REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …
10
REPORT ON ROOT CAUSE ANALYSIS ON VALVE LEAK OBSERVED AT LTHE HASBAH SITE Suresh J – Sr. DGM, Manufacturing. RCA REF: QM NCR IK ON 061RCA OO1
Transcript of REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …
REPORT ON
ROOT CAUSE ANALYSIS ON VALVE LEAK OBSERVED
AT LTHE HASBAH SITE
Suresh J – Sr. DGM, Manufacturing.
RCA REF: QM NCR IK ON 061�RCA OO1
2.1 Verifications at L&T Valves Factory:
2.2 Correction:
Why?
Why?
Why?
Why?
Why?
Why?