Sheet3SIMPLEX INFRASTRUCTURE LTD

DAILY WORK DIARYStrutureActivityManpower employedbottle necksS/FC/PMAHTotalMA411) Column Deshuttering, shuttering for bal 2 columns2) Colum Repairing 072090MA42Structure works completed(1)Lintel beam fixing500050

DPRSIMPLEX INFRASTRUCTURE LTDPROGRAMME FOR COMPLETION Date : 4/4/15Works plannedPlanned startplanned completePlanned durationActual startActual completeActual Durationduration elasped% of Work CompleteStatusbottlenecks for completion

MA 44Slab completion Date : 4/5/15days remaining1

Footings323-Mar28-Mar6200%100%completedColumns29-Mar31-Mar329-Mar30-Mar267%85%completedSlab scaffolding/ shuttering31-Mar2-Apr32-Apr4-Apr3100%100%completedReinforcement3-Apr4-Apr34-Apr150%285%Beam side shuttering4-Apr4-Apr14-Apr1100%285%

MA 45completion Date : 3/30/15days remaining-5

Tie beam30-Mar80%on progress (4 beams balance)Road base24-Mar28-Mar4awaiting for MEP Clearance

MA 47 Bcompletion Date : 4/19/15days remaining15

Excavation24-Mar29-Mar624-Mar11.00183%70%in progressDifferent levels may leads delayand MEP casing needs to be breakRoad base 1st laying30-Mar31-Mar2Road base 2nd laying1-Apr2-Apr2PCC2-Apr2-Apr1Reinforcement & Shuttering3-Apr4-Apr2footing concreting5-Apr5-Apr1columns casting6-Apr10-Apr5Grade slab works11-Apr13-Apr3Slab scaffolding & shuttering14-Apr16-Apr3reinforcement works17-Apr18-Apr2Stair case works14-Apr19-Apr6

LV 85C completion Date : 4/16/15**days remaining12

Excavation19-Mar28-Mar919-Mar28-Mar9.00100%100%completedRoad base 1st layer ( low level)29-Mar29-Mar128-Mar29-Mar1.00100%100%completedRoad base 2nd laying ( low level)29-Mar29-Mar128-Mar29-Mar1.00100%100%completedPCC ( first part)29-Mar29-Mar129-Mar30-Mar6.00600%100%on progressTrench PCC29-Mar29-Mar129-Mar30-MarReinforcement & Shuttering30-Mar31-Mar2footing concreting31-Mar31-Mar1Road base 1st layer ( 2nd part)1-Apr1-Apr1( depends on MEP CASING WORKS)Road base 2nd laying ( 2nd part)1-Apr1-Apr1PCC ( 2nd part)1-Apr1-Apr1Reinforcement & Shuttering2-Apr3-Apr2Trench Wall- 2 trenches1-Apr3-Apr3footing concreting4-Apr4-Apr1one footing after 3 days from date of trench wall castingcolumns casting5-Apr8-Apr4Grade slab works9-Apr10-Apr2Slab scaffolding & shuttering11-Apr13-Apr3reinforcement works14-Apr16-Apr3

Sheet4SIMPLEX INFRASTRUCTURE LIMITEDIMG THEME PARK PROJECT, DUBAILOG SHEETEQUIPMENT NAME :-

DATEOPERATOR NAMESTARTENDBREAK DOWN HRSTOTAL WORK HOURSFUELLOCATION & WORK DETAILS with site Engineer signTIMESIGNTIMESIGNGALONSIGN12345678910

Sheet1

Sheet2MANPOWER REQUIREMENT - IMGTPSl.NoStructureWorks RemainingPresent manpowerRequired ManpowerC/PS/FMAHelperTotalC/PS/FMAHelperTotal12345

Daily work logMilestones completion/ concrete qtyDaily Total ManpowerMA 41MA 42MA 43MA44MA 45MA 45 AMA 46MA 47MA 47 BMA 48LV 85 C1234123412341234123412341234123412341234123416-MarS/F 2C/P2MA1OT0S/F C/P6MAOTS/F C/PMAOTS/F 12C/P15MA3OT2S/F C/PMAOTS/F 6C/P4MAOTS/F C/PMAOTS/F 4C/P2MAOT5S/F 4C/P2MAOT5S/F241. Tie beam one no shutteting & Reft fxing2. Marking done at afternone for RCC columns1. ST-2 Staircase shuttering Completed1) Foundation concrete -15 Nos (38 cum)2) Maintanance pit Deshuttering & Wall reft works, shuttering3) Tie beam desuttering & Shuttering4) Backfilling startedHOLD1) Electrical Trench-1 Excavation Completed2) foundation Excavation Started after 3 PM1) Curing only1) Lift hook fixing is in progressC/P29MA 45 Footings -16 Nos38m3MA4OT7ConstraintsConstraintsConstraintsConstraintsConstraintsConstraintsConstraintsConstraintsConstraintsTOTAL64Showel not availablehold1) excavator, 2) dwg non-confirmity17-MarS/F 5C/PMAOTS/F 6C/P7MA2OTS/F C/PMAOTS/F 6C/P16MA2OT5S/F C/PMAOTS/F C/PMAOT2S/F C/PMAOTS/F 6C/P5MAOTS/F C/PMAOTS/F231) Vertical fixing for columns (incl drilling)1) Finishing/ Repairing works - roof beams2) ST-2 Shuttering works3) Column shuttering for jacketing Completed1) Tie beam shuttering -10 Nos2)Footing deshuttering & PCC Preparation- 5 Nos3) Pedestal Reft fixing4) Back filling is in progress ( spreading by bobcut)5) PCC done -4 Nos (night)1) Electrical Trench casting done 1) Excavation is in progress1) Curing only1) Chipping of Lift opening2) AC return duct precast slab casting 1Nos3) Lift hook beam fixing4) Lintel beam fixing and column fixingC/P28MA45-Tie beam(10s) & PCC (4)10m3MA4MA48 Ac duct precast cover (1)0.8m3OT7MA41 Tie beam (1)0.3m3ConstraintsConstraintsConstraintsConstraints5m3TOTAL62holdDwg not confirmed18-MarS/F 5C/PMAOT4S/F 9C/P7MA2OTS/F C/PMAOTS/F 6C/P16MA2OT5S/F C/PMAOTS/F C/PMAOT2S/F C/PMAOTS/F 6C/P5MAOTS/F C/PMAOTS/F261) Reinforcement fixing for columns2) Scaffolding for Columns1)ST -2 waist slab huttering completed, Reft works is in progress2)Finishing / Repiaring works3)column concreting near ST4 staircaseCompleted1) PCC laying -1 no2)Reft, Shuttering for Footing 5 Nos3)Pedestal shuttering, Bolt fixing is in progress4)Backfilling is in Progresshold1) Excavation is in progress1) curing onlyCompletedC/P28MA 45 PCC 1no0.5m3MA4MA 48 AC return duct cover0.9m3OT11ConstraintsConstraintsConstraintsConstraintsTOTAL69Manpower shortage for DeshutteringholdDwg not confirmed19-MarLV 85C Excavation startedS/F C/P4MAOTS/F 6C/P6MA2OT2S/F C/PMAOTS/F 6C/P21MA1OT5S/F C/PMAOTS/F C/PMAOTcS/F C/PMAOTS/F C/PMAOTS/F C/P3MAOT2S/F12Column shutter making1) ST2-stair reft, shuttering2)Finishing & Repairing works3)ST2 stair concrete (night) -6 m3completed1) Pedestal reft & shuttering, 2) Backfilling and grading for grade slab3)Deshuttering, bitumin paint applying, HK works4) concreting- M.pit, Fg-2,Pedestal -5 noshold1) excavation stopped due machinary shifted to LV 85 c (80% excavation completed)1) curing onlyReft & shuttering works for BW beams,1) Excavation is in progress (cum progress 65%)(Excavation done for EZ25 also along with LV 85 C)LV85 C - Electrical Trench DetailsC/P34MA45-M.pit wall, Fg, Pedestal9m3MA3MA42- ST2 staircase6.0m3OT9ConstraintsConstraintsConstraintsConstraintsconstraintsTOTAL581) concrete not available for balance fg, pedtlsholdDwg not confirmed1) Electrical trench details not available/ heavy ug utilities20-MarLV 85C Excavation startedS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F23C/P28MA4OT7ConstraintsConstraintsConstraintsConstraintsTOTAL62Manpower shortage for DeshutteringholdDwg not confirmed21-MarS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F23C/P28MA4OT7ConstraintsConstraintsConstraintsConstraintsTOTAL62Manpower shortage for DeshutteringholdDwg not confirmed22-MarS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F234 columns castedcompletedC/P28MA4OT7ConstraintsConstraintsConstraintsConstraintsTOTAL62Manpower shortage for DeshutteringholdDwg not confirmed23-MarS/F C/P7MA2OTS/F 5C/PMAOTS/F C/PMAOTS/F C/P4MAOT1S/F 10C/P13MA1OT3S/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F151) Column Deshuttering, shuttering for bal 2 columns2) Colum Repairing Structure works completed(1)Lintel beam fixingStructure works completed1.Formation leveling started after 2 PM ( morning workers diverted to LV86 columns)2) Road base laying started1)pedestal shuttering, concreting2)Maintanance pit reinforcement(top lift), shuttering3) Tie beam reft fixing, 4) Backfilling & Levelling worksholdholdde-shuttering of slab is in progressyet to startStructure works completedNo worksC/P24MA3OT4ConstraintsConstraintsConstraintsConstraintsTOTAL46No machinaries available, Shortage of ManpowerMason shortage for misc worksholdDwg not confirmedno manpowerpilcap clashing, MEP pipeline, No manpower24-MarMA 41 RCC Columns completedMA 45 Pedestal Casting completedS/F C/P3MAH2S/F C/PMA1H1S/F C/PMAOTS/F C/P5MAOT1S/F 10C/P13MA1OT3S/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F101) 2nos of column concreting2) scaffolding works for roof beam shutteringMA 42 lift finishingStructure works completed1) Road base laying completed2)PCC Preparation is in progrss1)pedestal concreting completed 2)Maintanance pit reinforcement(top lift), shuttering3) Tie beam reft fixing, 4) Backfilling & Levelling worksholdholdDe-shuttering completedExcavation Started -2 hrs jcb workedStructure works completedNo worksC/P21MA2OT7ConstraintsConstraintsConstraintsConstraintsTOTAL40Mason shortage for misc worksholdDwg not confirmedno extra manpower, JCB Not availablePilecap clashing25-MarMA 41 RCC Columns completedMA 45 Pedestal Casting completedS/F C/P3MAH2S/F C/PMA1H1S/F C/PMAOTS/F C/P5MAOT1S/F 10C/P13MA1OT3S/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOT4S/F C/PMAOTS/F C/PMAOTS/FGrade slab preparation worksExcavation with 4 Labours on contractC/PMAOT

TOTAL26-MarMA47 Grade slab completedS/FBalance Gradeslab completedRevised dwg received at eveningC/PMAOT

TOTAL27-MarS/FexcavationC/PMAOTConstraintsConstraintsConstraintsConstraintsTOTALholdDwg not confirmedno extra manpower, JCB Not availablepilecap clashing28-MarMA 44 Footing & Column completedS/F C/P2MAH2S/F C/PMA1H1S/F C/PMAOTS/F 7C/P8MAOTS/F 6C/P3MA3OTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/PMAOT7S/F C/PMAOTS/F C/P6MAOT2S/F131) Roof beam supporting upto 12.00 PM - completedcompletedStructure works completed1) shutter supporting and reinforcement final works2) Board making for Columns3)concreting done at night ( footings)1) Tie beam reft works& shuttering works2) Beam casting done -5 NosholdholdcompletedExcavation in progressStructure works completed1) excavation works for Footing & Trenches2) Road base 2 layers for Big foundation3)PCC laying for 2 NosC/P19MA45 Tie beam5m3MA4MA44 OT12ConstraintsConstraintsConstraintsConstraintsTOTAL48MEP Clearance not raised so concrete not doneTie beam reft re-works due to line pbholdDwg not confirmedgot instruction to down the footing by900m depth below foundation\29-MarS/F C/PMAHS/F C/PMA2H1S/F C/PMAOTS/F 2C/P4MAOT1S/F 6C/P5MA2OT4S/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F 3C/P3MAOT5S/F C/PMAOTS/F C/P6MAOTS/F111) MEP Clearance not givencompleted, (roof beam leveling works is in progress)Structure works completed1) Board making for Columns2) scaffolding for column shuttering, Reft fixing for columns1) Tie beam reft works& shuttering works2) Beam casting done -5 Nos3)maintanace pit repairing worksholdholdcompleted1.Excavation in progress2. Reft pre fabrication is in progressStructure works completed1) excavation works for Footing & Trenches2) Road base 2 layers for Big foundation3)PCC laying for 2 NosC/P18MA 45 Tie beam5m3MA4LV 85c1.5m3OT11ConstraintsConstraintsConstraintsConstraintsTOTAL44MEP Clearance not receivedholdDwg not confirmedgot instruction to down the footing by900m depth below foundation\30-MarMA 45 tie beams completedS/F C/PMAHS/F C/PMA1H2S/F C/PMAOTS/F C/P7MAOT4S/F C/P3MA3OT2S/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F 8C/P3MAOT7S/F C/PMAOTS/F 5C/P6MAOT1S/F131) MEP Clearance not givencompletedStructure works completed1) shuttering for columns2)5 nos of columns casted (night)1) De shuttering - tie beamsTie beam casting - 6 nos2) Maintanance pit repairing works3) Backfilling worksholdholdcompleted1) Reft cage fixing for columns2) Road base layingStructure works completed1)Road base laying2)footing & Trench PCCC/P19m3MA4m3OT16ConstraintsConstraintsConstraintsConstraintsTOTAL52MEP Clearance not receivedholdDwg not confirmed31-MarS/F C/PMAHS/F 3C/PMAHS/F C/PMAOTS/F C/P7MAOT4S/F C/P2MA4OT1S/F C/PMAOTS/F C/PMAOTS/F C/PMAOTS/F C/P3MAOT5S/F C/PMAOTS/F 6C/P7MAOT3S/F91) MEP Clearance not givencompleted1) Lintel Beam fixingStructure works completed1) de shutteing 2) formation preparation for grade slab1) De shuttering - tie beams2) Maintanance pit repairing works3) Backfilling worksholdholdcompleted1) No works due to labour shifted to MA 48 cleaningStructure works completed1)Road base laying2)Reft & shuttering works3) formation PreparationC/P19m3MA4m3OT13ConstraintsConstraintsConstraintsConstraintsTOTAL45MEP Clearance not receivedholdDwg not confirmed