RENTAL DIVISION - DIVISION LOCATION...5.79m to 6.02m 7'-10" 2.39m Door 9' 10" x 8' 2" (3.00 x 2.50m)...
Transcript of RENTAL DIVISION - DIVISION LOCATION...5.79m to 6.02m 7'-10" 2.39m Door 9' 10" x 8' 2" (3.00 x 2.50m)...
RENTAL DIVISION - DIVISION LOCATION
SL100 units #218 to 945
technical drawingS 2020
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 1
1.14m
3'-9"
0.27m
11"
3'-6"
1.06m
11'-1"
3.37m
10.66m
35'-0"
3'-0"
0.92m
2.09m
6'-10"
25'-0"
7.62m
6'-11"
2.10m
8'-0"
2.43m
Lbs Kg Lbs Kg Lbs KgTotal Mass 8752 3970 10604 4810 15000 6804Mass on Axle 7496 3400 9171 4160 14000 6350Mass on Hitch 1257 570 1433 650 3750 1701
Mass SL100 #599 and up
Unladen Standard Equipment Maximum Capacity
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
Mass & Dimensions
Trailer HitchKingPin / Fifth Wheel
Units No. 218 to 945
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 2
8'-3"
2.51m
6'-6"
1.98m
6'-0"
1.83m
4'-1"
1.24m
4.88m
16'-0"
3' 6" to 4' 3"
1.07m to 1.30m
19'-0" to 19'-9"
5.79m to 6.02m
7'-10"
2.39m
Door
9' 10" x 8' 2"(3.00 x 2.50m)
Door
9' 10" x 8' 2"(3.00 x 2.50m)
40'-0"
12.20m
3.66m
12'-0"
2.43m
8'-0"
24'-6"
7.47m
24'-0"
7.32m
37'-6"
11.43m
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
front view
WINDWALL
BANNER (For dimensions, please refer to Banner Book)
Units No. 218 to 945
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 3
23'-0" to 23'-9"
7,01m to 7,24m
13'-3"
4.04m
P11
4.21m
13'-10"
8.10m
14'-5"P11
4.40mT2
3'-6" to 4'-3"
1.07m to 1.30m
0.75m
2'-6"
14'-2"
4.32m
26'-7"
T112'-9"
3.88m
2.13m)
Windwall
Door3' 6" x 7' 0"
(1.07 x
Downstage
0.99m
3'-3"
7.09m
23'-3"
6.11m
20'-0"
1.17m
3'-10"
T214'-6"
4.41m
15'-8"
4.78m
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
Side view
WINDWALL
Units No. 218 to 945
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 4
7'-8"
2.34m
8'-0"
2.45m
24'-11"
7.59m
2.13m
7'-0"
0.91m
3'-0"
7'-0"
2.13m
37'-6"
11.43m
23'-8"
7.21m
27'-0"
8.22m
25'-5"
7.76m
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
Roof view
DOWNSTAGE
Units No. 218 to 945
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 5
Downstage
Upstage
0.86m
2.13m
2'-10"
6.09m
20'-0"
7'-0"
7'-0"
2.13m
7.32m
24'-0"
6'-0"
1.83m
8.86m
29'-1"
2'-3"
0.68m
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
floor view
CAPACITY: 100lbs/ft² (490kg/m²)
Units No. 218 to 945
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 6
5.84m
3.66m
12'-0" 12'-0"
3.66m
19'-2"
1.63m
5'-4"
0.63m
2'-1"
2.91m
9'-7"
2.42m
7'-11"
2.44m
8'-0"
2.42m
7'-11"
1.26m
4'-2"
7.27m
23'-10"
0.03m
1" 6"
0.14m
(455 kg)
1500 lb
1000 lb
(680 kg)
(680 kg)1500 lb1500 lb(680 kg)
Floor stabilizers, extensions and levelling jacks
100 lb(45 kg)
100 lb(45 kg)
100 lb(45 kg)
450 lb(250 kg)
450 lb(250 kg)
450 lb(250 kg)
450 lb(250 kg)
100 lb(45 kg)
1000 lb(455 kg)
1500 lb(680 kg)
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
Dead load ground suppport
FLOOR STABILIZERS, EXTENSIONS AND LEVELLING JACKS
Units No. 218 to 945
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 7
8'-0"
2.44m
12.19m
40'-0"
2.44m
8'-0"
20'-0"
6.11m
Standard Configurations
24'-0"
7.32m
20'-0"
6.11m
24'-0"
7.32m
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
extension platform layouts
PLATFORM
Units No. 218 to 945
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 8
A thorough understanding of the inter-related loadings shown in this rigging plan is needed in order to safely use this mobile stage roof and take full advantage of the many rigging opportunities it offers.This mobile stage roof offers a variety of rigging options with regard to load capacity, placement and type.
There are rigging pipes, trusses, roof rigging points and side overhang rigging beams.
This rigging plan locates and defines these rigging features, includes load capacity for each and describes maximum combinations of loads amongst features.
Take note of exclusions, maximum sub-totals in a group, load balance requirements, maximum lifting capacity of roof and maximum rigging load on roof.
The maximum load on the roof is less than the sum of the maximum load on each rigging feature.
Refer to Operator’s Manual for procedures in regards to proper setup and setup methods of the stage and its options.
RIGGING PLAN 1/4
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
#TRAITEMENT:
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential2015
DESSIN N°
CC 2015 - Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
unit 218 & 219
The information contained in the current document is final and must be considered as such. They are derived from design briefs and summarized to help the user plan rigging configurations safely. It is therefore mandatory that the user follows and respects the capabilities and limitations described herein. Overloading of stage components above their specified capacity may result in structural failure, equipment damage, injury or death. Stageline cannot be held responsible if the user, himself or subcontractors under his supervision, derogate from this document and/or the approved rigging plan. If a desired configuration cannot meet these requirements, the user must contact Stageline to analyse the case and obtain further instructions. Special restrictions and limitations may apply.
Certain authorities may require that a rig configuration plan, signed and sealed by a recognized member of a professional body, be available to allow the stage to be setup on their territory. This document was not intended to and cannot be used or considered as an official document or certificate to serve this purpose. Contact responsible authorities or Stageline for details.
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 9
RIGGING PLAN 2/4
0" 0.00m
-1'-8" 0.51m
2'-2" 0.65m
7'-4" 2.23m
12'-9" 3.88m
17'-11" 5.47m
20'-0" 6.11m
21'-10" 6.64m
-12
'-5
"3
.79
m
-15
'-6
"4
.74
m
12
'-5
"3
.79
m
15
'-6
"4
.74
m
-1
'-0
"0
.30
m
-2
'-0
"0
.61
m
1.8
3m
-6
'-0
"
-4
'-0
"1
.22
m
-4
'-8
"1
.43
m
2.8
6m
9
'-5
"
1
'-0
"0
.30
m
2
'-0
"0
.61
m
3
'-0
"0
.91
m
4
'-0
"1
.22
m
4
'-8
"1
.43
m
6
'-0
"1
.83
m
-1
'-1
1"
0.5
7m
-3
'-9
"1
.15
m
-7
'-6
"2
.29
m
-9
'-5
"2
.87
m
1
'-1
1"
0.5
7m
3
'-9
"1
.15
m
7
'-6
"2
.29
m
-3
'-0
"0
.91
m
-9
"0
.24
m
-2
'-4
"0
.72
m
-3
'-1
1"
1.2
0m
-4
'-8
"1
.43
m
3.1
2m
1
0'-3
"2.1
6m
-7
'-1
"
9
"0
.24
m
2
'-4
"0
.72
m
3
'-1
1"
1.2
0m
4
'-8
"1
.43
m
7
'-1
"2
.16
m
-1
0'-3
"3
.12
m
Truss T1
CL
Truss T2
Truss T1
Truss T2
05/12/2008
MODÈLE
SL 100ASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
DATE:STAGELINE MOBILE STAGE inc.
Tél: (450) 589-1063
Canada J5W 2G9 1-800-26-STAGE
Valérie Roy
www.stageline.com
CONÇU:
VÉRIFICATEUR:
DATE:APPROUVÉ:
DATE:JIG: POIDS (Kg)
#TRAITEMENT:
2015 - All rights reserved, Stageline Mobile Stage inc. ConfidentialC 2015C
DESSIN N°
SL 100
RÉV:
14- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
P5
P14P14'
Rigging pipe
P11'
P11P11'
P10 P9 P8 P7 P6P10'P9'P8'P7'P6'
P12'
P4 P3 P2 P1P4'P3'P2'P1'
P12
P11
ROOF
FLOOR
unit 218 & 219
Rigging Restrictions• MAXIMUM LOAD BEARING CAPACITY: 4800 lb (2177 kg).
All corner posts must be installed and pinned, and telescopic columns pinned and secured.
• Total loads on P12s is 200 lb (91 kg) once all corner posts have been installed and lateral banners are installed. Capacity can be increased to 500 lb (227 kg) if all corner posts are installed and lateral banners are not installed.
• Do not load more than 250 lb (115 kg) on downstage roof pannel, when corner posts are replaced by cylinder locks (Cylinder locks can only be used on the downstage roof panel).
• Load any number of P14s on rigging pipe, symmetrically, at positions shown on diagram, or use P11s.
LIFTING RESTRICTIONS• MAXIMUM ROOF LIFTING CAPACITY: 3800 lb (1725 kg)
• Maximum asymmetric load difference between downstage and upstage roof must not exceed 1550 lb (705 kg) including loads on T1 trusses.
• When lifting, make sure loads are evenly divided between right and left side of roof.
• Total load on T2 and P12s must not exceed 500 lb (227 kg) when using downstage P11s or rigging pipe. Total load can be increased to 850 lb (386 kg) if not using downstage P11s or rigging pipe.
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 10
RIGGING PLAn 3/4
* * Valid for symmetric loads only. In other cases, contact Stageline for assistance.
weight-loading-at-points1.png (Image PNG, 794 × 1123 pixels) - Redime... http://www.hirehop.co.uk/blog/wp-content/uploads/sites/4/2013/09/weigh...
1 sur 1 2015-11-05 11:49
UDL CHARTMAXIMUM LOAD CAPACITY
Point No. Lbs Kg Point No. Lbs Kg
P1, P2, P3 350 160 P12 425 190
P4, P5, P6, P7, P8 250 115 P14 30 13
P9 175 80
P10 90 41
P11 350 160
Load P1Capacity P1
Load P2Capacity P2
Load P3Capacity P3
Load P4Capacity P4
Load P5Capacity P5+ + + + < 1.00Truss T1* * :
Load P6Capacity P6
Load P7Capacity P7
Load P8Capacity P8
Load P9Capacity P9
Load P10Capacity P10+ + + + < 1.00Truss T2* * :
unit 218 & 219
P4
'
-1'-1
1" P
5
0,5
7m
-3'-9
"P3
'
1,1
5m
1'-1
1"P
4 0,5
7m
-7'-6
"P2
'
2,2
9m
-5'-8
"1
,72
m
P3
'
P1
'
-9'-5
"2
,87
m
3'-9
"1
,15
m
P3
7'-6
"2
,29
m
P2
1,7
2m
5'-8
"
P3
9'-5
"2
,87
m
P1
P1
'
3,4
4m
-11
'-3
" P1
11
'-3
"3
,44
m
P8
'
-3'-1
1"
1,2
0m
-9"
0.2
4m
P1
0'
-2'-4
"0
,72
m
P9
'
10
'-3
"P6 3,1
2m
-5'-6
"1
,67
m
P8
'
-7'-1
"2
,16
m
P7
'
-8'-8
"2
,64
m
P7
'
-10
'-3
"3
,12
m
P6
'
-11
'-1
0"
3,6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
,72
m
P9
3'-1
1"
1,2
0m
P8
5'-6
"1
,67
m
P8
7'-1
"2
,16
m
P7
8'-8
"2
,64
m
P7
P6
11
'-1
0"
3,6
0m
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
#TRAITEMENT:
2015
DESSIN N°
CC 2015
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
CLTruss T1
1'-6" 0,46m
CLTruss T2
1'-0" 0,31m
CL
P5P3 P3 P1
Truss T1
P1
CL
P4
'
-1'-1
1" P
5
0,5
7m
-3'-9
"P3
'
1,1
5m
1'-1
1"P
4 0,5
7m
-7'-6
"P2
'
2,2
9m
-5'-8
"1
,72
m
P3
'
P1
'
-9'-5
"2
,87
m
3'-9
"1
,15
m
P3
7'-6
"2
,29
m
P2
1,7
2m
5'-8
"
P3
9'-5
"2
,87
m
P1
P1
'
3,4
4m
-11
'-3
" P1
11
'-3
"3
,44
m
P8
'
-3'-1
1"
1,2
0m
-9"
0.2
4m
P1
0'
-2'-4
"0
,72
m
P9
'
10
'-3
"P6 3,1
2m
-5'-6
"1
,67
m
P8
'
-7'-1
"2
,16
m
P7
'
-8'-8
"2
,64
m
P7
'
-10
'-3
"3
,12
m
P6
'
-11
'-1
0"
3,6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
,72
m
P9
3'-1
1"
1,2
0m
P8
5'-6
"1
,67
m
P8
7'-1
"2
,16
m
P7
8'-8
"2
,64
m
P7
P6
11
'-1
0"
3,6
0m
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
#TRAITEMENT:
2015
DESSIN N°
CC 2015
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
CLTruss T1
1'-6" 0,46m
CLTruss T2
1'-0" 0,31m
CL
P5P3 P3 P1
Truss T1
P1
CL
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 11
When calculating the load on A SL100 truss, use following method.Each truss in the roof must be visualized as 2 trusses put together that share a center point, which in the following example is the P5.
Example: T1 on a SL100. Points from left to right are P1’, P2’, P3’, P4’, P5, P4, P3, P2, P1. We will only verify loads on 1 side of the truss, Meaning P1 thru P5.
Calculation example #1: 1 lighting truss on 2 motors, total uniformly distributed weight of the truss is 500lbs. The motors will be hung from P1. - 250lbs (50% of weight, see UDL chart) / 350 (the capacity of the P1 on the T1 truss) = 0.71 - 0.71 = 71 %, as 1.00 would equal 100 %.
So the T1 truss is at 71 % of its total capacity.
Calculation example #2:1 lighting truss on 3 motors, total uniformly distributed weight of the truss is 500lbs. The motors will be hung from P1, P5, P1. - P1
0.19 x 500 (19% of weight, see UDL chart) / 350 (P1) = 0.95, so this one point will use 95 % of the truss capacity.
- P5 0.62 x 500 (62% of weight, see UDL chart) / 250 (P5) = 1.24, so
this one point will use 124 % of the truss capacity.
Now that we have the loads for both points, we add them together to determine the total load on the truss.
1.24 + 0.95 = 2.19 So the T1 truss is at 219 % of its total capacity, which is overloaded.
Calculation example #3:1 lighting truss on 4 motors, total uniformly distributed weight of the truss is 500lbs. The motors will be hung from P1, P3, P3, P1. - P1
0.13 x 500 (13% of weight, see UDL chart) / 350 (P1) = 0.19, so this one point will use 19 % of the truss capacity.
- P3 0.37 x 500 (37% of weight, see UDL chart) / 350 (P3) = 0.53, so this one point will use 53 % of the truss capacity.
Now that we have the loads for both points, we add them together to determine the total load on the truss. 0.19 + 0.53 = 0.72 So the T1 truss is at 72 % of its total capacity.
RIGGING PLAn 4/4
P3
'
-5'-8
"P2
'
1.7
2m
2.8
7m
-7'-6
"2
.29
m
P1
'
-9'-5
"P1
'
0.5
7m
-11
'-3
"3
.44
m
P4
1'-1
1"
P3
3'-9
"
P3
1.1
5m
2.2
9m
5'-8
"1
.72
m
P2
7'-6
"
P1
P
5
9'-5
"2
.86
m
0.5
7m
-1'-1
1"P
4'
1.1
5m
-3'-9
"P3
'
P1
11
'-3
"3
.44
m
0.7
2m
-8'-8
"P7
'
2.6
4m
-2'-4
"
2.6
4m
8'-8
"P9
'
P7
-9"
0.2
4m
P1
0'
3.1
2m
10
'-3
"P6
-3'-1
1"
1.2
0m
P8
'
-5'-6
"1
.67
m
P8
'
-7'-1
"2
.16
m
P7
'
-10
'-3
"P6
'
3.1
2m
2.1
6m
7'-1
"
P7
-11
'-1
0"
3.6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
.72
m
P9
3'-1
1"
1.2
0m
P8
5'-6
"1
.67
m
P8
P6
11
'-1
0"
3.6
0m
CLTruss T1
1'-6" 0.46m
Valérie Roy
DATE:
CONÇU:
VÉRIFICATEUR:
DATE:APPROUVÉ:
05/12/2008
JIG:
DATE:
POIDS (Kg)
MODÈLE
SL 100ASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
Tél: (450) 589-1063
Canada J5W 2G9 1-800-26-STAGE
#TRAITEMENT:
- All rights reserved, Stageline Mobile Stage inc. Confidential2015C2015C
DESSIN N°
SL 100
RÉV:
14- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
P1
Truss T1
P3P1 P3P5
CL
CLTruss T2
1'-0" 0.31m
CL
unit 218 & 219
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 12
A thorough understanding of the inter-related loadings shown in this rigging plan is needed in order to safely use this mobile stage roof and take full advantage of the many rigging opportunities it offers.This mobile stage roof offers a variety of rigging options with regard to load capacity, placement and type.
There are rigging pipes, trusses, roof rigging points and side overhang rigging beams.
This rigging plan locates and defines these rigging features, includes load capacity for each and describes maximum combinations of loads amongst features.
Take note of exclusions, maximum sub-totals in a group, load balance requirements, maximum lifting capacity of roof and maximum rigging load on roof.
The maximum load on the roof is less than the sum of the maximum load on each rigging feature.
Refer to Operator’s Manual for procedures in regards to proper setup and setup methods of the stage and its options.
RIGGING PLAN 1/4
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
#TRAITEMENT:
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential2015
DESSIN N°
CC 2015 - Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
unit 220 to 449 & 451 to 455
The information contained in the current document is final and must be considered as such. They are derived from design briefs and summarized to help the user plan rigging configurations safely. It is therefore mandatory that the user follows and respects the capabilities and limitations described herein. Overloading of stage components above their specified capacity may result in structural failure, equipment damage, injury or death. Stageline cannot be held responsible if the user, himself or subcontractors under his supervision, derogate from this document and/or the approved rigging plan. If a desired configuration cannot meet these requirements, the user must contact Stageline to analyse the case and obtain further instructions. Special restrictions and limitations may apply.
Certain authorities may require that a rig configuration plan, signed and sealed by a recognized member of a professional body, be available to allow the stage to be setup on their territory. This document was not intended to and cannot be used or considered as an official document or certificate to serve this purpose. Contact responsible authorities or Stageline for details.
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 13
RIGGING PLAN 2/4
0" 0.00m
-1'-8" 0.51m
2'-2" 0.65m
7'-4" 2.23m
12'-9" 3.88m
17'-11" 5.47m
20'-0" 6.11m
21'-10" 6.64m
-12
'-5
"3
.79
m
-15
'-6
"4
.74
m
12
'-5
"3
.79
m
15
'-6
"4
.74
m
-1
'-0
"0
.30
m
-2
'-0
"0
.61
m
1.8
3m
-6
'-0
"
-4
'-0
"1
.22
m
-4
'-8
"1
.43
m
2.8
6m
9
'-5
"
1
'-0
"0
.30
m
2
'-0
"0
.61
m
3
'-0
"0
.91
m
4
'-0
"1
.22
m
4
'-8
"1
.43
m
6
'-0
"1
.83
m
-1
'-1
1"
0.5
7m
-3
'-9
"1
.15
m
-7
'-6
"2
.29
m
-9
'-5
"2
.87
m
1
'-1
1"
0.5
7m
3
'-9
"1
.15
m
7
'-6
"2
.29
m
-3
'-0
"0
.91
m
-9
"0
.24
m
-2
'-4
"0
.72
m
-3
'-1
1"
1.2
0m
-4
'-8
"1
.43
m
3.1
2m
1
0'-3
"2.1
6m
-7
'-1
"
9
"0
.24
m
2
'-4
"0
.72
m
3
'-1
1"
1.2
0m
4
'-8
"1
.43
m
7
'-1
"2
.16
m
-1
0'-3
"3
.12
m
Truss T1
CL
Truss T2
Truss T1
Truss T2
05/12/2008
MODÈLE
SL 100ASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
DATE:STAGELINE MOBILE STAGE inc.
Tél: (450) 589-1063
Canada J5W 2G9 1-800-26-STAGE
Valérie Roy
www.stageline.com
CONÇU:
VÉRIFICATEUR:
DATE:APPROUVÉ:
DATE:JIG: POIDS (Kg)
#TRAITEMENT:
2015 - All rights reserved, Stageline Mobile Stage inc. ConfidentialC 2015C
DESSIN N°
SL 100
RÉV:
14- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
P5
P14P14'
Rigging pipe
P11'
P11P11'
P10 P9 P8 P7 P6P10'P9'P8'P7'P6'
P12'
P4 P3 P2 P1P4'P3'P2'P1'
P12
P11
ROOF
FLOOR
Rigging Restrictions• MAXIMUM LOAD BEARING CAPACITY: 5400 lb (2450 kg).
All corner posts must be installed and pinned, and telescopic columns pinned and secured.
• Total loads on P12s is 425 lb (190 kg) once all corner posts have been installed and lateral banners are installed. Capacity can be increased to 800 lb (363 kg) if all corner posts are installed and lateral banners are not installed.
• Do not load more than 250 lb (115 kg) on downstage roof pannel, when corner posts are replaced by cylinder locks (Cylinder locks can only be used on the downstage roof panel).
• Load any number of P14s on rigging pipe, symmetrically, at positions shown on diagram, or use P11s.
LIFTING RESTRICTIONS• MAXIMUM ROOF LIFTING CAPACITY: 3800 lb (1725 kg)
• Maximum asymmetric load difference between downstage and upstage roof must not exceed 1550 lb (705 kg) including loads on T1 trusses.
• When lifting, make sure loads are evenly divided between right and left side of roof.
• Total load on T2 and P12s must not exceed 500 lb (227 kg) when using downstage P11s or rigging pipe. Total load can be increased to 850 lb (386 kg) if not using downstage P11s or rigging pipe.
unit 220 to 449 & 451 to 455
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 14
RIGGING PLAn 3/4
* * Valid for symmetric loads only. In other cases, contact Stageline for assistance.
weight-loading-at-points1.png (Image PNG, 794 × 1123 pixels) - Redime... http://www.hirehop.co.uk/blog/wp-content/uploads/sites/4/2013/09/weigh...
1 sur 1 2015-11-05 11:49
UDL CHARTMAXIMUM LOAD CAPACITY
Point No. Lbs Kg Point No. Lbs Kg
P1, P2, P3 350 160 P12 800 364
P4, P5, P6, P7, P8 250 115 P14 30 13
P9 175 80
P10 90 41
P11 350 160
Load P1Capacity P1
Load P2Capacity P2
Load P3Capacity P3
Load P4Capacity P4
Load P5Capacity P5+ + + + < 1.00Truss T1* * :
Load P6Capacity P6
Load P7Capacity P7
Load P8Capacity P8
Load P9Capacity P9
Load P10Capacity P10+ + + + < 1.00Truss T2* * :
unit 220 to 449 & 451 to 455
P4
'
-1'-1
1" P
5
0,5
7m
-3'-9
"P3
'
1,1
5m
1'-1
1"P
4 0,5
7m
-7'-6
"P2
'
2,2
9m
-5'-8
"1
,72
m
P3
'
P1
'
-9'-5
"2
,87
m
3'-9
"1
,15
m
P3
7'-6
"2
,29
m
P2
1,7
2m
5'-8
"
P3
9'-5
"2
,87
m
P1
P1
'
3,4
4m
-11
'-3
" P1
11
'-3
"3
,44
m
P8
'
-3'-1
1"
1,2
0m
-9"
0.2
4m
P1
0'
-2'-4
"0
,72
m
P9
'
10
'-3
"P6 3,1
2m
-5'-6
"1
,67
m
P8
'
-7'-1
"2
,16
m
P7
'
-8'-8
"2
,64
m
P7
'
-10
'-3
"3
,12
m
P6
'
-11
'-1
0"
3,6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
,72
m
P9
3'-1
1"
1,2
0m
P8
5'-6
"1
,67
m
P8
7'-1
"2
,16
m
P7
8'-8
"2
,64
m
P7
P6
11
'-1
0"
3,6
0m
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
#TRAITEMENT:
2015
DESSIN N°
CC 2015
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
CLTruss T1
1'-6" 0,46m
CLTruss T2
1'-0" 0,31m
CL
P5P3 P3 P1
Truss T1
P1
CL
P4
'
-1'-1
1" P
5
0,5
7m
-3'-9
"P3
'
1,1
5m
1'-1
1"P
4 0,5
7m
-7'-6
"P2
'
2,2
9m
-5'-8
"1
,72
m
P3
'
P1
'
-9'-5
"2
,87
m
3'-9
"1
,15
m
P3
7'-6
"2
,29
m
P2
1,7
2m
5'-8
"
P3
9'-5
"2
,87
m
P1
P1
'
3,4
4m
-11
'-3
" P1
11
'-3
"3
,44
m
P8
'
-3'-1
1"
1,2
0m
-9"
0.2
4m
P1
0'
-2'-4
"0
,72
m
P9
'
10
'-3
"P6 3,1
2m
-5'-6
"1
,67
m
P8
'
-7'-1
"2
,16
m
P7
'
-8'-8
"2
,64
m
P7
'
-10
'-3
"3
,12
m
P6
'
-11
'-1
0"
3,6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
,72
m
P9
3'-1
1"
1,2
0m
P8
5'-6
"1
,67
m
P8
7'-1
"2
,16
m
P7
8'-8
"2
,64
m
P7
P6
11
'-1
0"
3,6
0m
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
#TRAITEMENT:
2015
DESSIN N°
CC 2015
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
CLTruss T1
1'-6" 0,46m
CLTruss T2
1'-0" 0,31m
CL
P5P3 P3 P1
Truss T1
P1
CL
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 15
When calculating the load on A SL100 truss, use following method.Each truss in the roof must be visualized as 2 trusses put together that share a center point, which in the following example is the P5.
Example: T1 on a SL100. Points from left to right are P1’, P2’, P3’, P4’, P5, P4, P3, P2, P1. We will only verify loads on 1 side of the truss, Meaning P1 thru P5.
Calculation example #1: 1 lighting truss on 2 motors, total uniformly distributed weight of the truss is 500lbs. The motors will be hung from P1. - 250lbs (50% of weight, see UDL chart) / 350 (the capacity of the P1 on the T1 truss) = 0.71 - 0.71 = 71 %, as 1.00 would equal 100 %.
So the T1 truss is at 71 % of its total capacity.
Calculation example #2:1 lighting truss on 3 motors, total uniformly distributed weight of the truss is 500lbs. The motors will be hung from P1, P5, P1. - P1
0.19 x 500 (19% of weight, see UDL chart) / 350 (P1) = 0.95, so this one point will use 95 % of the truss capacity.
- P5 0.62 x 500 (62% of weight, see UDL chart) / 250 (P5) = 1.24, so
this one point will use 124 % of the truss capacity.
Now that we have the loads for both points, we add them together to determine the total load on the truss.
1.24 + 0.95 = 2.19 So the T1 truss is at 219 % of its total capacity, which is overloaded.
Calculation example #3:1 lighting truss on 4 motors, total uniformly distributed weight of the truss is 500lbs. The motors will be hung from P1, P3, P3, P1. - P1
0.13 x 500 (13% of weight, see UDL chart) / 350 (P1) = 0.19, so this one point will use 19 % of the truss capacity.
- P3 0.37 x 500 (37% of weight, see UDL chart) / 350 (P3) = 0.53, so this one point will use 53 % of the truss capacity.
Now that we have the loads for both points, we add them together to determine the total load on the truss. 0.19 + 0.53 = 0.72 So the T1 truss is at 72 % of its total capacity.
RIGGING PLAn 4/4
P3
'
-5'-8
"P2
'
1.7
2m
2.8
7m
-7'-6
"2
.29
m
P1
'
-9'-5
"P1
'
0.5
7m
-11
'-3
"3
.44
m
P4
1'-1
1"
P3
3'-9
"
P3
1.1
5m
2.2
9m
5'-8
"1
.72
m
P2
7'-6
"
P1
P
5
9'-5
"2
.86
m
0.5
7m
-1'-1
1"P
4'
1.1
5m
-3'-9
"P3
'
P1
11
'-3
"3
.44
m
0.7
2m
-8'-8
"P7
'
2.6
4m
-2'-4
"
2.6
4m
8'-8
"P9
'
P7
-9"
0.2
4m
P1
0'
3.1
2m
10
'-3
"P6
-3'-1
1"
1.2
0m
P8
'
-5'-6
"1
.67
m
P8
'
-7'-1
"2
.16
m
P7
'
-10
'-3
"P6
'
3.1
2m
2.1
6m
7'-1
"
P7
-11
'-1
0"
3.6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
.72
m
P9
3'-1
1"
1.2
0m
P8
5'-6
"1
.67
m
P8
P6
11
'-1
0"
3.6
0m
CLTruss T1
1'-6" 0.46m
Valérie Roy
DATE:
CONÇU:
VÉRIFICATEUR:
DATE:APPROUVÉ:
05/12/2008
JIG:
DATE:
POIDS (Kg)
MODÈLE
SL 100ASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
Tél: (450) 589-1063
Canada J5W 2G9 1-800-26-STAGE
#TRAITEMENT:
- All rights reserved, Stageline Mobile Stage inc. Confidential2015C2015C
DESSIN N°
SL 100
RÉV:
14- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
P1
Truss T1
P3P1 P3P5
CL
CLTruss T2
1'-0" 0.31m
CL
unit 220 to 449 & 451 to 455
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 16
A thorough understanding of the inter-related loadings shown in this rigging plan is needed in order to safely use this mobile stage roof and take full advantage of the many rigging opportunities it offers.This mobile stage roof offers a variety of rigging options with regard to load capacity, placement and type.
There are rigging pipes, trusses, roof rigging points and side overhang rigging beams.
This rigging plan locates and defines these rigging features, includes load capacity for each and describes maximum combinations of loads amongst features.
Take note of exclusions, maximum sub-totals in a group, load balance requirements, maximum lifting capacity of roof and maximum rigging load on roof.
The maximum load on the roof is less than the sum of the maximum load on each rigging feature.
Refer to Operator’s Manual for procedures in regards to proper setup and setup methods of the stage and its options.
RIGGING PLAN 1/4
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
#TRAITEMENT:
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential2015
DESSIN N°
CC 2015 - Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
unit 457 TO 945
The information contained in the current document is final and must be considered as such. They are derived from design briefs and summarized to help the user plan rigging configurations safely. It is therefore mandatory that the user follows and respects the capabilities and limitations described herein. Overloading of stage components above their specified capacity may result in structural failure, equipment damage, injury or death. Stageline cannot be held responsible if the user, himself or subcontractors under his supervision, derogate from this document and/or the approved rigging plan. If a desired configuration cannot meet these requirements, the user must contact Stageline to analyse the case and obtain further instructions. Special restrictions and limitations may apply.
Certain authorities may require that a rig configuration plan, signed and sealed by a recognized member of a professional body, be available to allow the stage to be setup on their territory. This document was not intended to and cannot be used or considered as an official document or certificate to serve this purpose. Contact responsible authorities or Stageline for details.
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 17
RIGGING PLAN 2/4
0" 0.00m
-1'-8" 0.51m
2'-2" 0.65m
7'-4" 2.23m
12'-9" 3.88m
17'-11" 5.47m
20'-0" 6.11m
21'-10" 6.64m
-12
'-5
"3
.79
m
-15
'-6
"4
.74
m
12
'-5
"3
.79
m
15
'-6
"4
.74
m
-1
'-0
"0
.30
m
-2
'-0
"0
.61
m
1.8
3m
-6
'-0
"
-4
'-0
"1
.22
m
-4
'-8
"1
.43
m
2.8
6m
9
'-5
"
1
'-0
"0
.30
m
2
'-0
"0
.61
m
3
'-0
"0
.91
m
4
'-0
"1
.22
m
4
'-8
"1
.43
m
6
'-0
"1
.83
m
-1
'-1
1"
0.5
7m
-3
'-9
"1
.15
m
-7
'-6
"2
.29
m
-9
'-5
"2
.87
m
1
'-1
1"
0.5
7m
3
'-9
"1
.15
m
7
'-6
"2
.29
m
-3
'-0
"0
.91
m
-9
"0
.24
m
-2
'-4
"0
.72
m
-3
'-1
1"
1.2
0m
-4
'-8
"1
.43
m
3.1
2m
1
0'-3
"2.1
6m
-7
'-1
"
9
"0
.24
m
2
'-4
"0
.72
m
3
'-1
1"
1.2
0m
4
'-8
"1
.43
m
7
'-1
"2
.16
m
-1
0'-3
"3
.12
m
Truss T1
CL
Truss T2
Truss T1
Truss T2
05/12/2008
MODÈLE
SL 100ASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
DATE:STAGELINE MOBILE STAGE inc.
Tél: (450) 589-1063
Canada J5W 2G9 1-800-26-STAGE
Valérie Roy
www.stageline.com
CONÇU:
VÉRIFICATEUR:
DATE:APPROUVÉ:
DATE:JIG: POIDS (Kg)
#TRAITEMENT:
2015 - All rights reserved, Stageline Mobile Stage inc. ConfidentialC 2015C
DESSIN N°
SL 100
RÉV:
14- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
P5
P14P14'
Rigging pipe
P11'
P11P11'
P10 P9 P8 P7 P6P10'P9'P8'P7'P6'
P12'
P4 P3 P2 P1P4'P3'P2'P1'
P12
P11
ROOF
FLOOR
Rigging Restrictions• MAXIMUM LOAD BEARING CAPACITY: 6500 lb (2948 kg).
All corner posts must be installed and pinned, and telescopic columns pinned and secured.
• Total loads on P12s is 500 lb (227 kg) once all corner posts have been installed and lateral banners are installed. Capacity can be increased to 800 lb (363 kg) if all corner posts are installed and lateral banners are not installed.
• Do not load more than 250 lb (115 kg) on downstage roof pannel, when corner posts are replaced by cylinder locks (Cylinder locks can only be used on the downstage roof panel).
• Load any number of P14s on rigging pipe, symmetrically, at positions shown on diagram, or use P11s.
LIFTING RESTRICTIONS• MAXIMUM ROOF LIFTING CAPACITY: 3800 lb (1725 kg)
• Maximum asymmetric load difference between downstage and upstage roof must not exceed 1550 lb (705 kg) including loads on T1 trusses.
• When lifting, make sure loads are evenly divided between right and left side of roof.
• Total load on T2 and P12s must not exceed 500 lb (227 kg) when using downstage P11s or rigging pipe. Total load can be increased to 800 lb (363 kg) if not using downstage P11s or rigging pipe.
unit 457 TO 945
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 18
RIGGING PLAn 3/4
* * Valid for symmetric loads only. In other cases, contact Stageline for assistance.
weight-loading-at-points1.png (Image PNG, 794 × 1123 pixels) - Redime... http://www.hirehop.co.uk/blog/wp-content/uploads/sites/4/2013/09/weigh...
1 sur 1 2015-11-05 11:49
UDL CHARTMAXIMUM LOAD CAPACITY
Point No. Lbs Kg Point No. Lbs Kg
P1, P2, P3 625 283 P12 800 364
P4, P5 500 227 P14 30 13
P6, P7, P8 250 113
P9 175 79
P10 90 41
P11 350 159
Load P1Capacity P1
Load P2Capacity P2
Load P3Capacity P3
Load P4Capacity P4
Load P5Capacity P5+ + + + < 1.00Truss T1* * :
Load P6Capacity P6
Load P7Capacity P7
Load P8Capacity P8
Load P9Capacity P9
Load P10Capacity P10+ + + + < 1.00Truss T2* * :
P4
'
-1'-1
1" P
5
0,5
7m
-3'-9
"P3
'
1,1
5m
1'-1
1"P
4 0,5
7m
-7'-6
"P2
'
2,2
9m
-5'-8
"1
,72
m
P3
'
P1
'
-9'-5
"2
,87
m
3'-9
"1
,15
m
P3
7'-6
"2
,29
m
P2
1,7
2m
5'-8
"
P3
9'-5
"2
,87
m
P1
P1
'
3,4
4m
-11
'-3
" P1
11
'-3
"3
,44
m
P8
'
-3'-1
1"
1,2
0m
-9"
0.2
4m
P1
0'
-2'-4
"0
,72
m
P9
'
10
'-3
"P6 3,1
2m
-5'-6
"1
,67
m
P8
'
-7'-1
"2
,16
m
P7
'
-8'-8
"2
,64
m
P7
'
-10
'-3
"3
,12
m
P6
'
-11
'-1
0"
3,6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
,72
m
P9
3'-1
1"
1,2
0m
P8
5'-6
"1
,67
m
P8
7'-1
"2
,16
m
P7
8'-8
"2
,64
m
P7
P6
11
'-1
0"
3,6
0m
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
#TRAITEMENT:
2015
DESSIN N°
CC 2015
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
CLTruss T1
1'-6" 0,46m
CLTruss T2
1'-0" 0,31m
CL
P5P3 P3 P1
Truss T1
P1
CL
P4
'
-1'-1
1" P
5
0,5
7m
-3'-9
"P3
'
1,1
5m
1'-1
1"P
4 0,5
7m
-7'-6
"P2
'
2,2
9m
-5'-8
"1
,72
m
P3
'
P1
'
-9'-5
"2
,87
m
3'-9
"1
,15
m
P3
7'-6
"2
,29
m
P2
1,7
2m
5'-8
"
P3
9'-5
"2
,87
m
P1
P1
'
3,4
4m
-11
'-3
" P1
11
'-3
"3
,44
m
P8
'
-3'-1
1"
1,2
0m
-9"
0.2
4m
P1
0'
-2'-4
"0
,72
m
P9
'
10
'-3
"P6 3,1
2m
-5'-6
"1
,67
m
P8
'
-7'-1
"2
,16
m
P7
'
-8'-8
"2
,64
m
P7
'
-10
'-3
"3
,12
m
P6
'
-11
'-1
0"
3,6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
,72
m
P9
3'-1
1"
1,2
0m
P8
5'-6
"1
,67
m
P8
7'-1
"2
,16
m
P7
8'-8
"2
,64
m
P7
P6
11
'-1
0"
3,6
0m
DATE:
MODÈLEASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
SL 100
Tél: (450) 589-1063
1-800-26-STAGE
Valérie Roy
DATE:
CONÇU:
Canada J5W 2G9 DATE:APPROUVÉ:
05/12/2008
JIG:VÉRIFICATEUR:
POIDS (Kg)
#TRAITEMENT:
2015
DESSIN N°
CC 2015
SL 100
RÉV:
14- All rights reserved, Stageline Mobile Stage inc. Confidential- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
CLTruss T1
1'-6" 0,46m
CLTruss T2
1'-0" 0,31m
CL
P5P3 P3 P1
Truss T1
P1
CL
unit 457 TO 945
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION
stageline.com I [email protected]
tech_drawings-l-SL100_no218to945-001-2020 19
When calculating the load on A SL100 truss, use following method.Each truss in the roof must be visualized as 2 trusses put together that share a center point, which in the following example is the P5.
Example: T1 on a SL100. Points from left to right are P1’, P2’, P3’, P4’, P5, P4, P3, P2, P1. We will only verify loads on 1 side of the truss, Meaning P1 thru P5.
Calculation example #1: 1 lighting truss on 2 motors, total uniformly distributed weight of the truss is 1000lbs. The motors will be hung from P1. - 500lbs (50% of weight, see UDL chart) / 625 (the capacity of the P1 on the T1 truss) = 0.8 - 0.8 = 80 %, as 1.00 would equal 100 %.
So the T1 truss is at 80 % of its total capacity.
Calculation example #2:1 lighting truss on 3 motors, total uniformly distributed weight of the truss is 1000lbs. The motors will be hung from P1, P5, P1. - P1
0.19 x 1000 (19% of weight, see UDL chart) / 625 (P1) = 0.3, so this one point will use 30 % of the truss capacity.
- P5 0.62 x 1000 (62% of weight, see UDL chart) / 500 (P5) = 1.24,
so this one point will use 124 % of the truss capacity.
Now that we have the loads for both points, we add them together to determine the total load on the truss.
1.24 + 0.30 = 1.54 So the T1 truss is at 154 % of its total capacity, which is overloaded.
Calculation example #3:1 lighting truss on 4 motors, total uniformly distributed weight of the truss is 1000lbs. The motors will be hung from P1, P3, P3, P1. - P1
0.13 x 1000 (13% of weight, see UDL chart) / 625 (P1) = 0.21, so this one point will use 21 % of the truss capacity.
- P3 0.37 x 1000 (37% of weight, see UDL chart) / 625 (P3) = 0.59, so this one point will use 59 % of the truss capacity.
Now that we have the loads for both points, we add them together to determine the total load on the truss. 0.21 + 0.59 = 0.80 So the T1 truss is at 80 % of its total capacity.
RIGGING PLAn 4/4
P3
'
-5'-8
"P2
'
1.7
2m
2.8
7m
-7'-6
"2
.29
m
P1
'
-9'-5
"P1
'
0.5
7m
-11
'-3
"3
.44
m
P4
1'-1
1"
P3
3'-9
"
P3
1.1
5m
2.2
9m
5'-8
"1
.72
m
P2
7'-6
"
P1
P
5
9'-5
"2
.86
m
0.5
7m
-1'-1
1"P
4'
1.1
5m
-3'-9
"P3
'
P1
11
'-3
"3
.44
m
0.7
2m
-8'-8
"P7
'
2.6
4m
-2'-4
"
2.6
4m
8'-8
"P9
'
P7
-9"
0.2
4m
P1
0'
3.1
2m
10
'-3
"P6
-3'-1
1"
1.2
0m
P8
'
-5'-6
"1
.67
m
P8
'
-7'-1
"2
.16
m
P7
'
-10
'-3
"P6
'
3.1
2m
2.1
6m
7'-1
"
P7
-11
'-1
0"
3.6
0m
P6
'
9"
0.2
4m
P1
0
2'-4
"0
.72
m
P9
3'-1
1"
1.2
0m
P8
5'-6
"1
.67
m
P8
P6
11
'-1
0"
3.6
0m
CLTruss T1
1'-6" 0.46m
Valérie Roy
DATE:
CONÇU:
VÉRIFICATEUR:
DATE:APPROUVÉ:
05/12/2008
JIG:
DATE:
POIDS (Kg)
MODÈLE
SL 100ASSEMBLAGE
ACCESSOIRES STANDARDS
TRAITEMENT:
RÉVISION
700, rue Marsolais
Fax: (450) 589-1711L'Assomption (Québec)
STAGELINE MOBILE STAGE inc.
www.stageline.com
Tél: (450) 589-1063
Canada J5W 2G9 1-800-26-STAGE
#TRAITEMENT:
- All rights reserved, Stageline Mobile Stage inc. Confidential2015C2015C
DESSIN N°
SL 100
RÉV:
14- Tous droits réservés, Stageline Mobile Stage inc. Confidentiel
P1
Truss T1
P3P1 P3P5
CL
CLTruss T2
1'-0" 0.31m
CL
unit 457 TO 945
© 2020 - All rights reserved, Stageline Mobile Stage Inc. Any and all forms of adaptation or reproduction of this document including the plans and drawings, in whole or in part, are strictly forbidden without the written authorisation of Stageline Mobile Stage Inc. Mass may vary depending on options. Technical specifications may change without notice. Stage specifications are subject to change without notice. Figures are nominal.
Drawings may show stage equipped with optional accessories. May be sold separately.
SL100RENTAL DIVISION - DIVISION LOCATION