Regional Water Supply Project (RWSP). Gary King, P.E., Engineering Manager Todd Jordan, P.E., Project Engineer. Meeting Agenda. Meeting Purpose Project Overview California Environmental Quality Act (CEQA) Overview/Environmental Impact Report (EIR) Scoping Comments. 1.Meeting Purpose. - PowerPoint PPT Presentation

Transcript of Regional Water Supply Project (RWSP)

Page 1: Regional Water Supply Project (RWSP)

Regional Water Supply Project (RWSP)

Gary King, P.E., Engineering ManagerTodd Jordan, P.E., Project Engineer

Page 2: Regional Water Supply Project (RWSP)

Meeting Agenda1. Meeting Purpose2. Project Overview3. California Environmental

Quality Act (CEQA) Overview/Environmental Impact Report (EIR) Scoping

4. Comments

Page 3: Regional Water Supply Project (RWSP)

1. Meeting PurposeCEQA public

disclosure process1st Step = Notice of

Preparation (NOP)Goal: seek public

agency and stakeholder input on scope of the Environmental Impact Report

Page 4: Regional Water Supply Project (RWSP)

2. Project OverviewBackgroundPurpose and

ObjectivesNevada Irrigation

District (NID) Service Area

Proposed ProjectComponents

Parker Dam is not part of this project

Page 5: Regional Water Supply Project (RWSP)

Project Background2003 – 2005 Siting Study2008 – 2012 Planning and

Predesign, including Environmental Constraints Analysis

Page 6: Regional Water Supply Project (RWSP)

Project Purpose & ObjectivesProject Purpose

Provide treated water to the portion of the City of Lincoln which is within the Nevada Irrigation District (NID) boundary using NID water on NID lands.

Primary ObjectivesSupply potable water.Provide raw water storage for unexpected fluctuation,

variations in water quality, and water supply emergencies.Provide potable water storage to accommodate

anticipated diurnal demand fluctuations, fire protection, and emergencies.

Construct potable water facilities that meet or exceed California Department of Public Health (CDPH) drinking water standards.

Increase operational flexibility, redundancy, capacity and reliability.

Increase the reliability of the City’s treated water supply.

Page 7: Regional Water Supply Project (RWSP)

NID Service Area

Page 8: Regional Water Supply Project (RWSP)

NID Service Area In Placer County

Page 9: Regional Water Supply Project (RWSP)

Project Overview Proposed Linear Infrastructure

Page 10: Regional Water Supply Project (RWSP)

Project OverviewProposed Water Treatment Plant

Page 11: Regional Water Supply Project (RWSP)

Project OverviewProposed Raw Water Storage Reservoir

Page 12: Regional Water Supply Project (RWSP)

California Environmental Quality Act

OverviewProcessSchedulePublic NoticingNotice of

Preparation/EIR Scoping

Page 13: Regional Water Supply Project (RWSP)

CEQA OverviewCEQA is triggered by Discretionary Action of Public Agency (i.e. RWSP is subject to Approval by NID Board)Lead Agency = Nevada Irrigation

District Some of the Responsible Agencies are:

City of Lincoln, Placer County, California Department of Fish and Wildlife, California Air Resources Board, Regional Water Quality Control Board, Placer County, City of Lincoln and among many others.

Page 14: Regional Water Supply Project (RWSP)

CEQA ProcessPublic Participation is Encouraged (3 key Public Review Periods)

Notice of Preparation = 30 day public review period – August 15-September 19, 2014. All written comments must be received by

September 19, 2014 at 5pm.Draft Environmental Impact Report (EIR) = 45

day public review period and public hearing – Estimated to be June-July, 2015

Final EIR = 10 day public review period and public hearing – Estimated to be October, 2015

Page 15: Regional Water Supply Project (RWSP)

Public NoticingCEQA Requires one of the following for Public Noticing:

NID completed all three for this Notice of Preparation

Publish, Post, orDirect Mailing

CEQA Guidelines §15087

Published – 3 journals NID website

(www.nidwater.com)Posted Notices at:

Nevada Irrigation District Offices Nevada County Clerk Placer County Clerk Lincoln City Hall Nevada County

Library (both locations) Placer County Library (Auburn) City of Lincoln Library (Lincoln)

Direct Mailing to: 380 stakeholders

Page 16: Regional Water Supply Project (RWSP)

Notice of Preparation (NOP)EIR ScopingThe purpose of scoping is to help ensure comprehensive and

focused EIR with a firm basis for the decision-making process.NOP determine focus and content of EIR

Range of actions, alternatives, environmental effects, and mitigation measures

Allows elimination of issues if not pertinent to the final decision

Bring together and address: public concernsaffected agencies, other interested parties.

Public/Agency ID of Significant issues

Page 17: Regional Water Supply Project (RWSP)

EIR ScopeTo Include Assessments of: Aesthetic and Visual

Resources;Agriculture;Air Quality;Biological Aquatic and

Fisheries Resources;Biological Terrestrial

Resources;Cultural Resources;Geology and Soils;Greenhouse Gas

Emissions;

Hazardous Waste and Materials;

Hydrology and Water Quality;

Land Use;Noise;Population and Housing;Public Services and

Utilities;Recreation; andTransportation and Traffic.

Page 18: Regional Water Supply Project (RWSP)

Selection of AlternativesCEQA Guidelines §15126.6 -- Alternatives

should:Feasibly meet basic objectives of projectAvoid/substantially lessen significant effects

“Rule of Reason”Consider:

site suitability, economic viability, availability of infrastructure, General Plan consistency, etc.

Page 19: Regional Water Supply Project (RWSP)

Potential Project AlternativesAlternatives under consideration:

Alternatives w/in the ProjectAlternative Pipeline AlignmentsAlternate Raw Water Reservoir SiteAlternate WTP Site

Alternatives to the ProjectNo Project or Project DenialPCWA/Ophir Alternative Bear River Pump Station

Page 20: Regional Water Supply Project (RWSP)

Alternatives within the Project

Page 21: Regional Water Supply Project (RWSP)

PCWA/Ophir Alternative

Page 22: Regional Water Supply Project (RWSP)

Bear River Pump Station Alternative

Page 23: Regional Water Supply Project (RWSP)

Comments and Questions?Comments and Inputs WelcomeTo capture the intent and purpose of your

comments please complete a comment card or write NID at:

Lisa Francis Tassone, Board Secretary Nevada Irrigation District,

1036 West Main Street, Grass Valley, CA 95945E-mail: [email protected]

Project website: NIDregionalwatersupply.org NID website: www.nidwater.com

Page 24: Regional Water Supply Project (RWSP)

Project Components

Valley View WTP Site

Metering Station

Backup Water Supply

Big Hill Reservoir

Hydropower Site (typ)

Cross River Penstock

Raw Water Pipeline

49

Treated Water Pipeline

Page 25: Regional Water Supply Project (RWSP)

Treated Water Demand continued