY SYSTEM
ISOMETRIC VIEW
P-25
75mm PVCMVSPVCVTR
75mm PVCDS
VSTR
PIPE CHASEPIPE CHASE PIP[E CHASEPIP[E CHASE
75mm PVCMVS
CO
FDFD
DS
CO
FDFD
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
150 mm
C
DP
sloped @ 2%
DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
-
SCALE : A-5
2
1 : 100 METERS
1A-5 SCALE : 1 : 100 METERS
1000
1000
2500
A-8
600
600
THIRD REFLECTED CEILING, ROOF PLAN
9000
4500
7000
2500
4500
9000
4500
9000
4500
4500
4500
4500600 4500 600
LN. OF STRUCTURE
RD RD
1000
1000
4500
9000
4500
GA#26 CORR. G.I. SHEETROOFING (PAINT FIN.)
GA#26 PLAIN G.I. RIDGEROLL (PAINT FIN.)
GA#26 PLAIN G.I. FLASHING(PAINT FIN.)
9000
4500
4500
9000
4500
4500
SLOPE
SLOPE
SLOPE
SLOPE
CEILING VENTILATION (SEEDETAIL)
GA#26 PLAIN GI GUTTER ON12x300mm FIBER CEMENT FASCIA
BOARD (PAINT FIN.)
6mm THK. ORD. PLYWOOD CEILING ON
50x50mm CEILING JOIST @600mm OC
BOTH WAYS (PAINT FIN.)
LIGHTING FIXTURES
6mm THK. MARINE PLYWOOD
CEILING ON 50x50mm CEILING
JOIST @600mm OC BOTH WAYS
(PAINT FIN.)
A-7
7
CONCRETE PARAPET
CONCRETE PARAPET
GA#26 G.I. GUTTER ON12x300mm FIBER CEMENT
FASCIA BOARD (PAINT FIN.)
GA#26 G.I. GUTTER ON12x300mm FIBER CEMENT
FASCIA BOARD (PAINT FIN.)
45004500
9000
4500
4500
9000
4500
4500
9000
4500
4500
RD RD RD RD RD RD RD RD RD RD RD
200 RD RD RD RD RD RD RDRD RD RD RD RD
MANHOLE MANHOLE
7000
4500
9000
4500
OLIVER R. HERNANDEZ
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED
RAMON C. BACANI
CHIEF, PFSED-OPS
DepED
UNDERSECRETARY
DepED
150 mm CDP sloped @ 2%
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
SEPTIC TANKLINE
150 mm CDP sloped @ 2%
100mm PVCSP
150 mm CDP sloped @ 2%
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB CB
RAMP
UP
150 mm
C
DP
sloped @ 2%
FD
COCO75mm PVCWP
SD
10
0m
m
PV
CW
P
RISER
CO
CO
FDWCFD
WCSS
CO
LAV
WCFD
150 mm CDP sloped @ 2%
CB CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
150 mm CDP sloped @ 2%
C O R R I D O R
CB
UP
CB
150 mm CDP sloped @ 2%
100mmCO
CO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
150 mm
C
DP
sloped @ 2%
150 mm CDP sloped @ 2%
RAMP
UP
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB
FD
CO
100mm PVCWP
HE
150 mm CDP sloped @ 2%
100mm PVCSP
LAV
FDWC
CO
NCR
CSCO
URWC
FD
CO
RISER
50mm PVCBV
50mm PVCBV
50mm PVCBV
50
mm
P
VC
BV
CB
CBCBCBCBCBCB
CO
FDFD
DS
DS
100mm PVCWS
100mm PVCSS
CS CSCS CS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
150 mm CDP sloped @ 2%
100mm PVCVS
100mm PVCVS
LINESEPTIC TANK
CB CB CB CB
CB CB CB CB CB
100mm PVCSP
150 mm CDP sloped @ 2%
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
2000 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CBCB
UP
RAMP
CB
100mm PVCHD
150 mm CDP sloped @ 2%
FD
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
SD
75mm PVCHD COCO
CB
SLFD
WCFD
WCFD
CO
CO
RISER
10
0m
m
PV
CH
D
100mm PVCSP
FD WC
CO
CS CS
LAV
50mm PVCVP
50mm PVCVP
150 mm CDP sloped @ 2%
CB
1
P-1 SCALE :
CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
C O R R I D O R
150 mm CDP sloped @ 2%
CB
UP
1 : 100 METERS
CB
150 mm CDP sloped @ 2%
CO
100mmCO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
100mm PVCVS
100mm PVCVS
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCHD75
mm
P
VC
HD
75mm PVCHD
FDWC FD
CSCSCS50mm PVCVP
50mm PVCVP
100mm PVCVS
100mm PVCVS
CB CB
CB
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
UP
RAMP
2000
mm
C
DP
slo
ped
@ 2
%
TO MAIN DRAINSYSTEM
CBCB
HE
100mm PVCHD
CO
FD
100mm PVCSP
150 mm CDP sloped @ 2%
NCR
CO
WC FD
10
0m
m
PV
CH
D
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
CO
RISER
CO
FDWC
URLAV
CSCSCS
50mm PVCVP
50
mm
P
VC
VP
100mm PVCVS
100mm PVCVS
DN
CO
UR
CO
CO
CO
75mm PVCHD
100mm PVCHD
75
mm
P
VC
HD
RISER
FD
WC WC
CSCS
50mm PVCVP
50
mm
P
VC
VP
50mm PVCVP
DS DSDS DSDS DS DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
100mm PVCWS
100mm PVCSS
FDCO
CO
WC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
HD
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCWS
100mm PVCSS
DN
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
WP
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCVSTR
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV2ND FLR3RD FLR
CB
CB
CB CB CB CB CB CB CB
CB
DRANAIGE & SANITARY SYSTEM
ISOMETRIC VIEW
P-25
75mm PVCMVSPVCVTR
75mm PVCDS
VSTR
PIPE CHASEPIPE CHASE PIP[E CHASEPIP[E CHASE
75mm PVCMVS
CO
FDFD
DS
CO
FDFD
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
150 mm
C
DP
sloped @ 2%
DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
-
5b DETAIL SECTION
A-6 SCALE 1:10 M
700
900
100
200
SPOT DETAILSCALEA-6 1:5 M
100X100 CONCRETE
SKIRTING
100
150
100
5b1
DET. ELEVATION OF RAMP
A-6
5
SCALE 1:50 M
200
700
900
200
700
900
1200
300
32mm G.I. PIPE HANDRAIL
WITH 32mm VERT. SUPPORT @
600mm O.C. (PAINT FINISH)
NONSKID PLAIN CEMENT FLOOR
FINISH W/ GROOVE LINES
TOILETS, STAIR & RAMP PLAN ANDRAMP DETAIL
32 mm G.I PIPE
VERTICAL SUPPORT @
600mm ON CENTER
PROVIDE 12mm
STEEL DOWELS (PAINTFIN.)
32mm G.I. PIPE
HANDRAIL WITH 32mm
VERT. SUPPORT @600mm
O.C. (PAINT FINISH)
32 mm G.I PIPE
VERTICAL SUPPORT
@600mm ON CENTER
PROVIDE 12mm
STEEL DOWELS (PAINTFIN.)
NONSKID PLAIN CEMENT
FLOOR FINISH W/GROOVE LINES
W
3
4500
SINK COUNTER
1750
1700
600
9500
3850
2500
SD
3150
1400
200x200mm VITRIFIED
FLOOR TILES
(UNGLAZED)
3600
UP
RAMP
1200
1500
D-3a
UP
WF3
W
4
D-3SHE
D-4D-4
2000
5000
7000
3850
RAMP
1200
3600 1700
2500
UP
D-3a
1500UP
2000
3150
10251700
CLEAR
888
4500
W
4
D-3
NCR
W
3
HE
SINK COUNTER
D-4
7000
9500
1500
2500
DN
1090
1400
600
200x200mm
VITRIFIED FLOOR
TILES (UNGLAZED)
4500
960955 960 1200
SHE
SINK COUNTER
D-2
D-2
D-4
W
3
D-4 D-4
STO
W
4
7000
9500
1500
DN
2500
4500
1000 13002100
SINK COUNTER
W
3
HED-4
D-2
1500
WCURINAL
D-4
600
200x200mm
VITRIFIED UNGLAZED
FLOOR TILES
WC
1400
1
2
3
4 16
5 15
6 14
7 13
8 12
9 11
10
A-8
5
A-8
12
D-2
WC WCWCWC WC
LAVWC
38mm STAINLESS
STEEL GRAB BAR
19
18
17
16
5 15
6 14
7 13
8 12
9 11
10
1
2
3
416
515
614
713
812
911
10
19
18
17
416
515
614
713
812
911
10
WC
LAV URINAL WC
38mm STAINLESS
STEEL GRAB BAR
A-8
9
9-STEPS@300mm = 2700
1337
1360 1359
8-STEPS@300mm = 2400
1337
200x200mm
VITRIFIED UNGLAZED
FLOOR TILES
STO.
STO.
D-2
3600 1700
A-6
5a
SPOT DETAIL5a
A-6 SCALE 1:50 M
NON-SKID PLAIN
CEMENT FLOOR
CEMEMNT FINISH
100100
6mm
TYPICAL
6mm6mm
A-6
5b
A-6
5b1
4
A-6 SCALE : 1:50
M
3
A-6 SCALE : 1:50
M
2
A-6 SCALE : 1:50
M
1
A-6 SCALE : 1:50
M
1075 850 850 1725
2000
3000
1574A-8
1
A-8
1
425
425
OLIVER R. HERNANDEZ
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED
RAMON C. BACANI
CHIEF, PFSED-OPS
DepED
UNDERSECRETARY
DepED
150 mm CDP sloped @ 2%
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
SEPTIC TANKLINE
150 mm CDP sloped @ 2%
100mm PVCSP
150 mm CDP sloped @ 2%
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB CB
RAMP
UP
150 mm
C
DP
sloped @ 2%
FD
COCO75mm PVCWP
SD
10
0m
m
PV
CW
P
RISER
CO
CO
FDWCFD
WCSS
CO
LAV
WCFD
150 mm CDP sloped @ 2%
CB CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
150 mm CDP sloped @ 2%
C O R R I D O R
CB
UP
CB
150 mm CDP sloped @ 2%
100mmCO
CO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
150 mm
C
DP
sloped @ 2%
150 mm CDP sloped @ 2%
RAMP
UP
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB
FD
CO
100mm PVCWP
HE
150 mm CDP sloped @ 2%
100mm PVCSP
LAV
FDWC
CO
NCR
CSCO
URWC
FD
CO
RISER
50mm PVCBV
50mm PVCBV
50mm PVCBV
50
mm
P
VC
BV
CB
CBCBCBCBCBCB
CO
FDFD
DS
DS
100mm PVCWS
100mm PVCSS
CS CSCS CS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
CO
FDFD
DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
150 mm CDP sloped @ 2%
100mm PVCVS
100mm PVCVS
LINESEPTIC TANK
CB CB CB CB
CB CB CB CB CB
100mm PVCSP
150 mm CDP sloped @ 2%
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
2000 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CBCB
UP
RAMP
CB
100mm PVCHD
150 mm CDP sloped @ 2%
FD
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
SD
75mm PVCHD COCO
CB
SLFD
WCFD
WCFD
CO
CO
RISER
10
0m
m
PV
CH
D
100mm PVCSP
FD WC
CO
CS CS
LAV
50mm PVCVP
50mm PVCVP
150 mm CDP sloped @ 2%
CB
1
P-1 SCALE :
CB
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
C O R R I D O R
150 mm CDP sloped @ 2%
CB
UP
1 : 100 METERS
CB
150 mm CDP sloped @ 2%
CO
100mmCO
150 mm CDP sloped @ 2%
100mm PVCSP
100mm PVCSPTO SEWER
100mmCO
100mm PVCVS
100mm PVCVS
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCHD75
mm
P
VC
HD
75mm PVCHD
FDWC FD
CSCSCS50mm PVCVP
50mm PVCVP
100mm PVCVS
100mm PVCVS
CB CB
CB
150
mm
C
DP
slo
ped
@ 2
%
150 mm CDP sloped @ 2%
UP
RAMP
2000
mm
C
DP
slo
ped
@ 2
%
TO MAIN DRAINSYSTEM
CBCB
HE
100mm PVCHD
CO
FD
100mm PVCSP
150 mm CDP sloped @ 2%
NCR
CO
WC FD
10
0m
m
PV
CH
D
150
mm
C
DP
slo
ped
@ 2
%
CB
UP
CO
RISER
CO
FDWC
URLAV
CSCSCS
50mm PVCVP
50
mm
P
VC
VP
100mm PVCVS
100mm PVCVS
DN
CO
UR
CO
CO
CO
75mm PVCHD
100mm PVCHD
75
mm
P
VC
HD
RISER
FD
WC WC
CSCS
50mm PVCVP
50
mm
P
VC
VP
50mm PVCVP
DS DSDS DSDS DS DS
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
100mm PVCWS
100mm PVCSS
FDCO
CO
WC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
HD
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCWS
100mm PVCSS
DN
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
DN
FDCO
CO
WCWC100mm PVCSP
SHE
SINK COUNTER
RISER
CO
FD
CO
75mm PVCWP75
mm
P
VC
WP
75mm PVCWP
FDFD
CSCSCS50mm PVCBV
50mm PVCBV
100mm PVCVSTR
CO
UR
CO
CO
CO
75mm PVCWP
100mm PVCSP
75
mm
P
VC
WP
RISER
FD
WC WC
CSCS
50mm PVCBV
50
mm
P
VC
BV
50mm PVCBV2ND FLR3RD FLR
CB
CB
CB CB CB CB CB CB CB
CB
DRANAIGE & SANITARY SYSTEM
ISOMETRIC VIEW
P-25
75mm PVCMVSPVCVTR
75mm PVCDS
VSTR
PIPE CHASEPIPE CHASE PIP[E CHASEPIP[E CHASE
75mm PVCMVS
CO
FDFD
DS
CO
FDFD
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
CO
75mm PVCDS
DS
150 mm
C
DP
sloped @ 2%
DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
-
TOILET SECTION DETAILS
150
URINAL
300
1625
1525
100
3200
CLASSROOM LVL.
TOILET LVL.
2ND FLR. LVL.
50
3200
4500
300
1600
1650
3250
CLASSROOM LVL.
TOILET LVL.
2ND FLR. LVL.
50
2695
3200
4549
1
A-7
DET. SECTION OF FEMALE TOILETSSCALE 1:50 M
6
A-7
MOUNTING FIXTURES OF MALE TOILETSCALE 1:50 M
FIN. GRD. LN.
TOILET LVL.
FIN. GRADE LN.
TOILET LVL.
500500
SD
200
600
3mm THK. FASCIAL
MIRROR ON AL. FRAMING
200x200mm VITRIFIED
WALL TILES (GLAZED)
CONC. COUNTER
800
600
300
PLAIN CEM. PLASTER
PAINT FIN.
PLAIN CEM. PLASTERED
PAINT FIN.
200x200mm GLAZED
WALL TILES
COUNTER SINK DET. PLAN
600
1900
200x200mm VITRIFIED
GLAZED TILES
5
A-7
DETAIL SECTIONSCALE 1:20 M
200x200mm VITRIFIED
GLAZED WALL TILES
600
70
100
100
15 25
50 300200
150
URINAL
WC
38 STAINLESS STEEL
GRAB BAR
300
3RD FLR. LVL.
3200
TOP OF BEAM LVL.
3225
1625
30050
3200
4500
900
FIN. GRD. LN.
CORRIDOR LVL.
TOILET LVL.
325
3200
3200
1600
1600
450450
200200
2
A-7
DET. SECTION OF MALE TOILETSSCALE 1:50 M
FEMALE
TOILET
FEMALE
TOILET
FEMALE
TOILET
STORAGE
STORAGE
W
3W
4
W
3W
4
W
3W
4
MALE
TOILET
MALE
TOILET
MALE
TOILET
W
3
WC 780
3
A-7
DETAIL OF COUNTER SINKSCALE 1:20 M
DETAIL SECTIONSCALE 1:20 M
DET. SECTIONSCALE 1:20 M
LAV
WC
W
3
W
3
WC WC WC
WC WC WC
1600
A-8
8
1000
1600
1800
100
200 20060
PLAIN CEMENT PLASTER
PAINT FINISH
200x200mm
VITRIFIED WALL
TILES ( GLAZED )
CORRIDOR LVL.
W
3
W
3
6mm THK. MARINE
PLYWOOD CEILING ON
50x50mm CEILING JOIST
@600mm OC BW.
w/10mm BAR HANGEREMBEDDED ON SLAB
@1200mm OC. BW.
150
TOILET LVL.
TOILET LVL.
GROUND FLOOR
2nd FLOOR
3rd FLOOR
TOP OF ROOF BEAM
13195
650
9425
9000
1000
1000
1000
802
654
392
1452
40
1000
1000
1000
1000
1000
1000
650
4175
650
80
500
268
654
80
1525
650
150
650
350
150mM THK. CHB
PLASTER FIN. w/40mmGROOVE @1040mm OC &
10mm REINF. BAR
@600mm OC. BW.
PLASTERED PAINT FIN.
150mm THK. CHB
PLASTERED PAINT FIN.
150mm CHB
GM
A
C AR
ES
CONCRETE COLUMN
3315
1000
1000
1000
40
1000
1000
1000
1000
1000
1000
DET. SECTION
CEM. PLASTERED FIN.
6" THK CHB PEDIMENT
1525
A-7 SCALE
7a
783
200
1:50 M
TOP OF ROOF BEAM
3200
3200
3200
6a
A-7
DET. OF FACADE PEDIMENTSCALE 1:50 M
7
A-7
3919
DET. SECTIONSCALE 1:20 M
7b
A-7
4
A-7
7a
A-7
7b
A-7
6a
A-7
(PROVIDE MANHOLE)
1500
FFLFFL
100284
800
183100
1500
650
R746
FFL
300
300
PIPE CHASE
PIPE CHASE
PIPE CHASE
OLIVER R. HERNANDEZ
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED
RAMON C. BACANI
CHIEF, PFSED-OPS
DepED
UNDERSECRETARY
DepED
DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
-
SCALE :
10
A-8 1:20 MTYPICAL DETAIL OF
BALCONY RAILINGSCALE
9
A-8 AS SHOWN
1:50 M
SECTION
700
SCALE
C150
100mm CHB CONC.
50
THIRD FLOOR LEVEL
RAILING W/ PLAIN CEM.PLASTER PAINT FIN.
SCALE 1:20 M
SPOT DET.
EVERY 1200mm
PAINT FINISH
W/ 25mm SQ. BAR STEEL BRACKET @
SCHED. 40 RAILING
50mm B.I. PIPEC
200
A-8
13
SCALE : 1 : 10 M
275
275
325 5050
575 575
1150
25x25mm WOOD VENT
PROVIDE INSECT SCREEN
NOT
8
A-8 SCALETO
GRAVEL BEDDING
DAMP PROOFING
POLYETHYLENE SHEET
CONCRETE SLAB
50
175
SPOT DETAIL1:5 M
4
A-8 SCALE
50
5
A-8
50
900
900
HANDRAIL DETAIL
1:5 M
HANDRAIL @150mm O.C.
WELDED TO G.I. PIPE
19mm SQUARE BAR
175
100
7
A-8 SCALE
50
SCALE
3
A-8 1:5 M
300
2
A-8
168
168
50
1:20 M
DETAIL SECTIONSCALE
LANDING F.F.L.
ANCHORED @ R.C. STAIR
SCHEDULE 40
50mm G.I. PIPE
(PAINT FINISH)
A-8
3
W A L L
6
A-8
CRASH RAILINGSCALE 1:20 M
ANCHORED @ R.C. STAIR150
SPOT DETAIL1:20 MSCALE
200
5050mm G.I. PIPE
SCHEDULE 40
(PAINT FINISH)
19mm SQUARE BAR
WELDED TO G.I. PIPE
HANDRAIL @150mm O.C.
50mm G.I. PIPE
SCHEDULE 40
(PAINT FINISH)
19mm SQUARE BAR
@150mm O.C. WELDED
TO G.I. PIPE HANDRAIL
(PAINT FIN.)
50mm G.I. PIPE
SCHEDULE 40
(PAINT FINISH)
19mm SQUARE BAR @150mm
O.C. WELDED TO G.I. PIPE
HANDRAIL (PAINT FIN.)
50mm G.I. PIPE
SCHEDULE 40
PAINT FINISH
19 mm SQUARE BAR
ANCHORED TO THE
WALL (PAINT FIN.)
50mm G.I. PIPE
SCHEDULE 40
(PAINT FINISH)
19 mm SQUARE BAR
ANCHORED TO THE
WALL (PAINT FIN.)
38mm STAINLESS
STL. GRAB BAR
7000
200x200mm VITRIFIED
GLAZED WALL TILES
1625
3200
FINISHED GRADE LINE
3200
325
6
STORAGE
3800
SECTION OF STAIR
2000
1
A-8 SCALE
FEMALE
1:50 M
3
2
4
5
CORRIDOR1
10
W-412
11
14
15
13
9
8
7
CORRIDOR
7000
A2500
B C
50mm G.I. PIPE
SCHEDULE 40 PAIN. FIN.
SCHEDULE 40 PAIN. FIN.
50mm G.I. PIPE
3200
3200
CORRIDOR
TOP OF ROOF BEAM
STAIR, HANDRAIL & MISC. DETAILS
D
3
900
FR. 25x75mm
WD.FRAME S4S KD
TANG.
1125
16
17
18
19
6
3
2
4
5
1
10
12
11
14
15
13
9
8
7
16
17
18
19
1200
100
10mm @250mm
ON CENTER
675
100
12x12mm GROOVE
BEAM REBARS SEE
STRUCTURAL DETAIL
25x25 mm
WOOD VENT
PROVIDE INSECT
SCREEN
D
4
W-4
W-4
D
4
19mm SQUARE BAR
RAILING @150mm O.C.
WELDED TO G.I. PIPE
50mm G.G. PIPE SCH.
40 (PAINT FIN.)
900
168
50 300
950
A-8
14
1 : 10 MSCALE :
A-8
14
A-8
2
SPOT DETAIL
(CRASH RAILING)
50mm G.I. PIPE
SCHEDULE 40 PAIN. FIN.
25x25x2mm THK.
ANGULAR BAR
NOSING
6mm THK. MARINE PLYWOOD
CEILING ON 50x50mm CEILING.
JOISTS @600mm O.C. B/W(PAINT FIN.)
150
150
150
200x200mm VITRIFIED
GLAZED WALL TILES
200x200mm VITRIFIED
GLAZED WALL TILES
LAV
WC
CS
WC
CS
WC
CS
25x25x2mm THK.
ANGULAR BAR
NOSING
200x200mm
VITRIFIED WALL
TILES ( GLAZED )
9-RISERS@168mm
=1512mm
10-RISERS@168mm
=1680mm
9-RISERS@168mm
=1512mm
GROUND FLOOR
TOILET FIN. LINE
SECOND FLOOR
TOILET FIN. LINE
THIRD FLOOR
TOILET FIN. LINE
6mm THK. MARINE PLYWOOD
CEILING ON 50x50mm CEILING
JOIST @600mm 0N CENTER
BOTHWAYS W/ 10mm BARHANGER @1200mm OC. BW.
CONC. BEAM
QUARTER ROUND
MOULDING
6mm THK. ORD.
PLYWD. CEILING
(PAINT) ON 50x50mmCLG. JST. @600mm
OC BW
SEE TRUSS DET.
6mm THK. MARINE PLYWD.
CEILING (PAINT) ON 50x50mmCLG. JST. @600mm OC BW
A-8
12
SCALE 1 : 10 M
LANDING
LANDING
PIPE CHASE
5
A-8
A-4
5
SCALE 1 : 20 M
38mm TEKSCREW
C-PURLIN (SEE STRUC'LDETAIL)SAG ROD SEE
STRUCTURAL DETAIL
GA 26 GI GUTTER
PAINT FIN.
GA 26 GI STRAP
BASKET STRAINER
75mm PVC
DOWNSPOUT PAINT
FINISH
CEILING VENT (SEEDETAIL)
6mm THK. MARINE
PLYWOOD CEILING ON
50x50mm CEILING
JOIST @600mm BW
1000
6mm THK. ORD.
PLYWOOD CEILING W/6mm GROOVE ON
50x50mm CEILING
JOIST @600mm BW
(PAINT FIN.)
ROOF
BEAM
TOP CHORD SEE
STRUCTURAL DETAIL
5A
A-4
GA 26 GI GUTTER
PAINT FIN.
GA 26 GI STRAP
BASKET STRAINER
75mm PVC
DOWNSPOUT PAINT
FINISH
6mm THK. MARINE
PLYWOOD CEILING ON
50x50mm CEILING
JOIST @600mm BW
12x300mm FIBER CEMENT
FASCIA BOARD FIX W/METALSCREW ON STL. FRAME PAINT
FINISH
20x20X2mm ANGULAR
BAR FOR FASCIA BOARD
FRAME COATED WITH
PRIMER
GA 26 CORR. G.I.
ROOFING SHT. PAINT FIN.
COPPER RIVET
38mm TEKSCREW
OLIVER R. HERNANDEZ
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED
RAMON C. BACANI
CHIEF, PFSED-OPS
DepED
UNDERSECRETARY
DepED
DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
-
SCALE :
1
A-9
2400
2100
D-1
FFL
CLASSROOM
900
300
1 : 50 METERS
TOILET (CUBICLE)
300
1500
1200
2100
2100
D-2 TOILET D-3
300
TOILET (DISABLED)
800
D-4
800 900
600
TANGUILE PANEL DOOR ON 50X150
mm YACAL/GUIJO JAMB W/ FIXEDCLEAR GLASS TRANSOM COMPLETE
WITH HARDWARE AND ACCESSORIES
HOLLOW CORE FLUSH TYPE SWING
DOOR ON 50x50mm YACAL GUIJO
JAMB W/ MARINE PLYWOOD FACINGINSIDE AND ORDINARY OUTSIDE
COMPLETE W/ HARDWARE ANDACCESSORIES
HOLLOW CORE FLUSH TYPE SWING
DOOR ON 50x150mm GUIJO/YACALJAMB w/MARINE PLYWOOD FACINGINSIDE AND ORDINARY OUTSIDE
COMPLETE W/ HARDWARE ANDACCESSORIES PROVIDE KICK PLATE
SWING DOOR ON 50X100
YACAL/GUIJO DOOR JAMBCOMPLETE WITH HARDWARE
ACCESSORIES
STAINLESS STL.
KICKING PLATE
800
D-3a
LOUVER DOOR ON 50X100
YACAL/GUIJO DOOR JAMBCOMPLETE WITH HARDWARE
ACCESSORIES
1 : 20 METERS
20
220
60
20
20 2 20
60 20
20 2 20
60 20
7
3
10
2A-9 SCALE :
1 : 10 METERS
4A-9 SCALE :
35
32
SEALANT
3x35mm Z-BAR
PUTTY
CLEAR GLASS
HINGE
MULLION
SPOT WELDFRAME
MEETING RAIL
25
25
WINDOW JAMB
WINDOW JAMB
FULL WELD
FULL WELD
10mm BAR
PVC PIPE
10mm BAR
PVC PIPE
SEALANTZ-BAR FRAME
CLEAR GLASS
PUTTY
I-BAR MULLION
SPOT WELD
Z-BAR
ANGLE PIN
CHB GROUT
WINDOW JAMB
25
25
25
25
16
1.6
35
1 : 10 METERS
3A-9 SCALE :
10mm BAR
PVC PIPE
SEALANT
SEALANTBEAM
3x25mm Z-BAR
PUTTY
CLEAR GLASS
FRAME
3x25mm Z-BAR
TRANSOM
BAR
1.6x35mm CONT.
WEATHERING
HINGES
CLEAR GLASS
GLAZING PIN
PUTTY
VENT
HINGE
WELD GROUT
WINDOW SILL
ANGLE PIN
CHB
FRAME
4EQ. PARTS=
4000
1199
300
1500
2400
1100
3 EQUAL PARTS = 2000
600
900
1200
2400
4EQ. PARTS
4000
300
400
300
2400
2400
600
600
9502 EQUAL PARTS =
2000
FF F F F
W-1 CLASSROOM
STEEL CASEMENT WINDOW
WITH FIX GLASS
W-2 CLASSROOM
JALOUSIE WINDOWS WITH CLEAR GLASS
BLADES ON STANDARD ALUMINUM CASING
ON 50X150mm YACAL/GUIJO JAMBCOMPLETE WITH HARDWARE AND
ACCESSORIES & STEEL GRILLS ON 300mm
FROM FLOOR FIN.
W-3 TOILET
STEEL AWNING WINDOW
W-4 TOILET
STEEL AWNING WINDOW
DOOR & WINDOW SCHEDULE, DETAILOF STEEL CASEMENT
SPOT DETAIL
(CRASH RAILING)
MANUAL LOCK
2100
2000
1800
RQD: 30 SETS
LOC: REAR ELEVATION
1000 1000 1000 1000
1000
OLIVER R. HERNANDEZ
NQM
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED
RAMON C. BACANI
CHIEF, PFSED-OPS
DepED
UNDERSECRETARY
DepED
DEPARTMENT OF EDUCATION
REPUBLIC OF THE PHILIPPINES
MERALCO AVENUE, PASIG CITYPHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
RECOMMENDING APPROVAL : SHEET NO:
REP. ACT 545
OWNER :
SHEET CONTENTS :
DEPARTMENT OF EDUCATION
DepED
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
PROJECT NO:
DATE :
PROJECT TITLE :
LOCATION :
DESIGNED BY:
CHECKED BY:
ENCODED BY:
NOTE:
DESIGNER: CHECKED BY : RECOMMENDING APPROVAL :
EDpeD
NOI S
I VIDG
NIREE
NIGNE
SLOOHCSDNASEITILICA F
L ACI SYHP
APPROVED BY :
-
TG-2
4500
TG-1
C-3
F-3
C-2F-2
4500450045004500
BOTHWAYS
SPACED AT 400
WITH 10mm
SLAB ON FILL
100mm THICK
TG-1
TG-2
TG-1
TG-2
TG-1
TG-2
C-1
F-1
1:100 M.SCALE :
S-1
A
TG-3 TG-3 TG-3 TG-3 TG-3
TG-3TG-3TG-3TG-3TG-3
TG-3TG-3TG-3TG-3TG-3
45004500
TG-1
TG-2
TG-3 TG-3
TG-3TG-3
TG-3TG-3
M
S-1
B SCALE NTSSCALE
C
(SEE SCHEDULE)
L
PLAN
t
SECTION
NGL
100 mm THICK
GRAVEL BEDDING
2ND FLOOR LEVEL
FOUNDATION LEVEL TO
2ND FLOOR LEVEL TO
3RD FLOOR LEVEL
3RD FLOOR LEVEL TO
ROOF DECKLEVEL
LEVEL C-3
C-1 C-2
MAIN BAR:
TIES : 10 mm
150mm TO CENTER
1@50, 8@75, REST @
8-20mm
TIES : 10 mm
MAIN BAR:
8-20mm
1@50, 8@75, REST @150mm TO CENTER
350
350
350
350
WIDTH
FOOTING DIMENSIONS (mm)
(W)
2500
MARK
FOOTING
LENGTH
(L)
F-3
F-2
F-1
2800
1700
11 - 20mm 1500 300 SQUARE FOOTINGSQUARE FOOTING
12 - 20mm
DEPTH
(D)
1500
1500
350
300
(t)
ThicknessBAR YBAR X
REINFORCEMENT
SQUARE FOOTINGSQUARE FOOTING
SQUARE FOOTINGSQUARE FOOTING
REMARKS
12 - 20mm
11 - 20mm 2500
2800
1700 9 - 16mm 9 - 16mm
SCALE :
D
S-11 : 25 M
REINFORCEMENT OF
SEE SCHEDULE FOR
C-3
G-4/G-6
LENGTH
2ND FLOOR LEVEL
G-5/G-7SEE DEV'TLENGTH
SEE DEV'T
NOTE:
MEMBERS.
C-4
2ND FLOOR LEVEL
G-5/G-7
S-1
TG-2
4500
TG-3
TG-3
TG-3
TG-1
TG-2
TG-1
TG-2
TG-1
TG-2
TG-1
TG-2
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
1@50, 10@75, REST @150mm TO CENTER
14-20mm
TIES : 10 mm
MAIN BAR: MAIN BAR:
TIES : 10 mm
12-20mm
150mm TO CENTER
1@50, 10@75, REST @
350
400
350
400
MAIN BAR:
TIES : 10 mm
150mm TO CENTER
1@50, 8@75, REST @
12-20mm
350
350
MAIN BAR:
TIES : 10 mm
150mm TO CENTER
1@50, 8@75, REST @
12-20mm
350
350
TG-2
TG-1
4500
TG-3 TG-3
TG-3TG-3
TG-3TG-3
4500
TG-3
TG-3
TG-3
TG-1
TG-2
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
TG-2
TG-1
4500
TG-3
TG-3
TG-3
4500
TG-3
TG-3
TG-3
TG-1
TG-2
C-3
F-3
C-2F-2
C-1
F-1
C-3
F-3
C-2F-2
C-1
F-1
FOUNDATION PLAN, DET. OF FOOTING, TIE BEAM,ELEV. OF COL. SCH. FOOTING & COLUMN
W
L
Y-BARS
X-BARS
X-BARS
Y-BARS
100
D
TIE BEAM
PC-1 PC-1TG-3
PC-1PC-1
TG-3
3800
29502950
A. CONCRETE f'c = 20.685 Mpa (3000psi), minimum compresive strength of concrete a 28 daysunless otherwise specified.
fy = 275.8 Mpa (40,000 psi), minimum yield strength of reinforcing bars unless otherwise specified.
SBP = 95.706 Kpa (2000psf) was used in the design for all footings.
No footing shall rest on fill.
NSCP 2001, ACI 318-89, AISC ((th Edition)
B. REBAR
C. FOUNDATION
REFERENCES
WF
WF
WFWF
WF
WF
WF WF
WF
WF
WF
WF
1:25
NGL
100
300
500
1500
1150
250
300
TOP BARS
BOTTOM BARS
10mm STIRRUPS
1@50, 6@100, REST@200
RAMPRAMP
9500
7000
2500
1525
1400
5301
1300
1525
5301
1300
MAIN BAR:
TIES : 10 mm
150mm TO CENTER
1@50, 8@75, REST @
8-16mm
350
350
MAIN BAR:
TIES : 10 mm
150mm TO CENTER
1@50, 8@75, REST @
8-16mm
MAIN BAR:
TIES : 10 mm
150mm TO CENTER
1@50, 8@75, REST @
8-16mm
350
350
350
350
CHIEF, PFSED-OPS
OLIVER R. HERNANDEZ
DepED
MMC
LGPLUIS G. PURISIMA
HEAD, PLANNING AND DESIGN UNIT
PFSED-DepED
BERNADETTE N. AQUINO
STRUCTURAL CONSULTANT, PFSED-DepED
MAXIMO M. CALBANG
PDO III, PFSED-DepED UNDERSECRETARY
RAMON C. BACANI
DepED
150 mm CDP sloped @ 2%
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
25mm
DEP
SEPTIC TANKLINE
150 mm CDP sloped @ 2%
100mm PVCSP
150 mm CDP sloped @ 2%
200 mm
C
DP
sloped @ 2%
TO MAIN DRAINSYSTEM
CB CB
RAMP
UP
150 mm
C
DP
sloped @ 2%
FD
COCO75mm PVCWP
SD
10
0m
m
PV
CW
P
RISER
CO
CO
FDWCFD
WCSS
CO
LAV
WCFD
150 mm CDP sloped @ 2%
CB