AgendaAgenda
Project Overview
PowerCenter Configuration
Configuration Management Deployment Process
Release Process
Summary
-
8/6/2019 Release Control With Power Center 2341
3/29
Project OverviewProject Overview
Global, integrated investment services firm offering- the full range of wealth management, asset management,
investment banking and securities services- to the full spectrum of clients
Worlds largest private bank
Top ten financial services firm by market capitalization
- $62 billion dollars Total client assets of US$1 trillion
UBSUBS
-
8/6/2019 Release Control With Power Center 2341
4/29
Project OverviewProject Overview
System EnvironmentsSystem Environments
Development ProductionTest
IBM AIX SP2 cluster
DB2 UDB EEE
PowerCenter 1.6
-
8/6/2019 Release Control With Power Center 2341
5/29
Project OverviewProject Overview
Load ProcessLoad Process
File
Preprocessing
Conditioning
AutoLoader
PowerCenter
SQL Apply
AutoLoader
System of Records
Common Data Warehouse
-
8/6/2019 Release Control With Power Center 2341
6/29
Project OverviewProject Overview
Main organizational element
Three letter acronym as base for naming standards
Each delivery stream gets the same infrastructure:UNIX directories, meta data area, PowerCenter folders
Each delivery stream has business responsible, data modeler,database administrator, delivery stream manager
Team size typically between 1 and 5
Delivery streams release independently from each other
Delivery StreamDelivery Stream
-
8/6/2019 Release Control With Power Center 2341
7/29
Project OverviewProject Overview
Application StructureApplication Structure
Delivery streams:
RCL release control tools
MDR meta data repository
DSF DWP sourcing framework
FDS feed specific data processing
subject data area
data mart
......
RCL MDR FDS
System of Records
DSFDSF
DWP Sourcing Framework
...
Common DataWarehouse
-
8/6/2019 Release Control With Power Center 2341
8/29
Project OverviewProject Overview
Two areas:
/dwp_root UNIX based files, version controlled
/dwp_data dynamic data, archival on demand
Additional directory level for the environment in order to
support more than one environment on one system
/dwp_root is organized by delivery streams
Directory StructureDirectory Structure
-
8/6/2019 Release Control With Power Center 2341
9/29
Project OverviewProject Overview
/dwp_data is organized by logical processing steps
and by delivery streams
Symbolic links from PowerCenter program area
to /dwp_data
Tool support for generation of directories
(delta processing, integration with release procedures)
Directory Structure (continued)Directory Structure (continued)
-
8/6/2019 Release Control With Power Center 2341
10/29
PowerCenter ConfigurationPowerCenter Configuration
Start with one single (local) repository
Support different, clearly separated environments with
different responsibilities All environments have identical structure (products,
databases, PowerCenter server configurations)
All program changes (UNIX, PowerCenter) are done on the
development system
All changes on test and production systems go through the
release process and are clearly tracked
Design PrinciplesDesign Principles
-
8/6/2019 Release Control With Power Center 2341
11/29
PowerCenter ConfigurationPowerCenter Configuration
Repository StructureRepository Structure
D S V S A S P
Server Server Server
D development
S stagingV versioning
A integration / user acceptance test
P production
-
8/6/2019 Release Control With Power Center 2341
12/29
PowerCenter ConfigurationPowerCenter Configuration
Folder StructureFolder Structure
Release area is identical in all environments.
user area
(avoid shortcuts)
team area
release area
-
8/6/2019 Release Control With Power Center 2341
13/29
PowerCenter ConfigurationPowerCenter Configuration
developer development, unit and integration testing
delivery stream manager manager, release planning
release manager deployment, tracking, configuration controlPowerCenter administration
session manager session management for testand production systems
Roles and ResponsibilitiesRoles and Responsibilities
Role Responsibility
-
8/6/2019 Release Control With Power Center 2341
14/29
Configuration ManagementConfiguration Management
External tool for software configuration management(Rational Corporation)
Powerful version control, work space andbuild management
Same directory structure as in developmentenvironment
Fully automated access layer
ClearCaseClearCase
-
8/6/2019 Release Control With Power Center 2341
15/29
Configuration ManagementConfiguration Management
Integrate all release specific data:sourcing framework, DDL, documentation, scripts & SQL
Avoid problems with current PowerCenter versionmechanism (shortcuts, sessions)
Enable automation of release process
Different responsibilities for different environments Enforce change tracking
Why external version control?Why external version control?
-
8/6/2019 Release Control With Power Center 2341
16/29
Configuration ManagementConfiguration Management
_..
e. g. ACC_1.0.1
major release number(high level wave planning)
minor release number(delivery stream development plan)
patch level (bug fixes, emergency releases)
Release NamingRelease Naming
-
8/6/2019 Release Control With Power Center 2341
17/29
Configuration ManagementConfiguration Management
VersioningVersioningExampleExample
Labeling Schema:
ACC_x.y.z release label
RLS_A current version in
user acceptance testRLS_P current version in production
/main/1/main/1
/main/2/main/2
/main/4/main/4
/main/5/main/5
ACC_1.0.0
ACC_1.0.1
ACC_1.0.2
ACC_2.0.0
RLS_P
RLS_A
reset_acc.sql
/main/3/main/3
-
8/6/2019 Release Control With Power Center 2341
18/29
Deployment ProcessDeployment Process
Repository Copy:- via GUI / database backup & restore- trackable (result is a file)
- problem: overwrites server configuration
Folder Copy:- only via GUI- and therefore not trackable
Mapping Copy:- only via GUI- used only within development repository
PowerCenter Deployment FacilitiesPowerCenter Deployment Facilities
-
8/6/2019 Release Control With Power Center 2341
19/29
Deployment ProcessDeployment Process
Repository Copy is the only trackable method
Delivery Streams require folder level deployment
ApproachApproach
Introduce staging repositories in all environments
Staging repository is used to separate folder from repository,using the Folder Copy method
Staging repository is then deployed using theRepository Copy method
Use combination of both methods:
-
8/6/2019 Release Control With Power Center 2341
20/29
Deployment ProcessDeployment Process
Freeze, Deliver and Receive ProcessesFreeze, Deliver and Receive Processes
D S V S A S P
manual folder copydatabase unload / load
automated process
delivery package
ClearCase
Freeze
Deliver
Receive
-
8/6/2019 Release Control With Power Center 2341
21/29
Deployment ProcessDeployment Process
sub unload {
system("db2 connect to $repository user $userusing $password");
db2select(\@tables, SELECT tabname FROM syscat.tables
WHERE tabschema = 'PCSTAGE'and (tabname LIKE 'OPB_%' or tabname LIKE 'REP_%') and type = 'T'
ORDER BY tabname");
foreach $table (@tables) {
system("db2 export to $table of del modified by coldel0x02 chardel0x03
select \\* from $user.$table);
};
system("tar cvf $tarfile *");
}
Repository UnloadRepository Unload
-
8/6/2019 Release Control With Power Center 2341
22/29
Deployment ProcessDeployment Process
sub load {
system("db2 connect to $repository user $userusing $password");
system("tar xvf $tarfile");
foreach $file (("OPB_REPOSIT", "OPB_REPOSIT_INFO")) {system("sed -e 's/CDW_StagingD/$name/g' $file > tmp.out");
system("sed -e 's/DDBPCR/$dbs/g' tmp.out > $file");
}
foreach $table () {
system("db2 delete from $user.$table);
system("db2 import from $table
of del modified by coldel0x02 chardel0x03 delprioritycharinsert into $user.$table);
};
}
Repository LoadRepository Load
-
8/6/2019 Release Control With Power Center 2341
23/29
Release ProcessRelease Process
Responsible for high level planning and impact analysis
Defines release scope and release numbers on base
of delivery streams
Assigns responsibilities (delivery stream manager, datamodeler, database administrator, business responsible)
Result is documented in wave plan document
Wave plan is base for all subsequent design,implementation and quality assurance tasks
Change Control BoardChange Control Board
-
8/6/2019 Release Control With Power Center 2341
24/29
Release ProcessRelease Process
1. Preparation of UNIX and PowerCenter release areas delivery stream manager
2. Issue release request delivery stream manager
3. Create new release (Freeze) release manager
- Copy to staging repository, unload- Create / update ClearCase file versions- Create release label and attach to new release
4. Create release package (Deliver) release manager - delta / full processing- lock release in ClearCase
5. Install release (Receive) IT integration / IT operation
- Load, copy from staging repository- Post install script
6. Create / update database objects in target environment database administrator
7. Restart PowerCenter server IT integration / IT operation
Release ProcedureRelease Procedure Responsible
-
8/6/2019 Release Control With Power Center 2341
25/29
-
8/6/2019 Release Control With Power Center 2341
26/29
Release ProcessRelease Process
Provide easy-to-use information on all releases
Today: ClearCase based
In future: Integration with meta data repository
Release DatabaseRelease Database
DSF_1.1.4 A 27-Jul-00.17:32:27 new config files
DSF_1.1.3 20-Jul-00.13:16:38 fix for single node load problem
DSF_1.1.2 P 19-Jul-00.14:05:30 correct JDM, error handling
DSF_1.1.1 18-Jul-00.17:51:19 removed environment dependencies
DSF_1
.1.0 17-Jul-00
.17:11:47 see release notes
DSF_1.0.2 11-Jun-00.14:07:01 changed Gen_Environment
DSF_1.0.1 09-Jun-00.13:20:03 see release notes
DSF_1.0.0 24-May-00.17:48:42 initial version
Example:
-
8/6/2019 Release Control With Power Center 2341
27/29
SummarySummary
PowerCenter was successfully introduced at UBS and proved
to work well within the sourcing framework
Configuration control with ClearCase is efficient and straightforward
Release process meets the requirements and is efficient
(so far ~200 successful releases, effort usually below hour)
Generally little administration overhead although someimprovements in PowerCenter would make administrators
and release managers life easier
ExperiencesExperiences
-
8/6/2019 Release Control With Power Center 2341
28/29
SummarySummary
Copy of sessions
Export / import folders via (UNIX) command line
for further automation of release process
Avoid restart after deployment
Logical backups / restores via command line with result on
server side (more flexible than database backup, avoid ODBC
overhead) User administration via command line
Wish ListWish List
-
8/6/2019 Release Control With Power Center 2341
29/29
Contact InformationContact Information
Friedrich Lehn
UBS AG, Switzerland
phone: +49 171 360 60 84
email: [email protected]