    Progress Report on PRS Implementation

    The Government of Liberia began the implementation of its Poverty Reduction Strategy (PRS) or Lift Liberia Development agenda in April 2008

    after receiving tremendous support and commitment from its development partners. The hopes of Liberians were high and expectations were

    raised as the successful implementation of the PRS promised to improve their living standards after nearly 15 years of civil war and destruction.

    But after the first year of implementation, the Government reported that progress on the implementation of the Lift Liberia agenda was slow

    relative to potential. This report received a lot of negative press in spite of the boldness of government to tell it like it was. It was the first time,

    in recorded Liberian history, that the government had mustered the coverage to tell the Liberian people that things were going as planned but

    that commitment to reverse course and accelerate implementation of the agenda was still very high on the priority list of the government.

    To demonstrate this commitment, the President, H.E. Ellen Johnson Sirleaf, requested that the Cabinet meet in a technical retreat session to

    review the entire PRS and identify ways to mitigate challenges and devise strategies to accelerate implementation by utilizing available

    opportunities and resources. It was clear from the President that there was no room for compromise on the implementation of the Lift Liberia

    agenda.

    Based on the request from the President, the Liberia Reconstruction & Development Committee (LRDC), the government-partner forum charged

    with the responsibility of coordinating the implementation of the PRS, organized a series of review activities that ended in a Cabinet retreat on

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    2/56

    August 14 & 15, 2009 at the Baptist Theological Seminary in Paynesville. The retreat was held under the theme: prioritizing the priorities and

    chaired by the President. In attendance were the Vice President, the Chief Justice, and a representative of the Speaker of the House of

    Representatives.

    During the technical review sessions, before and during the retreat, technicians from the donor community and government worked out revisedplans and strategies to accelerate implementation. In some cases, deliverables were disaggregated, re-sequenced, and clearly assigned to

    implementing ministries and agencies. As a result of the disaggregation, PRS deliverables increased from 360 to nearly 490. Mechanisms to fast-

    track certain policy and legislative deliverables were also put in place.

    The entire process of review led to the development of 90-day action plans to which each cabinet minister and heads of agencies committed to

    implementing as a demonstration of their commitment to accelerate PRS implementation. A new Pillar structure to support this 90-day action

    planning was also advanced: technical sub-working groups were to meet twice a month to work the details of implementation; Pillar meetings

    would be held once a month to address high level policy issues; and LRDC Steering Committee will meet once a quarter.

    As a result of the vigorous PUSH from the 90-day planning, we are pleased to report that current implementation stands at nearly 90% withunscheduled deliverables being completed as a result of the urgency and attention given the PRS from the highest political authority in Liberia as

    well as support from our development partners.

    Overall Government of Liberia Performance

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    3/56

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    4/56

    Performance by Pillar

    90 Day Scorecard for Ministries and

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    5/56

    Agencies

    Liberia Telecommunication Authority

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Publish Revised Tariff of Non-GSM and CDMAprovision

    Nov. 2009 Preparation for issuance of regulations andpublishing of revised tariff ongoing

    60% 30%

    80%

    Commence Training on Universal Access Program forLTA and MoPT staff

    Oct. 2009 Selection of 25 staff for Universal AccessProgram Seminar completed: 4-day trainingconducted in October 2009

    100% 50%

    80%

    Ministry of Post and Telecom (MoPT)

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Consultative Meeting with Stakeholders on formulationof national postal address system leading to a donorconference

    Oct. 2009 Consultative meeting with stakeholderscompleted; donor conference completed

    100% 50%

    85%Submit ICT policy to Cabinet through Pillar I V Chair Nov. 2009 Draft policy was posted on website. Pillar IV

    retreat on Telecom & ICT Policy held; inputreceived and processed. National consultationand validation of Telecom & ICT Policy is ongoing

    70% 35%

    Total 85%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    6/56

    Liberia TelecommunicationCorporation

    Planned Action Due Date Progress to date % completed 90 day Progress Overall Score

    Obtain infrastructure equipment and technical supportto ensure the sustainable operational efficiency of theLTC in Greater Monrovia

    Nov. 2009 LTC has been made operationally efficient in theGreater Monrovia. LTC is providing mobileinternet service as well as land line phones

    100% 50%

    75%

    Develop a Tender Document for deployment of fiberbackbone

    Nov. 2009 Finalization of LTCs Tender Document ongoing 50% 25%

    Total

    75%

    National Housing Authority

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    100 acres of land for Bomi County will be acquired Nov. 2009 Negotiation has been made for the 100 acres ofland and soliciting for funds to survey the land.

    90% 45%

    63%

    40 low income housing structures will be built to rooflevel Nov. 2009 40 foundations have been constructed onMarshall Road, due to heavy rain elavation wasdelay

    35% 18%

    Total 63%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    7/56

    Ministry of Transportation

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    NTPS to reach President by Nov. 1, 2009 Nov. 2009 NTPS approved by Cabinet on November 23,2009

    100% 25%

    85%Training & Deployment of Research Assistant acrossthe county

    Nov. 2009 Training completed; Research Assistantsdeployed across the country effective Nov. 8 2009

    100% 25%

    Draft Act prepared and stakeholders consultations held Nov. 2009 Draft Act prepared. Consultation scheduled formid December

    40% 10%

    Training needs & training institutions identified &

    contact established Nov. 2009

    Nov. 2009 Training circles for 85 directors/staffs in various

    areas

    100% 25%

    Total 85%

    National Port Authority

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Develop International Shipping and Port Securitycode (ISPS Code)

    Sept. 2009 International Shipping and Port Security Code (ISPSCode) developed and implemented

    100% 25%

    94%Complete the fencing of the entire port to meetinternational port standard

    Sept. 2009 Fence completed 100% 25%

    Construct fence to demarcate pier Sept. 2009 Fence constructed 100% 25%

    Receive response from proposal to privatize NPAmanagement

    Nov. 2009 Candidate selected 75% 19%

    Total 94%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    8/56

    Ministry of Education

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    70 % of payroll audit would be completed Nov. 2009 MOU has been signed with MoE, MoF, CSA andUSAID to fund the payroll. Audit completed inMontserrado and has begun in Bomi and MargibiCounties. Remaining counties will be completedby March 2010.

    65% 5.0%

    51%

    WRTTI teacher housing will be at roof level Nov. 2009 Foundation has been completed; Additionalmaterials required for construction work up to rooflevel have been procured and transported to worksite.

    40% 3.1%

    Identify sources of funding for teachers housingfrom GoL and development partners

    Nov. 2009 GoL and Catalytic Fund identified. EducationSector Plan and regional consultations completedtowards securing funding.

    80% 6.2%

    0.0%

    Distribute tools to the multilateral high schools Nov. 2009 2ndphase of the distribution of tools to vocationalinstitutions under MoE supervision has beencompleted; third quantity of tools has beenprocured by MoE and awaiting distribution

    85% 6.5%

    Acquisition of land for skill training center Nov. 2009 Counties identified and sites selected. Land deedshave been received from one county-(River Gee)

    100% 7.7%

    Complete the revision of CVs of all 15 CEOs and92 DEOs; Develop training modules for EOs andsupervising authorities

    Nov. 2009 Four CEOs have been replaced 40% 3.1%

    Complete Zero Draft of National EducationPolicy and revise all existing policies

    Nov. 2009 Zero draft of the Educational Sector Plan has beencompleted; regional consultations are being held

    100% 7.7%

    Develop M&E tool Nov. 2009 Assessment tools have been developed; ECconsultant is still working on M&E tool.

    0% 0.0%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    9/56

    Develop time-table of implementation Nov. 2009 EC consultant still working on developing time-table for the implementation of the M&E plan

    0% 0.0%

    Orientation of teachers Nov. 2009 Orientation Plan developed but has not beenimplemented due to staff turn over

    0% 0.0%

    Piloting and supervision and monitoring

    curriculum

    Nov. 2009 Revised National Curriculum printed; no further

    action has been taken due to lack of funding

    75% 5.8%

    Distribution of Text Books Nov. 2009 Textbooks have been distributed to 11 counties 0.0%

    Contract with teacher Training Institutes(Universities / Colleges ) will be completed forextension to remaining 9 counties

    Nov. 2009 Contracts for teacher training have been signedwith two universities (University of Liberia andCuttington University)

    80% 6.2%

    Total 51%

    Commission on Higher Education

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Holding of National Education Stakeholder Conferenceto review and adopt revised Higher Education NationalCurriculum

    Nov. 2009 Curricula have been collected from all universitiesand review is in process. Contacts with Educationstakeholders ongoing

    90% 30%

    72%

    Recruitment of additional qualified instructional staff toreplace TAs

    Nov. 2009 MOU signed with Nigerian professors andrecruitment process ongoing

    75% 25%

    Selection of contractors and signing of contracts;commencement of renovation work

    Nov. 2009 Bids published 50% 17%

    72%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    10/56

    General Service Agency

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall ScoreConduct technical and management skills training for125 staff

    Nov. 2009 Conducted technical training for 64 GoL personnelfrom BOB, MoE, CSA, GAC, and GSA.

    65% 16%

    70%Complete zero drafts of Real Estate and PublicBuilding Maintenance policies

    30 Nov. 2009 Real Estate and Public Building MaintenancePolicies draft completed and submitted to cabinet

    95% 24%

    Finalize drafts of Personal Property Policy for Cabinetendorsement

    30 Nov. 2009 Personal Property Policy completed andsubmitted to cabinet

    95% 24%

    Complete Mobile Equipment policies draft and submitto Cabinet for approval

    30 Nov. 2009 A needs assessment was done and zero draftcompleted

    25% 6%

    70%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    11/56

    Liberia Petroleum RefiningCorporation

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Expend and improve petroleum services to all parts ofLiberia using existing roads

    30 Nov. 2009 Done 100% 50.0%

    53%Complete the drafting of TOR for consultant to

    conduct feasibility study to determine the economic

    viability of constructing a new 50k to 100k refinery

    30 Nov. 2009 WB agreed to provide technical assistance for

    the drafting of the TOR

    5% 2.5%

    Total 53%

    National Oil Company of Liberia

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Finalize production sharing contract (PSC) for 2 blocks 30 Nov. 2009 Completed PSC with two (2) International Oil

    Companies: (1) Anadarko Liberia Company (2)

    Hong Kong Tongtai Petroleum International

    100% 100%100%

    Total 100%

    Central Bank of Liberia

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    12/56

    Print and launch National Micro- Finance Policy Oct. 2009 The Microfinance Unit on September 23, 2009presented two documents to the NationalMicrofinance Task Force

    80% 7%

    85%

    Complete the first draft of the regulatory framework for

    Non-Bank Financial institutions (NBFIs)

    Nov. 2009 Completed first draft of the Non Bank Financial

    Institutions

    100% 9%

    Formal request for technical assistance forestablishment of a fast track court will be made to thetwo institutions and follow-up actions implemented inthe direction

    Nov. 2009 Formal request for assistance for theestablishment of a fast tract court will be mad totwo institutions and follow actions implemented inthis direction

    100% 9%

    Preparatory work among the CBL legal team and thecommercial banks lawyers for the establishment of thecourt will be undertaken

    Nov. 2009 Work among the CBL legal team and commercialbanks' lawyers for the establishment of the courtis ongoing

    0% 0%

    Five Staff will be continuing with the 2ndphase of thebank examination course of the Central Bank of Nigeria(CBN); while additional staff will be attending trainingcourses in the USA & Nigeria in August and Oct., 2009.A resident supervisor is expected

    Oct. 2009 The training program for staff of the SupervisionDepartment of the CBL is on course. Thoseslated for the 2nd phase of the bank supervisioncourse are expected to depart for Lagos on Dec.15th, 2009. Currently two staff members of thedepartment are undergoing training in advancedbanking supervision at New York Fed. Three staffmembers are presently undertaking training in riskmanagement in bank supervision in Gambia

    80% 7%

    The list of banks licensed to operate in Liberia will bepublished

    Aug. 2009 List was published in all major newspapers 100% 9%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    13/56

    Encourage commercial banks to encash civil servantchecks, while concluding arrangement with the Ministryof Finance on the direct deposit program of civilservant salary checks, including expansion of bankbranches outside Monrovia to promote wider use ofchecks

    Nov. 2009 MOU signed with Ministry of Finance andCommercial banks on September 18, 2009

    100% 9%

    3rd quarter report will be reported to the ComplianceCommittee

    Sept. 2009 Examination report was presented to theCompliance Committee on November 13, 2009

    100% 9%

    IMF expert to arrive to continue studies on thepossibility of establishing a money and capital marketin the country

    Sept. 2009 Mr. Nicholas Close, the IMF expert was here inOctober and he continued his study. CBLestablished a Treasury Bill Committee that willevolve a frame work by mid-January 2010

    100% 9%

    Move closer toward a consensus on the institutionalsetup for the regulation and supervision of theinsurance sector. This should guide the harmonizationof the legal framework consistent with the institutionalsetup

    Nov. 2009 An international consultant was commissionedwith funding from UNDP to conduct a study on theinsurance sector and develop the legal frameworkfor the regulation and supervision of the insurancesector

    80% 7%

    The CBL will in the next 90 days, receive from the FirstInitiative Group of the World Bank, a draft legalframework on the establishment of a credit referencebureau. The draft will largely inform the CBLs work ondrafting of a legal framework for the credit referencebureau

    Nov. 2009 The CBL has received the draft and it iscustomizing it to suit the Liberian situation

    100% 9%

    Total85%

    Ministry of Internal Affairs

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    14/56

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall score

    Complete final draft of the policy framework forestablishing a national registry and submit to Cabinetfor endorsement

    30 Nov. 2009 Workshop to validate draft policy framework washeld, draft policy framework submitted to Cabinetfor endorsement, policy framework was endorsed

    by Cabinet.

    100% 16.7%

    98%

    Complete draft Act establishing a National RegistryOffice

    30 Nov. 2009 Act establishing the National Registry drafted. 100% 16.7%

    Establish local development forum to complete thedrafting of peace policies and coordinate GOL/Partnersintegrated planning and implementation of communitydriven development project for 3 regions (15 districts)

    30 Nov. 2009 Inter-agency team established and 15 districtsselected. Aide memoir prepared. Meeting are heldon October 1st to finalize proposal for submissionto partners for funding. Funding source identifiedand resource mobilized.

    95% 15.8%

    Complete final draft Capacity Development Plan forLocal Government Officials for submission to IMC onCivil Service Reform for endorsement

    30 Nov. 2009 Assessment was carried out in tree selectedcounties (Bomi, Bong, and River Gee) and MIACentral Office Draft assessment report wasdeveloped Validation ofassessment report was held on 28th November toreview and finalized, Capacity Development Planhas been drafted and will be submitted to the IMC

    95% 15.8%

    Rehabilitation of Maryland County City Hall to becompleted

    Nov. 2009 Reconstruction of Maryland County's, Harper CityHall completed.

    100% 16.7%

    Construction of 10 Peace Huts in four counties in thewestern region

    Nov. 2009 Ten peace huts have been completed in thewestern region

    100% 16.7%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    15/56

    Total 98%

    Liberia Institute of Public

    Administration

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Stakeholders validation of National Civil ServiceTraining Policy

    Nov. 2009 National Civil Service Training Policy is completedand awaiting Cabinet Approval

    95% 95%

    95%Total 95%

    Civil Service Agency

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Submission and Endorsement of MOA, MOL, andMPW functions and mandates review by IMC on CivilService Reform

    31 Oct. 2009 The MoA, MoL and MPW functions and mandatesreviews are still going at the level of the ministriesand Technical Working Group due to constraintsfollowing review of drafts

    25% 1.9%

    72%

    Submission and Endorsement of MOA, MOL, andMPW functions and mandates review by Cabinet

    30 Nov. 2009 Ongoing 50% 3.8%

    Recruit Technical Advisor to structure and draft theoperation framework for a Redirected WorkersProgramme

    30 Sept. 2009 A replacement for Technical Advisor foundthrough CISREP to draft operational frameworkfor a redirected workers program.

    70% 5.4%

    Draft of operational framework for Redirected WorkersProgramme, consultations, consolidation of commentsand development of a zero draft for validation

    30 Nov. 2009 Draft operational framework developed and isbeing reviewed

    75% 5.8%

    Complete the pilot wave for building employee fileswithin 15 Ministries and Agencies

    30 Sept. 2009 Completed the building of employees files. 100% 7.7%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    16/56

    Complete total Monrovia wave for building employeefiles for employees in all additional Ministries/agencies within Monrovia

    30 Nov. 2009 Awareness campaign completed. Employee formsare being completed for files build-up in theadditional ministries and agencies

    70% 5.4%

    Complete the pilot wave for biometrically enrolling andverifying government employees within 15 Ministries/Agencies

    30 Nov. 2009 Employee biometric data enrollment for 15ministries and agencies completed

    100% 7.7%

    Complete system-wide awareness campaign on theemployee file system build-up and the use of thebiometric ID system for the Civil Service

    30 Sept. 2009 Have commenced awareness campaign and haverecommended changes to current system toincorporate Biometric Enrollment and Verificationprocess. Workshop with HR heads ofMinistries/Agencies to complete awareness.

    95% 7.3%

    Develop and Endorse a framework for an interimHRMIS solution for Line Ministries and Agencies

    30 Sept. 2009 Have commenced collaboration with stakeholders.CSA, CISREP, the Biometric System Developer,HR Director of MoH. System specificationsdeveloped, zero draft of framework to follow

    53% 4.1%

    Complete Final Draft of the National Training Policy tobe submitted to the IMC for endorsement 06533829

    30 Nov. 2009 Final draft compiled and relevant parties aremaking necessary input.

    95% 7.3%

    Complete, submit and endorse by the IMC on CivilService Reform the final draft of the National CivilService Human Resources Policy

    30 Nov. 2009 Final draft completed, awaiting review by relevantparties and institutions. MGD working on genderanalysis

    65% 5.0%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    17/56

    Complete and submit a final draft of National CivilService Pension Reform Policy for endorsement by theIMC on Civil Service Reform

    30 Nov. 2009 Final draft on National Civil Service PensionReform Policy complied, legislature implicationmust be considered to move this bill. being vettedthrough the relevant institutions

    65% 5.0%

    Develop and adopt a National Civil Service Outreachand Service Delivery Strategy

    30 Nov. 2009 Final draft of the National Civil Service Outreachis being reviewed for endorsement

    75% 5.8%

    Total 72%

    Ministry of Commerce and Industry

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall ScoreComplete bidding process and design of building forcompleted business registry

    Nov. 2009 Express of Interest (EOI) advertised for renovationof registry building

    30% 8%

    25%Inspection to be conducted by Norwegian RegistrySpecialist

    Nov. 2009 0%

    Putting up a bid for registry building rehabilitation Nov. 2009 EOI advertised for: 40% 10%

    Renovation of registry building

    Procurement of hardware andsoftware

    Procurement of equipment andfurniture

    Renovation of building to commence Nov. 2009 Eviction notice sent to occupant of proposedregistry building. MOU drafted for renovation ofregistry building

    30% 8%

    Total 25%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    18/56

    Ministry of Information, Culture andTourism

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Develop PR campaign to move Freedom of InformationAct in the Legislature

    30 Nov. 2009 Media stakeholders appeared onLift Liberiaradio show, UNMIL Frontage, MICAT RegularPress Briefing to create public awareness aboutthe FOI; a seminar to increase awareness of theFreedom Information Act was held at MICAT;MICATand other media stakeholder continue tohold consultation with members of the NationalLegislature on the importance of the FOI. MICATHalf has begun broadcasting messages on theimportance of the FOI.

    90% 30%

    93%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    19/56

    Draft Communications strategy around publicprogramming.

    30-Nov-09 The Lift Liberia 45-minutes radio program isserving as an excellent conduct to gettinginformation out PRS related programming;Community radio through their association-ALICO-is repairing/rebroadcasting PRS relatedprograms; MICAT in collaboration with ELBC play

    PRS-related messages; MICAT half hour, itsbroadcast and television units produce airprograms on ELBC radio around PRS relatedprograms;

    90% 30%

    Draft Whistle Blower ACT 30 Nov. 2009 A Whistle Blower Working Group was formed

    comprising of MICAT, MOJ, CSA, GAC, MOL,CENTAL, GC, LEITI, and LACC. The workinggroup met several times, including astakeholder's consultative forum early in midOctober. Three committee were form, namely, thedrafting, publicity and budget A draft documenthas been completed. The draft was sent to majorstakeholders for inputs and a major stakeholder'sconsultation is being planned to adopt the draft foronward submission to the President

    100% 33%

    93%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    20/56

    Ministry of State

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Cabinet to Review and adopt National Policy onDecentralization and Local Governance

    30 Nov. 2009 Document before Cabinet for approval 70% 8%

    34%Cabinet Review and adopt National Public SectorReform Policy

    Sept. 2009 Document before Cabinet for approval 85% 9%

    Cabinet to review and adopt the Mandates Functionsand Structures Review of Ministries and Agencies ofGovernment

    30 Nov. 2009 Document before Cabinet for approval 65% 7%

    Presidential appointment and legislative confirmation ofmembers of the Land Commission

    30 Sept. 2009 Members of Land Commission appointed andconfirmed

    100% 9%

    Cabinet Review and endorsement of the Model MDA,National Mineral Policy, Mineral explorationRegulations and Small Scale Mining Regulations

    30 Nov. 2009

    Complete assessment to determine the timing and theprocess by which restructuring will be implemented Nov. 2009

    Conduct assessment of regulatory agencies Nov. 2009

    Develop concrete plan for each SOE, parastatal /agency

    Nov. 2009

    Draft legislation to effect rationalization, dissolution,privatization, or other needed regulatory controls foreach SOE / parastatal / agency

    Nov. 2009

    Total 34%

    Ministry of Finance

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Update and release the PFM regulation and submitregulation to Cabinet for approval

    30 Nov. 2009 PFM regulation is being finalized. Being submittedto Senior Management of MoF to be operationalzed by Nov. 1

    100% 8.3%

    99%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    21/56

    Complete the selection of supplier for Taxadministration software and hire consultant (ProjectManager) to do installation

    30 Nov. 2009 Consultant has been hired; selection of softwarecompleted but contract not awarded

    100% 8.3%

    Complete zero draft of legal paper to eliminate hut tax 30 Nov. 2009 Legal paper completed and submitted to Housefor enactment

    100% 8.3%

    Complete a comprehensive review of the LiberianRevenue Code

    30 Nov. 2009 Revenue code has been reviewed and submittedto the House of Representatives

    100% 8.3%

    Improve and deploy Sun System 01 Sept. 2009 System has been improved and deployed,awaiting launching

    95% 7.9%

    Complete bidding process for the hardware componentof the IFMIS project and present reporting templates toMoF and other stakeholders for approval

    30 Nov. 2009 Bidding process completed 100% 8.3%

    Senior Management of Finance to approve draftAccounting Standard and submit to Cabinet forapproval

    30 Nov. 2009 Draft has been approved by Senior Managementof MoF; to be submitted to next Cabinet

    100% 8.3%

    National Debt Management strategy to be presented toCabinet for approval

    30 Nov. 2009 Debt Management Strategy has been updatedawaiting submission to Cabinet at next meeting

    100% 8.3%

    Complete procurement process for debt managementsystem hardware

    30 Nov. 2009 Final agreement signed and submitted to LegalDepartment

    95% 7.9%

    Run the pilot phase of ASYCUDA for customsautomation

    30 Nov. 2009 First pilot testing completed; final pilot testing tobe completed by Nov. 2

    100% 8.3%

    Begin the process of restructuring customs and InternalRevenue

    30 Nov. 2009 Restructuring process has started with Customsand Internal Revenue

    100% 8.3%

    Complete the signing of an MOU to move from GST toVAT system

    01 Sept. 2009 MOU has been signed 100% 8.3%

    Total 99.2%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    22/56

    Liberia Electricity Corporation

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Establish a power sub-station( including 22 KV switch

    gear, 10 MMVA transformer and high voltage line) inPaynesville

    30 Nov. 2009 1. All 4 (HV/MV) 10MVA transformers

    delivered to sites (Bushrod,Krutown,Capitol&Paynesville) and installed 2. All 22kV

    switchgears delivered to sites and installed

    3.10km MV line installed 4. 2.2km HV line

    installed 5.10km of LV line installed

    90% 7.5%

    53%

    Establish a power sub-station( including 22 KV switch

    gear, 10 MMVA transformer and high voltage line) in

    New Kru Town

    30 Nov. 2009 1. All 4 (HV/MV) 10MVA transformers

    delivered to sites (Bushrod,Krutown,Capitol

    &Paynesville) and installed 2. All 22kV

    switchgears delivered to sites and installed

    3.10km MV line installed 4. 2.2km HV line

    installed 5.10km of LV line installed

    90% 7.5%

    Establish a power sub-station( including 22 KV switch

    gear, 10 MMVA transformer and high voltage line) in

    Capitol Hill

    30 Nov. 2009 1. All 4 (HV/MV) 10MVA transformers

    delivered to sites (Bushrod,Krutown,Capitol

    &Paynesville) and installed 2. All 22kV

    switchgears delivered to sites and installed

    3.10km MV line installed 4. 2.2km HV line

    installed 5.10km of LV line installed

    90% 7.5%

    Establish a power sub-station( including 22 KV switch

    gear, 10 MMVA transformer and high voltage line) in

    Bushrod Island

    30 Nov. 2009 1. All 4 (HV/MV) 10MVA transformers

    delivered to sites (Bushrod,Krutown,Capitol

    &Paynesville) and installed 2. All 22kV

    switchgears delivered to sites and installed

    3.10km MV line installed 4. 2.2km HV line

    installed 5.10km of LV line installed

    90% 7.5%

    Establish 1100, new connections in Monrovia (Central

    Monrovia, Bushrod Island, Sinkor, Congo Town,

    Paynesville)

    30 Nov. 2009 1. A total of 554 customers including Catholic

    Hospital connected to date; on account of the

    variations in the per unit loading of

    customers, a more realistic scenario will be to

    load the power stations to 85% of their

    50%

    4.2%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    23/56

    installed capacity 50%

    Expansion of street Lights for Red Light to 72nd 30 Sept. All Planned interventions done & completed

    100%100%

    8.3%

    Complete installation of 10KM of MV Lines 30 Nov. 2009 All Planned interventions done & completed

    100%100%

    8.3%

    Complete installation of 10KM of LV Lines 30 Nov. 2009 All Planned interventions done & completed

    100%100%

    8.3%

    Finalize new management contract for LEC 30 Nov. 2009 Procurement process in progress 1. RFP and

    Draft Management Contract issued by IFC

    80%

    80%

    6.7%

    Finalize contact to select engineering advisory firm to

    support the rehabilitation of the Mt. Coffee Hydro Plant

    30 Nov. 2009 1.Feasibility leading to complete

    rehabilitation completed; all other activities

    on hold as GOL focus shifted to BRE biomass

    and emergency power for Monrovia 60%

    60%

    5.0%

    Gaps project to further expand distribution network

    in greater Monrovia and environs

    1. Agreement signed between GOL and GON

    2.Management Contractor Secured and

    project just commenced in earnest 80%

    80%

    6.7%

    10-20MW Emergency diesel power for Monrovia in

    lieu of BR biomass power project

    1.Development of project concept completed

    and EOI to potential suppliers to be released

    on Dec. 21,2009 50%

    50%

    4.2%

    Total 82%

    Ministry of Labor

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    24/56

    Finalize and submit recommendation on the MinimumWage for review and endorsement by Cabinet

    30 Nov. 2009 Final report on recommendation on MinimumWage submitted to Cabinet for endorsement

    95% 12%

    86%Finalize and submit National Employment Policy forreview and endorsement by Cabinet

    30 Oct. 2009 National Employment Policy submitted toPresident for Cabinet review and approval

    100% 13%

    Finalize and submit the Revised Labor Code to Cabinetfor review and endorsement

    30 Nov. 2009 Draft 1, 2 and 3 completed, National LaborConference held; validation is expected soon foronward submission to Cabinet

    75% 9%

    Cabinet to endorse National HIV and AIDS WorkplacePolicy

    30 Sept. 2009 Policy submitted to Cabinet, awaiting Cabinetapproval

    100% 13%

    Conduct and finalize field-level data collection for theNational Labor force Survey

    30 Nov. 2009 Validation workshop scheduled for November12, TOT will start on November 30, and will befollowed by training of enumerators onDecember 10, 2009

    75% 9%

    Conduct 4 workshops (2 each) for the Liberia LaborCongress and the Liberia Chamber of Commerce

    30 Nov. 2009 Workshops has been planned; implementationslated for November 15 -20, 2009

    50% 6%

    Promote the creation 10,000 short-term jobs 30, Nov. 2009 About 9000 short term jobs have been createdby MoL/MYS/LME/MPW/LACE

    90% 11%

    Complete the training of employees in the use ofstatistical software

    30 Sept. 2009 Training has been completed and the Statisticalsoftware installed on 9 computers

    100% 13%

    86%

    Liberia Water and SewerCorporation

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    25/56

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Rehabilitate 1 rural city water system Nov. 2009 Contract signed; building under renovation;Ministry of Finance to provide $150,000 for theproject

    50% 17%

    23%

    Rehabilitate 30 existing wells Nov. 2009 Assessment completed on 200 meters ofpipelines 20% 7%

    To complete the awarding of contract for theconstruction of stabilization ponds in Fiamah

    Nov. 2009 To be removed as a 90 day deliverable as perMD

    0

    Total 23%

    Ministry of Lands, Mines, andEnergy

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall ScoreFinalize contract and select firm to extend MVelectricity line from Cote d' Ivoire to 18 communities inthe Southeast through the West Africa power pool

    30 Nov. 2009 Steady progress (negotiations) and on course,not possible in timeframe

    20% 1.3%

    79%Publish and launch the cabinet endorsed NEP 30 Nov. 2009 NEP printed and awaiting launching 95% 6.3%

    Renovate, furnish and staff the office of the RREA 30 Nov. 2009 Office space provided (MOU between MLMEand LEC) Staff recruitment in process by WorldBank, tender document for renovation completed

    60% 4.0%

    Publish a strategic sector plan (SSP) 30 Nov. 2009 Water Supply and Sanitation Policy presented toCabinet, Nov. 23, 2009. Draft SSP completedawaits validation

    80% 5.3%

    Gather data and complete feasibility study on hydro-geological information system

    30 Nov. 2009 First draft completed, soliciting technical imports 75% 5.0%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    26/56

    Complete the awarding of contract on capacity supportfor WATSAN sector reform

    30 Nov. 2009 Technical and financial proposals evaluated andaccepted by AWF/AFDB; negotiation for contactongoing

    95% 6.3%

    Finalize and submit National Mineral Policy for Cabinet

    review and endorsement

    30 Sept. 2009 Draft completed and 28 copies printed for

    submission to cabinet by Friday Dec. 11, 2009

    90% 6.0%

    Finalize and submit Model MDA to Cabinet for reviewand endorsement

    30 Sept. 2009 Model MDA drafted finalized by Consultant &MLME. Will submit to Cabinet by January

    85% 5.7%

    Finalize and submit revised small-scale miningregulations for Cabinet review and endorsement

    30 Sept. 2009 ISLP and MLME finalizing 75% 5.0%

    Operationalize final system operation of the MineralCadastre Information Management System

    30 Nov. 2009 Final hardware/software training ongoing will endin Dec. 18, 2009. MCIMS to be commission byend of Dec. 2009

    85% 5.7%

    Establish two new small-scale mining cooperatives 30 Nov. 2009 Two cooperatives already established; (1) SmithTown Mineral Multi-purpose Cooperative and (2)Barteh-Jam Gold Miner Multi-purposeCooperative Society

    100% 6.7%

    Conduct 4- sensitization workshops to educate smallscale miners regarding sound environmental miningpractice.

    30 Nov. 2009 Three sensitization workshops conducted; onewas conducted in Nimba on Sunday November1, 2009

    75% 5.0%

    Compile due diligence report and complete theevaluation for Western Cluster MDA

    30 Sept. 2009 Clarification documents have been provide by allbidders, evaluation will be completed in twoweeks

    70% 4.7%

    Finalize negotiations with BHP Bilton regarding Kitomo,and Goe Fantro MDAs

    30 Nov. 2009 Negotiations with BHP Bilton ongoing 80% 5.3%

    Finalize negotiations with Putu Iron Ore Mining (SilverStar) regarding Putu MDA

    30 Nov. 2009 Negotiations completed awaiting draft of PutuMOU

    95% 6.3%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    27/56

    Total 79%

    Forestry Development Authority

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Complete the filing of eviction plan for existingprotected areas

    30 Nov. 2009 Developed and awaiting presidential Approval 85% 21%

    61%Hold national consultative workshop on Wild LifeManagement Law

    30 Nov. 2009 Held on October 22, 2009 but the comments arebeing consolidated

    75% 19%

    Complete the drafting of the Wild Life ManagementLaw

    30 Nov. 2009 0%

    Complete the drafting of the gazette act for the LakePiso nature reserve

    30 Nov. 2009 Completed and is being presented to thePresident

    85% 21%

    Total 61%

    Ministry of Agriculture

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

    Need Assessment and Draft Policy on plant andanimal quarantine of review

    Nov. 2009 Draft policy prepared and awaiting printing anddistribution for internal review and stakeholdermeeting

    60% 2.9%

    55%

    Multiplication of Germplasm Nov. 2009 0.0%

    Develop extension policy and strategy. Identify farmersthrough established FFS, CDA, Rural Womenstructure,

    Nov. 2009 Draft extension policy for extension services hasbeen formulated by the office of the deputyMinister for extension and CDA. Copies to be

    30% 1.4%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    28/56

    Conduct training through the FFS approach circulated for inputs from farmers groups and localexperts

    To provide 13 power tillers to women organization Nov. 2009 Rural women identified and undergoing training;13 power tiller delivered in Bong, Nimba and Lofa

    and 1 assigned to peri-urban agriculture riceproduction in Zubah Town in Paynesville

    6% 0.3%

    To distribute 37 rice mills and 23 cassava processingunits by Sept. 3,

    Nov. 2009 Rice mills and cassava processing machinesdistributed to farming groups in Bomi and Gr.Cape Mt. Counties

    80% 4%

    Finalize the plan for 2010 distribution of FSN project Nov. 2009 Consultation with partners ongoing 0.0%

    Reactivation of 50 cooperatives by Dec. 2009;enhance the capacity of 150 FBOs through FFS

    Nov. 2009 Cooperatives are being established in the Lofaand Bomi Counties

    75% 3.6%

    Ongoing data collection to start Sept. 2009. Firstreport will be available on Oct. 2009

    Oct. 2009 Survey in marketplaces led by LISGIS is ongoing.Data collection is ongoing

    70% 3.3%

    Food Security project staff recruitment completed Sept. 2009 Recruitment process ongoing40%

    2%

    Food Security Monitoring System needs to beendorsed by Technical committee

    Oct. 2009 Monitoring system needs to be endorsed bytechnical committee

    50% 2.4%

    Develop tool and village saving and loan product inrural areas with UNDP,

    Nov. 2009 Development of tool and of village saving loanwith experts in micro-credit area is ongoing

    70% 3.3%

    0.0%

    Set criteria for target beneficiaries and identify thecommunities (MoGD)

    Nov. 2009 Beneficiaries selected through the rural womenstructures

    100% 5.0%

    Retrieve document and brief current minister (Min.Logan)

    Sept. 2009 Documents retrieved andMr. Logan has beenbriefed.

    100% 4.8%

    Reconvene stakeholders Nov. 2009 A framework has been developed by workinggroup to assess the capacity of LPMC forevaluation analysis; this frame work has beencirculated to all major stakeholders for input

    10% 0.5%

    Review and update Plan of Action

    Identify funding source (Sept. 2009)

    Develop Document

    Submission to Presidents office

    Follow up with the Standing Committee onConcession and Investment on the status of thefollowing bills:

    Nov. 2009 Discussions with the National Legislature onpassing the Act is ongoing

    70% 3.3%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    29/56

    New Revenue and Tax Code

    New Investment Code

    (with Legislature expected to go for Agric. Break, the90-days expected due date is not realistic)

    Need Assessment, produce the draft policy for review Nov. 2009 Needs assessment ongoing; FAO to locate and

    establish swamps

    60% 2.9%

    Develop the strategy Nov. 2009 Department of Fisheries held stakeholdersworkshop on Aquaculture and Rice; Consultationsto be held on enveloping an aquaculture strategy;draft fisheries law is being reviewed for finalizationand national validation.

    65% 3.1%

    Need Assessment Nov. 2009 Needs assessment ongoing with IITA, ACI-VOCA 40% 1.9%

    Six storage facilities will be constructed in Bong, Lofa,and Nimba Counties

    Nov. 2009 All storage sites earmarked and surveyed;contractor selected.; constructions scheduled tocommence October 15

    70% 3.3%

    Three markets will be constructed in the Bong, Lofa,and Nimba Counties

    Nov. 2009 UNDP and Partners have completed survey ofsites earmarked. Contractors selected

    60% 2.9%

    The 13 Power tillers to women groups Nov. 2009 Training of women groups on utilization of powertiller completed in Bong and Nimba Counties. The13 power tillers officially turned over to MoA,awaiting distribution to women groups

    100% 4.8%

    Total 55.3%

    Ministry of Gender and Development

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

    Source and select training providers for the roll-out ofbusiness development training

    30 Nov. 2009 ToR developed. Awaiting transfer of funds fromUNDP to select and hire trainers. Due to fundingdelays, completion is expected by January 15,2009

    50% 2%

    84%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    30/56

    Finalize the training program in business developmentand criteria for the beneficiaries

    30 Nov. 2009 In cooperation with MoCI, Concept note formarket women BDS program is completed andfinalized; The program will be managed out ofMoGD and will target 1000 market women across4 counties-Margibi, Montserrado, Bong andNimba by June 2010.

    100% 4%

    Develop a database containing the number of men andwomen in senior management positions (Director, Asst.Minister, Deputy Minister, and Minister).

    30 Nov. 2009 Questionnaire developed and distributed among25 MACs; database developed, 10% ofquestionnaires collected and entered intodatabase.

    85% 4%

    Conduct a gender analysis of National Civil ServiceTraining Policy

    30 Nov. 2009 MoGD received the draft National Training Policyfrom CSA on Nov. 6, 2009; Revision of the draft

    National Training Policy has begun.

    65% 3%

    Conduct gender analysis of National Civil ServiceHuman Resources Policy

    30 Nov. 2009 MoGd received the draft Human Resource policyfrom CSA on November 11, 2009; Revision hasbegun.

    60% 3%

    Finalize and submit draft National Gender Policy toCabinet for endorsement

    30 Nov. 2009 National Gender Policy finalized; Cabinet paperprepared; presentation made to Cabinet andPolicy endorsed by Cabinet.

    100% 4%

    Establish Secretariat to manage the implementation ofLiberias Action Plan on UNSCR 1325

    30 Nov. 2009 Recruitment of National Coordinator for1325Secretariat done and to be supported by UNDP;equipments purchased, and Secretariat office setup at MoGD.

    100% 4%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    31/56

    Review the Civil Service Standing Order to includelanguage on sexual harassment in the workplace

    30-Nov-09 Copy of the Civil Service Standing Ordersreceived and document prepared containingsexual harassment language and submitted toCSA to be incorporated into the Standing Order.

    100% 4%

    Establish CEDAW Implementation Committee 30 Nov. 2009 Key Sector Ministries, Agencies, Local andInternational Organizations written; draft ToR andimplementation Plan developed and finalized.

    100% 4%

    Hold consultation meeting with Children ProtectionAgencies (CPA) for the establishment andstandardization of national and community basedstructures;

    30 Sept. 2009 Meeting held with Children Protection Agenciesfor the establishment and standardization ofcommunity based structures

    100% 4%

    Develop terms of reference and training module fornational and community based children structures

    30 Sept. 2009 Terms of reference developed and trainingmodule is being finalized

    100% 4%

    Set standards for the establishment of ChildWellness Committees (CWC)

    30 Sept. 2009 Standards finalized and set for the establishmentof CWCs

    100% 4%

    Establish new CWCs and restructure existing ones; 30 Nov. 2009 Process commenced in Bomi County and wascompleted; mapping and selection ongoing inGbarpolu, Cape Mount and Rural Montserradocompleted. 61 new CWCs established.

    75% 3%

    Finalize procurement and contracting process fortraining providers to develop business developmentand job skills training for girls 16-24

    15 Sept. 2009 Four Service Providers have been contracted:ARC, IRC, LEP, & LEED.

    100% 4%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    32/56

    Develop training business development and job skillscurricula

    30 Oct. 2009 Developed all draft curricula; developed commonlearning objectives; curricula will be pre-testedand finalized during training

    90% 4%

    Finalize the recruitment of 2500 girl who will participatein the training

    30 Nov. 2009 Communities have been mobilized, Survey Firmhired, recruitment strategy developed, recruiting ofgirls to commence December 7, 2009

    60% 3%

    Complete the development of gender sensitivemodules to be included in the training curricula of allsecurity institutions

    30 Nov. 2009 module developed and endorsed by SecurityPillar, module printed and distributed to securityAgencies, TOT workshop held for Security Sectorpersonnel to utilize module

    100% 4%

    Construct 6 storage facilities and 3 markets (UNDP) 30 Nov. 2009 Contracts signed, Construction of storage facilitiesand markets ongoing across three counties;Nimba, Bong & Lofa

    35% 2%

    Distribute power tillers, rice mills and cassavaprocessing units to 43 womens farming groups (WFP& FAO)

    30 Nov. 2009 14 power tillers distributed. Quotation for rice millsand cassava processing units approved by FAOand order has been placed.

    70% 3%

    Disburse micro loans to 1500 rural women in RiverGee, Grand Bassa, Bong, Nimba and Lofa 30 Nov. 2009 Micro-loans disbursed to 1500 rural women inRiver Gee, Bassa, Nimba and Lofa 100% 4%

    Furnish Grand Bassa safe home and hire staff, incollaboration with MoHSW

    30 Nov. 2009 Bassa safe home furnished; staff recruited 100% 4%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    33/56

    Identify construction contractors in Bong, Lofa, Nimbaand River Gee

    30 Nov. 2009 Received and reviewed proposals; completedcontractual agreement forms, and concluding ofcontracts are underway

    65% 3%

    Develop strategy and action plan to reinforce theinitiative to realize 20% women participation in themilitary and various security agencies: administrativereview, approval , and endorsement of strategy

    30 Oct. 2009 Action Plan drafted and submitted foradministrative review and input 85% 4%

    84%

    Ministry of Youth and Sports

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

    Complete and submit Final draft of Youth Act forCabinet endorsement

    30 Nov. 2009 Final draft of the Youth Act completed andsubmitted to Cabinet for endorsement

    100% 25%

    76%Complete Community Youth Resource Center in 3-communities (Logan Town Site)

    30 Nov. 2009 Building Materials procured. Partnering withUNMIL CIMIC ongoing

    50% 13%

    Complete Community Youth Resource Center in 3-communities (Ganta Site)

    30 Nov. 2009 Main center completed. Blue print for multi-purpose court and children playground completed

    75% 19%

    Complete Community Youth Resource Center in 3-communities (Gbarnga Site)

    30 Nov. 2009 Construction of Youth Resource Center ongoing 80% 20%

    Adjusted Average 76%

    Ministry of Planning and EconomicAffairs

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    34/56

    Planned Action Due Date Progress to date % Completed 90 day Score Overall Score

    Identify stakeholders and form steering committee tobegin consultative meeting around National Visioning

    30 Sept.2009

    National Visioning consultative meetingheld

    100% 20%

    75%Brainstorming consultative meeting 15 Oct. 2009 The brainstorming session was held on Sunday

    10/11.100% 20%

    Launch economic growth studies 31 Oct. 2009 Economic Growth Studies launched 100% 20%

    National Vision best practice study tour 30 Nov. 2009 MPEA has made contact with the government ofRwanda and they suggest the 2nd week inDecember for the study tour. MPEA has alsocontacted the UNDP regarding funding the trip.

    50% 10%

    Conduct 4 workshops aimed at building the capacity ofcivil society organizations in terms of making inputsnational, regional, and county development planning

    30 Nov. 2009 Conducting training activities locally. Consented toCSOs participation in the PRS/ CDA monitoringnetwork

    25% 5%

    75%

    Monrovia City Corporation

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    35/56

    Review mandates and functions of the Monrovia CityCorporation

    Nov. 2009 MCC and GC met to review mandates, functions andstructure. The 1973 Act grant the MunicipalGovernment of Monrovia a Charter. The Charterneeds to be developed. A draft of the Charter hasbeen prepared and needs to be vetted.The following activities need to be undertaken:

    Organizing of a stakeholder forum to vet the draftcharter. Design a process to develop or formulate thereorganization of the mandate and functions of theMunicipal Government of Monrovia to fulfill therequirements of the PRS.

    25% 3%

    57%

    Develop strategic plan on the future structure of theMonrovia City Corporation

    Oct. 2009 Have done a diagnostic of MCC-Stakeholdersprofiling, SWOT analysis; the strategic plan to directthe reform process not the future structure of theMCC is contingent upon the finalization of the MCCmandates and functions review.

    40% 4.0%

    Setting up of technical committee comprising of keyagencies. Recruitment of both national andinternational consultants. Draft law review report andnational solid waste policy and strategy. Stakeholder

    validation process

    Nov. 2009 Workshop held on Solid Waste Policy, Law reviewworkshop held. Validation completed

    95% 9.5%

    Completion of land acquisition process for newcemetery to service the Monrovia area

    Nov. 2009 Land was identified and being surveyed. 20% 2.0%

    Identify and secure land for the playgrounds; liaise withthe Ministry of Public Works for technical drawing andplans. Validation by the various committees

    Nov. 2009 Land for 3 playgrounds identified, BOQ forconstruction provided by MPW

    60% 6.0%

    Identify and secure land in West Point for CommunityResource Center

    Nov. 2009 Land identified subject to negotiation for purchase 40% 4.0%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    36/56

    Conduct technical and physical assessment for thethree existing resource centers in Clara Town, Soniwenand Slipway for the three centers

    Nov. 2009 3 sites secured for construction 100% 10.0%

    TOR of the task force to be developed. Nov. 2009 MCC committee to develop task force TOR

    established

    10% 1.0%

    Technical Committee to be constituted by the Ministryof Public Works

    Feasibility study of five slums in Monrovia beginningFeb. 2010 is pending due to lack of sponsorship andfunding

    Nov. 2009 Feasibility study of five slums in Monrovia completed 100% 10%

    Finalize Mt. Barclay land acquisition process andidentify other options (Land) for permanent sanitaryland fill sites

    30 Nov. 2009 Mt. Barclay land identified, undergoing survey toreestablish title. Finalize ToR for EIA EnvironmentalImpact Assessment component and request EIApermit from EPA.

    80% 8.0%

    Adjusted Average

    57%National Investment Commission

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

    Prepare, submit and push passage of legislation tostreamline investment procedures and to level theplaying field between domestic and foreign investors

    1. Letters sent to Business Community for meeting;2.Business Community to send names ofparticipants in said meeting.Consultation with Business Community ongoing.

    85% 17%

    52%

    Reorient the functions of NIC more towards investmentpromotion, facilitation and attraction and realignmanagement structures to meet those objectives.

    Nov. 2009 Updated plan provided to NIC commissioners forreview

    75% 15%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    37/56

    Convene major investment forum Nov. 2009 The chairman attended MRU Forum in October,awaiting funding for a forum in the United KingdomThe chairman toured the sub region to finalizearrangement

    50% 10%

    Establish an SME Business Support Unit Nov. 2009 SME business Support Unit presently exists at heNational Investment Commission. Regional office willbe open; funding from Development still awaitingresponse from budget submitted to the Ministry ofPlanning. Policy document is currently being draftedto consolidate the SME units at MoCI and NIC

    60% 12%

    Investigate the feasibility of developing an SEZ nearBuchanan and other locations ove the medium term

    Nov. 2009 The structure, budget and head count have beenreviewed. Draft law is currently under review bystakeholders.

    75% 15%

    Adjusted Average 52%

    Public Works

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

    Produce a Zoning map of Monrovia and 5 major urbancenters; contract the services of a consultant tocommence the work.

    30 Nov. 2009 TOR completed; tendering begins; recruitment isexpected to take two months

    25% 1.4%

    81%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    38/56

    Complete Zero draft a Zoning Act to strengthen urbaninfrastructure and city planning

    30 Nov. 2009 Legal committee constituted, consultant servicescontracted; and zero draft of Zoning Act prepared

    100% 5.6%

    Complete assessment of 206 miles of primary literate

    roads and prepare tender document for bid process

    30 Nov. 2009 Assessment completed; BOQ prepared; tender

    document prepared, bidding process begunBrewerville-Bopolu;Bopulu-Beleya;Zwedru-Greenville;Saclapea-Loquatuo

    100% 5.6%

    Commence preparatory work to pave of 1 mile of roadfrom Cotton Tree to Bokay Town

    31 Oct. 2009 mobilization completed; Commenced roadconstruction

    100% 5.6%

    Complete 15 miles of all-weather secondary road fromSawmill to Lofa Bridge

    30 Nov. 2009 Assessment, preparation of tender document, biddingprocess ongoing /Royesville Road; BorlolaRoad;Gbatala-Kokoma; DcClarke-Zorodee Clay

    Town; Karloken-Barrobo

    95% 5.3%

    Complete assessment of feeder literate roads andprepare tender documents for bid process

    30 Nov. 2009 Assessment completed, BOQ prepared tenderdocuments prepared, rehabilitation completed

    100% 5.6%

    Complete project assessment of 61 miles ofneighborhood roads that were rehabilitate in Monroviaand submit voucher to the Ministry of Finance for

    payment of contractor

    30 Nov. 2009 Assessment of 61 miles neighborhood roadcompleted, tender documents prepared, biddingprocess begun

    100% 5.6%

    Complete tender document for the pavement of 3 milesof neighborhood roads in Monrovia

    30 Nov. 2009 Assessment completed; tender documents prepared;bidding process begun/15 miles of Monrovia's streets,Logan Town By-pass, Parker paint-Pipeline Neezoe

    100% 5.6%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    39/56

    Complete and launch 3 bridges in rural communities 30 Nov. 2009 10 bridges transported to site in Nyanforla, Sinji andCareysbury, excavation, form and steel workscompleted; 3 bridges launched

    80% 4.4%

    Complete assessment of human resources need of theMinistry of Public Works

    30 Nov. 2009 Recruited 2 HR consultants and a financialmanagement advisors; draft copy of HR needassessment report is 75% complete

    75% 4.2%

    Complete training for 16 road maintenance engineersand 22 data management staff

    30 Nov. 2009 20 road maintenance staff trained in labor-based roadmaintenance; 21 trained in contract management androad supervision; and 12 trained in changemanagement and systems administration.

    90% 5.0%

    Construct 1 groundwater-fed system in Monrovia 30 Nov. 2009 JICA completed 1 groundwater fed system at MTA toserve the community

    100% 5.6%

    Construct 30 boreholes fitted with hand pumps in ruralcommunities

    30 Nov. 2009 27 boreholes constructed in Lofa, Bong, Nimba andMontserrado

    90% 5.0%

    Construct 45 hand dug wells fitted with hand pumps inrural communities

    30 Nov. 2009 58 hand-dug wells constructed in Montserrado, CapeMount & Gbarpolu

    100% 5.6%

    Conduct assessment for spring catchment system 30 Nov. 2009 Assessment completed on 150 springs in Nimba and

    Lofa counties

    100% 5.6%

    Construct 80 bio-sand filters in inaccessible ruralcommunities

    30 Nov. 2009 122 bio-sand filters have been constructed in inseveral counties including Gbarpolu and Maryland

    100% 5.6%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    40/56

    Prepare technical specifications , bill of quantities, costestimate for rehabilitation of 5 Public buildings

    Assessment completed on Five (5) public buildingsbehind the Executive Mansion; BOQs done forExecutive Pavilion and NHSB

    100% 5.6%

    Design and implement a road safety initiative including

    side brushing and fabricate and install road safety signson city streets

    223 Road safety signs fabricated and installed by

    CHICO

    100% 5.6%

    Adjusted Average 81%

    Special Security Service

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

    Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure

    30 Nov. 2009 Final draft of the SOP for SSS is completed.Administration has endorsed the draft SOP;Personnel have access to SOP via the Computer lab.Hard copies are printed.

    100% 25%

    95%

    Complete the execution and monitoring of the Conceptof Operation (Con-Ops) for the SSS

    30 Nov. 2009 Draft of the Con-Ops is completed; copies circulatedto network cell were circulated and final draft prepared

    100% 25%

    Complete the inclusion of gender, disabilities, andenvironmental sensitive modules in the trainingcurriculum

    30 Nov. 2009 Gender and disabilities sensitive modules have beenfully incorporated in the training curricula of SSS 80% 20%

    Complete the preparation of a deployment plan 30 Nov. 2009 The deployment plan (County) is now completed;copy of plan has been submitted to the PTA andexecution is in progress

    100% 25%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    41/56

    Adjusted Average 95%

    Liberia National Police

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

    Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure

    30 Nov. 2009 Change management committee met and passed onthe SOP. Final draft has been produced andapproved.

    100% 100%

    100%

    100%

    Governance Commission

    Planned Action Due Date Progress to date % Completed 90 dayProgress

    Overall Score

    Launch and operationalize the Land Commission 30 Nov. 2009 Office space renovated. Technical team recruited.Retreat held

    98% 16%

    93%Complete the mandates and functions review in threeministries: Ministry of Agriculture, Ministry of Labor andMinistry of Public Works

    30 Sept. 2009 Review Evaluation Panel drawn (GC, CSA, LIPA,CSO),

    75% 13%

    MoA- report reviewed and recommended for GCsNo Objection to the report. GC responded positively

    and forwarded to CSA for submission to IMC forapproval.

    MPW draft report is being review by TWG and later bythe Review Evaluation Panel

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    42/56

    MoL- contacted to review and finalize it MRF report

    MICAT- added to group. Draft report presented toTWG for comments, preparing final report forsubmission to the Review Evaluation Panel

    Cabinet to review and adopt National Policy onDecentralization and local Governance

    30 Nov. 2009 Meeting held with Cabinet on October 26, 2009,awaiting Cabinet final approval

    98% 16%

    Cabinet Review and adopt National Public SectorReform Policy

    30 Nov. 2009 National Public Sector Reform Policy approved byCabinet.

    100% 17%

    Cabinet to review and adopt the Mandates Functionsand Structures Review of Ministries and Agencies ofGovernment

    30 Nov. 2009 Meetings held with Cabinet for endorsement. 85% 14%

    President appointment and legislative confirmation of

    members of the Land Commission

    30 Sept. 2009 Member of the Land Commission appointed by

    President and confirmed by Legislative

    100% 17%

    Adjusted Average 93%

    Ministry of Justice

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    43/56

    Commence the implementation of the strategic planformulated to address capacity development issueswithin the legal system

    30 Nov. 2009 validation mtg held on MoJ strategic plan; 2departments have completed implementation plansunder the strategic plan; UNDP held action planningmtg with prosecution; 2 trainings held for 170 citysolicitors and police; 35 prosecutors (15 cty attorneys,4 assistant cty attorneys, 16 MoJ/SGBV crime unit

    staff); hired Liberian professionals for each of thesecurity sectors

    90% 9%

    72%

    Produce a full listing of prioritized infrastructure andequipment needed by all legal institutions

    30 Nov. 2009 Listing completed for LNP, BIN, NFS & BCR 83% 8%

    Complete the assessment and revision of existingCrime Policy

    30 Nov. 2009 need information from LNP 0%

    Complete the set up of a working group to compriseMIA, MoJ, Judiciary & MICAT to begin open dialogueon legal matters at the local level

    30 Nov. 2009 Working group has been created to develop publiceducation campaign; held initial meeting

    100% 10%

    Complete the joint action plan for the child justiceprogram

    30 Nov. 2009 Completed: joint action plan has been signed by allpartners - no final document yet

    95% 10%

    Develop a pilot program to track and profile criminals 30 Nov. 2009 started pilot at MCP and national palace ofcorrections, compiling photos and bio-data on alldetainees; have full dossier on MCP; and trying toreplicate in other prisons

    33% 3%

    Complete needs assessment of inmates to determinepsychological needs and begin the designing oftreatment plan

    30 Nov. 2009 needs assessment at MCP progressing, being doneby Mr., Sylla (psychotherapist) from MYS

    50% 5%

    Commence the implementation of a pilot project toreduce the lengthen of pre-trial detention 30 Nov. 2009 launch of magistrate sitting program at MCP toconduct pre-trial hearings; collaborating with judiciaryand civil society to define approach; initiate design ofpublic education campaign on release of pre-traildetainees

    100% 10%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    44/56

    Commence the implementation of plan intended toprotect vulnerable groups (women, children, elderly &the disable) who come in contact with the law

    30 Nov. 2009

    ongoing work of Joint Program for Children; SGBVunit continues to prosecute rape cases, and totarget prevention in communities where women areabused; LNP women and children protection unitsubmitted proposal to create accommodation roomfor pregnant female detainees; MOGD developedguidelines on women and disabled persons that arebeing embedded into MoJ policies particularlycorrections; and UNIFEM contributing funds towork with women in prisons

    67% 7%

    Complete the setting up of a task force to develop anational framework for the practice of informal,customary justice system that conforms to humanrights standard, and the rule of law

    30 Nov. 2009 Legal working group held 3rd meeting in Zwedru,UNMIL is drafting report in preparation for nationalconference on moving forward to harmonizetraditional justice with formal system

    100% 10%

    Adjusted Average 72%

    Bureau of Correction

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure

    30 Nov. 2009 Draft of the SOP is presently completed; internalvalidation is completed. SOP has been compiled andapproved.

    100% 33%

    93%Complete the inclusion of gender, disabilities, andenvironmental sensitive modules in the trainingcurriculum

    30 Nov. 2009 Gender and disabilities sensitive modules have beenincorporated in the training curricula of Corrections

    80% 27%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    45/56

    Complete the preparation of a deployment plan 30 Nov. 2009 The deployment plan is complete. Final copy will besubmitted to the PTA by 29 September 2009.

    100% 33%

    Adjusted Average 93%

    Bureau of Immigration andNaturalization

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Complete the preparation of a deployment plan 30 Nov. 2009 Draft of deployment plan has been completed; internalvalidation is completed. Final copy is completed.

    100% 33%

    93%

    Complete the inclusion of gender, disabilities, andenvironmental sensitive modules in the trainingcurriculum

    30 Nov. 2009 Gender and disabilities sensitive modules have beenincorporated into the training curriculum of BIN

    80% 27%

    Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure

    30 Nov. 2009 Draft of SOP is done; internal validation done; finalcopy is ready

    100% 33%

    Adjusted Average 93%

    Liberia National Fire Service

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure

    30 Nov. 2009 Final draft of SOP is completed. Hard copy has beensubmitted to the PTA.

    100% 50.0%

    100

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    46/56

    Complete the preparation of a deployment plan 30 Nov. 2009 Deployment plan is also completed and hard copysubmitted to the PTA

    100% 50.0%

    %Adjusted Average 100%

    Bureau of Customs

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Conduct operational needs assessment 30 Nov. 2009 Draft report of the needs assessment is completed.Validation completed and final copy submitted

    100% 100%

    100%

    100%

    National Security Agency

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Complete the inclusion of gender, disabilities, andenvironmental sensitive modules in the trainingcurriculum

    30 Nov. 2009 Gender and disabilities sensitive modules have beenincorporated into the training curriculum of NSA

    80% 80%

    80%

    80%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    47/56

    Environmental Protection Agency

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Complete the development of environmental sensitive

    modules to be included in the training curricula of allsecurity institutions

    30 Nov. 2009 EPA is drafting its environment sensitive modules.

    Outline and narrative is being finalized

    80% 80%

    80%80%

    Disabilities Commission

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Complete the development of disabilities sensitivemodules to be

    30 Nov. 2009 Security Pillar has endorsed the final copy of thedisabilities sensitive module. Hard copies have beencirculated to the relevant security institutions. TOTworkshop held.

    100% 100%

    100%

    100%

    Ministry of Health & Social Welfare

    Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score

    Meet with JFK administration on the establishment ofthe Lab Tech program, and submit report/minutes

    30-Sep Committee established, 2 meetings held. Equipmentassessment completed and sent to funding committee.Requested TA from WHO to develop curriculum.

    100% 1.2%

    75%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    48/56

    Establish Technical Working Group (TWG), hold thefirst meeting to develop action plan on Leadership andManagement Training program, and submitreport/minutes

    20-Aug Technical Working Group established, first meeting todevelop action plan held, report and minutessubmitted; completed

    100% 1.2%

    Solicit Technical Assistance from partners to work withTWG on leadership and management program

    15-Sep TWG established. Meetings held to determinerole/necessity of the TA. Requested TA from WHO toassist with assessment & development of leadership &management. TA expected week of November16.

    100% 1.2%

    Review and adapt existing leadership & managementtraining modules

    15-Oct Document currently under review by LIPA 50% 0.6%

    Produce revised draft leadership and managementtraining modules

    30-Oct Pending review and revision of module 0% 0.0%

    0.0%

    Validate and print leadership & management revised

    modules

    30-Nov Pending review and revision of module 0% 0.0%

    Conduct HR census and present initial statistical report 30-Oct completed 100% 1.2%

    Complete discrete choice analysis survey and submitreport

    30-Nov Focus group and interviews completed. TA's arecurrently developing questionnaires for the study. Thisactivity will be carried forward to the 2nd 90 Daydeliverables work plan as implementing the survey anddata analysis is not feasible before the end of the year

    40% 0.5%

    Develop draft human resource policy 30-Dec Consultant approved. Negotiating start date. ThisDeliverable will also be postponed to the 2nd 90 Daywork plan, as reports from the HR studies are neededto inform the policy development process.

    25% 0.3%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    49/56

    Provide refresher training for 150 traditionally trainedmid wives in home based LSS

    30-Nov 100 trained (Sept). Additional 100 trained in October. 100% 1.2%

    Train 250 health workers in integrated BPHScurriculum

    30-Oct Exceeded target. 310 trained in September. 24additional HW trained in October.

    100% 1.2%

    Train 250 health workers in SOPs 30-Nov Target exceeded. 923 completed training inMontserrado, Bomi, Cape Mount, Gbarpolu, GrandKru, MD, River Gee. Training on going in remaining 8counties.

    100% 1.2%

    Train 27 HIV/AIDS Counselors 30-Nov Training Completed. 27 health workers from South eastregion trained (trained ended Oct. 16)

    100% 1.2%

    Recruit health care workers in areas of criticalshortages and clinical teachers at TNIMA

    30-Sep Health care workers recruited in these critical areas-Nurse anesthetist, OR tech, Midwifery. Still seekingclinical teachers in Maternal and Child Health,

    radiography, nurse midwifery, Nurse anesthetist.

    85% 1.0%

    Complete payroll validation and remove ghostworkers from payroll

    31-Aug 400 plus ghost names identified, 1st draft submitted 100% 1.2%

    Place 300 health workers (CMs, nurses, doctors, labtechs, Pas, & health managers) on incentives

    30-Nov 275 health workers placed on incentives 92% 1.1%

    Provide scholarships to 200 professional healthworkers (CU-23, Phebe-75, Esther Bacon-70, MPHS-

    30, JICA-1, study abroad- 10)

    30-Nov Scholarships awarded to 227 professional healthworkers

    100% 1.2%

    Establish psychosocial working group 21-Aug Psychosocial Working Group established 100% 1.2%

    Conduct mapping exercise among partners to identifynumber and location of community social workers andcase workers in the country

    19-Sep Mapping exercised completed, report complied 100% 1.2%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    50/56

    Review, consolidate, and finalize national psychosocialtraining manual

    30-Nov Committee established. Consultant procurement inprogress. Existing manuals collected.

    40% 0.5%

    Deploy 40 case managers to 7 districts covering 21zones, in 3 counties

    30-Oct Completed 100% 1.2%

    Train 90 community based social workers 30-Nov 210 trained in -Montserrado, Bong, Margibi 100% 1.2%

    Implement BPHS in 40% (an increase of 5% to the35% already being provided) of health facilities

    30-Nov Accreditation field-work completed. Data analysiscompleted. BPHS is being implemented in 47% ofhealth facilities

    100% 1.2%

    Train 60 mid level health workers in the clinicalmanagement of rape in BPHS health facilities

    30-Nov Completed 100% 1.2%

    Hold meetings with partners on the drafting of SOPs

    and guidelines, and review best practices for theprovision on gender specific services

    30-Sep Meeting held, SOPs and guidelines drafted. Best

    practices on gender specific services indentified

    100% 1.2%

    Recruit and train ambulance crews (including drivers)to provide EMS in 5 counties

    30-Nov TORs for ambulance crews developed. Recruitmentand hiring underway.

    75% 0.9%

    Conduct needs assessment to identify and cost lifesaving equipment, and communication services forambulances nationwide

    30-Oct Completed. M&E unit checklist developed 100% 1.2%

    Install communication equipment within ambulances in

    5 counties

    30-Oct Radios for ambulances procured. Procurement of

    repeater underway.

    100% 1.2%

    Deploy 7 fully equipped ambulances to 7 counties 30-Sep 7 fully equipped ambulances dispatched to 7counties 100% 1.2%

    Establish and equip the national dispatch center thisincludes hiring and deployment of staff

    30-Nov Dispatch center established at JFK 100% 1.2%

    Select & finalize sites for drug depots, and completeprocurement and contracting for the construction of 7new drug depots, in 7 counties

    30-Nov Sites selected. Seeking funding for 4 depots 25% 0.3%

    0.0%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    51/56

    Hold birth registration regional consultations to createawareness for county authorities, document for dutybearers (chiefs, etc), and plan for county roll out

    30-Sep Birth registration consultation held in all regions, planfor county rolled out

    100% 1.2%

    Establish birth registration database 30-Nov New consultant hired. Format for report generationpending.

    90% 1.1%

    County consultations for 7 counties to createawareness on the community and facility based birthregistration system

    30-Nov Moved to the next 90 days. Consultant hired. 10% 0.1%

    Procure 1.5 million copies of blank certificates 30-Nov 10% 0.1%

    Procure 2000 for community birth registration ledgers 30-Nov In progress; to be completed by Dec. 31, 2009 80% 1.0%

    Procure 50,000 copies of application forms 30-Nov In progress to be completed by Dec. 31, 2009 80% 1.0%

    Establish comprehensive EMONC centers in 4hospitals, in 4 counties

    30-Nov Training planned for 60 Health workers. 56 mid levelhealth professionals and 2 medical doctors trained inneonatal resuscitation. Neonatal resuscitation kits

    distributed to 40 health facilities in 15 counties(hospitals received 4 kits, health centers 3 kits, clinics 2kits)-October. BPHS accreditation shows 5 hospitalspreviously with partial EMOC services are now carryingout FULL EMONC services. Liberia GovernmentHospital-Buchannan, Government Hospital-Bomi, St.Timothy Hospital, Cape Mount, Telewoyan in Lofa, GWHarley-Nimba.

    100% 1.2%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    52/56

    Establish full basic EMOC centers in 6 health centers 30-Nov Training carried out, neonatal resuscitation kitsdistributed, 4 EMOC centers operating in New KruTown-Montserrado, Bahn- Nimbi, Pipeline-Montserrado, Fish Town-River Gee.

    67% 0.8%

    Establish 13 HIV Counseling Testing Centers inexisting health facilities

    30-Nov 13 Counseling centers established (OCT). GrandGeddeh-3 clinics, River Cess-2 clinics, River Gee- 2clinics, Sinoe 2 clinics, Maryland-2 clinics. 2 clinics inBomi

    100% 1.2%

    Establish 7 PMTCT Centers in existing health facilities 30-Nov 7 established in: Fish Town, River Gee; C.H Renne,Margibi; Sass Town, Bomi; Suehn-mecca, Bomi;Jallah-lone Health Center, Gbarpolu, St-Francis inRiver Cess, F.J Grant Sinoe hospital.

    100% 1.2%

    Establish 3 new ART Centers in existing countyhospitals

    30-Nov Sites indentified- River Gee-Fish Town hospital, RiverCess-St, Francis, LAC Hospital, Compound # 3, GrandBassa. Health workers training completed. DeploymentOct. 23.

    100% 1.2%

    Establish 17 new DOT Centers in the South EastRegion (Sinoe, Maryland, River Cess, River Gee,

    Grand Geddeh, Grand Kru, Grand Bassa)

    30-Oct completed 100% 1.2%

    Train and equip 83 health workers (pharmacists, labtechs, dispensers, community health workers, andcase managers) in TB and leprosy case management

    30-Nov Completed.110 trained. 100% 1.2%

    Roll out new 6 month regimen in 6 counties (Bomi,Cape Mount , Gbarpolu, Margibi, Montserrado, Nimba)to Northwestern Region

    30-Oct Completed. Targeting additional regions. 100% 1.2%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    53/56

    Produce Environmental and Social ManagementFramework/ Medical Supplies and Medical Waste Plan

    13-Nov Framework and MSMW plan completed. Will bepresented to relevant stakeholders at MOHSW forfeedback

    75% 0.9%

    Rehabilitate 9 facilities Phebe, Martha Tubman (MT),Foya, J. J. Dossen, TNIMA, AM Dogliotti, GW Harley,St. Frances, Liberian Government Hospital (Buchanan)

    30-Nov Phebe-100% MT- 100%, Foya- 100%, J. J. Dossen-100%, TNIMA-100%, AM Dogliotti-on going, GWHarley-100%, St. Frances-100%, Liberian GovernmentHospital (Buchanan)-100%

    100% 1.2%

    Obtain Public Works approval for design and construct9 new clinics, and 5 health facilities (1-EPI cold room,3-community health department (CHD) in Gbarpolu,Buchannan & Tubmanburg, 1-MCH Annex Margibi C.H. Rennie)

    30-Nov Public Works approval received. EPI cold room-completed, CHD Buchanan completed, CHDTubmanburg-100%, CHD Gbarpolu 60%-Sengbe/OXFAM, C.H. Rennie-Contract awarded,building commenced-65%. UNICEF-9 Clinicsconstruction underway (40%), to be completed by

    years end.

    65% 0.8%

    Finalize procurement and contracting process for theconstruction of midwifery school in Zwedru

    30-Oct Procurement completed. Contract negotiations inprogress. Meeting planned for Sept 28

    100% 1.2%

    Commence construction of midwifery school in Zwedru 30-Nov Contract awarded. Construction to commence in Nov. 10% 0.1%

    Finalize architectural standards for hospitals and health

    centers

    15-Oct Architectural standards approved by infrastructure

    Task Force. Working drawings produced and sent toMPW (approval pending).

    100% 1.2%

    Conduct validation workshop on the draft National SWpolicy with members of the IBS Pillar

    15-Sep Validation workshop on the draft National SW policywith IBS Pillar members conducted

    100% 1.2%

    Hold 3 regional validation consultations to reviewnational SW and mental health policies

    15-Oct completed 100% 1.2%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    54/56

    Present National SW policy to cabinet and Health andSocial Welfare subcommittee for endorsement

    30-Nov Pillar changes incorporated, Dept of Planning toarrange presentation

    100% 1.2%

    Receive revision of 1st draft of SW plan from theconsultant

    30-Nov completed 100% 1.2%

    Commence the reform process (develop TORs andplace appropriate persons in appropriate positions) forthe department of social welfare in order to implementSW policy and plan

    30-Nov Relevant persons notified and reassigned. New TORsdeveloped. Current structures revised, pendingapproval.

    75% 0.9%

    Establish social welfare advisory committee to overseeimplementation of policy and plan

    30-Nov TOR developed, pending agreement that this shouldbe a function of HSCC, or separate committee

    100% 1.2%

    Identify 3 regional offices for the decentralization ofSocial Welfare Services

    30-Nov Concept paper drafted. Regional office locationsproposed. Site Inspections planned for week of Nov.16.

    40% 0.5%

    Present accreditation tools/procedures to PCT 27-Aug Accreditation tools and procedures presented to PCT 100% 1.2%

    Present accreditation tools/procedures to the pillar 30-Oct Presented at the Oct. 5,2009 IBS meeting. 0.0%

    Develop TOR for social worker licensing board andappoint board members

    15-Sep TOR being completed. Meeting held on Sept 11.Board members appointed. Meeting being planned.

    75% 0.9%

    Establish TWG to develop standards for licensing

    social workers

    15-Sep Technical Working Group established 100% 1.2%

    Develop standards for licensing social workers 15-Oct Draft licensing standards developed. 75% 0.9%

    Hold validation meeting to validate the licensingstandards

    30-Oct Pending development of standards 0% 0.0%

    Present to licensing standards to PCT for endorsement 5-Nov Pending development of standards 0% 0.0%

  • 8/14/2019 Released by Authority of the Ministry of Planning and Economic

    55/56

    Present to MOH for endorsement 9-Nov Pending development of standards 0% 0.0%

    Present licensing standards to HSCC for endorsement 19-Nov Pending development of standards 0% 0.0%

    Print and disseminate Licensing Standards 27-Nov Pending development of standards 0% 0.0%

    Establish and hold 1st meeting of inter agencycommittee/TWG to develop the Basic Package ofSocial Welfare Services

    16-Oct Members identified, Subsequent meetings held.Working on work plan/schedule of activities.

    100% 1.2%

    Complete assessment national reference laboratory 4-Sep National reference laboratory assessment completed 100% 1.2%

    Submit procurement list of materials needed tocomplete laboratory

    11-Sep Item list developed, and submitted to DM-HealthServices

    100% 1.2%

    Complete the procurement process for necessarybuilding materials and general for the renovation

    30-Oct List complete, awaiting submission 65% 0.8%

    Hold consultations and present report on the status of2 regional blood banks in Montserrado and BongCounties

    15-Sep Bong consultations held, Montserrado location underdiscussion 75% 0.9%

    Expedite delivery and installation of medical laboratoryand IT equipment

    30-Sep 1st shipment of medical laboratory equipment received 50% 0.6%

    Production of 2008/2009 financial statement 31-Aug 2008/2009 financial statement completed 100% 1.2%

    Complete TOT Training for financial managers 30-Sep TOT training for fi