Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
i
Table of Contents
Part I: Existing Situation ................................................................................................................ 1
1. Introduction .......................................................................................................................... 1
1.1. Objectives of Comprehensive Mobility Plan (CMP) ............................................................. 2
1.2. Scope of CMP ................................................................................................................. 2
2. City Profile ............................................................................................................................ 3
2.1. General Back Ground ...................................................................................................... 3
2.2. Socio-Economic Profile .................................................................................................... 3
3. Review of Landuse Systems ................................................................................................... 6
3.1. Existing Reports and Documents ..................................................................................... 6
3.2. Land use Patterns and Development Trends .................................................................... 6
3.3. Land Use Development Policies and Strategies ................................................................. 8
4. Existing Transport Systems .................................................................................................. 10
4.1. Existing Studies, reports and proposals .......................................................................... 10
4.2. Existing Transport Infrastructure ................................................................................... 10
4.3. Urban Goods Movement ............................................................................................... 13
4.4. Traffic Safety and Enforcement ..................................................................................... 13
4.5. Legal framework and Standards .................................................................................... 13
4.6. Institutional and Financial Situation ............................................................................... 14
4.7. Environmental and Social Conditions ............................................................................. 14
4.8. Other Relevant Issues .................................................................................................. 14
5. Analysis of Existing Traffic/ Transport Situation ..................................................................... 15
5.1. Traffic Surveys ............................................................................................................. 15
5.2. Development of Base Year Transport Model ................................................................... 21
5.3. Analysis of Traffic Characteristics -Base Year Travel pattern ............................................ 29
5.4. Analysis of Vehicular Traffic and Bottlenecks .................................................................. 31
5.5. Analysis of Social Considerations ................................................................................... 35
5.6. Identification of Issues ................................................................................................. 36
5.7. Comprehensive Analysis of Urban Transport Environment ............................................... 37
PART II: DEVELOPMENT OF URBAN LANDUSE AND TRANSPORT STRATEGY .................................. 40
6. Development of Vision and Goals .......................................................................................... 40
6.1. The Vision .................................................................................................................... 40
6.2. Urban transport Development Strategies ....................................................................... 40
6.3. Goals Setting ............................................................................................................... 41
7. Future Urban Growth Scenarios ............................................................................................ 42
7.1. Urban Growth Scenarios in Master Plan ......................................................................... 42
8. FUTURE TRANSPORT NETWORK SCENARIOS ........................................................................ 46
8.1. Road Network Scenarios ............................................................................................... 46
8.2. Public Transport Development Split Scenarios ................................................................ 47
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
ii
9. Development of Urban Land Use and Transport Strategy ....................................................... 52
9.1. Evaluation of Urban Growth and Transport Network Scenarios ........................................ 52
9.2. Strategies for Landuse and Transport Systems Development .......................................... 53
PART III: PLANS AND PROJECTS ................................................................................................. 57
10. Public Transport Improvement Plan ................................................................................... 57
10.1. Bus Service Improvement Plan .................................................................................. 57
10.2. MRT Development Plans ........................................................................................... 58
10.3. Trunk and Feeder Public Transport network ............................................................... 60
10.4. ITS Applications ........................................................................................................ 61
11. Road Network Development Plan ...................................................................................... 68
11.1. Hierarchical Road Network ........................................................................................ 68
11.2. Arterial Road Construction/Improvement .................................................................... 68
11.3. Secondary Road Constructions/Improvement ............................................................. 72
11.4. From Lahori gate ...................................................................................................... 74
11.5. Intersection Improvements and Flyovers .................................................................... 78
11.6. Railway Crossing and Underpass ................................................................................ 81
11.7. Hawker Zones .......................................................................................................... 82
12. NMT Facility Improvement Plan......................................................................................... 83
12.1. Strategy for NMT Facility Improvement ...................................................................... 83
12.2. Pedestrian Facility Improvement ................................................................................ 83
12.3. Bicycle Plan .............................................................................................................. 84
13. Intermodal Facilities ......................................................................................................... 86
13.1. Bus Terminals........................................................................................................... 86
13.2. Bus-rail Interchanges ................................................................................................ 86
13.3. Development of Parking LOTS & Park and ride facilities .............................................. 86
13.4. Freight Management Plan .......................................................................................... 90
14. Regulatory and Institutional Measures ............................................................................... 91
14.1. Unified Metropolitan Transport authority .................................................................... 91
14.2. Traffic Impact Assessment Mechanism ....................................................................... 95
14.3. Regulatory Changes Required For Introduction of TDM Measures ................................ 98
14.4. Traffic Safety regulations .......................................................................................... 99
14.5. Parking Regulations ................................................................................................ 100
15. Fiscal Measures .............................................................................................................. 102
15.1. Fare Policy for Public Transportation and Parking ...................................................... 102
15.2. Subsidy Policy for Public Transport Operators ........................................................... 111
15.3. Taxation on Private Vehicles and Public Transport Vehicles ....................................... 112
15.4. Potential for Road Congestion Charging ................................................................... 113
16. Mobility Improvement Measures and NUTP Objectives ..................................................... 114
16.1. Introduction ........................................................................................................... 114
16.2. Summary of NUTP Objectives and the Proposed Measures ........................................ 115
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
iii
17. Social and Environmental Conditions ............................................................................... 116
18. Implementation Programs .............................................................................................. 117
18.1. List of Mobility Improvement Projects and Measures ................................................. 117
18.2. Selection of Priority Projects/Measures ..................................................................... 118
18.3. Implementation Agencies ........................................................................................ 120
18.4. Financing Options ................................................................................................... 121
19. Resources Mobilization ................................................................................................... 122
19.1. Public Private Partnership: ....................................................................................... 125
19.2. Urban Transport Fund ............................................................................................. 129
19.3. Municipal Bonds ..................................................................................................... 129
19.4. Central Government Schemes .................................................................................. 132
19.5. Betterment Charges ................................................................................................ 133
19.6. Lending .................................................................................................................. 134
ANNEXURE 1: Survey Questionnaires ......................................................................................... 136
ANNEXURE 2: Traffic and Travel Survey Data ............................................................................. 143
ANNEXURE 3: Roads Proposed for Improvement ........................................................................ 152
ANNEXURE 4: Cross Sections ..................................................................................................... 153
ANNEXURE 5: Hawker Zones ..................................................................................................... 154
ANNEXURE 6: Project Profile Sheets ........................................................................................... 158
ANNEXURE 7: Details of Stakeholder’s Workshop ........................................................................ 160
ANNEXURE 8: Compliance to Guidelines of National Disaster Management Authority NDMA ........... 171
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
iv
List of Tables
Table 2-1: Population of constituents Of LPA, Patiala ...................................................................... 3
Table 3-1: Land-use Distribution .................................................................................................... 6
Table 4-1: Major city roads and connecting cities .......................................................................... 10
Table 4-2: Flyovers/ROBs ............................................................................................................ 11
Table 5-1: Details of Outer Cordon Locations ................................................................................ 17
Table 5-2: Survey Locations......................................................................................................... 17
Table 5-3: List of Locations/Stretches for parking studies .............................................................. 20
Table 5-4: Zone of study area ...................................................................................................... 23
Table 5-5: Patiala Road Network Details ....................................................................................... 23
Table 5-6: Trip Purposes Used in the Patiala Transport Model ........................................................ 24
Table 5-7: Trip Productions and Attraction Equations for the Patiala Transport Model ...................... 25
Table 5-8: Coefficients in the Exponential function to estimate friction factors ................................ 27
Table 5-9: Summary of the Estimated Base Year Travel Demand (mode-wise) ................................ 30
Table 5-10: Summary of the Estimated Base Year Travel Demand (Trip Purpose wise) .................... 30
Table 5-11: Results of Observed and Assigned flows on Screen Lines ............................................. 31
Table 5-12: Passenger to PCU conversion Factors ......................................................................... 31
Table 5-13: Traffic Volumes from the Base Model on Arterials ....................................................... 32
Table 5-14: Traffic Volumes from the Base Model on Arterials ....................................................... 32
Table 5-15: Population Sample Distribution by Age ....................................................................... 35
Table 5-16: Income Categories according to HUDCO ..................................................................... 36
Table 5-17: Future traffic scenario in Patiala with do nothing alternative ........................................ 39
Table 6-1: Transport system goals for Patiala ............................................................................... 41
Table 8-1: Mass Transit Options ................................................................................................... 49
Table 8-2: Suggested Public Transport Systems ............................................................................ 50
Table 9-1: Transport Strategies and Policies ................................................................................. 54
Table 10-1: BRTS and Mini Bus Routes ......................................................................................... 59
Table 11-1: Categories of Roads .................................................................................................. 76
Table 11-2: Patiala City Roads Suggested for Improvement ........................................................... 76
Table 11-3: Accident Prone Locations ........................................................................................... 80
Table 13-1: Multi-Level Parking Locations ..................................................................................... 87
Table 16-1: Proposed measures to achieve NUTP Objectives ....................................................... 115
Table 18-1: Phasing of projects.................................................................................................. 119
Table 19-1: Urban Transport Project Funding Schemes proposed by Central Government .............. 132
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
v
List of Figures
Figure 1-1: Patiala Location in Punjab ............................................................................................ 1
Figure 2-1: Population of Patiala .................................................................................................... 4
Figure 2-2: Work Force Participation rate ....................................................................................... 4
Figure 4-1: A view of intercity bus terminal ................................................................................... 12
Figure 5-1: Outer Cordon Locations-Patiala ................................................................................... 17
Figure 5-2: Parking Survey in progress. ........................................................................................ 21
Figure 5-3: Patiala Zonal Map ...................................................................................................... 23
Figure 5-4: Patiala coded highway network................................................................................... 24
Figure 5-5: Patiala Transit Network .............................................................................................. 24
Figure 5-6: Trip Generation Process ............................................................................................. 24
Figure 5-7: Network skimming process ......................................................................................... 25
Figure 5-8: Trip Distribution process ............................................................................................ 26
Figure 5-9: Trip Length Frequency Distributions ............................................................................ 28
Figure 5-10: Traffic Assignment process ....................................................................................... 30
Figure 5-11: Traffic volumes on Major Arterials ............................................................................. 31
Figure 5-12: Leela Bhavan (Children mode Chowk) ....................................................................... 32
Figure 5-13: Bus Stand Chowk ..................................................................................................... 33
Figure 5-14: Dukhniwaran Sahib Chowk ....................................................................................... 33
Figure 5-15: Fountain chowk ....................................................................................................... 34
Figure 5-16: SST Chowk .............................................................................................................. 34
Figure 7-1: Development proposals of Master Plan ........................................................................ 42
Figure 7-2: Proposed land use plan .............................................................................................. 43
Figure 8-1: Proposed Ring Road alignment ................................................................................... 46
Figure 8-2: Patiala Road Network ................................................................................................. 47
Figure 8-3: Patiala Raod Network with Inner ring and Radials (2021) ............................................. 47
Figure 8-4: Patiala Raod Network with Outer ring and Radials (2031) ............................................. 47
Figure 8-5: MASS TRANSIT NETWORK (2021) .............................................................................. 51
Figure 8-6: MASS TRANSIT NETWORK (2031) .............................................................................. 51
Figure 9-1: Patiala Road Network-2031 ........................................................................................ 52
Figure 9-2: Transport Strategies and their inter linkages ............................................................... 53
Figure 10-1: Special Purpose Vehicle Structure for Improvement of Bus Service ............................. 57
Figure 10-2: Patiala Bus Route Network (2031) ............................................................................. 59
Figure 10-3: Trunk and Feeder Public Transport network .............................................................. 60
Figure 10-4: ITS Applications ....................................................................................................... 61
Figure 10-5: ITS System .............................................................................................................. 61
Figure 10-6: Components of Seamless Integration ........................................................................ 62
Figure 11-1: Proposed Cross section of Mobility Corridor with BRT Lanes 30m-RoW ........................ 69
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
vi
Figure 11-2: Proposed Cross section of Mobility Corridor with BRT Lanes & two wheeler parking 30m-
RoW ........................................................................................................................................... 69
Figure 11-3: Proposed cross section of Mobility Corridor with BRT bus Stop on median platform ...... 69
Figure 11-4: Proposed cross section of Mobility Corridor with BRT Bus lanes in 40 m ROW .............. 70
Figure 11-5: Pictorial Representation of a Cross Section of Mobility Corridor with 40 m Right of Way
(RoW) ........................................................................................................................................ 70
Figure 11-6: Patiala Outer ring- Multi-modal Corridor .................................................................... 71
Figure 11-7: Alternative -1 (Exit restricted to Bahera) .................................................................... 74
Figure 11-8: Alternative -2 (One entry from fisheries dept lane and another from Nabha Gate road) 74
Figure 11-9: One way proposal at Lahori gate .............................................................................. 75
Figure 11-10: Details of Proposed cross sections ........................................................................... 79
Figure 12-1: Footpath proposals .................................................................................................. 83
Figure 12-2: NMT facility inside city core area ............................................................................... 85
Figure 14-1: Unified Transport Authority for Patiala ....................................................................... 94
Figure 14-2: Traffic and Transportation Cell in Municipal Corporation ............................................. 94
Figure 15-1: Fare System Parameters ......................................................................................... 102
Figure 17-1: Social and Environmental Impacts of Proposed Projects ........................................... 116
Figure 18-1: List of Mobility Improvement Projects ...................................................................... 117
Figure 18-2: Break-up of Block Cost Estimates (2010-2020)......................................................... 119
Figure 18-3: Break-up of Block Cost Estimates (2020-2031)......................................................... 120
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
1
Figure 1-1: Patiala Location in Punjab
PART I: EXISTING SITUATION
1. INTRODUCTION
Patiala is one of the erstwhile princely cities of Punjab. Located in the south-eastern part of
the state, 65 km from the state capital of Chandigarh, it lies between 29°49’ and 30°47’ north
latitude, 75°58’ and 76°54' east longitude and 25 Km away from the Grand Trunk Road (i.e., National
Highway No.1) and is about 250 Km from Delhi.
It is well connected with important urban
centres of Punjab by the network of National
Highway, State Highways and District roads. The city
is linked with railway network as Rajpura branch
railway line passes through the city. Though
historians have tried to trace the origin of Patiala (as
far as the name is concerned) to Rig Vedic literature
yet the town as it stands today was founded by Baba
Ala Singh with the construction of the Qila Mubarak
in the year 1763. One gets the impression as if the
city was designed and developed according to a plan
akin to that of temple architecture. In the heart of
the city was the seat of the king similar to the house
of the deity and the residential areas of communities developed around it status-wise. The area
covered now by the ruins of Pattan-wala, it is popularly believed that the word Patiala comes either
from Pattan-wala, or from a combination of the word 'Pati' which means ‘territory’ and ‘Ala' from
founder Baba Ala Singh. Maharaja Narendra Singh (1845-1862) fortified the city of Patiala by
constructing ramparts and ten gates around the city.
Patiala's sway over the Malwa area extended beyond merely political influence. Patiala was
equally the set of religious and cultural life. Educationally, Patiala was in the forefront. Patiala was the
first town in this part of the country to have Degree Collage-the Mohindra College-in 1870. The
famous printing of Munshi Nawal Kishore was also established here in the seventies of the 19th
century. Patiala had a culture of its own, evolving into a distinct "patialavi" culture. Patiala has also
seen evolution of a distinct style of architecture. Borrowing from the Rajput Style, its beauty and
elegance are, however, moulded according to the local coloring. With the active patronage of the
erstwhile rules of Patiala, a well established style of Hindustani music called ‘the Patiala Gharana’
came into existence and has held its own up to the present times. This school of music has had a
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
2
number of famous musicians, many of whom came to Patiala after the disintegration of the Mughal
Court at Delhi in the 18th century. This school of music continues to get the patronage of the State
though the North-Zone Culture Centre, established at Patiala
1.1. OBJECTIVES OF COMPREHENSIVE MOBILITY PLAN (CMP)
The main objectives of the CMP are as follows:
To identify the various issues and problems in existing transport system in the city.
To recognize the varying need and priorities of the different transportation users and stake
holders.
To provide mobility to all transportation users
To present a long term vision (2031) of desirable mobility patterns.
To provide strategy and policy measures to achieve this vision.
To provide effective and sustainable urban development
1.2. SCOPE OF CMP
Comprehensive Mobility Plan would integrate mobility plan with land use plan and spelled out
the projected mobility needs of the cities as also the manner in which such mobility needs are
proposed to be met. The focus would be on analyzing the existing transportation scenario; examine
the pattern of growth of the town and projecting the passenger and freight mobility requirements for
the next 20 years, keeping in view the attributes like population, employment, business, commerce,
industry, growth of the cities, among others. As a part of this exercise and in order to meet the
present and projected mobility needs of the cities and region, several projects for implementation
under short, medium and long term would get identified for the cities. The broad scope of work for
the study is as follows
Collection appraisal of data/reports
Demographic & Socio-Economic Analysis
Traffic and Travel Surveys
Data Processing
Engineering studies
Development of Transportation Model
Planning of short term/immediate improvement measures
Planning of medium and long term measures
Identification of Technologies and integration with Metro.
Cost Estimate for the Identified Projects
Prioritization of Projects
The study area as per TOR issued is Municipal Corporation. As the corporation has extended,
through regular interactions, with adjacent towns and villages, the Local Planning Area (LPA)
comprising of Corporation area and its urbanisable environs with peripheral control belt till the 2031
was considered for the Master Plan. Existing land use plan and proposed land use plan till 2031 for
LPA area are available, entire LPA area or a portion of it more than the corporation extent to cover
the future urbanisable area has been considered.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
3
2. CITY PROFILE
2.1. GENERAL BACK GROUND
Patiala with its population of 3.03 lakhs is
the fourth largest city of Punjab and also it is one
of the counter magnets considered outside National
Capital Region (NCR) other than Bareily, Hissar,
Gwalior and Kota in order to reduce the pressure
on Delhi. On account of substantial administrative,
institutional and commercial development that has
already taken place, its growth impulses have led
to growth outside the limits of Municipal Corporation of Patiala. LPA Patiala comprises of 155 villages,
out of which 10 villages (few of them part villages) have been merged in Municipal Corporation area
of Patiala and one village (part of it) consisting of Municipal Council of Sanaur. The total area of
Patiala Municipal Corporation is 50.11 sq.km. According to Census 2001, the total population of LPA
Patiala was 485497 a person out of which 341819 was urban.
2.2. SOCIO-ECONOMIC PROFILE
POPULATION
The population of LPA Patiala as per 2011 census is 18, 92,282 persons which has grown at a
growth rate of about 19.04% during 2001-2011. The details are summarized in table below:
Table 2-1: Population of constituents Of LPA, Patiala
LPA PATIALA 1981 1991 2001
URBAN* 219888 270196 341819
RURAL 110331 138183 143678
Total 330219 408379 485497
Decadal Growth Rate (%) -- 24 19
Patiala Urban = Patiala UA + Sanaur Mcl Source: Master Plan
The percentage of urban population of L.P.A. Patiala to total urban population of Punjab state
was 4.73% in 1981, 4.51% in 1991 and slightly declined to 4.14% in 2001. The decadal growth rate
has also decreased from 24% to 19% which is the outcome of decreasing urban growth in LPA
Patiala from 1991-2001.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
4
Figure 2-1: Population of Patiala
The average population density of Patiala City is 82 persons / ha. However, ward wise
densities vary considerably. The highest and the lowest density varies between 420 persons per
hectare and 9 persons per hectare respectively. The low average population density is due to big
institutional areas, abundance of govt. and semi govt. offices and housing on large areal extent. Out
of a total increase of 70178 persons in the population of Patiala city during 1991-2001, 26966 were
due to migration from states other than Punjab.
EMPLOYMENT
The economy of Patiala and its L.P.A is based mainly on trade, commerce, agriculture and
agro based industry. City or district wise estimates of domestic products are not available. However,
education, tourism, hospitality, real estate business like multiplexes, malls and other commercial
establishments, financial and banking services etc. also contribute to the economic wellbeing of the
people of the city. The work force participation rate of LPA Patiala as per 2001 census is 33.98% and
that of Patiala City is 31.80%. The main sectors providing employment in Patiala City are Public
administration and other services etc. (37.70%), Wholesale and Retail Trade (20.83%),
Manufacturing (11.55%), Finance, real estate and business activities (7.58%).
Figure 2-2: Work Force Participation rate
38%
21%
11%
8%
22%Public adminsitration &Other Services
Wholesale & retail trade
Manufacturing
finance , Business & Realestate activities
Others
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
5
HOUSING CHARACTERISTICS
Housing characteristics (stock) reflects the economic and social status of the people residing
in a particular area. The growth of residential houses and households has been found to be keeping
pace with the growth of population. Housing stock from the year 1981 to 2001, reveals that the
number of occupied residential houses in the city increased from 37637 to 74256 because of the
rapid urbanization of the city. A growth rate of 11% has been observed in 1981-1991 and sharp
increase in growth of 78% has been witnessed in the decade of 1991-2001. The number of
households in 1981 was 37699 only which increased to 44897 in 1991 showing a growth rate of 19%
in the decade of 1981-1991. It further increased to 58298 households in 2001 and reported 30% of
growth in 1991-2001. The household size of population of the Patiala city shows an inverse
correlation with the number of households and occupied residential houses in Patiala city. The
household size which was 5.4 in 1981, decreased to 5.3 in 1991 and it further came down to 5.2 in
the year 2001. Consequently, the number of households and number of occupied residential houses
increased during this decade. The fast paced development, awareness among people of a small
family and breaking up of joint families into nuclear families has resulted into the decrease in the
household size of the city. The house hold characteristics can be further examined with the help of
House hold survey that has been carried out in all the wards of Patiala on sample basis.
INDUSTRIES
Patiala is having industrial area on Sirhind road, Industrial Focal Point, Diesel Loco
Modernization Workshop (DMW). Apart from above there are few rice- shelters and tool
manufacturing industries. Besides this, there is (PRTC) PEPSU Road Transport Corporation workshops
on Nabha road and Rajpura road comprising of 7.90 ha. In these workshops all the buses of PRTC are
repaired. There is another service industry comprising of 12.5 ha near Rajpura road known as Hira
Bagh between marriage palace of Palm Court and Gurudwara on Bari nadi. Here repair of trucks,
truck body buildings is carried out. Industrial Focal Point and DMW are located on inner bye-pass.
Industrial Focal Point has been developed on the basis of planned layout plan supported by basic
essential infrastructure and services to provide appropriate environment for industrial growth and
development. DMW was established on an area of 225 ha in 1981. It comprises of 83 ha. under
industrial use and 142 ha. under staff colony having well laid road network, all the amenities namely
separate water works, STP, hospital, school, market and golf course. Thus the total area under
industry within U.A Patiala comprising of service small and large industry is 205.78 ha. which is
3.21% of the total developed area.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
6
3. REVIEW OF LANDUSE SYSTEMS
3.1. EXISTING REPORTS AND DOCUMENTS
The reports of previous studies and the other documents relating to the development of
Patiala would help in providing amicable solution, so that the recommendations of the same will be
appreciated and would consider for improvement and further to implementation through CMP.
Previously, Patiala Development Authority has prepared Patiala Master Plan for the next 30 years. The
Master plan has considered all the possible development patterns and has provided the proposed
landuse map and the likely future network of Patiala discretely. The same has been collected from the
authorities for reference.
3.2. LAND USE PATTERNS AND DEVELOPMENT TRENDS
The existing land use distribution determines the nature of development of a settlement and
its economic status is also reflected through the type of its physical development. The study of
existing land use distribution helps in fixing the priorities and for evolving a strategy for the future
development of the area. The existing land use scenario guides a planner to allocate land for different
land uses viz., residential, industrial, commercial, public / semi public etc rationally and optimally so
as to achieve the high level of efficiency of land which is limited. The existing land use plan for Local
Planning Area, The following table shows the existing allocation of land under different land uses in
Local Planning Area, Patiala
Table 3-1: Land-use Distribution
LANDUSE TYPE AREA
(Ha.) %age
RESIDENTIAL
Urban Residential 2141.93 33.42
Residential Plots 212.88 3.32
Internal Road Area 245.78 3.83
TOTAL 2600.59 40.58
COMMERCIAL
Retail Shopping 107.28 1.67
General Business & Commercial District/ Centres 27.88 0.44
Whole Sale, Godowns, Ware Housing Regulated
Market
47.14 0.73
TOTAL 182.3 2.84
INDUSTRY
Service and Light Industry 42.73 0.67
Planned Industrial Areas 70.90 1.11
Medium, Large & Heavy 92.15 1.44
TOTAL 205.78 3.21
UTILITIES
Water Works 10.84 0.17
Electric Grid 19.64 0.31
Sewage Disposal 0.03 -
Solid Waste 7.85 0.12
Communication 2.85 0.04
Sewage Treatment Plant 0.39 -
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
7
LANDUSE TYPE AREA
(Ha.) %age
TOTAL 41.60 0.65
PUBLIC AND SEMI
PUBLIC
Govt / Semi Govt/ Public Offices 158.15 2.47
Govt Land (Use Undetermined) 49.74 0.78
Education and Research 402.60 6.28
Medical & Health 35.98 0.56
Social, Cultural & Religious 67.07 1.05
Cremation & Burial Grounds 6.26 0.10
TOTAL 719.8 11.23
TRANSPORTATION
Roads 589.59 9.20
Bridges / Flyovers 3.74 0.06
Roundabouts 1.32 0.02
Parking Area 14.72 0.23
Railway line & Siding 27.76 0.43
Railway Station 2.07 0.03
Bus Terminus 1.97 0.03
Truck Terminus 14.60 0.23
TOTAL 655.77 10.09
Play Grounds, Stadium, Sports Complex 122.77 1.92
RECREATIONAL Parks &Gardens (Public Open Spaces 76.74 1.20
TOTAL 199.51 3.12
AGRICULTURAL
Agriculture 577.24 9.01
Katccha. Road 2.56 0.04
Forest 2.53 0.04
Water Bodies 99.99 1.56
Canal 2.88 0.04
Plantation & Orchards 95.25 1.49
Dairy and Poultry Farms 0.17 -
Vacant Land 790.88 12.34
TOTAL 1571.50 24.52
Heritage & Conservation Area 25.82 0.40
SPECIAL AREA Other use 206.33 3.22
TOTAL 232.15 3.62
GRAND TOTAL 6409 100
Source: Master Plan, Patiala
RESIDENTIAL
It is quite evident from table above that residential use has a larger share of developed area.
Out of the total area of U.A Patiala, 2600.59 ha. is under residential use which includes both planned
and unplanned development. Out of this, total developed residential area of 1504.61 ha. is under
planned / regulated schemes which is almost 58%.This planned, regulated residential area comprises
of Tripuri, Model Town, CPA and Town Planning Schemes, three Urban Estates, one pocket under
OUVGL scheme of PUDA, two Development Schemes of Improvement Trust and are uniformly located
in the city except south and south – west.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
8
COMMERCIAL
The commercial use is the most important use of the urban area though it may have lesser
share in the areal extent. It plays a vital role in the formation of city character. In case of Patiala city,
the total area covered under planned as well as unplanned commercial use is 182.3 ha., which is
2.86% of the total developed area. Out of this, 39.06 ha. area is under planned commercial, which is
21.43% of the total commercial area. The main unplanned commercial area is confined to walled
city especially Dharampura bazaar, Adalat bazaar, Arya Samaj chowk and Qila chowk. Similarly the
famous wholesale markets namely Gurmandi, Sher-e-Punjab wholesale cloth market, Medicine
market, Timber market, Fruits & Vegetable market, Sarafan bazaar are also located within walled city.
The commercial areas within walled city are in the form of line bazaars. This area lacks in parking and
other public amenities. There are only two paid parking's within walled city i.e. one at the back of A.C
market and another opposite to the old Kabari market which are insufficient to meet the demand of
parking. Other than walled city, all the unplanned residential areas have commercial (retail) activity
along the main roads.
INDUSTRIAL
Under this use comes the industrial area on Sirhind road, Industrial Focal Point, DMW. Apart
from above there are few rice- shellers and tool manufacturing industries. Besides this, there is
(PRTC) PEPSU Road Transport Corporation workshops on Nabha road and Rajpura road comprising of
7.90 ha. In these workshops all the buses of PRTC are repaired. There is another service industry
comprising of 12.5 ha near Rajpura road known as Hira Bagh between marriage palace of Palm Court
and Gurudwara on Bari nadi. Here repair of trucks, truck body buildings is carried out. Industrial Focal
Point and DMW are located on inner bye-pass. Industrial Focal Point has been developed on the basis
of planned layout plan supported by basic essential infrastructure and services to provide appropriate
environment for industrial growth and development. DMW was established on an area of 225 ha in
1981. It comprises of 83 ha. under industrial use and 142 ha. under staff colony having well laid road
network, all the amenities namely separate water works, STP, hospital, school, market and golf
course. Thus the total area under industry within U.A Patiala comprising of service small and large
industry is 205.78 ha. which is 3.21% of the total developed area.
3.3. LAND USE DEVELOPMENT POLICIES AND STRATEGIES
On the basis of study of existing land use distribution under different land uses the need has
been felt to allocate the scarce land optimally under different uses so as to cater to the growing
needs of the population adequately and economically. The proposed land use quantum has been
adequately allocated for each of the specific uses to sustain the needs of LPA till year 2031. The
residential land-use has been increased with the increase in population and also in conjunction with
the sustainable housing development. The industrial sector has been given more priority for making
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
9
Patiala economically vibrant city. The strategy behind the master plan of Patiala 2031 can be poised
in to five aspects i.e., intensification of Central Core, Intensive growth along the transport radials,
Development of ring towns, extension of Peri-urban area and land-use transport planning. A
redevelopment strategy for accommodating more population in a planned manner is suggested to be
taken up on priority in all use zones for efficient and optimum utilization of the existing urban land,
both in planned and unplanned areas. This would have to be supported with provision of adequate
infrastructure viz. water supply, sewerage, road network, open spaces and the essential social
infrastructure.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
10
4. EXISTING TRANSPORT SYSTEMS
4.1. EXISTING STUDIES, REPORTS AND PROPOSALS
As mentioned earlier, the master plan has been reviewed and the brief
recommendations of the master plan are as follows. Regarding Transportation, master plan has given
priority to RoB’s and Underpasses especially at railway crossings. The recommendations were phased
based on the inter city, intra city traffic and crossings occurring in the future proposed ring roads.
Certain roads like Bhadson road, Rajpura Road, Sangrur road and other future roads were
recommend for capacity enhancement. An outer ring road was proposed. Mass Rapid transit systems
like BRTS was also given importance in the Master Plan 2031. The details were dealt in further
chapters.
4.2. EXISTING TRANSPORT INFRASTRUCTURE
ROAD NETWORK
The existing road network in the city is partially radial in pattern. The Nabha road also carries
the traffic of Bhadson road which merges at Thapar University Chowk and meets Sirhind road at
Gurudwara Dukhniwaran Sahib and then lead to the city. Similarly Sangrur road also carries the traffic
of Samana road which bifurcates near Bhakra main line. Rajpura road carries the traffic from Chotti
Nadi onwards and from transport nagar it also carries the traffic of Sanaur road, Cheeka road and
Pehowa road. The National Highway 64 enters the city from two sides i.e north east and south west,
two state Highways enter the city from south-west and south-east, several other important roads
enter the city from north, north-west, south-west and south directions.
These important roads entering the city are listed below:
Sangrur – Patiala (N.H. 64)
Rajpura – Patiala (N.H. 64)
Pehowa – Patiala (State Highway no. 8)
Samana – Patiala (State Highway no. 10)
Nabha-Patiala (scheduled road)
Bhadson – Patiala (Scheduled road)
Sirhind – Patiala (Scheduled road)
Sanaur – Patiala (Other distt. road)
Cheeka – Patiala (Other distt. road)
RAIL NETWORK
Rail is considered as the lifeline of a nation and a good rail network boosts the economy.
Patiala is not very fortunate in terms of rail network as it has a single railway line i.e. branch line of
Rajpura railway line. Many trains pass through this single railway line and connect Patiala to various
cities and states of India. The main rail route passing through Patiala has been listed in the table
given below. The detail of connectivity by railway lines is given in Table below.
Table 4-1: Major city roads and connecting cities
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
11
Sl.No. Name of the route Important cities connected
1. Patiala-Ambala Rajpura -Ambala
2. Ambala Cant. -Bathinda Ambala Cant, Rajpura, Patiala, Dhuri, Bathinda
3. Haridwar – Shri Ganga Nagar
Express
Haridwar, Ambala, Rajpura, Patiala, Dhuri, Bathinda,
Ganga Nagar
4. New Delhi – Bathinda New Delhi, Ambala, Rajpura, Patiala, Dhuri, Bathinda
5. Ambala – Shri Ganga Nagar Ambala, Rajpura, Patiala, Dhuri, Bathinda, Ganga Nagar
6. Kalka – Jodhpur Kalka, Chandigarh, Ambala, Rajpura, Patiala, Bathinda,
Jodhpur
RAILWAY OVER-BRIDGES & UNDER-PASSES
Although, there is only one railway line i.e. branch line of Rajpura passing from the middle of
city yet there are 10 level crossings which are all manned. This railway line has three R.O.B's located
at 22 No. Phatak, 21, No. Phatak and near Bus Stand which reduces the chaotic traffic condition at
the level crossings. The detail of level crossings is given in the table:
Table 4-2: Flyovers/ROBs
Sl.
No.
Name of Level
Crossings/ R.O.B/ Underpass
Location Status
1. Phatak No. 15 Divn. (On Rajpura-Sirhind Bye Pass) Manned
2. Phatak No. 16 Near Railway Godown Manned
3. Phatak No.17 Near Railway Station R.O.B.
4. Phatak No.18 In front of Bus stand Closed
5. Phatak No. 19 Lahori Gate (In Baradari) Manned
6. Phatak No. 20 In Baradari Manned
7. Phatak No. 21 Rajbaha Road R.O.B.
8. Phatak No. 22 Bhupindra Road R.O.B.
9. Phatak No. 23 Opposite Model Town Manned
10. Phatak No. 24 Partap Nagar Manned
PUBLIC TRANSPORT SYSTEMS
There is no public transport system in Patiala city. Due to the inefficient services and
unorganized system of public transport, predominant modes used for intra city passenger travel are
personalized vehicles (Cars & Two-wheelers), cycle rickshaws, auto-rickshaws etc. which enhance the
problems like congestion, accidents, parking as well as pollution. However, some mini buses going to
rural areas from bus stand pick up the passengers and drop at various stops in the city to facilitate
the general public thus functioning partly as city level public transport. Besides this a large number of
buses owned by private and government organizations have their own fleet of buses which carry a
large number of passengers daily. In the absence of an effective and efficient public transport system
in Patiala the nature of city road network has lead to the enormous growth of intermediate public
transport in the form of rickshaws and auto-rickshaws. Preferred mode of transport in the city has
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
12
been witnessed as use of auto-rickshaws which have been found to be highly convenient by the users
because of affordable fare and convenience of getting on and getting down at any place in the city. It
has been estimated that about 500 auto rickshaws and about 300 cycle rickshaws are plying on the
city roads. Looking at the existing pattern of transportation it has been observed that for the smaller
distance and intra city travel, auto-rickshaws & cycle-rickshaw are the preferred mode of travel
whereas for inter city and longer distance travel, bus remains to be the popular mode of travel.
BUS TERMINUS
The only bus terminal of
Patiala is located on Patiala - Rajpura
Road. The total area of bus stand is 6
acres and a workshop of 4.2 acres
adjoining it and another workshop
cum head office of P.R.T.C on Nabha
road comprising 13.50 acres. The
most preferred mode of transport in
the area is bus transport as buses
from all the districts of Punjab and
neighbouring states on their way halt
at the bus stand and quite a few
originate and terminate at the main bus stand. Bus transport is also considered as a preferred means
of transport for the daily commuters which considerably contribute to the increasing bus traffic. There
is a proper link between bus stand and railway station that makes its location appropriate as far as
the change of mode of transportation is concerned. The over bridge on Phatak No. 17 has been
developed and heavy vehicular regional traffic has been diverted through the over bridge. There is no
cycle rickshaw stand, auto rickshaw stand or taxi stand in and around the bus stand, with the result
these are parked along road side along with Rehriwallas which reduces the effective width of road
thus resulting in congestion, lowering of journey speed and intersection delay. Public transport
system is not very much developed in Patiala city. Increased number of private vehicles like cars,
motorcycles, scooters, light- weight scooters etc. has been catering commuter passenger demand to
large extent. In walled city mainly hand driven rickshaws are used. Local bus service has few buses
and connects Patiala to some localities as well as villages located on the periphery of Municipal Limits
of Patiala. Buses of various educational institutes like Punjabi University, RIMT, Bhai Gurdas
Engineering College, Desh Bhagat Group of Institutes, Chitkara and other engineering colleges,
nursing colleges and educational colleges of nearby towns, as well as school buses also contributes
towards the bus traffic of Patiala city.
Figure 4-1: A view of intercity bus terminal
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
13
4.3. URBAN GOODS MOVEMENT
Besides passenger vehicles, goods are also contributing to the city traffic. Main incoming
products to Patiala city are pebbles and sand from Zirakpur, sugar from U.P, spare parts from Delhi,
cement from Ropar, Kartarpur, H.P, Bathinda and Rice comes from W.Bengal and wheat comes from
the neighbouring villages. The outgoing products are wine, milk powder, products of DMW and
Escorts etc which are sent to Bombay, Calcutta, Delhi, J&K etc. In spite of development of heavy
industries in the city and great importance of wholesale activity, Patiala does not have any authorized
Truck Terminal. Due to the absence of proper Truck Terminal the trucks are parked along the main
roads. These trucks reduce the effective width of the roads.
For immediate relieving the traffic congestion, the consultant recommend shifting of all on-
street loading and unloading activities from peak traffic periods during day time to off peak hours late
evening and early mornings.
4.4. TRAFFIC SAFETY AND ENFORCEMENT
There are not many measures in place with regards to Traffic safety and enforcement.
Because of lack of enforcement, safety became main concern at major intersections. Certain
Junctions like Fountain Chowk, Children-mode Chowk and Bus stand road became major accident-
prone areas due to lacks of safety and proper planning. Traffic police need to educate people for the
same. The Education and enforcement measures were recommended in capacity building
programme.
4.5. LEGAL FRAMEWORK AND STANDARDS
The principal legislation governing Regional and Town Planning is the “Punjab Regional and
Town Planning and Development Act, 1995 (PRTPDA)” was enacted in the year 1995 (Punjab Act
No.11 of 1995) which has been amended in the year 2006 and is now known as “The Punjab
Regional and Town Planning and Development (Amendment) Act 2006” (Punjab Act No 11 of 2006).
This is an act to make provision for better planning and regulating the development and use of land
in planning areas delineated for that purpose, for preparation of Regional Plans and Master Plans and
implementation thereof, for the constitution of a Regional and Town Planning and Development
Board, for guiding and directing the planning and development processes in the State, for the
constitution of a State Urban Planning and Development Authority, Special Urban Planning and
Development Authorities and New Town Planning and Development Authorities, for the effective and
planned development of planning areas and for undertaking urban development and housing
programs and schemes for establishing new towns and for matters connected therewith or incidental
there to.
Prior to the enactment of the Act the town planning activity within urban areas was being
governed by different legislations such as The Town Improvement Act 1922, The Punjab Municipal
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
14
Act 1911, The Punjab Municipal Corporation Act 1976, The Punjab Urban Estates (Development and
Regulation) Act 1964 etc and for areas falling outside municipal limits in the periphery of urban
centers, there was ‘The Punjab Scheduled Roads And Controlled Areas Restriction of Unregulated
Development Act 1963(Now repealed)’ but no comprehensive legislation was available for the overall
control and development at local and regional level.
4.6. INSTITUTIONAL AND FINANCIAL SITUATION
The institutional arrangement of Patiala Local Planning Area is like the other cities, which
have some individual functioning rather Unified functionality. The major stakeholders of the City are
Patiala Municipal Corporation
Patiala Development Authority
Public Works Department
Punjab Road Transport Corporation
Traffic Police
North Western Railways
General Public
Because of multiplicity of agencies, there is lack of coordination and hand in hand
development. Hence, a strong institutional set-up needs to be recommended to take forth the
development and recommendations of any study.
The Patiala Municipal Corporation and Patiala Development Authority will act as a main
funding agency. With the massive development anticipated in future, there is a strong potential in
Land Banking and the Transit Oriented Development with the introduction of Bus Rapid Transit
Systems and Monorail Systems.
4.7. ENVIRONMENTAL AND SOCIAL CONDITIONS
Because of the increasing private/personalized mode of transport there is a huge
deterioration in environment levels and social conditions. The elements of emissions from vehicles
such as Carbon-mono-oxide, Hydrocarbons and Particulate matter have significantly increased during
the years. So, Introduction of Public Transport Systems will definitely reduce the carbon emissions. As
the traffic will get choked in peak hours, travel time is increasing with huge vehicular growth. The
implementation of proposed projects will definitely enhance the mobility and reduce travel time, thus
have some positive social impact.
4.8. OTHER RELEVANT ISSUES
The intermediate public transport should be a supplementary to the Public Transport System
and not as a complimentary one. Considering the radial pattern of the city and its current size, Bus
Service should be improved and the IPT should be controlled on some prescribed routes. Separate
Lanes are not provided for the NMT vehicles and the pedestrian facilities were also on the lower side.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
15
5. ANALYSIS OF EXISTING TRAFFIC/ TRANSPORT SITUATION
5.1. TRAFFIC SURVEYS
Traffic Surveys and studies are an integral component of preparation of Comprehensive
Mobility Plan. Appreciation of existing traffic and travel characteristics is extremely important for
developing a mobility plan. For any assignment of this kind, establishing baseline data plays a pivot
role in building up a model that exactly resembles the realistic conditions of the city. Apart from
helping in understanding the existing traffic and transportation situation, challenges and the
strengths, this data would help in development, calibration and validation of the travel demand
models.
A number of traffic & transportation surveys were conducted as a part of the study in order
to assess the passenger and goods movement pattern, travel characteristics, pedestrian & parking
characteristics and the available infrastructure facilities with the study area. The data collection
activities included.
Classified Traffic Volume Counts (CTVs) (at mid-blocks, Intersections and Outer cordon
locations, Industrial focal points)
Origin Destination Surveys (OD Surveys)
Road Inventory Surveys
Household and Socio-Economic & Travel Surveys
Speed and Delay Surveys
Public Transport (PT) & IPT Commuter surveys
Pedestrian surveys
Parking Surveys
Rail Crossing Surveys
In addition, significant data from secondary sources pertaining to demographic, Socio-
economic characteristics, public transport system etc., was also collected as part of data collection
activity.
PLANNING OF SURVEYS
The Surveys were carried out on major roads like National Highways, the State highways, the
arterials etc., within study area which includes some major villages and municipal councils as stated
earlier. The foremost requirement for road network surveys to be initiated was of a map or maps of
the study area in which the existing road network would be represented in sufficient detail. The maps
of Corporation area were collected from Municipal Corporation and those of Local Planning Area were
collected from the Town and Country Planning Department of the city, which has given a fair idea
about the distribution of the population, existing road network and the spatial distribution.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
16
RECONNAISSANCE
As an initial step of the study, Reconnaissance Survey has been carried out in the month of
November and collected the secondary information like Base maps and Master plan from various
Agencies viz., Municipal Corporation, District Town Planning Office, Traffic Police etc. Study team had
extensive discussions with officials of various line departments regarding the study to understand the
city traffic and study area. The team visited various parts of the Patiala City and along the major road
radiating from Patiala town leading to different major settlements; major roads like Bhadson road,
Nabha road etc., The team also visited major focal points of the industries, rail crossings, Bus
Terminals and the Railway Stations.
SECONDARY DATA
While field traffic surveys provide information on the existing traffic characteristics, secondary
data provides details on the existing landuse, demographic and other features related to the study
area.
Secondary data have been collected to describe:
Characteristics of existing demand of travel
Accident details on the road network
Existing supply of transport infrastructure including fleet size of mass transport system,
operation, cost, performance, regulation and utilization
Demographic and socio -economic characteristics
Present and proposed land use patterns
Planned transport investments, policy changes and other government actions
Funding sources and expected funds available for transport improvements
While development planning related (land use, demographic, socio -economic) and transport
policy related information is largely available from secondary sources, a number of primary surveys
have been undertaken to obtain information on network, system and travel pattern.
IDENTIFICATION OF CORDON AND SCREEN LINES
An imaginary line circumscribing the boundary of the study area is termed as the cordon line.
Similarly, imaginary lines along the physical and natural barriers, having limited road crossing points
within the study area, are termed as screen lines. The screen lines were delineated in order to check
the accuracy of the data collected and for validation of demand forecasting models for north -south
and east-west travel. The cordon points were selected on all the major entries/exits of the city (say
external points) that will catch all the traffic entering/leaving the city. Patiala City is connected with 7
inter-city roads viz., like Sanaur road, Pohewa road, Nabha road, Bhadson road, Sirhind road, Rajpura
road and Sangrur road. In addition, Road Side Interview (RSI) survey of goods and passenger
vehicles was undertaken on sample basis. Classified Traffic Volume Survey for 24 hours has been
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
17
carried out at all these entry/exit locations. In addition, Road Side Interview (RSI) survey of goods
and passenger vehicles was undertaken on sample basis. The cordon points were as shown in figure
below.
Figure 5-1: Outer Cordon Locations-Patiala
Table 5-1: Details of Outer Cordon Locations
In addition to the 7 outer cordon locations, traffic count was carried out on Screen Line Points
(SLPs)/Inner Cordons (ICs), Mid-Block Locations (MBs) on major corridors and Rail Crossings (LCs) to
understand the traffic movement among different sub-regions of the study area, within major sub-
region etc., The survey locations are presented in following Table 5-2.
Table 5-2: Survey Locations
Sl.No. Cordon/Survey Locations Location ID CTV Count (16 hrs)
Railway Level Crossings
1 Phatak-17 P-LC-1 Y
2 Phatak-19 P-LC-2 Y
3 Phatak-20 P-LC-3 Y
4 Phatak-15 P-LC-4 Y
Sl. No. Cordon/Survey Locations Location ID
CTV Count (24 hrs)
RSI (24 hrs)
1 Sangrur Road OC-1 Y Y
2 Nabha Road OC-2 Y Y
3 Bhadson Road OC-3 Y Y
4 Sirhind Road OC-4 Y Y
5 Rajpura Road OC-5 Y Y
6 Sanaur Road OC-6 Y Y
7 Pohewa Road OC-7 Y Y
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
18
Sl.No. Cordon/Survey Locations Location ID CTV Count (16 hrs)
Inner Cordon Points
1 Maharani Club P-IC-1 Y
2 SST Chowk P-IC-2 Y
3 Rajpura Chowk P-IC-3 Y
4 Fountain Chowk P-IC-4 Y
5 Thikrilal Chowk P-IC-5 Y
6 Thappar Chowk P-IC-6 Y
7 Jai road Chowk P-IC-7 Y
8 Gurudwara Chowk P-IC-8 Y
9 Sanaur Chowk P-IC-9 Y
10 Sanaur Y Chowk P-IC-10 Y
11 Children mode P-IC-11 Y
12 Sheeranwalagate Chowk P-IC-12 Y
13 Bus Stand Chowk P-IC-13 Y
14 Leelabhawan Flyover P-IC-14 Y
SURVEY METHODOLOGY
Traffic Survey has been carried out during the four normal working days on a typical weekday
i.e. Monday through Friday. Surveys on days of public holiday were not considered. Further, survey
on a rainy day was also avoided. At the cordon interview stations a sample of 30% of vehicles could
be stopped and interviewed. The percentage sampling was reduced to 17% to 18% on congested
major arterial roads like National highways in order to avoid the traffic congestion and inconvenience
to road users.
SURVEY TEAM & TRAINING
Each survey team consisting of nearly 12-16 numbers of enumerators for RSI survey and 4-6
numbers of enumerators for traffic volume count was selected. Enumerators were trained on methods
of filling the survey formats, methods of interviewing the road user. Enumerators were given the
description of the project and the Study area, survey stations/traffic characteristics etc. The selection
of enumerators was made in week advance of the commencement of the traffic surveys, As RSI
survey involves the stopping of vehicles and interviewing them, police help is indispensable. The
assistance of two traffic police constables at each RSI survey stations was sought during entire period
of survey (in two shifts of 12 hours) at each station. In total, four traffic police personnel were used
for each location for 24 Hours. These personnel were allocated mostly from the local police station in
the vicinity of the survey location.
SURVEY EXECUTION
With prior finalisation of the schedule, duration of the survey, sample to be collected, and
with trained enumerators, the surveys at all locations have been executed. Trained enumerators were
moved to the sites at least an hour before the actual survey started and allowed to organize
themselves under the guidance of traffic engineers. Adequate precautions were taken to maintain the
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
19
quality of work during the survey period. Every care was taken to organize the survey in an efficient
manner. Banners indicating that the survey is in progress and requesting the road users to cooperate
were displayed on the approaches of the survey locations. This assisted the road users to decelerate
their vehicles and thereby ensuring the safety of the enumerators.
In addition to the Classified Traffic Volume counts at all the locations (mentioned in Table 4)
and the RSI at Outer Cordons, Some other Surveys like Road Inventory Survey, Speed and Delay
Survey, Parking Surveys, Commuter Surveys, Occupancy Surveys, Delays at Level Crossings,
Household Travel Surveys were also carried out. The description of the same is as below.
ROAD INVENTORY SURVEY
The objective of this survey was to assess the physical characteristics and condition of roads
within the study area, identify physical constraints and bottlenecks, assess potential capacity and to
identify the extent for its future development/improvement. All the major roads of Patiala were
surveyed by travelling along the road by visual evaluation, inspection and physical measurement.
OD-SURVEY
The main objective of Origin Destination (O–D) survey was to obtain information on travel
pattern of passenger and goods vehicles at the cordon line along with the trip desire in terms of
destined to/originated from and through trips to the study area. As mentioned in the Table the OD
survey was conducted at seven locations along the Outer Cordon line. The Survey was conducted by
Road Side Interview method for 24 hours on a random sample basis.
HOUSEHOLD TRAVEL SURVEY
The Objective of the Home Interview Survey (HIS) was to assess the household
characteristics, Socio-economic and trip characteristics of residents in Patiala. The Survey was carried
out on a sample basis that accounts to 7672 households, representing 5% of households within the
study area. The sample households were selected based on stratified random sampling technique out
of the ward wise Electoral Lists. The number of households within each zone was based on the
respective residential population in each zone. The main steps involved in conduction of the Surveys
were:
Design of Questionnaire
Selection and Training of Enumerators
Conduction of Pilot Surveys and Main Surveys
Data Coding, Punching, Checking and Data Analysis.
The questionnaire presented in inception report has been used for data collection. The
questionnaire was divided into three main modules, viz. household information, personal level
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
20
information and trip information. The questionnaire was designed to incorporate cross-checks on
some of the most important responses for which it may be difficult to obtain reliable information like
household/ personal income etc., Details were collected for trips performed by the respondent and
the family members on the previous working day. The trip details were broken down into individual
stages to study the characteristics of linked trips. As mentioned earlier, the enumerators were trained
for the collection of the Household data. The household samples were collected in all the 50 wards of
the Patiala City, and also from the adjacent villages covering Patiala Local Planning Area.
SPEED & DELAY SURVEY
The objective of this survey was to assess the speed and delay characteristics along the
existing road network and to identify bottleneck locations and their probable causes, to identify
significant road conditions influencing the observed travel times. Speed & Delay survey along the
identified road network was carried out by 'Moving Car Observer Method' by traversing along the road
sections, in the peak and off peak hours. Information regarding number of vehicles overtaking the
test car, overtaken by test car, number of vehicles in opposite direction to the test car, journey and
running time along with cause and quantum of delay were recorded. Following outputs are derived
from the surveys:
Journey speeds along the corridors
Running speeds along links between intersections
Nature and extent of delay at intersections and mid blocks
The speed data is being used to develop zone-to-zone travel time matrices for use in trip
distribution and traffic assignment stages of demand modeling. The Speed and Delay Survey was
carried out on all the major roads of Patiala viz., Rajpura road, Sangrur road, Phowera road, Nabha
road etc.,
PARKING SURVEY
The main objective was to appreciate the parking demand and supply characteristics, identify
issues and constraints & suggest appropriate policies for meeting the horizon year parking demand.
The survey was conducted in order to assess the level of usage of on-street and off-street parking
facilities at pre-selected locations like Central Business District (CBD), and other commercial locations.
The locations of the parking surveys were presented in Table 6.
Table 5-3: List of Locations/Stretches for parking studies
Sl.No. Location/road Section Location ID Duration
ON STREET PARKING
1 Transport Nagar P-ONP-1 12 hr
2 Adalat Bazar P-ONP-2 12 hr
3 Dharampura Bazar P-ONP-3 12 hr
4 Quilla Chowk P-ONP-4 12 hr
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
21
Sl.No. Location/road Section Location ID Duration
5 Bus Stand P-ONP-5 12 hr
6 Gopal’s Restaurant P-ONP-6 12 hr
OFF STREET PARKING
1 Adalat Bazar P-OFP-1 12 hr
2 Choti Bharadhari P-OFP-2 12 hr
Figure 5-2: Parking Survey in progress.
PUBLIC TRANSPORT (PT) USER SURVEYS
With the objective to appreciate the Public Transport user characteristics like Origin,
Destination, mode, purpose, trip length and travel cost, the Survey was carried out at Patiala Bus
Terminal, Railway Station and also in the City Bus Services.
In addition to the PT, Some sample of IPT users were also collected in the working hours of
the day. The data of the PT and IPT user surveys were collected for duration of 12 hrs.
PEDESTRIAN SURVEY
The main objective of the Pedestrian survey is to assess the need of Pedestrian facilities like
footpaths, Foot over Bridges (FOBs), Skywalks and Pedestrian Only streets. The survey has been
carried out in the Public transport terminals, Central Business District (CBD) area and some other
major roads where there are major commercial activities. The survey has been carried out for the
duration of 12 hrs
Bus Stand
Railway Station
Lahori gate
Sheran wala Gate
5.2. DEVELOPMENT OF BASE YEAR TRANSPORT MODEL
The main purpose of the Urban Travel Demand Model is to predict the travel patterns and
modal shares under different land-use and transport scenarios. Travel Demand Models can be used
for testing different scenarios without actually implementing projects. For example, one can see the
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
22
impact of adding a mass transport use like a Monorail or BRT etc. Similarly impact on transportation
network due to changes in the land use patterns can be analysed. The broad framework for the
transport modeling for Patiala Study area is given in figure.
Several software programs are available for developing travel demand models. The Patiala
transport Model has been developed using TransCAD 5.0.
MODEL STRUCTURE
The model is based on a conventional 4-stage transport model approach. It includes
Trip Generation – calculating the number of origins and destinations for each zone.
Trip Distribution – attaching the origins and destinations for complete trips.
Mode Choice – determining the mode for each trip (TW, car, auto rickshaw, taxi, Public
transport).
Assignment – assigning passengers to their respective highway and transit networks.
The highway (road) network includes all major roads and some key minor roads. The transit
system was built with the existing public transport system i.e., bus with their routes, frequency and
fare structure.
CALIBRATION
Household interview survey was conducted at 2% sample size of each zone and about 8110
samples were collected in the study area. Through the sample collected along with RSI, mode wise
matrices were developed for two wheeler, car, auto rickshaw, taxi and public transport (bus). These
base year trip matrices are checked for their accuracy by assigning distributes trips by mode on the
road network. The assigned traffic across the screen lines are compared with the observed traffic.
Once the model is calibrated, it can be used to predict the future travel patterns under different land
use transport scenarios.
The model is responsive to:
Street congestion, travel costs, availability of competing transport modes including other
Public Transport systems and the growth of the city.
Generalized costs that include out of pocket costs i.e. fare, vehicle operating cost etc. and
perceived user costs such as value of travel time, cost of waiting time for transit etc., The economic development of the region. A comprehensive data on economic
development in the form of land-use and transport development proposals was collected.
The model focuses on morning journey to work peak period conditions. Peak period models
provide much more accurate indications of directional travel patterns during design conditions than
do daily models. However, the daily traffic forecasts can be estimated using peak today expansion
factor which is obtained from the traffic survey. From the surveys it was observed that the morning
peak hour is during 09:45 AM to 10:45 AM. So the model was built for this duration.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
23
Figure 5-3: Patiala Zonal Map
PLANNING PERIOD
Year 2011 is taken as the base year. Demand forecasting on the network and on any
proposed mass transit system is required over a 20-25 year period. In order to analyze the travel
demand in the study area and estimate the likely traffic patronage on any proposed system, all
relevant data have been collated for the base year 2011 and the horizon year 2031.
MODES
The modes that are modeled in the study include two wheeler, car, auto rickshaw, taxi and
public transport (bus). Commercial vehicles and NMT (cycle) were considered as a preload.
The following section detail out the Travel Demand Model developed for the project.
STUDY AREA ZONING
The zoning system adopted should also be in coherence with those adopted by the local
planning bodies and those by the past traffic studies conducted in the region. The zone system of
study area (Patiala) comprised of 50 internal zones and 11 external zones outside, making a total of
61 zones. These zones for Patiala study area are
shown in following Figure and Table.
Table 5-4: Zone of study area
Sl.No Sub area Total No of Zones
1. MCB 57
2. Other Villages 6
3. External Zones 4
Total 67
NETWORK DEVELOPMENT
Transport network developed for the model comprises of
two components
Highway Network for vehicles
Transit Network for public transport system i.e. bus.
Each of the networks is described in detail as below.
Table 5-5: Patiala Road
Network Details
Road length 200 km
Nodes 417 nos.
Centroids 67
links 1502 nos.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
24
HIGHWAY NETWORK
The coded highway network for the study area
represents the nodes (intersections) and links between
them. Connectivity between the network and zones is
provided through centroid connectors. Based on the
network inventory, each link has been assigned attributes
such as: number of lanes; divided or undivided
carriageway; encroachments; availability of footpaths etc.
Identified road network for the study area is given in
Figure 5-4.
TRANSIT NETWORK
The transit network represents the connectivity,
headways, speeds and accessibility of transit services.
Patiala’s public transport system is included in the model’s
transit network. The transit routes are specified as those
using the transport links and having stops/stations at
determined locations. The access to the stops/stations from
zone centroids and other nodes is provided either by
existing highway links or by defining exclusive walk links.
The base demand model does not have any Public
Transport systems. Primarily the buses are plying on major roads.
TRIP GENERATION
The trip generation process estimates the productions and attractions for each trip purpose.
Patiala transport Model has three trip purposes and are shown in the Table No
Table 5-6: Trip Purposes Used in the Patiala Transport Model
Sl.No Purpose Description
1 Home Based Work (HBW) Work and work-related business
2 Home Based Education (HBE) Educational Related
3 Home Based Others (HBO) Religious, medical/dental, personal, business, school,
take someone or pick up someone, and other
Various Planning parameters like Population,
Employment, Student population, average income,
area of different land uses that attracts the trips. The
trip generation equations developed for the Patiala
Transport model is as shown below. The trip
generation process used for the development of trip
generation table is also shown in Figure 5.7.
Figure 5-4: Patiala coded
highway network
Figure 5-5: Patiala Transit
Network
Figure 5-6: Trip Generation Process
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
25
Table 5-7: Trip Productions and Attraction Equations for the Patiala Transport Model
HBW +158.805+(-12.86) Car+7.5 (2W)-5.40(bicycle)+0.17(POP) – 0.020(INC)
R2 = 0.78 ; F=40.20; T= 1.89;
HBE 0.3557(POP_STU)
R2 = 0.57 ; F=12.49 ; T= 3.53
HBO 309.398 - 0.078 (POP) +0.294 (EMP)
R2 = 0.58 ; F=5.62 ; T= 3.67
HBW 19.65(AREA_GOVT)+91.43 (Area of Shopping)
R2 = 0.55 ; F=4.89; T=2.21
HBE 8.84(Area_Edu)
R2 = 0.64; F= 8.59
HBO 33.49(Area_hosp)+0.59(Area_Ind)+29.306(Area_Shop)
R2 = 0.73 ; F=2.72 ; T=2.93
POP = population of TAZ (Traffic Analysis Zone)
INC = average income of household in TAZ
EMP = employment in TAZ
POP_STU = student population in TAZ
AREA_GOVT = area of government land in TAZ
AREA_SHOP = area of shops in TAZ
AREA_EDU = area of educational institutions in TAZ
NETWORK SKIMMING
Network skimming is a process of
identifying the route or travel path on the
transportation network that has the lowest
“cost” for the traveller. The “cost” can be the
travel time, distance or some monetary value.
In the Patiala Model the cost used is travel
time. This minimum path value is stored in a
matrix called the impedance matrix. This minimum path value results from the “skim tree” that is
developed. The skim tree is a table that shows all the possible combinations of links or paths that
could be used to go from one zone to another. The above Figure 5.8 shows the network skimming
process used for the Patiala model. The roadway network (.NET) file created in the “Network
Creation” process serves as one of the inputs in this process. The model uses the highway network
and performs highway skims from centroid node to centroid node. The travel time is “minimized” and
travel distance is skimmed. After the minimum travel time matrix is calculated, intrazonal travel times
are calculated and added.
Figure 5-7: Network skimming process
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
26
TRIP DISTRIBUTION
The purpose of trip distribution is to produce a
trip table of the estimated number of trips from each
TAZ to every other TAZ within the study area. Trip
distribution for this study was estimated using the
TransCAD Gravity Model program. The Gravity Model
assumes that the number of trips between two zones
is 1) directly proportional to the trips produced and
attracted to both zones, and 2) inversely proportional
to the travel time between the zones.
The Gravity Model formulation states that the number of trips between each zone is equal to:
n
j
AjFijKij
AjFijKijPiTij
1
)(
Figure shows the trip distribution process used for Patiala transport model. The trip
generation table and shortest path travel time matrix files created in previous steps serve as inputs in
this process.
PRODUCTIONS AND ATTRACTIONS
The forecasts of the number of trips produced and attracted by each zone provide the values
to which the rows and columns of the production-attraction matrix are balanced. The productions and
attractions must be either stored in a zone layer or in a table that is joined to a zone layer. These
values are the output of trip generation.
IMPEDANCES
Many different measures of impedance may be used to represent the functions of disutility of
travel between zones. Frequently-used measures of impedance are travel time, travel distance, or
cost. Impedances may be a combination of these measures and/or a combination of the impedance
of different modes.
GENERATING A FRICTION FACTOR MATRIX
Once you have an impedance matrix, you can generate the friction factor matrix. A friction
factor matrix contains the friction factor for travel between each pair of zones. Friction factor matrices
are created from an impedance matrix and either an impedance function or a friction factor lookup
table.
Figure 5-8: Trip Distribution process
Where Tij = Number of Trips from Zone i to zone j
Pi = Number of Trips productions in zone i
Aj = Number of Trip attractions in zone j
Fij = Friction factor represents the spatial separation between zones i & j
Kij = Optional adjustment factor (fudge factor)
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
27
Popular choices of the impedance function are the exponential and inverse power functions
typically used in entropy models. The equations are as follows:
Exponential Function f (dij) = e –c (dij) c>0
Gravity (Inverse Power) Function f (dij) = dij –b b>0
Tanner’s /Gamma (Combined function) f (dij) = a. dij –b . e –c (dij) a >0, c >=0
The aim is to select an impedance function and its corresponding parameters such that the
gravity model reproduces the trip length distribution (TLD) of the study area. There are several ways
to obtain these parameters. The preferred method is to calibrate the chosen impedance function to
match the travel patterns of the study area, or to use parameters that have previously been
calibrated for the study area.
Table 5-8: Coefficients in the Exponential function to estimate friction factors
Sl.No Purpose Inverse power Co-efficient
1 Home Based Work (HBW) 0.0407
2 Home Based Education (HBE) 0.3115
3 Home Based Others (HBO) 0.2168
K FACTORS MATRIX
Sometimes there are special situations where the travel patterns are different from those
predicted by the gravity model. These special patterns can be replicated using K factors matrix.
However, it is recommended to limit the use of these factors since the same flow patterns might not
continue in the future years. For the Patiala Transport model the K factors matrix is not used.
However, it is provided as an option in the model interface for future use, if needed.
TRIP LENGTH DISTRIBUTION TABLES
The travel time matrix from highway skimming and PA matrices from the trip distribution
process are used to determine the average trip length and the trip length frequency distribution for
each trip purpose. Figure 5.10 shows the observed and estimated trip length distribution results for
each trip purpose. In the Patiala model, the trip length results are saved to individual matrix files for
each trip purpose. TransCAD charting tools can be used to graphically display the trip length
distribution results.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
28
0%
10%
20%
30%
40%
0 5 10 15 20
PER
CEN
TAG
E
TIME (MINUTES)
TLFD CURVE (ESTIMATED &
OBSERVED)
HBW ESTIMATEDHBW OBSERVED
0%
10%
20%
30%
0 5 10 15 20
PER
CEN
TAG
E
TIME (MINUTES)
TLFD CURVE (ESTIMATED &
OBSERVED)
HBE ESTIMATEDHBE OBSERVED
0%
5%
10%
15%
20%
25%
30%
0 5 10 15
PER
CEN
TAG
E
TIME (MINUTES)
TLFD CURVE (ESTIMATED &
OBSERVED)
HBO ESTIMATEDHBO OBSERVED
0%
5%
10%
15%
20%
25%
30%
0 5 10 15 20
PER
CEN
TAG
E
TIME (MINUTES)
TLFD CURVE (OBSERVED)
HBW OBSERVEDHBE OBSERVEDHBO OBSERVED
0%
5%
10%
15%
20%
25%
30%
35%
0 2 4 6 8 10 12 14 16
PER
CEN
TAG
E
TIME (MINUTES)
TLFD CURVE (ESTIMATED)
HBW ESTIMATED
HBE ESTIMATED
HBO ESTIMATED
Figure 5-9: Trip Length Frequency Distributions
MODE SPLIT
The household travel survey carried out in 2010 shows low modal split in favour of public
transport. Modal split in favour of public transport for the city of size of Patiala should be in the range
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
29
of 40% – 60% of total motorized trips. The lower modal split in favour of public transport system
shows the deficiency in public transport system in terms of quantity and quality. A good mass
transport system is expected to increase a higher modal split in favour of public transport. It has been
assumed that modal split in favour of Mass Transport will increase to 45% by the year 2031.
5.3. ANALYSIS OF TRAFFIC CHARACTERISTICS -BASE YEAR TRAVEL PATTERN
DEVELOPMENT OF MATRICES
Household and roadside passenger interview data were used to develop the mode-wise trip
matrices. The external trips for the car, two wheeler, auto and commercial vehicles were developed
based on the O-D survey conducted at the outer cordon.
ROAD SIDE INTERVIEW
The road side interview on a sample basis along with classified traffic volume count was
conducted at outer cordon to capture the travel pattern across the cordons. Survey has been done for
duration of 24 hours at all outer cordon locations on a typical week day. Interview targeted all modes
(except public transit) that are to be modelled to extract the travel pattern across these cordons. The
mode wise matrices developed from the road side interview at cordon locations were merged using a
computer programme (developed in-house) to eliminate duplicate trips. Any illegal trips due to error
in data capture or at data entry level were removed and matrices were extracted.
The following steps including few major checks were carried out through the programme
Checking of any data entry error and zone coding error
Comparison of inner cordon and outer cordon matrices
Adjustments for common trips
Expansion of matrices with the classified volume count
Merging of RSI matrices
HOUSEHOLD INTERVIEW
Household interviews were conducted for a sample size of 8110 households in the study area.
The trip data has been coded to the zoning system. Mode wise matrices were developed. The
matrices were controlled at the cordons.
MATRIX MERGING
RSI matrices as well as the HHI matrices were merged to obtain the observed mode wise
matrices for validation. The results of the travel demand estimation for base year and trip rate
analysis is summarized in the Table.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
30
Table 5-9: Summary of the Estimated Base Year Travel Demand (mode-wise)
Sl.No Mode Internal External
Total (pcus) I-I I-E E-I E-E
1 Two Wheeler 29897 382 12772 167 43217
2 Car 1663 21 710 9 2403
3 IPT 4661 59 1991 26 6737
4 Public Transport 636 8 272 4 920
Total 29897 382 12772 167 53277
Table 5-10: Summary of the Estimated Base Year Travel Demand (Trip Purpose wise)
Sl.No Purpose No of Trips Percentage
1 Home Based Work (HBW) 107139 43.16%
2 Home Based Education (HBE) 63362 25.52%
3 Home Based Others (HBO) 77760 31.32%
Total 248261 100.00%
TRIP ASSIGNMENT
Trip assignment first involves the calculation of the
shortest path from each origin to all destinations (usually
the minimum time path is used). Trips for each O-D pair
are then assigned to the links in the minimum path and the
trips are added up for each link. The assigned trip volume
is then compared to the capacity of the link to see if it is
congested. If a link is congested the travel time is adjusted
to result in a longer travel time on that link. Changes in
travel time means that the shortest path may change. Hence the whole process is repeated several
times (iterated) until there is an equilibrium between travel demand and travel supply. Trips on
congested links will be shifted to uncongested links until this equilibrium, condition occurs. Figure
shows the trip assignment process for the Patiala Transport model. TransCAD User Equilibrium
method is utilized for each assignment with a default number of 20 iterations per assignment. After
each assignment, the output volumes for each link are exported to a new geographic file.
SCREEN LINE ANALYSIS
There are 6 screen lines in the Patiala Transport model. Screen lines are imagery lines drawn
across several sections of various roadways to assess the performance of the model by comparing the
total model assigned volumes and total actual counts for those roadway sections. Figure shows the
location of screen lines used in the Patiala Transport model. Table below shows the results of the
screen line analysis. Individual screen lines volume should have a comparison goal of plus or minus
20%.
Figure 5-10: Traffic Assignment
process
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
31
Table 5-11: Results of Observed and Assigned flows on Screen Lines
Sl.No Screen Line Inflow (PCUs)
% Out flow (PCUs)
% Assigned Observed Assigned Observed
1 Sangrur Road 1972 2033 -2.98% 956 889 7.59%
2 Nabha Road 1752 1561 12.25% 636 739 -13.88%
3 Bhadson Road 840 875 -4.02% 1200 1160 3.47%
4 Sirhind Road 3233 3184 1.53% 2033 1834 10.84%
5 Rajpura Road 3531 3656 -3.42% 3371 3111 8.36%
6 Sanaur Road 928 997 -6.92% 1613 1736 -7.10%
7 Pohewa Road 5399 5438 -0.72% 3446 3693 -6.70%
The observed highway and public transport matrices were assigned on the network. The
assigned traffic volume has been compared with the observed traffic counts on cordons and screen
lines. The assignment is carried out in two stages with the assignment of Transit trips following the
Highway PCU Assignment. The highway assignment is the assignment of vehicles on roads and this is
carried out also in stages with commercial vehicles, NMT (cycle) and buses taken as pre loads. The
mode wise trip matrices developed from the primary surveys have been converted into PCUs by
applying the equivalent passenger conversion factors. The occupancy and PCUs used for different
modes is presented in Table.
Table 5-12: Passenger to PCU conversion Factors
5.4. ANALYSIS OF VEHICULAR TRAFFIC AND BOTTLENECKS
After calibration and validation, the base travel matrices were once again loaded and the flow
themes were created to analyze the existing situation. As the capacities of the existing roads were
unable to get content with the increasing traffic of Patiala, the level of service of all the roads gets
deteriorated. Almost all the major roads have Volume/Capacity (v/c) ratio exceeded one.
Figure 5-11: Traffic volumes on Major Arterials
Mode PCE Occupancy Factors
Car 1 2.5
Two Wheeler 0.5 1.5
IPT 0.5 3.20
Bus 3.7 22
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
32
Table 5-13: Traffic Volumes from the Base Model on Arterials
NAME LENGTH TOTAL PCUS MAX_V/C CAR TW IPT
Bhadson rd 10.98 2036 0.66 144 2861 444
Bhupinder road 2.09 4555 1.39 273 5579 857
Mall road 1.59 3462 1.14 72 1454 225
Nabha road 7.89 2792 1.17 151 3145 472
Ghanaur-Patiala road 29.53 2734 0.99 102 1826 284
Sh8 (Sirhind road) 18 8024 2.56 335 6738 1033
Stadium road 1.26 5341 1.65 209 4381 676
The traffic volumes on the major arterials were presented in Table 13. The major roads Like
Bhupinder road, Mall road and Sirhind road are carrying more than 5000 PCUs/hr. The National
Highways like NH64 is carrying more than 7500 PCUs/hr. The traffic near Bus stand is getting choked
with the access of pedestrians amidst of heavy flow in peak hours. This urges the need for the
planned development so that the increased traffic can be taken care. The V/C ratios of all the major
corridors are shown above. The V/C ratios of major roads like Sangrur road, Nabha road, Sirhind
Road, Rajpura road exceeded 1.5 which offers the Level of Service F. The intersection volumes with
the turning movements are presented in the figure below. Major junctions like Children mode,
Dukhniwaran chowk, Fountain Chowk and other junctions need to be treated to cater the growing
traffic.
Table 5-14: Traffic Volumes from the Base Model on Arterials
Sl.No Major Roads/Traffic Generators V/C Ratio
1 Sangrur Road 1.83
2 Nabha Road 1.17
3 Bhadson Road 1.23
4 Sirhind Road 2.56
5 Rajpura Road 1.89
6 Sanaur Road 0.99
7 Pohewa Road 3.11
Figure 5-12: Leela Bhavan (Children mode
Chowk)
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
33
Figure 5-14: Dukhniwaran Sahib Chowk
Figure 5-13: Bus Stand Chowk
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
34
Figure 5-16: SST Chowk
Figure 5-15: Fountain chowk
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
35
4%
17%6%
35%
26%
0%
2%
10%
Distribution of Population by Occupation
Govt.ServicePrivateServiceBusiness
Student
0
5000
10000
15000
20000
0-6 7-16 17-24 25-59 >60
po
pu
lati
on
Age Group
Distribution of Population by Age
5.5. ANALYSIS OF SOCIAL CONSIDERATIONS
HOUSEHOLD AND PERSON CHARACTERISTICS
The Socio-economic characteristics of the people of Patiala city by their spatial distribution
have been analysed to discuss their impact on their travel behavior and pattern. The following
sections present the socio-economic characteristics of the people by Traffic Analysis zones.
HOUSEHOLD SIZE
The average household size at city level is observed to be 4.49. It ranges between 7.38 (TAZ-
13) and 2.74 (TAZ- 56).
AGE GROUP
Patiala is a city of young teens and adult people. Nearly 50% are below 25 years. Presently
8% of people are above 60 years. The average age group can be considered between 25-30 years.
The high share of young and middle age groups indicate the high demand for educational and work
opportunities.
Table 5-15: Population Sample Distribution by Age
OCCUPATION
Students (28%) and House wife (28%)
accounts to the major share of occupation in the
Patiala City. Private Service is next to the
occupations above with 14% followed by
Business with 8%.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
36
HOUSE HOLD INCOME
The average monthly household income was observed to be `13029. The range amongst the
zones is wide. TAZ No. 38 (Polo ground, Lower mall)) recorded the maximum average household
income of `25,000 and minimum in TAZ No. 11 (Ghuman Nagar) with `3,477. For assessing
distribution of households by the income groups, the following categorization based on HUDCO
practice, has been adopted:
Table 5-16: Income Categories according to HUDCO
Category Monthly Household
Economically weaker Sections Up to 2500
Low Income Group 2501-5500
Middle Income Group 5501-10000
High Income Group Above 10000
More than 40% of the households recorded as high Income Group followed by the Middle
Income group and low income group with 26 and 27% respectively. The Economically weaker section
is negligible.
HOUSEHOLD INCOME AND EXPENDITURE
The household monthly expenditure is nearly 50% and the expenditure on transport accounts
to 20% in the City level. Precisely, the average monthly income, expenditure and expenditure on
transport of the household is `3,029, `4410, `790 respectively at city level. But in most of the TAZs
which belongs to High Income Group and Middle Income group the expenditure ranges between 60%
- 70% and expenditure on transport is between 15-25%.
5.6. IDENTIFICATION OF ISSUES
To assess the existing mobility issues, a large scale data collection effort that included several
traffic and socio-economic surveys were undertaken. Formats of the surveys are shown in Annexure
1. The transportation related issues in Patiala that must be addressed for its impact on the transport
system include:
Road Infrastructure
Personalized transport
Public transport
Traffic
Parking
Safety etc.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
37
5.7. COMPREHENSIVE ANALYSIS OF URBAN TRANSPORT ENVIRONMENT
ROAD INFRASTRUCTURE
The Study area has a total road network of around 200 Km (excluding local network). The major
roads and National Highways constitutes up to 73 km. Approximately 60% of the roads are two
lane roads and 20% of the roads are 4 lane. Though the surveyed 4 lane roads are 20%, parking
and encroachments on carriage way has led to underutilization of the road capacity.
Due to the spatial disparity in growth, traffic movement is from periphery to the core city. The
radial roads especially in the periphery are inadequate, with the absence of more circumferential
roads connecting radial roadway system.
The roads in and around old city are congested due to unauthorized/designated parking stretch
at irregular intervals, hawkers encroachments and traffic indiscipline.
Sufficient road space is now available inside the core city areas like Dharampura Bazar,
Anardhana Chowk, Arna Barna Chowk, Dwakoli bazar, Arya Samaj chowk, but if there is a lack of
planning for decentralization of core area, there is a chance for creation of haphazardness in near
future. The Cloth market areas and mall road markets will expand with time.
PERSONALIZED TRANSPORT
The average annual growth rate of vehicles in Patiala is about 7.5% substantially higher than
the population growth rate. Increase in the number of registered vehicles on the limited road space
has led to overcrowding and congestion on roads.
PUBLIC TRANSPORT
Private bus operators dominate and there is no Government Transport System. More over the
private operators of inter city traffic compete with Government Systems.
Due to inefficient rationalization of routes, public transit routes are unregulated, with too many
buses in one route causing confusion and congestion.
The lack of dedicated bus system also tends the commuters to prefer the personalized mode of
transport.
TRAFFIC
Traffic volume is very high in the vicinity of old city. Volume-Capacity ratio is found to be
more than 1 during the peak periods.
Many junctions are congested during peak hours.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
38
Some junctions are not up to geometric design standards. Low sight distance and turning
radius prevails at many junctions.
Bus stops and access to minor roads are located closely at many junctions.
Intermediate transport modes like auto-rickshaws, cycle rickshaws and camel carts are
prevalent in the core city area.
The average speed in the commercial areas of the city is 15 kmph during peak hour.
PARKING
Absence of off-street parking facilities result in haphazard parking along the roads,
leading to congestion on roads in the core city area.
About 70% of the vehicles are parked for duration of 30 min or less.
Highest parking demand is recorded in and around the old city area.
SAFETY
Incidentally, the highest death rate in road accidents has been recorded in Patiala district
where 331 persons died in 551 accidents in 2007 and 306 persons lost their lives in 638 road
accidents in 2008. Ludhiana district followed closely with 283 deaths in 512 road accidents in 2007
and 312 deaths in 483 road accidents in 2008. In the year 2009 in January alone 32 persons had died
in Patiala district in 49 road accidents-both figures again highest in the state
OTHER ISSUES
Lack of enforcement of traffic rules, especially inside the old city.
Lack of traffic awareness among the citizens.
Need for adequate truck terminals
NON-MOTORIZED FACILITIES
The share of non-motorized trips is 40%. Of which about 35% are walk trips. There is
significant usage of cycle rickshaws and bicycles in the city especially near core area.
Lack of organized NMT facilities like pedestrian crossings, cycle rickshaw stands, bicycle
lanes etc.
Footpaths are encroached by hawkers
The detailed analysis of the present traffic characteristics of the study area is presented in
Annexure 2.
The present situation in Patiala will continue to worsen if nothing is done. Do-Nothing
forecasts show lower network speed of 20 kmph in 2030.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
39
Table 5-17: Future traffic scenario in Patiala with do nothing alternative
Average journey Speed 18 kmph (core areas) ; 30 kmph (total network)
Fatality index (Fatalities/ Lakh of population) 24
Walkability Index (Footpath length/road Length) 70%
Public Transit share -Nil-
Non-motorized share 35%
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
40
PART II: DEVELOPMENT OF URBAN LANDUSE AND
TRANSPORT STRATEGY
6. DEVELOPMENT OF VISION AND GOALS
6.1. THE VISION
The Mobility Plan seeks to “move people, not vehicles”. By emphasizing the pre-eminence of
public transport and non-motorized transport and integrating the land use with transport networks, it
seeks to achieve the objective of National Urban Transport Policy (NUTP) in Patiala. The vision for
transport in Patiala ensures that the city will have high class sustainable and efficient transport
system that will trigger the city to become economically vibrant, environmentally sustainable.
6.2. URBAN TRANSPORT DEVELOPMENT STRATEGIES
The rapid pace of urbanization that Patiala has witnessed will continue in future and as a
consequence it is imperative that the transport system must support the Patiala city and regional
development. The existing infrastructures and facilities of transport in the town will be inadequate to
adequately meet the demands of the future growth by the horizon year. Integration of transport
facilities with the economic activity areas must be a priority. Inspite of having and relying on non-
motorized modes of transport, non-motorized facilities are deplorable and needs to be improved and
integrated with the public transport system. The increased vehicular traffic has deteriorated the
quality of environment of Patiala.
In order to address the existing and envisaged mobility situation in 2030 and to fulfill the
vision stated above, the following objectives need to be achieved.
Integration of land use and transport connectivity
Improved accessibility
Improved pedestrian facilities
Introduce parking facilities
Improved safety of travel
Reduction un traffic congestion
Reduction in Pollution
The mobility goals for Patiala are addressed through a multi-pronged approach. Solutions for
complex transport improvements cannot be achieved by a single strategy. The strategies set for
Patiala are Land Use and Transport Strategy, Development of Mobility Corridors, Public Transit
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
41
Improvement Strategy, Non-Motorized Transport Strategy, Parking management Strategy, Freight
management Strategy and Traffic Management Strategy.
6.3. GOALS SETTING
A set of planning level performance indicators have been developed as goals to be achieved
for the city. The goals have been defined based on the vision and the objectives. The goals were set
in consultation with Patiala Municipal Corporation and the Stakeholders. The mobility strategies
(addressed in the subsequent chapter) developed will aim at attaining these goals.
The goals set for Patiala transport system are illustrated here
Table 6-1: Transport system goals for Patiala
Index Formulation Present Goal Exclusive PT Mode Share (Motorized)
Public Transport Trips / Total Trips (Motorized) 0% 45%
Walkability Footpath Length / Road Length 70% 100% Fatality No. of Fatalities / Lakh of Population 24 1 NMT % of NMT trips in total trips 35% 45%
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
42
7. FUTURE URBAN GROWTH SCENARIOS
7.1. URBAN GROWTH SCENARIOS IN MASTER PLAN
The existing land use distribution determines the nature of development of a settlement and
its economic status is also reflected through the type of its physical development. The study of
existing land use distribution helps in fixing the priorities and for evolving a strategy for the future
development of the area. The existing land use scenario guides a planner to allocate land for different
land uses viz., residential, industrial, commercial, public / semi public etc rationally and optimally so
as to achieve the high level of efficiency of land which is limited.
PRESENT LANDUSE AND MASTER PLAN OBJECTIVE
The beauty of Patiala City is its radial spread
of topology with minimal constraints and opened on
all sides for the development. While most of the
economic activities are located in and around old city
area, the residential colonies have grown mostly in
the southern parts particularly in the south western,
south eastern and north eastern areas. The Central
business district lies in the centre. This imbalance in
the location of the jobs and residence over space
coupled with inadequacy of the Public Transport
system generates huge volume of intermediate and personalized traffic especially on arterial roads.
This is also reflected in the traffic volumes on the main roads with growth rates of volumes ranging
between 6 to 8% per annum.
In recent years, the city was mostly developed in the southern region viz., model town
because of variety of reasons like away from the city centre, availability of arterial network etc.
Considering all these developments the physical development can be categorized in to two parts (i)
Old City area (ii) Outside City area. The old city area is continuously developed area having densely
populated residential and commercial land uses with no scope for physical expansion. This has
pressurized development in the north eastern, south eastern sides. The area on the eastern side from
Railway Lines is more developed relatively to the other half.
The Master Plan 2031 strategy aims:
Figure 7-1: Development proposals of
Master Plan
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
43
The long term vision and the mission
statements would require spatial land use planning,
infrastructure planning, financing and
implementation, effective management and
operation of infrastructure services, and regulating
and enforcing plan proposals. The objective of the
Master Plan is to create enabling spatial and Land
Use Planning framework to achieve the Vision of
LPA Patiala. More specifically following are the
objectives.
To make Patiala city as the most vibrant economic centre to promote the balanced regional
growth.
To make land allocation in an environmentally benign fashion.
To minimize haphazard, unplanned and sub-standard growth and development of the city
and to achieve planned growth to create healthy environment.
To effectively manage the traffic and transportation within the city through the mechanism of
rationalizing the landuse pattern defined in the Master Plan.
To make land available for public purposes.
To minimize travel within the city by creating self contained and self sufficient communities
Adequate parking spaces to be created in the city as an integral part of commercial,
industrial and institutional planning and development process.
To strengthen the basic infrastructure favorable for Petro Chemical and Petroleum Industries.
To rationalize the distribution of physical and social infrastructure in order to ensure
appropriate quality of life to all the residents of the city.
To identify man-made and natural heritage and to make heritage conservation as integral
part of the city planning and development process.
The Proposed future developments of Residential and Industrial are shown in figure.
The Patiala Urban area is the major economic core but at the same time, it is crucial to actually
realize the contribution of the Region towards the economy. No single alternative can be adopted for
L.P.A Patiala, keeping in view the trend of development and urban sprawl all around the municipal
limits of Patiala. Hence a combination of all the three alternatives need to be applied for better
planning and development of the area i.e twin centres, one centre along Patiala - Sirhind road and
another along Patiala – Rajpura road with development along Patiala – Nabha road and Patiala –
Bhadson road has been proposed, including optimum utilization of strategically located govt. lands.
Similarly development between Sangrur road and Nabha road, Nabha.
Population of the study area is expected to increase from 6.59 lakhs in 2010 to 9.80 lakhs in
2031. Considering proposed land use, transport sector requirements up to 2031 are assessed using
Figure 7-2: Proposed land use plan
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
44
travel demand model using the TransCAD software. The transport sector recommendations contained
in the various state and local governments have been examined before making the assessments.
There are 4 models of urban development which generally observed in various cities. The
details of same are discussed below.
Model 1 - Concentric Growth: This is type of urban growth is
prevalent in most of the Indian cities with Central Business District
(CBD) and concentric growth all round with lower densities as the
distance from center increases. This growth model is generally observed
in cities due to lack of land use planning processes.
Model 2 – Ring Towns: This is type of development is
proposed for cities with concentrated development to prevent any
further growth. Development of Satellite towns on the radial roads
away from the city would act as counter magnet growth centers that
will restrict the growth of original city. This concept is implemented in
National Capital Region of Delhi NCR towns all round Delhi have been
identified to act as counter magnet to Delhi.
Model 2 - Corridor Development: This type of development is also
known as linear development, prevalent in Indian cities due to
uncontrolled development. This type of development is takes place on
either side of the road all along radial roads outside the city limits.
This type of development is generally observed in new townships
planned in the outskirts of cities. Corridor development is allowed in
such areas before imposing development controls in order to allow
densification of the new townships.
Model 4 – Corridor Node Development: This is a
combination of above two models namely Mode 2 and Model 3 (Ring
town/ Satellite Town & corridor / linear development. In this model
the development along the radial roads is allowed in addition to
satellite / ring towns. This model would allow the faster development
/ densification of the study area.
For the purpose of transport demand analysis, two scenarios have been analyzed as follows:
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
45
SCENARIO 1
This scenario considers a ‘do nothing’ situation wherein no Improvement in the existing
system is proposed. The purpose of the scenario is to identify the magnitude of the problem and the
extent of meeting the vision if no measures are taken to overhaul the transport system in the city.
SCENARIO 2
In addition to the proposals that are on the anvil, scenario 2 considers the implementation of
certain mobility strategy plans as detailed later in this section. These strategies would enable to
evaluate the development and compliment the scenario that has been developed.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
46
8. FUTURE TRANSPORT NETWORK SCENARIOS
8.1. ROAD NETWORK SCENARIOS
RING ROAD
The city grew around the core area and
consequently several roads that form the radials
became prominent. The future land use growth
will continue in the existing Patiala Local Planning
area, along with new growth centres being
developed in the periphery of PDA. Due to this a
ring road (58 km) is proposed around the Patiala
City to increase the mobility of the city and divert
the through traffic without adding the congestion
to the city road network.
The integrated land use transport
strategy will focus on:
i. Accessibility within Patiala LPA of Patiala
ii. Connectivity to the new growth areas
iii. Development of areas near arterials
Consequently, the framework for the urban transport network strategy has been evolved in the
following manner.
Radial network complemented by semi circumferential roadway system, wherever
possible, thereby leading to decentralization of trips through the old city area, by
identification of new access points into the city and connecting it to the activity areas of the PDA.
This will lead to identification of missing links in order to complete the above radial with
semi orbital roadway system.
The density pattern of the proposed development of preferred landuse with in 1 km
radius is as shown in the figure. This represents the proposed Outer Ring Road of Patiala
and the improvement of the same leads to the development of Land Use Transport which can be responsible for reduction of traffic chaos for the massive growth of traffic in
future.
The Road Network Scenario in one short can be explained as shown in the figure. Considering
the major corridors as indicated earlier, during the horizon years 2021, the inner ring can be
constructed with the planned radials with a right of way 60-80 m. By the completion of 2031, full ring
can be constructed, thus completing the Outer ring road for Patiala.
Figure 8-1: Proposed Ring Road alignment
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
47
Figure 8-2: Patiala Road Network
Figure 8-3: Patiala Raod Network with Inner ring and Radials (2021)
Figure 8-4: Patiala Raod Network with Outer ring and Radials (2031)
8.2. PUBLIC TRANSPORT DEVELOPMENT SPLIT SCENARIOS
One of the goals identified as part of the vision is to increase the public transport trips (road
and rail) to 40-45% from current levels.
For this purposes various technology alternatives in public transport are being considered.
The alternate scenarios considered are:
• Bus Fleet Augmentation
• Bus Rapid Transit System (BRTS)
• High Capacity Rail Based Systems (Monorail)
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
48
BUS AUGMENTATION
Patiala city doesn’t have any Public transportation system. Considering the size of the city,
most of the inter-city trips would be catered by Non-motorized vehicles and Auto rickshaws. The
inter-city bus services (the sub-urban services to mofussil towns round Patiala) coming to the bus
stand also serves as a part of intra-city travel demand from the periphery of the city centre. The
absence of proper city bus services in Patiala is being felt lately by the local population as modern
economic activities have grown significantly in the city over last one decade or so. An organized and
well structured CBS is expected to enhance the mobility levels of city population specially children,
women and senior citizens. Due to complete lack of a good transport facility, this group of city
dwellers is facing severe constraint in travel.
Bus Augmentation can be done only if there is any existing transportation system by the
Government Authorities. As there is no PT system in place, this would be the right time to develop
Bus Corridors in conjunction with the commercial and residential development.
HIGHER ORDER MASS TRANSIT SYSTEM STRATEGY
As ridership levels increases, a high capacity public transport system is warranted for the
future. The various mass transit options that are available with its salient features are presented in
the following table. With the anticipated population of almost 10 lakhs in 2031, it is expected that the
Peak Passenger per Hour per Direction (PPHPD) in the transit network, along some of the corridors
would have more person trips in future. Bus augmentation will not be able to cater to the increased
public transit load and alternatives mass transit system such as BRTS, Mono-Rail, and LRT etc
become necessary. Based on the ridership levels on various corridors, appropriate PT systems are
suggested for Patiala and presented in the following Table and Figure. Results from the transport
model indicates that the high capacity High Dense Bus Corridor, BRTS and Monorail network would
increase the public transport modal shares to 45%.
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Patiala Final Report
49
Table 8-1: Mass Transit Options
Transit Mode Metro Monorail AGT LRT BRT
Station Spacing (Approx)
1-2 km 1 km 1.5 km 0.5 km
Vehicles High platform cars
operating in multiple car trains sets.
High platform cars operating
in multiple car trains sets, electric propulsion
Articulated, double articulated
low floor can operate in multiple car sets, electric
propulsion
Standard, articulated double
articulated low or high platform cars diesel/hybrid propulsion, Electric
Trolley Bus
Seated Capacity 60-80 Per Car 30-75 Per Car 65-85 Per Car 40 Standard; 65 Articulated
85 double articulated
Passenger Throughput
Throughput Up to 40,000 PPHPD
Up to 15,000 PPHPD Up to 30,000 PPHPD (Elevated LRT)
Up to 5,000
Min.Curve Radius 120 m 30 m 30 m 15 m
App O & M Cost per km
100-200 Lakhs 40-60 Lakhs 50-60 Lakhs 10 Lakhs
App Capital Cost
per km
200 Crores 120 Crores 150 Crores 15 Crores
Implemented Cities (International)
Bangkok, Kuala Lampur, Mexico City, Cairo
Tokyo, Kuala Lampur, Sydney, Seattle
Hongkong, Shanghai, Kuala Lampur
Istanbul, Taipei, Bogota, Curitiba, Pitts, Adelaide
Implemented Cities (India)
Delhi, Kolkata, Bangalore, Hyderabad Under
implementation
Under Implementation in Mumbai
Kolkata Ahmedabad, Delhi
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
50
Table 8-2: Suggested Public Transport Systems
Sl.No Line No
From via To Length PPHPD (2030)
System Phase II
(2020-2030)
1 Line 1 Chamarheri Bus Stand, Mini Secretariat, Thapar College Kalyan Village 22.1 9041 HCBRT
2 Line 2 Hardaspur FCI, Fountain Chowk Ranbirpura 17.7 10173 HCBRT
3 Line 3 Sidhuwal Bhadson road-Mall road-Bus Stand-Sanaur Kula Mazra 18.9 8377 HCBRT
4 Line 4 Outer Ring Road(Kalyan,Kalwa, Daun Kalan,Pasiana,Bishanpur) 54.1 7859 HCBRT
In addition to the above routes, two mini bus routes were proposed to cater the early and existing demand in current year. The routes are as below.
Sl.No Line No
From Via (some stops) To Length
1 Mini bus line 1 Seuna Ranjith nagar, Anand Nagar, Tripuri town, Tripuri Chowk,
Bus Stand, Mohindra College Sanaur 18.5
2 Mini bus line 2 Jhill Focal point, DCW workshop, Gurubakhs Colony,
Mohindra college, Modi College, Alipur road junction Jhill 18.7
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
51
Figure 8-6: MASS TRANSIT NETWORK (2031)
Figure 8-5: MASS TRANSIT NETWORK (2021)
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
52
9. DEVELOPMENT OF URBAN LAND USE AND TRANSPORT STRATEGY
9.1. EVALUATION OF URBAN GROWTH AND TRANSPORT NETWORK SCENARIOS
To accommodate the projected population of 10 lakhs by the year 2031 in Local Planning
Area, Patiala, a four-pronged strategy is adopted:
Intensification of central core
Intensive growth along the inner ring and Outer ring
Development of ring towns in the Local Planning Area
Extension of peri urban area
Generally, the development would take place along the corridors and the same happened in
current scenario. In future along with the proposed developments, growth areas have to be identified
along the proposed ring road. Currently the densification of the residential pattern along the corridor
within one km is as shown in the figure.
The major network of Patiala and surrounding region appears as radial type of network. The
Master Plan 2031 advocates the inner ring and outer ring road pattern with wide roads. The vision of
Master Plan would be complemented with additional radial and semi circumferential roads to form a
radial and semi ring pattern. These semi rings would also be part of the mobility corridors. The
network strategy would be used to identify the multi-modal corridors in the study area.
Figure 9-1: Patiala Road Network-2031
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
53
9.2. STRATEGIES FOR LANDUSE AND TRANSPORT SYSTEMS DEVELOPMENT
TRANSPORTATION IMPROVEMENT STRATEGIES
The mobility goals for Patiala are addressed through a multi-pronged approach. Solutions for
complex transport improvements cannot be achieved by a single strategy. The strategies set for
Patiala are
Land Use and Transport Strategy
Development of Mobility Corridors
Public Transit Improvement Strategy
Non-Motorized Transport Strategy
Parking management Strategy
Freight management Strategy and
Traffic Management Strategy
It is important to note that each of the above strategies is equally important and the order of
listing does not imply priority. Each of the broad strategies includes sub strategies of immense
importance. The strategies when implemented through specific projects shall fulfill the goals and
objectives of the study. The following table highlights the specific strategies and policies and the
sections thereafter discuss these strategies in detail.
Figure 9-2: Transport Strategies and their inter linkages
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
54
Table 9-1: Transport Strategies and Policies
Sl.
No Strategy Policy
1. Moving people rather than
Vehicles
• Augmenting the coverage and capacity of the rail and bus transits • Priority for bus transit by reservation of lanes along major arterial roads
• Differential pricing commensurate with the LOS for public transit.
• Running mini-buses for railway/metro stations access
2. Integrating land
use and urban transportation
• Developing a transport network based on Comprehensive Transport &
Traffic Study • Restructuring the land use distribution around MRTS/transit nodes
• Reduce the gap in the supply of minor arterial/collectors. Develop grid
network in outer areas.
3. Priorities to non-
motorized
transport (NMT)
• Footpaths in residential streets and on major roads with commercial
activities
• Redeeming the existing footpaths from encroachments & obstructions • Propose legal framework for evicting the encroachments on footpaths /
roads • Demarcating road space exclusively for movement by pedestrians and
cyclists • Providing safe passage of pedestrian / cyclists by grade separation
4. Optimizing the
existing road
and transport infrastructure
• Widening critical road links and intersections
• Phased widening of roads to their prescribed street alignment width
• Articulating the road network by developing missing links • Selected junction improvements for improving corridor throughput
• Upgrading high density corridors as multi-modal transit corridors • Shifting the inter-regional terminals from city core to the city fringe.
Mandative off-street parking norms for various land uses
Develop multi-level parking at major traffic generating locations
Develop park-and-ride facility at all critical Public Transport Stations.
5. Putting a
parking policy in place
Develop park-and-ride facility at all critical bus terminals
Restrict/ban on-street parking on critical commercial streets
Parking pricing to reduce the use of private modes
Construction of parking complexes on government agencies land
6. Redefining the
role of para-transit
Encourage wider coverage and capacity by the para-transit
Provide parking for para-transit at public transport terminals
Encourage cycle-rickshaws to operate between residential areas and
transit routes
Regulate the operation of para-transit by enforcing minimum safety
norms.
7. Segregating
freight traffic &
passenger traffic
Plan and develop orbital roads in the form of urban bypasses
Plan and develop outstation truck terminals and parking
8. Deploying
various travel
demand management
(TDM) measures
Stagger the school & office & market times zone- wise
Encourage car-pooling and van-pooling
Encourage new industrial complexes to have residential quarters within
their premises
Decentralize major activities to reduce traffic
9. Putting in place
an environmental
development management
mechanism
Enlarge vehicular population using pollution free fuels viz. LPG / CNG /
battery
Establish a GIS based air quality monitoring and information system
Major transport development measure to comply with environmental
safeguards Subject every major transport development measure to safety audit
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
55
Sl. No Strategy Policy
10. Setting up a
unified institutional
framework
encompassing all modes
Set up UMTA within a specified timeframe with coordinating, planning
and advisory role
PPP in development as well as operation of urban transport
infrastructure
11. Enforcement as a potential tool
for development
Effectively clear infrastructure assets from encroachments by constant
patrolling Campaigns and special drives to educate the road users to adhere to
traffic discipline
12. Promoting
innovative technologies /
practices
Leverage ITS and technology applications
Develop new roads with ducts for services / utilities
Cement-concrete the existing road pavement particularly the road
intersections
NON-MOTORIZED TRANSPORTATION STRATEGY
About 35% of trips are made by Non-Motorized
Transport (NMT) that include walk, cycle trips as well as
trips made by cycle rickshaws and other NMT modes. Even
though walk being a predominant mode of transportation in
the city, the infrastructure available for the same is poor as
well as substandard.
The mobility plan targets to atleast sustain the
current share of NMT trips (35%) in the future also as it is difficult to increase NMMT with the
declining trend of its growth. important to improve thee facilities making it a preferred mode for short
trips. Strategies towards NMT are to segregate them from fast modes by providing safe facilities like
designated and well maintained footpath of 1.5m width (desirable 2m). Provision of cycle tracks along
all mobility corridors and designate safe cycle zones in residential areas.
PARKING MANAGEMENT STRATEGY
Currently most of the roads in Patiala have free- on
street parking, including the core city areas like Old GT road
from PNB chowk to Jyothi Chowk, Nehru Garden road, near
PMC Chowk.
The main consequence of this is the loss in the
throughput of the adjacent street due to parking
interference. As part of the principles upon which the CMP is
being developed, it is envisaged that off-street parking sites
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
56
would be developed and integrated with the Public Transport terminals to facilitate the public
transport.
FREIGHT MANAGEMENT STRATEGY
On an average daily about 6% of the truck and MAV’s enter and leave Patiala which has no
business in Patiala. At present most of the commercial activities are located in the core area i.e. along
Dhobi Bazar, Sirki bazar, Kikkar Bazar, Bank Bazar, Hanuman Chowk etc., This has made it
mandatory for all the commercial vehicles which have origin /destination in the town to enter the core
area for loading and unloading at least during the night hours. Also considerable LCV’s are seen to be
parked along roads at different part of the town. Freight transport management strategies include
increasing the efficiency of freight and commercial transport by restricted delivery times in the old city
area, allowing commercial vehicles only on designated truck routes during peak periods, shifting of
market activities towards the periphery of the town and developing truck terminals/warehouses on
the periphery of the town.
TRAFFIC MANAGEMENT STRATEGY
The old city area has narrow roads encroached with hawkers and parking and is highly
congested. Outside old city large sprawling junctions which are accident prone are seen. Significant
benefits can accrue out of Traffic Management measures. The improvement schemes are low cost but
yet can use existing infrastructure at the optimum. Level Key traffic management measures are:
Junction improvements (geometrics and
signage) and redesign
Bus shelters
Street lighting
One way street operations
Traffic signal improvements
Signs and markings
Safety measures
Education and Enforcement
STAKEHOLDERS MEETING
PMIDC has encouraged the development of CMP in partnership with many entities that
influence the transportation in Patiala City along with interested members of the general public. The
study team interacted with the following stakeholders before evolving the Strategies:
Patiala Municipal Corporation
Patiala Development authority
PWD
Traffic Police
RTO
Private Operators
General Public
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
57
Figure 10-1: Special Purpose Vehicle Structure for Improvement of Bus Service
PART III: PLANS AND PROJECTS
10. PUBLIC TRANSPORT IMPROVEMENT PLAN
10.1. BUS SERVICE IMPROVEMENT PLAN
Public transport is complex and in order to evolve an effective and efficient service, it is
necessary to understand this complexity. The complexity exists both within the organization of a
service provider and the environment in which the service provider operates. As the external
environment impacts the transport system to a large extent, it is necessary for the external
environment to be examined properly. Similarly, the internal sub-systems need to be fully
appreciated. Adopting a correct and well-informed approach is a pre-requisite for improving public
transport.
The main objective of the Bus operation is to meet the user’s requirements. The main user’s
requirements are
Connectivity
Reliability
Wait time
Comfort
Safety
Fare
The major factors that strive and would influence in achieving the User’s requirements are
like Connectivity
includes modal
integration, seamless
travel, integrated ticketing
Reliability includes Route
Length, route Bottlenecks,
Intersection Control,
Ridership and passenger
dispersal
Wait time includes fleet
size and Service Planning.
With the existing Bus
service that restricted to only 3
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
58
routes would not full fill the requirement of commuters and thus discouraging the Public Transport
System. Hence, after the capacity enhancement and introduction of Bus infrastructure, the bus
service can be improved.
Bus Improvement Plan Includes
Bus Infrastructure Plan
Bus Operating Plan (Route Plan, Trunk with
feeder etc.,)
Route Rationalisation
Capacity enhancement
Operations management
Ticketing and revenue management
Customer Orientation
Human resource Development
Modal Integration Plan
Special Purpose Vehicle
The company must choose ultra-modern low-floor TATA Starbus to run on the roads of
Patiala. The beauty of the bus should be a spectacle and the practicality provided is unmatchable. A
fully automated vehicle tracking system will ensure that the city buses reach the stop at fixed time.
Any deviation from timing would be corrected and controlled using GPS and real time tracking
solutions. The very purpose for this city bus service is to offer better civic facilities and BCTSL (Patiala
City Transport Service Limited) should be formed to ascertain that the service level is duly monitored.
A GPS based System will be used as a tool to ascertain the service levels. For this, BCTSL should plan
to establish a control room for Online Tracking System and every bus will be fitted with GPS based
tracking device with online data transfer facility.
10.2. MRT DEVELOPMENT PLANS
To improve the public transport service, the main strategy adopted is to improve the existing
Terminals and segregate the mofussil services from the local services. Several new bus routes are
proposed as shown for improving the service in the developing area. Along with that around 160 bus
shelters are proposed in the study area. Several Corridors have been identified for higher order mass
transit systems such as Bus Rapid Transit System (BRTS) different alternatives as shown. The
demand and the appropriate systems on various corridors are presented in the following Table and
figure. The major corridors in the inner part of the city like Leela Bhavan road, Sirhind road, Bhadson
road, Mall road, Stadium road are proposed as BRT corridors which can hold the estimated demand of
11000 PPHPD. The Mass Transit Plans for the horizon years 2021 and 2031 area as shown in the
figures below. During the Horizon years 2015-2021, Exclusive Bus lanes/mini bus routes need to be
operated on all the BRTS routes in addition to the other routes like Seuna-Sanaur via Lower Mall
road and other ring route connecting Jhill, urban estate phase-II & III, Bus stand etc.,
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
59
Table 10-1: BRTS and Mini Bus Routes
Sl.
No. Line No From via To
Length
(km)
1 Line 1 Chamarheri Bus Stand,Mini Secretariat, Thapar College Kalyan Village
22.1
2 Line 2 Hardaspur FCI, Fountain Chowk Ranbirpura 17.7
3 Line 3 Sidhuwal Bhadson road-Mall road-Bus Stand-Sanaur Kula Mazra 18.9
4 Line 4 Outer Ring Road(Kalyan,Kalwa, Daun Kalan,Pasiana,Bishanpur) 54.1
1 Mini bus
line 1 Seuna
Ranjith nagar, Anand Nagar, Tripuri town,
Tripuri Chowk, Bus Stand, Mohindra College Sanaur 18.5
2 Mini bus
line 2 Jhill
Focal point, DCW workshop, Gurubakhs Colony, Mohindra college, Modi College,
Alipur road junction
Jhill 18.7
Figure 10-2: Patiala Bus Route Network (2031)
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
60
Figure 10-3: Trunk and Feeder Public Transport
network
10.3. TRUNK AND FEEDER PUBLIC TRANSPORT NETWORK
The Public transport network of
150 kms is a major route network origin
from the major growth centres and
would be potential growth centres and
destining in the city. These routes in
future would be operated as High
Capacity BRTS and Monorail based on
the estimated Ridership. The major
trunk service would be the Punjab
University-Bus Stand- Medical college
corridor and the feeder services are like
supplementing this corridor from all the
directions. In future when the city
grows, the feeder corridors would be
operated as exclusive corridors with definite origin and destination. In the course of attaining the
ridership, the current proposal is to operate as Exclusive Bus lanes on the 3 Major corridors of Patiala.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
61
Figure 10-4: ITS Applications
10.4. ITS APPLICATIONS
Intelligent
Transportation Systems
(ITS) apply advanced
technologies of
communications, control,
electronics and computer
hardware and software to
the surface transportation
problems. ITS technologies
that are specific to public
transportation are grouped
under Advanced Public
Transportation Systems
(APTS). APTS technologies can help improve transit and ridesharing services. For achieving the Users
Satisfaction and the perfect Bus Service/mass Transit Service, ITS system is essential and the
framework for the same is as shown below.
Figure 10-5: ITS System
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
62
The framework should be poised in three stages Regional ITS, Corridor ITS and APTS. These
include Arterial Management, Parking management, Commercial vehicle management and Demand
Management. The main aspect of ITS is the Traveller Information which can reduce the travel time
and the bus routes can be optimised or re-routed. ITS System can be well integrated with the
Ticketing systems and thus achieving the objective of MoUD’s National Urban Transport Policy (NUTP)
Seamless Travel.
SEAMLESS TRAVEL
The objectives of the seamless travel are
Providing integrated fare media for use by patrons of all agencies.
Improved convenience and seam-less travel
Providing a platform for coordinated marketing of transit services throughout the region,
Generating cost savings and increased rider-ship.
Simplifying fare structures across multiple providers and reducing public avoidance due to
perceived complexities of transit use.
The basic infrastructure of integrated ticketing is as shown in the figure below.
Intelligent transport systems (ITS) are advanced applications which, without embodying
intelligence as such, aim to provide innovative services relating to different modes of transport and
traffic management and enable various users to be better informed and make safer, more
coordinated, and 'smarter' use of transport networks.
Figure 10-6: Components of Seamless Integration
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
63
Various ITS applications that can be implemented in the cities include the following
Roadway applications
Bus Applications
Web based passenger information system
Use of CCTV cameras for safety, security and traffic surveillance
Variable Message Signboard system for traffic information
ROADWAY APPLICATIONS
In Urban roads, improving the safety of roadway can diminish overall efficiency. Bus dedicated way, which typically requires serving the highest volume and safety. Development of ITS application on the
road way will provide system managers, passengers, drivers with timely information on current
conditions on the road ways. It functions for smooth, safer flow of public transport bus with better tool for controlling flow and managing incidents and events. The direct benefits anticipated from
actively managed ITS road application are reduced delay, increased throughput, smoother flow, fewer crashes and quicker response time. Secondary benefits expected are most consistent, reliable travel
times and reduced air pollution emission (because of stoppage of vehicle due to traffic jam).
ITS road application designs proposed for the city corridors are described below:
1. Network surveillance: It is proposed to put video camera with CCTV
cameras at regular intervals along the Corridor, which will cover whole Bus corridor. It will collect information on travel conditions through the
intelligent camera placed at 500 m c/s distance. This will allow system
manager to monitor traffic flow condition besides public transport bus, identify location of bus at any instant, identify & verify incident, detect
faults in indicator operations and collect data which can be used for traffic strategy development and long run planning. This can be installed at all major intersections, busy corridors so that
traffic violations can be better monitored and managed through adopting appropriate measures to arrest them.
2. Meter Ramps: It is a system wherein meter ramps on corridors are installed, which will allow
controlling freeway flow on corridors for motorized vehicles as well as Public Transport buses. Particularly, when the load on vehicular lanes increases, the system will release entering vehicle
at a steadier rate, so that they can merge with less disruption.
3. On board Information Dissemination: This involves installation of ITS device to provide
information to travelers on roadways. It will work either in form of advisory radios or in form of
signage. The dynamic message signs deployed at locations where the travelers can adjust their trips on motorized vehicle lane. Similarly Bus driver will have awareness on information like road
congestion, traffic jamming, weather etc. before reaching the destination. It will also provide information about parking facilities / space available for parking on motorise vehicle lane. The
system will also help system manager in AITS control room, which is proposed to set in the
center of the city to: 1) notify travelers of construction, incident or any other events and 2) potentially provide alternative travel suggestions on motorized vehicle lane traveler.
4. Incident Management System: As described above this also forms part of Area ITS in the city, Incident Management System will collect and correlate information from network and probe
surveillance applications, weather information systems and other sources to detect and verify incident nature and location. This will be used by AITS system manager to coordinate and
implement appropriate responses.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
64
5. Data Marts: This involves setting up of establish a centralized AITS control centre to use it for future traffic plans / system development. This will require having strong database. Therefore, it
is proposed to get data marts, which will collect and store data gathered from field devices for future analysis. The system managers use this data to develop improved operational plans and
responses. The data so collected, will be useful for other transportation professional for future
transportation planning activities.
BUS APPLICATIONS DESIGN
Intelligent vehicle technologies telemetric
comprise electronic, electromechanical and electromagnetic devices, usually silicon
micro-machined components operating in
conjunction with computer controlled devices and radio transceivers to provide precision
repeatability functions emergency warning validation performance reconstruction.
It is proposed to set ITS application in all the buses operated as Public Transport buses. These applications are developed for three major functions of Public Transport bus operation:
1. Vehicle Tracking system
GPS based vehicle tracking is advance technique through which an individual can track down any
movable object. This GPS tracking system has lots of benefits to an individual. It provides the timely and detailed information about the location of private vehicle or public transport fleet
position easily.
Benefits of vehicle tracking system are: a) IMPROVE DRIVING SKILLS: As the GPS vehicle tracking monitors capture each moment of
vehicles, it can easily determine the drivers’ behaviour. By setting up alarms at exceeding speed limit would remind them that they are being monitored by GPS system, and it enough
to modify their driving skills. By adapting more conservative driving methods the fuel consumption will reduce and it’ll also reduces the wear and tear of vehicles too. The main
benefit is it will control road accidents.
b) UPDATED REPORTS OF VEHICLES POSITION: The GPS vehicle tracking system is more beneficial to the public /goods transporters. It provided the fleet’s updated reports related to vehicle
position, vehicle type and fuel consumption. It means: o It measures the number of vehicles on road
o Provide the information about the vehicles which are overused.
o It checks the time taken to complete a delivery process.
2. Fleet management system
Fleet Management System (FMS) is a combination of mobile hardware devices, cellular data
communications, GPS tracking and internet-based services to create integrated systems for the
remote management of mobile vehicles, mobile workers and other high-value assets.
FMS is the third generation of a technology that began with basic, automated, vehicle location before moving into GPS Fleet Management. In addition to core Fleet Management technologies,
FMS solutions provide seamless integration with third-party dispatch systems, vehicle operating
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
65
diagnostics or driver monitoring for legislation compliance, back-end systems and efficient system monitoring process.
If implemented in public transport management will provide efficient monitoring of the business
processes which would enable efficient handling of passengers/commuters, effective monitoring
of staff (drivers/conductors) and optimum utilization of fleet.
3. Public Transport Management System
This is proposed to be achieved through the following steps.
a. Vehicle Tracking Systems: Vehicle Tracking Systems are electronic devices installed in Bus to
enable AITS controller / Bus operator system manager to track the location of a vehicle. It will be developed on the buses of GPS (Global positioning system) modules to get easy and
accurate location of the Bus. A system will be developed to view the position of bus on electronic map via customized software. It is also proposed to get information of bus fleet,
managers telling whether a vehicle is on or off, engine vitals, brake status, bus speed, direction, stop time at particular bus stops. Proposed VTS system is to be designed as active
devices as it is essential to have real-time data via cellular or satellite networks to a
centralized monitoring control room.
b. Fleet Management System: It is proposed to develop fleet management customized software
based on data collected by GPS module inside the bus. Functions identified for fleet management are dispatching, bus passenger traffic, number of passengers boarding, space
available in each bus, requirement of any additional bus, on board information and security
etc.
c. Passenger Information System: It is proposed to develop ITS correlated system to provide
information to passenger on board about the current stations, next station, bus speed etc. It will also provide information about the concerned bus at bus stop arrival, by two way auto-
communication.
It will also provide the information to passenger at bus stop about cancellation of bus, route, diversion of route etc.
WEB BASED PASSENGER INFORMATION SYSTEM
The information gathered by the ITS system can be uploaded on to a website of city transport system
to provide the passengers with the information regarding a. Nearest bus stop for the tourists/new comers to the city
b. Bus(s) to be taken to reach a particular destination c. Present location of a bus
d. IPT mode (auto rickshaw, taxi, mini bus, rickshaw) availability to reach nearest bus
e. Fares of IPT modes f. Time of availability of next bus at a particular bus stop
g. Total likely journey time and total fare
Installation of such a system would enable a seamless travel by tourists and newcomers to the city
without any hurdles.
BUS APPLICATIONS
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
66
As specified above, City Buses can be developed by using ITS based on GPS module & CDMA / GSM module. City GIS mapping is essential for this purpose and will be used for preparing Bus station ITS
application design. Following ITS application modules developed will be used for the following purposes:
1. LED scrolling board will be fixed inside the bus terminals / stations from where one can know
arrival / departure of the Bus.
2. Probable arrival time of bus at particular bus stop.
3. Automobile control / information transfer facility with centrally located AITS.
CCTV CAMERA FOR SAFETY, SECURITY AND TRAFFIC SURVEILLANCE:
A traffic enforcement camera system, consisting of a camera and a vehicle-
monitoring device, is used to detect and identify vehicles disobeying a speed
limit or some other road legal requirement and automatically ticket offenders
based on the license plate number. Traffic tickets are sent by mail.
Applications include:
Speed cameras that identify vehicles traveling over the legal speed limit. Many such devices use
radar to detect a vehicle's speed or electromagnetic loops buried in each
lane of the road.
Red light cameras that detect vehicles that cross a stop line or designated
stopping place while a red traffic light is showing.
Bus lane cameras that identify vehicles traveling in lanes reserved for
buses. In some jurisdictions, bus lanes can also be used by taxis or vehicles engaged in
carpooling.
Level crossing cameras that identify vehicles crossing railways at grade illegally.
Double white line cameras that identify vehicles crossing these lines.
High-occupancy vehicle lane cameras for that identify vehicles violating HOV requirements.
Turn cameras at intersections where specific turns are prohibited on red. This type of camera is
mostly used in cities or heavy populated areas.
Variable Message Signboard system for traffic information
The information collected through various data collection system installed, can be used to
disseminate the information to road users through installing variable signage boards to
i. control the speed of the traffic
ii. divert the traffic to less congested routes in case of any traffic chaos
iii. congestion pricing to discourage vehicles to use congested corridors
Various sign boards are shown below:
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
67
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
68
11. ROAD NETWORK DEVELOPMENT PLAN
11.1. HIERARCHICAL ROAD NETWORK
Functionally urban roads are classified as arterial, sub-arterial, collector/distributor and local
streets. Functional classification of the urban roads is an important step wherein design and
management of roadways would be standardized. By designating certain roads as mobility corridors,
these corridors get priority for increasing the throughput of people as well as improvement of speeds
would be focused and accordingly appropriate solutions would be identified. Experience indicates that
as speeds of public transport vehicle reduce travel times increase to such an extent that commuters
look for personalized modes of travel. In addition to the user travel preferences the road design and
operations also have bearing on the traffic congestion.
Congestion results in lower traffic speeds for all vehicles and more so for public transport
vehicles. The corridors like Outer Ring road, and some radials, new roads established by the network
strategy need to be developed as mobility corridors that maximizes throughput of people focusing on
mass transport and NMT, rather than vehicular traffic.
11.2. ARTERIAL ROAD CONSTRUCTION/IMPROVEMENT
As indicated earlier, Mobility corridors focus on mobility and aims to maximize the throughput
of the people. Mobility Corridors focus on public transit systems, ensuring when designing these
corridors, all modes of travel is considered and integrated. It is imperative therefore certain strategic
roads be designated as Mobility Corridors for focusing on corridor mobility. These corridors get
priority for increasing the throughput as well as operating level of service.
These corridors would be expected to have the following cross sectional elements:
Public transport right of way that is preferably dedicated where conditions permit
The road cross section for mixed traffic conditions where desirable road width would be
30 m (4 lane).
Continuous kerb, Footpath cum drain
Service roads wherever possible
Optimized Signals
Restriction or preferably prohibition of parking on the carriageway/shoulders.
The parking must be shifted to off -street parking locations or cross roads.
Proper Bus bays
The mobility corridors for the study area constitute of radial roads complemented with inner
ring and the outer ring roads to form a radial and ring pattern. Mobility corridors forming the radial
and ring network are
Sangrur Road Rajpura road Nabha Road
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
69
Bhadson Road
Pohewa Road
Sanaur road
Sirhind Road
The present and future road network needs to be upgraded to mobility corridor standards.
These along with the suggested orbitals in the master plan will provide the dispersal of traffic from
the core city area.
To have the mobility corridor network as proposed, some existing roads need to be widened
and up graded to the cross-sections shown below. Some of the recommended mobility corridors have
missing links and have to be constructed. The proposed cross sections of mobility corridors with
different options are show below.
Figure 11-1: Proposed Cross section of Mobility Corridor with BRT Lanes 30m-RoW
Figure 11-2: Proposed Cross section of Mobility Corridor with BRT Lanes & two wheeler
parking 30m-RoW
Figure 11-3: Proposed cross section of Mobility Corridor with BRT bus Stop on median
platform
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
70
Figure 11-4: Proposed cross section of Mobility Corridor with BRT Bus lanes in 40 m ROW
Figure 11-5: Pictorial Representation of a Cross Section of Mobility Corridor with 40 m
Right of Way (RoW)
RING ROAD
The outer ring with a right of way (ROW) width of at least 60 m would be a regional ring
circumscribing Patiala study area. This ring connects the Regional roads like Rajpura road, Sangrur
road, Nabha road, Bhadson road etc. This ring must accommodate dedicated public transport
corridor, non-motorized lanes, wide medians and service roads in addition to the motor vehicle lanes
and NMT lanes. The inner semi orbital should have a minimum of 30 m ROW. i.e. four lane divided
carriage way to accommodate the possible urban growth along and surrounding the corridor. The
requirement for the grade separation at intersections as well as feasibility of the
indicated alignments needs to be established through a Techno Economic Feasibility
Study.
The projected peak hour traffic for 2030 on various sections of Inner Ring Road and proposed
new links is found to be in the range of 6000-10000 PCUs. In addition to the Outer Ring Road major
radials connecting the outer ring is also proposed.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
71
Development of Radial Roads and other sector roads during the year 2020-2030 is proposed.
Apart from the ring road, 45 kms of other sector roads, 16 kms of radial roads and 8 kms of other
roads were proposed and the details of the same are as below. The map showing the roads proposed
for development is presented in Annexure 3.
OTHER SECTOR ROADS
ID No DESCRIPTION LENGTH (Km)
OSR1 From Village Jhill (Sir Hind Road) to Daun Kalan via Rasulpur Jaura 5.91
OSR2 From Faridpur Village (ORR) to Karheri Village (Rajpura Road) 10.53
OSR 3 From Majra Kalan (Sirhind Road) to OSR 2 near Mirjapur Village 2.43
OSR 4 From village Rurkhi to village Daun Kalan (ORR) 5.99
OSR 5 Mehamadpur arian to Ghanaur road ( LPA limit) 7.76
OSR 6 From Sindhwal (ORR) to Pasiana (Samana - Sangrur Road Junction) Along Bhakra Main Line
9.67
OSR 7 From Bishanpura (ORR) to OSR 6 from Sindhwal to Pasiana 2.72
TOTAL 45.01
RADIAL ROADS
ID NO DESCRIPTION LENGTH (Km)
R1 SH8 PHEWA RD. 7.46
R2 PATIALA- SANAUR RD. 4.29
R3 SEUNA (ORR)- VILLAGE BARAN 5.04
TOTAL 16.79
Figure 11-6: Patiala Outer ring- Multi-modal Corridor
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
72
OTHER ROADS
ID NO DESCRIPTION LENGTH (Km)
OR1 Nasirpur (Rajpura Road) to Budhanpur (ORR) 3.17
OR2 Ghanaur Road ( From Chaura to LPA Limit) 4.69
TOTAL 7.86
11.3. SECONDARY ROAD CONSTRUCTIONS/IMPROVEMENT
In order to address the pressing needs of traffic improvements, the consultants are proposing
short term/ immediate improvement proposal. These proposals are aimed at reliving the chaotic
traffic conditions on three major corridors of the city.
Though the mobility corridor status can be given to the Mall road, it should be addressed with
blend of traffic management measures and enforcement of the same. The Long-term improvements
would be discussed in later chapters, while the short term improvements are as below.
One way systems are one among the various short term traffic management measures that
ensures smooth traffic circulation for a short period until other medium and long term measures are
implemented Signal Optimization and Co-ordination, Pedestrian Crossing Facilities, Regularized On-
Street Parking, Traffic Signage’s and Markings and Vehicle Emission Checking centre are some of the
measures that will improve the mobility and safety at the work centres located near Mall Road,
Children Mode, lower mall road, in the CBD area.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
73
Old City area requires exclusive traffic control facilities such as ATC. Some of the short term
measures that can be implemented in this area are
Parking Improvement
Cordon controls
Footpath
Signage and Road Markings
One-way plans
Vehicle segregation & Enforcement
Encroachment & Hawker Management
Some of the locations identified for implementing the above measures are Arna Barna Chowk,
Anardhana Chowk, Dharampura Bajar, Dwakoli bazar, books market etc.,
Overall awareness of the traffic discipline and compliance with the traffic rules by road users
in Patiala is below the desired level. Traffic Police will have to offer positive leadership in the form of
education and enforcement to make people responsible and rule abiding road users.
The old city area has narrow roads encroached with hawkers and parking and is highly
congested. Outside old city large sprawling junctions which are accident prone are seen. Significant
benefits can accrue out of Traffic Management measures. The improvement schemes are low cost but
yet can use existing infrastructure at the optimum. Level Key traffic management measures are viz.,
Junction improvements (geometrics and signage) and redesign, Street lighting, One way street
operations, Traffic signal improvements, Signs and markings, Safety measures, Education and
Enforcement.
It was observed that the traffic conflicts near Anardhana Chowk and Arna Barna Chowk is
mainly because of the entry of the four wheelers and also lack of traffic management measures.
Though there is an restriction of two-way movement from Dwakoli bazar, Dharampura bazar to
Anardhana Chowk, due to lack of enforcement delay is occurring in the rush hour of the day.
Two Alternatives were suggested for the restriction of one-way movement to Anardhana
Chowk and is as below.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
74
Figure 11-7: Alternative -1 (Exit restricted to Bahera)
Figure 11-8: Alternative -2 (One entry from fisheries dept lane and another from Nabha
Gate road)
11.4. FROM LAHORI GATE
There is an existing restriction for exit through the Lahori Gate from the CBD, Arya Samaj
Chowk, but there is no enforcement on this lane even. Hence, the entry to CBD from Lahori Gate
should be allowed and the entry should be restricted strictly. The exit from the CBD at this end can
be made from the lane adjacent to the Nehru Garden and Bus Stand. The lane behind the bus stop
should be free from encroachments.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
75
These one-way improvements can be made with minimal cost to ensure smooth flow of
traffic in the congested CBD areas. But this can be achieved with proper enforcement coupled with
appropriate provision of parking lots near and around CBD. Entry of four wheelers should also be
restricted in rush hours.
OLD CITY PROPOSALS
Old City attracts huge traffic throughout the day due to the presence of several commercial
establishments namely Bazaars. Lack of enforcement and traffic sense has led to haphazard parking,
encroachments, predominance of hawkers etc which in turn resulted in traffic congestion and delay.
The old city requires Area Traffic Management (ATC) in the long run.
Some of the significant features of the ATC are
The Area Traffic Control Systems shall link various elements of Intelligent Transportation
Systems.
Will enable decision makers to identify and react to an incident in a timely manner based on real-
time data.
The ATC will help to reduce incident response times, disseminate traveller information and hence
reduce congestion and enhance safety.
Some of the short term measures that can be implemented in this area are
Parking Improvement: On-Street parking can be totally banned on various stretches such as
Dharampura bazaar, Adalat bazaar, Arya Samaj chowk and Qila chowk Cordon controls on
entering the old city.
Implementation of one-way plans
Provide Vehicle Emission Check Center
Vehicle segregation & Enforcement of lane discipline to ensure safety
Figure 11-9: One way proposal at Lahori gate
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
76
Education & Enforcement: Overall awareness of the traffic discipline and compliance with
the traffic rules by road users in Patiala is below the desired level. Traffic Police have to offer positive
leadership in this direction to make people responsible and rule abiding road users. Special traffic
drives are to be planned by them for making the public aware of the traffic rules. Also the procedure
for imposing fines at the spot for defaulters may be reviewed in view of large backlog of pending
traffic offence cases. The Road Safety programs should be aimed principally at adult road users and
serve three main purposes:
To inform the public of new regulations or changes to the traffic regulation system
To influence the attitudes towards road safety
To persuade road users to change their behaviour in relation to identified causal factors in
road accidents.
These traffic management measures are normally easy to implement with less cost.
Apart from the one-way measures, Road improvements are proposed for 89 kms of roads in
Patiala. The roads are categorised in to 6 types based on the Right of Way (RoW) or the available
width. The categorisation is as below.
Table 11-1: Categories of Roads
Category Width of road (m) Length (km)
1 Less than 18 23.76
2 18 -20 14.16
3 20-25 18.02
4 25-35 13.47
5 35-45 9.0
Total 78.41
Table 11-2: Patiala City Roads Suggested for Improvement
Sl. No.
Name of the Road Length in K.M.
Width of
Road (M)
Width of
Carriage way (M)
Category
1 From bus stand to Rajpura Road up to M.C. Limit 4.80 37.80 8.23 5
2 From Bus stand to S.S.T.Chowk 1.80 24.39 7.32 3
3 From S.S.T. Chowk to Sangrur Road up to M.C. Limit 2.20 38.41 6.71 5
4 From Bridge (on Chotti Nadi) to Devigarh Road 1.05 33.00 10.00 4
5 From Sanaur-Devigarh Junction to Sanaur Road up to M.C. Limit
0.35 33.00 10.00 4
6 From Old Octroi (on Patiala-Rajpura Road) up to Bridge along Chotti Nadi
0.90 18.0 5.5 2
7 Gurudwara Dukhniwaran Sahib to Thapar Univ. (Jail Road)
2.25 27.43 7.30 4
8 From Thapar University to Nabha Road unto M.C. Limit. 2.60 25.00 6.90 3
9 Gurudwara Dukhniwaran Sahib to Sirhind Road up to M.C. Limit
4.40 25.00 7.32 3
10 From Mahindra College to Dakala Road up to M.C. Limit 1.30 12.00 7.00 1
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
77
Sl. No.
Name of the Road Length in K.M.
Width of
Road (M)
Width of
Carriage way (M)
Category
11 From Thapar Univ. Chowk to Bhadson Road (up to Jail end)
0.80 23.48 6.71 3
12 From Jail end to Bhadson Road (up to M.C. Limit) 1.05 21.00 10.00 3
13 Gurudwara Moti Bagh to Vill. Main Road 1.25 20.00 9.10 2
14 From Bus Stand to Gurdwara Dukhniwaran Sahib Chowk 0.90 18.29 6.71 2
15 From Bus Stand to Gurbax Colony (up to Chotti Nadi) 2.10 20.80 6.0 3
16 From Fountain Chowk to Leela Bhawan Chowk 0.70 32.93 13.5 4
17 From Fountain Chowk to Mahindra College (Lower Mall) 2.25 29.30 10.0 4
18 From Leela Bhawan Chowk toNabha road Chowk (Bhupindra Road)
2.10 34.15 7.32 4
19 From Leela Bhawan Chowk to Gurudwara Dukhnawaran 1.46 32.93 13.5 4
20 Leela Bhawan Chowk to Sheran Wala Gate (Through Baradari)
1.10 14.33 6.5 1
21 Leela Bhawan Chowk to Lal Singh Memorial Hospital Chowk (Income Tax Road)
0.70 30.48 21.95 4
22 S.S.T Chowk to Gurudwara Moti Bagh (Upper Mall) 1.90 37.50 7.5 5
23 S.S.T Chowk to Lal singh Memorial Hospital Chowk 0.80 34.0 30 4
24 Gandhi Nagar to Rajpura Road Chowk (In front of bus stand)
0.10 44.51 8.85 5
25 War Memorial to Military Area (Woman College Road) 1.00 19.30 14.63 2
26 Bus Stand to D.C.W Road (Up to Bye-Pass) 3.00 18.90 6.0 2
27 Budha Dal (Ragho Majra Puli) Chowk to Vill. Main Road 1.84 19.0 10.0 2
28 Lal Singh Memorial Hospital Chowk to Railway line Via Badunger
1.85 16.11 5.0 1
29 Gurudwara Dukhniwaran to Bhupindra Road (Passey Road)
2.00 18.29 10.0 2
30 Jail Road to Village Jhill Via Tripuri 2.70 10.0 5.0 1
31 From Hotel Fly Over to Bundha (Factory Area Road) 0.80 18.6 5.0 2
32 Rajbaha Road to State College (Lehal Road) 0.60 10.0 6.5 1
33 State College to Bhupindra Road 1.40 13.70 8.0 1
34 Bye Pass (Northern) 4.7 60.0 12.2
35 From Kohli Sweet Chowk to Gurudwara Kashmirian (Tripuri Road)
1.00 27.4 13.4 4
36 From Nabha Road to 24 No. Phatak 1.45 9.0 4.8 1
37 From Nabha Road to Ablowal Grid 1.4 8.0 4.6 1
38 From Tripuri to Ranjit Nagar 2.0 10.0 6.0 1
39 Road on Defence Bundh from Industry area to Sirhind Road
1.18 13.0 10.0 1
40 Road in Azad Nagar 0.56 10.0 6.0 1
41 Road from Bye Pass to Railway line (Ghuman Nagar) 2.31 8.0 5.0 1
42 From Rajpura Road to Bishan Nagar (Sector Road) 0.81 30.0 6.7 4
43 Rajpura Road to Bishan Nagar (S.S.T. Portion) 0.54 24.40 12.0 3
44 From S.S.T Nagar to Bishan Nagar, Jujhar Nagar up to Bari Nadi (from Rajpura road)
1.3 10.0 6.0 1
45 T.B.Hospital road 1.61 12.20 10.0 1
46 Southern circular road of walled city 4.73 24.20 8.0 3
47 From S.S.T Nagar to Hanuman Mandir Chowk (via Bishan Nagare)
0.43 9.10 6.0 1
48 From Hanuman Mandir to Gurbax Colony road (Via Rajpura Colony)
0.65 18.30 7.0 2
49 From Upper Mall to Vill. Kheri Gujran 1.8 18.29 10.0 2
50 From Sullar road to Kheri Gujran 1.07 6.50 4.0 1
51 Road from Byepass to M.C limit(Along Bari Nadi) 6.0 - 15 8
52 Road Backside Thapar University 1.5 6.0 5.0 1
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
78
Based on the above categorisation, typical cross-section are presented for all categories. The
detail drawings are given in Annexure 4 and the same are given below in Figure 10-11 for
reference.
11.5. INTERSECTION IMPROVEMENTS AND FLYOVERS
Following traffic management measures must be considered as part of junction
improvements:
• Junction redesign
• Restriction of right turns. The restricted right turn traffic must suitably be rerouted through indirect right turns or U-turns etc.
• Widening the intersection throat to increase the approach capacity
• Installation of medians and closing the cross street to divert traffic to other high capacity
intersections if feasible.
As the Junctions like Fountain Chowk, Bus Stand Chowk, Dukhniwaran Chowk will be busy
and the traffic will get increased in the coming 4 years i.e., by 2015. All the above mentioned
junctions are exceeding their handling capacity and are reaching 10000 PCUs. Hence, it is proposed
to make these junctions grade separated. However, a detailed study for the alignment needs to be
taken up for the construction.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
79
Figure 11-10: Details of Proposed cross sections
PAVEMENT MARKINGS
Pavement markings such as: Center line, Traffic lane lines, Stop lines, Pedestrian crossings,
Parking space limits, Kerb marking for visibility, Obstruction marking, etc. must be provided keeping
in view all users of the road and especially for night time driving. Markings should be provided
according to IRC: 35-1997.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
80
SIGNAGE
In general, it was observed that the traffic signs are found wanting in Patiala. It is
recommended that proper signs be installed at appropriate locations. Road signs are classified into
three categories: Mandatory/Regulatory signs, Cautionary/Warning signs, and informatory signs. It is
recommended that signs near schools should be installed on priority basis. All the traffic signs should
be facilitated as per the guidelines provided in IRC publication 67-2001.
SAFETY MEASURES
Poor road Geometry and inadequate street lighting along with limited road space and lack of
traffic sense both to drivers and pedestrians increase the incidence of accidents. Mainly they are
caused due to the casual approach of the road users towards driving rules, safety precautions and
regulations.
As per the accident records collected from the traffic police and having discussions with the
citizens, the following locations/stretches were identified as the major accident prone locations.
Table 11-3: Accident Prone Locations
1 Bus stand Patiala to Punjabi University chowk lights
2 Gurudwara Dukhniwaran Sahib T-point to Sirhind road by pass.
3 Corner chowk bus to military area Passiana nehar bridge.
4 Sanaur Adda Patiala to Jodian Sadakan Pehwa road.
5 Nabha Patiala gate to rohty bridge bus stand nabha mour to pind daldi.
6 Village Fatehpur Patiala road to Samana nehar bridge, Bhawanigarh chowk lights Samana to village Mavikalan.
7 Village Dedna to Ghaga Bus stand.
8 Rajpura T-Point by-pass Sirhind road to Gagan chowk, Gagan chowk Ambala road Madanpur Jhalery mour.
9 Gaganchowk Rajpura to Takansoo bridge,Bus stand Banur Barrier Banur Chowk.
10 Barrier Banur Village Tipla.
Source: Punjab Police
The following key safety measures needs to be implemented to the above listed stretches/locations.
Well delineated right of way for vehicles and pedestrians as per the IRC standards.
Markings at speed breakers & islands/rotaries and installation of sign boards adequately
for night time visibility.
Traffic signage’s be made retro reflective.
Safe crossing facility for pedestrians near the sensitive areas like institutions, medical
centres, recreation centres. Create traffic safety patrol programs for student volunteers at all schools.
Ensure that adequate street lighting is provided on all collectors, sub-arterials, and
arterials.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
81
Black spots must be identified and specific improvements must be proposed at those
locations. Install pavement markings such as lane lines, median lines, stop bar, parking stalls/bays
etc.
A Road Accident Analysis System (RAAS) based on the accident database must be
implemented for accurate reporting and use in geometric improvements.
11.6. RAILWAY CROSSING AND UNDERPASS
Though there is an urgent need of Rail Over Bridges / Flyovers to facilitate the movement of
passengers and goods transportation yet their priority of construction is also required to be fixed
because of limited resources and their requisite judicious use. Accordingly, keeping in view the
volume of rail / road traffic, frequency and intensity, smooth flow of inter city traffic, traffic
congestion in central areas of the city, priority has been evolved. Based on aforesaid factors basically
three preferences have been envisaged i.e., large volume of through traffic, inner city congestion and
traffic bottlenecks and future problem potential areas in outer growth of the city. Thus preference has
been given in proposal of Rail Over Bridges on GT Road to ensure smooth flows of inner city traffic
and to avoid mixing of inter and intra city traffic in the city area.
Considering the traffic and congestion problems the following railway crossings can be made
grade separated. These are the same crossings that have been proposed in master Plan.
RAIL OVER BRIDGES
There are three Railway Over Bridges (R.O.Bs) presently existing in the city. In order to
ensure the smooth flow of regional and local traffic over the existing and proposed roads of LPA
Patiala, four more R.O.B’s are proposed. The list of R.O.B’s in order of priority is given as below;
On inner bye-pass near Diesel Component Works (DCW)
On outer ring road connecting Rajpura road with Sirhind road on Rajpura railway line.
On outer ring road connecting Sangrur road with Nabha road on Dhuri railway line.
On new link connecting Sirhind road with Rajpura road along Chotti nadi by using bandh
parallel to nadi.
ROAD UNDER PASS (RUP)
In order to facilitate free movement of traffic on following intersections, RUPs are proposed
RUP between Urban Estate Phase-I and II
RUP in front of new bus stand and S.S.T Nagar.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
82
11.7. HAWKER ZONES
Hawkers are the prominent road users in any Indian City as they are part and parcel of the
typical Urban Environment in India. In most of the city roads, almost 80 per cent of the pavements
are encroached by hawkers and illegal settlers, who use pavements or other public places to retail
their goods or services.
It is obvious that most of the traffic problems in cities are created due to these hawkers. The
traffic problems in cities cannot be resolved until the hawkers are relocated / moved out of the roads.
In order to address this issue, various cities have formulated laws restricting the movement hawker
zones to decongest the city roads by demarcating areas into green, amber and red zones. All major
arterials to restriction on hawing and sub arterials to be allowed hawking and market roads on
holidays and weekends and residential areas and Government/Municipal vacant lands to be used for
hawking. The hawker zone details with areas marked on map is presented in Annexure 5.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
83
12. NMT FACILITY IMPROVEMENT PLAN
12.1. STRATEGY FOR NMT FACILITY IMPROVEMENT
Non-Motorized Transport users are
the vulnerable road users. 2/3 rd of fatalities
involve NMT users. About 35% of trips are
made by Non-Motorized Transport (NMT)
that include walk, cycle trips as well as trips
made by cycle rickshaws and other NMT
modes. Even though walk being a
predominant mode of transportation in the
city, the infrastructure available for the same
is poor as well as substandard.
The mobility plan targets to atleast
sustain the current share of NMT trips (35%)
in the future also as it is difficult to increase
NMMT with the declining trend of its growth.
It is important to improve thee facilities
making it a preferred mode for short trips.
Strategies towards NMT are to segregate them from fast modes by providing safe facilities like
designated and well maintained footpath of 1.5m width (desirable 2m). Provision of cycle tracks along
all mobility corridors and designate safe cycle zones in residential areas.
12.2. PEDESTRIAN FACILITY IMPROVEMENT
The mobility plan targets 100% Walkability. Proposed pedestrian facilities include footpath
along mobility corridors and other significant roads as well as safe crossing facilities in the form of
subways/FOBs, zebra crossings, etc.
Footpath plan: Following suggestions are made in
the installation of footpath:
It is desirable to have a footpath width of 2.0 m for
all roads.
A minimum usable width of 1.5 m should be provided
for footpath.
Obstructions on footpath must be relocated /cleared.
Footpaths at all busy intersections must be provided
with handrails to enforce pedestrians cross at zebra Figure 12-1: Footpath proposals
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
84
crossings.
Foot path is proposed on the mobility corridors and also the secondary arterials, as a
minimum requirement.
Maintenance mechanism to ensure that clean walkable footpaths are present must be
introduced.
It is very essential that pedestrians are dispersed from public transportation systems safely
onto footpaths. About 280 kms of roads were identified for construction / improvement of footpath.
For safety and to ensure unobstructed pedestrian movement, especially near educational
institutions and work centres on busy traffic roads, the following sub ways and footpaths are
proposed in conjunction with Master Plan. Grade separated pedestrian crossing facilities must be
located on mobility corridors and near pedestrian intensive areas such as critical junctions, bus stops
and busy mid blocks. A review of the preliminary studies and pedestrian crossing demand was utilized
in identifying prima facie a few selective locations like Dukhniwaran Sahib Chowk, Kalika Mandir, and
Bus Stand Chowk.
At junctions on major roads and bus stops, zebra crossings are proposed. It is proposed that
in front of schools and colleges, hospitals and transport terminals, one zebra crossing with pedestrian
signals be installed. The CMP also recommend standard signs and markings for pedestrians.
It was cited by the authorities to consider the pedestrian crossing towards Smashan Ghat on
the National Highway. A pedestrian under pass is to be constructed below the National Highway for
the road leading to Smashan Ghat.
Grade separated pedestrian crossing facilities must be located on mobility corridors and near
pedestrian intensive areas such as critical junctions, bus stops and busy mid blocks. A review of the
past studies and pedestrian crossing demand was utilized in identifying prima facie a few selective
locations where grade-separated crossing facilities are necessary.
In order to facilitate the movement of pedestrians while crossing the congested Rajpura-
Patiala-Sangrur road, the following four Subways are proposed:-
At Bahadurgarh chowk
In front of Punjabi University
Near Birji cremation ground
Near Kali Devi Mandir
Pedestrian overbridge/ under bridge near Gurudwara Dukhniwaran Sahib.
Pedestrian Underpass below National Highway 7 towards Rajpura.
12.3. BICYCLE PLAN
Along all the proposed public transport corridors bicycle lanes are proposed. Additionally
pedestrian and cycle only routes are proposed inside the old city. Major roads like Lower Mall road,
Mall road, Bhupinder road, NH-64, NMT lanes were proposed. The proposed cross-sections of the
same were discussed earlier. In addition these, NMT lanes or strictly NMT lanes were proposed in the
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
85
Patiala City Core areas. Road like Dharampura Bazar road, Arna Barna Chowk, Jaurian Bhatti road,
Books Market road, etc., need to pedestrian only streets/ NMT streets.
Figure 12-2: NMT facility inside city core area
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
86
020406080
100120140160180200
No
's
Location
Peak Accumulation
Two Wheelers
Car
13. INTERMODAL FACILITIES
13.1. BUS TERMINALS
In Patiala the bus terminal is located in the center of the city, from where buses move in all
the directions on the inter city and intra city roads. The Existing bus stand falls in the centre of the
city and at present is overcrowded. In order to provide relief to city roads, new bus stand for inter
city traffic has been finalised opposite to S.S.T Nagar. The site measuring about 5.58ha. (13.78 acres)
approximately with State of art facilities has been cleared of the encroachments and development
work has to start. The existing Bus Stand of Patiala city is proposed to be converted in to local bus
stand in a phased manner by 2031.
13.2. BUS-RAIL INTERCHANGES
Any public transit system is incomplete without intermodal integration. Intermodal integration
involves:
Integrated public transit network planning
Integrated fare policy and ticketing
Intermodal stations to minimize delay/transfers
Intelligent Transportation Systems (ITS)
Access to the public transit network that includes integration with auto rickshaws, taxis,
and NMT modes like cycle rickshaws, Park and ride facilities along mobility corridors Institutional integration
The major intersections of Mobility Corridors are to be planned as Intermodal Stations.
13.3. DEVELOPMENT OF PARKING LOTS & PARK AND RIDE FACILITIES
Currently most of the roads in
Patiala have free- on street parking,
including the core city areas like Arna
barna Chowk, Anardhana Chowk, Jaurian
Bhatian road, Lahori gate road, Leela
Bhavan Market etc. The main consequence
of this is the loss in the throughput of the
adjacent street due to parking
interference. Areas that are badly affected
include Lower Mall, Mall Road, Bus Stand
Road, Adalat Bazaar, Sheran-wala Gate,
TB Hospital Road and Chhoti Baradari
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
87
As part of the principles upon which the CMP is being developed, it is envisaged that off-
street parking sites would be developed and integrated with the Public Transport terminals to
facilitate the public transport.
Following measures are proposed as part of parking management plan.
Organize On-street parking in major CBD area by providing separate Parking bays.
Additional off-street multi-level parking places near Bahera Road, Jaurian Bhatian Road, Leela
Bhavan market are to be developed to cater the growing cities vehicles.
New parking spaces to integrate with commercial activity centers and also the Public Transit
terminals
Parking plans to facilitate pedestrian schemes
Multi-Level parking facilities need to be developed. Some of the Locations identified are presented
below.
Locations for Development of Multi- level Car parking (With ramps/Lifts)
1. Near Leela Bhavan market
2. City Centre (near Jaggi Sweets)
3. AC market (Near Anardhana Chowk)
4. Water Tank (Jourian Bhatian Road)
5. Choti Bharadari (Lower Mall Road)
In addition to the above, Streamlining of the on-street parking will also reduce traffic chaos in
the city of Patiala. The typical cross-sections of roads in view of parking is also presented in
Annexure 4.
Table 13-1: Multi-Level Parking Locations
Sl. No
Name of the Location Type of Parking Approximate area (sq.m)
Net area available
ECS/flr
MLCP with ramps
MLCP with lifts
1 Leela Bhavan market MLCP/Under Ground 893 803.7 27 50
2 AC Market (Anardhana Chowk)
MLCP/Over Ground 480 432 14 27
3 Water Tank (Jourian Bhati Rd)
MLCP/Over Ground 330 297 10 19
4 Near City Centre MLCP/Over Ground 1242 1118 37 70
5 Choti Baradari MLCP/Over Ground 1200 1080 36 68
The parking locations are shown below. Apart from the above, land is available on Bahera
Road near Fisheries Department. Construction of Multi-Level Car parking at this location would be
very useful for the Commercial area. The main advantages are as follows.
Nearer to Anardhana Chowk, Dharampura Bajar, AC market etc.,
Cars entering commercial areas can be restricted in Business Hours.
“Pedestrian only Streets” can be implemented easily.
Other facilities like Children Play stations, “Car Service on Park” can be made possible.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
88
This Land (in front of Fisheries Department) is with Patiala Improvement Trust, So MLCP at this
location is very much useful in the context of reducing congestion in Patiala Core Area.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
89
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
90
ENFORCEMENT
This figure shows the unused parking area which
has a capacity of almost 50-60 ECS. This is located near
the CBD but it was not used properly because of its
distance from CBD area. This space can be relocated and
new parking lots can be constructed in the identified areas.
13.4. FREIGHT MANAGEMENT PLAN
Following recommendations are made to improve the efficiency of freight and commercial
transport:
Truck traffic will need to be restricted during day time with in the Patiala City limits and
also restricted in commercial areas like Dharampura bazar, Anardhana Chowk, Dwakoli
Bazar, Arna Barna Chowk etc.,
Goods delivery time in the core city needs to be restricted during peak periods i.e. 9 am-
9 pm
Implementation of ring roads will facilitate through movement of freight traffic to bypass
the town.
The present site of truck stand is located on 41 acres out of which 9 acres has been given to
Kabari Market shifted from walled city.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
91
14. REGULATORY AND INSTITUTIONAL MEASURES
14.1. UNIFIED METROPOLITAN TRANSPORT AUTHORITY
PRESENT INSTITUTIONAL SET-UP
The prime agency responsible for planning and development of transport infrastructure
(road) including finance & investment of Patiala city as well as the surrounding region is the Patiala
Municipal Corporation. Patiala Development Authority and Public Works Department (PWD) is
responsible for any planning and development in the road transport sector including financing and
investment outside Patiala Urban area. Traffic Police is responsible for traffic safety and operations in
the town. The Regional Transport Officers (RTO) for Patiala is responsible for licensing of vehicles and
drivers in the district.
Public transport need of the town is handled by Patiala Municipal Corporation and private
agencies. Other than RTO, there is no other agency/authority to control/manage private bus
operations.
ISSUES WITH THE PRESENT INSTITUTIONAL SET - UP
It can be seen from the activities and a function of the different organizations involved in
urban transport planning in Patiala is that there is no co-ordination between these agencies. It can
also be noted that there is no agency looking after only urban transport issues. It is thus imperative
that there shall be a nodal agency looking after urban transport issues. No nodal agency has any
control on the accountability in ownership, performance, and maintenance in transportation
infrastructure. The issues are summarized as follows:
• Lack of coordination among organizations involved in Urban Transport
• Lack of Transport Planning expertise in the organizations
• No accountability in ownership, performance and maintenance of transportation infrastructure and systems operations.
• No single apex agency regulating, facilitating and integrating operations of different modes.
PROPOSED INSTITUTIONAL FRAMEWORK
The responsibilities for policy making, planning, investment, operations and management
should be stream lined and strengthened. An empowered body should coordinate, over-see and
regulate the entire transportation project. Frame work is critical for effective Public Transport. It
should address all the functions, clearly assign responsibilities and be responsive to the policy
concerns of all citizens (mobility needs, air quality, and traffic safety).
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
92
In this regard, the Institutional Framework suggested for Patiala is as follows;
The suggested Institutional set-up will have ‘Three Tiers’. Each tier is responsible for some
specific suggested functions. Co-operation among the tiers is very important.
TIER I: STATE TRANSPORT PLANNING AND REGULATORY COMMISSION STPRC
The State Transport Planning and Regulatory Commission (STPRC) should be a statutory
body, created by an Act of Parliament as an enabling body in each State. The STPRC should be a
statutory body, and should have transport professionals as members. The STPRC will have adequate
transport planning expertise in order to study growth of the Patiala Region and initiate preparation of
perspective plans for transport and related infrastructure. It will also channel funding as per the
policies of the government. All urban transport related projects need to be approved by the STPRC,
for funding (Central/State) to be available to them. It will also be responsible as a regulatory
authority, where it will adopt/set performance standards for bus, roadways, etc. It will also have
bus/vehicle operating standards, and also be responsible for traffic and transport policies for the
state. Along with this it has a very important role as a coordinator with other urban infrastructure
departments, as well as the other tier in the institutional set-up. STPRC will be responsible for
initiating undertaking of studies and updating all transport studies, including Comprehensive Mobility
Plans (CMP), every 3-5 years.
TIER II: DEVELOPMENT AUTHORITY
The Development Authority will be responsible in actually undertaking studies and updating
all land use and transport studies, including the Master Plan and the Comprehensive Mobility Plans
(CMP), every 3-5 years. They will coordinate one-to-one with the municipal corporation, public transit
operators (bus, BRTS, other) with respect to their plans and implementation, so that all plans are
coordinated and form part of the comprehensive planning process for the city. Their responsibility
includes preparation of the Comprehensive Mobility Plan, Traffic Impact Assessments, Traffic System
Management, Travel Demand Management, and other existing duties. The PDA should be made
responsible for mobility and should play an active role in promoting public participation including all
stakeholders to influence transport policies. They will need to have two different cells, one the
technical cell undertaking studies and the other coordination cell coordinating the
recommendations of the study with the PMC and the other stakeholders.
The Patiala Development Authority should have a team of experienced land use/urban
planners, transport planners, bus system and mass transit specialists, along with transport economist
and financial specialists. The coordinating cell will need to form a Multimodal Task Group (MTG)
having members from all stakeholders and the technical team to decide on Route and fare fixation,
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
93
integration policy for different modes with respect to routes, fare and other facilities. This task force
will also initiate a PPP policy framework to be taken up by the bus operators, and other organizations
for implementation of their plans. The team determines the routes, timings and service-mix and will
pay the operators by an agreed rate. At the same time, it is at this level that decisions about the
quantum and quality of para-transit services, such as auto-rickshaws, etc., are taken. This Task Force
will plan for contracting with advertisers and collect such revenue as it can in order to augment its
financial resources to be ploughed back either as social cost reimbursement or for providing improved
facilities for passengers.
TIER III: IMPLEMENTERS AND OPERATORS
The Municipal Corporation will be responsible for having its own comprehensive plan that will
be a subset of the larger regional plan of the PDA. It has to be coordinated and synchronized with the
regional plan. It will continue issuance of Building Permits, and other current existing duties.
Municipality should have a small team of transport planners, transport economists and management
staff.
PSRTC will be responsible for transit planning, bus service management and also a facilitator
for PPP initiatives. Since the police commissioner regulates traffic, an important task at this level is to
ensure a forum for coordination both for mobility and for safety with the enforcement authority. The
municipality will be responsible for providing the necessary infrastructure in the shape of bus stations
and bus stops. PWD will continue as the responsible agency for construction and maintenance of
roads and other road infrastructure. It is essential that PWD has to work in coordination with all other
urban infrastructure departments. The Regional Transport Office will continue being the licensing
authority. The Traffic Police will need to have co-ordination and input with respect to the town’s TSM
and TDM Plan. It is again at this level decisions should be taken, in consultation with STPRC, on the
type of buses – mini – or regular – buses, their desired age, passenger friendly entry and exit fitness,
etc., If there are environmental and pollution-preventing measures they should be supervised by
MTG. The Traffic Police will have a small team of transport and finance personnel, who will implement
the overall transport plan prepared by STPRC. This team will be effectively supervised by STPRC and
is constantly guided in respect of all technical guidance, while it works administratively under the
municipality.
In addition to the proposed institutional set-up for smooth coordination and development, a
Traffic and Transportation Cell in Municipal Corporation is also recommended. The set-up for the
same is shown below.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
94
Organisation Structure at Municipal Corporation Level
Municipal CommissionerCommissioner of Police
Corridor Management &
Safety
Parking &
Bus Stops
Engineer
Traffic & Transportation
Execution and
Maintenance
Traffic Signals & Signs
and Markings
Engineer RoadsAdvisory Panel
Traffic Police, Bus
Transport, Trucking
Companies, IPT
Other Units
Figure 14-2: Traffic and Transportation Cell in Municipal Corporation
Figure 14-1: Unified Transport Authority for Patiala
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
95
14.2. TRAFFIC IMPACT ASSESSMENT MECHANISM
Traffic Impact Assessments (TIAs) are a valuable tool for analyzing traffic generated by
proposed developments with new access or increased use of an existing access. A TIA generally
includes a description of the scope and intensity of the proposed project, a summary of the projected
impacts and any required mitigation measures, and helps ensure that the highway can safely
accommodate a proposed subdivision/ development. A well-prepared traffic impact assessment helps
the developer and permitting agency accomplish the following:
Forecast the traffic impacts created by proposed development based on accepted
practices, not perceptions;
Determine improvements needed to accommodate the proposed development;
Allocate funds more efficiently;
Relate land use decisions with traffic conditions;
Evaluate the number, location, and design of access points;
Update traffic data (projections)
Identify needed roadway improvements; and
Provide a basis for determining the developer’s responsibility for specific off-site
improvements.
The following guideline is intended to assist developers and consultants in better
understanding the department’s requirements and expectations regarding TIAs. These guidelines are
not intended to provide technical engineering guidelines, but rather to provide a framework for the
documentation of such reports. A qualified transportation engineer should complete the TIA.
EXISTING/ BACKGROUND TRAFFIC
Although not a traffic projection, it is important to establish the background traffic volumes
and turning movements within the study area, before projecting background traffic into the future
horizons.
PROJECTED BACKGROUND TRAFFIC
Traffic projections shall be prepared for the build year or such other years as may be
appropriate due to development staging. In all cases, the background traffic should be projected to
the 20-year horizon, as this represents the life of most pavement structures. These traffic projections
should be based upon the established annual traffic growth rate for the study area. In cases with
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
96
erratic and/or unusual growth rates in recent years, consideration should be given to using the
provincial average growth rate (currently 2.5%/year) for projections beyond the 5-year horizon. All
traffic projections should be based on non-compounded growth.
PROJECTED DEVELOPMENT TRAFFIC
Development traffic projections shall be prepared for the build year or such other years as
may be appropriate due to development staging. In all cases, the development traffic should be
projected to the 20-year horizon. For each projection year, a turning movement diagram and/or table
should be included illustrating the projected development traffic by turning movement. In most cases,
the trip generation for the proposed development should be based on the current Institute of
Transportation Engineers trip generation rates, which can be found in the publication entitled “Trip
Generation”. However, in some cases the data provided in the “Trip Generation” manual does not
necessarily represent the situation present in rural Alberta. For land uses not listed in this source or
when the consultant believes these rates are not representative, the department may accept
alternative evidence of representative rates. Documentation and rationale will also be required for trip
distribution including directional traffic splits, intersectional traffic splits, pass-by trips, and internal
trips. This information should be supplied in a graphical and/or tabular format, and included in the
projected development traffic section.
BACKGROUND + DEVELOPMENT TRAFFIC
Once the development traffic has been identified, the background traffic and development
traffic should be combined for the determined peak periods and projection years. This information
should be supplied in a graphical and/or tabular format. The peak hour traffic analysis periods shall
be identified for the proposed development, the highway, and the resultant peak-hour condition. It
shall show the combination of site generated and background traffic, which causes the critical peak
period(s). The peak hour will generally correlate to the AM and PM weekday peak periods on the
highway. In some cases, depending on development characteristics, analysis of other peak periods
such as Saturday afternoon or evening may be necessary.
CAPACITY ANALYSIS
The TIA shall include a capacity analysis for the various traffic scenarios identified in the
document. The “Highway Capacity Manual” (HCM), Special Report 209 is the standard for capacity
analysis. Capacity worksheets must be provided as an appendix to the TIA. In cases where the
proposed development utilizes an existing intersection, it is necessary to first understand how the
existing highway and/or intersection operates without the development. Where applicable, the TIA
should include capacity analysis for the existing intersections in question.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
97
Impacts should be evaluated with development for the build year, staging years, and 20-year
horizon. Once the recommended improvements are identified the analysis should be conducted
including improvements in the appropriate horizon year in order to ensure the improvements will
improve intersection operations. The capacity analysis should, in most cases, include the following
information for each analysis scenario:
Delay per vehicle (seconds) by intersection, turning movement & peak period
Level of service (LOS) by intersection, turning movement & peak period
Left-turn/ right-turn warrants (based on the IRC codes
In some cases, it may be necessary to include:
LOS on a highway link (using HCM methodology/ software/IRC codes)
Vehicle queuing information
With complex TIAs, it may be beneficial to supply the department with the digital capacity
analysis files for review by one of the departments qualified transportation engineers. This should be
determined through discussions between the developer, consultant, and department
SIGNALIZATION ANALYSIS
Signalized intersections are generally not allowed in rural areas along the provincial highway
system, and signalization is an absolute last resort for improving an at-grade rural intersections. The
analysis should consider all other possible alternatives prior to recommending signals. If signals are
recommended at a previously unsignalized intersection, supporting documentation will be required
illustrating that all options were considered.
In some cases, and mainly in urban and semi-urban centres, signals may already exist at an
intersection. Analysis should be conducted to ensure that the current signal timings and phases are
still valid. If not, new signal timings and turning phases should be recommended. In cases where the
distance between signalized intersections is less than optimal (at least 800 metres), the analysis must
consider the impacts of the development on the upstream/ downstream signals.
All warrant calculations and analysis worksheets should be included in the appendix of the
TIA.
ILLUMINATION WARRANT ANALYSIS
Illumination is becoming a more prevalent issue for INFTRA, specifically in semi-urban and
urban areas. Lighting warrants for rural and semi-urban intersections shall be determined based on
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
98
the department’s Highway Lighting Guide. This will result in a requirement for full lighting, partial
lighting, delineation lighting, or no lighting. For further details refer to the IRC codes.
All warrant calculations and analysis worksheets should be included in the appendix of the
TIA.
PEDESTRIAN WARRANT ANALYSIS
Pedestrian movement accommodation is an important issue in the urban and semi-urban
areas. Depending on the type of development, and its interaction with the surrounding community,
pedestrian movements can become a significant issue. Consequently, improvements to pedestrian
facilities may be required. On the other hand, at isolated rural developments, pedestrian movements
are not likely an issue.
All warrant calculations and analysis worksheets should be included in the appendix of the
TIA
OPERATIONAL ANALYSIS
The operational analysis is a critical phase of the TIA that should not be overlooked. Once the
traffic analysis has been completed and the recommended intersection improvements have been
determined, it is necessary to ensure that the design vehicle is capable of safely manoeuvring the
intersection without interfering with other traffic movements. Intersection plans should be provided
illustrating that the design vehicle can safely manoeuvre the intersection. If the design vehicle is
unable to properly make a specific turning movement with respect to the development, recommended
revisions to the intersection layout are required.
CONCLUSIONS & RECOMMENDATIONS
The TIA should summarize the findings of the various analyses conducted, including potential
issues, and clearly outline the recommendations regarding:
Required intersection improvements;
Pedestrian mitigation;
Illumination;
Signalization; and
Right-of-way requirements.
14.3. REGULATORY CHANGES REQUIRED FOR INTRODUCTION OF TDM MEASURES
Transportation Demand Management (TDM) Measures came in to use in response to a need
to improve air quality, reduce peak period congestion and to reduce the demand for off-street parking
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
99
in the core-city area. TDM strategies utilized in the region have focused on alternates to single
occupant vehicle use during peak commuting hours. Carpooling, Vanpooling, subsidies for transit use,
pricing of parking and measures to encourage walking or biking to work have become part of the
TDM tool box with success have included job related measures such as flexi-time, compressed
workweeks and telecommuting.
Among the key benefits of incorporating TDM measures into the daily mix of transportation
services is its ability to extend the capacity of and promote the more efficient use of transportation
systems. The expansion of transportation infrastructure system for vehicular travel, whether in terms
of vehicle moving capability or vehicle storage, is expensive and usually lags behind growth. By
utilizing TDM effectively to complement private vehicle travel, the existing transportation system can
support a higher density of development, which is especially critical in major activity centres.
Discouraging the use of personalized modes by providing efficient public transport systems
and providing park and ride facilities will definitely make people swing towards the PT systems.
The other regulatory changes includes
Park and ride Facilities
Pedestrian Movements Shuttle lots and Shuttle buses
Bicycle lanes Employer transit Subsidies or support programs
Carpools
Ride Sharing Staggered work and School shifts.
14.4. TRAFFIC SAFETY REGULATIONS
ROAD USERS EDUCATION
Special traffic drives are to be planned by the traffic police of Patiala for making the public
aware of the traffic rules. Also the procedure for imposing fines at the spot for defaulters may be
reviewed in view of large backlog of pending traffic offence cases. Periodic road safety public
campaigns including exhibitions, lectures and film shows are also necessary for road user education in
Patiala. The target audience shall include all road users including drivers of public vehicles.
THE ROAD SAFETY PROGRAMS
Road safety program should be aimed principally at road users and serve three main
purposes:
To inform the public of new regulations or changes to the traffic regulation system
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
100
To influence the attitudes towards road safety
To persuade road users to change their behavior in relation to identified causal factors in
road accidents
BENEFITS
Improves road sense among the users
Better enforcement
TRAINING
In order to enhance the knowledge of engineers, planners and other staff of the municipality
in the field of transportation, it is necessary to conduct training programs in the form of workshops.
The workshops should cover the basics of urban transport planning process, the surveys to be
conducted, forecasting the future traffic etc. in their agenda.
Training and awareness program should be conducted by the Traffic Police at schools,
employment centers and also residential hubs. The training should be focused on adherence to
driving rules and safety during driving (importance of helmets, even for pillion drivers).
BENEFITS
The people working in the field of transportation will get the knowledge of the transportation
needs and methodologies for arriving at the solutions
The knowledge learnt at the workshops will be disseminated to other departmental staff
The public will be exposed to the traffic rules and the importance of the adherence to it.
14.5. PARKING REGULATIONS
Parking is a complex issue that elicits strong and sometimes contradictory reactions from
members of the Patiala Municipal Corporation. While some approach it as a practical problem, closely
tied to their ability to fulfil their job responsibilities, others emphasize the planning, environmental, or
even philosophical dimensions of the parking conundrum. While acknowledging these differences, it is
believed that current parking policies have the unfortunate effect of generating unproductive conflict
and resulting in a significant loss of commuters. The lack of adequate parking can also have a
negative impact on the mission of the City, producing consequences that range from heightened
stress, to reduced opportunities for commuters, even including the occasional missed class. The
Parking Policy Should includes the following.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
101
Levy of a high parking fee that truly represents the value of the land occupied should be
used to make public transport comparatively more attractive
Provide park and ride facilities for bicycle users with convenient interchange
Graded scale parking fees should aim to recover the economic cost of land used for
parking and electronic metering should be used widely
State governments should amend building byelaws in all million plus cities so that
adequate parking space is available for users of such buildings
Byelaws should also control carriage way parking in residential areas
Multi-level parking complexes should be a mandatory requirement in city centres that
have high rise commercial complexes and will be given priority under the NURM
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
102
15. FISCAL MEASURES
15.1. FARE POLICY FOR PUBLIC TRANSPORTATION AND PARKING
Fares or Fare integration in simple can be defined as the actions taken with respect to fare
and fare technology that facilitate movement between vehicles. These vehicles can be of the same or
different modes, and may be operated by a single operator or by different operators. In considering
fare policy, it is necessary to also recognize that if fares are set too low, substantial subsidies are
needed, which must be funded from other taxes on the community. Low fares also encourage
additional demand, which raises the cost of providing services and further increases the need for
subsidies. Complex fare structures and arrangements discourage use of PT. Fares policy needs to
balance the need for cost-recovery, simplicity of understanding, and other government policies such
as with regard to the environment and social equity.
Generally Fare policies would be decided on the passenger demand, cost of construction of
corridor, level of dedicated facility, Economical and Financial rate of returns. Fares policy needs to
balance the need for cost-recovery, simplicity of understanding, and other Government
policies such as with regard to the environment and social equity.
A desirable policy objective for Mumbai, as it is in most cities that seek to provide an
attractive public transport system, should be:
the integration of the ticketing and fare systems of rail, MRT and the bus system; and
the adoption of uniform fares for modes of similar quality.
Figure 15-1: Fare System Parameters
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
103
Fare policy is a matter that needs to be addressed at the outset, because it affects passenger
demand, design of stations and interchanges, the financial viability of public transport, and the form
and content of operating concessions.
Integrating fares implies standardization of fare structures, definitions of different categories
of users including concession/ discount fares (e.g. student, adult, and seniors/pensioner) and some
standardization of ticket product. Many cities have found such integration too difficult to achieve (e.g.
Hong Kong and London) although they have modern smart card integrated ticketing systems. On the
other hand, cities such as Singapore and Melbourne introduced integrated fares and integrated
ticketing at the same time.
There are different fare levels that guide the fare policy. It may differ with operators to
operator, but the integrated fares with different modes of travel would enable easily, the objective of
Seamless Travel.
Fare levels relating to geographical criteria:
Zonal system: In a zonal system, the network is divided into zones with a flat fare whilst
travelling within each zone. The price to be paid by the passenger will depend on the number
of zones crossed.
Graduated distance based system: In a distance based fare system, the price per km is
usually applied. For rail services, the fare system might enable station to station fares to be
set that are distance dependent. For bus services, the concept of fare stages is used. A fare
stage may be a single bus stop or a group of bus stops (where density of the network is
high). The fare charged then reflects the distance travelled between different fare stages.
The primary pricing basis for taxi services is distance based and it might include some time
based elements as well (e.g. associated with waiting and congestion delay).
Flat fare: Flat fare systems imply that a flat fare is charged for every trip made regardless of
distance travelled, or type of passenger. It may be suitable in situations where a majority of
passengers travel approximately the same distance e.g. shuttle buses to airports from the city
centre.
The regional fare management system must be governed by a single body mutually acceptable to
all participating entities-a regional coordinating body. To a certain extent, each participating
agency must delegate certain responsibilities associated with the development and operation of
the new program to this coordinating party. To be cooperative, all participating agencies will
resolve to rely on the expertise and judgment of a single coordinating entity, often wholly
independent from transit operations.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
104
COOPERATIVE ESTABLISHMENT OF POLICIES
Policy coordination may address topics such as fare policy coordination, customer service and
accounting policies and overall technical investment. The regional coordinating body may establish a
Program Policy Coordination Council (PPCC), composed of the general/senior managers of all
participating agencies, as well as supporting government sponsors of the program. Senior
management of neighboring non-transit transportation agencies—such as highway, toll-way, bridge
and tunnel agencies, and aviation agencies—may serve as non-voting participants and advisors to the
PPCC. Some of the proposed functions of PPCC are to:
Lead efforts (coordinated public outreach programs, dedicated public relations,
communicating with elected officials and government bodies) to inform the public of the
benefits of regional fare management system
Lead efforts to address historical legal restrictions that may hamper the effective coordination
of revenue management systems
Serve as the forum through which individual agency’s concerns on the delegation of authority
from individual entities to a consolidated program governing body are addressed
Some of the policies which need coordination among the participating agencies are detailed
out below.
PRICING POLICY
As the geographic service regions of mass transit providers expand and the historic
commutation patterns of riders shift, transit patrons must often use multiple transit agencies to
complete a single through-travel event. The ease of such travel can be hampered by the need to
transact a variety of inconsistent, uncoordinated transactions for the purchase of transit privileges for
a single journey. Inconvenience in payment processes can deter travelers from selecting transit.
In an effort to foster more efficient and convenient transit practices in multi-agency travel
patterns, various forms of cooperative multi-agency systems may be built. These systems may
depend on the pricing policy decided upon by the all the participating agencies.
The coordinating agency should identify and evaluate the goals of the pricing policy before
finalizing the policy itself. These goals may include:
Customer related goals: Increase ridership, maximize social equity, increase ease of use, increase
fare operations, and reduce complexity.
Financial goals: Increase revenue, reduce fare collection costs, reduce fare abuse/ evasion, and
improve revenue control.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
105
Institutional goals: Improve modal and regional connectivity, maximize ease of implementation, and
achieve fare box recovery ratio goal or requirement
One of the main aims of the pricing policy is to encourage the use of automated fare systems
in order to achieve the savings or efficiencies expected from such systems. Such encouragement can
be achieved through pricing policies that allow discounting or other financial benefits to be directly
received by the customer. The regional fare management system benefits should be tailored to
encourage repetitive use of the systems. Infrequent patrons may be served through the prepaid sale
of “day passes,” which should be destructively validated for the date of travel by the initial vehicle
operator, or “ten-ride” ticket sets priced to provide discounted access to transit through presentation
of a single ticket for each leg of the journey.
The pricing policy usually reflects the discounting from amounts charged for the purchase of
multiple single-agency instruments under pre–regional fare management system operations.
However, all multi-agency instruments sold under the regional fare management system program are
priced at levels higher than like-kind instruments issued for single agency travel (i.e., a multi-agency
weekly pass will be priced higher than any weekly pass issued by an agency for use on its own
system alone, but will be less than the cost of weekly passes for two separate agencies).
Any patron surcharge applied to legacy fare instruments may be approved by the PPCC. The
surcharge should reflect the regional fare management system pricing or discount policies.
All interagency travel services may be provided solely through the use of prepaid instruments.
All transit agencies maintain a discrete set of practices related to dealings with patrons on
fare issues. Such policy recommendations should be reviewed and approved by the PPCC. Agency
policies on addressing topics such as demands for credit or refunds as a result of fare disputes are
directed by factors such as the historic expectations of the public, the complexities of the fare media,
or pricing models. Employee latitude in dealing with customers is defined uniquely by each agency.
Such issues are of great concern to agencies in developing multi-agency arrangements. Consistent
treatment of passenger comment and concern is essential to maintaining cordial relationships with all
patrons. However, all parties must understand the level and format of deviations from policy, and
acceptable levels of delegation to fellow agencies must be provided to ensure smooth operations.
The convenience and ease of use for patrons of an automated product is a key factor in the
acceptance of the program by the local communities. Design of instruments, as well as processes
employed for the sale and acceptance of the regional instrument, must be sensitive to the patron
experience. The possible sales outlets may include grocery stores, telephone booths, petrol outlets
and ATM centers. Security on the data contained on the card is another important component of
customer comfort with the technology.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
106
ACCOUNTING POLICIES
It is essential to clearly define all pertinent accounting rules prior to commencing service. All
participants must be comfortable with their risk position in areas such as revenue recovery levels,
security of revenue and data, and impacts on internal accounting systems and reporting
requirements. Clearinghouse functions or acceptance of retained independence of revenue handling
tasks can be tailored to address all expressed concerns.
The coordinating agency should provide all regional fare management system accounting
services. All interagency transactions may be subjected to continuous audit and analysis by jointly
selected third-party oversight entities selected by the regional fare group, such as major local
accounting firms. All accounting results may also be subject to periodic audit and review by a third-
party, independent entity. The results of the periodic reviews may be disseminated to all participating
agencies.
The smaller agencies are enticed into participation with regional multi-agency consortiums by
assumption of development costs and certain operating revenue risks by a larger agency or an
independent governmental unit.
POLICIES ON PROGRAM OPERATING REVENUE
Policies on Program Operating Revenue could include policy statements such as:
All revenue collected through patron sales of the multi-agency instruments may be retained
by the selling agency
All revenue collected through collection of legacy instrument surcharges may be retained by
the selling agency
All multi-agency instrument sales and legacy instrument surcharges may be reported to the
coordinating agency on a daily basis
The value of funds collected may be used to compute credits or payment obligations between
the participating agency and the coordinating agency for recovery of program costs and
hence may be used to determine the financial impact of regionalization.
The value of funds earned by all participating agencies through multi-agency transactions
may be computed by the coordinating agency and the level of contribution toward program
costs to be provided by each agency may also be computed through application of respective
program revenue generation.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
107
POLICIES ON PROGRAM OPERATING COSTS
During the initial phase of regional fare management system operation, each agency should
bear responsibility for its own internal cost exposures. Costs associated with modifying fare media,
training field personnel, and administering the sale and collection of revenue instruments should be
incorporated into the core operating budgets of the entities. Such costs should be relatively minor
adjustments to historical operating cost levels in light of the minimal changes to normal practices
required by the introductory system.
Initial phase program operation costs will also include items such as joint program marketing
and clearinghouse functions. Such program costs will be expended by the coordinating agency.
Recovery of these program expenses from participating agencies may be shared on a proportional
basis. The contribution level of each agency will be assessed relative to the respective level of patron
participation as measured by rider-ship statistics, fare media sales transactions, or route miles
operated.
During the later phases, operating costs associated with larger, more intricate regional fare
management system programs may be significantly greater for each participating agency. These costs
may include the need to maintain new technologies and address patron issues with new forms of
revenue transaction or integration with commercial enterprises and participating entities. As the
regional fare management system program expands into more sophisticated technologies and
procedures, the PPCC may develop equitable models for determining the contributions from each
participating agency. Although the majority of operating costs will be incurred by the coordinating
agency, each participant will incur direct costs associated with increased sales, equipment
maintenance, additional transportation service levels to serve the patron of regional fare management
program, training of sales and vehicle operating personnel and interaction with third-party patrons or
specialized marketing efforts.
Only cost factors that reflect a 10% increase above historical levels of expense should be
reported as regional fare management system–related costs. Costs that are related solely to
execution of regional fare management system activities may be reported, as well.
ONBOARD OPERATION POLICIES
Multi-agency fare systems should be sensitive to field conditions, providing simplistic
transaction formats for the benefit of the patrons and field personnel. Failure to account for the
environment in which the actual transaction event occurs can result in an unfavorable fare climate,
which is counterproductive to the goal of attracting riders. Overly complicated fare tables, instrument
formats, and onboard collection decisions can create an untenable position for field personnel.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
108
Vehicle operators may not be required to execute sale or surcharge transactions while
operating a service route. Operator duties related to regional fare management system activities may
be limited to confirming the adequacy of presented fare instruments for the travel service to be
provided. Conflicts with patrons may not be permitted to impact safe vehicle operation or service
schedules. Each agency’s existing operating practices on dealing with patron conflicts will be applied
in cases of regional fare management system–related patron conflicts. Accordingly, multi-agency fare
structures should minimize the need for cross-agency knowledge of zones, time restrictions, fare
tables, or routes. Automated fare collection systems used to support multi-agency systems should be
self-reliant, not requiring interaction with the vehicle operator.
All patron conflict events related to regional fare management system actions and procedures
may be reported by the agencies to the coordinating and the regional fare group. Conflict trends may
be assessed on a quarterly basis by the regional fare group in concert with the PPCC and may result
in modification of policies and practices as deemed appropriate.
TECHNOLOGY POLICIES
Actions or projects under consideration by any participating agency that impact revenue
instrument sales or collection equipment should be communicated to the PPCC. The PPCC shall review
the conformity of such actions to program plans and procedures of the regional fare management
system. Replacement, modification, or augmentation of sales equipment, sales outlets, collection
equipment, or fare management systems must be consistent with the overall plans and directions of
the regional fare management system program in order to ensure maintenance of a fully integrated,
coordinated program of regional fare management.
FARE POLICY AMENDMENT POLICIES
Plans under consideration by any participating agency for the modification of fare tables, fare
media, or customer service should be communicated to the PPCC. Such plans should be fully
assessed to determine the impact on regional fare management system activities, policies,
procedures, and technologies. The coordinating agency, should work closely with the agency
considering the change in order to ensure that all impacts on other participants are fully assessed and
addressed.
The impact on individual agency fare policies or media may (1) generate direct effects on the
regional fare management system financial models or design of multi-agency fare instruments or (2)
necessitate retraining or retooling at other agencies. The individual agency may be required to
reimburse the regional fare management system or other participating agencies for costs directly
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
109
related to maintaining interoperability with the agency’s changed fare practices. Alternatively, the
agency may be removed from the regional fare management system program.
CAPITAL FUNDING SOURCES
Capital financing requirements for an introductory regional fare management system should
be minimal if efforts are focused on mutual acceptance of existing protocols by all participating
agencies. Capital investment would be limited to those costs associated with planning and design of
revenue modeling, accounting systems, and audit functions associated with managing agreed-upon
revenue apportionment and cost allocations. Some additional costs may be associated with creating
distinctive fare media designs for the new regional fare tables, as well as program market analysis
and sales communications.
Those systems attempting to apply legacy magnetic stripe instruments during the initial
phase of regionalism may incur capital costs associated with designing code and revising acceptance
hardware to allow acceptance of all forms of instrument. Likewise, some expenditure will be required
to produce appropriate reporting capabilities from the acceptance systems to allow for the accurate
clearinghouse analyses needed to reconcile instrument sales to usage points.
As the program eventually proceeds toward development of integrated fare management
technologies for use by the regional program, capital costs will become dramatically greater as efforts
extend into engineering, acquiring, installing, and implementing the requisite technologies, programs,
and entities required to support such an effort.
Capital financing for the regional fare management system may be generated from the
following sources:
The PPCC will coordinate efforts to generate contributions from all participating agencies.
Agencies will be asked to contribute a portion of required funding at levels comparable to
their relative share of affected rider ship. Contributions of equipment, staff time, and
professional services will be computed as components of each agency’s overall contribution to
the effort
The PPCC will also serve as coordinator of efforts to obtain capital financing from central and
state entities responsible for providing capital grant funding for programs of this nature. Local
governmental grant support should be attracted and managed through action by each
participating agency respectively
As regionalization attracts transit patrons from a wider span of operations, local chambers of
commerce or major attractions (such as convention centers, sports arenas, or theme parks
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
110
receiving visitors through the service expansion) may also be enticed to contribute to the
overall capital campaign.
As the regional fare management system eventually expands into broader commercial
applications, private funding sources may be achievable, as well. Investment in certain fare
technologies that allow “off-line” transaction processing, such as “smart cards” or “blue
tooth” approaches, may allow the agencies to open the instruments for use at local
commercial establishments. Vendor participation in the program would require a contribution
to the overall program capital requirements.
COMPREHENSIVE BUSINESS PLANNING
A thorough plan for implementing regional fare structures is essential to the success of the
program. Addressing topics related to the respective customer service needs of the region allows all
participating agencies to maintain desired service quality levels while delivering improved convenience
to their mutual patrons. Clear definition of actions and responsibilities for sales, refunds, and
reconciliation processes prior to system implementation minimizes confusion to patrons and concern
among participating agencies. Complete business planning will also address all prospective
investments required to produce a reliable, technologically versatile system. The appropriate volume
of computing and marketing resources to be directed toward the effort must be accurately
established. All program members must be resolved to contribute a reasonably defined level of
financial support, consistent with the respective level of gains to be experienced from the effort. The
appropriate plan for resource allocation must be defined in a manner supported by all participants at
the outset of the program to avoid differences or difficulties during the implementation or operating
phases.
PROGRAM OPERATIONS
Interagency program operations will be managed by the program operating agency (POA).
The POA will be designated by the PPCC and will most likely be the largest participating agency. The
POA will execute defined procurements, fare media production, distribution of fare media, cash
management, and all clearinghouse and reconciliation functions. The POA will perform all necessary
data collection and accounting functions for the program.
The agencies must agree upon a single formula of operating protocols for the consistent
handling of revenue issues and transactions. While each agency may maintain its legacy program of
fare management, policies, and procedures in the early stages of a regional fare management system
program, efforts to define consolidated operation processes must begin at the earliest phases of
cooperation.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
111
As the program progresses, all members of the regional fare management system should
implement consistent fare policies, fare tariffs, and fare technologies simultaneously in order to
maximize the benefits to all affected parties. By proving the benefits of regionalism through early
implementation of a simplistic partnership, public support and internal support from all agencies for
complete program integration can be fostered.
A major factor to be resolved prior to commencing multi-agency operations is clarification of
reconciliation and clearinghouse functions by the participating agencies. In several instances, allowing
each agency to retain proceeds from its own sales of joint instruments or fare box collections has
circumvented the issue. In other instances, the agencies have agreed to formulas that provide a
means to settle sales receipts to collections through a periodic assessment of rider ship levels and
average fare levels. Failure to clearly define revenue reconciliation processes prior to system
implementation can cause serious financial difficulties in maintaining the effort.
15.2. SUBSIDY POLICY FOR PUBLIC TRANSPORT OPERATORS
The long-term viability of public transport operations is crucial for protection against air
quality degradation. The ability of public transport operators to provide continuous, high-quality
service is necessary to keep the public from shifting to private transport or para-transit modes.
Consequently, policies to address various social and environmental aspects of the transport system
need to ensure the operator’s ability to provide levels of service that maintain and, if possible, expand
public transport mode shares.
The two areas of particular concern are
(i) subsidies for public transport, often provided to keep fares affordable for low-income groups and
(ii) mandates on technology choices, which are often justified on environmental grounds.
Subsidies aimed at reducing air pollution from public transport should be based in part on an
analysis of the relative net benefits that can be achieved. They may be warranted where they either
support vehicle and emissions technology upgrading, and/or maintenance standards. Technology
upgrading could also include alternative fuel use such as compressed natural gas, liquified petroleum
gas and others. The case for subsidies is strongest where there are poor or nonexistent regulations
regarding maintenance to reduce tailpipe emissions. Such subsidies should be explicit, and designed
taking into account the method of franchising and regulating public transport services. Stringent
regulations and standards for vehicle maintenance and repair, and fleet quality and service levels
should be specified and enforced as part of the franchise. Subsidies for public transport are often
provided for social reasons, such as to reduce transport costs for people with low incomes. However,
experience suggests that providing this subsidy by mandating artificially low fares for the public
transport operator —that is, requiring the operator to provide the subsidy—can lead to an
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
112
unsustainable cycle of deferred maintenance, declining service, loss of ridership, and ultimately,
modal shifts away from public transport even among the urban poor. Consequently, while public
transport subsidies may be an important public policy objective, the actual way they are delivered can
have important impacts on air quality. Targeted subsidies— for example, government or employer-
provided vouchers to public transport riders that are reimbursable by the public transport operator—
may be a more effective way of accomplishing the subsidy goal without inducing a degradation in
service, maintenance, or air quality. Experience also suggests that transfers or payments directly to
the public transport operator can also become internalized into the operator’s wage structure and
operating costs, providing benefit not to the urban poor, but rather to the often middle-class workers
of the public transport operator. Such subsidies (i.e. to keep fares low) could also be aimed at
attracting car drivers and so reduce pollution from transport. Because car drivers tend not to be
sensitive to the price of bus fares, subsidies for this purpose tend not to be cost-effective. Motorists
are more likely to switch to public transport where its speed and quality is greatly increased (e.g.,
express buses and air-conditioned buses). Since premium bus services would usually command a
higher fare they would not normally require a subsidy, however, high-quality rail services that have
higher fixed costs than buses may still need to be subsidized.
Mandates to public transport operators to use a particular
Technology—or even to meet particular emissions criteria without a specification of
technology—may also burden their operations, particularly if their finances are marginal to
begin with.
Having very clean buses may be a laudable goal, but they will have little impact or even
exacerbate urban air quality if the operator must cut service (or not expand as rapidly as
needed to meet growing demand) in order to meet the standards. Consequently, any analysis
of technology options must include a service-level and demand-side component in order to
fully understand the air quality implications.
15.3. TAXATION ON PRIVATE VEHICLES AND PUBLIC TRANSPORT VEHICLES
Private vehicles, including cars and motorcycles, should pay their full external costs. However,
in some Asian countries, motorcycle and car ownership is seen as desirable and to be promoted at all
cost. Coupled with this perception is the common view that development and support of the
automobile and motorcycle manufacturing industry is good for a country’s economic development. For
these reasons, policymakers often implement policies that artificially lower the cost of vehicle
ownership through very low or non-existent first time and subsequent registration taxes. They may
also apply relatively low sales taxes to these vehicles (compared to other goods) and adopt policies
that permit motorists to avoid maintaining their vehicles to roadworthiness standards and reduce
emissions to desirable levels. Such policies can lead to excessive demand for private transport modes,
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
113
with consequent external impacts and the erosion of the public transport’s viability. Setting prices so
that motorists perceive the marginal social costs of their travel decisions is desirable in order to
mitigate private vehicle use, but this is often not acceptable.
Fuel taxes are a simple and practical instrument which may sometimes achieve some
moderation in vehicle travel demand. Fuel taxes cannot address the time and location dimensions of
congestion. To date, the main purpose of fuel taxation has been to raise general revenue; however,
for an environmental purpose there is a valid case to tax both gasoline and diesel fuel use. Policies on
fuel taxation need to be evaluated carefully to avoid the possible adverse effects of inter-fuel
substitution, and misuse and adulteration of fuels. In many countries, transport taxes and charges are
used as general revenue in part because their tax base is underdeveloped. There is a case for the
creation of a special fund—one that uses earmarked revenues raised through levied taxes and
charges to support clearly-defined environmental objectives. These funds can be designed so as not
to affect normal revenue-raising. Experience from several countries shows that increased levies,
where directly and visibly linked to specific improvements, are acceptable to the public at large, It
appears appropriate that the administration of these special funds should be decentralized
15.4. POTENTIAL FOR ROAD CONGESTION CHARGING
Comprehensive pricing to manage transport demand is feasible, but has been implemented in
only a few cities, such as in Singapore since 1975, and more recently in Hong Kong, China, where the
feasibility of ERP was investigated thoroughly from 1997 to 2001. While some cities outside Asia, such
as London, are considering the implementation of road pricing, very few Asian cities are expected to
assess this instrument over the next decade due to difficulties in securing the high level of community
support it requires. The purpose of a road tax is mainly to raise revenue, while that of transport
pricing is to influence the location and time of demand; these purposes are often confused by the
public and politicians throughout Asia. As a result, the implementation of transport pricing measures
usually faces stiff opposition. But in the cities Like Patiala with only few major roads and other
National Highways in City limits, the congestion pricing is not feasible.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
114
16. MOBILITY IMPROVEMENT MEASURES AND NUTP OBJECTIVES
16.1. INTRODUCTION
National Urban Transport Policy (NUTP), 2006 envisages setting up of Unified Metropolitan
Transport Authority (UMTA) in all million plus cities, to facilitate coordinated planning and
implementation of urban transport programmes and projects and an integrated management of the
urban transport systems, as the current structure of governance for the transport sector is not
equipped to deal with the problems of urban transport and also the Comprehensive Transportation
Study urges the need of the strong Institutional Frame work for the implementation of its
recommendations. The objectives of the NUTP are:
Incorporating urban transportation as an important parameter at the urban planning stage
rather than being a consequential requirement
Encouraging integrated land use and transport planning in all cities so that travel distances
are minimized and access to livelihoods, education, and other social needs, especially for the
marginal segments of the urban population is improved
Improving access of business to markets and the various factors of production
Bringing about a more equitable allocation of road space with people, rather than vehicles,
as its main focus
Encourage greater use of public transport and non-motorized modes by offering Central
financial assistance for this purpose
Enabling the establishment of quality focused multi-modal public transport systems that are
well integrated, providing seamless travel across modes
Establishing effective regulatory and enforcement mechanisms that allow a level playing field
for all operators of transport services and enhanced safety for the transport system users
Establishing institutional mechanisms for enhanced coordination in the planning and
management of transport systems
Introducing Intelligent Transport Systems for traffic management
Addressing concerns of road safety and trauma response • Reducing pollution levels through
changes in traveling practices, better enforcement, stricter norms, technological
improvements, etc.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
115
Building capacity (institutional and manpower) to plan for sustainable urban transport and
establishing knowledge management system that would service the needs of all urban
transport professionals, such as planners, researchers, teachers, students, etc
Promoting the use of cleaner technologies
Raising finances, through innovative mechanisms that tap land as a resource, for investments
in urban transport infrastructure
Associating the private sector in activities where their strengths can be beneficially tapped
Taking up pilot projects that demonstrate the potential of possible best practices in
sustainable urban transport.
16.2. SUMMARY OF NUTP OBJECTIVES AND THE PROPOSED MEASURES
The suggested Improvement measures were planned in order to meet the objectives of the
National Urban Transport Policy (NUTP). The objectives were mentioned above.
Table 16-1: Proposed measures to achieve NUTP Objectives
Sl.No NUTP Objective Proposed Measure
1. Integrated Land use and transport Planning
The people can walk to work with the proposed Urban growth and transport development scenarios. The development of Outer ring
road and radials will enforce the land pockets and the institutional
development can take place and thus the residential colonies will develop abutting the Work Places.
2. Equitable allocation of
Road Space
The Proposed Cross Section represents the exact objective of
National urban Transport policy. Rather than moving vehicles, movement of people can be attained through the equitable
allocation. Provision of NMT lanes and pedestrian walkways is the proposed measure for achieving the same.
3. Encourage Public
Transport
Almost 180 Kms of Public Transport is Proposed on all the major
corridors.
4. Multimodal Integration For the horizon years, mass transit options like Monorail and BRTS
has been given and also the development of Multi-modal corridor
as Outer ring road will fetch a lot in ensuring seamless travel.
5. Institutional
Arrangement
A three tier institutional set-up is proposed for smooth
coordination and operations of the proposed projects. Unified Metropolitan Transport Authority is suggested to manage the
lacuna of Multiplicity of agencies.
6. Capacity Building An exclusive traffic and transportation cell is suggested in all the Municipal Corporations for time to time monitoring and planning of
projects.
7. Promoting Use of Cleaner technologies.
The advance technologies for the Mass transit options and the Integrated ticketing systems is suggested for smooth functioning
and to withhold the robust usage.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
116
17. SOCIAL AND ENVIRONMENTAL CONDITIONS
Several traffic and transport proposals with more emphasis to Public Transport schemes that
are proposed in this study which when implemented have positive impact on the environment. The
elements of emissions from vehicles such as Carbon-mono-oxide, Hydrocarbons and Particulate
matter have significantly reduced during the year 2030 as indicated.
The impact of the proposed projects from the social angle is analyzed at a broader
perspective. It is found that most of the projects have significantly less impact with respect to
Rehabilitation and Resettlement. Land acquisition for some of the projects is inevitable. The proposed
projects that significantly improve mobility with reduced travel time.
Figure 17-1: Social and Environmental Impacts of Proposed Projects
Project
Right of way / Land
Acquisition
Requirement of Rehabilitation
& Resettlement
Improve
Mobility
Reduction in Travel Time
Bus Fleet Augmentation No No Yes Yes
BRTS No No Yes Yes
Intermodal Stations Yes Yes Yes NA
Monorail Yes Yes Yes Yes
Bus Terminals Yes Yes Yes NA
Bus Shelters & Bus bays Yes Yes Yes Yes
Grade separators & ROBs Yes Yes Yes Yes
Rd Widening – 4laning Yes Yes Yes Yes
Rd Widening – 6laning Yes Yes Yes Yes
New Roads (4 lane) Yes Yes Yes Yes
Ring Road Yes No Yes Yes
Bike lane yes No Yes Yes
Foot Path cum drains No No Yes NA
Pedestrian FoB/Subway No No Yes NA
Major Junction Improvements No No Yes Yes
Area Traffic Control No No Yes Yes
Signages and Road Markings No No Yes Yes
Core Area Plans No No Yes Yes
Off-Street Parking Yes Yes Yes NA
Truck Terminal Yes Yes Yes NA
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
117
18. IMPLEMENTATION PROGRAMS
18.1. LIST OF MOBILITY IMPROVEMENT PROJECTS AND MEASURES
The mobility plan elements discussed in the previous sections were considered in the
estimation of block cost estimate for implementing the elements in the future. Summary of the costs
including the phasing of investments is presented in Table. The rates are assumed based on
consultants experience on similar studies in the past. The approximate capital cost for implementing
the mobility plan is approximately Rs. 5315 Crores over the next 20 years. Major share of the
investment is for developing public/mass transport systems.
To meet the transport needs of the future, investment requirements will increase to levels
three to four times higher in real terms from the present levels. The financing of this level will be a
massive task. While the government will continue to be a major source of funds for infrastructure,
internal generation of resources by the sector itself will have to increase. Pricing of transport services
and reduction in the costs will have to play a much bigger role than in the past. A larger role of the
private sector is also visualized. In a maze of subsidies and social service obligations public sector
transport has lost the importance of commercial operations. Urban transport Policy of the Ministry of
Urban development clearly indicates the areas and levels of possible government support in planning
to implementation of urban transport components. There are certain areas of urban transport
components that different stakeholders can participate so that the required funding and
responsibilities can be shared with suitable coordination and regulation mechanism.
Figure 18-1: List of Mobility Improvement Projects
Schemes/Projects Details Unit Quantity
Bus shelters & Bus bays
The bus shelters are planned to provide 0.5 km
spacing in commercial areas and 1-2 km spacing in
other areas.
Nos 160
Inner & Outer Ring
Road (same as part
of New Links proposed)
Proposal for development of 59 km of Outer Ring
road. The project involves development of 60-90 m
wide corridor, with expressway, service roads and a Mass rapid transit route especially BRTS/Monorail.
kms 59
Foot path cum drain Proposed Mobility Corridors and other significant
roads of LPA kms 89
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
118
Schemes/Projects Details Unit Quantity
Flyovers /
Underpasses / ROBs
1. inner bye-pass near D.C.W.
2. On outer ring road connecting Rajpura road
with Sirhind road on Rajpura railway line. 3. On outer ring road connecting Sangrur road
with Nabha road on Dhuri railway line. 4. On new link connecting Sirhind road with
Rajpura road along Chotti nadi by using
bandh parallel to nadi. 5. RUP between Urban Estate Phase-I and II
6. RUP in front of new bus stand and S.S.T
Nagar.
7. Dukhniwaran Sahib Flyover
8. Leading arm to Bus Stand
nos 8
Foot Over Bridges & Skywalk
Dukhniwaran Sahib Mandir, Kalika Mandir, At Bahadurgarh chowk, In front of Punjabi University and
pedestrian push button arrangement for entry to Birji
cremation ground road
nos 5
Off-street Parking
sites
Bahera Road, Improvement Trust land, Jaurian
Bhatian Road, Leela Bhavan market, city centre, Choti Bharadhari
nos 6
Road widening (2 to 4
lane& 4 to 6 lane)
Road widening Proposed under this study which
includes those proposed in Master Plan kms
Area Traffic Control Inner City area LS
Bus Terminal ISBT 1 nos 1
BRTS
Line 1: Chamarheri-Bus Stand- Kalyan Line 2: Hardaspur-FCI-Ranbirpura
Line 3: Sidhuwal- Bus Stand- Kula Mazra Line 4: Outer Ring road
Mini Bus-1 : Seuna-Mohindra college-Sanaur
Mini Bus- 2 : Jhill- Urban Estate –Modi College- Jhill
kms 150
Bike Lane All mobility corridors and some areas inside core city. kms 89
18.2. SELECTION OF PRIORITY PROJECTS/MEASURES
The investment is phased into two periods as shown in Table, such as 2010- 2020 and
2020-2030. About 75 percent of the investments as per the CMP are aimed at improving the public
transit system in the PDA area. The first period (2010- 2020) basically focuses on public transit
system enhancements including bus terminals, traffic management measures, including some
pedestrian grade separated crossings etc, along with development of mobility corridors.
All traffic management measures are taken up during this phase. The second phase seeks
continued improvements in the mass public system enhancements, bus augmentation, additional
mass transit system enhancements and road capacity augmentation continue, along with construction
of ring roads.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
119
Table 18-1: Phasing of projects
Phases Rs. In Crores % BRTS
Portion Phase 1 (2010-2020) 1633 50.2% 69.8 % (1140)
Phase 2 (2020- 2030) 1622.5
49.8% 40.7 % (660 )
Total 3255.5 100%
PHASING PLAN (2010-2020)
The break-up of costs for 2010 – 2020 are shown in Table below Priority should be given to
the following investments.
Traffic management along with core area plans that are focused on non-motorized traffic
and pedestrians.
Construction and improvement of footpaths, pedestrian crossings for safe flow of
pedestrian traffic, and accessibility to transit corridors.
Junction improvements to encourage flow of traffic and reduce conflict, thereby taking
into account safety and also minimizing emission (due to congestion).
Public transit augmentation and improvement. Implementation of high capacity mass
transport options for 100 km of road sections this also would include Route
Rationalization Study, feeder services, bus shelter and bus bays, high density bus corridor
etc. BRTS services should be made operational. This would help in enhancing the transit
share, and reduce dependence on private vehicles.
Parking Management Plans along with construction of some parking plazas is important
at this stage and will complement the core area plans and pedestriansation efforts of
some areas.
As automobile ownership and usage levels would not reduce overnight, selected
junctions with significant anticipated congestion problems are identified for flyovers until
capital intensive public transportation schemes are in place.
Figure 18-2: Break-up of Block Cost Estimates (2010-2020)
No Schemes/Projects Unit Quantity Rate COST
1. Bus shelters & Bus bays Nos 110 0.15 16.5
2. Traffic Management Measures- one way schemes LS 1
5
3. Flyovers/Underpassess/ROBs nos 5 20 100
4. Foot Over Bridges & Skywalk nos 5 2 10
5. Off-street Parking sites nos 5 4 20
6. Augmentation of Bus fleet nos 400 0.5 200
7. Improvements of Road Sections kms 89 1.5 133.5
8. Area Traffic Control LS 1
5
9. Bus Terminal nos 1 3 3
10. BRTS kms 95 12 1140
Total (INR Crores) 1633
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
120
PHASING PLAN (2020-2030)
The break-up of costs for 2020 – 2030 are shown in Table Priority should be given to the
following investments.
Public transit augmentation and improvement should continue, along with focus on mass
transit options on the mobility corridors feeder services, bus shelter and bus bays, etc. Focus
should be on high dense bus corridor and mass transit options (Monorail/BRTS). This would
help in enhancing the transit share, and reduce dependence on private vehicles.
Focus in this phase should include building up of bus terminals, and also intermodal stations,
as needed, along the mobility corridors; this would encourage public transit usage, and
increase the public transit share.
Up gradation of the roadway system to mobility corridor standards should also be a priority
during this phase.
Focus on construction and improvement of footpaths along with Grade separated pedestrian
crossings should continue for safe flow of pedestrian traffic, and accessibility to transit
corridors.
Missing link roads and new roads that enhance mobility in the PDA area also should be given
priority in this phase.
There is a need to rigorously evaluate all the above proposals and complete a thorough
evaluation of other technological alternatives (Alternate Analysis), especially for transit system choice.
Project Profile Sheets of the projects proposed are included in the Annexure 6 of the CMP.
Figure 18-3: Break-up of Block Cost Estimates (2020-2031)
No Schemes/Projects Unit Quantity Rate COST
1. Bus shelters & Bus bays Nos 50 0.15 7.5
2. Traffic Management Measures- one way schemes LS 0
3. Flyovers/Underpassess/ROBs nos 2 20.0 40
4. Foot Over Bridges & Skywalk nos 0 2.0 0
5. Off-street Parking sites nos 0 4.0 0
6. Augmentation of Bus fleet nos 400 0.5 200
7. Outer ring road kms 59 5.0 295
8. New Links & Road along Nalla that includes Ring Roads
kms 70 6.0 420
9. Area Traffic Control LS 0
10. Bus Terminal nos 0 3.0 0
11. BRTS kms 55 12.0 660
Total (INR Crores) 1622.5
18.3. IMPLEMENTATION AGENCIES
As proposed in the institutional arrangements UMTA has to be set-up for implementation of
these projects headed by Patiala Development authority. As PDA would have more financing options
and an exclusive transportation planning department, it should take the initiatives for the detailed
study of the mass transit corridors and their implementation.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
121
18.4. FINANCING OPTIONS
The infrastructure finance market in India is largely characterized with inadequate flow of
long-term funds despite a large and diversified financial sector. The tenor of available funds from the
domestic market is typically 10 years or less with a 2–3 year re-set clause, effectively making such
funding short-term. This typically leads to front-loading of tariffs during the initial years of the project
cycle which adversely affects affordability of the services for the low income end-users. Since user
tariffs are required to provide for debt repayments, return on equity, and depreciation costs, tariff
affordability depends on amortizing debt through smaller repayments over a longer period of time. In
the absence of long-term fixed rate financing, stability of cash flows are difficult to achieve.
Some of the financing options for the infrastructure development are
Public Private Partnership
Increase in Floor Space Index (FSI) within one km radius of Mass transit Corridors
Development of Growth centres
Land Bank
Betterment Charges etc.,
Evaluation of these options can make the project viable and can give boast for the initial investment of many projects.
PUBLIC PRIVATE PARTNERSHIP
Recognizing the significance of the role of private sector in infrastructure development, the
Government has placed PSP and PPPs at the center of its infrastructure development strategy. The
Government’s framework and measures for promoting PPPs draw on international experience with
appropriate adaptations to the Indian context include the following.
Establishing a PPP cell in the Department of Economic Affairs (DEA) in the Authority
Institutionalizing PPP Cells in selected states and central line ministries for identifying and
developing potential PPP opportunities, developing PPP projects, and bringing them to market
for financial closure.
Establishing Punjab Infrastructure Project Development Fund for financing PPP project
preparation activities such as conduct of feasibility studies.
Establishing the IIFCL, the executing agency (EA) for the proposed Facility, for facilitating
access to long-term funds for infrastructure development.
Launching the Viability Gap Fund with annual allocation.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
122
19. RESOURCES MOBILIZATION
Most of the cities in India have been facing transport problems for over last few decades,
affecting the mobility of people and economic growth of urban areas. These problems are due to
prevailing imbalance in modal split; inadequate transport infrastructure and its sub-optimal use; no
integration between land-use and transport planning; and no improvement or little improvement in
city bus service, which encourage a shift to personalised modes. In view of this, the Government of
India approved the National Urban Transport Policy (NUTP) in April, 2006. The policy primarily
focuses on the mobility of people not the mobility of vehicles. This requires the public transportation
system to be more attractive to use. The challenge for improved public transport is to provide good
quality service at an affordable price. All the million plus cities needs one or the other forms of public
transport systems or combination depending on the size of the city/ region to contain the traffic
congestion, reduce the pollution levels, providing affordable, safe and secure transport facilities. It is
important to evaluate public transport technologies in the context of city characteristics. The public
transport options vary between low cost buses to high cost rail metros. Moreover the shape of a city
is very important for selecting the appropriate mode of transport and capacity building is a very
important factor in introducing and implementing public transport system.
Funding urban transport infrastructure is a challenge in all cities. This challenge exists
because city governments’ limited ability relative to the regional/ state/ central government levels to
raise revenue and the ever increasing demands they face to meet year on year exceeding their
funding capacity. As a result, allocating sustained funding for long term capital projects is difficult to
maintain in the face of pressing short term demands for the essential service like housing, solid waste
management, water supply, sewerage, drainage etc.
Resources are prime important for implementation of any project in urban areas. Lack of
funds is limiting the Urban Local Bodies (ULB) to implement infrastructure improvement projects,
Urban Transport is no exception.
Urban Local Bodies (ULBs) in Punjab are well-off in terms of resources compared to other
ULBs in India. However, due to lack of systematic approach to address the infrastructure issues,
Urban Transport remain unattended due to its low priority over the other basic infrastructure
requirements like housing, water supply, drainage, solid waste management, street lighting etc.
The present Comprehensive mobility plans are aimed at attending these issues in a
sequential, systematic manner developing vision for the city and prioritizing the projects to meet the
demand in the future for short term (upto 5 years), medium term (5 to 10 years) and long term (over
10 years). In order to provide congestion free traffic movement through planning projects for
implementation predicting the probable problems at these timelines based on the demand estimated
at those timelines.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
123
Urban transport has been a neglected area both in terms of policy planning and
implementation in India. With advent of JnNURM, it had gained prime importance through allocation
of funds for implementation of project in this area. Urban transport projects generate multiple
benefits ranging from pure private good to public good. The beneficiaries for each category are also
different. Public institutions need to develop innovative instruments that capture value from indirect
and proximity beneficiaries so that urban transportation projects do not excessively rely on real-estate
development for financing. The specific type of instrument would vary depending upon the demand
for commercial real estate, existing density, availability of complementary instruments, and
administrative efficiency of ULBs.
The revenues generated from such instruments should be ring-fenced into a separate urban
transport fund. Finally, formation of Unified Metropolitan Transport Authorities would help in
realigning the institutional structure to address urban transport related issues in an integrated
manner.
Identifying the difficulties in resource mobilization for Urban Transport Projects, National
Urban Transport Policy (NUTP) has envisages the idea of Innovative financing mechanisms using land
as a resource.
FUNDS FROM STATE/ CENTRAL GOVERNMENT
Intergovernmental transfers from the state and central government are expected to play a
major role in funding infrastructure based largely on the schemes of:
Viability Gap Funding (VGF): It is a capital grant from the central government providing
funding assistance to projects under Public-Private Partnership (PPP) which are otherwise not
feasible. The VGF is always equivalent to lowest bid for capital subsidy but is restricted to the
maximum of 20% of total project cost1. If the sponsoring body- ministry/state government/statutory
body- provide any other assistance, it can be further extended up to maximum of 40% of the cost of
the project.
Jawaharlal Nehru Urban Renewal Mission (JNNURM): It is a scheme for bringing
improvement in urban infrastructure and urban governance. It provides financial assistance in the
form of grants to ULBs and parastatal state agencies such as Development Authorities of cities for
implementation of projects. For cities with four million plus population if ULB or parastatal body can
raise 50% and state government is ready to share 15% of the project cost, central government can
fund 35% of the cost as grant2. These grants can be utilized for following three purposes:
1 Scheme and Guidelines for Financial Support to Public Private Partnership, 2008; Department of Economic Affairs, Ministry of Finance, Government of India 2 Modified Guidelines for Projects of Jawaharlal Nehru National Urban Renewal Mission on Urban Infrastructure and Governance; September 2006; Ministry of Urban Development Government of India
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
124
i) Attracting more resources: to leverage additional resources which could be utilised for capital or O&M investment in a project
ii) Bridging the commercial viability gap: for enhancing commercial viability of a project iii) Ensuring bankability of projects: To fund credit enhancement mechanisms such as
establishing liquidity support mechanisms, up-front debt-service reserve facility, deep
discount bonds, contingent liability support and equity support. Its aim is to help projects meet the needs of funds during variations in cash-flow and enhance bankability of a project.
However, the formula for 35% grants from central government need not apply to urban
transport projects. The level and nature (loan and/or equity) of central assistance for urban transport
projects may be fixed by Cabinet Committee on Economic Affairs (CCEA) while deciding on the
project. Moreover, no commitments have been secured under these schemes for any sum of money
at this stage. This is understandable given the large amount involved and the extended period over
which the money is required. Because there is no formal commitment there remains a degree of
uncertainty as to whether the senior governments will be in a position to fund almost INR 60,000
Crores (22% share) over the next ten years.
The VGF component is linked to private investment. If the target for private investment is not
attained, VGF will also be affected.
It is anticipated that given the importance of the Punjab economy to the Indian economy and
in view of potential development, the Government of India support would be forth coming.
LAND AS RESOURCES
Urban infrastructure demands are huge and a few sources alone would obviously not suffice.
Local authorities, therefore, must access, wherever possible, the vast resources available in the
private financial market. This may itself trigger a series of fundamental reforms within municipalities
that would make them attractive investment propositions. In cases where smaller and financially
weak municipal bodies find it difficult to draw the market attention, financial intermediaries that can
provide venture capital to local authorities would be a welcome step. These intermediaries are
eminently positioned to mix funds borrowed from the market by leveraging the budgetary resources
as seed capital or equity, and passing them on as a mix of grants and loans to the smaller
municipalities for infrastructure projects.
FLOOR SPACE INDEX (FSI)
Large cities, where land has gained in value substantially, can use mechanisms like Floor
Space Index (FSI) and Transfer of Development Rights (TDR) to raise resources. The Floor Space
Index stands for the ratio of the total area of a plot of land to the total built up area permissible on all
floors. Thus if in a particular suburb if the designated FSI is 1, it means that on a plot of 1000 square
metres, the owner could construct a total of 1000 square metres. The regulations here could stipulate
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
125
that a certain level of FSI might normally be available, and excess FSI could be purchased at a
premium from the FSI bank created by the municipal body.
Evidently, there would have to be a cap on such use of FSI bearing in mind the ability of the
city to absorb additional construction and provide for city infrastructure. The price or level of the FSI
could be determined by auction rather than on a pre-fixed price. This would curb speculation on the
FSI and would limit its release only when really required for projects.
TRANSFER OF DEVELOPMENT RIGHTS (TDR)
A related concept is Transfer of Development Rights. If the municipality intends to take over
a plot of land for public use, it robs the owner of his ability to build on that land. Traditionally, the
ULB would compensate him through payment of acquisition money. This itself is becoming difficult for
municipal bodies since land acquisition payments have risen sharply and have come closer to the
market value of land than what they were earlier. Every year municipalities make budgetary
provisions for land acquisition, but they are nowhere in the vicinity of what they would need to buy
land for various projects. Under TDR, however, a cash strapped local body can replace cash payment
with TDR. It makes the landowner happier since TDR allows him to use the construction potential of
his acquired land on some other plot. And if he does not own an alternate plot, or does not wish to
use it himself, he could sell the TDR, just like shares, to anyone who wishes to use it. Since the value
of urban land is in its construction potential, TDR is an attractive alternative for city landowners. The
use of Transfer of Development Rights is a good tool not merely for land acquisition, but also for
getting public works executed against the grant of TDR through a calculation of costs of works, and
the market rate of TDR. Its drawbacks are that the concept becomes operative only in towns where
there is great demand for construction and a shortage of land. The concept itself needs to be further
refined in terms of giving equitable value for different kinds of land. However, in markets where lands
have not acquired such value, swapping of equal value public land could be a great tool.
As discussed above resource mobilization for Urban Transport Projects identified can be done
by the following ways in addition to the ULB’s own resources.
Public Private Partnership
Urban Transport Fund
Municipal Bonds
Central Government Schemes
Betterment Charges
Lending
19.1. PUBLIC PRIVATE PARTNERSHIP:
Emerging Change: A further welcome change creeping into municipal thinking is in treating
urban infrastructure as an area in which municipalities may not be the sole providers. In many
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
126
countries in Asia, infrastructure was always considered a public monopoly and there was no felt need
to involve the private sector. Since most urban infrastructure services were treated as public services,
the concept of cost recovery received scant attention. Moreover it was feared that the private sector
would exploit the monopolistic nature of infrastructure to the detriment of equitable availability. The
private sector was itself not very keen to venture into this area as huge capital investments were
needed and gestation periods were unduly long. However, opinions have begun to change and for
several reasons larger and larger degrees of private sector participation in urban infrastructure now
appears inevitable.
As Urban Transport projects involve multiple benefits to multiple stakeholders, there is a
strong case for public-private-partnerships for urban transportation project with an active role for the
public institution. It would also be possible for cities to find twenty per cent of the project cost from
the Viability Gap Funding (VGF) mechanism of the Department of Economic affairs, Ministry of
Finance, Government of India. The scheme is called the “Scheme for Support to Public Private
Partnerships in Infrastructure”. The viability gap funding or grant is made with the objective of
making a project commercially viable.
VGF only for PPPs: As the name suggests, for this money, the ULBs must use the Public
Private Partnership format. “The project shall be implemented i.e. developed, financed, constructed,
maintained and operated by a private sector company”. This company shall be “selected through a
process of open competitive bidding”. A number of municipal infrastructure projects such as roads
and bridges, urban transport, water supply, sewerage, solid waste management and such physical
projects are eligible. “The project should provide a service against payment of a predetermined tariff
or user charge”. “Projects based on standardized/model documents duly approved by the respective
Government would be preferred”. It is also advisable to have the projects appraised properly by
reputed financial institutions and vetted by them.
From the above discussion, it is clear that the bidding of such projects would mandatorily
have to be done on the variable of viability gap. This means that the concession period, the revenue
streams, the physical scope of the work and other parameters would all have to be defined and
frozen. The shortlisted group of bidders (selected after satisfying the other technical and financial
criteria) would then compete on the amount of money they would need as viability gap. The bidder
who quotes the least viability gap would be the preferred bidder.
Volume of Infrastructure Work: Municipalities today face huge volumes of work, as
populations multiply and cities expand, and virgin areas have to be covered with infrastructure. Most
of them also find serious financial crunch staring them in the face. The high establishment bills that
civic bodies run, the inefficiencies that have crept into public management, and increasing
competition that has emerged among cities to attract capital, industries, services and wealth creating
opportunities have combined to make private sector participation an attractive proposition. The
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
127
private sector itself has discovered urban infrastructure to be an area worth turning to, as huge work
opportunities seem to lie within the urban realm. Given the wide range of municipal services, city
governments provide enormous scope for work. Municipalities have also been found wanting in a
variety of professional competencies that these infrastructures demand. The conventional path that
cities have trodden till now has been to attempt all infrastructure jobs in the traditional manner of
awarding contracts from year to year, scaled to the resources traditionally available. These funding
streams have been the municipal budget, government grants and loans.
Shortfalls of Current Strategy: Conventional working has only allowed cities to do limited
and selected jobs, not always prioritized in the best interests of the city. There have been complaints
about governance issues related to infrastructure, about poor quality and piecemeal solutions that
have not stood the test of the onslaught of relentless urbanization. In the process larger
infrastructure deficits have piled up. When the task gets too big, it is like the steep run rate in a one
day match. You strategize anew and work towards a mammoth task or slog and leave the rest to
fate. Unfortunately, cities are not one day matches and slogging and leaving the rest to fate is not an
alternative.
Given the circumstances, cities must be able to see the shortfalls of the current strategy.
Even with the help of government grants coming from the Government of India and the State
through the Jawaharlal Nehru Urban Renewal Mission, cities cannot use the traditional budgetary
method to handle all infrastructures. Cities have a huge variety of infrastructures to handle. These
must be put in place in a limited time frame to keep pace with the quality of life that needs to be
delivered. They must continuously be maintained, expanded, upgraded and ultimately replaced once
they have outlived their lives. A rough calculation shows that a city with a five million population
would require in excess of Rs. 4,000 crores (at 200 litres per person per day) as capital cost for water
and sewerage systems alone. Solid waste management, traffic and transportation, education, health,
and poverty alleviation require huge layouts. So do gardens, playgrounds, burial grounds and a host
of other public amenities. Many of these need acquisition of land and land in cities costs huge money.
A rough estimate shows that on an average a reasonably financially healthy Indian city will need sixty
to eighty years to provide decent infrastructure out of its own resources. Use of other money and
instruments put together may halve the time frame. But even that is not good enough and will not
remain good enough given the quickening pace of urbanization.
No ULB despite all its sincere effort has the wherewithal in-house to catch up with
infrastructure needs. It must meet its committed expenditures of salary and maintenance first before
it sets aside money for asset building. From data available most cities have huge establishment costs
and can carve out only a fraction of their revenues for building fresh infrastructure. It is quite obvious
that if time, talent and money are common weaknesses of the ULBs, they must get partners to help
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
128
cities out. And they must simultaneously locate methods of raising resources beyond the traditional
streams of budget, grants and loans.
Partnerships: Partners would quite evidently come from the private sector. They have the
advantages of process flexibility, financial strength and ability to deploy manpower with requisite
skills. It is these advantages that allow the private sector to bring in quality and efficiencies in the
delivery of infrastructure. A range of partnerships could be developed on the public-private format.
But the most effective in major urban infrastructure would be those that allow larger financial and
managerial responsibilities and risks to be taken up by the private sector. In return, they have a long-
term profitability to derive from the infrastructure.
Of all the infrastructures that cities need to provide, they need to decide on what can best be
done by others. Only those that cannot draw private sector interest should be of interest to the
municipal bodies. Even here, strategies could be worked out to shore up the viability of
infrastructures by suitable clubbing with highly viable ones and allow them to be managed by the
private sector. Cities must also figure out what could be the financial instruments other than the
traditional resource base that could provide a sound revenue stream. This essentially means shifting
infrastructures from being funded by taxes to funding them through user charges, different varieties
of fees and land instruments.
Such a strategy would reveal that a substantial portion of the burden that cities put on their
own resources can be passed on to the private sector, with revenue streams that do not impact city
budgets. This also reduces work-load on the city, allowing it to concentrate on a basket of things that
are central to the running of cities (vision, policy, priorities and equity).
Unfortunately, private sector participation in core municipal infrastructure (water, sewerage,
solid waste, traffic and transportation) is itself in its very nascent stage in India. After decades of
effort in the privatization of water supply in the country there is very little to show and emulate. Quite
similar is the situation in many other areas. This is sadly on account of a municipal mindset that
refuses to change. It is plain that holding on to monopolies and the power of discretion and
dispensation that accompanies them will not hold good in the background of feeble capacity to deliver
infrastructure. Time is ripe for a conscious decision on the part of cities and State Governments to
create the climate for change. The climate would encourage the private sector to build its own
capacities and confidence, and get deeply engaged in the provision of urban infrastructure.
The variations and degrees of private sector participation cited above are amenable to further
variations through different combinations and allow local bodies a wide repertoire of methodologies to
select from. Since public private partnerships in urban infrastructure are yet an uncertain and largely
untried area, it has been felt that standard guidelines on financial and management mechanisms
should be available for civic bodies that could serve as overall principles on which such partnerships
could proceed.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
129
The great funding requirements for urban infrastructure quite evidently require every
conceivable method being sensibly tapped. That is the only path that would narrow the gap between
what cities need and what they can get. But the bottom line is good governance in the cities
themselves. This is a requirement that no other support system can replace, as it is fundamental to
the well being of cities.
Due Diligence: While private sector participation must be encouraged, it must also be said
that the road to partnerships is not simple. A great degree of care, expertise and due diligence is
required so that a project does not get mired in controversies and unending litigation. The firming up
of financial and technical criteria of bidders, the process of shortlisting bidders, the contractual
provisions, the apportionment of risks between the successful bidder and the employer, operation
and maintenance criteria, the estimation of revenue streams, the signing and award of contract, each
could be a pitfall if not carefully laid out and properly negotiated. Hence municipal managements
would be well advised to take time on the drawing board. This may take more time than actual
execution. But it is time well spent as it helps smooth sailing of a project since it was launched with
care.
19.2. URBAN TRANSPORT FUND
The Central Government has been envisaged in NUTP that it would encourage the levy of
dedicated taxes to be credited to an urban transport fund and used exclusively to meet urban
transport needs. Such dedicated taxes could be in the form of a supplement to the petrol and diesel
taxes, betterment levy on land owners or even an employment tax on employers.
Urban transport funds do not imply earmarking of taxes. Earmarked taxes, such as the payroll
tax on employers, that supports the public transport agency Régie Autonome des Transport Parisiens
(RATP) in Paris, have the advantage of a secure legal and budgetary foundation, and are often the
basis on which sound long-term service planning can be undertaken. However, the value of having an
integrated urban transport fund does not depend on any specific tax source being earmarked for
transport. Moreover, in order to develop the credibility of the fund, and particularly to gain political
and popular support for the payment of congestion charges, it is essential that the objectives and
scope of an urban transport fund be clearly defined, that allocations be subject to rigorous appraisal,
and that the operations of the fund be transparent.
19.3. MUNICIPAL BONDS
Around several parts of the world, municipal bonds have emerged as a source of sizable
funds for infrastructure projects. The long-term nature of municipal bonds makes them suitable for
urban infrastructure whose operating and revenue-generating capacity is spread over a long period of
time. In the United States and many western countries, the use of capital markets to finance
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
130
investment in urban infrastructure has existed for several decades. This has been aided by the strong
municipal autonomy prevalent in these countries that allows them freedom to access the capital
market without being unduly questioned by Government and impeded by clearances. These countries
have also developed strong bond markets.
The capital market is where institutional and individual investors put their money in public
and private ventures by purchasing debt or equity securities. These investments get listed on an
exchange where they are priced and traded. A municipal bond is an obligation between an entity that
proposes to take up an infrastructure project (the municipality) and the investors (those institutions
or individuals who purchase the bond). The municipality undertakes to repay the investors for the
investment. The repayment comprises part of the principal and the interest accruing for that year. All
the principal and interest must be paid back by the civic body over the term of the loan, and such
combined repayment is called debt service.
General Obligation Bond: Municipalities issue two kinds of bonds. The first is a general
obligation bond, wherein a local government pledges the whole range of its taxing powers to repay
these bonds. This pledge is termed a 'full faith and credit' pledge. The ability of a municipality to
repay its general obligation debt is assessed by examining the municipal economic base, focusing on
size, structure and diversity of the tax base and its debt burden. The diversity and growth of the
economy are also key considerations in assessing the repayment ability of a municipal borrower. In
some countries, for general obligation bonds, the power to levy taxes to repay debt is prescribed.
Municipalities must levy taxes upon their citizens at such rates or amounts as are sufficient to take
care of debt service. The use of such bonds is generally for social infrastructure projects that yield
lower returns.
Revenue Bond: The second kind is revenue bonds, which are backed by specific sources of
revenue and not by the 'full faith and credit' of the issuing municipality. Revenue bonds are issued for
the purpose of constructing, operating and maintaining a project and are generally payable solely
from the revenues generated by the project. Rating agencies make an economic analysis to evaluate
both the demand for the services to be provided by the proposed project, as well as the trends
relating to the specific revenues pledged to the project.
Credit Rating: Municipal capacity to service bond obligations is generally gauged through a
credit analysis or credit rating, carried out by a professional rating agency. The agency has
established credentials and its estimates carry weight with the investors. The credit rating agency
assesses the ability of the municipality to repay the obligations that it intends to incur, including the
need for the project being financed. During recent traumatic events in the global market, credit rating
agencies have come under some criticism on account of threatening investor wealth by
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
131
recommending without responsibility, and of having failed to warn investors of impending financial
crises. This has led to demands of enforcing some accountability on Credit Rating Agencies.
In lieu of the finances being made available to a municipality, the civic body will usually allow
investors an interest in some asset that it controls. With a general obligation bond, the investors are
granted the right to cause the municipality to raise taxes; with revenue bonds, the municipality grants
investors the right to seize or capture the user fees of the project being financed.
Incentives: Several countries have strengthened these processes by making investment in
urban infrastructure more attractive through the provision of incentives. In India, for instance, the
Union Government has taken steps towards tax-free municipal bonds. Fiscal incentives for private
sector participation in urban infrastructure, permitting FDI inflows into city hardware have heralded
the possibilities of renewed all round interest in urban infrastructure.
Further Steps: However, in the area of borrowing through bonds, certain further steps need
to be taken. Cities need to be given larger freedom for borrowing. A reasonable method of regulation
would be to allow municipal bodies to raise loans independently with a prescribed cap on the
quantum of borrowing. The cap can be based on the ability of the municipality to raise resources and
repay debt, worked out on the basis of a budget performance formula. Such borrowing could be
restricted to meet obligatory functions alone, where it would be mandatory to have both a long-term
investment plan in place, and ready-to-go projects for the immediate utilization of the proceeds. With
adequate disclosure requirements having been satisfied by municipal bodies through accounting and
auditing reforms, governmental control could be replaced by a market linked agency such as
Securities Exchange Board/Commission to take up the regulatory role.
Accounting Reforms: Turning to the capital market for resources mandates certain
fundamental reforms to be put in place by municipalities. One of the chief concerns of financial
institutions and investors in this regard is the ability to elicit sufficient information from the municipal
bodies about their financial health. One of the obstacles in this respect has been the accounting
practice of municipal bodies in the developing world. Urban local bodies practice the single-entry cash
based system of reporting which leaves some of the most fundamental information with regard to
revenue receipts and expenditures, capital receipts and expenditures and performance indicators,
relatively inaccessible. Many serious off-budget/book liabilities incurred are not recorded, and intra-
budgetary transfers and unutilized budgetary amounts are shown as opening balances for the next
fiscal year. Likewise there is no clarity on unutilized funds, such as the transfer of surplus in the
revenue account to capital expenditures, or deposits or advances received for specific projects.
Information and reporting systems are generally inadequate, leading to delays in the finalization of
accounts which is further compounded by the absence of efficient audits.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
132
In view of these inadequacies of traditional accounting, many municipalities in South Asia
have begun to switch over to the double entry accrual-based accounting system. They have begun to
pay heed to the advice that financial accounting and reporting must conform to accepted accounting
standards and policies, and accounts of local bodies must be regularly audited by independent and
external auditors. The value of such changes is becoming apparent as municipalities turn to the
capital markets to raise funds for large infrastructure projects. In order to sell bonds, the civic body
must show that it is a good credit risk; and to receive a favourable credit rating, it is critical to show
that revenue generated by a project will be sufficient to pay the debt being incurred. Only an accrual
based accounting system can keep track of the relationship between revenues, expenditures,
maintenance costs etc in a manner that enables investors, credit rating agencies, and the
Government itself to forecast its ability to meet debt obligations through project revenue generation.
Tamil Nadu and Kerala have formed Tamil Nadu Urban Development Fund (TNUDF) and
Kerala Road Fund Board (KRFB) respectively to cater the Urban Development needs including
Transport in the lines of UTF.
19.4. CENTRAL GOVERNMENT SCHEMES
Central Government working group on Urban Transport recommended various investment
schemes in urban transport sector for implementation under twelfth five year plan. The details of the
plans are presented in the following table.
Table 19-1: Urban Transport Project Funding Schemes proposed by Central Government
Sl.No. Component Investment
1. Street Network - New Areas Contribution from private party as the cost of
development itself i.e. self financing
2. Street Network - Upgradation
a. Pedestrian, NMV, Streetscaping 50% by GoI and 50% by State Govt./ ULB/ Parastatal
b. Road 20% by GoI, 80% by State Govt./ULB/Parastatal
3. Public Transport
a. Buses 50% by GoI, 30% by State Govt./ULB/Parastatal, 20%
by private investment
b. BRTS 50% by GoI and 50% by State Govt./ULB/Parastatal
c. Metro Rail, Commuter / Regional
Rail
About 20% projects are envisaged on PPP with 20%
Viability Gap Funding from GoI and 20% Viability Gap
Funding from State Govt. For the remaining 80% of projects, funding envisaged
is 20% (30% in exceptional cases) from GoI as equity / subordinate debt/grant (as a suitable combination),
20% from State Govt./Parastatal, 5% from property development,5% from Developmental Agencies, 50%
as loan from international and domestic financial
institutions
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
133
Sl.No. Component Investment
4. Bus Infrastructure (Depots,
Terminals, Workshops)
50% by State Govt. and 50% by PPP
5. ITS and ATC 50% by GoI and 50% by State Govt./ULB/ Parastatal. The operation and maintenance is envisaged on PPP
6. Parking 20% from Viability Gap Funding support by GoI and
rest on PPP
7. Scheme for modernization of auto
rickshaws and taxis management system and public bicycle scheme
100% funding by GoI
8. Innovations, research and
development for guided transit projects and pilot project scheme
100% by GoI
9. Institutions and Capacity Building 100% by GoI
10 Introduction of Public Bicycle
Scheme and upgradation of cycle rickshaws
100% funding by GoI
19.5. BETTERMENT CHARGES
Betterment charges are generally levied as part of the property tax. These charges are mainly
aimed at recovering the cost of providing improved infrastructure to the citizens by Urban Local
Bodies. Hence, betterment charge can be levied to the properties which get directly benefited due to
the infrastructure facility. In case of an access or a parking facility to a commercial area, the
properties (getting benefited) in the area can be levied with betterment charge for recovering the
cost of construction of the project.
SALE OF ADVERTISING RIGHTS
Experience in other jurisdictions has shown that advertising revenues can be an important
source of funds for any regional transportation authority. Identified opportunities for revenue
generation however, may infringe on rights that previously were held by another public body. The
intended use of the funds should be identified at the outset as often they are committed to meet
operation and maintenance requirements and not available for infrastructure investments. The
proposed action plan for the sale of advertisement rights would be as follows.
PROPOSED ACTION PLAN:
Two areas have been identified, for example purposes, where opportunities may exist for
generating enhanced revenue for Development Authorities from advertising:
(i) Adjacent to Regional Roads identified in the Mobility Plan (ii) The Regional Public Transit System
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
134
(i) Advertising Adjacent to Regional Roads: • Consideration could be given to adding a surcharge to the licensing tax collected by the
municipalities for any billboard or similar form of advertising that is within 300 meters of a regional road and within the line of sight of the road users.
• The rationale for this could be that the marketability to the sign is greatly enhanced by the
presence of the regional road and hence is of more financial benefit to the advertiser. • This would require careful discussions with the municipality who may feel this is their
exclusive right. (ii) Advertising on the Regional Public Transit System:
• As mentioned above, advertising revenue has proved to be a major source of revenue for
regional transit authorities. Experience in other jurisdictions has shown that that the potential revenue on a mature system could be as high as Rs 1.5 per passenger. To achieve this level
of revenue requires a comprehensive approach including CCTV, on-board advertising panels, and concessions etc.
PARKING FEE
Parking fee forms a major source of revenue generation for a number of city development
authorities. In core city areas land is at premium, and not available. Hence it is recommended that the
parking fee should be linked to the value of land. There would be two advantages in this context,
Cities like Jalandhar, Bathinda and Patiala have more composition of Personalised Transport and four
wheelers in particular. Hence, the heavy levy of parking charges with reference to the availability of
land and demand may increase the revenue or decrease the parking potential.
19.6. LENDING
Another option available to urban local bodies for development of urban infrastructure is
getting loan from funding agencies. There are national and international funding agencies available in
the market.
FUNDING FROM BILATERAL AND MULTILATERAL AGENCIES
Foreign funds from bilateral and multilateral agencies to an organization are channeled to the
country through its Government. No organizations can have access to loan funds directly from the
bilateral and multilateral agencies. Even for grant funds, the international agencies and the concerned
receiving organizations have to apply for formal permission from their respective Governments and
concerned authorities. For providing loan funds to an organization for certain projects, international
agencies go through a number of technical assessments and meetings with the Government to
discuss a variety of aspects, including the roles of the proposed executing and implementing
organizations and the potential ultimate beneficiaries. Once the projects are discovered feasible, the
international agencies enter into agreements with the respective Governments, and then the
government agencies make subsidiary agreements with the concerned executing and/or
implementing agencies of the projects. The funds are released in a number of installments based on
the compliances with the specified covenants and conditions agreed upon by the parties. The project
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
135
activities are monitored and supervised through a number of project missions and studies conducted
by the international agencies and the government agencies. For smooth implementation of the
projects, international and domestic consultancy services are procured, which generally incur a huge
amount of funds. The donor agencies normally ensure that the concerned government agencies are
committed to the systematic implementation of the projects in the specified period. However, there
have been a number of projects managed by a professional team, which have been implemented
successfully without any external consultancy service. For instance, the Rural Microfinance Project
(RMP), which has been awarded four times by the Asian Development Bank for exemplary
performance, has not used the budgeted consultants from the very beginning. RMP has been
implemented by the Rural Microfinance Development Centre Ltd. (RMDC), an apex microfinance
organization in Nepal.
Many Infrastructure projects like Area Traffic Control in Mumbai, Construction of Outer Ring
Roads etc., were being funded by World Bank (WB), Asian Development Bank (ADB), Japan
International Cooperation Agency (JICA) in India.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
136
ANNEXURE 1: SURVEY QUESTIONNAIRES
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
137
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
138
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
139
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
140
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
141
Comprehensive Mobility Plan for Jalandhar,Patiala and Bathinda Cities Under Package-II
Date/Day Enumerator
Address
Name of the Respodent
Name of the Head of House hold
Occupation Of Head of House hold
Relation Ship of Respodent With House hold
Number of Persons in family
Number of the School Going Children
Vehicles Owned Car
Two
Wheeler Bicycle Auto Others
Family Income per Month
Details of Household Members
Member
No. Sex Age Occupation*
Monthly
income
Monthly
Expenditure
Monthly
Expenditure
on Transport
Working/
School
Location Remarks
*Occupation 1.Govt Service,2. Pvt Service,3.Business,4.Student,5.House Wife
,6.Retired Person,7. Unemployed
Punjab Municipal Infrastructure Development Company
House Hold Survey
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
142
Trip Summary of Previous working Day
Details of Each Trip
S.No Member No. Origin
Destinatio n
Home Based/ NHB
Travel
Mode *
Travel Distance in Km
Travel time in min
Travel Cost
Trip
Purpose +
Ingress Distance in Km
Ingress Time in min
Ingress Mode
Waiting Time in min
Egress Distance in Km
Egress Time in min
Egress Mode
A
* 1.Bus,2.Mini Bus,3.Car,4.Two Wheeler,5.Auto Richksaw,6.Bicycle,7.Railway,8.Walk + 1.Work,2.School,3.Home,4.Shopping,5.Leisure,6.Business,7.Religious,8.Social
Punjab Municipal Infrastructure Development Company Comprehensive Mobility Plan for Jalandhar,Patiala and Bathinda Cities Under Package-II
House Hold Survey
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
143
ANNEXURE 2: TRAFFIC AND TRAVEL SURVEY DATA
TRAFFIC VARIATIONS AT OUTER CORDON LOCATIONS
TRAFFIC INTENSITY AT OUTER CORDON LOCATIONS
Location ID
Incoming Outgoing Total
Vehicles PCUs Vehicles PCUs Vehicles PCUs
P-OC-1 10253 12327 10438 11956 20691 24283
P-OC-2 5956 5841 6288 6364 12244 12205
P-OC-3 4304 4199 4789 4801 9093 9000
P-OC-4 9228 10776 9447 10164 18675 20940
P-OC-5 14420 17654 13753 16855 28173 34509
P-OC-6 6452 6187 4961 4608 11413 10795
P-OC-7 4448 5399 6136 6891 10584 12290
Total 55061 62383 55812 61639 110873 124022
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
144
TRAFFIC COMPOSITION AT OUTER CORDON LOCATIONS
Location ID
Two Wheelers
Three Wheelers
Car/Jeep/ Van/Taxi
Bus Truck Tractor Slow moving Vehicles
Total
P-OC-1 5374 609 9194 994 2984 470 1066 20691
P-OC-2 3532 472 5762 260 854 143 1221 12244
P-OC-3 3492 321 3112 119 457 275 1317 9093
P-OC-4 5404 892 7060 746 2745 275 1553 18675
P-OC-5 6693 1303 10420 2276 5470 426 1585 28173
P-OC-6 4930 459 2911 101 452 175 2385 11413
P-OC-7 3162 185 3462 286 1894 232 1363 10584
Total 32587 4241 41921 4782 14856 1996 10490 110873
MODAL SHARE AT OUTER CORDON LOCATIONS
TEMPORAL VARIATION OF THE TRAFFIC AT OUTER CORDON
Location ID Total Vehicles Total Percentage Share Peak hour Volume
PH%
Day Night Day Night
P-OC-1 19358 1333 20691 93.56% 6.44% 1750 8.46%
P-OC-2 11910 334 12244 97.27% 2.73% 1207 9.86%
P-OC-3 8884 209 9093 97.70% 2.30% 951 10.46%
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
145
Location ID Total Vehicles Total Percentage Share Peak hour Volume
PH%
Day Night Day Night
P-OC-4 18079 596 18675 96.81% 3.19% 1722 9.22%
P-OC-5 27077 1096 28173 96.11% 3.89% 2443 8.67%
P-OC-6 11095 318 11413 97.21% 2.79% 1284 11.25%
P-OC-7 9568 1016 10584 90.40% 9.60% 895 8.46%
AVERAGE 95.58% 4.42%
TEMPORAL VARIATION OF TRAFFIC AT OUTER CORDON
COMPOSITION OF TRAFFIC FLOWS AT INNER CORDON
LOCATION Two
Wheelers
3
wheeler
Car/Jeep/
Van/Tempo
Bus Truck Tractor Slow
moving vehicles
Total
PHATAK 17 5447 2040 2819 15 223 15 6315 16874
PHATAK 19 5623 229 2476 33 61 10 4186 12618
PHATAK 20 6806 308 3318 6 130 7 5656 16231
PAHATAK 15 8813 320 4489 12 1190 153 5303 20280
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
146
LOCATION Two Wheele
rs
3 wheeler
Car/Jeep/ Van/Tempo
Bus Truck Tractor Slow moving vehicles
Total
TOTAL 26689 2897 13102 66 1604 185 21472 66003
% SHARE 40.44% 4.39% 19.85% 0.10% 2.43% 0.28% 32.53% 100.00%
TOTAL VEHICLES AT INNER CORDON
MODAL SHARE AT INNER CORDON
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
147
020000400006000080000
100000120000140000160000180000
Near…
Rajp
ura
Bye P
ass
Sanauri A
dda
Sherw
ali
Gate
Thapar
Colle
ge
Tik
rila
l Chow
k
Founta
in C
how
k
Dukhniw
ara
n…
Bus
Sta
nd c
how
k
Child
ren m
ode
SST C
how
k
Tota
l Ve
h/P
CU
s
Location
Daily Traffic at all Locations
Total vehicles
Total PCUs
DAILY TRAFFIC AT ALL INTERSECTIONS
DAILY AND PEAK HOUR TRAFFIC (VEHS & PCUS) AT ALL INTERSECTIONS
Sl. No.
Location Type of
Intersection Total
Vehicles Total PCUs
Peak Hour
Volume (PCUs)
Peak Hour % PH Share
1 Near Dukhniwaran Chowk T-Junction 69989 65312 6689 1:00-2:00 10.2%
2 Rajpura Bye Pass Four Legged 57216 57082 5263 6:00-7:00 9.2%
3 Sanauri Adda Four Legged -S 26313 24269 2359 10:00-11:00 9.7%
4 Sherwali Gate Four Legged 62389 52391 4755 4:00-5:00 9.1%
5 Thapar College Four Legged 96277 79803 7954 9:00-10:00 10.0%
6 Tikrilal Chowk Four Legged-S 77691 68692 7185 10:00-11:00 10.5%
7 Fountain Chowk Four Legged 88818 85729 9074 3:00-4:00 10.6%
8 Dukhniwaran Chowk T-Junction 94962 83475 7360 1:00-2:00 8.8%
9 Bus Stand chowk Four Legged 164660 150897 13211 4:00-5:00 8.8%
10 Children mode Four Legged 77097 64205 6409 11:00-12:00 10.0%
11 SST Chowk Four Legged 62420 62208 5933 10:00-11:00 9.5%
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
148
020406080
100120140160180200
No
's
Location
Peak Accumulation
Two Wheelers
Car
HOURLY VARIATION OF THE TRAFFIC AT ALL LOCATIONS
PEAK ACCUMULATION (TWO WHEELERS AND CARS)
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
149
0
50
100
150
200
250
No
's
Location
Peak Accumulation (ECS)
Peak Accumulation
PEAK ACCUMULATION (IN EQUIVALENT CAR SPACES)
PASSENGER TRIPS AT OUTER CORDON LOCATIONS
Category
Mode
Total Percentage Car Two wheeler
Three
Wheelers
E-E 7150 1662 142 8954 18.65
E-I 11550 7364 1029 19943 41.53
I-E 12060 6910 148 19118 39.82
Total 30760 15936 1319 48015 100.00
FREIGHT MOVEMENT AT OUTER CORDON LOCATIONS
Category Mode Total
Percentage LCV Trucks MAV
E-E 1632 2538 224 4394 34.29
E-I 2573 1394 137 4104 32.02
I-E 2627 1634 56 4317 33.69
Total 6832 5566 417 12815 100.00
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
150
DISTRIBUTION OF GOODS TRAFFIC ACCORDING TO TYPE OF COMMODITY
CARRIED
S.No Commodity Type % of Share
1 Empty 26.3
2 Construction Material 9.1
3 Food grains 13.7
4 Fruits/Vegetable/Poultry/Fish 4.1
5 Chemical/Fertilizers 8.1
6 Petroleum Products 0.9
7 Milk Products 3.2
8 Machinery 2.6
9 Clothes/textiles 1
10 Miscelleneous 30.9
DISTRIBUTION OF PASSENGER TRAFFIC ACCORDING TO PURPOSE
S.No Purpose % of Share
1 Work 79.7
2 Education 1.7
3 Shopping 2.2
4 Social/Meeting 0.8
5 Tour/Recreation 1.4
6 Religious 2.2
7 Others 11.9
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
151
DESIRE LINE PATTERN OF PASSENGERS TRAVELLING WITHIN THE STUDY AREA
DESIRE LINE PATTERN OF FREIGHT TRAFFIC IN STUDY AREA
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
152
ANNEXURE 3: ROADS PROPOSED FOR IMPROVEMENT
Ro
ad
Ne
two
rk M
ap
sh
ow
ing
Ro
ad
s p
rop
ose
d f
or
imp
rov
em
en
t
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
153
ANNEXURE 4: CROSS SECTIONS
Proposed typical cross section of a 18 m road
Proposed typical cross section of 24 m wide road
Proposed typical cross section of 30 m wide road
Details of the cross sections as per the available Right of Way are presented in A3 size
drawings in volume II
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
154
ANNEXURE 5: HAWKER ZONES
Introduction
Street vending as a profession has been in existence in India since time immemorial. However,
their number has increased manifold in the recent years. According to one study Mumbai has the
largest number of street vendors numbering around 250,000, while Delhi has around 200,000.
Calcutta has more than 150,000 street vendors and Ahmedabad has around 100,000 during year
2004. Women constitute a large number of street vendors in almost every city. Some studies
estimate that street vendors constitute approximately 2% of the population of a metropolis. The total
number of street vendors in the country is estimated at around 1 crore. Urban vending is not only a
source of employment but provide ‘affordable’ services to the majority of urban population. The role
played by the hawkers in the economy as also in the society needs to be given due credit but they
are considered as unlawful entities and are subjected to continuous harassment by Police and civic
authorities. This is reported to be continuing even after the ruling of the Supreme Court that “if
properly regulated according to the exigency of the circumstances, the small traders on the sidewalks
can considerably add to the comfort and convenience of the general public, by making available
ordinary articles of everyday use for a comparatively lesser price. An ordinary person, not very
affluent, while hurrying towards his home after a day’s work can pick up these articles without going
out of his way to find a regular market. The right to carry on trade or business mentioned in Article
19(1)g of the Constitution, on street pavements, if properly regulated cannot be denied on the
ground that the streets are meant exclusively for passing or re-passing and no other use.”
Street vendors provide valuable services to the urban population while trying to earn a
livelihood and it is the duty of the State to protect the right of this segment of population to earn
their livelihood. This policy aims to ensure that this important section of the urban population finds
recognition for its contribution to society, and is conceived of as a major initiative for urban poverty
alleviation.
Definition
A street vendor is broadly defined as a person who offers goods or services for sale to the
public without having a permanent built up structure but with a temporary static structure or mobile
stall (or headload). Street vendors may be stationary by occupying space on the pavements or other
public/private areas, or may be mobile in the sense that they move from place to place carrying their
wares on push carts or in cycles or baskets on their heads, or may sell their wares in moving bus etc.
In this policy document, the term urban vendor is inclusive of both traders and service providers,
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
155
stationary as well as mobile vendors and incorporates all other local/region specific terms used to
describe them, such as, hawker, pheriwalla, rehri-patri walla, footpath dukandars, sidewalk
traders, etc.
In view of Supreme court orders, some cities drafted guidelines for regulating urban vending
activities. However, the provisions made so far do not generally recognize the fact that demands for
their wares/ services is highly specific and varies as to location and time, manifesting as a natural
propensity of Street vendors to locate in various places at particular times. On the contrary, the
present urban planning norms completely disregard the formation of such natural markets. They also
do not have implementation systems in place. Planning norms should be supportive of such natural
markets.
ENCROACHMENT & HAWKER MANAGEMENT:
Regularize the Hawkers & Encroachments in the Dharampura bazaar, Adalat bazaar, Arya
Samaj chowk and Qila chowk Cordon controls on entering the old city. Depending upon the intensity
of hawkers and their hindrance to the traffic following zones are delineated as shown for appropriate
action
GREEN ZONE:
Allow hawkers to do their business at all the times without any restrictions. The locations
around the market areas generally are designated as Green Zones
Though the Government/Authorities have to provide livelihood for the hawkers, at the same
time that should not cause hindrance to traffic. Green Zones should be around any parks or tourist
locations like. Also some natural markets can be formed inside the city with some well established
boundaries. The area should be in such a way that it should not cause any obstruction to traffic flow.
Some vacant lands near Market areas need to be identified and the hawking activity should be
allowed all the time. Land should be selected in such a way that there should be least obstruction to
traffic.
AMBER ZONE:
Some restrictions for the vendors and hawkers. These restrictions could either be by time of
the day, or by the day of the week. On all other times, vending is allowed at designated areas. The
heavily congested areas like Dharampura bazaar, Adalat bazaar, Arya Samaj chowk, Anardhana
Chowk, Book shop chowk, Arna-Barna Chowk, Jaurian Bhatia Road in the core city area, and area
abutting choti bharadhari, Sheranwala Gate etc., are to be designated as Amber zones. The hawking
activity should be allowed only on some days of week.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
156
RED ZONE:
Hawking/vending is not allowed at these designated areas at any time. The zones identified
as Red Zones will always prohibit hawkers. All the busy corridors of the town, will come under the
cover of Red Zone, and hence, are hawker-free zones. The area around railway station, Bus stand,
land /footpath abutting the major arterials should be designated as Red zones for the Hawkers. The
land beside the major roads to be protected in order to ensure mobility and also necessitates the
widening in future. The hawking activity behind bus stand should be controlled with immediate effect.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
157
Red zones for Hawking activity in Patiala
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
158
ANNEXURE 6: PROJECT PROFILE SHEETS
Project No: 1 Project Title: City Bus routing and Fleet Augmentation
Project Type: Local City Bus Transport
Quantity - (2010-2020) - 800 No s
(2020-2030) - 800 No s Location: Approximate Bus Routes Approximate Cost: INR 400 Cr ; INR 400 Cr.
Detailed Description:
The b us f l e e t augmentation should focus on modern buses where choice of bus
technology is important, as it will strongly influence the system’s performance and
commuter perceptions. Vehicles have
direct impact on speed, capacity, environmental friendliness and comfort.
Implementation
Period 2010-2030
Potential Benefits:
Increase Transit share Reduce Pollution
Affordable, environment-friendly mobility measure
Project No: 2 Project Title: Bus Rapid Transit Systems
Project Type: Public Transport Improvement
Quantity - (2010-2020) – 100 kms (2020-2030) – 50 kms
Location: As shown in figure Approximate Cost: INR 1200 Cr ; INR 600 Cr. Detailed Description:
The b us f l e e t augmentation should focus
on modern buses where choice of bus technology is important, as it will strongly
influence the system’s performance and commuter perceptions. Vehicles have
direct impact on speed, capacity, environmental friendliness and comfort.
Implementation Period
2010-2030
Potential Benefits: Increase Transit share
Reduce Pollution Affordable, environment-friendly mobility measure
Project No: 4 Off street - Parking Facilities
Project Type: Traffic Management Measure Locations - 4
Location: As shown in figure Approximate Cost: INR 16 Cr.
Detailed Description: it is envisaged that strategic parking plazas would be developed and integrated with the other CMP elements. The parking structures, either isolated or integrated with the public transport terminals, should meet some or all of the following requirements before implementation:
The parking plaza must discourage other commercial uses in the same premises
The parking plaza must facilitate public transport
The parking plaza must facilitate non-motorized transport
The parking plaza should off-set removal of on-street parking
The parking plaza should improve the traffic circulation of the vicinity
Implementation
Period 2010-2020
Potential Benefits:
• Regulate parking. • Discourage parking on roads, thereby increasing effective capacity.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
159
Project No: 5 Bus shelters and Bus bays Project Type: Traffic Management
Measure Quantity: 100 (2015-2021) ; 80 (2021-2031)
Location: All major corridors and activity
centres Approximate Cost: INR 15Cr ; INR 12 Cr.
Detailed Description:
The Bus shelters are planned to provide at every 0.5 km throughout the mobility
corridors.
Implementation Period 2010-2030
Potential Benefits: It provides shelter and transfer point for bus
commuters.
Project No: 5 One-way Street Measures
Project Type: Traffic management
Measures, Core area development. Quantity: 2 locations
Location: City Core Area, Lahori Gate, Arya samaj Chowk. Anardhana
Chowk, Dharamupua Bazar, Dwakoli
Bazar.
Approximate Cost: INR 5 cr
Detailed Description:
To ease the roads from the snarls of the burgeoning traffic the traffic
circulation plan with one way system has been proposed.
Implementation Period
2010-2012
Potential Benefits:
Control of both vehicular and pedestrian traffic.
They assign the right-of-way to the various traffic movements and thereby ensure smooth traffic flow.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
160
ANNEXURE 7: DETAILS OF STAKEHOLDER’S WORKSHOP
The Consultant have organised a detailed workshop to interact with various project
stakeholders including functionaries of municipal corporation, nodal officers of various line
departments, representatives form commercial agencies, NGOs and trade unions to brief them about
the project and to understand the existing daily traffic problems faced by them that need to be
addressed.
The first Stakeholder workshop at Patiala was organised at Municipal Corporation meeting
hall on December 29, 2010. The participants included Municipal Corporation Mayor, Municipal
Corporation Commissioner, Municipal Corporation Superintending Engineer; Municipal Councillors; Mr.
K Murali Krishna, Team Leader; Mr. K J V Ramana Rao, Project Coordinator; Mr. J Chaitanya, Patiala
Field coordinators.
Consultant’s Representative and Municipal Corporation Commissioner
addressing the audience
Project Coordinator Mr. Rao welcomed the gathering which included, citizens, officers from
various line departments, Corporation Engineers and ward councillors, truck operators, Auto rickshaw
union members representatives from general public. Mr. Rao presented the study objectives,
objectives of the workshop and methodology of their study to the participants and asked stakeholders
to describe the daily traffic problems faced by them. The participants presented the general traffic
problem faced by them which are listed below:
Mr. Shaminder singh, Govt Girls School pointed out that:
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
161
When near YPS School when there is School timing and at the time of closing of the school
Cars are parked in 2-3 lanes to pick the students. It is suggested that for that half an hour
some parking should be provided within the school premises.
ROB should be constructed at 20 level crossing because of traffic chaos during gate closures
Representative of Vyapar Mandal, Patiala asked out for the following:
Bypass should be constructed on four sides of the Patiala city
Traffic police is only challenging the vehicles to earn money. At some places due to
on-street parking roads are congested and traffic police should use tow vehicle to
tow off the violating vehicle. This is done with 2-3 vehicles daily.
Parking at Dharampura, Sheranwala Gate, Gurbaksh colony should be augmented by
providing organised parking lots
Corporation while issuing licence to hand carts should indicate their parking place.
There is no provision of pedestrians at red lights.
At Badian Wala Chowk there is a cremation ground, it is a major bottleneck resulting
in frequent jams and accidents
There should be traffic signals at choti nadi chowk
Encroachment should be cleared and for this regular committee is to be selected and
fine the shopkeepers with little amount.
Loading and unloading of goods at Adalat Bazaar and at all other congested Bazaars
should be provided
Thikriwala to 22 no. Phatak road should be 6 lane
At 23 no. Phatak there should be underpass
Rajpura road should be widened to 6 lane divided carriageway configuration.
There are 42 no. Of poles which are hindering in Patiala..they should be removed
immediately
Narrow bridges on river should be widened immediately
Others reiterated the following:
From Fountain to Railway Station many Rallies and Dharnas are being organised
causing traffic blockade, Corporation should provide alternate location for such
activities
Congested Markets should be pedestrianised restricting entry of vehicular traffic
Richshaws should follow each other in single lane in stead of overtaking one another.
Dukhniwaran intersection should be improved
Buses does not stop at demand stops and at few locations it was observed to be
stopping at a distance prior to the bus stop near the intersections causing traffic
jams at intersection. The situation need to be improved immediately by instructing
the Bus Drivers and Operators to avoid traffic jams at intersections.
School students are using bikes illegally and they parked them outside the school at
some places there are 2-3 schools are adjacent so due to this congestion takes place
One way should be properly used so no business is effected and there should be
proper coordination between corporation and traffic police
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
162
Ambulance and First aid should be provided immediately at accident site
Students, rickshaw pullers and two wheeler Drivers should have road sense and they
Should be regularly taught by teachers, Principals and Traffic officers
There are lots of cuts in dividers in Patiala..they should be closed
Inspector Mr. Hardeep Singh highlighted the traffic management and infrastructure
improvement. Main points of his speech are listed below:
Everyone is in hurry road users should have patience.
Shop keepers are creating problems by encroaching the roads to display their
commodities.
Underpasses are already suggested at all critical locations
Cross section of stakeholders
Municipal Corporation Commissioner and Mayor in sitting in the audience
Mr. Murali Krishna, Consultant’s Team Leader proposed vote of thanks and assured the
stakeholders to address all the traffic problems highlighted in the workshop.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
163
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
164
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
165
The Second Stakeholder workshop at Patiala was organised at Municipal Corporation
meeting hall on August 1, 2011. The participants included, Municipal Corporation
Superintending Engineer; Municipal Councillors; Representatives from PUDA, Traffic
Police Dept, Pollution Control Board, Schools, NGOs, Vypar Mandal and Press.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
166
Cross section of stakeholder’s Workshop-2
Most of the Points Which pointed out was repated in the second workshop also.. some Points
Which not covered in First Workshops are listed below
It is iterated the early usage of Bypass which connects Rajpura road and Sangrur Road which
is in under construction so that traffic can be bypassed without entering city.
Building bylaws for new commercial buildings has to be strictly followed. So that new
commercial buildings will have their own parking facilities in their buildings.
Traffic markings like yellow lines for parking in Commercial areas and signal has to be
followed properly
There is huge parking problem in CBD Areas like Adalat Bazar, Arnabarna chowk, Books
Market, Anardhana Chowk, AC Market, Dharampura Bazar.
Pubilc following the traffic rules only in the presence of Traffic Police.. Nature of Public should
be changed.
More Pedestrian movements near Kalimata Mandir In Mall Road especially in festival days.. So
Pedestrian Underpass/ Overbridge should be provided.
One way Plan is required for the CBD area to avoid congestions In CBD area (Lohri Gate,
Arya Samaj Chowk, Sherawala Gate chowk, Anardhana Chowk, Adalat Bazaar, Dharampura
Bazaar, Moti College, Nabha gate) Problem in Crossing the Rajpura road for the while
accessing the Bir Ji Cremation Ground from the other side since continuous vehicles plying on
the road.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
167
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
168
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
169
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
170
DISTRICT LEVEL CONSULTANTION:
Consultant has organized a district level consultant in the office of Deputy Commissioner, Patiala on 25 June 2012. Consultant made a detailed presentation of the project including the consultants
working methodology, surveys location selection methodology, data analysis, travel demand modeling, demand forecasting and arriving of short term, medium term and long term proposals for
improvement of traffic and transportation needs of the city commuters.
Consultant made modifications in the report based on the feedback received in the meeting and
accordingly submitting the Final Report.
News paper clippings on the consultations on 21 June 2012 are given below:
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
171
ANNEXURE 8: COMPLIANCE TO GUIDELINES OF NATIONAL
DISASTER MANAGEMENT AUTHORITY NDMA
In Compliance to MoUD Letter No.K-14011/107/2009-UT dated 18th November, 2011
communicated to us by PMIDC, the consultant has prepared following write up on the above aspect.
Highway Disaster Management Planning
The highways and selected other routes where the POL traffic is very high, should be mapped
for provision of first aid boxes and reliable communication facilities. The available study material and
information for the specific highways stretches that carry high traffic density of HAZCHEM carriers
shall be replicated for other national/state highways. The highway disaster management plan should
delineate preparedness, mitigation and prevention strategies for accidents of POL tankers as
recommended by National disaster management guidelines for Chemical (Industrial) disasters.
Authorized Parking Spaces
The central and state governments should approve parking places in their respective areas of
control for safe and secure parking of POL Tankers PESO should be provided with appropriate man
power to critically re-evaluate its approvals with regard to submissions made by the industries as well
as transporters. RTOs in various states, who have also been working overtime in discharge of
responsibilities with regard to all sorts of vehicles engaged in commercial activities and for personal
use, should be sensitized towards this important responsibility of managing POL tankers.
Suggested Mechanism for Implementation
A single window approach should be adopted for implementation of existing regulations and
suggested new rules and regulations.
Single Window Approach
It is an opinion of experts that transportation of POL tankers requires single window control
mechanism which can only be provided by a defined regulator. Petroleum and Natural Gas Regulatory
Board (PNGRB) based on their existing mandate and statutory backup shall act as a regulator. PNGRB
shall coordinate, monitor and ensure the implementation of rules, regulations and SOPs for POL
tankers. It shall develop an adequate mechanism to put up a check on functioning of various
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
172
stakeholders / service providers with respect to safety and security aspects of POL Tankers.
Transportation Disaster Management Planning is very important and should be formulated under
ERDMP (emergency response to disaster management planning) in the country. It shall cover
important transportation routes of hazardous chemical and dangerous goods including the
transportation of POL tankers. The implementation model should be undertaken in a phased manner
under defined timelines. It shall include the following:
a) Strategy to enhance the infrastructure requirement and capacity development by providing
adequate manpower to various existing stakeholders/ service providers;
b) Adoption of single window approach to facilitate the functioning and ensuring implementation of
various rules and regulations and;
c) State level emergency management planning for different types of transportation hazards and
special mechanisms to address linkages. The model needs to be implemented in a stipulated time
period using a consultative and participatory approach.
Existing Operational Mechanism of Transportation
There are number of regulations and different stakeholders operating / controlling the
operations of transportation of petroleum products from consigner place to consignee place. The
petroleum products, under the Petroleum Rules, 1976 are transported on road in a well National
Disaster Management Guidelines: Strengthening of Safety and Security of POL Tankers 17 designed
petroleum road tankers (as approved by the Chief Controller of Explosives as per in accordance with
third schedule of petroleum rules). POL tankers are arranged by a oil company from a fleet of
dedicated transport (self owned) or from a transporter who supplies the vehicle and enters into
obligatory contract with the oil company to take responsibilities of safe and secured transportation
from the consigners place (place of loading) –to the consignees place (destination). All safety
provisions/gadgets and compliances according to the CMV rules are the responsibility of the
consigner. It is obligatory on the part of consigner to check all the oil tankers before dispatch either
owned by consigner themselves or hired through the transporter under the contractual obligation.
The responsibilities of all the statutory authorities are well defined but in practice these are executed
by the consigner who owns the products until delivered. The consigner also has the overall
responsibility to ensure that POL tankers engaged in service meet all specified safety and security
norms besides making the driving crew fully conversant with the product safety data as well as safety
features conforming to CMV rules, 128 to 137, exclusively pertaining to transportation of goods of
hazardous nature to human life. The existing operational mechanism for transportation of petroleum
products is diagrammatically represented as follows
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
173
Transportation Disaster Management Planning is very important and should be formulated
under ERDMP (emergency response to disaster management planning) in the country. It shall cover
important transportation routes of hazardous chemical and dangerous goods including the
transportation of POL tankers. The implementation model should be undertaken in a phased manner
under defined timelines. It shall include the following:
a) Strategy to enhance the infrastructure requirement and capacity development by providing
adequate manpower to various existing stakeholders/service providers;
b) Adoption of single window approach to facilitate the functioning and ensuring implementation of
various rules and regulations and;
c) State level emergency management planning for different types of transportation hazards and
special mechanisms to address linkages. The model needs to be implemented in a stipulated time
period using a consultative and participatory approach.
Vehicle Tracking System (VTS)
Oil and Manufacturing Companies shall implement Vehicle Tracking System (VTS) on all tank
trucks for delivered POL supplies for overall monitoring through Global Positioning Satellites (GPS) as
per directives from MoP & NG. The vehicle tracking system facilitates tracking movement of the
vehicle. Following features are available in the vehicle tracking system: Live tracking and ascertaining
current position of TT Tracking deviation from the standard route tracking of en route unauthorized
stoppage tracking of tampering with dome cover and bottom fittings. Generation of exception reports
of all locations by e-mail on daily basis. The main parameters e.g. route deviation and unauthorized
halts shall be generated on daily basis by the consigner (IOC) and action taken as per Industry
Transport Discipline Guidelines (ITDG) Access to all transporters for tracking the vehicles plying in
their contract for better fleet management & effective controls over their tank truck crew Consignees
(Retail Outlet Dealers) shall have password access to VTS website to monitor the movement of their
TTs Necessary amendments in the Petroleum Rules, 2002 and CMV rules, 2009 are required to be
made to ensure that all tank trucks shall mandatorily be fitted with VTS.
Regional Transport Officers (RTOs)
The primary responsibility of RTOs is to ensure compliance status of rules under CMV from
129-137 for which a check list should be duly signed by officer on duty and also signed by driver for
ready reference. The other recommendations include:
a) Operationalising and harmonizing network responsibility during transportation by POL tankers with
the help of uninterrupted records of VTS and GPS available to them.
b) To organize safe parking areas in their jurisdiction regions which is very important from security
point-of-view as well
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
174
c) Possession and checking of transport approvals by transport authorities
d) Tracing of any loss of GPS /VTS signal based on notification by consigner to ensure that the vehicle
is safe and back to main route
RTOs shall remain nodal authorities
RTOs are nodal point for information exchange of any change in route due to natural hazards
or congestion of traffic. If the vehicle is not traceable for more than six hours, the primary responders
including police, fire and medicos should be alerted through emergency information and alert signals
as planned.
a) To ensure that vehicle passing through the district ‘A’ should be pre-informed to district ‘B’ in
Receiving or in point of crossing.
b) To coordinate with all the oil companies in their sectoral region such that during emergencies, their
emergency plan can be activated.
c) For activation, off-site emergency plan (notification of accident) should ideally be initiated at this
Juncture itself. The new amendments to develop a format for ‘Off-Site Link Plan’ for transportation
through POL tankers should be included in the given Petroleum rules.
General on Disaster Management
India is vulnerable to a variety of natural and man-made disasters that hinder the country’s
growth. The management of response in disasters requires the existing administrative set up, civil
society and its various institutions to carry out a large number of tasks. The activities involved in
response management would depend on the nature and type of disaster. It has been observed that in
times of disaster, apart from lack of resources, lack of coordination among various agencies and an
absence of role clarity amongst various stakeholders pose serious challenges. If the response is
planned and the stakeholders are trained, there will be no scope for ad-hoc measures and the
response will be smooth and effective. The objective of these Guidelines is to pre-designate officers
to perform various duties as well as train them in their respective roles.
Realisation of certain shortcomings in response and a desire to address the critical gaps led
Government of India (GoI) to look at the world’s best practices and adopt the Incident Command
System (ICS).
The ICS incorporates all the duties that may be performed in case of any disaster or event. It
envisages a complete team with various sections to attend to all possible requirements. If the ICS is
put in place and stakeholders trained in their respective duties and roles, it will help reduce chaos and
confusion during actual incident management and everyone involved will know what all needs to be
done, who will do it, where the resources are and who is in command, etc.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
175
The ICS is a flexible system and all its Sections need not be activated in every situation at the
same time. Only required sections may be made operational as and when required. This system
envisages that the roles and duties shall be laid down in advance, the personnel earmarked and
trained in their respective roles and duties.
This system consists of a number of useful features like; 1) Management by Objectives, 2)
Unity and Chain of Command, 3) Transfer of Command, 4) Organisational Flexibility, 5) Manageable
Span of Control, 6) Area Command, 7) Unified Command, 8) Common Terminology, 9) Personnel
Accountability, 10) Integrated Communications, 11) Planning and Comprehensive Resource
Mobilisation, Deployment and Demobilisation, 12) Incident Action Plan, 13) Information Management,
14) Proper documentation of the entire response activities through forms and formats, 15)
Responder's Safety, 16) Media Management and 17) Agency Coordination.
For educating road users about traffic signs and making them aware of importance of
adhering to traffic rules, Traffic Safety Week is being observed in the first week of January every year
in India, through organising traffic awareness camps and rally. The event is marked by making people
aware of the traffic rules through meetings, role plays of carrying out first aid, importance of traffic
rules and safe driving practices and distribution of pamphlets regarding traffic signs and rule printed
in English and local dialect. Consultants during the field surveys in January 2011 have participated in
one such event at Patiala and pamphlet distributed is presented below for ready reference.
Pamphlets distributed at Patiala Traffic safety week celebrations on January 1, 2011
The road users should give special attention to emergency vehicles by giving way to
emergency vehicles like – fire tenders, ambulances and police vehicles. Road users should not ignore
any accident that they come across while commuting on road, should inform local police immediately
and, if possible, should make arrangements to take the victims to nearest hospital.
Hazards refer to “potential to cause injury” and risk is “probability of occurrence of such
event”. Due to unprecedented growth of industries since Independence the chemical risk contained
within the boundaries of industry has now reached the densely populated zones in the form of
“transportation vehicles”. The exponential increase in number of vehicles carrying petroleum goods
corresponds to the significant increase in industrial growth. Accordingly, a rapid increase in number of
incidences involving tankers has also increased.
With the advent of Disaster Management (DM) Act, 2005, a process of institutionalizing
disaster management framework was initiated. Chemical (Industrial) Disaster Management Guidelines
and Chemical (Terrorism) Disaster Management Guidelines were, thereafter developed and released.
The Environment Protection Act, the Petroleum Act, the Factories Act and Central Motor Vehicles
Rules provide significant regulations starting from design approval to safe/ secure transportation of
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
176
POL tankers. However, the major limitation is the multiplicity of regulations, stakeholder involved and
ineffective coordination amongst various emergency service providers. The existing mechanism of
operation of such vehicles starts from design approval by PESO to multiple authorized checks till
reaching consignee place. The increase in terrorist threat has also raised concerns on current safety
and security aspects. Consequently, NDMA has undertaken an initiative based on recommendations of
the regulators to a) discuss the vital issues with both all the regulators and important oil companies
and; b) to identify critical gaps to develop preparedness /mitigations strategies there upon. After
meeting with all the important stakeholders and service providers (Appendix I), a core group
(Appendix II) was constituted under the chairmanship of Lt Gen (Dr) JR Bhardwaj, Member, NDMA.
NDMA in its approach towards disaster management firmly believes that man-made disasters which
include the incidents involving POL tankers can be very well minimized, if prevention and
preparedness practices are adopted to a level that there is no chance left of slippage.
The important recommendations to be implemented include:
a) Regulatory frame work should address the roles of occupiers, transporters, drivers and
district and state authorities explicitly for fail safe transportation of POL tankers;
b) Response capabilities of hospitals, fire services and police on transportation routes especially
in mofussil towns should be strengthened;
c) More emphasis should be given to maintenance of safety features in POL tankers;
d) National tanker registry should be developed;
e) Tracking of POL tankers through GPS and VTS should be compulsorily adopted;
f) District Disaster Management Authority (DDMA) should have a cell for transportation of POL
Tankers;
g) Separate data base of petroleum products should be created;
h) Emergency response guide for transportation of POL tankers should be prepared;
i) Efforts should be made to designate and train community leaders on prominent highways for
down the line training of communities enroute and;
j) Safety documents should be prepared by the occupier/ transporter for vehicle, driver and
journey management for pre, during and post transportation phases.
k) Road users should keep in mind that pedestrian possesses the first right-of-way. Hence, they
should respect pedestrians by giving way. Special attention to be given in case of children,
disabled and senior citizens.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
177
Sl. No.
Type of Disaster Risks involved Mitigation measures
1 Terrorist Attack
In November 2004 a United Nations (UN) panel described terrorism as ‘an act intended to cause death or serious bodily harm to civilians or non-combatants with the purpose of intimidating a population, or compelling a government or an international organization to do or abstain from doing any act’. A terrorist attack involving chemical agents differs from other terrorist attacks as it presents specific health effects to a larger population in the shortest possible
period, hence creating great panic in the community.
The areas affected need to be cordoned off. Tariff to and from the affected areas need to be regulated under surveillance to check the suspects and nab the culprits.
Traffic to the affected areas need to regulated to allow free movement of rescue vehicles like ambulances, fire tenders, police vehicles etc.
2 Earth Quake
India’s high earthquake risk and vulnerability is evident from the fact that about 59 per cent of India’s land area could face moderate to severe earthquakes. During the period 1990 to 2006, more than 23,000 lives were lost due to 6 major earthquakes in India, which also caused enormous damage to property and public infrastructure. The occurrence of several devastating earthquakes in areas hitherto considered safe from earthquakes indicates that the built environment in the country is extremely fragile and our ability to prepare ourselves and effectively respond to earthquakes is inadequate.
All the buildings should be designed seismic resistant. Identification and networking of nodal agencies and partners at different levels for Implementation of the programme. Formation of City and Ward level Disaster
Management Teams [DMT] including the concerned Government Depts. Senior citizens, National Cadet Corps (NCC)/National Social Service (NSS), Rotary and Lions Clubs, Bhagidaris (Delhi)/City Nagarik Committees/resident welfare associations, elected members, NGOs and other civil society response groups.
Development of city and ward level earthquake preparedness and response plans.
Development of an inventory of resources at all levels for speedy response during emergencies and establishing linkages with the India Disaster Resources Network (IDRN) portal being commissioned by MHA.
3 Floods Being located in midst of five rivers the state of Punjab is more vulnerable for floods in monsoon
In case of flood prone areas, the storm water drains need to be de-silted and repaired well before monsoon.
Irrigation canal and river banks need to be repaired and regularly to keep them ready for monsoon.
River bunds need to be strengthened annually to reduce the chances of flooding
4 Fire Accidents
Fire accidents generally occur due to error like, industrial or chemical fire disasters, fires at social gatherings due to Electrical short circuit fires, accidental fire and kitchen-fires. Rural and urban
residential and non-residential structural fires are also largely manmade fires.
The Delhi Fire Service issues fire safety guidelines to the various agencies for which the cases are to be referred to Chief Fire Officer, Delhi Fire Service through the building authorities concerned or licensing authorities in line with the bldg. by laws/relevant code of practices. In case of high-rise buildings i.e. 15 meter or more in height a questionnaire has to be tilled & submitted by the architect along with the plans. In order to avoid inconvenience all the information required in the questionnaire should be properly indicated. The fire safety guidelines should ensure that the information is correctly provided.
Punjab Municipal Infrastructure Development Company
Comprehensive Mobility Plan for Patiala Final Report
178
Sl. No.
Type of Disaster Risks involved Mitigation measures
6 Building collapse due to dilapidation
This has been a major source of human loss in old settlements where centuries old building is being used for residential and other purposes.
All old buildings not worth living should be identified and vacated if being used for habitation. And reconstruction of such building should be taken up demolished them at the earliest possible.
In case of any such untoward incident happens, the rescue teams should be put in service to save any injured beneath the debris.
5 Road Accidents
In India, road accidents are major cause of deaths.
The road users need to strictly adhere to traffic rules while driving
Personal safety equipment like helmets, safety belts must be used by all road users.
All road users should follow road signages and signals.
Speeding near congested locations, schools and hospitals to be avoided.
Drivers should use dipper at night.