Released by Authority of the Ministry of Planning and Economic Affairs, Republic of Liberia
Progress Report on PRS Implementation
The Government of Liberia began the implementation of its Poverty Reduction Strategy (PRS) or Lift Liberia Development agenda in April 2008
after receiving tremendous support and commitment from its development partners. The hopes of Liberians were high and expectations were
raised as the successful implementation of the PRS promised to improve their living standards after nearly 15 years of civil war and destruction.
But after the first year of implementation, the Government reported that progress on the implementation of the Lift Liberia agenda was slow
relative to potential. This report received a lot of negative press in spite of the boldness of government to tell it like it was. It was the first time,
in recorded Liberian history, that the government had mustered the coverage to tell the Liberian people that things were going as planned but
that commitment to reverse course and accelerate implementation of the agenda was still very high on the priority list of the government.
To demonstrate this commitment, the President, H.E. Ellen Johnson Sirleaf, requested that the Cabinet meet in a technical retreat session to
review the entire PRS and identify ways to mitigate challenges and devise strategies to accelerate implementation by utilizing available
opportunities and resources. It was clear from the President that there was no room for compromise on the implementation of the Lift Liberia
agenda.
Based on the request from the President, the Liberia Reconstruction & Development Committee (LRDC), the government-partner forum charged
with the responsibility of coordinating the implementation of the PRS, organized a series of review activities that ended in a Cabinet retreat on
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
2/56
August 14 & 15, 2009 at the Baptist Theological Seminary in Paynesville. The retreat was held under the theme: prioritizing the priorities and
chaired by the President. In attendance were the Vice President, the Chief Justice, and a representative of the Speaker of the House of
Representatives.
During the technical review sessions, before and during the retreat, technicians from the donor community and government worked out revisedplans and strategies to accelerate implementation. In some cases, deliverables were disaggregated, re-sequenced, and clearly assigned to
implementing ministries and agencies. As a result of the disaggregation, PRS deliverables increased from 360 to nearly 490. Mechanisms to fast-
track certain policy and legislative deliverables were also put in place.
The entire process of review led to the development of 90-day action plans to which each cabinet minister and heads of agencies committed to
implementing as a demonstration of their commitment to accelerate PRS implementation. A new Pillar structure to support this 90-day action
planning was also advanced: technical sub-working groups were to meet twice a month to work the details of implementation; Pillar meetings
would be held once a month to address high level policy issues; and LRDC Steering Committee will meet once a quarter.
As a result of the vigorous PUSH from the 90-day planning, we are pleased to report that current implementation stands at nearly 90% withunscheduled deliverables being completed as a result of the urgency and attention given the PRS from the highest political authority in Liberia as
well as support from our development partners.
Overall Government of Liberia Performance
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
3/56
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
4/56
Performance by Pillar
90 Day Scorecard for Ministries and
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
5/56
Agencies
Liberia Telecommunication Authority
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Publish Revised Tariff of Non-GSM and CDMAprovision
Nov. 2009 Preparation for issuance of regulations andpublishing of revised tariff ongoing
60% 30%
80%
Commence Training on Universal Access Program forLTA and MoPT staff
Oct. 2009 Selection of 25 staff for Universal AccessProgram Seminar completed: 4-day trainingconducted in October 2009
100% 50%
80%
Ministry of Post and Telecom (MoPT)
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Consultative Meeting with Stakeholders on formulationof national postal address system leading to a donorconference
Oct. 2009 Consultative meeting with stakeholderscompleted; donor conference completed
100% 50%
85%Submit ICT policy to Cabinet through Pillar I V Chair Nov. 2009 Draft policy was posted on website. Pillar IV
retreat on Telecom & ICT Policy held; inputreceived and processed. National consultationand validation of Telecom & ICT Policy is ongoing
70% 35%
Total 85%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
6/56
Liberia TelecommunicationCorporation
Planned Action Due Date Progress to date % completed 90 day Progress Overall Score
Obtain infrastructure equipment and technical supportto ensure the sustainable operational efficiency of theLTC in Greater Monrovia
Nov. 2009 LTC has been made operationally efficient in theGreater Monrovia. LTC is providing mobileinternet service as well as land line phones
100% 50%
75%
Develop a Tender Document for deployment of fiberbackbone
Nov. 2009 Finalization of LTCs Tender Document ongoing 50% 25%
Total
75%
National Housing Authority
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
100 acres of land for Bomi County will be acquired Nov. 2009 Negotiation has been made for the 100 acres ofland and soliciting for funds to survey the land.
90% 45%
63%
40 low income housing structures will be built to rooflevel Nov. 2009 40 foundations have been constructed onMarshall Road, due to heavy rain elavation wasdelay
35% 18%
Total 63%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
7/56
Ministry of Transportation
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
NTPS to reach President by Nov. 1, 2009 Nov. 2009 NTPS approved by Cabinet on November 23,2009
100% 25%
85%Training & Deployment of Research Assistant acrossthe county
Nov. 2009 Training completed; Research Assistantsdeployed across the country effective Nov. 8 2009
100% 25%
Draft Act prepared and stakeholders consultations held Nov. 2009 Draft Act prepared. Consultation scheduled formid December
40% 10%
Training needs & training institutions identified &
contact established Nov. 2009
Nov. 2009 Training circles for 85 directors/staffs in various
areas
100% 25%
Total 85%
National Port Authority
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Develop International Shipping and Port Securitycode (ISPS Code)
Sept. 2009 International Shipping and Port Security Code (ISPSCode) developed and implemented
100% 25%
94%Complete the fencing of the entire port to meetinternational port standard
Sept. 2009 Fence completed 100% 25%
Construct fence to demarcate pier Sept. 2009 Fence constructed 100% 25%
Receive response from proposal to privatize NPAmanagement
Nov. 2009 Candidate selected 75% 19%
Total 94%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
8/56
Ministry of Education
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
70 % of payroll audit would be completed Nov. 2009 MOU has been signed with MoE, MoF, CSA andUSAID to fund the payroll. Audit completed inMontserrado and has begun in Bomi and MargibiCounties. Remaining counties will be completedby March 2010.
65% 5.0%
51%
WRTTI teacher housing will be at roof level Nov. 2009 Foundation has been completed; Additionalmaterials required for construction work up to rooflevel have been procured and transported to worksite.
40% 3.1%
Identify sources of funding for teachers housingfrom GoL and development partners
Nov. 2009 GoL and Catalytic Fund identified. EducationSector Plan and regional consultations completedtowards securing funding.
80% 6.2%
0.0%
Distribute tools to the multilateral high schools Nov. 2009 2ndphase of the distribution of tools to vocationalinstitutions under MoE supervision has beencompleted; third quantity of tools has beenprocured by MoE and awaiting distribution
85% 6.5%
Acquisition of land for skill training center Nov. 2009 Counties identified and sites selected. Land deedshave been received from one county-(River Gee)
100% 7.7%
Complete the revision of CVs of all 15 CEOs and92 DEOs; Develop training modules for EOs andsupervising authorities
Nov. 2009 Four CEOs have been replaced 40% 3.1%
Complete Zero Draft of National EducationPolicy and revise all existing policies
Nov. 2009 Zero draft of the Educational Sector Plan has beencompleted; regional consultations are being held
100% 7.7%
Develop M&E tool Nov. 2009 Assessment tools have been developed; ECconsultant is still working on M&E tool.
0% 0.0%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
9/56
Develop time-table of implementation Nov. 2009 EC consultant still working on developing time-table for the implementation of the M&E plan
0% 0.0%
Orientation of teachers Nov. 2009 Orientation Plan developed but has not beenimplemented due to staff turn over
0% 0.0%
Piloting and supervision and monitoring
curriculum
Nov. 2009 Revised National Curriculum printed; no further
action has been taken due to lack of funding
75% 5.8%
Distribution of Text Books Nov. 2009 Textbooks have been distributed to 11 counties 0.0%
Contract with teacher Training Institutes(Universities / Colleges ) will be completed forextension to remaining 9 counties
Nov. 2009 Contracts for teacher training have been signedwith two universities (University of Liberia andCuttington University)
80% 6.2%
Total 51%
Commission on Higher Education
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Holding of National Education Stakeholder Conferenceto review and adopt revised Higher Education NationalCurriculum
Nov. 2009 Curricula have been collected from all universitiesand review is in process. Contacts with Educationstakeholders ongoing
90% 30%
72%
Recruitment of additional qualified instructional staff toreplace TAs
Nov. 2009 MOU signed with Nigerian professors andrecruitment process ongoing
75% 25%
Selection of contractors and signing of contracts;commencement of renovation work
Nov. 2009 Bids published 50% 17%
72%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
10/56
General Service Agency
Planned Action Due Date Progress to date % Completed 90 day Progress Overall ScoreConduct technical and management skills training for125 staff
Nov. 2009 Conducted technical training for 64 GoL personnelfrom BOB, MoE, CSA, GAC, and GSA.
65% 16%
70%Complete zero drafts of Real Estate and PublicBuilding Maintenance policies
30 Nov. 2009 Real Estate and Public Building MaintenancePolicies draft completed and submitted to cabinet
95% 24%
Finalize drafts of Personal Property Policy for Cabinetendorsement
30 Nov. 2009 Personal Property Policy completed andsubmitted to cabinet
95% 24%
Complete Mobile Equipment policies draft and submitto Cabinet for approval
30 Nov. 2009 A needs assessment was done and zero draftcompleted
25% 6%
70%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
11/56
Liberia Petroleum RefiningCorporation
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Expend and improve petroleum services to all parts ofLiberia using existing roads
30 Nov. 2009 Done 100% 50.0%
53%Complete the drafting of TOR for consultant to
conduct feasibility study to determine the economic
viability of constructing a new 50k to 100k refinery
30 Nov. 2009 WB agreed to provide technical assistance for
the drafting of the TOR
5% 2.5%
Total 53%
National Oil Company of Liberia
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Finalize production sharing contract (PSC) for 2 blocks 30 Nov. 2009 Completed PSC with two (2) International Oil
Companies: (1) Anadarko Liberia Company (2)
Hong Kong Tongtai Petroleum International
100% 100%100%
Total 100%
Central Bank of Liberia
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
12/56
Print and launch National Micro- Finance Policy Oct. 2009 The Microfinance Unit on September 23, 2009presented two documents to the NationalMicrofinance Task Force
80% 7%
85%
Complete the first draft of the regulatory framework for
Non-Bank Financial institutions (NBFIs)
Nov. 2009 Completed first draft of the Non Bank Financial
Institutions
100% 9%
Formal request for technical assistance forestablishment of a fast track court will be made to thetwo institutions and follow-up actions implemented inthe direction
Nov. 2009 Formal request for assistance for theestablishment of a fast tract court will be mad totwo institutions and follow actions implemented inthis direction
100% 9%
Preparatory work among the CBL legal team and thecommercial banks lawyers for the establishment of thecourt will be undertaken
Nov. 2009 Work among the CBL legal team and commercialbanks' lawyers for the establishment of the courtis ongoing
0% 0%
Five Staff will be continuing with the 2ndphase of thebank examination course of the Central Bank of Nigeria(CBN); while additional staff will be attending trainingcourses in the USA & Nigeria in August and Oct., 2009.A resident supervisor is expected
Oct. 2009 The training program for staff of the SupervisionDepartment of the CBL is on course. Thoseslated for the 2nd phase of the bank supervisioncourse are expected to depart for Lagos on Dec.15th, 2009. Currently two staff members of thedepartment are undergoing training in advancedbanking supervision at New York Fed. Three staffmembers are presently undertaking training in riskmanagement in bank supervision in Gambia
80% 7%
The list of banks licensed to operate in Liberia will bepublished
Aug. 2009 List was published in all major newspapers 100% 9%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
13/56
Encourage commercial banks to encash civil servantchecks, while concluding arrangement with the Ministryof Finance on the direct deposit program of civilservant salary checks, including expansion of bankbranches outside Monrovia to promote wider use ofchecks
Nov. 2009 MOU signed with Ministry of Finance andCommercial banks on September 18, 2009
100% 9%
3rd quarter report will be reported to the ComplianceCommittee
Sept. 2009 Examination report was presented to theCompliance Committee on November 13, 2009
100% 9%
IMF expert to arrive to continue studies on thepossibility of establishing a money and capital marketin the country
Sept. 2009 Mr. Nicholas Close, the IMF expert was here inOctober and he continued his study. CBLestablished a Treasury Bill Committee that willevolve a frame work by mid-January 2010
100% 9%
Move closer toward a consensus on the institutionalsetup for the regulation and supervision of theinsurance sector. This should guide the harmonizationof the legal framework consistent with the institutionalsetup
Nov. 2009 An international consultant was commissionedwith funding from UNDP to conduct a study on theinsurance sector and develop the legal frameworkfor the regulation and supervision of the insurancesector
80% 7%
The CBL will in the next 90 days, receive from the FirstInitiative Group of the World Bank, a draft legalframework on the establishment of a credit referencebureau. The draft will largely inform the CBLs work ondrafting of a legal framework for the credit referencebureau
Nov. 2009 The CBL has received the draft and it iscustomizing it to suit the Liberian situation
100% 9%
Total85%
Ministry of Internal Affairs
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
14/56
Planned Action Due Date Progress to date % Completed 90 day Progress Overall score
Complete final draft of the policy framework forestablishing a national registry and submit to Cabinetfor endorsement
30 Nov. 2009 Workshop to validate draft policy framework washeld, draft policy framework submitted to Cabinetfor endorsement, policy framework was endorsed
by Cabinet.
100% 16.7%
98%
Complete draft Act establishing a National RegistryOffice
30 Nov. 2009 Act establishing the National Registry drafted. 100% 16.7%
Establish local development forum to complete thedrafting of peace policies and coordinate GOL/Partnersintegrated planning and implementation of communitydriven development project for 3 regions (15 districts)
30 Nov. 2009 Inter-agency team established and 15 districtsselected. Aide memoir prepared. Meeting are heldon October 1st to finalize proposal for submissionto partners for funding. Funding source identifiedand resource mobilized.
95% 15.8%
Complete final draft Capacity Development Plan forLocal Government Officials for submission to IMC onCivil Service Reform for endorsement
30 Nov. 2009 Assessment was carried out in tree selectedcounties (Bomi, Bong, and River Gee) and MIACentral Office Draft assessment report wasdeveloped Validation ofassessment report was held on 28th November toreview and finalized, Capacity Development Planhas been drafted and will be submitted to the IMC
95% 15.8%
Rehabilitation of Maryland County City Hall to becompleted
Nov. 2009 Reconstruction of Maryland County's, Harper CityHall completed.
100% 16.7%
Construction of 10 Peace Huts in four counties in thewestern region
Nov. 2009 Ten peace huts have been completed in thewestern region
100% 16.7%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
15/56
Total 98%
Liberia Institute of Public
Administration
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Stakeholders validation of National Civil ServiceTraining Policy
Nov. 2009 National Civil Service Training Policy is completedand awaiting Cabinet Approval
95% 95%
95%Total 95%
Civil Service Agency
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Submission and Endorsement of MOA, MOL, andMPW functions and mandates review by IMC on CivilService Reform
31 Oct. 2009 The MoA, MoL and MPW functions and mandatesreviews are still going at the level of the ministriesand Technical Working Group due to constraintsfollowing review of drafts
25% 1.9%
72%
Submission and Endorsement of MOA, MOL, andMPW functions and mandates review by Cabinet
30 Nov. 2009 Ongoing 50% 3.8%
Recruit Technical Advisor to structure and draft theoperation framework for a Redirected WorkersProgramme
30 Sept. 2009 A replacement for Technical Advisor foundthrough CISREP to draft operational frameworkfor a redirected workers program.
70% 5.4%
Draft of operational framework for Redirected WorkersProgramme, consultations, consolidation of commentsand development of a zero draft for validation
30 Nov. 2009 Draft operational framework developed and isbeing reviewed
75% 5.8%
Complete the pilot wave for building employee fileswithin 15 Ministries and Agencies
30 Sept. 2009 Completed the building of employees files. 100% 7.7%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
16/56
Complete total Monrovia wave for building employeefiles for employees in all additional Ministries/agencies within Monrovia
30 Nov. 2009 Awareness campaign completed. Employee formsare being completed for files build-up in theadditional ministries and agencies
70% 5.4%
Complete the pilot wave for biometrically enrolling andverifying government employees within 15 Ministries/Agencies
30 Nov. 2009 Employee biometric data enrollment for 15ministries and agencies completed
100% 7.7%
Complete system-wide awareness campaign on theemployee file system build-up and the use of thebiometric ID system for the Civil Service
30 Sept. 2009 Have commenced awareness campaign and haverecommended changes to current system toincorporate Biometric Enrollment and Verificationprocess. Workshop with HR heads ofMinistries/Agencies to complete awareness.
95% 7.3%
Develop and Endorse a framework for an interimHRMIS solution for Line Ministries and Agencies
30 Sept. 2009 Have commenced collaboration with stakeholders.CSA, CISREP, the Biometric System Developer,HR Director of MoH. System specificationsdeveloped, zero draft of framework to follow
53% 4.1%
Complete Final Draft of the National Training Policy tobe submitted to the IMC for endorsement 06533829
30 Nov. 2009 Final draft compiled and relevant parties aremaking necessary input.
95% 7.3%
Complete, submit and endorse by the IMC on CivilService Reform the final draft of the National CivilService Human Resources Policy
30 Nov. 2009 Final draft completed, awaiting review by relevantparties and institutions. MGD working on genderanalysis
65% 5.0%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
17/56
Complete and submit a final draft of National CivilService Pension Reform Policy for endorsement by theIMC on Civil Service Reform
30 Nov. 2009 Final draft on National Civil Service PensionReform Policy complied, legislature implicationmust be considered to move this bill. being vettedthrough the relevant institutions
65% 5.0%
Develop and adopt a National Civil Service Outreachand Service Delivery Strategy
30 Nov. 2009 Final draft of the National Civil Service Outreachis being reviewed for endorsement
75% 5.8%
Total 72%
Ministry of Commerce and Industry
Planned Action Due Date Progress to date % Completed 90 day Progress Overall ScoreComplete bidding process and design of building forcompleted business registry
Nov. 2009 Express of Interest (EOI) advertised for renovationof registry building
30% 8%
25%Inspection to be conducted by Norwegian RegistrySpecialist
Nov. 2009 0%
Putting up a bid for registry building rehabilitation Nov. 2009 EOI advertised for: 40% 10%
Renovation of registry building
Procurement of hardware andsoftware
Procurement of equipment andfurniture
Renovation of building to commence Nov. 2009 Eviction notice sent to occupant of proposedregistry building. MOU drafted for renovation ofregistry building
30% 8%
Total 25%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
18/56
Ministry of Information, Culture andTourism
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Develop PR campaign to move Freedom of InformationAct in the Legislature
30 Nov. 2009 Media stakeholders appeared onLift Liberiaradio show, UNMIL Frontage, MICAT RegularPress Briefing to create public awareness aboutthe FOI; a seminar to increase awareness of theFreedom Information Act was held at MICAT;MICATand other media stakeholder continue tohold consultation with members of the NationalLegislature on the importance of the FOI. MICATHalf has begun broadcasting messages on theimportance of the FOI.
90% 30%
93%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
19/56
Draft Communications strategy around publicprogramming.
30-Nov-09 The Lift Liberia 45-minutes radio program isserving as an excellent conduct to gettinginformation out PRS related programming;Community radio through their association-ALICO-is repairing/rebroadcasting PRS relatedprograms; MICAT in collaboration with ELBC play
PRS-related messages; MICAT half hour, itsbroadcast and television units produce airprograms on ELBC radio around PRS relatedprograms;
90% 30%
Draft Whistle Blower ACT 30 Nov. 2009 A Whistle Blower Working Group was formed
comprising of MICAT, MOJ, CSA, GAC, MOL,CENTAL, GC, LEITI, and LACC. The workinggroup met several times, including astakeholder's consultative forum early in midOctober. Three committee were form, namely, thedrafting, publicity and budget A draft documenthas been completed. The draft was sent to majorstakeholders for inputs and a major stakeholder'sconsultation is being planned to adopt the draft foronward submission to the President
100% 33%
93%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
20/56
Ministry of State
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Cabinet to Review and adopt National Policy onDecentralization and Local Governance
30 Nov. 2009 Document before Cabinet for approval 70% 8%
34%Cabinet Review and adopt National Public SectorReform Policy
Sept. 2009 Document before Cabinet for approval 85% 9%
Cabinet to review and adopt the Mandates Functionsand Structures Review of Ministries and Agencies ofGovernment
30 Nov. 2009 Document before Cabinet for approval 65% 7%
Presidential appointment and legislative confirmation ofmembers of the Land Commission
30 Sept. 2009 Members of Land Commission appointed andconfirmed
100% 9%
Cabinet Review and endorsement of the Model MDA,National Mineral Policy, Mineral explorationRegulations and Small Scale Mining Regulations
30 Nov. 2009
Complete assessment to determine the timing and theprocess by which restructuring will be implemented Nov. 2009
Conduct assessment of regulatory agencies Nov. 2009
Develop concrete plan for each SOE, parastatal /agency
Nov. 2009
Draft legislation to effect rationalization, dissolution,privatization, or other needed regulatory controls foreach SOE / parastatal / agency
Nov. 2009
Total 34%
Ministry of Finance
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Update and release the PFM regulation and submitregulation to Cabinet for approval
30 Nov. 2009 PFM regulation is being finalized. Being submittedto Senior Management of MoF to be operationalzed by Nov. 1
100% 8.3%
99%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
21/56
Complete the selection of supplier for Taxadministration software and hire consultant (ProjectManager) to do installation
30 Nov. 2009 Consultant has been hired; selection of softwarecompleted but contract not awarded
100% 8.3%
Complete zero draft of legal paper to eliminate hut tax 30 Nov. 2009 Legal paper completed and submitted to Housefor enactment
100% 8.3%
Complete a comprehensive review of the LiberianRevenue Code
30 Nov. 2009 Revenue code has been reviewed and submittedto the House of Representatives
100% 8.3%
Improve and deploy Sun System 01 Sept. 2009 System has been improved and deployed,awaiting launching
95% 7.9%
Complete bidding process for the hardware componentof the IFMIS project and present reporting templates toMoF and other stakeholders for approval
30 Nov. 2009 Bidding process completed 100% 8.3%
Senior Management of Finance to approve draftAccounting Standard and submit to Cabinet forapproval
30 Nov. 2009 Draft has been approved by Senior Managementof MoF; to be submitted to next Cabinet
100% 8.3%
National Debt Management strategy to be presented toCabinet for approval
30 Nov. 2009 Debt Management Strategy has been updatedawaiting submission to Cabinet at next meeting
100% 8.3%
Complete procurement process for debt managementsystem hardware
30 Nov. 2009 Final agreement signed and submitted to LegalDepartment
95% 7.9%
Run the pilot phase of ASYCUDA for customsautomation
30 Nov. 2009 First pilot testing completed; final pilot testing tobe completed by Nov. 2
100% 8.3%
Begin the process of restructuring customs and InternalRevenue
30 Nov. 2009 Restructuring process has started with Customsand Internal Revenue
100% 8.3%
Complete the signing of an MOU to move from GST toVAT system
01 Sept. 2009 MOU has been signed 100% 8.3%
Total 99.2%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
22/56
Liberia Electricity Corporation
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Establish a power sub-station( including 22 KV switch
gear, 10 MMVA transformer and high voltage line) inPaynesville
30 Nov. 2009 1. All 4 (HV/MV) 10MVA transformers
delivered to sites (Bushrod,Krutown,Capitol&Paynesville) and installed 2. All 22kV
switchgears delivered to sites and installed
3.10km MV line installed 4. 2.2km HV line
installed 5.10km of LV line installed
90% 7.5%
53%
Establish a power sub-station( including 22 KV switch
gear, 10 MMVA transformer and high voltage line) in
New Kru Town
30 Nov. 2009 1. All 4 (HV/MV) 10MVA transformers
delivered to sites (Bushrod,Krutown,Capitol
&Paynesville) and installed 2. All 22kV
switchgears delivered to sites and installed
3.10km MV line installed 4. 2.2km HV line
installed 5.10km of LV line installed
90% 7.5%
Establish a power sub-station( including 22 KV switch
gear, 10 MMVA transformer and high voltage line) in
Capitol Hill
30 Nov. 2009 1. All 4 (HV/MV) 10MVA transformers
delivered to sites (Bushrod,Krutown,Capitol
&Paynesville) and installed 2. All 22kV
switchgears delivered to sites and installed
3.10km MV line installed 4. 2.2km HV line
installed 5.10km of LV line installed
90% 7.5%
Establish a power sub-station( including 22 KV switch
gear, 10 MMVA transformer and high voltage line) in
Bushrod Island
30 Nov. 2009 1. All 4 (HV/MV) 10MVA transformers
delivered to sites (Bushrod,Krutown,Capitol
&Paynesville) and installed 2. All 22kV
switchgears delivered to sites and installed
3.10km MV line installed 4. 2.2km HV line
installed 5.10km of LV line installed
90% 7.5%
Establish 1100, new connections in Monrovia (Central
Monrovia, Bushrod Island, Sinkor, Congo Town,
Paynesville)
30 Nov. 2009 1. A total of 554 customers including Catholic
Hospital connected to date; on account of the
variations in the per unit loading of
customers, a more realistic scenario will be to
load the power stations to 85% of their
50%
4.2%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
23/56
installed capacity 50%
Expansion of street Lights for Red Light to 72nd 30 Sept. All Planned interventions done & completed
100%100%
8.3%
Complete installation of 10KM of MV Lines 30 Nov. 2009 All Planned interventions done & completed
100%100%
8.3%
Complete installation of 10KM of LV Lines 30 Nov. 2009 All Planned interventions done & completed
100%100%
8.3%
Finalize new management contract for LEC 30 Nov. 2009 Procurement process in progress 1. RFP and
Draft Management Contract issued by IFC
80%
80%
6.7%
Finalize contact to select engineering advisory firm to
support the rehabilitation of the Mt. Coffee Hydro Plant
30 Nov. 2009 1.Feasibility leading to complete
rehabilitation completed; all other activities
on hold as GOL focus shifted to BRE biomass
and emergency power for Monrovia 60%
60%
5.0%
Gaps project to further expand distribution network
in greater Monrovia and environs
1. Agreement signed between GOL and GON
2.Management Contractor Secured and
project just commenced in earnest 80%
80%
6.7%
10-20MW Emergency diesel power for Monrovia in
lieu of BR biomass power project
1.Development of project concept completed
and EOI to potential suppliers to be released
on Dec. 21,2009 50%
50%
4.2%
Total 82%
Ministry of Labor
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
24/56
Finalize and submit recommendation on the MinimumWage for review and endorsement by Cabinet
30 Nov. 2009 Final report on recommendation on MinimumWage submitted to Cabinet for endorsement
95% 12%
86%Finalize and submit National Employment Policy forreview and endorsement by Cabinet
30 Oct. 2009 National Employment Policy submitted toPresident for Cabinet review and approval
100% 13%
Finalize and submit the Revised Labor Code to Cabinetfor review and endorsement
30 Nov. 2009 Draft 1, 2 and 3 completed, National LaborConference held; validation is expected soon foronward submission to Cabinet
75% 9%
Cabinet to endorse National HIV and AIDS WorkplacePolicy
30 Sept. 2009 Policy submitted to Cabinet, awaiting Cabinetapproval
100% 13%
Conduct and finalize field-level data collection for theNational Labor force Survey
30 Nov. 2009 Validation workshop scheduled for November12, TOT will start on November 30, and will befollowed by training of enumerators onDecember 10, 2009
75% 9%
Conduct 4 workshops (2 each) for the Liberia LaborCongress and the Liberia Chamber of Commerce
30 Nov. 2009 Workshops has been planned; implementationslated for November 15 -20, 2009
50% 6%
Promote the creation 10,000 short-term jobs 30, Nov. 2009 About 9000 short term jobs have been createdby MoL/MYS/LME/MPW/LACE
90% 11%
Complete the training of employees in the use ofstatistical software
30 Sept. 2009 Training has been completed and the Statisticalsoftware installed on 9 computers
100% 13%
86%
Liberia Water and SewerCorporation
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
25/56
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Rehabilitate 1 rural city water system Nov. 2009 Contract signed; building under renovation;Ministry of Finance to provide $150,000 for theproject
50% 17%
23%
Rehabilitate 30 existing wells Nov. 2009 Assessment completed on 200 meters ofpipelines 20% 7%
To complete the awarding of contract for theconstruction of stabilization ponds in Fiamah
Nov. 2009 To be removed as a 90 day deliverable as perMD
0
Total 23%
Ministry of Lands, Mines, andEnergy
Planned Action Due Date Progress to date % Completed 90 day Progress Overall ScoreFinalize contract and select firm to extend MVelectricity line from Cote d' Ivoire to 18 communities inthe Southeast through the West Africa power pool
30 Nov. 2009 Steady progress (negotiations) and on course,not possible in timeframe
20% 1.3%
79%Publish and launch the cabinet endorsed NEP 30 Nov. 2009 NEP printed and awaiting launching 95% 6.3%
Renovate, furnish and staff the office of the RREA 30 Nov. 2009 Office space provided (MOU between MLMEand LEC) Staff recruitment in process by WorldBank, tender document for renovation completed
60% 4.0%
Publish a strategic sector plan (SSP) 30 Nov. 2009 Water Supply and Sanitation Policy presented toCabinet, Nov. 23, 2009. Draft SSP completedawaits validation
80% 5.3%
Gather data and complete feasibility study on hydro-geological information system
30 Nov. 2009 First draft completed, soliciting technical imports 75% 5.0%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
26/56
Complete the awarding of contract on capacity supportfor WATSAN sector reform
30 Nov. 2009 Technical and financial proposals evaluated andaccepted by AWF/AFDB; negotiation for contactongoing
95% 6.3%
Finalize and submit National Mineral Policy for Cabinet
review and endorsement
30 Sept. 2009 Draft completed and 28 copies printed for
submission to cabinet by Friday Dec. 11, 2009
90% 6.0%
Finalize and submit Model MDA to Cabinet for reviewand endorsement
30 Sept. 2009 Model MDA drafted finalized by Consultant &MLME. Will submit to Cabinet by January
85% 5.7%
Finalize and submit revised small-scale miningregulations for Cabinet review and endorsement
30 Sept. 2009 ISLP and MLME finalizing 75% 5.0%
Operationalize final system operation of the MineralCadastre Information Management System
30 Nov. 2009 Final hardware/software training ongoing will endin Dec. 18, 2009. MCIMS to be commission byend of Dec. 2009
85% 5.7%
Establish two new small-scale mining cooperatives 30 Nov. 2009 Two cooperatives already established; (1) SmithTown Mineral Multi-purpose Cooperative and (2)Barteh-Jam Gold Miner Multi-purposeCooperative Society
100% 6.7%
Conduct 4- sensitization workshops to educate smallscale miners regarding sound environmental miningpractice.
30 Nov. 2009 Three sensitization workshops conducted; onewas conducted in Nimba on Sunday November1, 2009
75% 5.0%
Compile due diligence report and complete theevaluation for Western Cluster MDA
30 Sept. 2009 Clarification documents have been provide by allbidders, evaluation will be completed in twoweeks
70% 4.7%
Finalize negotiations with BHP Bilton regarding Kitomo,and Goe Fantro MDAs
30 Nov. 2009 Negotiations with BHP Bilton ongoing 80% 5.3%
Finalize negotiations with Putu Iron Ore Mining (SilverStar) regarding Putu MDA
30 Nov. 2009 Negotiations completed awaiting draft of PutuMOU
95% 6.3%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
27/56
Total 79%
Forestry Development Authority
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Complete the filing of eviction plan for existingprotected areas
30 Nov. 2009 Developed and awaiting presidential Approval 85% 21%
61%Hold national consultative workshop on Wild LifeManagement Law
30 Nov. 2009 Held on October 22, 2009 but the comments arebeing consolidated
75% 19%
Complete the drafting of the Wild Life ManagementLaw
30 Nov. 2009 0%
Complete the drafting of the gazette act for the LakePiso nature reserve
30 Nov. 2009 Completed and is being presented to thePresident
85% 21%
Total 61%
Ministry of Agriculture
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
Need Assessment and Draft Policy on plant andanimal quarantine of review
Nov. 2009 Draft policy prepared and awaiting printing anddistribution for internal review and stakeholdermeeting
60% 2.9%
55%
Multiplication of Germplasm Nov. 2009 0.0%
Develop extension policy and strategy. Identify farmersthrough established FFS, CDA, Rural Womenstructure,
Nov. 2009 Draft extension policy for extension services hasbeen formulated by the office of the deputyMinister for extension and CDA. Copies to be
30% 1.4%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
28/56
Conduct training through the FFS approach circulated for inputs from farmers groups and localexperts
To provide 13 power tillers to women organization Nov. 2009 Rural women identified and undergoing training;13 power tiller delivered in Bong, Nimba and Lofa
and 1 assigned to peri-urban agriculture riceproduction in Zubah Town in Paynesville
6% 0.3%
To distribute 37 rice mills and 23 cassava processingunits by Sept. 3,
Nov. 2009 Rice mills and cassava processing machinesdistributed to farming groups in Bomi and Gr.Cape Mt. Counties
80% 4%
Finalize the plan for 2010 distribution of FSN project Nov. 2009 Consultation with partners ongoing 0.0%
Reactivation of 50 cooperatives by Dec. 2009;enhance the capacity of 150 FBOs through FFS
Nov. 2009 Cooperatives are being established in the Lofaand Bomi Counties
75% 3.6%
Ongoing data collection to start Sept. 2009. Firstreport will be available on Oct. 2009
Oct. 2009 Survey in marketplaces led by LISGIS is ongoing.Data collection is ongoing
70% 3.3%
Food Security project staff recruitment completed Sept. 2009 Recruitment process ongoing40%
2%
Food Security Monitoring System needs to beendorsed by Technical committee
Oct. 2009 Monitoring system needs to be endorsed bytechnical committee
50% 2.4%
Develop tool and village saving and loan product inrural areas with UNDP,
Nov. 2009 Development of tool and of village saving loanwith experts in micro-credit area is ongoing
70% 3.3%
0.0%
Set criteria for target beneficiaries and identify thecommunities (MoGD)
Nov. 2009 Beneficiaries selected through the rural womenstructures
100% 5.0%
Retrieve document and brief current minister (Min.Logan)
Sept. 2009 Documents retrieved andMr. Logan has beenbriefed.
100% 4.8%
Reconvene stakeholders Nov. 2009 A framework has been developed by workinggroup to assess the capacity of LPMC forevaluation analysis; this frame work has beencirculated to all major stakeholders for input
10% 0.5%
Review and update Plan of Action
Identify funding source (Sept. 2009)
Develop Document
Submission to Presidents office
Follow up with the Standing Committee onConcession and Investment on the status of thefollowing bills:
Nov. 2009 Discussions with the National Legislature onpassing the Act is ongoing
70% 3.3%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
29/56
New Revenue and Tax Code
New Investment Code
(with Legislature expected to go for Agric. Break, the90-days expected due date is not realistic)
Need Assessment, produce the draft policy for review Nov. 2009 Needs assessment ongoing; FAO to locate and
establish swamps
60% 2.9%
Develop the strategy Nov. 2009 Department of Fisheries held stakeholdersworkshop on Aquaculture and Rice; Consultationsto be held on enveloping an aquaculture strategy;draft fisheries law is being reviewed for finalizationand national validation.
65% 3.1%
Need Assessment Nov. 2009 Needs assessment ongoing with IITA, ACI-VOCA 40% 1.9%
Six storage facilities will be constructed in Bong, Lofa,and Nimba Counties
Nov. 2009 All storage sites earmarked and surveyed;contractor selected.; constructions scheduled tocommence October 15
70% 3.3%
Three markets will be constructed in the Bong, Lofa,and Nimba Counties
Nov. 2009 UNDP and Partners have completed survey ofsites earmarked. Contractors selected
60% 2.9%
The 13 Power tillers to women groups Nov. 2009 Training of women groups on utilization of powertiller completed in Bong and Nimba Counties. The13 power tillers officially turned over to MoA,awaiting distribution to women groups
100% 4.8%
Total 55.3%
Ministry of Gender and Development
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
Source and select training providers for the roll-out ofbusiness development training
30 Nov. 2009 ToR developed. Awaiting transfer of funds fromUNDP to select and hire trainers. Due to fundingdelays, completion is expected by January 15,2009
50% 2%
84%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
30/56
Finalize the training program in business developmentand criteria for the beneficiaries
30 Nov. 2009 In cooperation with MoCI, Concept note formarket women BDS program is completed andfinalized; The program will be managed out ofMoGD and will target 1000 market women across4 counties-Margibi, Montserrado, Bong andNimba by June 2010.
100% 4%
Develop a database containing the number of men andwomen in senior management positions (Director, Asst.Minister, Deputy Minister, and Minister).
30 Nov. 2009 Questionnaire developed and distributed among25 MACs; database developed, 10% ofquestionnaires collected and entered intodatabase.
85% 4%
Conduct a gender analysis of National Civil ServiceTraining Policy
30 Nov. 2009 MoGD received the draft National Training Policyfrom CSA on Nov. 6, 2009; Revision of the draft
National Training Policy has begun.
65% 3%
Conduct gender analysis of National Civil ServiceHuman Resources Policy
30 Nov. 2009 MoGd received the draft Human Resource policyfrom CSA on November 11, 2009; Revision hasbegun.
60% 3%
Finalize and submit draft National Gender Policy toCabinet for endorsement
30 Nov. 2009 National Gender Policy finalized; Cabinet paperprepared; presentation made to Cabinet andPolicy endorsed by Cabinet.
100% 4%
Establish Secretariat to manage the implementation ofLiberias Action Plan on UNSCR 1325
30 Nov. 2009 Recruitment of National Coordinator for1325Secretariat done and to be supported by UNDP;equipments purchased, and Secretariat office setup at MoGD.
100% 4%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
31/56
Review the Civil Service Standing Order to includelanguage on sexual harassment in the workplace
30-Nov-09 Copy of the Civil Service Standing Ordersreceived and document prepared containingsexual harassment language and submitted toCSA to be incorporated into the Standing Order.
100% 4%
Establish CEDAW Implementation Committee 30 Nov. 2009 Key Sector Ministries, Agencies, Local andInternational Organizations written; draft ToR andimplementation Plan developed and finalized.
100% 4%
Hold consultation meeting with Children ProtectionAgencies (CPA) for the establishment andstandardization of national and community basedstructures;
30 Sept. 2009 Meeting held with Children Protection Agenciesfor the establishment and standardization ofcommunity based structures
100% 4%
Develop terms of reference and training module fornational and community based children structures
30 Sept. 2009 Terms of reference developed and trainingmodule is being finalized
100% 4%
Set standards for the establishment of ChildWellness Committees (CWC)
30 Sept. 2009 Standards finalized and set for the establishmentof CWCs
100% 4%
Establish new CWCs and restructure existing ones; 30 Nov. 2009 Process commenced in Bomi County and wascompleted; mapping and selection ongoing inGbarpolu, Cape Mount and Rural Montserradocompleted. 61 new CWCs established.
75% 3%
Finalize procurement and contracting process fortraining providers to develop business developmentand job skills training for girls 16-24
15 Sept. 2009 Four Service Providers have been contracted:ARC, IRC, LEP, & LEED.
100% 4%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
32/56
Develop training business development and job skillscurricula
30 Oct. 2009 Developed all draft curricula; developed commonlearning objectives; curricula will be pre-testedand finalized during training
90% 4%
Finalize the recruitment of 2500 girl who will participatein the training
30 Nov. 2009 Communities have been mobilized, Survey Firmhired, recruitment strategy developed, recruiting ofgirls to commence December 7, 2009
60% 3%
Complete the development of gender sensitivemodules to be included in the training curricula of allsecurity institutions
30 Nov. 2009 module developed and endorsed by SecurityPillar, module printed and distributed to securityAgencies, TOT workshop held for Security Sectorpersonnel to utilize module
100% 4%
Construct 6 storage facilities and 3 markets (UNDP) 30 Nov. 2009 Contracts signed, Construction of storage facilitiesand markets ongoing across three counties;Nimba, Bong & Lofa
35% 2%
Distribute power tillers, rice mills and cassavaprocessing units to 43 womens farming groups (WFP& FAO)
30 Nov. 2009 14 power tillers distributed. Quotation for rice millsand cassava processing units approved by FAOand order has been placed.
70% 3%
Disburse micro loans to 1500 rural women in RiverGee, Grand Bassa, Bong, Nimba and Lofa 30 Nov. 2009 Micro-loans disbursed to 1500 rural women inRiver Gee, Bassa, Nimba and Lofa 100% 4%
Furnish Grand Bassa safe home and hire staff, incollaboration with MoHSW
30 Nov. 2009 Bassa safe home furnished; staff recruited 100% 4%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
33/56
Identify construction contractors in Bong, Lofa, Nimbaand River Gee
30 Nov. 2009 Received and reviewed proposals; completedcontractual agreement forms, and concluding ofcontracts are underway
65% 3%
Develop strategy and action plan to reinforce theinitiative to realize 20% women participation in themilitary and various security agencies: administrativereview, approval , and endorsement of strategy
30 Oct. 2009 Action Plan drafted and submitted foradministrative review and input 85% 4%
84%
Ministry of Youth and Sports
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
Complete and submit Final draft of Youth Act forCabinet endorsement
30 Nov. 2009 Final draft of the Youth Act completed andsubmitted to Cabinet for endorsement
100% 25%
76%Complete Community Youth Resource Center in 3-communities (Logan Town Site)
30 Nov. 2009 Building Materials procured. Partnering withUNMIL CIMIC ongoing
50% 13%
Complete Community Youth Resource Center in 3-communities (Ganta Site)
30 Nov. 2009 Main center completed. Blue print for multi-purpose court and children playground completed
75% 19%
Complete Community Youth Resource Center in 3-communities (Gbarnga Site)
30 Nov. 2009 Construction of Youth Resource Center ongoing 80% 20%
Adjusted Average 76%
Ministry of Planning and EconomicAffairs
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
34/56
Planned Action Due Date Progress to date % Completed 90 day Score Overall Score
Identify stakeholders and form steering committee tobegin consultative meeting around National Visioning
30 Sept.2009
National Visioning consultative meetingheld
100% 20%
75%Brainstorming consultative meeting 15 Oct. 2009 The brainstorming session was held on Sunday
10/11.100% 20%
Launch economic growth studies 31 Oct. 2009 Economic Growth Studies launched 100% 20%
National Vision best practice study tour 30 Nov. 2009 MPEA has made contact with the government ofRwanda and they suggest the 2nd week inDecember for the study tour. MPEA has alsocontacted the UNDP regarding funding the trip.
50% 10%
Conduct 4 workshops aimed at building the capacity ofcivil society organizations in terms of making inputsnational, regional, and county development planning
30 Nov. 2009 Conducting training activities locally. Consented toCSOs participation in the PRS/ CDA monitoringnetwork
25% 5%
75%
Monrovia City Corporation
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
35/56
Review mandates and functions of the Monrovia CityCorporation
Nov. 2009 MCC and GC met to review mandates, functions andstructure. The 1973 Act grant the MunicipalGovernment of Monrovia a Charter. The Charterneeds to be developed. A draft of the Charter hasbeen prepared and needs to be vetted.The following activities need to be undertaken:
Organizing of a stakeholder forum to vet the draftcharter. Design a process to develop or formulate thereorganization of the mandate and functions of theMunicipal Government of Monrovia to fulfill therequirements of the PRS.
25% 3%
57%
Develop strategic plan on the future structure of theMonrovia City Corporation
Oct. 2009 Have done a diagnostic of MCC-Stakeholdersprofiling, SWOT analysis; the strategic plan to directthe reform process not the future structure of theMCC is contingent upon the finalization of the MCCmandates and functions review.
40% 4.0%
Setting up of technical committee comprising of keyagencies. Recruitment of both national andinternational consultants. Draft law review report andnational solid waste policy and strategy. Stakeholder
validation process
Nov. 2009 Workshop held on Solid Waste Policy, Law reviewworkshop held. Validation completed
95% 9.5%
Completion of land acquisition process for newcemetery to service the Monrovia area
Nov. 2009 Land was identified and being surveyed. 20% 2.0%
Identify and secure land for the playgrounds; liaise withthe Ministry of Public Works for technical drawing andplans. Validation by the various committees
Nov. 2009 Land for 3 playgrounds identified, BOQ forconstruction provided by MPW
60% 6.0%
Identify and secure land in West Point for CommunityResource Center
Nov. 2009 Land identified subject to negotiation for purchase 40% 4.0%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
36/56
Conduct technical and physical assessment for thethree existing resource centers in Clara Town, Soniwenand Slipway for the three centers
Nov. 2009 3 sites secured for construction 100% 10.0%
TOR of the task force to be developed. Nov. 2009 MCC committee to develop task force TOR
established
10% 1.0%
Technical Committee to be constituted by the Ministryof Public Works
Feasibility study of five slums in Monrovia beginningFeb. 2010 is pending due to lack of sponsorship andfunding
Nov. 2009 Feasibility study of five slums in Monrovia completed 100% 10%
Finalize Mt. Barclay land acquisition process andidentify other options (Land) for permanent sanitaryland fill sites
30 Nov. 2009 Mt. Barclay land identified, undergoing survey toreestablish title. Finalize ToR for EIA EnvironmentalImpact Assessment component and request EIApermit from EPA.
80% 8.0%
Adjusted Average
57%National Investment Commission
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
Prepare, submit and push passage of legislation tostreamline investment procedures and to level theplaying field between domestic and foreign investors
1. Letters sent to Business Community for meeting;2.Business Community to send names ofparticipants in said meeting.Consultation with Business Community ongoing.
85% 17%
52%
Reorient the functions of NIC more towards investmentpromotion, facilitation and attraction and realignmanagement structures to meet those objectives.
Nov. 2009 Updated plan provided to NIC commissioners forreview
75% 15%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
37/56
Convene major investment forum Nov. 2009 The chairman attended MRU Forum in October,awaiting funding for a forum in the United KingdomThe chairman toured the sub region to finalizearrangement
50% 10%
Establish an SME Business Support Unit Nov. 2009 SME business Support Unit presently exists at heNational Investment Commission. Regional office willbe open; funding from Development still awaitingresponse from budget submitted to the Ministry ofPlanning. Policy document is currently being draftedto consolidate the SME units at MoCI and NIC
60% 12%
Investigate the feasibility of developing an SEZ nearBuchanan and other locations ove the medium term
Nov. 2009 The structure, budget and head count have beenreviewed. Draft law is currently under review bystakeholders.
75% 15%
Adjusted Average 52%
Public Works
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
Produce a Zoning map of Monrovia and 5 major urbancenters; contract the services of a consultant tocommence the work.
30 Nov. 2009 TOR completed; tendering begins; recruitment isexpected to take two months
25% 1.4%
81%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
38/56
Complete Zero draft a Zoning Act to strengthen urbaninfrastructure and city planning
30 Nov. 2009 Legal committee constituted, consultant servicescontracted; and zero draft of Zoning Act prepared
100% 5.6%
Complete assessment of 206 miles of primary literate
roads and prepare tender document for bid process
30 Nov. 2009 Assessment completed; BOQ prepared; tender
document prepared, bidding process begunBrewerville-Bopolu;Bopulu-Beleya;Zwedru-Greenville;Saclapea-Loquatuo
100% 5.6%
Commence preparatory work to pave of 1 mile of roadfrom Cotton Tree to Bokay Town
31 Oct. 2009 mobilization completed; Commenced roadconstruction
100% 5.6%
Complete 15 miles of all-weather secondary road fromSawmill to Lofa Bridge
30 Nov. 2009 Assessment, preparation of tender document, biddingprocess ongoing /Royesville Road; BorlolaRoad;Gbatala-Kokoma; DcClarke-Zorodee Clay
Town; Karloken-Barrobo
95% 5.3%
Complete assessment of feeder literate roads andprepare tender documents for bid process
30 Nov. 2009 Assessment completed, BOQ prepared tenderdocuments prepared, rehabilitation completed
100% 5.6%
Complete project assessment of 61 miles ofneighborhood roads that were rehabilitate in Monroviaand submit voucher to the Ministry of Finance for
payment of contractor
30 Nov. 2009 Assessment of 61 miles neighborhood roadcompleted, tender documents prepared, biddingprocess begun
100% 5.6%
Complete tender document for the pavement of 3 milesof neighborhood roads in Monrovia
30 Nov. 2009 Assessment completed; tender documents prepared;bidding process begun/15 miles of Monrovia's streets,Logan Town By-pass, Parker paint-Pipeline Neezoe
100% 5.6%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
39/56
Complete and launch 3 bridges in rural communities 30 Nov. 2009 10 bridges transported to site in Nyanforla, Sinji andCareysbury, excavation, form and steel workscompleted; 3 bridges launched
80% 4.4%
Complete assessment of human resources need of theMinistry of Public Works
30 Nov. 2009 Recruited 2 HR consultants and a financialmanagement advisors; draft copy of HR needassessment report is 75% complete
75% 4.2%
Complete training for 16 road maintenance engineersand 22 data management staff
30 Nov. 2009 20 road maintenance staff trained in labor-based roadmaintenance; 21 trained in contract management androad supervision; and 12 trained in changemanagement and systems administration.
90% 5.0%
Construct 1 groundwater-fed system in Monrovia 30 Nov. 2009 JICA completed 1 groundwater fed system at MTA toserve the community
100% 5.6%
Construct 30 boreholes fitted with hand pumps in ruralcommunities
30 Nov. 2009 27 boreholes constructed in Lofa, Bong, Nimba andMontserrado
90% 5.0%
Construct 45 hand dug wells fitted with hand pumps inrural communities
30 Nov. 2009 58 hand-dug wells constructed in Montserrado, CapeMount & Gbarpolu
100% 5.6%
Conduct assessment for spring catchment system 30 Nov. 2009 Assessment completed on 150 springs in Nimba and
Lofa counties
100% 5.6%
Construct 80 bio-sand filters in inaccessible ruralcommunities
30 Nov. 2009 122 bio-sand filters have been constructed in inseveral counties including Gbarpolu and Maryland
100% 5.6%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
40/56
Prepare technical specifications , bill of quantities, costestimate for rehabilitation of 5 Public buildings
Assessment completed on Five (5) public buildingsbehind the Executive Mansion; BOQs done forExecutive Pavilion and NHSB
100% 5.6%
Design and implement a road safety initiative including
side brushing and fabricate and install road safety signson city streets
223 Road safety signs fabricated and installed by
CHICO
100% 5.6%
Adjusted Average 81%
Special Security Service
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure
30 Nov. 2009 Final draft of the SOP for SSS is completed.Administration has endorsed the draft SOP;Personnel have access to SOP via the Computer lab.Hard copies are printed.
100% 25%
95%
Complete the execution and monitoring of the Conceptof Operation (Con-Ops) for the SSS
30 Nov. 2009 Draft of the Con-Ops is completed; copies circulatedto network cell were circulated and final draft prepared
100% 25%
Complete the inclusion of gender, disabilities, andenvironmental sensitive modules in the trainingcurriculum
30 Nov. 2009 Gender and disabilities sensitive modules have beenfully incorporated in the training curricula of SSS 80% 20%
Complete the preparation of a deployment plan 30 Nov. 2009 The deployment plan (County) is now completed;copy of plan has been submitted to the PTA andexecution is in progress
100% 25%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
41/56
Adjusted Average 95%
Liberia National Police
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure
30 Nov. 2009 Change management committee met and passed onthe SOP. Final draft has been produced andapproved.
100% 100%
100%
100%
Governance Commission
Planned Action Due Date Progress to date % Completed 90 dayProgress
Overall Score
Launch and operationalize the Land Commission 30 Nov. 2009 Office space renovated. Technical team recruited.Retreat held
98% 16%
93%Complete the mandates and functions review in threeministries: Ministry of Agriculture, Ministry of Labor andMinistry of Public Works
30 Sept. 2009 Review Evaluation Panel drawn (GC, CSA, LIPA,CSO),
75% 13%
MoA- report reviewed and recommended for GCsNo Objection to the report. GC responded positively
and forwarded to CSA for submission to IMC forapproval.
MPW draft report is being review by TWG and later bythe Review Evaluation Panel
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
42/56
MoL- contacted to review and finalize it MRF report
MICAT- added to group. Draft report presented toTWG for comments, preparing final report forsubmission to the Review Evaluation Panel
Cabinet to review and adopt National Policy onDecentralization and local Governance
30 Nov. 2009 Meeting held with Cabinet on October 26, 2009,awaiting Cabinet final approval
98% 16%
Cabinet Review and adopt National Public SectorReform Policy
30 Nov. 2009 National Public Sector Reform Policy approved byCabinet.
100% 17%
Cabinet to review and adopt the Mandates Functionsand Structures Review of Ministries and Agencies ofGovernment
30 Nov. 2009 Meetings held with Cabinet for endorsement. 85% 14%
President appointment and legislative confirmation of
members of the Land Commission
30 Sept. 2009 Member of the Land Commission appointed by
President and confirmed by Legislative
100% 17%
Adjusted Average 93%
Ministry of Justice
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
43/56
Commence the implementation of the strategic planformulated to address capacity development issueswithin the legal system
30 Nov. 2009 validation mtg held on MoJ strategic plan; 2departments have completed implementation plansunder the strategic plan; UNDP held action planningmtg with prosecution; 2 trainings held for 170 citysolicitors and police; 35 prosecutors (15 cty attorneys,4 assistant cty attorneys, 16 MoJ/SGBV crime unit
staff); hired Liberian professionals for each of thesecurity sectors
90% 9%
72%
Produce a full listing of prioritized infrastructure andequipment needed by all legal institutions
30 Nov. 2009 Listing completed for LNP, BIN, NFS & BCR 83% 8%
Complete the assessment and revision of existingCrime Policy
30 Nov. 2009 need information from LNP 0%
Complete the set up of a working group to compriseMIA, MoJ, Judiciary & MICAT to begin open dialogueon legal matters at the local level
30 Nov. 2009 Working group has been created to develop publiceducation campaign; held initial meeting
100% 10%
Complete the joint action plan for the child justiceprogram
30 Nov. 2009 Completed: joint action plan has been signed by allpartners - no final document yet
95% 10%
Develop a pilot program to track and profile criminals 30 Nov. 2009 started pilot at MCP and national palace ofcorrections, compiling photos and bio-data on alldetainees; have full dossier on MCP; and trying toreplicate in other prisons
33% 3%
Complete needs assessment of inmates to determinepsychological needs and begin the designing oftreatment plan
30 Nov. 2009 needs assessment at MCP progressing, being doneby Mr., Sylla (psychotherapist) from MYS
50% 5%
Commence the implementation of a pilot project toreduce the lengthen of pre-trial detention 30 Nov. 2009 launch of magistrate sitting program at MCP toconduct pre-trial hearings; collaborating with judiciaryand civil society to define approach; initiate design ofpublic education campaign on release of pre-traildetainees
100% 10%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
44/56
Commence the implementation of plan intended toprotect vulnerable groups (women, children, elderly &the disable) who come in contact with the law
30 Nov. 2009
ongoing work of Joint Program for Children; SGBVunit continues to prosecute rape cases, and totarget prevention in communities where women areabused; LNP women and children protection unitsubmitted proposal to create accommodation roomfor pregnant female detainees; MOGD developedguidelines on women and disabled persons that arebeing embedded into MoJ policies particularlycorrections; and UNIFEM contributing funds towork with women in prisons
67% 7%
Complete the setting up of a task force to develop anational framework for the practice of informal,customary justice system that conforms to humanrights standard, and the rule of law
30 Nov. 2009 Legal working group held 3rd meeting in Zwedru,UNMIL is drafting report in preparation for nationalconference on moving forward to harmonizetraditional justice with formal system
100% 10%
Adjusted Average 72%
Bureau of Correction
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure
30 Nov. 2009 Draft of the SOP is presently completed; internalvalidation is completed. SOP has been compiled andapproved.
100% 33%
93%Complete the inclusion of gender, disabilities, andenvironmental sensitive modules in the trainingcurriculum
30 Nov. 2009 Gender and disabilities sensitive modules have beenincorporated in the training curricula of Corrections
80% 27%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
45/56
Complete the preparation of a deployment plan 30 Nov. 2009 The deployment plan is complete. Final copy will besubmitted to the PTA by 29 September 2009.
100% 33%
Adjusted Average 93%
Bureau of Immigration andNaturalization
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Complete the preparation of a deployment plan 30 Nov. 2009 Draft of deployment plan has been completed; internalvalidation is completed. Final copy is completed.
100% 33%
93%
Complete the inclusion of gender, disabilities, andenvironmental sensitive modules in the trainingcurriculum
30 Nov. 2009 Gender and disabilities sensitive modules have beenincorporated into the training curriculum of BIN
80% 27%
Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure
30 Nov. 2009 Draft of SOP is done; internal validation done; finalcopy is ready
100% 33%
Adjusted Average 93%
Liberia National Fire Service
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Complete the formulation of Standard OperatingProcedures (SOP) for existing infrastructure
30 Nov. 2009 Final draft of SOP is completed. Hard copy has beensubmitted to the PTA.
100% 50.0%
100
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
46/56
Complete the preparation of a deployment plan 30 Nov. 2009 Deployment plan is also completed and hard copysubmitted to the PTA
100% 50.0%
%Adjusted Average 100%
Bureau of Customs
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Conduct operational needs assessment 30 Nov. 2009 Draft report of the needs assessment is completed.Validation completed and final copy submitted
100% 100%
100%
100%
National Security Agency
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Complete the inclusion of gender, disabilities, andenvironmental sensitive modules in the trainingcurriculum
30 Nov. 2009 Gender and disabilities sensitive modules have beenincorporated into the training curriculum of NSA
80% 80%
80%
80%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
47/56
Environmental Protection Agency
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Complete the development of environmental sensitive
modules to be included in the training curricula of allsecurity institutions
30 Nov. 2009 EPA is drafting its environment sensitive modules.
Outline and narrative is being finalized
80% 80%
80%80%
Disabilities Commission
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Complete the development of disabilities sensitivemodules to be
30 Nov. 2009 Security Pillar has endorsed the final copy of thedisabilities sensitive module. Hard copies have beencirculated to the relevant security institutions. TOTworkshop held.
100% 100%
100%
100%
Ministry of Health & Social Welfare
Planned Action Due Date Progress to date % Completed 90 day Progress Overall Score
Meet with JFK administration on the establishment ofthe Lab Tech program, and submit report/minutes
30-Sep Committee established, 2 meetings held. Equipmentassessment completed and sent to funding committee.Requested TA from WHO to develop curriculum.
100% 1.2%
75%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
48/56
Establish Technical Working Group (TWG), hold thefirst meeting to develop action plan on Leadership andManagement Training program, and submitreport/minutes
20-Aug Technical Working Group established, first meeting todevelop action plan held, report and minutessubmitted; completed
100% 1.2%
Solicit Technical Assistance from partners to work withTWG on leadership and management program
15-Sep TWG established. Meetings held to determinerole/necessity of the TA. Requested TA from WHO toassist with assessment & development of leadership &management. TA expected week of November16.
100% 1.2%
Review and adapt existing leadership & managementtraining modules
15-Oct Document currently under review by LIPA 50% 0.6%
Produce revised draft leadership and managementtraining modules
30-Oct Pending review and revision of module 0% 0.0%
0.0%
Validate and print leadership & management revised
modules
30-Nov Pending review and revision of module 0% 0.0%
Conduct HR census and present initial statistical report 30-Oct completed 100% 1.2%
Complete discrete choice analysis survey and submitreport
30-Nov Focus group and interviews completed. TA's arecurrently developing questionnaires for the study. Thisactivity will be carried forward to the 2nd 90 Daydeliverables work plan as implementing the survey anddata analysis is not feasible before the end of the year
40% 0.5%
Develop draft human resource policy 30-Dec Consultant approved. Negotiating start date. ThisDeliverable will also be postponed to the 2nd 90 Daywork plan, as reports from the HR studies are neededto inform the policy development process.
25% 0.3%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
49/56
Provide refresher training for 150 traditionally trainedmid wives in home based LSS
30-Nov 100 trained (Sept). Additional 100 trained in October. 100% 1.2%
Train 250 health workers in integrated BPHScurriculum
30-Oct Exceeded target. 310 trained in September. 24additional HW trained in October.
100% 1.2%
Train 250 health workers in SOPs 30-Nov Target exceeded. 923 completed training inMontserrado, Bomi, Cape Mount, Gbarpolu, GrandKru, MD, River Gee. Training on going in remaining 8counties.
100% 1.2%
Train 27 HIV/AIDS Counselors 30-Nov Training Completed. 27 health workers from South eastregion trained (trained ended Oct. 16)
100% 1.2%
Recruit health care workers in areas of criticalshortages and clinical teachers at TNIMA
30-Sep Health care workers recruited in these critical areas-Nurse anesthetist, OR tech, Midwifery. Still seekingclinical teachers in Maternal and Child Health,
radiography, nurse midwifery, Nurse anesthetist.
85% 1.0%
Complete payroll validation and remove ghostworkers from payroll
31-Aug 400 plus ghost names identified, 1st draft submitted 100% 1.2%
Place 300 health workers (CMs, nurses, doctors, labtechs, Pas, & health managers) on incentives
30-Nov 275 health workers placed on incentives 92% 1.1%
Provide scholarships to 200 professional healthworkers (CU-23, Phebe-75, Esther Bacon-70, MPHS-
30, JICA-1, study abroad- 10)
30-Nov Scholarships awarded to 227 professional healthworkers
100% 1.2%
Establish psychosocial working group 21-Aug Psychosocial Working Group established 100% 1.2%
Conduct mapping exercise among partners to identifynumber and location of community social workers andcase workers in the country
19-Sep Mapping exercised completed, report complied 100% 1.2%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
50/56
Review, consolidate, and finalize national psychosocialtraining manual
30-Nov Committee established. Consultant procurement inprogress. Existing manuals collected.
40% 0.5%
Deploy 40 case managers to 7 districts covering 21zones, in 3 counties
30-Oct Completed 100% 1.2%
Train 90 community based social workers 30-Nov 210 trained in -Montserrado, Bong, Margibi 100% 1.2%
Implement BPHS in 40% (an increase of 5% to the35% already being provided) of health facilities
30-Nov Accreditation field-work completed. Data analysiscompleted. BPHS is being implemented in 47% ofhealth facilities
100% 1.2%
Train 60 mid level health workers in the clinicalmanagement of rape in BPHS health facilities
30-Nov Completed 100% 1.2%
Hold meetings with partners on the drafting of SOPs
and guidelines, and review best practices for theprovision on gender specific services
30-Sep Meeting held, SOPs and guidelines drafted. Best
practices on gender specific services indentified
100% 1.2%
Recruit and train ambulance crews (including drivers)to provide EMS in 5 counties
30-Nov TORs for ambulance crews developed. Recruitmentand hiring underway.
75% 0.9%
Conduct needs assessment to identify and cost lifesaving equipment, and communication services forambulances nationwide
30-Oct Completed. M&E unit checklist developed 100% 1.2%
Install communication equipment within ambulances in
5 counties
30-Oct Radios for ambulances procured. Procurement of
repeater underway.
100% 1.2%
Deploy 7 fully equipped ambulances to 7 counties 30-Sep 7 fully equipped ambulances dispatched to 7counties 100% 1.2%
Establish and equip the national dispatch center thisincludes hiring and deployment of staff
30-Nov Dispatch center established at JFK 100% 1.2%
Select & finalize sites for drug depots, and completeprocurement and contracting for the construction of 7new drug depots, in 7 counties
30-Nov Sites selected. Seeking funding for 4 depots 25% 0.3%
0.0%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
51/56
Hold birth registration regional consultations to createawareness for county authorities, document for dutybearers (chiefs, etc), and plan for county roll out
30-Sep Birth registration consultation held in all regions, planfor county rolled out
100% 1.2%
Establish birth registration database 30-Nov New consultant hired. Format for report generationpending.
90% 1.1%
County consultations for 7 counties to createawareness on the community and facility based birthregistration system
30-Nov Moved to the next 90 days. Consultant hired. 10% 0.1%
Procure 1.5 million copies of blank certificates 30-Nov 10% 0.1%
Procure 2000 for community birth registration ledgers 30-Nov In progress; to be completed by Dec. 31, 2009 80% 1.0%
Procure 50,000 copies of application forms 30-Nov In progress to be completed by Dec. 31, 2009 80% 1.0%
Establish comprehensive EMONC centers in 4hospitals, in 4 counties
30-Nov Training planned for 60 Health workers. 56 mid levelhealth professionals and 2 medical doctors trained inneonatal resuscitation. Neonatal resuscitation kits
distributed to 40 health facilities in 15 counties(hospitals received 4 kits, health centers 3 kits, clinics 2kits)-October. BPHS accreditation shows 5 hospitalspreviously with partial EMOC services are now carryingout FULL EMONC services. Liberia GovernmentHospital-Buchannan, Government Hospital-Bomi, St.Timothy Hospital, Cape Mount, Telewoyan in Lofa, GWHarley-Nimba.
100% 1.2%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
52/56
Establish full basic EMOC centers in 6 health centers 30-Nov Training carried out, neonatal resuscitation kitsdistributed, 4 EMOC centers operating in New KruTown-Montserrado, Bahn- Nimbi, Pipeline-Montserrado, Fish Town-River Gee.
67% 0.8%
Establish 13 HIV Counseling Testing Centers inexisting health facilities
30-Nov 13 Counseling centers established (OCT). GrandGeddeh-3 clinics, River Cess-2 clinics, River Gee- 2clinics, Sinoe 2 clinics, Maryland-2 clinics. 2 clinics inBomi
100% 1.2%
Establish 7 PMTCT Centers in existing health facilities 30-Nov 7 established in: Fish Town, River Gee; C.H Renne,Margibi; Sass Town, Bomi; Suehn-mecca, Bomi;Jallah-lone Health Center, Gbarpolu, St-Francis inRiver Cess, F.J Grant Sinoe hospital.
100% 1.2%
Establish 3 new ART Centers in existing countyhospitals
30-Nov Sites indentified- River Gee-Fish Town hospital, RiverCess-St, Francis, LAC Hospital, Compound # 3, GrandBassa. Health workers training completed. DeploymentOct. 23.
100% 1.2%
Establish 17 new DOT Centers in the South EastRegion (Sinoe, Maryland, River Cess, River Gee,
Grand Geddeh, Grand Kru, Grand Bassa)
30-Oct completed 100% 1.2%
Train and equip 83 health workers (pharmacists, labtechs, dispensers, community health workers, andcase managers) in TB and leprosy case management
30-Nov Completed.110 trained. 100% 1.2%
Roll out new 6 month regimen in 6 counties (Bomi,Cape Mount , Gbarpolu, Margibi, Montserrado, Nimba)to Northwestern Region
30-Oct Completed. Targeting additional regions. 100% 1.2%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
53/56
Produce Environmental and Social ManagementFramework/ Medical Supplies and Medical Waste Plan
13-Nov Framework and MSMW plan completed. Will bepresented to relevant stakeholders at MOHSW forfeedback
75% 0.9%
Rehabilitate 9 facilities Phebe, Martha Tubman (MT),Foya, J. J. Dossen, TNIMA, AM Dogliotti, GW Harley,St. Frances, Liberian Government Hospital (Buchanan)
30-Nov Phebe-100% MT- 100%, Foya- 100%, J. J. Dossen-100%, TNIMA-100%, AM Dogliotti-on going, GWHarley-100%, St. Frances-100%, Liberian GovernmentHospital (Buchanan)-100%
100% 1.2%
Obtain Public Works approval for design and construct9 new clinics, and 5 health facilities (1-EPI cold room,3-community health department (CHD) in Gbarpolu,Buchannan & Tubmanburg, 1-MCH Annex Margibi C.H. Rennie)
30-Nov Public Works approval received. EPI cold room-completed, CHD Buchanan completed, CHDTubmanburg-100%, CHD Gbarpolu 60%-Sengbe/OXFAM, C.H. Rennie-Contract awarded,building commenced-65%. UNICEF-9 Clinicsconstruction underway (40%), to be completed by
years end.
65% 0.8%
Finalize procurement and contracting process for theconstruction of midwifery school in Zwedru
30-Oct Procurement completed. Contract negotiations inprogress. Meeting planned for Sept 28
100% 1.2%
Commence construction of midwifery school in Zwedru 30-Nov Contract awarded. Construction to commence in Nov. 10% 0.1%
Finalize architectural standards for hospitals and health
centers
15-Oct Architectural standards approved by infrastructure
Task Force. Working drawings produced and sent toMPW (approval pending).
100% 1.2%
Conduct validation workshop on the draft National SWpolicy with members of the IBS Pillar
15-Sep Validation workshop on the draft National SW policywith IBS Pillar members conducted
100% 1.2%
Hold 3 regional validation consultations to reviewnational SW and mental health policies
15-Oct completed 100% 1.2%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
54/56
Present National SW policy to cabinet and Health andSocial Welfare subcommittee for endorsement
30-Nov Pillar changes incorporated, Dept of Planning toarrange presentation
100% 1.2%
Receive revision of 1st draft of SW plan from theconsultant
30-Nov completed 100% 1.2%
Commence the reform process (develop TORs andplace appropriate persons in appropriate positions) forthe department of social welfare in order to implementSW policy and plan
30-Nov Relevant persons notified and reassigned. New TORsdeveloped. Current structures revised, pendingapproval.
75% 0.9%
Establish social welfare advisory committee to overseeimplementation of policy and plan
30-Nov TOR developed, pending agreement that this shouldbe a function of HSCC, or separate committee
100% 1.2%
Identify 3 regional offices for the decentralization ofSocial Welfare Services
30-Nov Concept paper drafted. Regional office locationsproposed. Site Inspections planned for week of Nov.16.
40% 0.5%
Present accreditation tools/procedures to PCT 27-Aug Accreditation tools and procedures presented to PCT 100% 1.2%
Present accreditation tools/procedures to the pillar 30-Oct Presented at the Oct. 5,2009 IBS meeting. 0.0%
Develop TOR for social worker licensing board andappoint board members
15-Sep TOR being completed. Meeting held on Sept 11.Board members appointed. Meeting being planned.
75% 0.9%
Establish TWG to develop standards for licensing
social workers
15-Sep Technical Working Group established 100% 1.2%
Develop standards for licensing social workers 15-Oct Draft licensing standards developed. 75% 0.9%
Hold validation meeting to validate the licensingstandards
30-Oct Pending development of standards 0% 0.0%
Present to licensing standards to PCT for endorsement 5-Nov Pending development of standards 0% 0.0%
-
8/14/2019 Released by Authority of the Ministry of Planning and Economic
55/56
Present to MOH for endorsement 9-Nov Pending development of standards 0% 0.0%
Present licensing standards to HSCC for endorsement 19-Nov Pending development of standards 0% 0.0%
Print and disseminate Licensing Standards 27-Nov Pending development of standards 0% 0.0%
Establish and hold 1st meeting of inter agencycommittee/TWG to develop the Basic Package ofSocial Welfare Services
16-Oct Members identified, Subsequent meetings held.Working on work plan/schedule of activities.
100% 1.2%
Complete assessment national reference laboratory 4-Sep National reference laboratory assessment completed 100% 1.2%
Submit procurement list of materials needed tocomplete laboratory
11-Sep Item list developed, and submitted to DM-HealthServices
100% 1.2%
Complete the procurement process for necessarybuilding materials and general for the renovation
30-Oct List complete, awaiting submission 65% 0.8%
Hold consultations and present report on the status of2 regional blood banks in Montserrado and BongCounties
15-Sep Bong consultations held, Montserrado location underdiscussion 75% 0.9%
Expedite delivery and installation of medical laboratoryand IT equipment
30-Sep 1st shipment of medical laboratory equipment received 50% 0.6%
Production of 2008/2009 financial statement 31-Aug 2008/2009 financial statement completed 100% 1.2%
Complete TOT Training for financial managers 30-Sep TOT training for fi