Van Nuys Station Project
Regional Rail
![Page 2: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/2.jpg)
Project Location
Project Location
![Page 3: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/3.jpg)
Purpose
Provide passenger service to both main tracks
Provide safe pedestrian access through a grade separated pedestrian undercrossing
Improve travel times for intercity and commuter rail service
Improve train operational reliability and on-time performance
![Page 4: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/4.jpg)
Latest Developments
> Previous concept was a side platform.
> Changed to a center platform:> Minimizes impacts
to the bridge.> Eliminates conflicts
with the UPRR facility.
> Minimizes utility impacts.
![Page 5: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/5.jpg)
Existing Station
UPRR Yard Lead
MT-2
Van Nuys Station
UPRR Gemco YardMT-1
![Page 6: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/6.jpg)
Existing Station
> The Van Nuys Station serves both Amtrak and Metrolink passengers.
> The main tracks are shared with the Union Pacific Railroad.
> Serves 33 trains per weekday> 850 foot platform> Double track with a single side platform> Bus services
> DASH and Amtrak Thruway onsite> Metro stops on Van Nuys Blvd.
![Page 7: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/7.jpg)
Station Theme
![Page 8: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/8.jpg)
Site Accessibility and Travel Path
Proposed Accessible Path of Travel
![Page 9: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/9.jpg)
Platform Model
![Page 10: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/10.jpg)
Station ThemeVan Nuys Station
![Page 11: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/11.jpg)
Schedule
Finish Construction May 2019
Begin Construction May 2017
End Final EngineeringDecember 2016
Begin Final EngineeringJuly 2014
![Page 12: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/12.jpg)
Participating Agencies
METRO Metrolink Caltrans Amtrak LADOT (City) UPRR
![Page 13: Regional Rail - Metrolink · 2018-03-13 · Existing Station. UPRR Yard Lead MT-2. Van Nuys Station UPRR Gemco Yard. MT-1. Talk about the project site: Constrained site with 2 main](https://reader035.fdocuments.net/reader035/viewer/2022070711/5ec85e5e34415804115bda87/html5/thumbnails/13.jpg)
Please feel free to contact us with any
additional questions or comments!