Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12...

8
No. Supplier Agency 1 iServe Customer Management Court of Appea ls Solutions, Inc. Stone of David Tactica l 2 Equipment Company and JOAVI Philippine National Police Philippines Corporation .. 3 PDS Industries Corporation Development Bank of the Philippi nes (DBP) Philippine Amusement 4 Magnaye Electri ca l Servi ces and Ga ming Corporation Republic of the Philippines G OVERNME NT PROC U REMENT POliCY SOARD TEC HNI CAL SUPP ORT O FFI CE CONSOLIDATED BLACKLI STING REPORT as of 4 January 2018 Project Offense Application Management of Ou tside force majeure, failure to deliver and perform the out-put and Attendance and leave Monitoring deliverables within the specific period System Integrated wit h Biometrics both in the contract and extension Ti mekeepi ng Devices granted. Failure of the Contractor to fully and Supp ly and Delivery of 743 Units Sub- fa it hfull y comply with its contractual Machine Gun Supply Contract dated obligations without valid cause due to December 03, 2015 Public Bidding No. non-delivery<Jf the 743 units Sub- PNP-15-23G machine Gun despite several request for extension of time to deliver. Supply and Delivery of Va rious Submission of eligibility r equirements Corporate Giveaways for the containing false information or Development Bank of t he Philippines falsified documents. (DBP) Submission of Annual Income Tax Repair of PAGCOR's existing "Bal dor" Return for CY 2015 and Tax Clearance Water Pump under ITB No. SVP 16- Certificate which was identified by the 00079 Bureau of Internal Revenue to be "Spurious". Sanction Date End Date Imposed Blackli sted One (1) Year 2/9/2017 2/9/2018 Blacklisting One (1) Year 2/27/2017 2/ 27/2018 Blacklisting One (1) Year ?./7/2017 3/6/2018 Blacklisting One (1) Year 3/9/2017 3/8/2018 Blacklisti ng

Transcript of Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12...

Page 1: Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12 SANKAI Konstrak and Supply Province of Northern for Partially and Totally Damaged

No. Supplier Agency

1 iServe Customer Management

Court of Appea ls Solutions, Inc.

Stone of David Tactica l

2 Equipment Company and JOAVI Philippine National

Police Philippines Corporation

..

3 PDS Industries Corporation Development Bank of

the Philippines (DBP)

Philippine Amusement

4 Magnaye Electrica l Services and Gaming

Corporation

Republic of the Philippines

G OVERNMENT PROC UREMENT POliCY SOARD

TECHNICAL SUPPORT O FFICE

CONSOLIDATED BLACKLISTING REPORT as of 4 January 2018

Project Offense

Application Management of Outside force majeure, f ailure to

deliver and perform the out-put and Attendance and leave Monitoring

deliverables within the specific period System Integrated with Biometrics

both in the contract and extension Timekeeping Devices

granted.

Failure of the Contractor to fully and

Supply and Delivery of 743 Units Sub- faithfully comply with its contractual

Machine Gun Supply Contract dated obligations without valid cause due to

December 03, 2015 Public Bidding No. non-delivery<Jf the 743 units Sub-

PNP-15-23G machine Gun despite several request

for extension of time to deliver.

Supply and Delivery of Various Submission of eligibility requirements

Corporate Giveaways for the containing false information or

Development Bank of t he Philippines falsified documents.

(DBP)

Submission of Annual Income Tax

Repair of PAGCOR's existing "Baldor" Return for CY 2015 and Tax Clearance

Water Pump under ITB No. SVP 16- Certificate which was ident ified by the

00079 Bureau of Internal Revenue to be

"Spurious".

Sanction Date End Date

Imposed Blacklisted

One (1) Year 2/9/2017 2/9/2018

Blacklisting

One (1) Year 2/27/2017 2/ 27/2018

Blacklisting

One (1) Year ?./7/2017 3/6/2018

Blacklisting

One (1) Year 3/9/2017 3/8/2018

Blacklisting

Page 2: Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12 SANKAI Konstrak and Supply Province of Northern for Partially and Totally Damaged

. Supplier Sanction Date

End Date No. Agency Project Offense Imposed Blacklisted

Per Accomplishment Report on March

2016 after a year since the Notice to

Proceed issued on February 2015,

5 OGF Construction and Supplies City Government of Construction of Barangay Hall at there is a negative slippage of- One (1) Year

3/15/2017 3/ 15/2018 Zamboanga Campo Islam 72.76%. The contractor failed to Blacklisting

comply several directives to complete

the project and it was charged of

abandonment since June 2016.

Failure of the contractor to fully and

Stone of David Tactical faithfully comply with its contractual

Equipment Company and JOAVI Philippine National Supply and Delivery of 201, 114 Units obligations without valid cause for the

One (1) Year 6

Philippines Corporation and Ad Police Magazine for Caliber 5.56mm Assualt non-delivery of the 201, 114 units

Blacklisting 3/20/2017 3/20/2018

Lib International Sa les, Inc. Rifle Magazine for Caliber 5.56mm Assault

Rifle despite several request for

extension of time to deliver.

Due to the Contractor's fault and

while the project is on-going it has

incurred negative slippage of fifteen

K2rjllndustrial Sales and Repainting of the Exterior Walls of the percent (15%) or more; The

One (1) Year 7 Sandiganbayan Contractor did not execute the Wor ks 4/10/2017 4/10/2018

Services, Co. Sandiganbayan Centennial Building in accordance with the contract or

Blacklisting

persistently or flagrantly neglected t o

carry out its obligations under the

contract.

Philippine Amusement Supply and Delivery of Ten (10) Lots Termination for Default, failure to

8 SAIKO International Trading

and Gaming Various Beverages under ITB No. PB16 deliver or perform any or all of the One (1) Year

4/19/2017 4/ 18/ 2018 Corporation

Corporation 034 (Lot 5 and 6) Goods within the period specified in Blacklisting

the contract . 5

Page 3: Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12 SANKAI Konstrak and Supply Province of Northern for Partially and Totally Damaged

No. Supplier Agency Project Offense Sanction Date

End Date Imposed Blacklisted

As stated in BAC Resolution No. 01-05-

Consulting Services for Advisory, 17, the offense committed by the

Armed Forces of the Review and Design Services of 15th 5 consulting firm is that they failed to

9 ASCOTI Pacific Consultant Inc. Philippines- Philippine W Transfer at Lumbia Airport, complete the project within the One (1) Year

5/ 16/ 2017 5/ 16/2018

Air Force (AFP-PAF) Cagayan de Oro City of 15th 5 W in prescribed period stipulated in the Blacklisting

the amount of P8,367, 744.00 contract despite of the continuous

correspondence between the PAF and

the Company.

National Police Construction ofTolosa MPS Bldg Violation of Section 69 (f) of the

Revised Implementing Rules and

10 Ruby Lim Construction and Commission- Philippine Project; Construction of Carigara MPS Regulations of Republic Act 9184 and

Two (2) Years 5/18/2016 5/ 18/ 2018

Supplies Incorporated National Police ( Police Bldg Project; Construction of Abuyog Item 4.2 (g) of GPPB Resolution No. Blacklisting

Regional Office VIII) MPS Bldg Project 09-2004

As stated in BAC Resolution No. 2017-

20, the two construction companies

Supply/Delivery of Materials for violated Section 69.1 of Revised IRR of

Municipality of Bobon R.A. 9184. The two companies

11 MIAPE Construction and Supply Province of Northern Emergency Shelter Assistance (ESA) separately submitted false

One (1) Year 5/ 19/ 2017 5/ 19/2018

for Partially and Totally Damaged Blacklisting

Samar Houses ofTyphoon Ruby information/falsified documents in

their Technical Documents in their bid

documents for the competitive

bidding of the procuring entity.

As stated in BAC Resolution No. 2017-

20, the two construction companies

Supply/Delivery of Materials for violated Section 69.1 of Revised IRR of

Municipality of Sobon Emergency Shelter Ass istance (ESA) R.A. 9184. The two companies One (1) Year

12 SANKAI Konstrak and Supply Province of Northern for Partially and Tota lly Damaged separately submitted fa lse Blacklisting

5/19/ 2017 5/19/2018

Samar Houses of Typhoon Ruby information/ falsified documents in

their Technical Documents in their bid

documents for the competitive

bidding of the procuring entity.

..

Page 4: Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12 SANKAI Konstrak and Supply Province of Northern for Partially and Totally Damaged

Supplier Agency Sanction Date

End Date No. Project Offense Imposed Blacklist ed

As stated in BAC Resolution No. ORO-Joint Venture between the

Procurement of One (1) Lot M35 001-2017, t he Joint Ventures between

Fourth Dimensions Inc. (FDI) and the Fourth Dimensions Inc. (FDI) and R One(1) Year 13

R World Access Trading Inc. Philippine Army Spare Parts with an ABC of Twenty

World Access Trading Inc. (Autotito) Blacklisting 6/9/2017 6/9/2018

(Autotito) Million Pesos (P20,000,000.00)

submitted a false Tax Clearance

Certificate

Department of Submission of eligibility requirements

One(1) Year 14 O.K. Jocson Construction

Transportation (DOTr) San Vicente Port Development project containing false information or

Blacklisting 6/16/2017 6/ 15/2018

fa lsified documents

Department of Civil Works for Lot 16 (MIAA-NCR) of Poor performance arising from its

15 AOA Global Construction Transportation and the "Kayo and Boss Ko" Toilet fault or negligence, which resulted in Two (2) Years

6/28/2016 6/27/2018

Communications Facilities Improvement Project incurring a negative slippage of more Blacklisting

than fifteen percent (15%)

Acquisition of 44,080 units of Force Failure to deliver the 44,080 units of

16 Colorado Shipyard Corporation Department of National Protection Equipment for the Force Protection Equipment for the One (1) Year

7/19/2017 7/19/2018 Defense Philippine Army and Philippine Marine Philippine Army and Philippine marine Blacklisting

Corps Corps

Department of

17 Marknest Construction and Education, Division of Repair of Three Classroom Building

Failure to accept Notice of Award One (1) Year

8/1/2017 8/1/2018 Trading Pampanga (Region Ill, under the CY 2016 BEFF Blacklisting

City of San Fernando)

City of Lapu-Lapu, General Rehabilitation of 1 Unit of Termination of Contract for the

One (1) Year 18 SSVF-ADD Trading General Rehabilitation of 1 Unit of 8/12/2017 8/11/2018

Office of the Mayor LG2H Mitsubishi Road Grader LG2H Mitsubishi Road Grader

Blacklisting

... I

Page 5: Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12 SANKAI Konstrak and Supply Province of Northern for Partially and Totally Damaged

No. Supplier Agency Project Offense Sanction Date

End Date Imposed Blacklisted

Unsatisfactory progress in the delivery

of Goods arising from her fault or

Supply, Handling, Transport and negligence on which the ten percent

19 Angelita Amat Plant Nursery and Philippine Coconut

Delivery of 344,000 pieces of good (10%) cumulative amount of One(1) Year

8/24/ 2017 8/23/2018 Agri-Trading Authority

quality Coconut Seedlings. liquidated damages has reached, as Blacklisting

provided for in Section 68 ·of the

Revised Implementing Rules and

Regulations of the Republic Act 9184

Unsatisfactory progress in the delivery

of Goods arising from her fault or

Supply, Handling, Transport and negligence on which the ten percent

Philippine Coconut (10%) cumulative amount of One (1) Year 20 C:oronc;do's Farm Plant Nursery

Authority Delivery of 414,150 pieces of good

liquidated damages has reached, as Blacklisting 8/24/2017 8/ 23/ 2018

quality Coconut Seedlings. provided for in Section 68 of the

Revised Implementing Rules and

Regulations of the Republic Act 9184

Supply and Delivery of Construction Fa ilure to deliver all the Goods w ithin One (1) Year

21 ARMTEX Sales Hardware Philippine Navy Materials for the Rehabilitation of the period specified in the contri!ct Blacklisting

8/ 25/ 2017 08/ 25/2018

Capt Moya boat Landing

Supply and Delivery of 840 pes For failure on the part of the Supplier

Philippine Army Batteries for Handheld Radios under to deliver the specified item within One (1) Year

8/25/ 2017 8/ 25/2018 22 iOne Resources, Inc Contract Number SIG-251-12-12 the maximum allowable delivery Blacklist ing

amounting to PhP11,075,400.00 period.

Supply and Delivery of two (2) sets of

generator 75KVA, 3-phase 240V 60HZ Failure to deliver the specified item One (1) Year

23 Motie 's Enterprises Philippine Army with soundproofing enclosure and within the maximum allowable Blacklisting

8/25/2017 8/25/2018

350A, 2PDT Manual Transfer Switc;h, delivery period

240V 60HZ Fusible )

Page 6: Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12 SANKAI Konstrak and Supply Province of Northern for Partially and Totally Damaged

Supplier Offense

Sanction Date End Date

No. Agency Project Imposed Blacklisted

Since this is t he second offense ~

committed by AOA Global

Construction, disqualification for a

period of TWO (2) YEARS, counted

Civil Works for lot 16 (MIAA-NCR) of from the date of approval of this

24 AQA Global Construction Department of hte ' Kayo ang Boss Ko" Toilet

Order, from participating in the Two (2) Years 9/14/2016 9/14/2018

Transportation Facilities Improvement Project. procurement activities of all Blacklisting

government agencies.

2. Forfeiture of the performance

security submitted by AOA Global

Construction for the project.

Failure by the cont!actor to fully and

faithfully comply with its contractual

obligations without valid cause, or

Suppft and Door to Door Delivery of failure by the contractor to comply

Department of Technical, Vocational and livelihood " with any written lawful instructions

25 SHANDAU Enterprises Education- Cordillera (TVl) Tools and Equipment, lot 3 - pursua nt to the implementation of One (1) Year

9/25/2017 9/24/2018

Bread and Pastry (NC II) to Various contract; Unsatisfactory or inferior Blacklisting

Administrative Region Public Senior High Schools in DepEd- quality of goods; willful or del iberate

CAR non-performance of the project or

contract by the contractor resulting to

substantial breach thereof without

lawful and/ or just cause.

Philippine Amusement Services for the :Preventive Termination for Default, Failure to

Greenworth Industrial Services, Maintenance of Water Purification

One (1) Year

26 and Gaming System at lmus Complex for Three (3) deliver or perform any other Blacklisting

10/23/2017 10/22/2018

Inc. Corporation obligation under the contract

Years under ITB No. COR 16-00095 I,

Page 7: Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12 SANKAI Konstrak and Supply Province of Northern for Partially and Totally Damaged

No. Supplier Sanction Date

End Date Agency Project Offense Imposed Blacklisted

Failure to deliver or perform all the

Legaspi City Water Consultancy & Implementation Outputs and Deliverables within the

One(1) Year 27 The Positiveway Solutions, Inc. Services for the Establishment of an period(s) specified in the contract, or 11/ 15/2017 11/15/2018

District Blacklisting Enterprise Resource Planning System within any extension thereof granted

by the LCWD.

28 Kaisa Consulting Company, Inc. Philippine Deposit

Loans Monitoring System Project Termination of Contract due to Fault One (1) Year

11/16/2017 11/15/2018 Insurance Corporation of the Contractor Blacklisting

Procurement of Fusidate Sodium 20%

Department of Health · Ointment 15G Tube under IB No. 2015

Default in delivery/performance of Two (2) Years 29 999 Seth Pharmaceutical Inc. 109 with Purchase Order No. GOP- 3/31/2017 3/31/2019

Central Office 2015-111 with a Contract Price of

contractual obligations. Blacklisting

Php4,239,000.00

Department of Social a. Failure to post furnish the agency

Welfare and Purchase of Supplementary Feeding copy of Performance Bond within the

30 Shan Dau Enterprises Development· Program Personalized Advocacy prescribed time. Two (2) Years

7/31/2017 7/ 31/2019

Cordillera Materials (ITB No. 2017-DSWD-CAR- Bl~cklisting

Administrative Region 01 b. Failure to enter into contract within

the prescribed time.

Unsatisfactory progress in the delivery

of Goods arising from her fault or

Supply, Handling, Transport and negligence on which the ten percent

31 Angelita Am at Plant Nursery and Philippine Coconut

Delivery of 405,450 pieces of good (10%) cumulative amount of Two (2) Years

8/24/2017 8/23/2019 Agri-Trading Authority

quality Coconut Seedlings. liquidated damages has reached, as Blacklisting

provided for in Section 68 of the

Revised Implementing Rules and

Regulations of the Republic Act 9184

Department of Science Supply of Labor and Materials for the Submission of bids that contain false

!Serve Customer Management and Technology· Construction, Rehabilitation and information or falsified documents ...

Two (2) Years 32 Metals Industry Restoration of Rooms at Basement, in order to influence the outcome of 10/9/2017 10/9/2019

Solutions, Inc. Research & 1st, 2nd and 3rd Floors of Gold eligibility screening or any other stage

Blacklisting

Development Center Building - Negotiated of the public bidding -

'--·

Page 8: Republic of the Philippines G OVERNMENT …€¦ · R.A. 9184. The two companies One (1) Year 12 SANKAI Konstrak and Supply Province of Northern for Partially and Totally Damaged

.; CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES

CONSOLIDATED LIST OF BLACKLISTED CONSTRUCTORS AS OF 31 DECEMBER 2017 NAME OF CONSTRUCTOR NAME OF AMd LIC. NO. UPTO AGENCY

A. P . Torres, B.J . Contractors Antonio P. Torres UL-0001 AB Present NHA Al-alamiah Construction Nassib D. Sampaco 24075 AB * NPC Al-alamiah Construction Nassib D. Sampaco 24075 AB * NPC Alpha Trine Motors Corporation Rodolfo Mendoza UL-0002 AB * MWSS AQA Global Construction Miguel ito Alberto F. Achurra 33756 AB 6/27/2018 DOTC AQA Global Construction Miguelito Alberto F. Achurra 33756 AB 9/14/2018 DOTr ARPEE Construction & Supply Ruben A. Pasion 17200 AB • DepEd B.E. Construction Ma. E!ena A. Malaga 2730 AB • DPWH Constructive Builder, Inc. Benjamin C. Yu 5110 AB Present NHA O.K. Jocson Construction Danilo K. Jocson 6896 AB 6/15/2018 DOTr E.S. A lmuete Construction Efren S. Almuete L-5131 AB NIA FBARON Construction and Supply, Inc. Feliciano B. Baron, Ill 37265 AB 2/28/2018 MIAA F.N.A. Construction Francisco N. Alincastre 4577 AB • DepEd Francis Lim Construction Francisco H. Lim 8037 AB Present NIA Geety Realty & Development Corp. Andrea T. Tubeira 30447 RL 1/28/2019 PCAB Infra-Structural Construction Eleuterio C. Perez 491 AB • MWSS !Serve Customer Management Solutions, Inc. Philex Wilson Yao Go 40543 AB 10/9/2019 JOST-MIRDC J. R. Maliwanag Trading and Construction Joel R. Maliwanag 17648 AB * JM Yalung Construction Inc. Marie Liz B. Yalung 39620 SL 1/25/2018 Janice Engineering Construction Jorge T. Maliuanag 10888 AB *

Marknest Construction and Trading Mark Nestor S. Pineda 16818 AB 08//01 /2018

OGF Construction and Supplies Olyver G. Fortich 35027 AB 3/1.5/2018

R. T. Katigbak Construction Corporation Ricardo T. Katigbak 8150 AB • Ramona Mining and Development Corp. Juanita T . de Veyra 6710 AB • River Concrete Construction and Development

George 0 . Matunog, Jr. 33895 AB 3/29/2019 Corporation Ruby Lim Construction and Supplies

Ruby D. Lim 11685 AB 5/18/2018 Incorporated RVRU Builders and Trading Ranhi V. Rubiano 0. DL 1/25/2021 S & W Construction and Gen. Merchandise Simeon Antique 10557 AB Present Sarbet Builders Saripoden T. Alonto 26905 AB * Square 'R' Builders and Development Corp. Serafin H. Ramirez, Sr. 9516 AB Present Stern Builders Corporation Servillano R. dela Cruz 3379 AB * Suzuka Construction Co., Ltd. Tamotu Suzuka OEC0-13862 AB • Villcruz Construction and Supply Leonardo F. Villanueva 12947 AB

- nothing follows -

Legend: * Constructors with expired suspension are still included in the list due to the non-issuance of

a delisting order by the proponent/source agency AB AMO DL JV NW Present RL SL SP UL

Agency Blacklisted Authorized Managing Officer Denied PCAB License Joint Venture New Applicant (no PCAB license yet) Conditional Blacklisting (Conditions not yet complied) Revoked PCAB License Suspended PCAB License Special PCAB License Unlicensed (not registered with PCAB)

For more information or details regarding this report, please call up the PDCB Secretariat at the · following telephone numbers: 896-1801 or 897-0791 or e-mail us at [email protected]

DPWH PCAB DPWH

DepEd-Pampanga

Zamboanga City

MWSS NHA

Mun. of Calamba

PNP-Region 8

PCAB PPA NPC DOH

MWSS DPWH DPWH

Page 1 of 1