2
About ISO New England• Private, not-for-profit corporation
created in 1997 to oversee New England’s deregulated electric power system
– Regulated by the Federal Energy Regulatory Commission (FERC)
– Independent of companies doing business in the market
– Independent board of directors, with no financial stake in regional energy firms
– Approximately 400 employees headquartered in Holyoke, MA
3
Planning Process• ISO Role in Restructured Electric Industry
– Provide ‘independent’ assessment of bulk power system needs– FERC granted ISO sole authority to lead planning effort (2000)– Stakeholder input from Transmission Expansion Advisory Committee
• Regional Transmission Expansion Plan for 2004 – The most comprehensive planning effort to date to ensure system reliability
and promote market efficiency– RTEP04 constitutes a regional ‘system’ plan
• Objectives– Identify system needs – Provide information to the marketplace to attract generation, merchant
transmission, and demand-response solutions– Identify regulated transmission solutions as a backstop for reliability
4
NewGeneration
Retirements/Deactivations
TransmissionProjects
LoadForecast
Planningis
Ongoing
Demand-Side Management
Demand Response Program
Planning Process
5
Reliability Concern in “Load Pockets”
• Areas with limited import capability and local generation– Southwest Connecticut– Connecticut– Boston– Northwest Vermont
• Timely completion of 345 kV transmission upgrades to these areas is essential to address reliability concerns and to allow needed development of new resources.– Even with new 345 kV transmission, only a limited time for re-powering or
developing new resources will exist.• Market incentives are needed to promote development of new resources.
6
System-Wide Resource Reliability
• Present capacity ‘surplus’ will be short-lived.• New England supply outlook shifts from tight to deficit conditions in
two to four years.• Some generation units needed for system reliability are “at risk.”• Potential retirements/deactivations include units in critical load
pockets.
7
System-Wide Resource Reliability, cont.
• New England is heavily dependent on gas-fired generation. – The 9,500 MW of capacity added since 1999 is largely gas-fired.– Approx. 11,500 MW of capacity is now capable of burning gas as a
primary fuel.– Poses major concerns for unit availability during winter periods.
• Region is vulnerable to price fluctuation, delivery constraints and competing demands for natural gas.
• Cold Snap initiatives are underway to improve unit availability, and thus system reliability, during winter season.
8
Net Generating Capacity 90/10 Load + Operating Reserves
50/50 Load + Operating Reserves
10,000
15,000
20,000
25,000
30,000
35,000
-
5,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Sum
mer
Meg
awat
tsNew England’s Capacity Situation Today’s surplus capacity situation will be short-lived
9
Transmission Projects• Progress in Several Areas Since RTEP03
– Projects placed in service since RTEP03: 25– Total New RTEP04 projects: 39– Total RTEP04 projects needed for reliability: 246
• Major 345 kV Projects (Estimated costs)– Southwest Connecticut Reliability Project ($890M) *– Southern New England Reinforcement Project ($125M)– NSTAR 345kV Transmission Reliability Project ($217M)– Northwest Vermont Reliability Project ($156.3M)– Northeast Reliability Interconnect Project ($90.4M)– Subtotal: approximately $1.5 billion
• Remaining RTEP04 Projects: approximately $0.6 billion• 2004 Transmission System Project Plan Grand Total: $2.1 billion
* Additional equipment or expense may be required for underground design.
10
Market Information• New England needs a capacity market that appropriately values the
location of resources.• RTEP04 provides historical market information and economic
assessments of the system in the future.• Congestion component of energy pricing has been low.
11
Conclusions• Reliability is at risk in Southwestern Connecticut, the State of
Connecticut, Northwest Vermont and Boston.– Problems in these areas could adversely impact the regional bulk power
system.• Resource reliability could become a major system-wide issue for
New England in two to four years.• Timely completion of transmission projects is critical.
– Delays exacerbate reliability problems.• Implementation of actions identified in RTEP04 and enhancements
to the market design are needed to address New England’s reliability concerns.
Questions?
Backup material
14
Emergency Actions
Southern New England ReinforcementProject CT Import Increase (900 MW)Current Import Limit (2,200 MW)
Net Generating Capacity
90/10 Peak Load + Reserves (Largest Unit)
50/50 Peak Load + Reserves (Largest Unit)
-
2,000
4,000
6,000
8,000
10,000
12,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Sum
mer
Meg
awat
ts
NOTE: Transmission project in-service dates are subject to delay
Connecticut Capacity Situation
15
Emergency Actions
SWCT Reliability Project Phase II - Import Limit Increase (850 MW)
SWCT Reliability Project Phase I - Import Limit Increase (550 MW)
Current Import Limit (2,000 MW)
Net Generating Capacity
90/10 Peak Load + Reserves (Largest Unit)
50/50 Peak Load + Reserves (Largest Unit)
-
1,000
2,000
3,000
4,000
5,000
6,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Sum
mer
Meg
awat
ts
NOTE: Transmission project in-service dates are subject to delay
Southwest Connecticut Capacity Situation
16
Post-Contingency ViolationsCurrent System Thermal Overloads
New Have
n
Stamford
Norwalk
Bridgeport
Milford