Project Description:The project proposes to replace the bridge that carriesCounty Road 35 (Slab City) over Trout Brook. County Road35 is a two-lane local rural road located in the northernportion of St. Lawrence County located in the Town ofPotsdam. The project corridor begins at a point on CountyRoad 35 approximately 550 feet south of the existingbridge and ends at a point on County Road 35approximately 350 feet north of the existing bridge.Additionally, the project limits extend west on Morley-Potsdam Road approximately 500 feet from the southernintersection of County Road 35 and Morley-Potsdam Road,and east on Morley-Potsdam Road approximately 300 feetfrom the northern intersection of County Road 35 andMorley-Potsdam Road.
Existing Bridge:The existing bridge was originally constructed in 1921 as aconcrete arch and later widened with the addition of steelbeams and a concrete deck. The existing single-spanbridge provides for two lanes of traffic and has a clear-roadway width of approximately 53’-3” between railings.
Project Need and Objectives:St. Lawrence County has identified the need for the projectto address deficiencies of the bridge following review of theBiennial Inspections reports. The bridge exhibits severalstructural deficiencies and is considered scour critical.
Several problem areas and project needs have beenidentified for the project. These needs have been used todevelop the following project objectives:
Correct or eliminate structural deficiencies to improvethe condition of the bridge using cost effectivetechniques while minimizing the cost of futuremaintenance and repair.
Address geometric deficiencies to improve traffic flowand facilitate safer traffic operations.
Improve hydraulic efficiency and reduce the potentialfor erosion and scour by improving the streamalignment.
Meet the objectives above in a socially, economically,and environmentally sensitive manner
Bridge Condition:The existing bridge is in poor condition and exhibits severalstructural deficiencies. The steel girders are exhibiting significant and out of
plane bending has occurred at the diaphragm to girderconnections.
Both abutments exhibit surface spalling, cracking withefflorescence, and deteriorated concrete.
The bridge is misaligned relative to the stream channel.The stream bends sharply immediately upstream of thebridge, continues under the bridge, then bends again tofollow the natural path of the stream. The misalignmenthas resulted in scouring along the face of the endabutment.
Alternatives Considered:The following alternatives were considered as possiblesolutions to the project need:
Alternative 1 – Null / Do Nothing:Has been determined not to satisfy the project needs andprogramming goal, and therefore, has been eliminated fromfurther consideration.
Alternative 2 - Bridge RehabilitationHas been considered and rejected. Rehabilitation would failto address hydraulic deficiencies and the extensiverequired repairs would not be economical.
Alternative 3 – Bridge ReplacementHas been determined to fully satisfy the project needs andprogramming goal. This alternative has been identified asthe preferred alternative.
Right of Way:The project will require acquisition of Right of Way andEasements along portions of the properties adjacent to theproject. The Right of Way acquisitions will be needed forconstruction of the re-aligned intersections. The easementswill be needed the re-alignment of the stream and for futuremaintenance of the stream and bridge. Affected propertyowners will be contacted during final design.
Maintenance & Protection of Traffic:The project will require closure of County Road 35 at thebridge and require traffic to follow an off-site detour for theduration of construction. The two intersections of CountyRoad 35 and Morley-Potsdam Road will remain open totraffic during construction. The detour will be approximately14.4 miles long.
Project Features:The preferred alternative of bridge replacement includesthe following features in the project:
• Completely remove the existing bridge.
• Construct a new bridge consisting of a steel multi-girderand concrete deck superstructure supported onreinforced concrete integral abutments founded onpiles. The bridge will be built to accommodate two 11’-0” travel lanes and 4’-0” shoulders.
• Construct a new cast-in-place concrete wingwall at thesoutheast corner of the new structure.
• Re-align the stream in the vicinity of the bridge toimprove the hydraulic efficiency of the stream byreducing the angle at which the stream approaches thebridge.
• Place stone fill in front of the structure and along thestream banks to prevent erosion and scour.
• Reconstruct the County Road 35 roadway approachesat each end of the bridge along a similar horizontalalignment and a slightly increased vertical profile.
• Reconstruct the two intersections of the Morley-Potsdam Road and County Road 35 to provide saferintersections. The intersections will be re-aligned toform “T” shaped intersections and provide additionalseparation between the intersections and the ends ofthe bridge.
• Construct dry swale stormwater controls and drainageimprovements to comply with environmental permits.
• Install and replace guide railing, signage, and stripingthroughout the corridor to meet current standards.
Funding & Costs:Funding for the construction of the project has yet to beestablished. St. Lawrence County is submitting forconstruction funds under the 2021 BridgeNY process andthe funds will be announced in the Fall/Winter of 2021 Theestimated construction cost for the project is $2.4 million(expected award amount).
Comments, Questions & Concerns:We welcome all your comments, questions and concernswith regards to this project. They may be submitted bycompleting a Public Comment Form and submitting toStantec, or feel free to contact Donald Chambers or TomButler at their respective contacts below.
Donald ChambersSt. Lawrence County Department of HighwaysSuperintendent of HighwaysPhone: (315) 379-1542Email: [email protected]
Tom ButlerStantec Consulting Services Inc.Associate, Project Manager, Transportation InfrastructurePhone: (585) 943-7260Email: [email protected]
Schedule:The project is currently in the preliminary design phase andwill soon continue into final design. Construction has notyet been scheduled. Further communication will be madewhen construction dates have been determined.
BIN 3341700
Town of Potsdam, St. Lawrence County
Bridge Replacement
County Road 35 (Slab City) over Trout Brook
TM# 63.004-1-39.12INSTR.#2011-00004345
(REPUTED OWNER)ALEXANDER K. STEWART
TM# 63.004-1-47
LIBER 1101 PAGE 725
(REPUTED OWNER)
EILEEN SCHAFFER
PAUL SCHAFFER
TM# 63.004-1-6INSTR.#2014-00011845(REPUTED OWNERS)SUSAN J. BERUBE
HAROLD G. BERUBE
TM# 63.004-1-5INSTR.#2010-00000312(REPUTED OWNERS)SUSAN C. QUINELL
ELAINE M. GABENSKI
TM# 63.004-1-3
INSTR.#2011-00002271
(REPUTED OWNER)
BANNA SAMERPITAK
TM# 63.004-1-41
INSTR.# 1998-00011422
(REPUTED OWNER)
THOMAS A. OWNEY
COUNTY ROAD 35
MO
RLEY-P
OTSD
AM R
OAD
EASEMENT
PERMANENT
APPROXIMATE
RE-ALIGNMENT
TROUT BROOK
DRAINAGE DITCH
RECONSTRUCTION
BEGIN PAVEMENT
BOX BEAM GUIDE RAIL
REBATE
BEGIN PAVEMENT
APPROXIMATE GRADING LIMIT
N
General Plan (1 of 2)
OVER TROUT BROOK
REPLACEMENT BRIDGE
BRIDGE OVER TROUT BROOK
COMPLETELY REMOVE EXISTING
(TYP.)
MEDIUM STONE FILL
FOR STORMWATER (TYP.)
GRASS LINED DRY SWALE
MORLEY-POTSDAM ROAD
COMPLETELY REMOVE EXISTING
EXTENSION
DRIVEWAY
26'-0"
74'-10" SPAN
33'-4"
c
WALL TO BELOW GRADE
REMOVE EXISTING RETAINING
RE-ALIGNMENT
MORLEY-POTSDAM ROAD�
ACQUISITION
RIGHT-OF-WAY
APPROXIMATE
EASEMENT
TEMPORARY
APPROXIMATE
11'-0"
11'-0"
4'-0"
LA
NE
LA
NE
SEE GENERAL PL
AN SHEET 2
PLAN S
HEET 2
SEE G
ENERAL
TROUT BR
OOK
TROUT BR
OOK
EASEMENT
APPROXIMATE PERMANENT
(TYP.)
SHLD
R.
ELE
CTRIC FE
NCE
ELECTRIC FENCE
ELECTRIC FENCE
48"
CH
AIN
LINK
WOODEDBRUS
H
BRUSH
WOODE
D
WOODE
D
BRUSH
RESIDENCE
CR 10+00CR 11+00
CR 12+00CR 13+00
CR 14+00
CR 15+00
MP
W 13+00
MP
W 14+00
TB 12+00
TB 10
+00
TB 10
+50
TB 11+00TB 11+50
TB 12+50
TB 1
3+00
TB
13+5
0
TB
14+0
0
TB 14+50
TB 15
+00
6"
PIN
ES
BIN 3341700
Town of Potsdam, St. Lawrence County
Bridge Replacement
County Road 35 (Slab City) over Trout Brook
TM# 63.004-1-2.1
LIBER 1075 PAGE 685
(REPUTED OWNER)
JORETTA CREIGHTON
TM# 63.004-1-5
INSTR.#2010-00000312
(REPUTED OWNERS)
SUSAN C. QUINELL
ELAINE M. GABENSKI
TM# 63.004-1-1.112
INSTR.#1998-00016668
(REPUTED OWNERS)
ANNE BONNO
ROBERT BONNO
TM# 63.004-1-44.112
INSTR.#2006-00005375
(REPUTED OWNER)
THOMAS OWNEY
TM# 63.004-1-3
INSTR.#2011-00002271
(REPUTED OWNER)
BANNA SAMERPITAK
TM# 63.004-1-39.12
INSTR.#2011-00004345
(REPUTED OWNER)
ALEXANDER K. STEWART
TM# 63.004-1-42
INSTR.#2008-00012925
(REPUTED OWNERS)
DIAN M. LICHTY
WILLIAM S. LICHTY
REBATE
BEGIN PAVEMENT
RECONSTRUCTION
BEGIN PAVEMENT
MORLE
Y-P
OTSDA
M R
OAD
N
REBATE
END PAVEMENT
RECONSTRUCTION
END PAVEMENT
REBATE
END PAVEMENT
RECONSTRUCTION
END PAVEMENT
N
General Plan (2 of 2)
RE-ALIGNMENT
MORLEY-POTSDAM ROADc
ACQUISITION
RIGHT-OF-WAY
APPROXIMATE
SEE GENERAL PLAN SHEET 1 FOR STORMWATER (TYP.)
GRASS LINED DRY SWALE
MORLEY-POTSDAM ROAD
COMPLETELY REMOVE EXISTING
MORLEY-POTSDAM ROAD
COMPLETELY REMOVE EXISTING
RE-ALIGNMENT
MORLEY-POTSDAM ROADc
(TYP.)
DRIVEWAY EXTENSION
FOR STORMWATER (TYP.)
GRASS LINED DRY SWALE
GUIDE RAIL
BOX BEAM
ACQUISITION
RIGHT-OF-WAY
APPROXIMATE
26'-0"
26'-0"
11'-0"
11'-0"
4'-0"
SHLD
R.
SHLD
R.
4'-0"
LANE
LANE
PLA
N S
HEET 1
SEE G
ENERAL
ELECTRIC FENCE
BRUSH
MP
W 10+00
MP
W 11+00
MP
W 12+00
MP
W 13+00
WELL
PAD
CONCRETE
GARAGE
STONE RET. WALL
RESIDENCE
RESIDENCE
CR 16+00
CR 17+00
CR 18+00
CR 18+50
CR 18+50
MPE 11+00
MPE 12+00
MPE 13+00
33'-4"
4'-0" 11'-0" 11'-0" 4'-0" 1'-8"1'-8"
TRAVEL LANE TRAVEL LANE
OUT-TO-OUT
DECK SLAB
NEW CONCRETE
SUPERSTRUCTURE
NEW STEEL
4.0%2.0%
TRAVEL LANE TRAVEL LANE
CONTROL STRIP
VEGETATION
2'-3" ASPHALT
6.0%
4.0%2.0%
GRASS (TYP.)
12 MAX.
RAIL (TYP.)
BOX BEAM GUIDE
VARIES 4'-0"11'-0"11'-0"4'-0" VARIES
(THREE-RAIL) (TYP.)
STEEL BRIDGE RAILING
TRAVEL LANE TRAVEL LANE
& DITCH
SIDE SLOPE
& DITCH
SIDE SLOPE
2'-3" TOP SLOPE
2'-0" SHOULDER
2.0%
1.5" ASPHALT TOP COURSE
2" ASPHALT BINDER COURSE
3" ASPHALT BASE COURSE
12" SUBBASE
EXISTING GROUND
1
2 MAX.
(TYP.)
4" TOPSOIL
GRASS (TYP.)
VARIES 11'-0"11'-0" VARIES
2'-3" TOP SLOPE
2'-0" SHOULDER
2.0%
SIDE SLOPE SIDE SLOPESHOULDERSHOULDER
4.0%
CONTROL STRIP
VEGETATION
2'-3" ASPHALT
SHOULDERSHOULDER
4.0% 4.0%
BRIDGE SECTION
ROADWAY RECONSTRUCTION SECTION
COUNTY ROAD 35
ROADWAY RECONSTRUCTION SECTION
MORLEY-POTSDAM ROAD Typical Sections
BIN 3341700
Town of Potsdam, St. Lawrence County
Bridge Replacement
County Road 35 (Slab City) over Trout Brook
12" SUBBASE
EXISTING GROUND
2" ASPHALT BINDER COURSE
3" ASPHALT BASE COURSE
1.5" ASPHALT TOP COURSE
STRIP (TYP.)
VEGETATION CONTROL
3" THICK ASPHALT
(TYP.)
4" TOPSOIL
LOCATION
PROJECT
N
N.T.S.
Potsdam
Potsdam
West
Raquette River
Raquette River
Raquette River
Trout B
rook
Trout Brook
Trout Brook
Morley-Potsdam Rd.
Morley-Pots
dam
Rd.
Morley-Po
tsdam R
d.
Morley-Potsdam Rd.
Barnes Rd.
Wright R
d.
Waite Rd.
Finnegan R
d.
Finnegan R
d.
Sch
oolhouse R
d.
Sch
oolhouse R
d.
Emerso
n Rd.
Emerson
Rd.
Hazen R
d.
Ellis
Rd.
Ellis
Rd.
Baker Rd.
Blanchard R
d.
Rose
n R
d.
Judson Street
Rd.
Judson Street
Rd.A
mes R
d.
Ames R
d.
Wright R
d.
Bagda
d Rd.
Dayton R
d.
Dayton R
d.
Morgan R
d.
Morgan R
d.
Flat R
ock Rd.
Smith
Rd.
Flat Rock Rd.
Barker R
d.
Sullivan Rd.
River Rd.
River R
d.
Bagdad R
d.
Bagda
d Rd.
S Canton Rd.
S Canton Rd.
Sweeney Rd.
Sisso
nville R
d.
Sissonville Rd.
May Rd.
Regan R
d.
Leroy St.
May R
d.
Outer M
ain St.
Main St.
Bay St.
Barrin
gton Dr.
Garfield
Rd.
Finnegan Rd.
Slab City
Detour
BIN 3341700
Town of Potsdam, St. Lawrence County
Bridge Replacement
County Road 35 (Slab City) over Trout Brook
ST. LAWRENCE
66COUNTY
ST. LAWRENCE
35COUNTY
ST. LAWRENCE
35COUNTY
ST. LAWRENCE
35COUNTY
ST. LAWRENCE
34COUNTY
ST. LAWRENCE
34COUNTY
COUNTY
ST. LAWRENCE
138
COUNTY
ST. LAWRENCE
138
COUNTY
ST. LAWRENCE
310
72
56
56
56
345
345
11B
11
11
11