Reliable Power for Mining industry in DRC
AGENDA
1) Power is critical at every stage of mine’s life
2) Different power solution for mining companies in DRC
3) Interest of rental power solutions
4) Brief introduction to Aggreko
5) Case study
6) Q&A
Power is critical at every stage
- During exploration
- Cost and reliability of power is key for the investment decision
- Construction and commissioning are impacted by power situation
- To secure the full production and revenue from operations
- Extend the operation and profitability
Different type of solutions for mining companies in Katanga
1) Rely on the grid
2) Import power
3) Become a self power producer
4) Rely on the expertise of a rental power company
Interest of Rental Power solutions at Every Stage of a Mine’s Life
Early Explorations
Make even remote locations feasible with Aggreko’s complete & reliable power solution
Feasibly Stages
Why buy when you can receive expert engineering solutions that improve cash flow and avoid capital expenditure?
Construction & Commisioning
Fast-track mine construction and commissioning with rapid, on-time delivery of temporary power
Early Production
Early power, early production, early cash flow
Full Production
Avoid downtime and maintain production targets with safe, continuous power
Mine Expansion
Commercially engineered solutions to support project feasibility and rapid expansion
Ramp-down
Extend the life time and profitability of your project with Aggreko’s flexible solutions
Closure & Rehabilitation
Achieve optimum mine closure performance by minimising costs, fuel consumption, enviromental and social impact
Introduction to Aggreko
• The world’s largest fleet of containerised generator sets
• Over 45 years global experience
• Strategically located international service centres
• Strong network of over 165 service centers in 38 countries
• 4,500 highly skilled and experienced personnel
• Aggreko plc is listed on the London Stock Exchange and is a member of the FTSE-100 index
Introduction to Aggreko
• Local entity established
• 50 MW of installed capacity in DRC
• 3 different customers ( MMG, Ruashi, Banro)
• Pure Rental Approach, or BOOT approach
• Proven capability in working synch with national grid and reduce fuel consumption
Aggreko Equipment in Action
Fuel Management
Aggreko provides a full range of fuel management equipment including:
High capacity fuel tanks
Fuel filtration systems
Highly accurate fuel meters
Fuel heating systems for projects in cold climates
MMG Case study
- MMG production was highly impacted
by unreliable power from grid
- In end 2012 Aggreko and MMG entered
in formal agreement for a 12MW/33KV
power plant in continuous and 4MW/33
KV in standby, all diesel powered
- End of 2013 this agreement has been
extended to a further 8 MW/33 KV
diesel to reach a total of 24 MW
capacity. The entire power is planned to
run at least up to end 2015.
- This capacity can be ramp up of down
depending of quality of power from grid
MMG Kinsevere DRC production Report
Energy delivery August 2014
PLANT NUMBER PLANT 1 PLANT 2 PLANT 3
POWER PER PLANT 0 TO 12 MWH 12 TO 16 MWH 16 TO 24
MWH >24 MWH
EQUIVALENT RUNNING HOURS
<14.47 PER HOUR >14.47 PER HOUR >24 MWH
NUMBER OF RUNNING HOURS
LUMP SUM 1858.898 1.056
EXTRA $ N/A 15 150
Total Production MWh
5059.908
Fuel Consumption August 2014
Total Fuel (Liters) Fuel rate L/MWh
1363830 269.537
MMG: testimonial
MMG request that Aggreko maintain a minimum of 5 generators on line in order to keep power to the site following a trip of the utility supply. Load shedding disconnects the main productive loads at these times and retains light & power to the plant. There is a significant SAFETY benefit in keeping the lights on after these outages. This also allows a restart of the plant very quickly after an outage. Aggreko power is used initially with a swap over to utility power as soon as it becomes available. The ability of the Aggreko station to synchronise additional generators immediately following an outage certainly allows us to ramp up the power draw and get back to producing copper. The primary benefit where production is impacted is any time that Aggreko operates more than these first 5 sets. All MWh produced by these extra generators will be utilised to produce copper. A conservative estimate of copper produced would be one tonne of copper for every 3MWh. The cash flow impact for Kinsevere would be approximately 50% of the LME price for this extra copper produced
Donald Stevens
Senior Electrical engineer
MMG Kinsevere
Sum up, Q&A
- Reliable power generation is critical
for mining companies
- Uncertainty on power quality and
availability from grid and import
- Issues of grid are temporary
- You are expert in mining, not power
producers
- Aggreko is the world and DRC
leader for this type of services
Q&A