LAPORAN OPERASIONAL MATERIAL PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 07-10 februari 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 7-Feb-11 Paku 5 Cm Kg 2 9,750 19,500
Benang No 9 Bh 3 5,000 15,000
Slang Waterfas Mtr 20 1,500 30,000
2 8-Feb-11 Pasir Beton Cimalaka 425x185x105 M3 8.255 145,000 1,196,975
Kawat Beton Kg 5 15,000 75,000
Pipa PVC (Maspion) AW Abu 4" Btng 4 220,000 880,000
Lem Pipa (Asahi) Klng 1 25,000 25,000
3 9-Feb-11 Besi Beton 13 Mm Btng 60 95,000 5,700,000
Besi Beton 6 Mm Btng 20 23,000 460,000
Split 1/2" 425x185x65 M3 5.11 150,000 766,500
4 10-Feb-11 Pipa PVC (Maspion) AW Putih 2" Btng 3 35,000 105,000
Ploksock 3"x2" Bh 1 12,000 12,000
Besi Beton 8 Bc Mm Btng 100 27,500 2,750,000
Besi Beton 10 Mm Btng 20 57,500 1,150,000
Besi Beton 13 Mm Btng 70 95,000 6,650,000
Knee 1" Bh 2 3,000 6,000
SDD 1" Bh 1 3,000 3,000
Siltip (Onda) Bh 1 2,000 2,000
Ember Bh 11 5,000 55,000
Jumlah 19,900,975
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 2
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 12-18 Februari 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 12-Feb-11 Semen Holcim Zak 5 54,500 272,500
Kawat Beton Kg 0.5 12,400 6,200 2 14-Feb-11 Singkup (Ken Master) Bh 2 45,000 90,000
Semen Holcim Zak 2 54,500 109,000
Kawat Beton Kg 1.5 12,400 18,600 3 15-Feb-11 Semen Holcim Zak 7 54,500 381,500
Semen Holcim Zak 2 54,500 109,000 4 16-Feb-11 Semen Holcim Zak 6 54,500 327,000
Pencil Kayu Bh 1 1,500 1,500
Batu Belah 425x185x75 M3 5.896 90,000 530,640
Semen Holcim Zak 4 54,500 218,000
Pasir Pasang 425x185x105 M3 8.255 115,000 949,325
Semen Holcim Zak 2 54,500 109,000
Multi 9 Mm Lbr 20 94,000 1,880,000
Kaso 4x6 M3 2 1,200,000 2,400,000 5 17-Feb-11 Semen Holcim Zak 10 54,500 545,000
Kawat Beton Kg 1.5 12,400 18,600
Paku 7 Cm Kg 1.5 9,750 14,625
Paku 4 Cm Kg 5 10,750 53,750
Pasir Beton Cimalaka 425x185x107 M3 8.4112 145,000 1,219,624
Split 1/2 425x185x65 M3 5.11 150,000 766,500
Cangkul (Chrocodile) Bh 2 55,000 110,000
Doran Bh 2 10,000 20,000
Semen Holcim Zak 5 54,500 272,500 6 18-Feb-11 Semen Holcim Zak 5 54,500 272,500
Jumlah 10,695,364
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 3
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 19-24 Februari 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 19-Feb-11 Paku 7 Cm Kg 1.5 9,750 14,625
Bata Merah Idramayu Bh 7000 520 3,640,000
2 21-Feb-11 Semen Holcim Zak 1 54,500 54,500
Kawat Beton Kg 2 12,400 24,800
Mata Gergaji Besi (Sandflex) Bh 1 11,000 11,000
3 22-Feb-11 Besi Beton 10 Mm SNI Btng 20 57,000 1,140,000
Pencil Kayu Bh 1 1,500 1,500
Paku 5 Cm Kg 2 9,750 19,500
Pipa PVC (Triliun) D Putih 3" Btng 4 42,500 170,000
Kawat Beton Kg 1 12,400 12,400
Semen Holcim Zak 5 54,500 272,500
4 23-Feb-11 Semen Holcim Zak 15 54,500 817,500
Ram Ayam Mtr 14.5 12,500 181,250
Ram Kawat 1 Cm Mtr 1.5 14,000 21,000
Pipa PVC (Triliun) D Putih 2 1/2" Btng 5 32,000 160,000
Kawat Beton Kg 1 12,400 12,400
5 24-Feb-11 Dop 1/2" Bh 1 1,500 1,500
Lem Pipa (Asahi) Klng 1 25,000 25,000
Semen Holcim Zak 10 54,500 545,000
Pasir Pasang 420x190x105 M3 8.39 115,000 964,850
Jumlah 8,089,325
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 4
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 26 feb-04 mar 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 26-Feb-11 Kawat Beton Kg 1 12,400 12,400
Semen Holcim Zak 10 54,500 545,000
Paku 7 Cm Kg 1 9,750 9,750 2 28-Feb-11 Pipa PVC (Triliun) D Pth 3" Btng 2 55,000 110,000 3 1-Mar-11 Kaso (Borneo) 4x6x400 Cm M3 2 1,200,000 2,400,000
Bambu Btng 100 8,500 850,000
Semen Holcim Zak 5 54,500 272,500
Bata Merah Idramayu Bh 7000 520 3,640,000 4 2-Mar-11 Ploksock 4"x3" Bh 1 12,000 12,000
Knee 3" Bh 2 10,000 20,000
Pipa PVC (Triliun) 4" D Ptih Btng 4 65,000 260,000
Pipa PVC (Triliun) 3" D Ptih Btng 1 42,500 42,500
Kawat Beton Kg 1 12,400 12,400
Paku 7 Cm Kg 2 9,750 19,500
Paku 10 Cm Kg 1.5 9,750 14,625
Poksock 1"x3/4" Bh 1 3,000 3,000
Ploksock 3/4"x1/2" Bh 1 2,500 2,500
Stop Kran 1" Bh 1 16,500 16,500
Semen Holcim Zak 6 54,500 327,000 5 3-Mar-11 Bata Merah Bh 7000 520 3,640,000
Siltip (Onda) Bh 1 2,000 2,000
Socket 1" Bh 2 2,500 5,000
Semen Holcim Zak 10 54,500 545,000 6 4-Mar-11 Paku 5 Cm Kg 2.5 9,750 24,375
Paku 7 Cm Kg 5 9,750 48,750
Benang No 9 Bh 2 5,000 10,000
Paku 10 Cm Kg 3 9,750 29,250
Jumlah 12,874,050
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 5
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 05-11 maret 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 5-Mar-11 Paku 10 Cm Kg 3 9,750 29,250
Paku 7 Cm Kg 3.5 9,750 34,125 2 7-Mar-11 Paku 4 Cm Kg 5 10,750 53,750
Pasir Pasang Hitam 425x185x105 M3 8.255 115,000 949,325 3 8-Mar-11 Pipa PVC (Triliun) D Ptih 3" Btng 1 55,000 55,000
Pipa PVC (Triliun) D Ptih 2 1/2" Btng 4 41,000 164,000
Paku 7 Cm Kg 2 9,750 19,500
Kaso 4x6 M3 1 1,200,000 1,200,000 4 9-Mar-11 Paku 7 Cm Kg 6.5 9,750 63,375
Pipa PVC (Neovin) 1/2" Btng 2 12,000 24,000
Besi Beton 8 Mm Bc Btng 60 27,500 1,650,000
Besi Beton 10 Mm Full Btng 25 57,500 1,437,500
Besi Beton 13 Mm Full Btng 90 95,000 8,550,000
Multi 9 Mm Lbr 30 94,000 2,820,000 5 10-Mar-11 Semen Holcim Zak 1 54,500 54,500
Kawat Brton Kg 1 12,400 12,400
Knee Rck 3" Bh 5 10,000 50,000
Knee Rck 2 1/2" Bh 2 7,500 15,000
Pipa PVC (Triliun) AW Putih 1" Btng 1 4,000 4,000 6 11-Mar-11 Paku 7 Cm Kg 4 9,750 39,000
Pasir Beton Cimalaka 425x185x110 M3 8.648 145,000 1,253,960
Kawat Beton Kg 2.5 12,400 31,000
Jumlah 18,509,685
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 6
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 12 - 18 maret 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 12-Mar-11 Paku 7Cm, 5 Cm Kg 2 9,750 19,500
Split 1/2" 425x185x75 M3 5.896 150,000 884,400
Pasir Beton Cimalaka 425x185x103 M3 8.098 145,000 1,174,210
Kawat Brton Kg 1.5 12,400 18,600 2 14-Mar-11 Paku 7 Cm Kg 1 9,750 9,750
Paku 7 Cm Kg 0.5 9,750 4,875
Pipa Listrik (Triliun) C Putih 5/8" Btng 15 4,000 60,000 3 15-Mar-11 Pipa Listrik (Triliun) C Putih 5/8" Btng 3 4,000 12,000
Kawat Beton Kg 2 12,400 24,800 4 15-Mar-11 Paku 10 Cm Kg 1 9,750 9,750
Pipa PVC (Triliun) D Putih 1 1/4" Btng 1 25,000 25,000 5 16-Mar-11 Kawat Beton Kg 1.5 12,400 18,600
Paku 10 Cm Kg 1.5 9,750 14,625 6 17-Mar-11 Jerigen Bh 10 18,000 180,000
Solar Ltr 5 4,500 22,500
Spatu Boat (AP) Psng 5 55,000 275,000
Semen Holcim Zak 50 54,500 2,725,000
Mata Gergaji Besi (Sandflex) Bh 1 11,000 11,000
Singkup Bh 1 45,000 45,000
Pasir Beton Cimalaka 425x185x105 M3 8.255 145,000 1,196,975
Pengki Karet Bh 5 11,000 55,000
Samen Holcim Zak 8 54,500 436,000
Solar Ltr 5.5 4,500 24,750
Semen Holcim Zak 20 54,500 1,090,000 7 18-Mar-11 Pencil Kayu Bh 1 1,500 1,500
Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
Jumlah 8,346,835
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 7
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 19-025 maret 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 19-Maret-11 Semen Holcim Zak 3 54,500 163500
Kabel (Eterna) 3X21,5 Mtr 5 6500 32500
Paku 7 Cm Kg 2 9,750 19500
Paku 5 Cm Kg 3 9,750 29250
2 21-Maret-11 Semen Holcim Zak 10 54,500 545000
Pipa Listrik (Triliun) C Pth 5/8" Btng 1 4,000 4000
3 22-Maret-11 Pasir Pasang 420X190X105 M3 8.379 90,000 754110
Kabel (Eterna) 3X21,5 Mtr 6 6500 39000
4 23-Maret-11 Kawat Beton Kg 1 12,400 12400
Semen Holcim Zak 10 54,500 545000
Semen Holcim Zak 1 54,500 54500
Pipa Listrik (Triliun) C Pth 5/8" Btng 1 4,000 4000
5 24-Maret-11 Ram Kawat 1 Cm Cm 30 14000 420000
Semen Holcim Zak 5 54,500 272500
6 25-Maret-11 Paku 7 Cm Kg 3 9,750 29250
Semen Holcim Zak 6 54,500 327000
Pipa Listrik (Triliun) C Pth 5/8" Btng 2 4,000 8000
Kawat Beton Kg 2 12,400 24800
Jumlah 3,284,310
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 8
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 28 maret - 01 april 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 28-Maret-11 Semen Holcim Zak 5 54,500 272,500
Paku Triplex Kg 1 1/4 20,000 25,000
Paku 4 Cm Kg 1 10,750 10,750
Pasir Pasang 420X190X105 M3 8.379 115,000 963585
2 29-Maret-11 Paku 7 Cm Kg 2 9,750 19,500
Paku 10 Cm Kg 2 9,750 19,500
3 30-Maret-11 Semen Holcim Zak 10 54,500 545,000
Paku 5 Cm Kg 2 9,750 19,500
Paku 7 Cm Kg 2 9,750 19,500
Paku 10 Cm Kg 3 9,750 29,250
4 31-Maret-11 Bata Merah Indramayu Bh 7000 520 3,640,000
5 1-Apr-11 Semen Holcim Zak 5 54,500 272,500
Besi Beton 8 Mm PKS Btng 40 38,000 1,520,000
Besi Beton 10 Mm PKS Btng 25 57,500 1,437,500
Besi Beton 13 Mm Ulir PKS Btng 20 95,000 1,900,000
Jumlah 10,694,085
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 9
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 02 - 80 April 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 2-Apr-11 Semen Holcim Zak 10 54,500 545,000
Paku 7 Cm Kg 2.5 9,750 24,375
Benang No 9 Bh 1 5,000 5,000
Pipa Listrik PVC (Triliun) C ptih 5/8" Btng 8 4,000 32,000
Kawat Beton Kg 2 12,400 24,800
2 4-Apr-11 Knee 2 1/2" Bh 2 8,000 16,000
Besi Beton 6 Mm Full Btng 5 27,500 137,500
3 5-Apr-11 Pipa Listrik PVC (Triliun) C ptih 5/8" Btng 9 4,000 36,000
4 6-Apr-11 Kawat Beton Kg 5.5 12,400 68,200
Pipa Listrik PVC (Triliun) C ptih 5/8" Btng 4 4,000 16,000
Paku 7 Cm Kg 2 9,750 19,500
5 7-Apr-11 Semen Holcim Zak 10 54,500 545,000
Pipa Listrik PVC (Triliun) C ptih 5/8" Btng 5 4,000 20,000
6 8-Apr-11 Semen Holcim Zak 10 54,500 545,000
2,034,375
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 10
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 09 - 15 April 2011
NoTanggal
URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 9-Apr-11 Semen Holcim Zak 10 54,500 545,000
Pipa Listrik PVC (Triliun) C pth 5/8" Btng 5 4,000 20,000
2 11-Apr-11 Pipa Listrik PVC (Triliun) C pth 5/8" Btng 1 4,000 4,000
3 12-Apr-11 Paku 5 Cm Kg 3 9,750 29,250
Semen Holcim Zak 5 54,500 272,500
4 13-Apr-11 Pipa Listrik PVC (Triliun) C pth 5/8" Btng 2 4,000 8,000
Benang Cap Peniti Bh 1 2,000 2,000
Semen Holcim Zak 5 54,500 272,500
Ram Ayam 1/2 Cm Mtr 3 20,000 60,000
5 14-Apr-11 Paku 7 Cm Kg 2 9,750 19,500
Paku 10 Cm Kg 2 9,750 19,500
Semen Holcim Zak 5 54,500 272,500
Pipa Listrik PVC (Triliun) C pth 5/8" Btng 2 4,000 8,000
6 15-Apr-11 Pipa Listrik PVC (Triliun) C pth 5/8" Btng 1 4,000 4,000
1,536,750
Dibuat Tgl:
Di Ajukan Di Setujui
SAT
Page 11
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 16 -22 April 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 16-Apr-11 Semen Holcim Zak 2 54,500 109,000
2 18-Apr-11 Semen Holcim Zak 3 54,500 163,500
3 18-Apr-11 Semen Holcim Zak 7 54,500 381,500
Knee 1/2" Bh 2 2,000 4,000
Besi Beton 8 Mm Full Btng 2 38,000 76,000
Besi Beton 10 Mm Full Btng 2 57,500 115,000
Besi Beton 13 Mm Full Btng 10 95,000 950,000
Besi Beton 10 SNI Btng 15 57,500 862,500
4 19-Apr-11 Semen Holcim Zak 10 54,500 545,000
Pasir Pasang 425X185X110 M3 8.648 115,000 994,520
Besi Beton 6 Mm Full Btng 10 27,500 275,000
Besi Beton 8 Mm Full Btng 20 38,000 760,000
Besi Beton 10 Mm Full Btng 25 57,500 1,437,500
5 21-Apr-11 Semen Holcim Zak 10 54,500 545,000
Paku 10 Cm Kg 2 9,750 19,500
Paku 7 Cm Kg 1.5 9,750 14,625
Paku 5 Cm Kg 1.5 9,750 14,625
Pencil Kayu Bh 1 1,500 1,500
SAT
Page 12
6 22-Apr-11 Pipa (Triliun) AW Pih 1/2" Btng 3 14,000 42,000
7,310,770
Dibuat Tgl:
Di Ajukan Di Setujui
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 23 - 30 April 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 23-Apr-11 Pipa PVC (Triliun) AW Putih 1/2" Btng 2 14,000 28,000
2 25-Apr-11 Semen Holcim Zak 10 54,500 545,000
Paku 7 Cm Kg 2 9,750 19,500
Paku 5 Cm Kg 2 9,750 19,500
Inbowdus (Panasonic) Bh 59 2,000 118,000
Kabel (Etena) NYM 3X1,5 Roll 1 6,500 6,500
3 27-Apr-11 Kleman Kabel No 9 Bks 4 4,000 16,000
Kabel (Eterna) NYM 3X2,5 Roll 1 462,500 462,500
Semen Holcim Zak 10 54,500 545,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 3 4,000 12,000
Kabel (Eterna) NYM 3X1,5 Roll 1 325,000 325,000
Kabel (Eterna) NYM 2X1,5 Roll 1 255,000 255,000
4 28-Apr-11 Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
Kabel (Eterna) NYM 3X1,5 Roll 1 325,000 325,000
Solasi (Nitto) Bh 1 7,500 7,500
Kleman Kabel No 8 Bks 2 4,000 8,000
SAT
Page 13
5 30-Apr-11 Semen Holcim Zak 10 54,500 545,000
Benang No 9 Bh 1 5,000 5,000
3,250,500
Dibuat Tgl:
Di Ajukan Di Setujui
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 2 - 6 mei 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 2-Mei-11 Semen Holcim Zak 10 54,500 545,000
Kawat Beton Kg 1 12,400 12,400
Pipa PVC (Triliun) D Putih 4" Btng 2 75,000 150,000
Knee 4" Bh 1 12,000 12,000
Knee 3" Bh 2 9,000 18,000
Tee Y 4"x3" Bh 1 40,000 40,000
Lem Pipa (Asahi) Kleng 1 25,000 25,000
Pasir Pasang 425x185x102 M3 8.019 115,000 922,185
2 3-Mei-11 Kawat Beton Kg 1 12,400 12,400
Pipa PVC (Triliun) D Putih 4" Btng 1 75,000 75,000
3 4-Mei-11 Semen Holcim Zak 10 54,500 545,000
Klem Kabel No 8 Bks 2 4,000 8,000
Teedus Cbng 3 Bh 10 3,000 30,000
Teedus Cbng 4 Bh 5 3,500 17,500
SAT
Page 14
Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000
Solasi Nitto Bh 1 7,000 7,000
4 6-Mei-11 Semen Holcim Zak 10 54,500 545,000
Paku 7+10Cm Kg 1 9,750 9,750
Paku 7Cm Kg 1 9,750 9,750
Paku 5Cm Kg 1 9,750 9,750
Benang No 9 Bh 1 5,000 5,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
Solasi Nitto Bh 1 7,000 7,000
Pipa PVC (Triliun) D Putih 4" Btng 1 75,000 75,000
3,092,735
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
Kavling : 28
Periode : 7 - 13 mei 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 7-Mei-11 Pipa PVC (Triliun) D Putih 4" Btng 6 75,000 450,000
Pipa PVC (Triliun) D Putih 3" Btng 1 55,000 55,000
Knee 4" Bh 4 12,000 48,000
Knee 3" Bh 4 9,000 36,000
Knee 2 1/2" Bh 4 8,000 32,000
Tee 4" Bh 2 12,000 24,000
Tee Y 4"x3" Bh 1 40,000 40,000
Ploksock 4"x3" Bh 2 -
Tee 4" Bh 1 12,000 12,000
Paku 10 Cm Kg 2 9,750 19,500
2 9-Mei-11 Knee 2 1/2" Bh 2 8,000 16,000
Pencil Kayu Bh 1 1,500 1,500
Kikir Bh 1 22,500 22,500
Paku 4+7Cm Kg 1 10,750 10,750
3 10-Mei-11 Kawat Beton Kg 1 12,400 12,400
Semen Holcim Zak 10 54,500 545,000
SAT
Page 15
Kabel TV Mtr 48 3,000 144,000
Kabel Tlpn Mtr 100 3,000 300,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
Paku 10 Cm Kg 2-Jan 9,750 34,125
Paku 5 Cm Kg 2 9,750 19,500
4 11-Mei-11 Bambu Btng 20 9,000 180,000
Tambang Injuk iKet 25 5,000 125,000
Pipa PVC (Triliun) D Putih 4" Btng 1 75,000 75,000
5 12-Mei-11 Pipa PVC (Triliun) AW Putih 1" Btng 5 20,000 100,000
Pipa PVC (Triliun) AW Putih 1/2" Btng 3 1,400 4,200
Tee 1"x1/2" Bh 8 3,000 24,000
Ploksock 1"x2" Bh 5 6,000 30,000
Thinner Laba2 Hijau Gln 2 55,000 110,000
Cat Nippe NP 041 Saddle Brown Kg 3 49,000 147,000
Menie Celva Kg 4 40,000 160,000
Knee 1" Bh 5 3,000 15,000
Knee 1/2" Bh 3 2,000 6,000
Tee 1" Bh 5 3,000 15,000
Slang Ripeng (Westpeak) Mtr 50 9,000 450,000
Kabel (Eterna) NYM 2x1,5 Mtr 30 5,100 153,000
Klem Kabel No 8 Bks 3 4,000 12,000
6 13-Mei-11 Benang No 9 Bh 1 5,000 5,000
Skrup Gipsum Bh 60 150 9,000
Mata Bor Besi 2 Mm Bh 1 14,000 14,000
Paku 5 Cm Kg 2 9,750 19,500
Semen Holcim Zak 5 54,500 272,500
Box Sikring 6 Grup Bh 1 45,000 45,000
3,801,475
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 14- 20 mei 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 14-Mei-11 Kabel (Prima) NYM 3x1,5 mm Roll 1 325,000 325,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000
Inbowdus (Panasonic) Bh 10 3,000 30,000
Semen Holcim Zak 10 54,500 545,000
Pipa PVC (Triliun) AW Putih 1" Btng 7 20,000 140,000
Pipa PVC (Triliun) AW Putih 1/2" Btng 5 14,000 70,000
Knee 1" R Bh 10 3,000 30,000
Knee 1" R Bh 10 3,000 30,000
Lem Pipa (Asahi) Kleng 1 25,000 25,000
2 15-Mei-11 Pipa PVC (Triliun) AW Putih 1" Btng 5 20,000 100,000
SAT
Page 16
Pipa PVC (Triliun) AW Putih 1/2" Btng 5 14,000 70,000
Knee 2 1/2" Bh 1 8,000 8,000
Knee Besi Drat Dalam 1/2" Bh 1 5,000 5,000
SDL 12" Bh 1 3,000 3,000
3 16-Mei-11 Pasir Pasang 425x185x102 M3 8.019 115,000 922,185
Triplex 6 Mm Lbr 2 75,000 150,000
4 18-Mei-11 Solasi (Nitto) Bh 1 7,000 7,000
Paku Kaca Ons 1 2,000 2,000
Semen Holcim Zak 10 54,500 545,000
5 19-Mei-11 Kabel (Eterna) NYM 3x2,5 mm Roll 31-Dec 462,500 462,500
Pasir Pasang 425x185x102 M3 8.019 90,000 721,710
6 20-Mei-11 Knee Drat Dalam 1/2" Bh 8 5,000 40,000
SDL 12" Bh 15 3,000 45,000
Knee Ripeng Westpeak 1/2" Bh 2 25,000 50,000
Knee Drat Ripeng Westpeak 1/2" Bh 4 25,000 100,000
4,430,395
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 21-27 mei 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 21-Mei-11 Tee Ripeng (Westpeak) Bh 5 40,000 200,000
Knee Drat Ripeng (Westpeak) Bh 1 25,000 25,000
2 23-Mei-11 Semen Holcim Zak 10 54,500 545,000
Pipa Galpanis 3/4" Btng 1 120,000 120,000
Tombak Split penangkal petir Bh 1 25,000 25,000
Socket Drat Besi 3/4" Bh 1 5,000 5,000
Teedus Cbng 3 Bh 5 3,000 15,000
Klem Kabel No 9 Bks 2 4,000 8,000
SAT
Page 17
Klem Kabel No 8 Bks 1 4,000 4,000
kabel (Eterna) NYM 2x1,5 Mm Roll 1 255,000 255,000
Pisau Kramik (Bosch) Bh 2 85,000 170,000
3 24-Mei-11 Paku 10 Cm Kg 3 9,750 29,250
Kabel Antena TV Mtr 47 3,000 141,000
Kain Bal Kiloan Kg 0.5 20,000 10,000
4 25-Mei-11 Benang No 9 Bh 1 5,000 5,000
Paku 5 Cm Kg 1.5 9,750 14,625
Bata Merah Indramayu Bh 4392 520 2,283,840
Paku Kaca Ons 1 2,000 2,000
5 27-Mei-11 Semen Holcim Zak 10 54,500 545,000
Kleman Kabel No 8 Bks 1-Jan 4,000 8,000
Kleman Kabel No 9 Bks 1 4,000 4,000
Teedus Cbng 3 Bh 5 3,000 15,000
Kabel BC 25 Mtr 40 25,000 1,000,000
Pasir Pasang 425x185x105 M3 8.255 115,000 949,325
6,379,040
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Puri Syailendra
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 28 mei -3 juni 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 28-Mei-11 Amplas No 80 Mtr 1 9,000 9,000
Paku Beton 1" Dus 1 14,000 14,000
Kabel (Eterna) NYM 4x2,5 Mm Mtr 5 17,000 85,000
SAT
Page 18
Pipa PVC (Triliun) AW Putih 1/2" Btng 2 14,000 28,000
Kawat Beton Kg 1.5 12,400 18,600
2 30-Mei-11 Box MCB 8 Group Bh 1 45,000 45,000
Teedus Cbng 3 Bh 3 3,000 9,000
Mata Gergaji Besi (Sandflex) Bh 1 11,000 11,000
3 31-Mei-11 Paku Triplex Ons 1 2,000 2,000
Paku 4 Cm Ons 1 1,500 1,500
Besi 8 Banci Btnng 1 38,000 38,000
4 1-Juni-11 Semen Holcim Zak 10 54,500 545,000
Amplas slep Bh 5 11,000 55,000
Amplas Tayo No 80 Mtr 1 9,000 9,000
Meni Celva Kg 5 36,500 182,500
Thinner Laba2 Hijau Gln 2 55,000 110,000
Batu Slep (Resibon) Bh 3 10,000 30,000
Kawat Las Dus 1 97,500 97,500
Lampu (Cosco) 9 wtt Bh 1 22,000 22,000
Stecker (Broco) Bh 31-Dec 9,000 9,000
Fiting Lampu Bh 1 9,000 9,000
Paku 5 Cm Kg 1.5 1,500 2,250
Paku Triplex Ons 1 1,500 1,500
Batu Potong (Kinik) 14" Bh 1 31,000 31,000
Besi Beton 8 Banci Btng 1 27,500 27,500
5 2-Juni-11 Paku 5 + 10 Cm Kg 1.5 15,000 22,500
Thinner Laba2 Hijau Gln 1 57,500 57,500
6 3-Juni-11 Dempul Sanpolac Gln 1 86,000 86,000
Amplas No 240 Mtr 1 9,000 9,000
Ramset 7x8 Bh 20 1,200 24,000
Batu Potong (Kinik) 14" Bh 1 31,000 31,000
1,622,350
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Puri Syailendra
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 4 - 10 juni 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 4-Juni-11 Calbond U-stron Kg 1 30,000 30,000
Thinner Laba2 Hijau Gln 2 55,000 110,000
Cat Nippe Black dof 380 Kg 2 50,000 100,000
SAT
Page 19
Batu Slep (Resibon) 4" Bh 2 31,000 62,000
Paku 10 Cm Kg 1 9,750 9,750
Amplas No 80 Mtr 1 9,000 9,000
Semen Holcim Zak 4 54,500 218,000
2 6-Juni-11 Alcasit Bks 2 16,000 32,000
Amplas No 150 Mtr 4 9,000 36,000
Dempul RJ Gln 2 45,000 90,000
Koas 2 1/2" Bh 1 6,000 6,000
Impra SH-113 TEAK Gln 1 115,000 115,000
Benang No 9 Bh 1 5,000 5,000
Thinner Laba2 Hijau Gln 1 55,000 55,000
Kabel (Eterna) NYM 3x1.5 Roll 1 325,000 325,000
Kabel (Eterna) NYM 3x2.5 Roll 1 462,500 462,500
Kleman Kabel No 9 Bks 3 4,000 12,000
Semen Holcim Zak 10 54,500 545,000
3 7-Juni-11 Alumunium Omega Btng 4 45,000 180,000
Alumunium Lis U Btng 1-Jan 17,500 35,000
Cat Nippe Black dof 380 Kg 4 49,000 196,000
Solarlite Lbr 1 1,660,000 1,660,000
Thinner Laba2 Hijau Gln 1 55,000 55,000
Engsel Bubut 1" Psng 1 18,000 18,000
Paku Ruping 12x30 Bh 400 350 140,000
Nuts Sters Pendek Pcs 1 25,000 25,000
Knee Drat Ripeng Bh 4 25,000 100,000
Tee 1/2" Bh 3 3,000 9,000
Ploksock 1" x 1/2" Bh 2 3,000 6,000
Knee 1/2" Bh 6 2,000 12,000
Knee Besi Drat Dalam 1/2" Bh 8 5,000 40,000
Siltip Onda Bh 3 2,000 6,000
Paku 4 Cm Kg 1 15,000 15,000
Sealant Clear Bh 3 32,500 97,500
Knee Besi Drat Dalam 1/2" Bh 10 5,000 50,000
Dempul RJ Gln 1 45,000 45,000
Pipa PVC (Trilliun) AW Putih 1/2" Btng 4 14,000 56,000
4 8-Juni-11 Pipa PVC (Trilliun) D Putih 2 1/2" Btng 1 41,000 41,000
Pipa PVC (Triliun) D Putih 4" Btng 1 75,000 75,000
Paku 5 Cm Kg 0.5 9,750 4,875
Dempul RJ Pail 1 165,000 165,000
Plok sock 2 1/2"x3" Bh 3 9,500 28,500
Knee 2 1/2" Bh 5 8,000 40,000
Knee 1/2" Bh 10 2,000 20,000
Tee Drat 1/2" Bh 2 3,000 6,000
Besi Beton 8 Full Btng 2 38,000 76,000
Besi Beton 8 Banci btng 1 27,500 27,500
5 9-uni-11 Calbond U-stron Kg 1 30,000 30,000
Koas (Eterna) 3" Bh 1 6,500 6,500
Paku 5 Cm Kg 1 9,750 9,750
Page 20
Kawat Beton Kg 1 12,400 12,400
Knee 1" Bh 4 3,000 12,000
Tee Ripeng (Westpeak) Bh 1 40,000 40,000
Dop 1" Bh 2 3,000 6,000
Kabel Antena TV Mtr 13 3,000 39,000
Kabel (Eterna) NYM 2x1,5 Roll 1 255,000 255,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000
Dempul Gipsum Kg 1 5,000 5,000
Paku Beton 7 cm Bh 20 280 5,600
Semen Holcim Zak 10 54,500 545,000
Lem Pipa (Asahi) Kleng 1 25,000 25,000
Pipa PVC (Triliun) AW Putih 1/2" Btng 2 14,000 28,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000
Ploksock 3"x4" Bh 3 12,000 36,000
Tee 3"x2" Bh 1 15,000 15,000
Knee 3" Bh 3 9,000 27,000
Knee 4" Bh 1 12,000 12,000
Tee 3" Bh 2 12,000 24,000
Skraf NUG Set 1 15,000 15,000
6 10-juni-11 Spliter Antena TV 4x1 wy (Seebest) Bh 1 12,000 12,000
Spliter Antena TV 3x1 wy (Seebest) Bh 2 10,000 20,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000
Spliter Terminal Tlpn Bh 1 10,000 10,000
Eleganza YPKH 65100 Classic White (97 Box) Box 1 19,634,000 19,634,000
Eleganza MMP6700A Pure Black Box 17 -
Paku 10 Cm Kg 2 9,750 19,500
Calbond U-stron Kg 1 30,000 30,000
Kawat Beton Kg 1 12,400 12,400
Knee 3" Bh 8 9,000 72,000
Pipa PVC (Triliun) D Putih 3" Btng 2 55,000 110,000
26,531,775
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Puri Syailendra
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 11 -17 juni 2011
Page 21
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 11-Juni-11 Paku Beton 2" Dus 1 14,000 14,000
Calbond U-stron Kg 1 30,000 30,000
Lampu Dinding Taman (Zetalux) Bh 2 45,000 90,000
Kabel Antena TV Mtr 21 3,000 63,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
Lem Pipa (Asahi) Kleng 1 25,000 25,000
Pipa PVC (Triliun) D Putih 2 1/2" Btng 1 41,000 41,000
Semen Holcim Zak 4 54,500 218,000
Calbond U-stron Kg 1 30,000 30,000
Knee 3" Bh 2 9,000 18,000
Cat Vinilex (White) Gln 2 87,000 174,000
Calbond U-stron Kg 1 30,000 30,000
2 12-Juni-11 Besi Beton 8 Full Btng 1 27,500 27,500
3 13-Juni-11 Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
Inbowdus Clipsal Bh 5 3,000 15,000
Solasi Nitto Bh 1 7,000 7,000
Spliter Antena TV 3x1 wy (Seebest) Bh 1 10,000 10,000
Aquaproof Abu2 Kg 1 35,000 35,000
Cat Seiv 180 Super White Dof Kg 2 49,000 98,000
Teedus Cbng 3 Bh 10 3,000 30,000
Dempul Sanpolac Kg 1 22,500 22,500
Semen Holcim Zak 5 54,500 272,500
4 14-Juni-11 Semen Holcim Zak 10 54,500 545,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000
Pipa PVC (Triliun) D Putih 4" Btng 2 75,000 150,000
Knee 3/4" Bh 5 3,000 15,000
Pipa PVC (Triliun) D Putih 3/4" Btng 2 18,000 36,000
Teedus Cbng 3 Bh 10 3,000 30,000
Inbowdus (Panasonic) Bh 3 3,000 9,000
Kabel (Eterna NYM 3x1,5 Mtr 15 5,100 76,500
Spliter Terminal Tlpn Bh 1 10,000 10,000
5 15-Juni-11 Pipa PVC (Triliun) D Putih 1" Btng 3 20,000 60,000
Pipa PVC (Triliun) D Putih 2 1/2" Btng 1 41,000 41,000
Pipa PVC (Triliun) D Putih 1 1/4" Btng 1 27,500 27,500
Lem Pipa (Asahi) Kleng 1 25,000 25,000
Teedus Cbng 3 Bh 5 3,000 15,000
Teedus cbng 4 Bh 5 3,000 15,000
Kabel (Eterna) NYM 3x1,5 Mtr 5 6,500 32,500
Knee 2" Bh 1 6,000 6,000
Pipa PVC (Triliun) D Putih 2" Btng 1 32,500 32,500
6 16-Juni-11 Semen Holcim Zak 10 54,500 545,000
Cat Vinilex (White) 300 Pail 1 348,000 348,000
Bulu Roll Cat (Eterna) Bh 1 11,000 11,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
SAT
Page 22
Kabel (Prima) NYM 2x1,5 Roll 1 255,000 255,000
Kabel Radar Torn (Perdana) 2x0,75 Roll 1 150,000 150,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
7 17-Juni-11 Kabel (Eterna) NYM 3x1,5 Mtr 20 6,500 130,000
Teedus Cbng 3 Bh 3 3,000 9,000
Cat Dulux PT (Lakestone) 44153 Gln 1 121,000 121,000
Solasi (Unibel) Bh 2 7,000 14,000
Kramik Roman (RW 25x45 45206)(70 dus) ls 1 5,541,500 5,541,500
Kramik Roman (R 25x25 26249) dus 13 79,164 1,029,136
Knee 4" Bh 2 12,000 24,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000
10,594,136
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Page 23
Pelaksana :
Periode : 18- 24 juni 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 18-Juni-11 Roll Cat (Motoroll) Bh 1 22,500 22,500
Pipa PVC (Triliun) D Putih 4" Btng 2 41,000 82,000
Semen Holcim Zak 10 54,500 545,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
Downlet Inbow 4" Bh 1 20,000 20,000
Inbowdus Panasonic Bh 1 2,000 2,000
2 20-Juni-11 Cat Vinilex 300 White Pail 1 395,000 395,000
Paku 10 + 5 Cm Kg 1.5 9,750 14,625
Semen Holcim Zak 1 54,500 54,500
3 21-Juni-11 Downlight Inbow 4" Bh 2 20,000 40,000
Paku 10 Cm Kg 1 9,750 9,750
Paku 5 Cm Kg 0.5 9,750 4,875
Paku Triplex Kg 0.25 20,000 5,000
Kabel (Supreme) NYY 4x6 Mtr 21 56,000 1,176,000
Pipa PVC (Triliun) D Putih 1/2" Btng 1 14,000 14,000
Semen Holcim Zak 10 54,500 545,000
Kabel Antena TV Mtr 11 3,000 33,000
Besi Beton 8 Banci Btng 1 27,500 27,500
Box Tlpn Bh 1 90,000 90,000
Knee 1/2" Bh 1 2,000 2,000
4 22-Juni-11 Stopkontak Tutup (Broco) Bh 1 32,000 32,000
Inbowdus (Panasonic) Bh 2 2,000 4,000
Downlight Inbow 4" Bh 5 20,000 100,000
5 23-Juni-11 Downlight Inbow 4" Bh 9 20,000 180,000
Kabel (Suprim) NYY Mtr 20 56,000 1,120,000
Pasir Pasang 425x185x103 M3 8.098 115,000 931,270
Cat Dulux PT Lakestone 44153 Pail 1 959,000 959,000
Alkali Dulux 49100 Exterior Primer Pail 1 753,500 753,500
Semen Holcim Zak 10 54,500 545,000
Duradus External Bh 1 20,000 20,000
Kabel (Eterna) NYM 3x2,5 Mtr 25 9,250 231,250
6 24-Juni-11 Lampu Outbow Kotak Hitam Bh 1 70,000 70,000
Inbowdus Bh 2 2,000 4,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 2 4,000 8,000
Amplas Slep Bh 2 11,000 22,000
Knee 1/2" Bh 2 2,000 4,000
8,074,770
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
SAT
Page 24
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 25 juni -01 juli 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 25-Juni-11 Pipa PVC (Triliun) AW Putih 1" Btng 1 20,000 20,000
Lemkra Fs-202 (Putih) Kg 2 11,000 22,000
Sikat Kawat Kuningan Bh 2 6,000 12,000
Siltip Onda Bh 1 2,000 2,000
Semen Holcim Zak 1 54,500 54,500
Teedus Cbng 3 Bh 1 3,000 3,000
2 26-Juni-11 Semen Holcim Zak 1 54,500 54,500
3 27-Juni-11 Dempul Gipsum Kg 1.5 5,000 7,500
Cat Vinilex 300 (White) pail 1 395,000 395,000
Teedus Cbng 3 Bh 2 3,000 6,000
Semen Holcim Zak 6 54,500 327,000
Cat Dulux WS 4040M (DOVE) Gln 1 214,000 214,000
Cat Mowilex E200 (Hitam) Gln 1 110,000 110,000
Koas Eterna 2 1/2" Bh 1 6,000 6,000
Roll Cat Wall Coatter Bh 1 11,000 11,000
4 28-Juni-11 MCB (Schnider) 6A Bh 6 35,500 213,000
MCB (Schnider) 10A Bh 1 35,500 35,500
Lemkra Fs-202 (Putih) Kg 2 11,000 22,000
Paku 4 Cm Kg 0.25 15,000 3,750
Akuaproof Abu2 Kg 1 42,500 42,500
Koas Eterna 2 1/2" Bh 1 6,500 6,500
Dempul Gipsum Kg 8 5,000 40,000
5 29-Juni-11 Semen Holcim Zak 10 54,500 545,000
Knee 1/2" Bh 2 2,000 4,000
Tee 1" Bh 1 3,000 3,000
Dof 1" Bh 1 2,500 2,500
IMPRA MSS-123 Gln 1 182,000 182,000
Lakban Kertas Bh 2 6,000 12,000
Terpenten Btol 1 6,000 6,000
IMPRA Ws-162B Salak Brown Kg 1 44,000 44,000
Dempul RJ Gln1 1 45,000 45,000
Amplas No 120 Mtr 2 9,000 18,000
Amplas No 240 Mtr 2 9,000 18,000
Besi Beton 8 Banci Btng 5 27,500 137,500
Terpenten Btol 1 6,000 6,000
Thinner Laba2 Hijau Gln 1 55,000 55,000
6 30-Juni-11 Stopkontak AC (Panasonic) Bh 1 55,000 55,000
Semen Holcim Zak 3 54,500 163,500
7 1-Juli-11 IMPRA Ws-162B Salak Brown Kg 2 44,000 88,000
Lakban Kertas Bh 5 6,000 30,000
Terpenten Btol 2 6,000 12,000
SAT
Page 25
Semen Holcim Zak 13 54,500 708,500
Pasir Pasang Hitam 425x185x97 M3 7.626 115,000 876,990
Thinner Laba2 Hijau Gln 1 55,000 55,000
Stopkontak AC (Panasonic) Bh 1 55,000 55,000
Kabel Eterna NYM 3x2,5 Mtr 8 9,250 74,000
4,803,740
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 2 - 8 juli 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 2-Juli-11 Kleman Kabel No 8 Bks 1 4,000 4,000
Besi Beton 10 Mm Btng 9 55,000 495,000
Besi Beton 6 Mm Btng 2 27,500 55,000
2 4-Juli-11 Semen Holcim Zak 10 54,500 545,000
Calbond U-stron Kg 1 30,000 30,000
Meni Celva Kg 5 39,000 195,000
Batu Slep Resibon 4" Bh 5 10,000 50,000
Slepan Amplas Bh 5 11,000 55,000
Kawat Las Nikko steel 2,6 Dus 1 97,500 97,500
Mata Gergaji Besi Bh 1 11,000 11,000
Thinner Laba2 Hijau Gln 1 55,000 55,000
Batu Potong Kinik 14" Bh 1 31,000 31,000
Bata Merah Bh 7000 520 3,640,000
3 5-Juli-11 Btng 1 55,000 55,000
Btng 1 27,500 27,500
Kawat Beton Kg 1 12,400 12,400
Bh 1 45,000 45,000
Amplas Tayo No 8o Mtr 2 9,000 18,000
4 6-Juli-11 Thinner Laba2 Hijau Gln 1 55,000 55,000
Semen Holcim Zak 6 54,500 327,000
Batu Potong Kinik 14" Bh 1 31,000 31,000
Downligh Inbow 4" Bh 15 20,000 300,000
Amplas Tayo No 8o mTR 1 9,000 9,000
5 7-Juli-11 Sockdrat Luar Dalam Stainles 1/2" Bh 2 17,500 35,000
Knee 1 1/4" Bh 3 4,500 13,500
Dof 4" Bh 1 11,000 11,000
Pipa PVC Triliun D Putih 1 1/4" Btng 2 27,500 55,000
Pipa PVC Unilon AW Abu 3/4" Btng 1 18,000 18,000
Besi Beton Ø 10 Mm
Besi Beton Ø 8 Banci
Knee 4" 45°
SAT
Page 26
Paku 4 Cm Kg 0.5 10,750 5,375
Kabel (Supreme) NYY 4x6 Mtr 44 56,000 2,464,000
Ramset 8x7 Bh 20 1,200 24,000
Thinner Laba2 Hijau Gln 1 55,000 55,000
6 8-Juli-11 Paku 4 Cm Kg 1 15,000 15,000
Pencil Kayu Bh 1 1,500 1,500
Koas 2 1/2" Bh 1 6,500 6,500
Cat Vinilex 300 Putih Pail 1 395,000 395,000
Aquaproof Abu Kg 1 32,000 32,000
Semen Holcim Zak 10 54,500 545,000
Paku 10 cm Kg 1 9,750 9,750
Downligh Inbow 4" Bh 8 20,000 160,000
Dempul IMPRA SH-113 Teak Gln 1 115,000 115,000
Batu Potong Kinik 14" Bh 1 31,000 31,000
Siltip Onda Bh 1 2,000 2,000
10,137,025
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
Page 27
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 9 - 15 juli 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 9-Juli-11 Downlight inbow 4" Bh 12 20,000 240,000
Siltip Onda Bh 2 2,000 4,000
Amplas no 240 Mtr 2 9,000 18,000
Amplas no 120 Mtr 2 9,000 18,000
Tee 1" Bh 2 3,000 6,000
Krmk Roman 25x45 Rhapsody black Dus 2 79,164 158,329
Kabel NYY 4x6 Mtr 50 56,000 2,800,000
2 11-Juli-11 Ramset 7x8 Bh 10 1,200 12,000
Haxosfan (Maspion)MW-16 EX 25 W Unit 1 140,000 140,000
Downlight Outbow Kotak (YOMIKO) Bh 1 70,000 70,000
Lem Kayu Fox Kg 1 9,000 9,000
Terpenten Btol 1 6,000 6,000
3 12-Juli-11 Thinner Laba2 Hijau Gln 1 55,000 55,000
Downlight inbow 4" (Zetalux) Bh 3 70,000 210,000
Cat Dulux 4014 (DOVE) Gln 2 425,000 850,000
Lemkra FS-2003 Kg 1 11,000 11,000
4 13-Juli-11 Semen Holcim Zak 5 54,500 272,500
Paku 4 Cm Kg 0.25 17,500 4,375
Lemkra FS-2003 Hitam Kg 1 11,000 11,000
Engsel Pintu (MAVEN) Psng 2 31,000 62,000
5 14-Juli-11 MCB 6 A (SCNIDER) Bh 5 35,500 177,500
MCB 10 A (SCNIDER) BH 2 35,500 71,000
Jack TV Bh 2 1,000 2,000
Teedus Cbng 3 Bh 1 3,000 3,000
Kabel Eterna NYM 3x2,5 Mtr 3 9,250 27,750
Kabel Eterna NYM 2x1,5 Mtr 12 5,100 61,200
6 15-Juli-11 Semen Holcim Zak 4 54,500 218,000
5,517,654
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
SAT
Page 28
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Puri Syailendra
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 16 -22 juli 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 16-Juli-11 Amplas Tayo No 80 Mtr 2 9,000 18,000
Knee 1 1/2" Bh 3 3,500 10,500
Pipa PVC (Triliun) D Putih 1 1/2" Btng 1 25,000 25,000
Semen Holcim Zak 5 54,500 272,500
2 17-Juli-11 Terpenten Btol 2 6,000 12,000
IMPRA WS 162 Salak Brown Kg 2 44,000 88,000
IMPRA SS 123 Gln 1 192,000 192,000
Hardinner Btol 1 25,000 25,000
Thinner Laba2 Hijau Gln 1 55,000 55,000
Koas 2 1/2" Bh 1 6,500 6,500
3 18-Juli-11 Batu Potong Kinik 14" Bh 1 31,000 31,000
Inbowdus Clipsal Bh 1 4,000 4,000
Pipa Listrik (Triliun) C Putih 5/8" Btng 1 4,000 4,000
4 19-Juli-11 Engsel Pintu (Delizia) 4" Psng 7 31,000 217,000
Lampu Cosco 9 W Bh 1 22,000 22,000
Strecker Broco Bh 1 9,000 9,000
Kabel Eterna NYM 2x1,5 Mtr 5 5,100 25,500
Solasi Unibel Bh 1 7,500 7,500
Piting Plapon Kotak (Broco) Bh 1 9,000 9,000
Cat Dulux Ws-40140 Dove Pail 1 1,559,000 1,559,000
Cat Mowilex E200 Hitam Gln 1 110,000 110,000
Amplas No 240 Mtr 2 9,000 18,000
Amplas Tayo No 80 Mtr 2 9,000 18,000
5 20-Juli-11 Flourdrain Bh 2 50,000 100,000
Semen Holcim Zak 5 54,500 272,500
Pasir Pasang Hitam 420x190x110 M3 8.778 115,000 1,009,470
Moriselock (Dekson) 8485 IL SN Bh 3 85,000 255,000
Deluxe Cylinder (Dekson) 60 TC SN Bh 3 45,000 135,000
Handle BELLAGIO AB-008 NB Psng 3 90,000 270,000
Amplas Tayo No 80 Mtr 2 9,000 18,000
Page 29
6 21-Juli-11 Semen Holcim Zak 5 54,500 272,500
Mortiselock Dekson 8485 IL SN Bh 4 85,000 340,000
Handle BELLAGIO AB-008 NB Psng 3 90,000 270,000
Deluxe Cylinder (Dekson) 60 TC SN Bh 1 45,000 45,000
Lampu Carpot (Fatro) Htam Polos Bh 2 45,000 90,000
Stop Kontak Clipsal Bh 10 9,000 90,000
Socket 1" Bh 1 3,000 3,000
7 22-Juli-11 Downlight Outbow Kotak Bh 3 70,000 210,000
Outlet TV (Clipsal) Bh 8 62,500 500,000
Outlet Tlpn (Clipsal) Bh 3 71,000 213,000
Semen Holcim Zak 2 54,500 109,000
6,940,970
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 23 - 29 juli 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 23-Juli-11 Lakban Kertas Bh 5 5,000 25,000
IMPRA WS-162 Salak Brown Kg 1 44,000 44,000
Kain Ball Kiloan Kg 0.25 25,000 6,250
Downlight Outbow Kotak Bh 2 70,000 140,000
Saklar Seri (Clipsal) Bh 15 48,000 720,000
IMPRA WS-162 Salak Brown BH 1 44,000 44,000
Benang Cap Peniti Bh 1 5,000 5,000
Semen Holcim Zak 3 54,500 163,500
2 25-Juli-11 Semen Holcim Zak 5 54,500 272,500
3 26-Juli-11 Handle (BELLAGIO) AB-008 NB Psng 2 90,000 180,000
Deluxe Cylinder BK 60 SN Bh 1 45,000 45,000
Deluxe Cylinder DC 60 SN Bh 2 45,000 90,000
Mortiselock (Dekson) IL SN Bh 2 85,000 170,000
Saklar Seri (Clipsal) Bh 5 48,000 240,000
Saklar Tunggal (Clipsal) Bh 3 32,000 96,000
Saklar Hotel (Clipsal) Bh 1 38,000 38,000
Stopkontak (Clipsal) Bh 1 29,500 29,500
4 27-Juli-11 Cat Nippe Black Dof Kg 2 51,000 102,000
Menie Poxi (Nippe) Kg 1 39,000 39,000
Lemkra FS-202 Kg 1-Jan 11,000 22,000
Hexosfan MVY6EX (Masppion) 25 W Bh 31-Dec 140,000 140,000
Stopkontak (Clipsal) Bh 10 29,500 295,000
Page 30
Outlet TV (Clipsal) Bh 3 62,500 187,500
Outlet Tlpn (Clipsal) Bh 1 71,000 71,000
Semen Holcim Zak 1 54,500 54,500
Ramset 7x8 BH 22 1,200 26,400
5 28-Jli-11 Thinner Laba2 Hijau Gln 2 55,000 110,000
IMPRA ML-131 Semi Gloss Gln 1 192,000 192,000
Semen Holcim Zak 2 54,500 109,000
Saklar Tunggal (Clipsal) Bh 2 38,000 76,000
Saklar Seri (Clipsal) Bh 2 48,000 96,000
Teedus Cbng 3 Bh 2 3,000 6,000
Stopkontak (Clipsal) Bh 6 29,500 177,000
Lakban Kertas Bh 1 6,000 6,000
Delxe Cylinder (Dekson) TC 60 SN BH 1 85,000 85,000
Amplas No 120 Mtr 2 9,000 18,000
Semen Holcim Zak 1 54,500 54,500
Thinner Laba2 Hijau Gln 1 55,000 55,000
6 29-Juli-11 Stopkontak (Clipsal) Bh 2 29,500 59,000
Saklar Tunggal (Clipsal) Bh 1 32,000 32,000
Semen Holcim Zak 4 54,500 218,000
Paku Beton 1 1/4" Dus 1 16,000 16,000
4,555,650
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 30 juli - 5 agust 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 30-Juli-11 Kleman Kabel No 8 Bks 1 4,000 4,000
Amplas No 120 Mtr 2 9,000 18,000
Dempul Sampolac Kg 1 22,000 22,000
Semen Holcim Zak 2 54,500 109,000
2 2-Agustus-11 Cat Dulux PT (Lakestone) 44153 Pail 1 959,000 959,000
Floor Grating Stainles Steel 4"x4" Bh 1 55,000 55,000
Thinner Laba2 Hijau Gln 1 55,000 55,000
3 3-Agustus-11 Semen Holcim Zak 2 54,500 109,000
Amplas No 180 Mtr 2 9,000 18,000
4 4-Agustus-11 Piber Talang Mtr 6 10,000 60,000
Semen Holcim Zak 1 54,500 54,500
5 5-Agustus-11 Semen Holcim Zak 2 54,500 109,000
Dempul RJ Gln 1 45,000 45,000
Page 31
Lampu Sorot Halogen Flood Light set 1 70,000 70,000
Zetalux 150 Wtt Bh 1 90,000 90,000
1,777,500
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Puri Syailendra
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 6 - 12 agustus 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 6-Agustus-11 Semen Holcim Zak 3 54,500 163,500
2 8-Agustus-11 Semen Holcim Zak 2 54,500 109,000
IMPRA WS-162 B Salak Brown Klng 1 44,000 44,000
Terpenten Btol 1 6,000 6,000
Semen Holcim Zak 4 54,500 218,000
Engsel Pintu 4" Psng 2 31,000 62,000
3 9-Agustus-11 Paku 5 Cm Kg 0.5 9,750 4,875
Tee 3/4" Bh 1 3,000 3,000
Dof 3/4" Bh 2 2,500 5,000
Sealant Clear Btol 2 32,500 65,000
Kawat Beton Kg 1 12,400 12,400
Paku 7 Cm Kg 0.5 9,750 4,875
Paku 10 Cm Kg 0.5 9,750 4,875
Thinner Laba2 Hijau Gln 1 55,000 55,000
IMPRA MSS-123 2 Comp Gln 1 180,000 180,000
Lakban Krtas Bh 2 5,000 10,000
Baud Ruping Bh 50 400 20,000
4 10-Agustus-11 Semen Tigaroda Zak 10 57,000 570,000
5 11-Agustus-11 Benang Cap Peniti Bh 1 5,000 5,000
Amplas No 240 Mtr 2 9,000 18,000
Pasir Pasang Hitam 420x190x105 M3 8.379 90,000 754,110
Thinner Laba2 Hijau Gln 2 55,000 110,000
Lakban Krtas Bh 2 5,000 10,000
6 12-Agustus-11 Semen Tigaroda Zak 5 57,000 285,000
Page 32
Tee 1"x1/2" Bh 1 3,000 3,000
Pipa PVC (Triliun) AW Putih 1/2" Btng 1 14,000 14,000
Masterproof Pail 1 585,000 585,000
Cat Genteng Merah CP Kg 5 12,000 60,000
Dounlight Inbow 4" Bh 1 20,000 20,000
Semen Holcim Zak 2 54,500 109,000
3,510,635
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 13 - 19 agustus 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 13-Agustus-11 Semen Holcim Zak 4 54,500 218,000
Amplas No 120 Mtr 2 9,000 18,000
Mata Bor Beton 8 Mm Bh 1 12,500 12,500
Koas 2 1/2" Bh 1 6,000 6,000
Tee Shhower 1/2" (Stainles) Bh 3 16,000 48,000
2 15-Agustus-11 Semen Holcim Zak 2 54,500 109,000
Tee Z shower Bh 3 17,500 52,500
Sikat Kawat Kuningan Bh 2 6,000 12,000
Outbow Kotak 4" Bh 1 16,000 16,000
Torn Air 1100 Ltr + Kaki2 Bh 1 2,750,000 2,750,000
3 16-Agustus-11 Semen Holcim Zak 2 54,500 109,000
Thinner Laba2 Hijau Gln 2 55,000 110,000
Cat Nippe 2000 Black Dof Kg 1 51,000 51,000
Kawat Las Nikko Steel 2,6 Dus 1 97,500 97,500
Meni Nippe Kg 1 37,500 37,500
Stop Kontak Clipsal Bh 3 22,500 67,500
Benang Cap Peniti Bh 1 5,000 5,000
Sapu Lantai Bh 1 12,500 12,500
4 18-Agustus-11 Lemkra Fs-210 Cream Kg 5 11,000 55,000
Cat Dulux Pt Lakestone 44153 Pail 31-Dec 959,000 959,000
Semen Holcim Zak 3-Jan 54,500 218,000
Sikat Kawat Kuningan Bh 2 6,000 12,000
Batu Sikat Panca Warna Krung 2 40,000 80,000
5 19-Agustus-11 Semen Holcim Zak 4 54,500 218,000
Tee Shhower 1/2" (Stainles) Bh 2 19,000 38,000
Page 33
Lemkra Fs-210 Cream Kg 3 11,000 33,000
Sikat Kawat Kuningan Bh 2 6,000 12,000
Batu Sikat Panca Warna Krung 5 40,000 200,000
Koas 3" Bh 1 6,500 6,500
5,563,500
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Puri Syailendra
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 20 - 24 agustus 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 20-Agustus-11 Lemkra Fs-210 Cream Kg 2 11,000 22,000
Ploksock 1" x 3/4" Bh 2 3,500 7,000
Ploksock 3/4" x 1/2" Bh 2 3,000 6,000
Knee 3/4" Bh 4 3,000 12,000
SDL 3/4" Bh 4 35,000 140,000
Downlight Outbow Kotak Bh 2 70,000 140,000
Stopkran 1" Bh 2 22,500 45,000
Stopkran 1/2" Bh 2 14,000 28,000
Porstex Yuri Btol 1 11,000 11,000
Lemkra Fs-210 Cream Kg 10 11,000 110,000
Batu Sikat Panca Warna Krung 1 40,000 40,000
Semen Holcim Zak 3 54,500 163,500
2 22-Agustus-11 Semen Holcim Zak 6 54,500 327,000
Batu Sikat Panca Warna Krung 7 40,000 280,000
Pleuh 3/4" Bh 2 1,000 2,000
Pipa PVC 1/2" (Triliun) Btng 1 14,000 14,000
Sikat Kawat Kuningan Bh 4 6,000 24,000
Ploksok 3/4" x 1/2" Bh 2 3,000 6,000
Knee 3/4" Bh 2 2,500 5,000
Lampu Cosco 11 Watt Bh 1 22,500 22,500
Page 34
Tee 1" x 1/2" Bh 2 3,500 7,000
Ploksok 1" x 1/2" Bh 2 35,000 70,000
Lemkra Fs - 210 Cream Kg 6 11,000 66,000
Lemkra Fs - 203 Hitam Kg 2 11,000 22,000
Cat Dulux Ws Dove 40140 M Gln 4 214,000 856,000
Papan Borneo 3cm x 30cm x 4m Lbr 1 220,000 220,000
Triplek 4 Mm Lbr 2 45,000 90,000
3 23-Agustus-11 Lemkra Fs - 210 Cream Kg 4 11,000 44,000
Stopkontak Clipsal Bh 2 22,500 45,000
Radar Torn Bh 1 70,000 70,000
Paku Beton 1" Bh 10 14,000 140,000
HCL Btol 2 15,000 30,000
Coating Batu Mowilex Gln 1 125,000 125,000
Sikat Kawat Baja Bh 2 10,000 20,000
Paku 4 Cm Kg 30-Dec 15,000 7,500
4 24-Agustus-11 Coating Batu (AM) Clear Kleng 1 -
Lemkra Fs- 203 Hitam Kg 1 11,000 11,000
Dempul RJ Gln 1 45,000 45,000
Semen Holcim Zak 1 54,500 54,500
Talang PVC 4" Btng 1 -
Coating Batu Kleng 1 17,000 17,000
Gembok Bh 1 22,500 22,500
Semen Holcim Zak 4 54,500 218,000
3,585,500
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 6 - 9 sept 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 6-Septmbr-11 Mesin Pendorong (SHIMIZU) PC-135 Unit 1 365,000 365,000
2 8-Septmbr-11 Rel Pintu Dorong AF 80 Bh 1 120,000 120,000
Bulu Roll Cat ACE Bh 1 15,000 15,000
3 9-Septmbr-11 Semen Holcim Zak 2 54,500 109,000
Amplas No 180 Mtr 1 9,000 9,000
618,000
Dibuat Tgl:
Di Ajukan Di Setujui
Page 35
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 12 -16 sept 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 12-Septmbr-11 Alkasit Bks 3 16,000 48,000
Mata Gergaji Besi Bh 1 11,000 11,000
2 13-Septmbr-11 Bulu Roll Cat Kecil (Busa) Bh 1 11,000 11,000
Amplas No 240 Mtr 0.5 9,000 4,500
Knee 1" Bh 5 3,000 15,000
Kran Taman (Onda) Bh 2 25,000 50,000
SDL 1" Bh 2 3,000 6,000
SDL 3/4" Bh 2 3,000 6,000
Ploksock 1" x 3/4" Bh 1 3,500 3,500
Siltip Onda Bh 2 2,000 4,000
Koas 1" Bh 1 3,000 3,000
Koas 2" Bh 1 4,500 4,500
Socket Ripeng (Westpeak) Bh 1 25,000 25,000
Slang Ripeng (Westpeak) Mtr 6 9,000 54,000
3 15-Septmbr-11 Pipa PVC (Triliun) AW Putih 1/2" Btng 1 14,000 14,000
Knee 1/2" Bh 5 2,000 10,000
Tee 1" x 1/2" Bh 1 3,500 3,500
Semen Holcim Zak 2 54,500 109,000
Tee Ripeng (Westpeak) 1/2" Bh 1 45,000 45,000
Page 36
Cat Dulux Ws Dove Gln 31-Dec 214,000 214,000
Body Kunci Pintu Dorong Psng 31-Dec 100,000 100,000
Porstex Yuri Btol 1 11,000 11,000
4 16-Septmbr-11 Koas 1" Bh 1 3,000 3,000
755,000
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
LAPORAN OPERASIONAL MATERIAL
PT. Syailendra Bangun Persada - Bandung
Kavling : 28
Luas bangunan :
Pelaksana :
Periode : 17 - 21 sept 2011
No Tanggal URAIAN JUMLAHHARGA
TOTAL KeteranganSAT
1 17-Septmbr-11 Knee 1" Bh 2 3,000 6,000
Semen Holcim Zak 1 54,500 54,500
Washtafel LW 240 CJ Set 2 1,103,200 2,206,400
Washtafel LW 562 Pth Set 1 1,078,000 1,078,000
2 19-Septmbr-11 Lemkra Fs-202 (Putih) Kg 1 11,000 11,000
Skruf 7 Cm Bh 4 250 1,000
Flashband (Tambal Talang) Roll 1 82,500 82,500
4 20-Septmbr-11 Saklar Seri (Clipsal) Bh 1 48,000 48,000
LEMKRA Fs-203 (Hitam) Kg 1 11,000 11,000
Porstex Yuri Btol 1 15,000 15,000
Lampu ECLAT 11W/CDL Classic Bh 75 22,000 1,650,000
Kap Bambu 1x18W(P) Philips Set 2 115,000 230,000
Broco Fiting Plafond Segi Bh 1 9,000 9,000
Atlantic Stopkontak Bh 1 32,500 32,500
Handle Kotak Psng 1 130,000 130,000
Lampu Taman B0130-60 (Vacolux) Bh 1 325,000 325,000
5 21-Septmbr-11 Mesin Pompa (SHIMIZU) 375 BIT Unit 1 1,400,000 1,400,000
Page 37
Hardener IMPRA 0,5 L Btol 1 25,000 25,000
Knee 1" Bh 1 3,000 3,000
Knee 1 1/4" Bh 2 4,500 9,000
SDL 1" Bh 1 3,000 3,000
SDL 1 1/4" Bh 1 6,500 6,500
Ploksock 1 x 1 1/4" Bh 1 4,500 4,500
Knee 2 12" Bh 1 8,000 8,000
Lemkra Fs-202 (Putih) Kg 1 11,000 11,000
Paku Beton 1 1/4" Bh 20 320 6,400
Knee 1" Bh 1 3,000 3,000
Knee 1/2" Bh 1 2,000 2,000
7,371,300
Dibuat Tgl:
Di Ajukan Di Setujui
Logistik Pelaksana
Page 38
1,963,475
Page 39
3,466,089
Page 40
4,604,850
Page 41
7,280,000
Page 42
2,203,285
Page 43
3,255,585
Page 44
4,603,585
Page 45
994,520
Page 46
922185
Page 47
922,185
Page 48
3,233,165
Page 49
931,270
Page 50
876,990
Page 51
1,009,470
Page 52
36,266,654
REKAPITULASI MATERIAL PT. Syailendra Bangun Persada - Bandung
Puri Syailendra
Kavling : 28Luas bangunan : 195Pelaksana :
No Minggu ke Periode
1 07-10 februari 2011 19,900,975 2 12-18 Februari 2011 10,695,364 3 19-24 Februari 2011 8,089,325 4 26 feb-04 mar 2011 12,874,050 5 05-11 maret 2011 18,509,685 6 12 - 18 maret 2011 8,346,835 7 19-025 maret 2011 3,284,310 8 28 maret - 01 april 2011 10,694,085 9 02 - 80 April 2011 2,034,375
10 09 - 15 April 2011 1,536,750 11 16 -22 April 2011 7,310,770 12 23 - 30 April 2011 3,250,500 13 2 - 6 mei 2011 3,092,735 14 7 - 13 mei 2011 3,801,475 15 14- 20 mei 2011 4,430,395 16 21-27 mei 2011 6,379,040 17 28 mei -3 juni 2011 1,622,350 18 4 - 10 juni 2011 26,531,775 19 11 -17 juni 2011 10,594,136 20 18- 24 juni 2011 8,074,770 21 25 juni -01 juli 2011 4,803,740 22 2 - 8 juli 2011 10,137,025 23 9 - 15 juli 2011 5,517,654 24 16 -22 juli 2011 6,940,970 25 23 - 29 juli 2011 4,555,650 26 30 juli - 5 agust 2011 1,777,500 27 6 - 12 agustus 2011 3,510,635 28 13 - 19 agustus 2011 5,563,500 29 20 - 24 agustus 2011 3,585,500 30 6 - 9 sept 2011 618,000 31 12 -16 sept 2011 755,000 32 17 - 21 sept 2011 7,371,300
TOTAL 226,190,173 423,461,898 520,961,898
Jumlah
2,741,905
REKAPITULASI MATERIALKALING 28
3/4/2011 Material bambu3/14/2011 Bata merah (UOB000039)3/16/2011 Material pasir+split (hana GHAA097684)3/16/2011 Konsumsi cor3/18/2011 Material pasir (MDR QH039121)3/29/2011 Material kayu multi (BCA AW097018)4/6/2011 Material kayu multi (BCA AW097020)
4/11/2011 Material bata + Pasir (BCA AW097022)5/6/2011 Material Bata (Hana GHAA097690)5/9/2011 Material plat esser u/talang
5/14/2011 Pek. Talang Canopi5/24/2011 Kurang bayar Material bata5/24/2011 Material Genteng (BCA BB242904)6/10/2011 Material kusen (BCA BB242910)6/23/2011 Cat dulux 6/23/2011 Cat dulux 6/30/2011 Rangka atap (BCA BB242914)7/16/2011 Material keramik roman (BCA BD861751)7/12/2011 Material logistik (BCA BB242915)6/4/2011 Pekerjaan las tralis,torem, kanopi
7/28/2011 Gipsum8/11/2011 Saniter7/20/2011 Pintu tobindo
9/5/2011 solartuff7/19/2011 solartuff (mulford)7/21/2011 bata merah (sari endah)7/21/2011 sari endah (pasir)7/20/2011 Batu andesit
8/2/2011 Material granitKusen almuniumParguetPintu garasi sandez
Rp 1,530,000 Rp 7,157,000 Rp 15,915,000 Rp 1,562,000 Rp 350,000
Rp 4,585,000 Rp 4,368,000 Rp 3,462,000 Rp 5,818,000 Rp 2,940,000 Rp 2,000,000 Rp 960,000 Rp 350,000 Rp 6,881,000 Rp 6,856,000 Rp 1,125,000 Rp 753,000 Rp 15,647,000 Rp 5,541,500 Rp 32,975,000 Rp 2,325,000
Rp 10,131,000 Rp 6,986,700 Rp 9,440,150 Rp 2,017,125 Rp 1,660,000 Rp 3,255,000 Rp 3,775,250 Rp 2,954,000 Rp 19,634,000 Rp 20,233,000
Rp 10,000,000 Rp 197,271,725