Reliable Control Valves Solutions for Industry Leaders …€¦ · Reliable Control Valves...
Transcript of Reliable Control Valves Solutions for Industry Leaders …€¦ · Reliable Control Valves...
Reliable Control Reliable Control Valves Solutions for Valves Solutions for Industry LeadersIndustry LeadersSergio Jimenez
Business Development Manager, RefiningBusiness Development Manager, Refining
Reliable SolutionsReliable SolutionsReliable SolutionsReliable Solutions
[File Name or Event]Emerson Confidential27-Jun-01, Slide 2
Reliable SolutionsReliable SolutionsReliable SolutionsReliable SolutionsAVAILABILITY
� Ensure equipment is always available
SAFETY
� Reduce Risk – Mitigate unplanned shutdowns
PROFITABILITY
� Maximise asset operation and
[File Name or Event]Emerson Confidential27-Jun-01, Slide 3
� Proactive maintenance
� Focus on the right assets by having insight into equipment health
unplanned shutdowns
� Gain insight into the comprehensive health of assets to avoid SHE risks
operation and performance
� Minimise the duration and cost of a planned shutdown
EXPERTISE, TECHNOLOGY & SERVICES
� Improve financial and business performance through effective Enterprise Asset Management
� Provide expertise, resources and methodology
Offshore ProductionOffshore ProductionOffshore ProductionOffshore Production
[File Name or Event]Emerson Confidential27-Jun-01, Slide 4
Water Water InjectionInjection PumpPump RRecirculationecirculationValveValveWater Water InjectionInjection PumpPump RRecirculationecirculationValveValve� Valve Challenges:
– Dirty fluid – Large Particulate– From 1/4” to1/2” size
– Sand and Hydrocarbons (containing H2S)– High Pressure Drops (4500psi / 310bar)– Cavitation– Erosion
� Typical Valve Selection:– Higher Flow Rates: NPS 3 to 6
Globe or Angle valve (EHT/EHAT)– ASME CL2500 or API 10000– Trim: NotchFlo DST or DST Trim– Materials of Construction:
316SST/Duplex SST Body and Trim
– ANSI Class V shutoff
[File Name or Event]Emerson Confidential27-Jun-01, Slide 5
� Process Impact:– Water Injection is used to ensure
continued reservoir productivity – Main Pump damages– Production Losses– Lack of Plant Reliability
Water Water InjectionInjection PumpPump RRecirculationecirculationValveValveWater Water InjectionInjection PumpPump RRecirculationecirculationValveValve� Valve Challenges:
– Dirty fluid – Large Particulate– From 1/4” to1/2” size
– Sand and Hydrocarbons (containing H2S)– High Pressure Drops (4500psi / 310bar)– Cavitation– Erosion
� Typical Valve Selection:– Higher Flow Rates: NPS 3 to 6
Globe or Angle valve (EHT/EHAT)– ASME CL2500 or API 10000– Trim: NotchFlo DST or DST Trim– Materials of Construction:
316SST/Duplex SST Body and Trim
– ANSI Class V shutoff
[File Name or Event]Emerson Confidential27-Jun-01, Slide 6
� Process Impact:– Water Injection is used to ensure
continued reservoir productivity – Main Pump damages– Production Losses– Lack of Plant Reliability
� Process Improvement:– Maintain reservoir pressure– Optimize Production– Improved Controllability– Improved valve Performance– Pump Protection– Improved Unit availability
Fisher Fisher NotchFloNotchFlo DST FeaturesDST Features((Anti Anti CavitationCavitation, Particle Erosion & , Particle Erosion & OutgassingOutgassing))
Fisher Fisher NotchFloNotchFlo DST FeaturesDST Features((Anti Anti CavitationCavitation, Particle Erosion & , Particle Erosion & OutgassingOutgassing))
• The trim uses series of Notches to control the pressure drop of the fluid
• Multistage trim:Pressure staging reduces noise, vibration and cavitation damage
• Can be used for dirty services• Can be used for outgassing
[File Name or Event]Emerson Confidential27-Jun-01, Slide 7
• Can be used for outgassingapplication
• Hardened materials resist erosion damage
• Have been accepted by major process licensor like UOP, Axensand Chevron Lummus Global
• Leakage Class V
Seat ProtectionSeat ProtectionSeat ProtectionSeat Protection
Plug is off the seat before flow begins
protecting the seating
surfaces
[File Name or Event]Emerson Confidential27-Jun-01, Slide 8
Closed Open
surfaces
Success Story Success Story -- Water InjectionWater InjectionSuccess Story Success Story -- Water InjectionWater Injection• Problem:
• Cage guided valve selection:
• Cage plugging
• Wrong leakage shutoff
• Cavitation erosion
• Solution:
[File Name or Event]Emerson Confidential27-Jun-01, Slide 9
• Solution:
• DST Trim selection:
• Cage plugging
• Wrong leakage shutoff
• Cavitation erosion
More than 6 years in operationMore than 6 years in operationwithout issueswithout issues
RichRich Amine Amine LetLetddownown Control Control ValveValveRichRich Amine Amine LetLetddownown Control Control ValveValve� Valve Challenges:
– Erosion due to Outgassing, Cavitation and Flashing
– Vibration due to outgassing of entrained gases in the process streams
– Corrosion due to entrained corrosive gases– Noise– High Pressure Drop– Incorrect sizing
� Typical Valve Selection:– Higher Flow Rates: NPS 1 to 20
Globe valve (ET/EWT)– ASME CL150/300/600– Trim: Whisper I or III, NotchFlo
DST or DST Trim– Materials of Construction: WCC-
HT/316SST Body and Standard/ 316SST Trim
– ANSI Class IV or V shutoff
[File Name or Event]Emerson Confidential27-Jun-01, Slide 10
� Process Impact:– Contactor flooded– Plant Operation disruption– Lack of Reliability– Efficiency of contaminants removal
RichRich Amine Amine LetLetddownown Control Control ValveValveRichRich Amine Amine LetLetddownown Control Control ValveValve� Valve Challenges:
– Erosion due to Outgassing, Cavitation and Flashing
– Vibration due to outgassing of entrained gases in the process streams
– Corrosion due to entrained corrosive gases– Noise– High Pressure Drop– Incorrect sizing
� Typical Valve Selection:– Higher Flow Rates: NPS 1 to 20
Globe valve (ET/EWT)– ASME CL150/300/600– Trim: Whisper I or III, NotchFlo
DST or DST Trim– Materials of Construction: WCC-
HT/316SST Body and Standard/ 316SST Trim
– ANSI Class IV or V shutoff
[File Name or Event]Emerson Confidential27-Jun-01, Slide 11
� Process Impact:– Contactor flooded– Plant Operation disruption– Lack of Reliability– Efficiency of contaminants removal
� Process Improvement:– Improved Contactor control– Reduce variability of the process by
an improved valve Performance– Improved Contactor Efficiency– Increased Throughput– Improve Unit availability
Fisher Whisper III FeaturesFisher Whisper III FeaturesFisher Whisper III FeaturesFisher Whisper III Features• The trim uses series of parallel
passages to ensure jets independence and prevent additional noise.
• Frequency shifting: Higher frequencies are less problematic to hearing and process systems
• Complementary body design to prevent secondary noise sources
[File Name or Event]Emerson Confidential27-Jun-01, Slide 12
prevent secondary noise sources• Characterize trim to accommodate
the cage for different scenarios during travel
CAPTION: Computational fluid dynamics show jet inde pendencefrom three properly spaced holes (left). The same t hree holesspaced too closely (right) show jet interaction, wh ich leads toadditional noise. Being able to predict and control jet interactioncan reduce the noise produced by up to 40 dBA. Corr ect sizing and selection of the appropriate trim allows for th is reduction
AntisurgeAntisurge Control Control ValveValveAntisurgeAntisurge Control Control ValveValve� Valve Challenges:
– Most existing systems designed only for stroking speed
– Valve Performance:– Overshooting– Stability– Accuracy– Fast stroking
– Accessories installation and performance– Multiple vendors
– Compressor Protection– Commissioning Time
� Typical 1 st Stage Compressor Antisurge Valve Selection:
– Higher Flow Rates: NPS 6 to 10 Globe valve (ET/EWT)
– ASME CL2500 or API 10000– Trim: Whisper, Whisper III or
WhisperFlo Trim– Materials of Construction: WCC or
316SST Body and Trim– ANSI Class V shutoff
[File Name or Event]Emerson Confidential27-Jun-01, Slide 13
– Commissioning Time
� Process Impact:– Reduced:
– Throughput– Efficiency– Reliability
– Compressor trips– Production Losses (Profitability Losses)
– Environmental fines
AntisurgeAntisurge Control Control ValveValveAntisurgeAntisurge Control Control ValveValve� Valve Challenges:
– Most existing systems designed only for stroking speed
– Valve Performance:– Overshooting– Stability– Accuracy– Fast stroking
– Accessories installation and performance– Multiple vendors
– Compressor Protection– Commissioning Time
� Typical 1 st Stage Compressor Antisurge Valve Selection:
– Higher Flow Rates: NPS 6 to 10 Globe valve (ET/EWT)
– ASME CL2500 or API 10000– Trim: Whisper, Whisper III or
WhisperFlo Trim– Materials of Construction: WCC or
316SST Body and Trim– ANSI Class V shutoff
[File Name or Event]Emerson Confidential27-Jun-01, Slide 14
– Commissioning Time
� Process Impact:– Reduced:
– Throughput– Efficiency– Reliability
– Compressor trips– Production Losses (Profitability Losses)
– Environmental fines
� Process Improvement:– Improved Controllability– Improved valve Performance– Improved Efficiency– Increased Throughput– Reliable Compressor– Start-Up & Commissioning time
reduction
Fisher Fisher OptimizedOptimized AntisurgeAntisurge ValveValveFisher Fisher OptimizedOptimized AntisurgeAntisurge ValveValve• Controllability
–Designed with open- and closed-loop control in mind– Provides compressor protection in case of surge
– Provides accurate throttling control to maximize output and efficiency
–Control valve dynamics: better integration with compressor control systems
–Scalable dynamics
–Improved gain margins at the system level
• Reliability
[File Name or Event]Emerson Confidential27-Jun-01, Slide 15
Fisher 42” Optimized Antisurge Valve
• Reliability–Ruggedized hardware and vibration resistant mountings
• Maintainability–Standard constructions and standard parts
–Modular, field serviceable designs
–No specialized skills required
• Simplified Commissioning–Predictable, stable valve dynamics
–Factory and field testing
Offshore Critical ApplicationsOffshore Critical ApplicationsOffshore Critical ApplicationsOffshore Critical Applications
[File Name or Event]Emerson Confidential27-Jun-01, Slide 16
O&G Shale Summit
What if you could…What if you could…What if you could…What if you could…
� IMPROVE PRODUCTION by leveraging proven technology
� REDUCE OPERATIONAL COSTS by implementing reliable technology
[File Name or Event]Emerson Confidential27-Jun-01, Slide 17
� IMPROVE PROFITABILITY by increasing the uptime due to the access to reliable control valve service and support thorough Instrument & Valve Service (I&VS)
� MINIMIZE RISK to your personnel by reducing the number of unexpected situations?
Questions?Questions?Questions?Questions?
[File Name or Event]Emerson Confidential27-Jun-01, Slide 18