REGIONAL WORKSHOP ON NeGP
Date 01/10/2010Venue: Kolkata
Presented By -
S.De. SarkarDirector
Department of IT And Science & TechnologyGovt. of Arunachal Pradesh
Itanagar
Arunachal Pradesh attained its statehood on 20th February 1987. It
is situated in the North-Eastern part of India with 83743 sq. kms
area and has a long international border with Bhutan to the west
(160 km), China to the north and north-east (1,080 km) and
Myanmar to the east (440 km). It stretches from snow-capped
mountains in the north to the plains of Brahmaputra valley in the
south. Arunachal is the largest state area-wise in the north-east
region, even larger than Assam which is the most populous.
It is situated between latitude 26 30' N and 29 30 ' N and
longitude 91 30' E and 97 30' E. Itanagar is the capital of
Arunachal Pradesh and located at an altitude of 530 meters above
MSL. It is named after Itafort meaning fort of bricks built in 14th
centuryA.D.
Arunachal at a Glance
Population of State(2001 Census)-1, 091, 117
Literacy Rate-54.74%4
University-1
Engineering Institute-2 ( Nerist / NIT)
College- 7
Arunachal at a Glance Contd…
SWAN
COMMON SERVICE CENTRE
STATE PORTAL & SSDG
STATE DATA CENTRE
NATIONAL PORTAL
STATE MISSION MODE PROJECT
NeGP projects in Arunachal Pradesh & Status Thereof.
SWAN
BSNL Leased Line connectivity has been established
between 8 district headquarters and the State Head
Quarter (SHQ)
The 8 District headquarter (DHQ) – Yupia / Ziro / Daporijo
/ Along / Pasighat/ Khonsa/ Tezu / Roing .
5 district Head quarters (DHQ) are also connected with
SHQ through V- SAT connectivity. Ziro / Tawang/
Changlang / Anini/ Hawaii.
BSNL has issued demand note for 25 Block level offices
(BLO’s) for leased line connectivity for which money has
been released to BSNL.
80 % of the vertical connectivity is expected to be
completed by March 2011.
Common Service Center
Sl.No Districts Zone No. of CSCs Location Selected
No. of VLEs Selected
Training Complete
d
No.of CScs Rolled Out
No. of CSC Operational and having
connectivity
1. Anjaw
ZON
E 1
0 0 0 0 0 0
2. Changlang 5 2= Khagam
( Miao),
Changlang
5 5 5 5
3. Dibang
Valley
0 0 0 0 0 0
4. East
Kameng
2 1 = Seppa 2 2 2 2
5. East Siang 2 1 = pasighat 2 2 2 2
6. Kurung
Kumey
0 0 0 0 0 0
7. Lohit 8 3 = Tezu – 3,
Chowkham
– 2, Namsai
– 3
8 8 8 8
8. Lower
Dibang
Valley
3 1 = Roing 3 3 3 3
Sl.No Districts Zone No. of CSCs
Location Selected
No. of VLEs Selected
Training Completed
No. of CSCs Rolled Out
No. of CSC Operational and having
connectivity
9. Lower
Subansiri
ZONE 1
4 1 = ziro- I 4 4 4 4
10. Papumpare 10 3 = Itanagar-
5,
Naharlagun –
4, Doimukh –
1
10 10 10 10
11. Tawang 2 2 – Tawang-
1, Jang – 1
2 2 2 2
12. Tirap 5 3 = Khonsa,
1, Namsang –
3, Deomali - 1
5 5 5 5
13. Upper Siang 0 0 0 0 0 0
14. Upper
Subansiri
3 2 = Daporijo,
3 – Nilling - 1
3 3 3 3
15. West kameng 8 6= Bomdila -
2, Tenga – 1,
Kalaktang –
1, Dirang – 2,
Rupa – 1,
Bhalukpong
– 1
8 8 8 8
16. West Siang 4 3 = Basar – 2,
Along East –
1, Liromoba -
1
4 4 4 4
TOTAL 56 23 56 56 56 56
Services being provided by CSC
Sl.No Nature of Services
No. of CSCs providing the
services
Total earning of the VLEs during Aug -
2010
Total Transaction made during Aug -
2010
1. Air Booking 24 3,170.85 15
2. Mobile
Recharge
24 1,624.82 406
3. Railway
Booking
24 732.51 29
4. Utility 24 52.00 14
5. Suvidhaa
Shoppee
24 403.10 1
STATE PORTAL & SSDG
Bidding process for selection of implementing agency completed.
LOI being issued shortly
STATE DATA CENTRE
Govt. accorded approval for purchase of an existing buildings.
Process for mobilization of fund for the building cost is under progress.
RFP under submission to DIT, GoI.
DIT could not approved the RFP due to lack of site.
National Portal (Integrated MMP)
Sl.No Content Category Approved
1. Documents 160
2. Rules & Regulations 38
3. Schemes 9
4. Forms 181
5. Acts 68
The following contents have been uploaded in the www.india.Gov.in
STATE MISSION MODE PROJECT
1 )3 DPRs have been prepared for the following
departments
Education / Agriculture / Urban Development.
2 )The DPRs have been submitted to the concerned
department for onward submission to the line
ministry, Govt. of India.
Other e – Governance Initiatives
Computerization of Inner Line Permit Process
Connectivity of DDSE offices with Directorate of school education
Business Process Re engineering in the department of Planning and Programme Implementation .
e – Governance initiative in the Departments of Social Welfare
TYPES OF SERVICES PROVIDED BY JAN-SUVIDHA CENTRE
Permanent Residence Certificate
Schedule Tribe Certificate
Temporary Residence Certificate
Arms License
Succession Certificate
Death Certificate
Birth Certificate
Identity Card
Inner Line Pass and many more.
Plan of Action for next 3 Years
Task Area 2010 – 11 2011 – 12 2012 - 13
Basic
Requirements
1.Infrastructure readiness for SeMT.
2.Website, Design, development & rollout of ARDIT, APSCS&T
3.Formation of PeMT for all selected departments for MMP.
CAPACITY
BUILDING
1. Training of SeMT team at
required levels.
2. Detailed Training plan,
Budgeting, Approval from DIT,
Selection of vendor.
3. Training for the political and
policy makers.
4. Training for the CIC
Operators.
5. Implementation of e – samaj
for social welfare & WCD
6. Completion of training for
district level for 6 departments
1.To organise a specialized
Training for SNPIU
Team.
2. Training of balance staffs
in the first 6 MMP.
3. Training of all the staffs of
Deptt. selected for the
implementation of
second lot of 6 MMP
projects.
4. Refresher Course for
SeMT, PeMT & select
members on latest
technology.
1.Training of all staffs of
the departments
selected for the
implementation of
third & final lot of 6
MMP projects.
2. Refresher course for
SeMT, PeMT & select
members on latest
technology
Task Area 2010 – 11 2011 – 12 2012 - 13
ARSWAN
1. Site preperation for vertical PoPs
is completed for 1 SHQ, 13 DHQ
and 45 BLOs. Remaining DHQs
and is to be prepare.
2. BSNL connectivity has been
provided for only 8 DHQ , the
remaining 8 DHQ will be connected
soon.
1. BSNL connectivity has
been provided for only 8
DHQ, the remaining 8
DHQ will be connected
soon.
2. Launch of service of
ARSWAN in all Block
Level locations.
3. FAT, 3rd party audit on
SLA
4. Bandwidth usage audit &
improvement of bandwidth
if required.
1. Bandwidth usage
audit & improvement
of bandwidth if
required.
COMMON
SERVICE
CENTRE
1. All the 200 CSCs to be
implemented successfully in
the entire state.
2. All the CSC outlets should be
activated to start work with
B2C, G2C services for the
citizen.
1. All the CSC outlets should be
activated to start work with
B2C,G2C services for the
citizen.
2. Rolling out of first 6 MMP
through CSC.
3. SLA monitoring of SCA’s
1. Rolling out of next
6 MMP
through CSC.
2. SLA monitoring of
SCA’s
Task Area 2010 – 11 2011 – 12 2012 - 13
STATE DATA
CENTRE
1. Approval of RFP by DIT,GoI.
2. File has been put up for
purchasing Building for SDCs
setup.
3. Selection of vendor.
1. Implementation of SDC.
2. Appointment of 3rd party
Audit
3. PAT & FAT
4. SLA AUDIT
1.SLA audit & feed
back.
2. Estimate storage
requirement
with current
data history &
estimation.
MISSION
MODE
PROJECTS
1. Training the identified PeMTs.
2. Waiting for approval from Line
Ministries for 3 DPRs
submitted.
3. Sanction of MMP’s & Selection of
Vendor
1. Implementation of first 6
MMP
2. Identification of next 6 MMP
& training their PeMT’s.
3. DPR preparation &
submission to Line
Ministries for approval.
4. Sanction of MMP’s &
Selection of Vendor
1. Implementation of
second lot of
6 MMP
2. Identification of
last 6 MMP &
training their
PeMT’s.
3. DPR preparation
& submission
to Line
Ministries for
approval.
4. Sanction of
MMP’s &
Selection of
Vendor for
implementatio
n.
Task Area 2010 – 11 2011 – 12 2012 - 13
INTEGRATED
PROJECTS
1. Document Management
System
2. E – Mail System
1. e-Procurement
2. e-Courts
3. National Portal
1. e-Biz
Fixed Timelines for e – enabling Identified Services in next one year
All the 200 CSC centre should be implemented successfully in the entire state.
All the CSC outlets should be registered and activated to start work with B2C(Business to Citizen), G2C(Govt. to Citizen) services for the citizen.
Training needs to be conducted for all the VLE (CSC operator) to understand and execute the system/software function correctly.
DPR for Dept. of Education, Social Welfare & Woman and Child development department, Urban development Department, Agriculture is ready and sent to respective departments.
The DPR of the MMPs once approved by SeMT(State e-Mission Team) can be send to Line Ministry for approval.
Issue And Challenges
BSNL Connectivity
Inadequate suitable raw Power
Natural calamity like landslides, flood etc.
Surface Communication: mountainous terrain which is a
hindrance in establishing connectivity to villages.
Lack of Awareness on e – Governance at different level.
Non availability of G2C services from line departments.
BSNL Connectivity Status1)Provision of VPTs in uncovered villages
Sl.No State Total No. of
villages as
per census
2001
No. of
Inhabited
villages as
per Census
2001
No. of
villages
covered
with
VPTs
%
Achievement
Remarks
1. Arunachal
Prades
h
4065 3863 1499 5.14 % Very slow progress in
the provision of
VPTs in
Arunachal
Pradesh under
the New VPT
Agreement
1)First Phase of Shared Mobile Infrastructure Scheme
Sl.No State Number of Towers
to be set
Number of Towers
commissioned as on
31.12.2009
Name of the
Infrastructure
Provider
1. Arunachal
Pradesh
68 25 BSNL
Leased Line Connectivity
Sl.No State Nos of
DistHead
quarters
Leased
Line
connec
tivity
Require
d
Leased Line
Connecti
vity
Provided
%
Achieveme
nt
Remarks
1. Arunachal
Pradesh
16 16 8 50% BSNL unable to
ascertain
Timelines for
provisioning of
Connectivity for
the remaining 8
district
headquarter.
44