Report3 - Appendix1 - Draft Regeneration Programme.pdf

download Report3 - Appendix1 - Draft Regeneration Programme.pdf

of 39

Transcript of Report3 - Appendix1 - Draft Regeneration Programme.pdf

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    1/39

    London Legacy deveLopment corporation

    regenerationdelivery programme

    report 3 - appendix 1pubLic item 6 / 19 march 2013

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    2/39

    London Legacy deveLopment and regeneration pLan

    Summary

    Lodo Legc Deelopet Copoto (te Legc Copoto) ee etled to poote ddele pcl, ocl, ecooc d eoetl egeeto te Olpc P d odg e, ptcl xg te legc o te Olpc d Plpc Ge, ecg g-qlt tle

    deelopet d etet, eg te log-te cce o te clte d et t t dect cotold ppotg d pootg te o coegece.

    Follog te cce o te 2012 Ge, te Legc Copoto o oced o e-opeg d opetg ccel p, eg e deelopet t t ext to cete get plce, d ecg oppotted cge o people lg te e.

    Te Legc Copoto to e te cce o Qee Elzet Olpc P pgod o deegeeto, dg o t expeece d detdg o te locl e, t cotet to ptepog, d t cedle et e to cete te codto o cce. To cee t ojecte, te Legc

    Copoto gct et t te P, oe cptl dg, ece d te lt to g ptetogete, ell plg poe t t od.

    T eg docet et ot t te Legc Copoto dog to dele t coe ojecte o egeeto,te cotext t c t opetg, d te potce o jo, got, plceg, cot dcoectt to ceg t ojecte. Te Legc Copoto ledg o ppotg poject o te o jdgeet ot te delelt, te cotto tod ttegc ojecte, d te gec ooppott tt te oe.

    T docet ot te Legc Copoto Locl Pl, c ll et ot ld e d to plg polce

    o te e t te Copoto od. T poge doe ot ee to et polc o te Locl Pl delted docet, c ll e deeloped tog ol plc poce dg te coe o 2013 d 2014.

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    3/39

    3

    contentS

    1. introduction

    1.1. LOnDOns LEGaCy

    1.2. CEnTraL LOnDOns FuTurE1.3. LOnDOn LEGaCy DEvELOPmEnT COrPOraTiOn

    2. park opening, deveLopment and regeneration

    3. regeneration programme

    3.1. PrinCiPLEs3.2. PriOriTiEs3.3. JObs

    3.4. GrOwTh3.5. PLaCEmakinG3.6. COmmuniTy3.7. COnnECTiviTy

    4. Legacy pLaces and connections

    5. objectives and priority projects

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    4/39

    London Legacy regeneration strategy

    1.0 introduction

    1.1 L l

    Te Lodo 2012 Olpc d Plpc Ge ee qled cce. not ol dd Lodo te

    old-etg potg peoce, t te cptl edeed d pdted t ccte glol ct, tEt Lodo ocg t tlt, det d et to te old.

    Lodo Legc Deelopet Copoto to t d ld o t tc ecod o cce, to eett te e od Qee Elzet Olpc P ll t potetl tg exteo to te et o get old ct, c oe eced ocl d ecooc oppotte to cet d te edet,d ecoe exctg detto o Lodoe. i dog o, te Legc Copoto ll ld o tee c to, e te ot o te ll, pto d et o locl people, d dele ltgtoto o locl cote.

    Te Legc Copoto ll lo ee to ppot te gol o Coegece, c et ot te to tt ttwt 20 e, te cote o ot te 2012 Ge ll e te e ocl d ecooc cce

    te ego co Lodo. (sttegc regeeto Feo, 2010).Coegece dopted te Goeet p legc ojecte noee 2010. Te CoegeceFeo d acto Pl 2012-15 (2011) et ot o te Gete Lodo atot (GLa), hot boog dote pte, cldg te Olpc P Legc Cop (te Lodo Legc Deelopet Copotopedeceo), geed to o tod Coegece t oc o tee tee:

    Cetg elt d edcg poet

    sppotg elte letle

    Deelopg ccel egoood

    1.2 cl L

    Te 2012 Ge lo deotted tt teetd got o cetl Lodo, ceg oe tt e go t te ttep o deelopet Docld, eced sttod, gg Qee ElzetOlpc P to te et o Lodo.m eet oge, e leded eto sttod, pep o tet te, cedle plce to do e.

    Lodoe, ele, e plce tole, o d ejo te le.

    Te P le t te et o Lodogot oog (bg d Dge,Geec, hce, ne, Toe hlet, wlt Foet), oe to 1.3 llo people d te lc oLodo te deelopet. i te lt decde oe o o ll e jo Lodo, d 10 pe cet o tecptl totl eploet, ee geeted ee. it oect tt te ext 20 e te e ll dd ext7 llo ll to Lodo ecoo d el dole te 200,000 jo tt e led te e.

    ie Et Lodo led oe o te cptl ot exctg e, d get o cete ee o, tecolog d t. a Lodo oe etd, te e od te P ll o dge eteeLodo peet d t te. it ee Lodo ot tee eed eet Lodo getet oppotte te od o te Lodo Pl (2011) t Lodo ot pott egeeto poject o te ext 25 e.

    London Moving East

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    5/39

    5

    Legacy Communities Scheme

    2030 Illustrative Masterplan

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    6/39

    London Legacy deveLopment and regeneration pLan

    1.3 L L dl c

    Te mo o Lodo deco to etl mol deelopet copoto t e o opeto

    extedg eod Qee Elzet Olpc P d et cldg plg polc, deelopetgeet d egeeto eect log-te cotet to te e.

    t m f L c llw1 :

    To poote d dele pcl, ocl, ecooc d eoetl egeeto te Olpc P dodg e, ptcl xg te legc o te Olpc d Plpc Ge, ecgg-qlt tle deelopet d etet, eg te log-te cce o te clte d ett t dect cotol d ppotg d pootg te o coegece.

    wle te Legc Copoto pecc poe eltg to deed geogpcl e, t ee etled

    te mo o Lodo to poote ode poge o egeeto d cge et Lodo, tdeg leel o poe d ece t deet ptl cle:

    Qee Elzet Olpc P, ee te Legc Copoto te jo ldoe d te ledegeeto gec, d pecc plg d ote poe.

    WithintheLegacyCorporationarea,butoutsidethePark,wheretheCorporationisaveryminor ldoe, t tll te led egeeto gec, d pecc plg d ote poe.

    OutsidetheLegacyCorporationarea,wheretheLegacyCorporationownsnoland,isnotthelead egeeto gec d o poe, t doe e teet ttegc pte, d ll eeto ee tt t ppe de te od eet cote otde (d ce e).

    t L c p, pl pl l :

    PARK:TooperateasuccessfulandaccessibleParkandworld-classsportingvenues,oeringfacilitiesforg-peoce d cot ptcpto, etcg to ttcto, d poge opotg, cltl d cot eet tt ll cote to d cod to sttod;

    PLACE:TocreateoneofLondonsmostdynamicurbandistricts,attractinginvestmentfromacrossLondond eod, ecog locto o coce o cet edet d e l, ctg lco elt ceto d etepeep, d lg Qee Elzet Olpc P ettet odg egoood;

    PEOPLE:Tocreatelocalopportunitiesandtransformationalchange,topromoteregenerationand

    coegece o Et Lodo, d to ee le o oe o txpe

    1Mayor of Londons proposals for a Mayoral Development Corporation, February 2011

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    7/39

    7

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    8/39

    London Legacy deveLopment and regeneration pLan

    Oe te ext tee e, tee copote poge ll e cetl to te Legc Copoto : opegd opetg Qee Elzet Olpc P; gg od te deelopet o e egoood odte P; d deelopg d deleg te poge o log-te egeeto.

    Tee tee poge tt e detl to cce. sccel e-opeg ll t oet,ece eptto d ld le te log te, d el ette deelopet ll ld p to 7,000 eoe d pce o tod oe jo od te P d ee. bt tee poge eed to ecopleeted eecte egeeto poge: te P d t coecl, eploet d leeoppotte - t oge tog l t locl cote to e coegece elt.

    t p o pl l:

    Te P Toto poce - cl, c, cl - c eg edtel te te ed ote Plpc Ge d ll cle te Ge-te oel cldg tepo ee, l dod; coect te P t e od, ccle d pedet pt tt ttc co te te d to teodg e; d coplete peet ee, dge d pld o te legc e

    re-opeg te P tel, tge dg 2013 d 2014, t p , plgod d eldcpg deged to ppot poge o eet d to ttcto tt ll d locl,etopolt, tol d tetol to

    re-lcg peet ee (te std, te aqtc Cete, te velodoe, te Coppe box, teacelomtl Ot) t tet d opeto plcesccel dele o t poge ll cetete odto o ttc plce, o le ceto, o poel d, d o log-te coteet.

    sccel dele o t poge ll cete te odto o ttc plce, o le ceto, o

    poel d, d o log-te cot eet.

    al p , dl p l w:

    Pl o te ceto o e e egoood te P oe te ext 20 e, t p to 7,000 eoe d ppotg ocl tcte, ee ppoed Je 2012;

    Te t oe te Co mo egoood ll e de cotcto o 2014;

    ite e ll e ed to g le to loge-te deelopet plot; d

    Te Pe d bodct cete ll e e-lced jo eploet , t bT spot coed t co tet.

    Te regeeto Poge o dge etee te P, te ceto o e plce, d te pojecttt ll dele egeeto d tote cge o locl people. T docet et ot te pcple,tteg d pote tt dee t poge, d te ctcl poject tt e cetl eg ped.

    2.0 park opening, development and regeneration

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    9/39

    9

    South Park Plaza - completed for Park Opening

    Chobham Manor - construction to commence 2013

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    10/39

    London Legacy deveLopment and regeneration pLan

    3.1 pl

    Te Legc Copoto regeeto Poge oded o extee expeece o Et Lodo, ot

    t te Legc Copoto d og t pte. Qee Elzet Olpc P t te et o te LegcCopoto e, c o te ote pt o te Loe Le vlle, c t oe o te ctcl clteo got e Et Lodo d te cptl ole. Te Legc Copoto ll opete t ec o teeptl leel.

    O eql potce detdg o Et Lodoe te eed, pto d te cltl cett t cote to te. Et Lodo to ee oe o oto, e-eto d cge, dte e cetl oe to oe o te oget d ot dee poplto Lodo o te uk. bt teecote cote to ce pole, t pooe edctol, eploet d elt otcoe, oeog codto, d ge ce leel t te Lodo ege.

    Te Lodo 2012 Ge e let te Legc Copoto t ele et o et d oppotte,

    cldg P d ee tt ee deged to e ll cle to ll ecto o te cot, d coted te ot ccele Plpc Ge ee. Te Legc Copoto cotted to cg teepcple od, to ee tt te legc o te Plpc Ge le o te deelopet o tlcle d ccele plce.

    wle te Legc Copoto dg o ot-te etet e-opeg te P, t ppoc to deegeeto poject ll e to e c oe oppottc d etepeel, epecll ge te teecl eoet. Te Legc Copoto ll cee t ojecte g ece d ledep, g et e o lle dg d ecg e dg, d cetg plg polc eo ddeco-g poce tt coe clt d exlt.

    wle o et e cocetted te P, o eectee ll e xed e opete ptep, pt o ode llce o et Lodo. Ee ooltc dele o t et ele o te LegcCopoto, t old e tel o te ge eoce tt pte c g to te tle. a locled gec,ooted etopolt goeet, te Legc Copoto c elp to coect locl eed t Lodo-deoppott, o tt e et Lodo c eet o jot og t te ofce o te mo o Lodo, dote pt o te GLa Gop, ell t egog oog, locl cote, d te ee tte de et Lodo te oe.

    Fll, te Legc Copoto ll ee, d ee ece pdte, te lle ttegc o d plgpolc tt ee peeted docet le te sttegc regeeto Feo, te Olpc Legcsppleet Plg Gdce, d te o tepl, coe ttege d e cto pl tt eee peped d dopted te ot oog d te pte. we ll eect te ed o tt tod o o etled d ll o to dele te pot poject tt e ee deted

    3.2 s p

    i te lgt o tee pcple, te Legc Copoto egeeto tteg to e te ot o QeeElzet Olpc P edeelopet to detto d tg dtct, to o tepgod o d dg oce ed poge o ged cge tt ll ot ppotcoegece locll, d te Lodo cce o glol tge.

    j o locl people t te P, ee d e opce, d tog pootg d cptlgo te etepeel clte o te locl cote

    gw ppotg etepeep, cetg opce o ee, oteg te d ge

    edcto clte tt c ote oto d got,

    pl cetg plce tt o, cldg og deelopet tt eet locl d Lodo-de eed d ccoodte dee d cgg poplto

    3.0 the regeneration programme

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    11/39

    11

    c g e tt locl people (cldgtoe o deped cote) e te oppottd cpct to eet o eploet, e d

    lee oppotte, d elg locl people to g leto te e pce d egoood, to ct te log-te gto o t cce

    c tegteg d extedg te pcld ocl l etee Qee Elzet Olpc P,ote jo deelopet locto d odgcote, d oecog pcl e ttcetl epte cote, d t cce toeploet, e d lee oppotte

    Ge coted dg, ptcll te el e, e

    ll pe poject tt et t tee pote, t ll lo ctl to eze oppotte te e.

    3.3 j

    Te Lodo oog o bg d Dge, Geec,hce, ne, Toe hlet d wlt Foet (LodoGot boog) e te e e cete o Lodo. Tee cope 20,500 ecte o ld d oe to 1.3 llopeople tee te te ze o te ct o mcete.

    it oect tt te ext 20 e te e ll dd ext

    7 llo ll to Lodo ecoo d el dole te200,000 jo led ee. Oe eo o Lodo cete ogt og et te 2012 Ge, c e deleed pto 50 e o egeeto d tcte etet de decde.

    3.4 gw

    Lodo Got boog pode lled oppotte oe d eegg tecologe. Te e oe lge e og qlt ld, extee tpot d tlte tcte,d pdl-gog toc o e ldg. i ddto, te

    e ll e ogt te t Lodo to eet o bT ollot o pe-t odd.

    Te e d od Qee Elzet Olpc P ogg e dett o ge edcto d eecexcellece. Te jot bec/uet o Et Lodo cp el coplete sttod, d uet College Lodo dLogoog uet e to ote ttto expeg tog teet etlg peece te e.

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    12/39

    London Legacy deveLopment and regeneration pLan

    Te etepeel te o te e od Qee Elzet Olpc P e pedcto o got e

    peclte, t e e o ecooc got e lel to clde:

    Cle tec dte, ed o te expo o eoetl tecologe d te gee etepe zoett tg dtge o lge pool o egeeg tlet, gog ecclg dt, old-ledgeec o te edcto d epoceg d excellet popet opto.

    spot d edcl tecolog ee: ldg o te potg legc o te P, d te eecexpete te gog cdec clte t pt o et Lodo.

    Dgtl dte: te Tec Ct clte od Old steet copleeted ote cee c teedeelopet o te Pe d bodct Cete eploet , t clte o tecolog-ed d odct ee.

    Cete dte: te Got boog ot te lget e o tt d t ogto lg

    d og togete o cptl ct te old. Oe ee e jo te cete dte.soedtc, hoxto, sptleld, hce wc d F ild e tg t cete ee, ldgo te g cocetto o dege, tt d gllee, d e locto e eegg too.

    Te Legc Copoto ll o t d etet gece d locl tote to ee tt ee ll ecto c d e to locte d pope et Lodo ete Qee Elzet Olpc P, teLegc Copoto e o odg egoood. it ll lo ee to ee tt l c e oedetee lle etepeel ee tt te oot t e, t te jo copote ete ttcooe to locte te Pe d bodct Cete, Te itetol Qte, weteld sttod Ct d otelocl e cete.

    3.5 pl

    Qee Elzet Olpc P ll pode qe d pg plce o eet d lee ctte, d lle jo locl, tol d tetol cete o pot d clte, ell podg oe o le,d o got d jo. it ll e exctg e oe o e, lee d lg, gg te et oLodo togete oe plce.

    Te P qe edoet o tcte d tl ete, podg toc oppott tocete e etopolt cete te et o Et Lodo. Te legc pl ld o cog tdto doto to cete exctg e dtct tt tegte ll to Et Lodo, d poote egeeto dcoegece.

    Te e dtct ll pode:

    extee l og, cetg coee e cote ped Lodo egoood oteced oe d e, te t g-e deelopet;

    ge-det xed-e deelopet elect locto, cloel led to te etl, coecl d plctpot clte oeed sttod Ct;

    tog coecto to Et Lodo cote, ed o e dge, od, lg d cclg ote,d o ctel opeg te P p to locl edet;

    gl cte eto o te, p d plc pce, cog te tl etge o te Levlle t cte pogg o potg, cltl d ote eet;

    tetol to ttcto tt o te o gog to ecoo d ee te Olpc P

    copellg d popl detto;

    hg qlt potg ee tt g le to plc pce d eet o gl pogedppoc to eet, ecopg eetg o tetol copetto to g-oot deelopetpoject;

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    13/39

    13

    e opce d eploet oppotte t cce ot to plc tpot d to qepld ettg.

    Qee Elzet Olpc P le t te et o coplex e. it ot oe plce, t dtct togelted plce. Et Lodo o o t det d o te oppotte t poded to geeto oLodoe. it egoood e dee tee people, d ett to ple ccteto.

    Te P to eect t det, ot te et o t plc pce, og tpe d ctte, d te ceto o e e egoood tt eect d e coed te cctetc o odg e.

    3.6 c

    Depte te ecooc cce toe locll, Qee Elzet Olpc P oe o te cot otdeped e. i te pt, te deped cote ttg logde tee ecooc cce toe e otl eetted o te ttl - o exple tog cce to oe, egl jo,tg o ge leel o coe d ddtge ee ptcll cocetted og oe gop.

    Te Olpc bd locted te Le vlle d t sttod peccll to lee plc d pte etetto oe o Lodo ot deped e. T o ccdet, d te Legc Copoto cotted tog e tt locl people c eet o t etet.

    Te egeeto poge ll teeoe ppot te ecooc deelopet o te Legc Copoto ed te uk e ecooc poeoe. it ll lo dde oe o te log tdg e o ocl decooc depto to e od egog cote pt o te Coegece ged.

    3.7 c

    sttod oe o te et eed locto Lodo, t oe t 60 t ee o to cetl Lodo. it lo eed g peed l, tog tetol t do ot et top t sttod itetol stto, dll e Col stto o 2018.

    wt Qee Elzet Olpc P, coectt d peelt eg dtcll poed. 30 edge o l co te coplex e o cl d te tt o te et o te Loe Le vlle,d te poeet te qlt tt ee ceed llo tee cet tee to o e eto o lee, tpot d odet.

    Coectt e cllege oee, t te a12 og e etee te Legc Copoto ed cetl Lodo, od tt e d o pedet d cclt to gte, d t te cotg eed oe cog to ge et Lodo te qlt o tcte ejoed te et.

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    14/39

    London Legacy deveLopment and regeneration pLan

    4.0 legacy placeS

    1

    2

    3

    4

    LLDC Sub-Areas

    Te Legc Copoto e cot lttde o plce o dtct ccte, t o ee o decpto dl ee -dded to o -e. Tee -e ee to cpte ecogle plce toe ed ccte d e, ecopg ot e deelopet t Qee Elzet Olpc P

    d ge e otde t, ell cog oog ode. Te e deed to ppot dele dplg, d to ele tegto d coecto o e tt e ee epted, tot deg tetegt o extg plce.

    1. Co

    2. sttod

    3. bole bo & Pddg mll

    4 hce wc F ild

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    15/39

    15

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    16/39

    London Legacy deveLopment and regeneration pLan

    Co, c ecope pt o te Lodo oog o ne d wlt Foet, clde te d-e loc o Et vllge (te oe tlete llge), l og, pecel pld, pl pce d geo potg clte, g te tto etee te teel poplted d ctted e o sttod Ct

    d te ote Olpc P, te tdtol teced og egoood o Leto d te otecotto o te Le vlle.

    c m

    Co mo locted etee Et vllge d te velop, d logde te ote pld. Tee deelopet, c ll e te t pe o og to e eleed te Et vllge, to cete egoood o l oe ee de tee-led ee teect t tte teet d e, oeg eoet o qet teced oe d egoood qe.

    Te e cote te teet gd o Et vllge, podg cott o g d e codo. Te cleo deelopet le oetl, oee, t eltel lge loc o teet d edgg te p,

    copleeted lle cle deelopet o o teet d e, cldg ge o l ogtpologe.

    c F

    Te elee o oe dtl ld ll cltte deelopet o e l-oced edetlegoood to te ot o sttod metopolt To Cete. Te e ll l te pedotledetl ote zoe o sttod Ct, cldg Et vllge, d te extg egoood to te et sot Leto d sttod ne To. Te egoood teded to clde od 1,100 e edetlt, ppoted coecl d cot clte..

    e m

    Eto mo ll pode eced cete o pot cldg exle 5,000 et oce td, doote cete t cgg clte, ell ote cot potg d lee clte, c e--deptce.

    t n p

    Te deg o te pld ll coe pcteqe e lle e d qe e o o-det textee, plcl-ccele gee pce d ote.

    Te not P deged to ppot cte lee e d l-oeted ete c pl e, etldd te edcto e, lg pt, ccle pt, exle plted d l e, ell , to d detto plgod.

    Te not P lo ot te velop pg te e d podg clt o elte d ecetol cclt.

    e vll

    Te oe atlete vllge ll e ged Qt D Delce d Ttlo hoe, d ll oe el3,000 e oe, o c od 50 pe cet ll e odle. Fte pe ll cete te 2,000 oe.Locl etl d cot e e poded log t geeo gee pce ot plcl ccele dtel to te loc.

    L

    Leto pedotl edetl e t lel g teet, good qlt eteet teced og, d

    coecl cete o g ox etl t Leto mll. Te hg rod d Leto mll pode ot doo to teOlpc P, tog l eed to e tegteed te ed te.

    4.1 chobham

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    17/39

    17

    M.U.A.

    VELODROME

    M.U.A.

    ChObham

    manOr

    ETOn

    manOr

    ChObham

    Farm

    vELOPark

    LEyTOn

    EasT viLLaGE

    ChannEL TunnEL raiL Link

    nOrTh

    Park

    North Park Landscape Chobham Manor Leyton High Street

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    18/39

    London Legacy deveLopment and regeneration pLan

    4.2 Stratford

    sttod g togete te coe o metopolt sttod te extg to cete d egol l ,sttod Ct coecl, etl d tetol l clte d te sot P Plz d mgte w.

    c e

    Te Cpete Ette ctcl locto ext to sttod stto, etee te Olpc P d sttodhg steet. Lodo boog o ne eeg to edeelop ot o te ette o ped , to cete ette tegted egoood d ette og o locl people. Te boog ll e-oe tet,leeolde d eeolde g redet Cte te o t o.

    alogde te oe poce, uet College Lodo (uCL) e tdg te potetl o e 23-cecollote et dtct ceted o potgdte eec d tecg cece, tecolog dgdte leel eec, to clde cdec clte d ccoodto o t d tdet. T e dtctcold e lge uCL cet cp bloo, deottg te potetl cle o cotet dpct, d ctg oc o de eto o colloto og tetol, uk d locl cdec

    ttto d te pte ecto.s c

    sttod Ct, oe o te lget xed-e deelopet Eope d clde weteld sttod oppgcete, te coecl itetol Qte d e edetl cot. we coplete, sttod Ctll cot 465,000 qe ete o ofce, 270,000 qe ete o etl d lee pce, p to 2,000 oteloo, el 2,000 e oe ( ddto to toe Et vllge), cot clte d 32 ce o plcope pce.

    m W

    iedtel djcet to sttod Ct, d logde te aqtc Cete, mgte w ll e ,

    etopolt egoood, extedg sttod to cete, ctg gte to Qee Elzet OlpcP, d ecog detto o to, ell eg ttcte edetl qte t o gt.

    Tlle ldg ll e te ote pld d pode ettg o te aqtc Cete,acelomttl Ot d te std. i eepg t te e etopolt ccte, t t ed-to g-det loc ll e ged od pte, ldcped cotd.

    a g popoto o god oo, ptcll toe tt le te ot cte plc ote d pce, llpode op, ett d ce, ell ofce ccoodto d cot pce. T x o eepod c to t e ole egol to detto t doe to te pecc d-to-d eed ot edet.

    t s p plzTe sot P Plz ll ecoe te oc o jo potg d cltl eet e-od d te pcplplc pce t Et Lodo eegg e etopolt dtct.

    Te tetol gde, ot, t tllto, dge d poede eted o te Ge ll eeced e tee pltg, l d plo to cete pectcl p, coected d deed eto o te.

    Fo llo o to o sttod stto d weteld sttod Ct, te dge to te sot P ll e dtc l pot, oeg te t glpe o te Olpc P. Te std, te acelomttl Ot, d teaqtc Cete ll e te ote od o te Plz, cetg edge o tee ctt d ldldg. Poto o te oe Olpc cocoe ll e eted to coect tee, d to ct tge o

    eet d pogg.

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    19/39

    19

    t bl

    i te cete o te Olpc P, te beledee egt o 12 ete oe te re Le e t tltge pot o pectcl poc e o Et Lodo eet dtct, cldg ll te eted Olpcee. bot ot d ot p e ccele o te beledee, g t ot potl pot t teP d oc o ctt.

    s h s

    sttod hg steet ee tee deelopet ctt ecet e, d clde ttl eo e ptet ldg. a tee e copleted, te cllege ll e to poe te plc el d toge te pct o tfc, to e te hg steet lele pce tt coect sttod To Cete, QeeElzet Olpc P, Cpete d bole--bo.

    STADIUM

    AQUATICS

    M.U.A.M.U.A. wEsTFiELD

    sTraTFOrD

    CiTyinTErnaTiOnaL

    QuarTEr

    marshGaTE

    wharF

    sOuTh

    Park

    briDGEwaTErTrianGLE

    riCk rObErTs

    way

    CarPEnTErs

    EsTaTE

    Carpenters Estate South Park Plaza

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    20/39

    London Legacy deveLopment and regeneration pLan

    4.3 bromley-by-bow and pudding mill

    bole--bo d Pddg mll cope ee o oete ccele ld te ceted tcte cldg l, oto, ee d te. mc o te e tll occped dtl d coecl e, t ee o og d egeeto poject e et to todce oe

    edetl pce, d to o toge l etee egoood, le etg qe ccte.

    p mll

    Pddg mll tted o oe dtl ld, ee te eto o te o te bo bc reeet te Get Ete rl dct, te Gee (note Otll see) d sttod hg steet. Telge-cle tcte te e ce te ld to e o e-dcete ld, o c ete dded to egl plot extg tlte ldg d degod tcte.

    it tctl ldcpe, coed t te te o oe o te eg dtl ldg dce e, pt ptcl q, gtt ccte to e pctted e o expectedltte pce. a cotepot to t c e od te e g det, g-e edetl deelopet

    log te hg steet.a ge o edetl tpe d eploet e ll e todced to edte etee te cottgccte od t eolg cotext. T ppoc cotet t ote lge-cle egeeto poject te edte egoood (e.g . sg hoe Le d Tee mll) c, te togete, e te potetlto cete e d l egoood c xe cete etepe t cot.

    s h L

    sg hoe Le oe o te e e sttod tt et e dtl ccte t tede cce.Te pl o std Et deeloped iteie ll x e oe t te lo-co coeo o extgtcte, le eectg te e qe ccte. Te deg d dele o sg hoe Le ll eett dee edetl poplto ll e copleeted tg locl e cot. Te plce

    ll tll e oded te, t e excellet cclg d lg l e o e dge dcoecto.

    t mll il

    Tee mll ild t t te Tee mll Coeto ae o te re Le. Te ot o te ild coplex o l d teleo tdo d oe to Tee mll stdo. Te ccte o te e deed teodg e cel d te oe g dtlle ldg, og pe o toc ldg get-et tog te te. To te ot, Tee mll Gee ecetl eceed ldcpe poeet, d epl pce ll e deleed o te Gee e 2012.

    blbw n e

    bole-bo not e ccteed lo leel dtl t dced etee te re Led te a12. Pl o xed e locl cete t p to 1,200 edetl t ceted od lge e toe,d e plc pce, ell pedet cog co te a12, e cetl eg eeed ollog tete o ld to te Legc Copoto.

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    21/39

    21

    suGar-

    hOusE

    LanE

    PuDDinG

    miLL

    LanE

    brOmLEy

    by bOw

    ThrEE

    miLLs

    abbEy

    miLLs

    Tree Mills St Andrews development Sugarhouse Lane development proposal

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    22/39

    London Legacy deveLopment and regeneration pLan

    4.4 hackney wick and fiSh iSland

    hce wc d F ild, c clde pt o te Lodo oog o Toe hlet d hce, llx eploet d edetl e, coected cl d te, d dg t ccte o tetg ttc egoood o te edge o te Olpc P.

    h W

    hce wc xe og to te ot d dtl e to te ot. i ecet e, te e ecoeecoged pott e o t podcto, t g cocetto o tdo pce. Tee pcee ot ol occped cete pcttoe c dege d tt, t lo et o ppotge o gllee to pte to eet oge. wt te gct e o tdo, ppot ece de te e, tee te oppott to deelop odel o got o tee dte hce wctt ot ld po te extg et. hce wc te potetl to eege gct cete o gqlt cete d g tec ed podcto d, oe te, cltl d cete qte t ddtolop, etg plce d gllee.

    F il

    idtl ctt dee c o te ccte o F ild tod. T oed ldg gg o tod tee-toe c eoe d ctoe dtg o te 19t cet, to oe ecet pot- ctoe,d toge d dtto t.

    Te hce wc/F ild ae acto Pl et ot o o te d o plce F ild cold e tete, t e egoood cete t hce wc. Te Pl to cete lced ppoc toegeeto tt ll dele p to 2,800 e oe - cldg ttl poo o odle d log ppoted e cool, ope pce d elt clte, logde pce o e d extgee to go d te. Te Pl pto o F ild to ecoe tegl pt o Toe hlet,to eet te eed d ojecte o Toe hlet cote, d to xe t cotto to legc.

    sww

    seette ll e tql, copct, lo- to d-e l egoood t tegted locl ete.it ld o te cocetto o cete dte, gllee d ett eegg od F ild dexted t to cooldte e egoood cete te ct o wte Pot Le. rg logde kgyd Eeg Cete t ll e tl ote to te P o hce wc.

    seette ccte ll e olded t qe ettg etee to te, t cl-de p tote et, d te sot Plz d pld log te Old re Le to te et. T ettg ll ele te eto ttct le eeg ot pte et pce d dtcte plc ope pce. retl d coeclpce, p ce cete, e d ide stoe ll e todced log Cpete rod eg telocl edet o seette d hce wc. Te egoood lo clde p cool otg oto

    te cl p.

    at t ot ete edge, te egoood eet te not P d sot P Plz t te beledee.

    e W(cldg Pe d bodct Cete)

    Et wc ll exted te x o e d cete tlt o hce wc to cete ocl pot o jo dgot t te P. Te cte et o te e deelopet ll e log te et-et ote, extedgwll rod, etee dge oe te Lee ngto, pt te etce to te mlt-ue ae d to te P.

    ne oplce d cot clte oeloo t pcpl plc ote. Togete t e p cool,tee clte d te cl p ll g le to te Lee ngto cl edge, cetg l etee Et wcd extg egoood t hce wc.

    Te Pe d bodct Cete ll o e eploet , ccoodtg tod o jo, tegtg to tee logde e plc pce. redetl tece e popoed log te p edge to pode cte, tededge to te P, cotepo tepetto o Lodo tdto o lg p t tece oe.

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    23/39

    23

    STADIUM

    AQUATICS

    M.U.A.

    VELODROME

    FORMER

    IBC/MPC

    STADIUM

    AQUATICS

    VELODROME

    EasT wiCk

    haCknEy

    wiCk

    swEET-

    waTEr

    Fish isLanD

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    24/39

    London Legacy deveLopment and regeneration pLan

    5.0 obJectiveS and priority proJectS

    Te Legc Copoto lted eoce, d te jot o t dget e oced o te edtepote o e-opeg te P d ee te ttg pot o ccel egeeto. aceg deojecte ll eqe te og to det d ee pote, eze oppotte, oge ptep

    d lee dg o ote oce.

    O te o extg pl d poge, te Legc Copoto deted pcpl egeetoojecte ot tetc d ptl d pot poject o ceg tee. Tee poject e ddedto toe tt te Legc Copoto ll d d ge (pl toe t te Olpc P, o ccptl dg ee eced te edte te), d poject tt te Copoto ll ee to ppotd deelop t t pte, cldg tog ecg ed-te dg. Poject clde toe deleed deet deptet t te Legc Copoto.

    i ecg tee jdgeet ot pote, e e ed te ollog cte:

    HowwelltheprojectcontributestowardsachievingtheLegacyCorporationsstrategicobjectives(Park,Plce, People) d te egeeto pote ( jo, got, plceg, cot, coectt)deted t pl;

    Howdeliverabletheprojectisintermsoffundingforit,politicalsupport,andpartnershipstosupportdele d e ;

    Whetherwehavealegalorotherobligationtodelivertheproject;and

    Whetherthereisurgencyorauniqueopportunitytodelivertheproject,orwhetheritcanbedeliveredlte.

    LLdc area

    qeop

    barking riverside

    barking toWn

    centre

    royaL docks

    greenWich peninsuLa

    canary WharF

    oLd street/

    shoreditch

    e L m r a

    Lea river park

    river crossings

    internationaL trains stopping

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    25/39

    25

    areaWide priority projects

    objectives

    p

    riorityprojects

    To poe eploet te, edctol ttet d ll

    To poe locl d egol coecto

    To ece det, d ece clo d cot coeo

    To cete cte, e d lele plce

    Fund and Manage

    Eploet d ll o te o tloed tg d jo oege, cldg ppetcep

    Ee e et d eet tget o eploet o locl d eploed people, d tget gop

    Dele te tteg ptep t Cl & re Tt, to poote cte e o te d

    det pote o te etet d od te LLDC e

    Ee tget e et d et o ppetcep o locl people

    Deelop locl ppl c tog eet te e, d jot e ppot poge

    Coect locl cote t te P tog ee c locl to gde, cool poge dLegc yot Pel, d det te ece

    Poote ccelt tog te blt Eoet cce Pel d ote ee

    Deelop dlt pot poge, cldg l Fetl o Dlt spot

    bg od dele o e cool d ote locl tcte

    Dele Le re P pe d ppot dele o ote ot-ot coecto

    Dele t d clte tteg

    Steer and Develop

    Cpg o tetol l ece to top t sttod itetol, d o elet l etee hs1 dhs2

    sppot e Te e cog

    Deelop d ppot dele o tteg o pog cog oe a12

    Deelop tteg o odle opce de d otde Legc Copoto od

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    26/39

    London Legacy deveLopment and regeneration pLan

    0 100 200 300 400 5000 600 700 800 900 1000m

    Development

    LLDC

    LLDC

    Boundaries

    Borough

    Boundaries

    Public Realm/

    Open Space

    Infrastructure/

    Connections

    DevelopmentOthers

    Park Opening

    Park Opening

    Park Opening

    Park Opening

    [[3311sstt MMaarrcchh2201144]] [22001155]]

    Short

    Short

    Short

    Short

    [[2200221]

    Medium

    Medium

    Medium

    Medium

    Long

    Long

    Long

    Long

    [[2203311]]

    London Legacy Devlopment Corporation Regeneration Strategy

    Draft- 26thApril2012

    Long Term Delivery

    2031

    LB

    LLB WWAALLT AAMM

    FOOOORRRREES

    LBBNEWHHAM

    LBTTOWEER HAAAMMLLLET

    Y

    pl ll LLdc 2031

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    27/39

    27

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    28/39

    London Legacy deveLopment and regeneration pLan

    01 ChObham

    ObJEC

    TivEs

    PriOriTyPrOJECTs

    02 sTraTFOrD

    5.0 obJectiveS and priority proJectS by area

    To dele ccel e cote t Como d Et vllge tegted t odg

    egoood

    To cete ette coecto etee Leto dte Olpc P

    To cete tg cot oc t tenot P

    Fund and Manage

    1. Dele deelopet o Co mo

    2. Dele not P cldg not P d plgod, d ee tt te opetoctel poote e locl people

    3. Egge odg edet d ee Leto d mld tog coteggeet tte (eg, det te ecepoject)

    4. sppot te tegto o velop d Eto

    mo t te oell oe o Qee ElzetOlpc P d te dele o Locl beet

    Steer and Develop

    5. Ee te edeelopet popol o CoF te ppot log te o o tegted,g qlt egoood coectg Etvllge d mld cote.

    6. sppot popol o poeet to cpct dccelt o Leto tto.

    To ppot te tegto o sttod expdedto cete, cldg te itetol Qte

    d te egeeto o sttod old to cete

    To cete lel lg, og d etetetcete te sot P ed od te gtee legc ee

    To ppot egeeto o Cpete Ette,cldg tog potetl etet uCL,d poed cce to Olpc P

    Fund and Manage

    1. Dele sot P plee gde ceecldg sot P h d te eo sttod wteot, d ee tt teopeto ctel poote e locl people

    2. Dele e-e o std

    Steer and Develop

    3. sppot te dele o e ote etce tosttod regol tto o Cpete Ette

    4. sppot te egeeto o Cpete Ettecldg elg coectt poeet.

    5. sppot te edeelopet d egeeto osttod To Cete, cldg dogdg tegto te

    1

    2

    3

    4

    4

    5

    5 6

    1

    5

    2

    3

    3

    4

    Plnnng

    applcton

    Plcrelm

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    29/39

    29

    04 haCknEy wiCk anD Fish isLanD03 brOmLEy-by-bOw anD PuDDinG miLL

    To cete tg xed e o eploet dlg pce, le peeg extg ccte o

    dtl etge

    To oecoe eece ceted te dte a12 d a11

    To ppot etlet o e to cete tbole--bo tog elg cee tsg hoe Le d bole--bo (Teco) toe deleed d to ppot egeeto

    To ppot dele o Le re P tteg tae mll d eod.

    Fund and Manage

    1. Dele xed e egoood t Pddg mllLe, t poed l etee sg hoeLe (std Et) d te P, d ldg o te e tteg.

    2. idet log te tteg o Tee mll tdocoplex

    Steer and Develop

    3. sppot te pgde o bole--bo sttod stto sqe

    4. sppot te dele o copeeeedeelopet to cete xed e to cetecee, cldg a12 t gde cog d eecl dge to ht Le.

    5. sppot te dele o pedet cog oea11 o ll o bo rodot d e

    jcto to ele dect ecl coectoetee sg hoe Le d mgte Le.

    6. Ee tt te edeelopet o sg hoeLe ppot te log te ceto o exed egoood t gct opcee, g qlt l og d et te

    dtcte dtl etge ccte.

    To etl te Pe d bodct Cete jo eploet d good ego to

    te p d te edetl deelopet

    To t d ece te eeget cetedte clte te e, le llog oedeelopet le t toc ccte

    To poe tpot ccelt, cldghce wc stto d a12 cog

    To ee tog pcl d peceptlcoectt etee Et wc d seetteetd to hce d Toe hlet

    Fund and Manage

    1. Dee d dele edeelopet o hce wc te, dele poeet to hce wctto, d ppot deelopet o e loclcete od te tto

    2. Dele e-e o Pe d bodct Cete

    3. ipleet te dele o te Cl P dctel poote e locl people

    Steer and Develop

    4. Ee tt edeelopet cee hcewc F ild cotte to deleg te oo dtcte plce t eted dtletge d tg cete cottegted t e edet

    5. idet log te tteg o tgtg teeece pct o te a12, cldg egtt poed l (eg, to ro rod) eeced tog edeelopet poject.

    6. Dele to d cete te e ctt to tet d etl log te tocldg oppotte o locl edet dee.

    4

    1

    4

    2

    3

    3

    4

    6

    6

    5

    5

    1

    34

    6

    44

    4

    4

    2

    55

    intemu

    e

    intemu

    e

    LLDCDeelopment

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    30/39

    London Legacy deveLopment and regeneration pLan

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    31/39

    31

    Te ppedce cot p c lltte ll pled pcl poject te edte, ot, ed dlog te te LLDC e. Te e te o elet locl polc, gdce d pl.

    appendiceS

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    32/39

    LA

    CK

    LBWA

    AM

    FORE

    LBNEWHAM

    1.C

    HOBHAM

    2.S

    TRATFORD

    4.H

    ACKNEYWICK

    FISHISLAND

    append

    ix

    i|plano

    fpa

    rk

    openingp

    ro

    JectSandl

    ldc

    Sub-areaS

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    33/39

    m0001

    009

    008

    007

    006

    0005

    004

    003

    002

    001

    0Development

    LLDC

    LLDC

    Boundaries

    Borough

    Boundaries

    PublicRealm/

    OpenSpace

    Infrastructure/

    Connections

    Development

    Others

    ParkOpening

    ParkOpening

    ParkOpening

    ParkOpening

    [3[31stMaarcrc

    h200141]

    LondonLegacyDevlopment

    CorporationRegenerationStrategy

    Draft-26thApril2012

    ParkOpening

    31stMarch

    2014

    LBTOWERHAMLET

    3.B

    ROMLEYBYBO

    W&

    PUDDINGMILL

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    34/39

    append

    ix

    ii|plano

    fa

    llproJectSto2015

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    35/39

    m0001

    009

    008

    007

    006

    0005

    004

    003

    002

    001

    0Development

    LLDC

    LLDC

    Boundaries

    Borough

    Boundaries

    PublicRealm/

    OpenSpace

    Infrastructure/

    Connections

    Development

    Others

    ParkOpening

    ParkOpening

    ParkOpening

    ParkOpening

    [3[31s1tMaarcrc

    h20014

    [2010155

    Short

    Short

    Short

    Short

    LondonLegacyDevlopmentCorporationRegenerationStrategy

    Draft-26thApril2012

    ShortTermD

    elivery

    2015

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    36/39

    L

    LBWALTA

    M

    FORES

    LBNEWHAM

    append

    ixiii|pLano

    FaLLprojectsto2

    021

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    37/39

    0

    100

    200

    300

    400

    5000

    600

    70

    0

    800

    900

    1000m

    Development

    LLDC

    LLDC

    Boundaries

    Borough

    Boundaries

    PublicRealm/

    OpenSpace

    Infrastructure/

    Connections

    Development

    Others

    ParkOpening

    ParkOpening

    ParkOpening

    ParkOpening

    [[311stMaarrcch20014

    [22001155

    Short

    Short

    Short

    Short

    M

    edium

    M

    edium

    M

    edium

    M

    edium

    LondonLegacyDevlop

    mentCorporationRegenerationStrategy

    Draft-26thApril2012

    MediumT

    ermD

    elivery

    2021

    [2

    021]

    M

    edium

    M

    edium

    LBTTOWERHAMLETS

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    38/39

    append

    ixiv|pLano

    FaL

    Lprojectsto2

    031

    L

    LBWALTA

    M

    FORES

    LBNEWHAM

  • 7/29/2019 Report3 - Appendix1 - Draft Regeneration Programme.pdf

    39/39

    200

    300

    400

    5000

    600

    70

    0

    800

    900

    1000m

    ParkOpening

    ParkOpening

    ParkOpening

    ParkOpening

    [[311stMaarrcch20014

    [22001155

    Short

    Short

    Short

    Short

    [2

    021]

    M

    edium

    M

    edium

    M

    edium

    M

    edium

    Long

    Long

    Long

    Long

    [20331]]

    LondonLegacyDevlop

    mentCorporationRegenerationStrategy

    Draft-26thApril2012

    LongTermD

    elivery

    2031

    LBTTOWERHAMLETS