Gross Building Cost Building Area Cost/GSF Sellable Area
Cost/Rentable
SF
$1,660,939 0.98 acres $1,694,835 / acre $6.48 / sf
$864,346 1.78 acres $485,587 / acre $3.37 / sf
$7,701,543 170,762 sf $45.10 / sf $30.07 / sf
$51,171,697 357,494 sf $143.14 / sf $199.80 / sf
GRAND TOTAL $61,398,524 528,256 sf $116.23 / sf 256,121 sf $239.72 / sf
256,121 sf
Residential
Offsite Work
Sitework
Parking
Regent Square West Dallas Apartments - SD EstimateHouston, TX
May 18, 2011
Estimate Recap
GID WEST DALLAS APARTMENTS, Houston, Texas
LIST OF QUALIFICATIONS AND CLARIFICATIONS
May 19, 2011
General Project Information
The Budget Cost is based on the following:
o 100% Schematic Drawings dated May 5, 2011 (see list of drawings attached.)
o Exterior skin consists of brick, stucco, cast stone (Arriscraft), metal panels
o The Structure is included as post-tensioned cast-in-place concrete on auger cast piles.
o Our price is based on working hours between 7 a.m. to 10 p.m., Monday through
Saturday. No other restrictions are considered.
o Budget pricing includes costs for pursuing LEED Building certifications.
o We include the cost associated with providing a Contractor Controlled Insurance Program
(CCIP).
o J.E. Dunn will be furnished all CAD drawing (architectural and structural background)
and Revit model files for our use in preparing shop drawings.
o General Building Permits are included.
o Price includes a payment & performance bond.
The Budget Cost excludes the following:
o We have assumed that all residential units are rental units and have excluded insurance
premiums for condominiums.
o It is assumed that air rights for tower cranes and the building are obtained and provided
by the owner.
o Cost for crane easements.
o Cost for utility easements.
o We have not included the cost of a detailed LEED or 3rd Party building commissioning in
our budget.
o LEED certification of any buildings.
o Impact fees.
o Expediting of any permits or fees.
o Builders risk insurance.
o Document reproduction.
o Environmental survey.
o Soils report.
o Materials testing and inspections.
o Project survey.
o Tap and meter fees.
o Mold-free certification for each apartment.
o Retail space is included as cold dark shells.
Regent Square
List of Clarifications
May 19th, 2011
Page 2
1. GENERAL REQUIREMENTS
1.1 All supervision, engineering, temporary protection, temporary utilities, safety, cleanup,
preconstruction, hoisting, and equipment necessary to perform the work is included.
1.2 Substantial completion for of the project is 610 calendar days from start of construction.
This assumes that building permits are issued when required to allow work to start as
shown in our construction schedule.
1.3 General conditions are included
1.4 Budget is based upon a sales tax rate of 8.25% for Houston, Texas.
1.5 Previously agreed upon preconstruction costs are not included in this estimate.
2. DEMOLITION
The Budget Cost is based on the following:
2.1 Demolishing all existing offsite streets for new paving & utilities.
The Budget Cost excludes the following:
2.2 Temporary rental of parking meters or relocation of such.
2.3 Demolition, removal or abatement of the existing Allen House Apartments and buildings.
2.4 Cost associated with any City required street or sidewalk usage rental.
2.5 Demolition or relocation of any dry type utilities.
3. MASS EXCAVATION & SITE PREPARATION
The Budget Cost is based on the following:
3.1 Temporary dewatering system as needed.
3.2 Clearing.
3.3 Mass excavation and grading of the site. Estimate assumes a balanced site.
3.4 Temporary roads.
3.5 Erosion Control and SWPP plan.
3.6 Building Pads. (24” select fill material max).
3.7 Cuts & fills as required for offsite road work.
3.8 A $30,000 tree relocation allowance.
The Budget Cost excludes the following:
3.9 Excavation shoring. Shoring is included for site utilities trenches.
3.10 Removal or replacement of hazardous materials, unsuitable soils or rock, and any other
unforeseen structures or utilities.
3.11 Permanent dewatering system.
3.12 NPDES monitoring systems.
Regent Square
List of Clarifications
May 19th, 2011
Page 3
4. FOUNDATION EXCAVATION
The Budget Cost is based on the following:
4.1 Included with foundation allowance – reference line item #9.
The Budget Cost excludes the following:
4.2 Removal or replacement of hazardous materials, unsuitable soils or rock, and any other
unforeseen structures or utilities.
5. SITE UTILITIES
The Budget Cost is based on the following:
5.1 New domestic water, fire water, water meters, taps, backflow preventers, sewer, and
storm drainage as shown.
5.2 Cost includes utility piping, street cutting/demo, street patching, and traffic control.
5.3 Off-site utilities as shown.
5.4 A $3,500 allowance for a water and drain line for the dog park fountain (not shown on the
pricing documents).
5.5 Unknown underground utility relocation/demolition allowance of $100,000.
5.6 Centerpoint relocation allowance cost of $805,000 for overhead power lines.
5.7 Relocation allowance of $100,000 for phone and cable lines.
The Budget Cost excludes the following:
5.8 Water tap or sewer impact fees.
5.9 Detention basin/pond.
5.10 Filtration or treatment of storm water.
5.11 Gas services and meters to the building are assumed to be by local utility company.
5.12 Fiber-optic cable/telecom/data/security work other than the allowance included above.
6. SITE IMPROVEMENTS AND HARDSCAPE
The Budget Cost is based on the following:
6.1 Pedestrian sidewalks on the South side of West Dallas and along the East side of Rochow
to the end of Phase I limits.
6.2 An allowance of $10,000 is being carried for site furniture.
6.3 An allowance $55,000 is being carried for street lighting along W. Dallas.
6.4 Parking striping within the parking deck.
6.5 6” crushed concrete base material with SS-1 primer coat @ 0.15 to 0.25 gallon per sq. yd,
with 2” type D HMAC on the base material at all site streets.
6.6 An Allowance of $15,000 is being carried for the fountain located in the entry plaza dog
park.
6.7 An Allowance of $10,000 is included for garage signage.
Regent Square
List of Clarifications
May 19th, 2011
Page 4
The Budget Cost excludes the following:
6.8 Sandblasted curbs.
6.9 Wheel stops.
6.10 Permanent fencing.
6.11 Bus stops.
7. LANDSCAPING
The Budget Cost is based on the following:
7.1 Street level landscaping and irrigation is included as an allowance for $50,000.
8. SOIL POISONING
The Budget Cost is based on the following:
8.1 Termite treatment beneath the slab on grade at occupied buildings.
9. CONCRETE FOUNDATIONS
The Budget Cost is based on the following:
9.1 An allowance of $528,256 is included for footings, grade beams, pile caps, auger cast
piles, building pad, any and all other below grade foundation work.
The Budget Cost excludes the following:
9.2 Foundation drainage.
9.3 Excavation and removal of hazardous materials.
9.4 Foundation testing.
10. CONCRETE FRAME
The Budget Cost is based on the following:
10.1 Concrete frame as shown on structural drawings.
The Budget Cost excludes the following:
10.2 Puddling is excluded. Slab concrete strength is increased by 1,000 psi to remove the
need.
10.3 Architectural concrete finishes.
10.4 Powder blasting/sand blasting for architectural finishes.
10.5 Epoxy coated post tension cables.
Regent Square
List of Clarifications
May 19th, 2011
Page 5
11. CONCRETE FORMWORK
The Budget Cost is based on the following:
11.1 All formwork necessary to complete the concrete structure.
11.2 MDO plywood forms at all exposed exterior walls and columns.
11.3 BB plywood horizontal / MDO vertical for interior wall and column in the residential
floors.
The Budget Cost excludes the following:
11.4 Architectural concrete.
12. CONCRETE REINFORCING STEEL/POST TENSIONING
The Budget Cost is based on the following:
12.1 Reinforcing included as per structural drawings.
12.2 Foundation reinforcement is included in line 9 Foundations.
The Budget Cost excludes the following:
12.3 Encapsulated Cables (except at the pool deck area).
12.4 Galvanized or epoxy coated rebar.
13. EXTERIOR CAST STONE/LIMESTONE
The Budget Cost is based on the following:
13.1 Stonework in areas indicated on the drawings.
The Budget Cost excludes the following:
13.2 Flamed granite.
13.3 Limestone veneer.
Regent Square
List of Clarifications
May 19th, 2011
Page 6
14. MASONRY
The Budget Cost is based on the following:
14.1 12" CMU at walls greater than 13' tall.
14.2 8" CMU at walls less than 13' and trash chutes.
14.3 All partitions within the parking deck area are CMU unless noted otherwise on the
drawings.
14.4 Modular face brick is assumed included as shown in the Basis of Design.
14.5 Compressible fire safing insulation at the top of interior CMU walls with a continuous
dovetail slot and dovetail anchors per seismic requirements.
14.6 Gray "type S" mortar at all CMU areas.
14.7 An allowance of $34,000 is being carried for the masonry screen wall south of the
electrical poles in the entry plaza.
15. STRUCTURAL & MISCELLANEOUS STEEL
The Budget Cost is based on the following:
15.1 Miscellaneous steel pricing is based on the following: stairs and rails, masonry and
framing clips, window washing roof tie downs only (no davits) at 8 story buildings and
office building,
15.2 We have included Rheinzink metal panels.
The Budget Cost excludes the following:
15.3 Concrete column embed corner guards in the parking deck.
15.4 Angles at top of each side of masonry walls.
15.5 Stainless steel cable railing at parking garage ramps as shown and at the South face of the
parking garage in lieu of the wall assembly shown on the pricing documents.
16. ROUGH CARPENTRY
The Budget Cost is based on the following:
16.1 Fair Housing Act in-wall blocking within the units at toilet & tub/shower walls.
16.2 Roof blocking.
16.3 Door bucks in stud partitions and window blocking.
17. FINISH CARPENTRY
The Budget Cost is based on the following:
17.1 Nominal 1”x 6” MDF base in corridors and elevator lobbies.
17.2 Standard casing at all pre-hung doors within the units.
17.3 1" x 6" painted one-piece MDF base in the units.
17.4 Crown molding included in the units at kitchen and living room.
Regent Square
List of Clarifications
May 19th, 2011
Page 7
17.5 Casing at unit entry doors frames.
17.6 Ventilated wire shelving for closets.
17.7 Common area casework is included as an allowance of $30,000. This will include
mailrooms, maintenance rooms, and coffee bars.
The Budget Cost excludes the following:
17.8 Chair rail and crown molding at corridors.
17.9 Wood closet shelving and rods.
18. MAIN LOBBY FINISHES
The Budget Cost is based on the following:
18.1 Main Lobby Finishes are an allowance of $203,120. This allowance includes the main
concierge desk, the lobby flooring, lobby wall treatments, any wood trim, articulated
drywall ceilings (or other ceilings), interior partitions/storefronts, and millwork.
18.2 Exterior partitions, exterior doors, HVAC, plumbing, fire protection, and electrical
system costs are included elsewhere in the Budget.
The Budget Cost excludes the following:
18.3 Audio-visual equipment, plasma screen televisions, and furniture.
19. WATERPROOFING & SEALANTS
The Budget Cost is based on the following:
19.8 Bentonite waterproofing with HPDE protection layer at elevator pit slabs and site
retaining walls.
19.9 Joint sealants at exterior concrete paving.
19.10 Joint sealants at garage expansion joints, pour strip joints and control joints.
19.11 Joint sealants at top of wall and control joints in CMU.
19.12 Joint sealants at hollow metal door frames.
19.13 Pedestrian traffic coating at apartment balconies.
19.14 Fluid applied membrane air barrier with a wet film thickness of 70 mils to exterior
sheathing behind masonry, plaster and metal panels.
19.15 Joint sealants in exterior sheathing
19.16 40 mil self adhering rubberized asphalt wall flashing at framed window, door and louver
openings.
19.17 40 mil self adhering rubberized asphalt transition strips over window flanges.
19.18 24 ga. Stainless steel sheet metal flashing at heads of windows and doors.
19.19 24 ga. Stainless steel sheet metal flashing at base of walls.
19.20 40 mil self adhering rubberized asphalt thru-wall flashing.
19.21 215 mil hot fluid-applied rubberized asphalt waterproofing, composite drainage board
and 2” rigid insulation at areas to receive concrete paving or pavers at amenity deck.
Regent Square
List of Clarifications
May 19th, 2011
Page 8
19.22 215 mil hot fluid-applied rubberized asphalt waterproofing, water retention composite
drainage board, root barrier and 2” rigid insulation at areas to receive landscaping at
amenity deck.
19.23 215 mil hot fluid-applied rubberized asphalt waterproofing and composite drainage board
at planter slabs and walls on amenity deck.
19.24 215 mil hot fluid-applied rubberized asphalt waterproofing at pool tub slab and walls on
amenity deck.
19.25 Precast concrete pavers on pedestal system at amenity terrace.
19.26 Joint sealants at vertical masonry joints, masonry/metal panel transitions and
masonry/plaster transitions.
19.27 Expansion joint cover assemblies between apartments and garage
The Budget Cost excludes the following:
19.28 Damp proofing behind stucco at CMU/Concrete walls.
19.29 Traffic topping in parking decks above non-enclosed spaces.
19.30 Caulking the slab on grade joints.
19.31 Mold-free certification. Can be added at $325 per unit for 511 total units.
20. BUILDING INSULATION
The Budget Cost is based on the following:
20.1 R-19 unfaced fiberglass insulation is included at exterior walls.
20.2 R11 and R19 unfaced insulation is included at interior walls.
20.3 Exposed rigid thermal insulation on the parking garage where heated areas are above.
The Budget Cost excludes the following:
20.4 Sprayed insulation to deck.
21. ROOFING & SHEET METAL
The Budget Cost is based on the following:
21.1 Roofing system is assumed to consist of a Firestone modified roofing system consisting
of an SBS Ultra White cap with three plies of Ply VI felts in hot asphalt. ¼” per foot
tapered insulation and ½” cover board (R-25).
21.2 24 ga. pre-finished metal flashing for roofing systems, including parapet coping, counter
flashings, scuppers, and downspouts.
21.3 20 year manufacturer's warranty.
22. ENTRANCE CANOPIES
The Budget Cost is based on the following:
22.1 Composite metal cladding of structure carried in other areas.
Regent Square
List of Clarifications
May 19th, 2011
Page 9
23. HOLLOW METAL DOORS AND FRAMES
The Budget Cost is based on the following:
23.1 Hollow metal door frames with wood doors at all unit entries.
23.2 Hollow metal doors and frames at the elevator penthouse, the parking deck, and exterior
doors.
24. WOOD DOORS AND FRAMES
The Budget Cost is based on the following:
24.1 Common area doors to be 8’-0” high, prefinished solid core wood doors in hollow metal
frames.
24.2 8’-0” high, 20-minute rated solid core field painted select plain sliced maple doors at the
apartment entries and common areas.
24.3 8’-0” high x 1 3/8” thick two-panel hollow core pre-hung masonite doors at the apartment
interiors. Doors at HVAC closet and laundry rooms with stacking washer/dryers are
louvered. Laundry rooms with side by sides are two-panel doors.
24.4 All pre-hung doors are field painted and have 4 -9/16” jambs.
24.5 Service and back-of house doors assumed to be 8’-0” high, hollow metal doors in hollow
metal frames.
24.6 All pre-hung doors are framed with #473 finger jointed wood casing.
24.7 45-minute rated wood doors at the trash rooms on the typical floors.
The Budget Cost excludes the following:
24.8 Smoke hardware at 45-minute rated wood doors at the trash rooms on the typical floors.
25. FINISH HARDWARE
The Budget Cost is based on the following:
25.1 We have included hinges within the apartments to match the hardware sets.
25.2 All fire rated doors will have intumescent seals built into the door.
The Budget Cost excludes the following:
25.3 Magnetic doors strikes or other security hardware.
Regent Square
List of Clarifications
May 19th, 2011
Page 10
26. SPECIAL DOORS & DOCK EQUIPMENT
The Budget Cost is based on the following:
26.1 Two steel coiling doors.
The Budget Cost excludes the following:
26.2 Dock Levelers, bumpers and any other dock equipment.
27. BALCONY RAILINGS
The Budget Cost is based on the following:
27.1 Kynar XL finished metal framed glass railing at balconies.
The Budget Cost excludes the following:
27.2 Bituminous coating around the posts at balcony railings.
28. GLASS, GLAZING & STOREFRONT
The Budget Cost is based on the following:
28.1 Storefront cost is based on aluminum storefront with Kynar XL finish.
28.2 Residential windows to be non-operable Kawneer punch windows, storefront and curtain
wall in lieu of MI Windows.
28.3 All miscellaneous aluminum brake metal.
29. ROOF TOP ELEMENTS
The Budget Cost is based on the following:
29.1 See allowances
The Budget Cost excludes the following:
29.2 Architectural roof screens.
30. DRYWALL
The Budget Cost is based on the following:
30.1 Drywall partitions and ceilings as shown.
30.2 Exterior wall framing with Dens-glass sheathing and R-19 batt insulation has been
included in the wall cavity with a 2" leg deflection track at the top exterior wall frame
(not slotted head track) at all retail areas.
30.3 5/8” DensShield at restroom walls.
30.4 5/8” XP mold resistant wall board at laundry rooms.
Regent Square
List of Clarifications
May 19th, 2011
Page 11
30.5 Common area ceilings are included as soffitted. Apartment unit ceilings in concrete-
framed buildings will be 60% skim coated exposed structure, and 40% flat drywall
ceilings.
30.6 Drywall walls and ceilings at spaces along exterior walls to have a level 5 finish. All
other drywall to be a Level 4 finish.
31. ACOUSTICAL
The Budget Cost is based on the following:
31.1 Acoustical ceiling for the theater is included in the $90/sf finish allowance for the theater
finishes and the finish system.
The Budget Cost excludes the following:
31.2 Acoustical ceilings or grids in the retail spaces.
31.3 Special roof or under roof treatment to abate cooling tower or condenser noise.
32. STUCCO
The Budget Cost is based on the following:
32.1 Stucco/EIFS is included as shown on the drawings.
33. CLUB/FITNESS FINISHES
The Budget Cost includes the following:
33.1 Allowances are carried for the areas as follows:
a. Leasing Office: $65/sf
b. Gym/Fitness: $75/sf
c. Theater: $90/sf
d. Laundry: $40/sf
e. Internet Café: $75/sf
f. Kitchen: $905/sf
g. Dining Room: $80/sf
h. Bar: $100/sf
34. FLOOR AND WALL TILE
The Budget Cost is based on the following:
34.1 Ceramic tile at unit bathroom floors, tubs, showers, public restrooms, kitchen backsplash
and vanity backsplash.
34.2 Noble Seal crack isolation and waterproofing membrane in included at the bathroom and
shower floors.
Regent Square
List of Clarifications
May 19th, 2011
Page 12
The Budget Cost excludes the following:
34.3 Mud set tile.
34.4 Epoxy grout at shower floors or walls.
35. INTERIOR STONE WORK
The Budget Cost is based on the following:
35.1 There is no interior stone work included in the units. Any common area stone work is
included in the finish allowances as described elsewhere in this document.
36. KITCHEN & BATH COUNTERTOPS
The Budget Cost is based on the following:
36.1 Granite countertops are included at $24/sf at the kitchens and unit desk top. This should
cover 3 cm granite.
36.2 Residential bathroom vanities are solid surface.
36.3 Granite countertops are on ¾” plywood substrates.
The Budget Cost excludes the following:
36.4 Granite backsplashes at the kitchens.
37. RESILIENT TILE & CARPET
The Budget Cost is based on the following:
37.1 Carpet is included at common area corridors and offices at $40/SY.
37.2 Carpet is included at unit bedrooms at $16/SY.
37.3 VCT is included at back-of-house areas.
37.1 4” rubber base at all areas to receive VCT flooring.
37.2 Engineered wood plank flooring for unit living room and kitchen floors.
37.3 Acoustimat included at engineered wood flooring areas.
The Budget Cost excludes the following:
37.4 Flooring within the retail and office areas.
38. PAINTING
The Budget Cost is based on the following:
38.1 All drywall ceilings and walls within the residential units.
38.2 All painted surfaces in the residential units include a prime coat plus two finish coats.
38.3 Drywall ceilings at the typical corridors and other public areas.
38.4 All doors and frames except pre-finished doors.
38.5 All wood base as indicated.
Regent Square
List of Clarifications
May 19th, 2011
Page 13
38.6 All “fast track” metal stairs and handrails.
The Budget Cost excludes the following:
38.7 Painting the balcony bottoms and edges.
38.8 Painting any millwork or cabinets.
38.9 Painting within the retail spaces, restaurant space.
38.10 Painting in the garage.
38.11 CMU walls are not painted.
38.12 Wall covering.
38.13 Faux painting.
38.14 Painting of exposed, concealed or Mechanical Room MEP pipes, duct, conduits, vents or
other materials
39. MISCELLANEOUS SPECIALTIES
The Budget Cost is based on the following:
39.1 One 5 lb extinguisher is included at each apartment.
39.2 Mailboxes for each apartment are included.
39.3 Trash chutes are included.
39.4 Trash sorters are included as an allowance of $20,000.
39.5 Three dog wash sinks are included as an allowance of $3500/ea.
39.6 Lockers at the fitness room are included in an allowance of $2000.
39.7 iPod Docks are included as an allowance of $300/unit for a total of $83,400, and includes
the dock and speaker wire. Speakers are not included.
39.8 Bike racks are included in an allowance of $5,000.
The Budget Cost excludes the following:
39.9 Window washing equipment
39.10 Exercise equipment
39.11 Trash compactors
39.12 Wall bumpers at service corridor. There does appear to be a service corridor.
40. TOILET PARTITIONS
The Budget Cost is based on the following:
40.1 Plastic laminate ceiling hung toilet partitions at the amenities level bathrooms.
40.2 Plastic laminate wall mounted urinal screens to match toilet partitions at the amenities
level bathrooms.
Regent Square
List of Clarifications
May 19th, 2011
Page 14
41. TOILET ACCESSORIES
The Budget Cost is based on the following:
41.1 Units allow for toilet paper holder, towel bar, shower curtain rod, towel ring.
41.2 An allowance for common area restrooms toilet accessories of $700/bathroom for a total
of $9,350.
41.3 Medicine cabinets for the unit bathrooms.
42. PARKING EQUIPMENT
The Budget Cost is based on the following:
42.1 Parking equipment is included as an allowance of $30,000.
43. RESIDENTIAL CABINETS
The Budget Cost is based on the following:
43.1 Cabinets are included as and allowance of $2800/unit for a total of $778,400.
The Budget Cost excludes the following:
43.1 Light valances.
43.2 Crown molding at the kitchen cabinets.
43.3 Casework furr downs between top of cabinet and ceiling.
44. FURNISHINGS
The Budget Cost is based on the following:
44.1 An allowance of $280/unit with a total of $77,840 for 6-gauge, Bali Customiser 1"
horizontal mini-blinds on all exterior glass (other than at sliding door and fixed door
panel) in the residential units and fitness center.
The Budget Cost excludes the following:
44.2 Walk-off mats.
44.3 Televisions and all audio video equipment.
44.4 Blinds at unit sliding balcony door or fixed door leaf.
45. RESIDENTIAL APPLIANCES
The Budget Cost is based on the following:
45.1 Residential appliances are assumed at $2700/unit
45.2 Wine coolers are allowed separately at $450/unit.
45.3 All appliances, assumed to have stainless steel finish.
Regent Square
List of Clarifications
May 19th, 2011
Page 15
The Budget Cost excludes the following:
45.4 Dryer exhaust booster fans that may be required. Venting is assumed to be through the
side of the building.
45.5 Canopy hoods.
46. ELEVATORS
The Budget Cost is based on the following:
46.1 Two Otis Gen 2 room less passenger elevators with 2500 lb capacity and 450 fpm.
46.2 One Otis Gen 2 room less freight elevator with 4000 lb capacity and 450 fpm.
46.3 Elevator cab finishes allowed at $10,000/cab for a total of $30,000.
The Budget Cost excludes the following:
46.4 Card readers.
46.5 Televisions.
46.6 Monthly maintenance agreement beyond first three months
47. PLUMBING
The Budget Cost is based on the following:
47.1 An allowance for the TEAL System structure on the roof of $20,000 is included.
47.2 Domestic water piping will be CPVC.
47.3 In the residential area, PVC risers will be employed and connected to plastic Sovent
laterals.
47.4 Drainage is included for the parking deck, amenity area, and roofs.
47.5 Grease and lint traps.
47.6 Plumbing fixtures as follows:
47.6.1 San Hose h/cap water closets.
47.6.2 San Hose elongated bowl water closets
47.6.3 Danze Parma lavatory faucets.
47.6.4 EZ-flow under counter mount lavatories.
47.6.5 Pacific 2 compartment under counter mount kitchen sinks
47.6.6 Danze Anu k/sink faucets.
47.6.7 Sterling Ensembles #71101110 42” x 60” oval bath tubs.
47.6.8 Job built showers.
47.6.9 Danze Parma tub valves.
47.6.10 Danze Parma shower valves.
47.6.11 Badger 1/3 garbage disposals.
47.6.12 Washing machine boxes.
47.6.13 Icemaker box
47.7 Installation only of owner supplied water meters, excluding wiring or receiving stations.
47.8 Quantum flow booster pump.
Regent Square
List of Clarifications
May 19th, 2011
Page 16
The Budget Cost excludes the following:
47.9 Water heaters.
47.10 Sewer impact fees.
47.11 Domestic water meters.
47.12 Painting of plumbing materials.
47.13 Water softeners.
47.14 Floor drains at balconies.
47.15 Thermostatic valves.
47.16 Water hammer arresters.
47.17 Water softeners.
47.18 Sovent system.
48. HVAC
The Budget Cost is based on the following:
48.1 VRV HVAC system is included with all condensers being located on roof areas.
48.2 Combination fiberglass & flex duct systems for all residential units, with return air
through louvered doors.
48.3 Thermostats with locking covers will be provided for common corridors.
48.4 Test & Balance of common area HVAC systems only. Total airflow will be measured and
recorded for the residential units.
48.5 Mechanical louvers, where required for mechanical ventilation or outside air intakes.
48.6 Start up of all mechanical equipment.
48.7 Stair pressurization.
The Budget Cost excludes the following:
48.8 Condenser water circulating system beyond valved risers at non-residential cores.
49. FIRE PROTECTION
The Budget Cost is based on the following:
49.1 A complete and operable fire protections system which meets NFPA 13, NFPA 14 &
NFPA 20 as interpreted by the City of Houston.
49.2 The wet systems for the tower will be designed for light hazard occupancy and
hydraulically calculated per NFPA 13.
49.3 A wet pipe sprinkler system for the residential/common area space per the approval of the
local authority having jurisdiction.
49.4 A dry pipe sprinkler system for the garage per the approval of the local authority having
jurisdiction.
49.5 Standpipes will be provided in stairs.
49.6 Design, fabrication, installation & testing to meet the applicable codes.
Regent Square
List of Clarifications
May 19th, 2011
Page 17
49.7 Semi-recessed sprinkler heads will be provided in common areas. Concealed sprinkler
heads will be provided in the units and lobby areas. Brass upright sprinkler heads will be
provided in exposed areas.
49.8 Wet type, insulated (no heat trace) standpipe system for the parking levels.
49.9 1250 gpm @ 220 psi diesel fire pump with tank and jockey pump.
49.10 Surge tanks as required by Code criteria (currently priced as 4 X 4,000-gallon tanks).
49.11 Piping materials will be CPVC for all residential levels and steel in all other areas.
The Budget Cost excludes the following:
49.12 Balconies, terraces, courtyards, and pool areas.
49.13 Requirements to meet Factory Mutual requirements.
49.14 Diesel fuel for fire pump.
50. ELECTRICAL
The Budget Cost is based on the following:
50.1 All local and state amendments to the National Electrical Code.
50.2 Any local fees and/or permits required for installation.
50.3 Meter sockets for each residential unit, and key public areas are included. Owner or
Utility Company supplies meters.
50.4 Fire alarm system as per code.
50.5 MC cable will be used at all remaining areas where allowable by code.
50.6 Aluminum feeders will be used where allowed by code.
50.7 Residential tower light fixture allowance of $300,000 is included.
50.8 Concrete duct bank at high-voltage primaries. Not required by code at secondaries.
50.9 Rough-in for the parking control system.
50.10 An Allowance of $200,000 is included for car charging stations in the parking garage.
The Budget Cost excludes the following:
50.11 Impact fees associated with bringing permanent utility services onto the site.
50.12 Traffic signal work.
50.13 Electrical capacity for future work, including future tower on Block D. Those costs will
be included with that specific pricing.
Regent Square
List of Clarifications
May 19th, 2011
Page 18
51. IN UNIT LOW VOLTAGE CABLING
The Budget Cost includes the following:
51.1 Security system backbone. Security equipment is not included.
51.2 Fire alarm system.
51.3 Telecom system backbone. Phone equipment is not included.
51.4 Cable TV conduit and home runs. One outlet in each bedroom and one in the living room
only.
The Budget Cost excludes the following:
51.5 Audio visual equipment and cabling.
51.6 Sleeving for satellite TV systems.
52. SWIMMING POOL
The Budget Cost is based on the following:
52.1 Swimming pool is included as an allowance of $135/SF, including pool, perimeter
edging, pumps and equipment, skimmers, etc.
52.2 Raised pool fountains are included as allowances of $30,000/ea (total of 2).
52.3 Heated pool spa is included as an allowance of $125/sf.
52.4 Pool fencing and gates are included as shown on the amenity deck landscape plans.
53. TERRACE LEVEL IMPROVEMENTS
The Budget Cost is based on the following:
53.1 The amenity deck improvements are included as shown the May 5, 2011 SD Drawings
and in the detailed estimate package. Some specific allowances are below:
a. Outdoor Fireplace (SF-2): $40,000
b. Rainwater harvesting system (ST-3): $10,000
c. Small outdoor Living Cabanas (ST-2): $10,000
d. Cast Stone Hearth (SF-1): $20,000
e. Landscape Allowance : $350,000
54. INSURANCE, PERMITS, & FEES
The Budget Cost is based on the following:
54.1 For this pricing exercise, general liability insurance is included in the subcontract
numbers and JE Dunn GL Insurance is included at 0.77%. In final pricing, a contractor
controlled insurance program will be priced at 1.5% at no additional cost to the Owner.
54.2 Excess Liability Insurance - $25,000,000 limit – included in CCIP program rate.
54.3 Insurance on equipment.
Regent Square
List of Clarifications
May 19th, 2011
Page 19
54.4 Subguard/SDI program is included in lieu of subcontractor bonds at 1.5% of
subcontractor cost.
54.5 Lump Sum Fee equal to 2.5% of the GMP price.
54.6 Lump Sum Contractor's Contingency equal to 2.0% of the GMP price.
54.7 Building permit.
54.8 Performance & payment bonds.
The Budget Cost excludes the following:
54.9 Condominium Insurance premium equal to $4,280 per unit at apartment units. If any
units currently designated as apartments are changed to condos, this premium will be
added.
54.10 Builder's Risk Insurance & difference in conditions policies.
54.11 Permit expeditor.
54.12 All third party materials testing, soils testing, moisture control testing & lab testing is by
others.
Number Title Revision Num Revision Date
Cover Sheet 0 05-05-2011
G1 Drawings Index and General Notes 0 05-05-2011
G2 Code Information 0 05-05-2011
G4 Accessibility Standards 0 05-05-2011
G5 Accessibility Room Layouts 0 05-05-2011
C1S Schematic Grading & Drainage Plan 0 05-05-2011
C2S Schematic Underground Utilities Plan 0 05-05-2011
L1.01 Site Plan 0 05-05-2011
L1.02 Entry Plaza Enlarged Plan 0 05-05-2011
L1.03 Terrace Plan 0 05-05-2011
L1.04 Terrace Sections 0 05-05-2011
L1.05 Roof Terrace Options 0 05-05-2011
A1.1.0 Site Plan 0 05-05-2011
A2.1.1 Floor Plan - Level 1 0 05-05-2011
A2.2.1 Floor Plan - level 2 0 05-05-2011
A2.3.1 Floor Plan - Levels 3 to 6 0 05-05-2011
A2.7.1 Floor Plan - Level 7 0 05-05-2011
A2.8.1 Floor Plan - Level 8 0 05-05-2011
A2.9.1 Floor Plan - Level 9 to 20 0 05-05-2011
A2.21.1 Floor Plan - Roof 0 05-05-2011
A3.1.1 South Elevation 0 05-05-2011
A3.1.2 North Elevation 0 05-05-2011
A3.1.3 East Elevation 0 05-05-2011
A3.1.4 West Elevation 0 05-05-2011
A3.2.1 Building Section 0 05-05-2011
A3.2.2 Building Section 0 05-05-2011
S0.00 Cover Sheet 0 05-05-2011
S1.00 Foundation Plan - Level 1 0 05-05-2011
S2.00 Forming Plan - Level 2 0 05-05-2011
S2.01 Forming Plan - Level 3-6 0 05-05-2011
S2.02 Forming Plan - Level 7 0 05-05-2011
S2.03 Forming Plan - Level 8 0 05-05-2011
S2.04 Forming Plan - Level 9 0 05-05-2011
S2.05 Forming Plan - Level 10-20 0 05-05-2011
S2.06 Forming Plan - Level Roof 0 05-05-2011
S5.10 Concrete Column Schedule 0 05-05-2011
S5.20 Concrete Shearwall Schedule 0 05-05-2011
M6.01 Mechanical VRV Diagram 0 05-05-2011
E1.01 Electrical Site Plaan 0 05-05-2011
E6.01 Electrical Riser Diagram 0 05-05-2011
P6.01 Plumbing Gas & Water Riser 0 05-05-2011
Regent Square - Block D Apartments19-May-11
Document List
Regent Square - Block D Apartments19-May-11
Company Revision Date
ZCA 05-05-2011
Cobb Fendley
SWA
WSP
Flack+Kurtz
MEP Systems Schematic Design Narrative
Narrative List
Schematic Design Outline Specifications
Title
Basis of Design - SD Phase
Landscape Site Development Design Description
ActID
DescriptionDur.(Wds)
EarlyStart
EarlyFinish
-1MONTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
GENERAL
GN-100 Construction NTP 0 09JAN12
GN-120 Overall Duration - CAL. DAYS 624d * 09JAN12 23SEP13
GN-130 Substantial Completion / Occupation 0 23SEP13
PROCUREMENT / MOCKUPS
PR01-100 Critical / Long Lead Items Procurement 120d 16JAN12 02JUL12
PR01-110 Building Skin Mockup / Approval 30d 05JUN12 17JUL12
CONSTRUCTION
Foundations / Below Grade Work
CN-100 Mobilize / SWPPP 5d 09JAN12 13JAN12
CN-105 Demo / Clear Site 20d 16JAN12 10FEB12
CN-110 Foundations / Below Grade Structure 60d 13FEB12 04MAY12
Above Grade Structure
CN-122 Above Ground Structure - F1-F7 + Pool Deck 120d 23APR12 10OCT12
CN-120 Above Ground Structure - F8-Roof 86d 11OCT12 14FEB13
MEP Rough-in / Interior Framing
CN-135 MEP Risers / Primary Rough-in 170d 26JUL12 28MAR13
CN-142 Interior Framing / MEP Rough-in - F1-F7 Units 100d 09AUG12 03JAN13
CN-140 Interior Framing / MEP Rough-in - F8 - F21 Units 120d 16NOV12 09MAY13
CN-200 Permanent Power 0 15MAR13
Building Skin / Roof / Dry-in
CN-132 Building Skin - F1-F7 110d 18JUL12 21DEC12
Construction NTP
Overall Duration - CAL. DAYS
Substantial Completion / Occupation
Critical / Long Lead Items Procurement
Building Skin Mockup / Approval
Mobilize / SWPPP
Demo / Clear Site
Foundations / Below Grade Structure
Above Ground Structure - F1-F7 + Pool Deck
Above Ground Structure - F8-Roof
MEP Risers / Primary Rough-in
Interior Framing / MEP Rough-in - F1-F7 Units
Interior Framing / MEP Rough-in - F8 - F21 Units
Permanent Power
Building Skin - F1-F7
Start date 03JAN12Finish date 23SEP13Data date 09JAN12Run date 31MAY11Page number 1A© Primavera Systems, Inc.
PR05-Regent Sch...JE Dunn Construction
Regent Square - Scheme 7A
21 Story Tower + Parking Garage
Preliminary Schedule
Early bar
Progress bar
Critical bar
Summary bar
Start milestone point
Finish milestone point
ActID
DescriptionDur.(Wds)
EarlyStart
EarlyFinish
-1MONTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
CN-130 Building Skin - F8 - F21 135d 08NOV12 22MAY13
CN-133 Temp. Roofing for Units Below F7 15d 08NOV12 30NOV12
CN-136 Temp Dry-in for Units Below F7 to Start Finishes 0 03DEC12
CN-123 Roofing - F6 / F7 40d 11JAN13 07MAR13
CN-125 Roofing / Roof Top Work - High Roof @ F21 60d 15FEB13 09MAY13
CN-126 Permanent Dry-in - Units below F7 0 07MAR13
Interior Finishes / Elevators
CN-152 Interior Finishes - F1-F7 Units 110d 03DEC12 08MAY13
CN-160 Install Elevators 135d 27DEC12 08JUL13
CN-150 Interior Finishes - F8 - F21 Units 120d 07FEB13 26JUL13
CN-162 Amenity Deck Area Finishes 80d 11APR13 02AUG13
CN-205 JED Pre-Punch Units - F1-F7 20d 09MAY13 06JUN13
CN-165 2 Elevators Ready for Temp. Use 0 10JUN13
CN-170 Remove Man / Material Hoist 5d 10JUN13 14JUN13
CN-180 Finish Skin @ Hoist 35d 17JUN13 05AUG13
CN-190 Finish Units at Hoist Location 45d 08JUL13 09SEP13
CN-210 JED Pre-Punch Units - F8-F21 25d 12AUG13 16SEP13
Closeout / Occupancy Certification
CN-218 Owner / Arch. Punchlist - F1-F7 10d 07JUN13 20JUN13
CN-225 Inspections / TCO - F1-F7 10d 07JUN13 20JUN13
CN-235 Early Completion of Units - F1-F7 Level 0 20JUN13
CN-230 Inspections / Occupancy Cert. - Full Bldg. 20d 26AUG13 23SEP13
Building Skin - F8 - F21
Temp. Roofing for Units Below F7
Temp Dry-in for Units Below F7 to Start Finishes
Roofing - F6 / F7
Roofing / Roof Top Work - High Roof @ F21
Permanent Dry-in - Units below F7
Interior Finishes - F1-F7 Units
Install Elevators
Interior Finishes - F8 - F21 Units
Amenity Deck Area Finishes
JED Pre-Punch Units - F1-F7
2 Elevators Ready for Temp. Use
Remove Man / Material Hoist
Finish Skin @ Hoist
Finish Units at Hoist Location
JED Pre-Punch Units - F8-F21
Owner / Arch. Punchlist - F1-F7
Inspections / TCO - F1-F7
Early Completion of Units - F1-F7 Level
Inspections / Occupancy Cert. - Full Bldg.
Early Occupancy of the Units will be subject to removal of
hoist, completion of the street level work, Life Safety Systems
and to City Requirements. Amenity Deck area work might not
be complete 100% at the time of early occupancy of units.
Start date 03JAN12Finish date 23SEP13Data date 09JAN12Run date 31MAY11Page number 2A© Primavera Systems, Inc.
PR05-Regent Sch...JE Dunn Construction
Regent Square - Scheme 7A
21 Story Tower + Parking Garage
Preliminary Schedule
Early bar
Progress bar
Critical bar
Summary bar
Start milestone point
Finish milestone point
ActID
DescriptionDur.(Wds)
EarlyStart
EarlyFinish
-1MONTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
CN-220 Owner / Arch. Punchlist - F8-F21 10d 10SEP13 23SEP13
CN-240 Substantial Completion 0 23SEP13
Owner / Arch. Punchlist - F8-F21
Substantial Completion
Start date 03JAN12Finish date 23SEP13Data date 09JAN12Run date 31MAY11Page number 3A© Primavera Systems, Inc.
PR05-Regent Sch...JE Dunn Construction
Regent Square - Scheme 7A
21 Story Tower + Parking Garage
Preliminary Schedule
Early bar
Progress bar
Critical bar
Summary bar
Start milestone point
Finish milestone point
AREA SUMMARY
PROJECT NAME GID West Dallas Apartments SD Estimate - 21 Floors
PROJECT #
DATE 31-May-11
FLOORGROSS AREA
(ENCLOSED)
STRUCTURE
GROSS(Including
balcony, amenity)
Leasable
Common &
Service Leasable
Common &
Service Sellable
Common
Area Lobbies Amenities Fitness Storage
Back of
House
Total
Heated Pools
Unit
Balcony
Number of
Units Area # of Spaces Area Area
Level 1 7,712 7,383 1,601 3,414 4,012 24,122 669 10 22,590 88 3,209 49,921 50,590
Level 2 18,445 5,984 197 509 25,135 1591 22 25,289 65 50,424 52,015
Level 3 18,453 5,952 199 503 25,107 1565 22 25,329 75 50,436 52,001
Level 4 18,453 5,952 199 503 25,107 1565 22 25,329 75 50,436 52,001
Level 5 18,453 5,952 199 503 25,107 1565 22 25,329 75 50,436 52,001
Level 6 18,453 5,952 199 503 25,107 1565 22 25,329 75 50,436 52,001
Level 7 12,860 4,701 3,395 1,015 21,971 977 14 21,567 59 43,538 44,515
Level 8 2,056 938 7,108 2,721 486 13,309 2,149 25,130 13,309 40,588
Level 9 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 10 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 11 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 12 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 13 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 14 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 15 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 16 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 17 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 18 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 19 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 20 11,941 1,710 459 14,110 903 12 14,110 15,013
Level 21 11,941 1,710 459 14,110 903 12 14,110 15,013
0 0 0
TOTAL 0 0 0 0 268,062 66,162 2,539 7,108 2,721 7,802 14,001 368,395 2,149 21,236 290 170,762 512 3,209 25,130 542,366 590,881
Avg Unit Size 924
Notes:
1. Elevator cores and stairs in Tower and Parking Deck are included in residential common area calculations.
2. Terraces are not included in gross area calculations.
3. Amenity deck and pool areas are not included in gross area calculation.
4. Vertical shafts and circulation are included in residential common area.
5. Unit areas - area calculated from center line of demising walls between units,to exterior face of glass, to exterior face of stucco and to corridor side of wall separating unit and corridor.
6. Retail - area calculated from outside face of window system where glass is predominant to the outside face of retail corridor and to center line of demising walls.
GROSS AREA SUMMARY - FOR ESTIMATE COMPARISON PURPOSES
TOWER 371,604 (Tower Heated + Loading Dock)
PARKING 170,762
RETAIL 0
Gross Building 542,366
AMENITY
DECK
RETAIL LOADING
DOCK
OfficePARKING
Residential
GID West Dallas Apartments SD Estimate - 21 Floors
UNIT NAME
DESCRIPTION
QUANTITY
BEDROOMS
BATHROOMS
S1 0BD/1BA 12 0 12 709 SF 8,507 SF
TOTAL Efficiency 12 0 12 709 SF 8,507 SF
A1 1BD/1BA 39 39 39 873 SF 34,034 SF
A2 1BD/1BA 38 38 38 964 SF 36,632 SF
A3 1BD/1BA 26 26 26 935 SF 24,297 SF
A4 1BD/1BA 13 13 13 985 SF 12,805 SF
A6 1BD/1BA 27 27 27 947 SF 25,578 SF
A7 1BD/1BA 28 28 28 748 SF 20,955 SF
A8 1BD/1BA 5 5 5 3,645 SF 18,225 SF
A9 1BD/1BA 6 6 6 1,233 SF 7,398 SF
TOTAL 1 Beds 182 182 182 989 SF 179,924 SF
B1 2BD/2BA 13 26 26 1,360 SF 17,680 SF
B2 2BD/1BA 19 38 19 906 SF 17,208 SF
B3 2BD/2BA 19 38 38 1,433 SF 27,223 SF
B4 2BD/2BA 13 26 26 1,195 SF 15,535 SF
B5 2BD/2BA 13 26 26 1,298 SF 16,874 SF
B6 2BD/2BA 7 14 14 1,262 SF 8,831 SF
B7 2BD/2BA 6 12 12 1,137 SF 6,820 SF
B8 2BD/1BA 6 12 6 1,079 SF 6,474 SF
TOTAL 2 Beds 96 192 167 1,215 SF 116,645 SF
TOTAL 290 374 361 1,052 SF 305,076 SF
UNIT HEATED
SQUARE
FOOTAGE
TOTAL
HEATED
SQUARE
FOOTAGE
May 31, 2011
Estimate Number: 2011 SD Pricing
Date: 5/18/2011
Estimator: MH
Type of Building: Multi Use
Project: Regent Square- Block D - Offsite Work Location: Houston, TX Duration: 87 Weeks
Owner: GID Urban Development Area: 0.98 acres No. of Units: 278
Architect: ZeiglerCooper Cost / Acre $1,694,835.32 ENR Cost Index:
ITEMS MATERIAL LABOR SUB TOTAL COST/Acre
1. GENERAL REQUIREMENTS $0 $0 $0 $0 $0.00
1a. CRANES & HOISTS $0 $0 $0 $0 $0.00
2. DEMOLITION $0 $0 $17,160 $17,160 $17,510.20
3. SITE EXCAVATION & PREPARATION $0 $0 $32,000 $32,000 $32,653.06
4. FOUNDATION EXCAVATION $0 $0 $0 $0 $0.00
5. SITE UTILITIES $0 $0 $1,266,415 $1,266,415 $1,292,260.20
6. SITE IMPROVEMENTS $0 $0 $202,824 $202,824 $206,963.15
7. LANDSCAPING $0 $0 $0 $0 $0.00
8. SOIL POISONING $0 $0 $0 $0 $0.00
9. CONCRETE FOUNDATIONS $0 $0 $0 $0 $0.00
10. BUILDING CONCRETE $0 $0 $0 $0 $0.00
11. FORMWORK $0 $0 $0 $0 $0.00
12. RESTEEL/POST TENSIONING $0 $0 $0 $0 $0.00
13. EXTERIOR CONCRETE/STONE $0 $0 $0 $0 $0.00
14. MASONRY $0 $0 $0 $0 $0.00
15. STRUCTURAL & MISC. STEEL $0 $0 $0 $0 $0.00
16. ROUGH CARPENTRY $0 $0 $0 $0 $0.00
17. FINISH CARPENTRY $0 $0 $0 $0 $0.00
18. MAIN LOBBY FINISHES $0 $0 $0 $0 $0.00
19. WATERPROOFING & SEALANTS $0 $0 $0 $0 $0.00
20. BUILDING INSULATION $0 $0 $0 $0 $0.00
21. ROOFING & SHEET METAL $0 $0 $0 $0 $0.00
22. ENTRY CANOPIES $0 $0 $0 $0 $0.00
23. HOLLOW METAL $0 $0 $0 $0 $0.00
24. WOOD DOORS $0 $0 $0 $0 $0.00
25. FINISH HARDWARE $0 $0 $0 $0 $0.00
26. SPECIAL DOORS & DOCK EQUIPMENT $0 $0 $0 $0 $0.00
27. BALCONY RAILINGS $0 $0 $0 $0 $0.00
28. GLASS, GLAZING & STOREFRONT $0 $0 $0 $0 $0.00
29. ROOF TOP ELEMENT $0 $0 $0 $0 $0.00
30. DRYWALL $0 $0 $0 $0 $0.00
31. ACOUSTICAL $0 $0 $0 $0 $0.00
32. STUCCO/EIFS $0 $0 $0 $0 $0.00
33. AMENITY, FITNESS, CLUB ROOMS $0 $0 $0 $0 $0.00
34. CERAMIC TILE $0 $0 $0 $0 $0.00
35. INTERIOR STONE WORK $0 $0 $0 $0 $0.00
36. KITCHEN & BATH COUNTERTOPS $0 $0 $0 $0 $0.00
37. FLOORING (CARPET/RESILIENT/WOOD) $0 $0 $0 $0 $0.00
38. PAINT & WALLCOVERING $0 $0 $0 $0 $0.00
39. MISC. SPECIALTIES $0 $0 $0 $0 $0.00
40. TOILET PARTITIONS $0 $0 $0 $0 $0.00
41. TOILET ACCESSORIES $0 $0 $0 $0 $0.00
42. PARKING EQUIPMENT $0 $0 $0 $0 $0.00
43. RESIDENTIAL CABINETS $0 $0 $0 $0 $0.00
44. BLINDS & SHADES $0 $0 $0 $0 $0.00
45. RESIDENTIAL APPLIANCES $0 $0 $0 $0 $0.00
46. ELEVATORS $0 $0 $0 $0 $0.00
47. PLUMBING $0 $0 $0 $0 $0.00
48. H.V.A.C. $0 $0 $0 $0 $0.00
49. FIRE PROTECTION $0 $0 $0 $0 $0.00
50. ELECTRICAL $0 $0 $0 $0 $0.00
51. IN-UNIT LOW VOLTAGE CABLING $0 $0 $0 $0 $0.00
52. SWIMMING POOL $0 $0 $0 $0 $0.00
53. TERRACE LEVEL IMPROVEMENTS $0 $0 $0 $0 $0.00
54 EXTRA $0 $0 $0 $0 $0.00
55 EXTRA $0 $0 $0 $0 $0.00
56 EXTRA 3 $0 $0 $0 $0 $0.00
SUB TOTAL $0 $0 $1,518,399 $1,518,399 $1,549,386.62
Labor Burden 26.50% $0 $0.00
Sales Tax 8.25% $0 $0.00
SUB TOTAL $1,518,399 $1,549,386.62
Contractor's Contingency 0.00% $0 $0.00
Builder's Risk Insurance by owner $0 $0.00
GL Insurance & Fees $12,789 $13,050.23
SDI/Subguard Program 1.50% $22,776 $23,240.80
Building Permits $2,658 $2,711.74
SUB TOTAL $1,556,622 $1,588,389.39
Payment & Performance Bond 1.0000% $16,609 $16,948.35
SUB TOTAL $1,573,231 $1,605,337.74
General Conditions 3.00% $47,197 $48,160.13
TOTAL $1,620,428 $1,653,497.87
Condo Insurance Premium 0 $0 $0.00
Storn/Time Inflation 0 $0 $0.00
Fee 2.50% $40,511 $41,337.45
GRAND TOTAL $1,660,939 $1,694,835.32
Estimate General Summary Sheet
Offsite Work
Line Item: 2. DEMOLITION
Project: Offsite WorkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Site Demolition (Texas Environmental) 0 LS $0 $0 $15,000.00 $0 $0
Remove existing parking $0 $0 $0 $0
Remove parking canopy $0 $0 $0 $0
Remove existing fencing & assoc. electric $0 $0 $0 $0
$0 $0 $0 $0
Remove Paving at Rochow 11,700 sf $0 $0 $1.00 $11,700 $11,700
Haul Off Pavement 455 cy $0 $0 $12.00 $5,460 $5,460
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $17,160 $17,160
Line Item:
Project: Offsite WorkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Building Pad Select Fill - assume 2' fill 0 CY $0 $0 $15.00 $0 $0
Haul Off Spoils 0 cy $0 $0 $12.00 $0 $0
Remove Trees 4 ea $0 $0 $500.00 $2,000 $2,000
Transplant Trees - Allowance 3 ea $0 $0 $10,000.00 $30,000 $30,000
$0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $32,000 $32,000
3. SITE EXCAVATION
& PREPARATION
Line Item:
Project: Offsite WorkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
08" Water Line 241 LF $0
08" Water Line (Road Bore) 34 LF $0
$0
$0
10" Storm 92 LF $0
12" Storm 366 LF $0
15" Storm 365 LF $0
Storm MH 5 EA $0
Storm Inlet 5 EA $0
Curb Inlet 4 EA $0
$0 Water and Drain Line to Doggie Fountain (no
details shown) 0 ls $0 $0 $3,500 $0 $0
$0 $0 $0 $0
Tejas Utility - Onsite 0 ls $0 $0 $88,348 $0 $0
Tejas Utility - Public Storm and Water 1 LS $0 $0 $98,615 $98,615 $98,615
Tejas Utility - Public Sanitary 1 LS $0 $0 $262,800 $262,800 $262,800
Allowance - Relocate Unknown underground utilities 0 LS $0 $0 $100,000 $0 $0
$0 $0 $0 $0
Centerpoint Allowance - Relocate Overhead Power 1 LS $0 $0 $805,000 $805,000 $805,000
$0 $0 $0 $0
Relocate ATT/Comcast Allowance 1 LS $0 $0 $100,000 $100,000 $100,000
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $1,266,415 $1,266,415
Included in Tejas Utility numbers Below
5. SITE UTILITIES
Line Item:
Project: Offsite WorkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0 $0 $0 $0 $0
Asphalt @ Rochow 2,311 sy $0 $0 $26.00 $60,089 $60,089 Curb @ Rochow 1,300 lf $0 $0 $14.00 $18,200 $18,200 Demo Rochow (included above) 0 sf $0 $0 $1.50 $0 $0
Fine Grade/Recompact Rochow 20,800.00 sf $0 $0 $1.50 $31,200 $31,200
Lime Treat Rochow 2,311.11 sy $0 $0 $4.50 $10,400 $10,400
Sidewalk @ W Dallas and Rochow 4,117.00 sf $0 $0 $5.00 $20,585 $20,585
Import fill @ Rochow 0.00 cy $0 $0 $15.00 $0 $0
PV 4 Pavers on support Grid 0 sf $0 $20.00 $0 $0
PV 6 - 7" concrete at Plaza, integral color, sandblast
finish, sawcut joints at 48" o.c. 0 sf $0 $0 $10.00 $0 $0
7" Paving under pavers 0 sf $0 $0 $4.00 $0 $0 7" Paving at Service yard 0 sf $0 $0 $4.00 $0 $0 Concrete Edge Banding (surrounds gravel, crushed
granite etc. 0 sf $0 $0 $4.50$0 $0
Pavers at parallel parking on Rochow 1,050 sf $0 $0 $7.00 $7,350 $7,350 Driveway entrance Premium 0 ea $0 $0 $2,500.00 $0 $0
$0 $0 $0 $0
Footings for Planters No Details 0 sf $0 $0 $15.00 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0 Trash Bin, Dog Waste 0 ea $0 $0 $1,500.00 $0 $0
$0 $0 $0 $0 4' Ornamental Fence 0 lf $0 $0 $55.00 $0 $0 Ornamental Gates walk 0 ea $0 $0 $750.00 $0 $0 Sliding Gate 0 ls $0 $0 $22,250.00 $0 $0
motor operator 0 ea $0 $0 $3,500.00 $0 $0
Perimeter Chain link Fencing 0 lf $0 $0 $25.00 $0 $0
Decorative Bollards 0 ea $0 $0 $950.00 $0 $0
$0 $0 $0 $0 Fountain - Allowance 0 LS $0 $0 $15,000.00 $0 $0
$0 $0 $0 $0
Pavers Entry Area 0 sf $0 $0 $15.00 $0 $0 Pavers at Unit Entries 0 sf $0 $0 $15.00 $0 $0
$0 $0 $0 $0
Site Furnishings Allowance 0 LS $0 $0 $10,000.00 $0 $0
Decorative Light Poles along Dallas 11 EA $0 $0 $5,000.00 $55,000 $55,000 $0 $0 $0 $0
SUB TOTAL $0 $0 $202,824 $202,824
6. SITE
IMPROVEMENTS
Estimate Number: 2011 SD Pricing
Date: 5/18/2011
Estimator: MH
Type of Building: Multi Use
Project: Regent Square- Block D - Sitework Location: Houston, TX Duration: 87 Weeks
Owner: GID Urban Development Area: 1.78 acres No. of Units: 278
Architect: ZeiglerCooper Cost / Acre $485,587.44 ENR Cost Index:
ITEMS MATERIAL LABOR SUB TOTAL COST/SF
1. GENERAL REQUIREMENTS $0 $0 $0 $0 $0.00
1a. CRANES & HOISTS $0 $0 $0 $0 $0.00
2. DEMOLITION $0 $0 $15,000 $15,000 $8,426.97
3. SITE EXCAVATION & PREPARATION $0 $0 $161,532 $161,532 $90,748.31
4. FOUNDATION EXCAVATION $0 $0 $0 $0 $0.00
5. SITE UTILITIES $0 $0 $191,848 $191,848 $107,779.78
6. SITE IMPROVEMENTS $0 $0 $241,047 $241,047 $135,419.38
7. LANDSCAPING $0 $0 $50,000 $50,000 $28,089.89
8. SOIL POISONING $0 $0 $0 $0 $0.00
9. CONCRETE FOUNDATIONS $0 $0 $0 $0 $0.00
10. BUILDING CONCRETE $0 $0 $0 $0 $0.00
11. FORMWORK $0 $0 $0 $0 $0.00
12. RESTEEL/POST TENSIONING $0 $0 $0 $0 $0.00
13. EXTERIOR CONCRETE/STONE $0 $0 $0 $0 $0.00
14. MASONRY $0 $0 $40,918 $40,918 $22,987.67
15. STRUCTURAL & MISC. STEEL $0 $0 $0 $0 $0.00
16. ROUGH CARPENTRY $0 $0 $0 $0 $0.00
17. FINISH CARPENTRY $0 $0 $0 $0 $0.00
18. MAIN LOBBY FINISHES $0 $0 $0 $0 $0.00
19. WATERPROOFING & SEALANTS $0 $0 $14,824 $14,824 $8,328.09
20. BUILDING INSULATION $0 $0 $0 $0 $0.00
21. ROOFING & SHEET METAL $0 $0 $0 $0 $0.00
22. ENTRY CANOPIES $0 $0 $0 $0 $0.00
23. HOLLOW METAL $0 $0 $0 $0 $0.00
24. WOOD DOORS $0 $0 $0 $0 $0.00
25. FINISH HARDWARE $0 $0 $0 $0 $0.00
26. SPECIAL DOORS & DOCK EQUIPMENT $0 $0 $0 $0 $0.00
27. BALCONY RAILINGS $0 $0 $0 $0 $0.00
28. GLASS, GLAZING & STOREFRONT $0 $0 $0 $0 $0.00
29. ROOF TOP ELEMENT $0 $0 $0 $0 $0.00
30. DRYWALL $0 $0 $0 $0 $0.00
31. ACOUSTICAL $0 $0 $0 $0 $0.00
32. STUCCO/EIFS $0 $0 $0 $0 $0.00
33. AMENITY, FITNESS, CLUB ROOMS $0 $0 $0 $0 $0.00
34. CERAMIC TILE $0 $0 $0 $0 $0.00
35. INTERIOR STONE WORK $0 $0 $0 $0 $0.00
36. KITCHEN & BATH COUNTERTOPS $0 $0 $0 $0 $0.00
37. FLOORING (CARPET/RESILIENT/WOOD) $0 $0 $0 $0 $0.00
38. PAINT & WALLCOVERING $0 $0 $0 $0 $0.00
39. MISC. SPECIALTIES $0 $0 $0 $0 $0.00
40. TOILET PARTITIONS $0 $0 $0 $0 $0.00
41. TOILET ACCESSORIES $0 $0 $0 $0 $0.00
42. PARKING EQUIPMENT $0 $0 $0 $0 $0.00
43. RESIDENTIAL CABINETS $0 $0 $0 $0 $0.00
44. BLINDS & SHADES $0 $0 $0 $0 $0.00
45. RESIDENTIAL APPLIANCES $0 $0 $0 $0 $0.00
46. ELEVATORS $0 $0 $0 $0 $0.00
47. PLUMBING $0 $0 $0 $0 $0.00
48. H.V.A.C. $0 $0 $0 $0 $0.00
49. FIRE PROTECTION $0 $0 $0 $0 $0.00
50. ELECTRICAL $0 $0 $75,000 $75,000 $42,134.83
51. IN-UNIT LOW VOLTAGE CABLING $0 $0 $0 $0 $0.00
52. SWIMMING POOL $0 $0 $0 $0 $0.00
53. TERRACE LEVEL IMPROVEMENTS $0 $0 $0 $0 $0.00
54 EXTRA $0 $0 $0 $0 $0.00
55 EXTRA $0 $0 $0 $0 $0.00
56 EXTRA 3 $0 $0 $0 $0 $0.00
SUB TOTAL $0 $0 $790,169 $790,169 $443,914.92
Labor Burden 26.50% $0 $0.00
Sales Tax 8.25% $0 $0.00
SUB TOTAL $790,169 $443,914.92
Contractor's Contingency 0.00% $0 $0.00
Builder's Risk Insurance by owner $0 $0.00
GL Insurance & Fees $6,655 $3,739.02
SDI/Subguard Program 1.50% $11,853 $6,658.72
Building Permits $1,383 $776.94
SUB TOTAL $810,059 $455,089.61
Payment & Performance Bond 1.0000% $8,643 $4,855.87
SUB TOTAL $818,703 $459,945.48
General Conditions 3.00% $24,561 $13,798.36
TOTAL $843,264 $473,743.84
Condo Insurance Premium 0 $0 $0.00
Storn/Time Inflation 0 $0 $0.00
Fee 2.50% $21,082 $11,843.60
GRAND TOTAL $864,346 $485,587.44
Estimate General Summary Sheet
Sitework
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item: 2. DEMOLITION
Project: SiteworkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Site Demolition (Texas Environmental) 1 LS $0 $0 $15,000.00 $15,000 $15,000
Remove existing parking $0 $0 $0 $0
Remove parking canopy $0 $0 $0 $0
Remove existing fencing & assoc. electric $0 $0 $0 $0
$0 $0 $0 $0
Remove Paving at Rochow 0 sf $0 $0 $1.00 $0 $0
Haul Off Pavement 0 cy $0 $0 $12.00 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $15,000 $15,000
Line Item:
Project: SiteworkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Building Pad Select Fill - assume 2' fill 5,983 CY $0 $0 $15.00 $89,740 $89,740
Haul Off Spoils 5,983 cy $0 $0 $12.00 $71,792 $71,792
Remove Trees 0 ea $0 $0 $500.00 $0 $0
Transplant Trees - Allowance 0 ea $0 $0 $10,000.00 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0
SUB TOTAL $0 $0 $161,532 $161,532
3. SITE EXCAVATION
& PREPARATION
2011_05_31 Added Floor Estimate REVISED.xls, Site Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: SiteworkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
08" Water Line 241 LF $0
08" Water Line (Road Bore) 34 LF $0 $0 $0
10" Storm 92 LF $0
12" Storm 366 LF $0
15" Storm 365 LF $0
Storm MH 5 EA $0
Storm Inlet 5 EA $0
Curb Inlet 4 EA $0 $0
Water and Drain Line to Doggie Fountain (no details
shown) 1 ls $0 $0 $3,500 $3,500 $3,500
$0 $0 $0 $0
Tejas Utility - Onsite 1 ls $0 $0 $88,348 $88,348 $88,348
Tejas Utility - Offsite Storm & Water 0 ls $0 $0 $98,615 $0 $0
Tejas Utility - Offsite Sanitary 0 ls $0 $0 $262,800 $0 $0
$0 $0 $0 $0
Allowance - Relocate Unknown underground utilities 1 LS $0 $0 $100,000 $100,000 $100,000
$0 $0 $0 $0
Centerpoint Allowance - Relocate Overhead Power 0 LS $0 $0 $805,000 $0 $0
$0 $0 $0 $0
Relocate ATT/Comcast Allowance 0 LS $0 $0 $100,000 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $191,848 $191,848
5. SITE UTILITIES
Included in Tejas Utility Numbers Below
2011_05_31 Added Floor Estimate REVISED.xls, Site Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: SiteworkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0 $0 $0 $0 $0
Asphalt @ Rochow 0 sy $0 $0 $26.00 $0 $0 Curb @ Rochow 0 lf $0 $0 $14.00 $0 $0 Demo Rochow (included above) 0 sf $0 $0 $1.50 $0 $0
Fine Grade/Recompact Rochow 0.00 sf $0 $0 $1.50 $0 $0 Lime Treat Rochow 0.00 sy $0 $0 $4.50 $0 $0 Sidewalk @ W Dallas and Rochow 0.00 sf $0 $0 $5.00 $0 $0
$0 $0 $0 $0 PV 4 Pavers on support Grid 407 sf $0 $0 $20.00 $8,140 $8,140 PV 6 - 7" concrete at Plaza, integral color, sandblast
finish, sawcut joints at 48" o.c. 8,463 sf $0 $0 $10.00 $84,630 $84,630
7" Paving under pavers 1,272 sf $0 $0 $4.00 $5,088 $5,088 7" Paving at Service yard 2,243 sf $0 $0 $4.00 $8,972 $8,972 Concrete Edge Banding (surrounds gravel, crushed
granite etc. 287 sf $0 $0 $4.50$1,292 $1,292
Pavers at parallel parking on Rochow 0 sf $0 $0 $7.00 $0 $0 Driveway entrance Premium 2 ea $0 $0 $2,500.00 $5,000 $5,000
$0 $0 $0 $0
Footings for Planters No Details 293 sf $0 $0 $15.00 $4,395 $4,395
$0 $0 $0 $0
$0 $0 $0 $0 Trash Bin, Dog Waste 2 ea $0 $0 $1,500.00 $3,000 $3,000
$0 $0 $0 $0 4' Ornamental Fence 118 lf $0 $0 $55.00 $6,490 $6,490 Ornamental Gates walk 2 ea $0 $0 $750.00 $1,500 $1,500 Sliding Gate 1 ls $0 $0 $22,250.00 $22,250 $22,250
motor operator 1 ea $0 $0 $3,500.00 $3,500 $3,500
Perimeter Chain link Fencing 335 lf $0 $0 $25.00 $8,375 $8,375
Decorative Bollards 12 ea $0 $0 $950.00 $11,400 $11,400
$0 $0 $0 $0 Fountain - Allowance 1 LS $0 $0 $15,000.00 $15,000 $15,000
$0 $0 $0 $0
Pavers Entry Area 1,272 sf $0 $0 $15.00 $19,080 $19,080 Pavers at Unit Entries 1,529 sf $0 $0 $15.00 $22,935 $22,935
$0 $0 $0 $0
Site Furnishings Allowance 1 LS $0 $0 $10,000.00 $10,000 $10,000
Decorative Light Poles along Dallas 0 EA $0 $0 $5,000.00 $0 $0 $0 $0 $0 $0
SUB TOTAL $0 $0 $241,047 $241,047
6. SITE
IMPROVEMENTS
2011_05_31 Added Floor Estimate REVISED.xls, Site Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: SiteworkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
PL 03 ground cover 1 gallon 4,109 SF $0 $0 $5.00 $20,545 $20,545
PL 04 seasonal plantings 168 SF $0 $0 $10.00 $1,680 $1,680
PL 05 ornamental shrubs, 5 gallon 75 SF $0 $0 $5.00 $375 $375
PL 06 evergreen trees, 14' savannah holly 5 EA $0 $0 $650.00 $3,250 $3,250
PL 07 perennial plantings, 1 gallon 306 SF $0 $0 $5.00 $1,530 $1,530
PL 08 sodded lawn 304 SF $0 $0 $4.00 $1,216 $1,216
Irrigation Allowance 1 LS $0 $0 $10,000.00 $10,000 $10,000
$0 $0 $0 $0
PV 12 - Crushed stone paving 3/4' black star gravel,
3" depth, filter fabric, stabilized subgrade, 877 sf 877 sf $0 $0 $7.00 $6,139 $6,139
$0 $0 $0.00 $0 $0 PV 9 - decomposed granite paving 3" depth, filter
fabric, stabilized subgrade 1,378 sf 1,378 sf $0 $0 $5.00 $6,890 $6,890
$0 $0 $0 $0
Adjust for $50,000 Landscape Allowance -1 ls $0 $0 $1,625.00 ($1,625) ($1,625)
$0 $0 $0 $0
$0 $0 $0 $0
Carry Fwd. $0 $0 $50,000 $50,000
Line Item:
Project: SiteworkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
WL-02 Brick Veneer at Garden Wall 384 sf $0 $0 $12.00 $4,608 $4,608
WL-04 12" x 8' h screen wall - Allowance 2,790 sf $0 $0 $12.19 $34,000 $34,000
$0 $0 $0 $0
SF-01 Seat Wall-Cast Stone Veneer 83 sf $0 $0 $28.00 $2,310 $2,310
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $40,918 $40,918
14. MASONRY
7. LANDSCAPING
2011_05_31 Added Floor Estimate REVISED.xls, Site Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Project: Sitework Line Item:
Estimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Bentonite Waterproofing 1 ls $0 $0 $12,046.00 $12,046 $12,046
Joint Sealants 1 ls $0 $0 $2,778.00 $2,778 $2,778
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $14,824 $14,824
Line Item:
Project: SiteworkEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Electrical 1 LS $0 $0 $75,000 $75,000 $75,000
$0 $0 $0 $0
SUB TOTAL $0 $0 $75,000 $75,000
19. WATERPROOFING
& SEALANTS
50. ELECTRICAL
2011_05_31 Added Floor Estimate REVISED.xls, Site Detail
Estimate Number: 2011-Conc
Date: 5/18/2011
Estimator: MH
Type of Building: Multi Use
Project: Regent Square- Block D Garage Location: Houston, TX Duration: 87 Weeks
Owner: GID Urban Development Area: 170,762 sf No. of Cars 512
Architect: ZeiglerCooper Cost / Car: $15,042 ENR Cost Index:
ITEMS MATERIAL LABOR SUB TOTAL COST/SF
1. GENERAL REQUIREMENTS $0 $0 $0 $0 $0.00
1a. CRANES & HOISTS $0 $0 $198,000 $198,000 $1.16
2. DEMOLITION $0 $0 $0 $0 $0.00
3. SITE EXCAVATION & PREPARATION $0 $0 $0 $0 $0.00
4. FOUNDATION EXCAVATION $0 $0 $0 $0 $0.00
5. SITE UTILITIES $0 $0 $0 $0 $0.00
6. SITE IMPROVEMENTS $0 $0 $42,436 $42,436 $0.25
7. LANDSCAPING $0 $0 $0 $0 $0.00
8. SOIL POISONING $0 $0 $2,033 $2,033 $0.01
9. CONCRETE FOUNDATIONS $0 $0 $170,762 $170,762 $1.00
10. BUILDING CONCRETE $0 $0 $2,804,472 $2,804,472 $16.42
11. FORMWORK $0 $0 $0 $0 $0.00
12. RESTEEL/POST TENSIONING $0 $0 $0 $0 $0.00
13. EXTERIOR CONCRETE/STONE $0 $0 $0 $0 $0.00
14. MASONRY $0 $0 $2,014,003 $2,014,003 $11.79
15. STRUCTURAL & MISC. STEEL $0 $0 $550,695 $550,695 $3.22
16. ROUGH CARPENTRY $0 $0 $0 $0 $0.00
17. FINISH CARPENTRY $0 $0 $0 $0 $0.00
18. MAIN LOBBY FINISHES $0 $0 $0 $0 $0.00
19. WATERPROOFING & SEALANTS $0 $0 $76,400 $76,400 $0.45
20. BUILDING INSULATION $0 $0 $13,475 $13,475 $0.08
21. ROOFING & SHEET METAL $0 $0 $0 $0 $0.00
22. ENTRY CANOPIES $0 $0 $0 $0 $0.00
23. HOLLOW METAL $0 $0 $11,000 $11,000 $0.06
24. WOOD DOORS $0 $0 $0 $0 $0.00
25. FINISH HARDWARE $0 $0 $0 $0 $0.00
26. SPECIAL DOORS & DOCK EQUIPMENT $0 $0 $0 $0 $0.00
27. BALCONY RAILINGS $0 $0 $0 $0 $0.00
28. GLASS, GLAZING & STOREFRONT $0 $0 $0 $0 $0.00
29. ROOF TOP ELEMENT $0 $0 $0 $0 $0.00
30. DRYWALL $0 $0 $0 $0 $0.00
31. ACOUSTICAL $0 $0 $0 $0 $0.00
32. STUCCO/EIFS $0 $0 $61,500 $61,500 $0.36
33. AMENITY, FITNESS, CLUB ROOMS $0 $0 $0 $0 $0.00
34. CERAMIC TILE $0 $0 $0 $0 $0.00
35. INTERIOR STONE WORK $0 $0 $0 $0 $0.00
36. KITCHEN & BATH COUNTERTOPS $0 $0 $0 $0 $0.00
37. FLOORING (CARPET/RESILIENT/WOOD) $0 $0 $0 $0 $0.00
38. PAINT & WALLCOVERING $0 $0 $207,468 $207,468 $1.21
39. MISC. SPECIALTIES $1,700 $255 $0 $1,955 $0.01
40. TOILET PARTITIONS $0 $0 $0 $0 $0.00
41. TOILET ACCESSORIES $0 $0 $0 $0 $0.00
42. PARKING EQUIPMENT $0 $0 $30,000 $30,000 $0.18
43. RESIDENTIAL CABINETS $0 $0 $0 $0 $0.00
44. BLINDS & SHADES $0 $0 $0 $0 $0.00
45. RESIDENTIAL APPLIANCES $0 $0 $0 $0 $0.00
46. ELEVATORS $0 $0 $0 $0 $0.00
47. PLUMBING $0 $0 $50,000 $50,000 $0.29
48. H.V.A.C. $0 $0 $110,995 $110,995 $0.65
49. FIRE PROTECTION $0 $0 $170,762 $170,762 $1.00
50. ELECTRICAL $0 $0 $524,448 $524,448 $3.07
51. IN-UNIT LOW VOLTAGE CABLING $0 $0 $0 $0 $0.00
52. SWIMMING POOL $0 $0 $0 $0 $0.00
53. TERRACE LEVEL IMPROVEMENTS $0 $0 $0 $0 $0.00
54 EXTRA 1 $0 $0 $0 $0 $0.00
55 EXTRA 2 $0 $0 $0 $0 $0.00
56 EXTRA 3 $0 $0 $0 $0 $0.00
SUB TOTAL $1,700 $255 $7,038,450 $7,040,405 $41.23
Labor Burden 26.50% $68 $0.00
Sales Tax 8.25% $140 $0.00
SUB TOTAL $7,040,612 $41.23
Contractor's Contingency 0.00% $0 $0.00
Builder's Risk Insurance by owner $0 $0.00
GL Insurance & Fees $59,302 $0.35
SDI/Subguard Program 1.50% $105,602 $0.62
Building Permits $12,322 $0.07
SUB TOTAL $7,217,839 $42.27
Payment & Performance Bond 1.0000% $77,015 $0.45
SUB TOTAL $7,294,854 $42.72
General Conditions 3.00% $218,846 $1.28
TOTAL $7,513,700 $44.00
Condo Insurance Premium 0 $0 $0.00
Inflation/Escalation 0 $0 $0.00
Fee 2.50% $187,843 $1.10
GRAND TOTAL $7,701,543 $45.10
Estimate General Summary Sheet
Garage/Parking
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item: 1a. CRANES & HOISTS
Project:
Estimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Man/Material Hoist Allotment $0 $0 $0 $0
Tower Crane 1 LS $0 $0 $198,000.00 $198,000 $198,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $198,000 $198,000
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0 Striping 512 EA $0 $0 $30.00 $15,360 $15,360
Signage 1 LS $0 $0 $10,000.00 $10,000 $10,000 Clean & Pressure Wash 170,762 SF $0 $0 $0.10 $17,076 $17,076
$0 $0 $0 $0 $0 $0 $0 $0
SUB TOTAL $0 $0 $42,436 $42,436
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Termite Treatment 22,590 SF $0 $0 $0.09 $2,033 $2,033
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $2,033 $2,033
Garage/Parking
8. SOIL POISONING
6. SITE
IMPROVEMENTS
2011_05_31 Added Floor Estimate REVISED.xls, Garage Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Foundation Allowance 170,762 SF $0 $0 $1.00 $170,762 $170,762
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $170,762 $170,762
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Parking Structure Area 170,762 SF $0 $0 $15.58 $2,660,472 $2,660,472
DCI Additive (Per Specs) 1 LS $0 $0 $144,000.00 $144,000 $144,000
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $2,804,472 $2,804,472
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
CMU walls (interior) 812 sf $0 $0 $10.00 $8,120 $8,120
CMU walls 197,431 sf $0 $0 $10.00 $1,974,310 $1,974,310
Brick Veneer 2,255 sf $0 $0 $14.00 $31,573 $31,573
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $2,014,003 $2,014,003
10. BUILDING
CONCRETE
14. MASONRY
9. CONCRETE
FOUNDATIONS
2011_05_31 Added Floor Estimate REVISED.xls, Garage Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Stair 3 1 LS $0 $0 $96,545.00 $96,545 $96,545
Stair 4 1 LS $0 $0 $97,123.00 $97,123 $97,123
Stair 5 1 LS $0 $0 $97,123.00 $97,123 $97,123
Beam at Stair 3 chase 1 LS $0 $0 $5,443.00 $5,443 $5,443
Stair #3 roof deck support 1 LS $0 $0 $9,117.00 $9,117 $9,117
Stair #4 roof deck support 1 LS $0 $0 $18,466.00 $18,466 $18,466
Stair #5 roof deck support 1 LS $0 $0 $12,834.00 $12,834 $12,834
Galvanized steel pipe bollards (70 ea) 1 LS $0 $0 $25,128.00 $25,128 $25,128
$0 $0 $0 $0
Painted Metal Security Fencing 1 LS $0 $0 $26,517.00 $26,517 $26,517
Stainless Steel Cable Railing System at South Elevation 1 LS $0 $0 $64,965.00 $64,965 $64,965 Adjust to SS across South Garage Wall (Remove
Wall) 1 LS $0 $0 $51,374.00 $51,374 $51,374
$0 $0 $0 $0
Barrier Strands @ Ramps 1,316 LF $0 $0 $35.00 $46,060 $46,060
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $550,695 $550,695
Project: Garage/Parking Line Item:
Estimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Joint Sealants 1 ls $0 $0 $76,400.00 $76,400 $76,400
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $76,400 $76,400
15. STRUCTURAL &
MISC. STEEL
19. WATERPROOFING
& SEALANTS
2011_05_31 Added Floor Estimate REVISED.xls, Garage Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Insulation underside A/C areas in garage 3,500 SF $0 $0 $3.85 $13,475 $13,475
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $13,475 $13,475
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
HM Doors, Frames, Hardware 11 ea $0 $0 $1,000.00 $11,000 $11,000
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $11,000 $11,000
Line Item:
Project:Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Stucco/EFIS 7,235 sf $0 $0 $8.50 $61,500 $61,500
(Removed in Stainless adjustment above) $0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $61,500 $61,500
20. BUILDING
INSULATION
23. HOLLOW METAL
32. STUCCO/EIFS
2011_05_31 Added Floor Estimate REVISED.xls, Garage Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Paint (R&M) 1 ls $0 $0 $10,000.00 $10,000 $10,000
CMU Elastomeric Paint 197,468 SF $0 $0 $1.00 $197,468 $197,468
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $207,468 $207,468
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Fire Extinguishers (1 per 10,000 SF) 17 EA $100.00 $1,700 $15.00 $255 $0 $1,955
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $1,700 $255 $0 $1,955
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Traffic Control Gates - Allowance 2 EA $0 $0 $15,000.00 $30,000 $30,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $30,000 $30,000
39. MISC.
SPECIALTIES
38. PAINT &
WALLCOVERING
42. PARKING
EQUIPMENT
2011_05_31 Added Floor Estimate REVISED.xls, Garage Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Plumbing 1 LS $0 $0 $50,000 $50,000 $50,000
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $50,000 $50,000
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Garage Ventilation 170,762 $0 $0 $0.65 $110,995 $110,995
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $110,995 $110,995
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Sprinklers 170,762 sf $0 $0 $1.00 $170,762 $170,762
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $170,762 $170,762
47. PLUMBING
48. H.V.A.C.
49. FIRE PROTECTION
2011_05_31 Added Floor Estimate REVISED.xls, Garage Detail
Print Date: 5/31/2011 Print Time: 3:39 PM
Line Item:
Project: Garage/ParkingEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Electrical 170,762 sf $0 $0 $1.90 $324,448 $324,448
$0 $0 $0 $0
$0 $0 $0 $0
Car Charging Stations Allowance 1 LS $0 $0 $200,000 $200,000 $200,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $524,448 $524,448
50. ELECTRICAL
2011_05_31 Added Floor Estimate REVISED.xls, Garage Detail
Estimate Number: 2011-Conc
Date: 5/18/2011
Estimator: MH
Type of Building: Multi Use
Project: Regent Square- Block D Residential Tower Location: Houston, TX Duration: 87 Weeks
Owner: GID Urban Development Area: 357,494 sf No. of Units 278
Architect: ZeiglerCooper Cost / Unit: $184,071 ENR Cost Index:
ITEMS MATERIAL LABOR SUB TOTAL COST/SF
1. GENERAL REQUIREMENTS $0 $0 $0 $0 $0.00
1a. CRANES & HOISTS $0 $0 $817,002 $817,002 $2.29
2. DEMOLITION $0 $0 $0 $0 $0.00
3. SITE EXCAVATION & PREPARATION $0 $0 $0 $0 $0.00
4. FOUNDATION EXCAVATION $0 $0 $0 $0 $0.00
5. SITE UTILITIES $0 $0 $0 $0 $0.00
6. SITE IMPROVEMENTS $0 $0 $0 $0 $0.00
7. LANDSCAPING $0 $0 $0 $0 $0.00
8. SOIL POISONING $0 $0 $2,520 $2,520 $0.01
9. CONCRETE FOUNDATIONS $0 $0 $371,604 $371,604 $1.04
10. BUILDING CONCRETE $0 $0 $6,242,947 $6,242,947 $17.46
11. FORMWORK $0 $0 $0 $0 $0.00
12. RESTEEL/POST TENSIONING $0 $0 $0 $0 $0.00
13. EXTERIOR CONCRETE/STONE $0 $0 $470,851 $470,851 $1.32
14. MASONRY $0 $0 $1,926,207 $1,926,207 $5.39
15. STRUCTURAL & MISC. STEEL $0 $0 $1,328,614 $1,328,614 $3.72
16. ROUGH CARPENTRY $95,393 $95,393 $0 $190,786 $0.53
17. FINISH CARPENTRY $152,506 $182,508 $75,224 $410,238 $1.15
18. MAIN LOBBY FINISHES $0 $0 $203,120 $203,120 $0.57
19. WATERPROOFING & SEALANTS $0 $0 $864,805 $864,805 $2.42
20. BUILDING INSULATION $0 $0 $0 $0 $0.00
21. ROOFING & SHEET METAL $0 $0 $539,558 $539,558 $1.51
22. ENTRY CANOPIES $0 $0 $96,880 $96,880 $0.27
23. HOLLOW METAL $172,330 $58,125 $0 $230,455 $0.64
24. WOOD DOORS $273,164 $113,564 $0 $386,729 $1.08
25. FINISH HARDWARE $249,478 $91,169 $0 $340,647 $0.95
26. SPECIAL DOORS & DOCK EQUIPMENT $0 $0 $12,000 $12,000 $0.03
27. BALCONY RAILINGS $0 $0 $1,129,811 $1,129,811 $3.16
28. GLASS, GLAZING & STOREFRONT $0 $0 $5,066,720 $5,066,720 $14.17
29. ROOF TOP ELEMENT $0 $0 $0 $0 $0.00
30. DRYWALL $0 $0 $5,458,405 $5,458,405 $15.27
31. ACOUSTICAL $0 $0 $0 $0 $0.00
32. STUCCO/EIFS $0 $0 $190,215 $190,215 $0.53
33. AMENITY, FITNESS, CLUB ROOMS $0 $0 $812,742 $812,742 $2.27
34. CERAMIC TILE $0 $0 $597,188 $597,188 $1.67
35. INTERIOR STONE WORK $0 $0 $0 $0 $0.00
36. KITCHEN & BATH COUNTERTOPS $17,223 $17,223 $415,466 $449,911 $1.26
37. FLOORING (CARPET/RESILIENT/WOOD) $0 $0 $1,186,774 $1,186,774 $3.32
38. PAINT & WALLCOVERING $0 $0 $1,091,044 $1,091,044 $3.05
39. MISC. SPECIALTIES $13,920 $2,900 $228,780 $245,600 $0.69
40. TOILET PARTITIONS $0 $0 $7,200 $7,200 $0.02
41. TOILET ACCESSORIES $69,470 $12,619 $0 $82,088 $0.23
42. PARKING EQUIPMENT $0 $0 $0 $0 $0.00
43. RESIDENTIAL CABINETS $0 $0 $812,000 $812,000 $2.27
44. BLINDS & SHADES $0 $0 $81,200 $81,200 $0.23
45. RESIDENTIAL APPLIANCES $0 $0 $913,500 $913,500 $2.56
46. ELEVATORS $0 $0 $1,000,000 $1,000,000 $2.80
47. PLUMBING $0 $0 $2,374,426 $2,374,426 $6.64
48. H.V.A.C. $0 $0 $3,420,880 $3,420,880 $9.57
49. FIRE PROTECTION $0 $0 $717,196 $717,196 $2.01
50. ELECTRICAL $0 $0 $4,224,660 $4,224,660 $11.82
51. IN-UNIT LOW VOLTAGE CABLING $0 $0 $467,936 $467,936 $1.31
52. SWIMMING POOL $0 $0 $347,945 $347,945 $0.97
53. TERRACE LEVEL IMPROVEMENTS $0 $0 $1,441,729 $1,441,729 $4.03
54 EXTRA 1 $0 $0 $0 $0 $0.00
55 EXTRA 2 $0 $0 $0 $0 $0.00
56 EXTRA 3 $0 $0 $0 $0 $0.00
SUB TOTAL $1,043,483 $573,501 $44,937,149 $46,554,133 $130.22
Labor Burden 26.50% $151,978 $0.43
Sales Tax 8.25% $86,087 $0.24
SUB TOTAL $46,792,198 $130.89
Contractor's Contingency 0.00% $0 $0.00
Builder's Risk Insurance by owner $0 $0.00
GL Insurance & Fees $394,022 $1.10
SDI/Subguard Program 1.50% $689,709 $1.93
Building Permits $81,875 $0.23
SUB TOTAL $47,957,805 $134.15
Payment & Performance Bond 1.0000% $511,717 $1.43
SUB TOTAL $48,469,522 $135.58
General Conditions 3.00% $1,454,086 $4.07
TOTAL $49,923,607 $139.65
Condo Insurance Premium 0 $0 $0.00
Inflation/Escalation 0 $0 $0.00
Fee 2.50% $1,248,090 $3.49
GRAND TOTAL $51,171,697 $143.14
Estimate General Summary Sheet
Residential
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item: 1a. CRANES & HOISTS
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Material Hoisting Allotment 371,604 LS $0 $0 $1.00 $371,604 $371,604
Man/Material Hoist, Lull, etc. $0 $0 $0 $0
Tower Crane 1 LS $0 $0 $445,398.00 $445,398 $445,398
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $817,002 $817,002
Line Item:
Project:ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Termite Treatment 28,000 sf $0 $0 $0.09 $2,520 $2,520
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $2,520 $2,520
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Foundations 371,604 SF $0 $0 $1.00 $371,604 $371,604
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $371,604 $371,604
8. SOIL POISONING
9. CONCRETE
FOUNDATIONS
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
$0 $0 $0 $0
Structure Area (Formed Area) 371,604 sf $0 $0 $16.80 $6,242,947 $6,242,947
Square footage is structure area $0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $6,242,947 $6,242,947
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Cast Stone/Arch. Concrete 1,015 sf $0 $0 $58.00 $58,865 $58,865
ST (Stone) - Arriscraft 11,444 sf $0 $0 $36.00 $411,986 $411,986
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $470,851 $470,851
13. EXTERIOR
CONCRETE/STONE
10. BUILDING
CONCRETE
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Brick Veener 118,156 sf $0 $0 $14.00 $1,654,190 $1,654,190
$0 $0 $0 $0
$0 $0 $0 $0
Trash Chute CMU 5,574 sf $0 $0 $12.00 $66,889 $66,889
$0 $0 $0 $0
sf $0 $0 $35.00 $0 $0
$0 $0 $0 $0
Interior Walls-CMU 7,462 sf $0 $0 $12.00 $89,544 $89,544
Storage Walls-CMU 4"? 9,632 sf $0 $0 $12.00 $115,584 $115,584
sf $0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $1,926,207 $1,926,207
14. MASONRY
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
$0 $0 $0 $0
Miscellaneous Steel 371,604 sf $0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Metal Panels (NOW) 14,207 sf $0 $0 $33.30 $473,079 $473,079
$0 $0 $0 $0
Stair Package: $0 $0 $0 $0
Stair & Rail 1 1 LS $0 $0 $271,231.00 $271,231 $271,231
Stair & Rail 2 1 LS $0 $0 $271,231.00 $271,231 $271,231
$0 $0 $0 $0
Elevator Divider Beams 1 LS $0 $0 $13,607.00 $13,607 $13,607
Elevator Sill Angles 1 LS $0 $0 $25,869.00 $25,869 $25,869
Elevator Guide Rail Support tubes 1 LS $0 $0 $6,002.00 $6,002 $6,002
Elevator Sump pit grating 1 LS $0 $0 $1,419.00 $1,419 $1,419
Elevator pit ladders (3) 1 LS $0 $0 $2,859.00 $2,859 $2,859
Stair #1 Mechanical Chase 1 LS $0 $0 $13,607.00 $13,607 $13,607
Stair #2 Mechanical Chase 1 LS $0 $0 $13,607.00 $13,607 $13,607
Steel support at service elevator machine room roof 1 LS $0 $0 $5,803.00 $5,803 $5,803
Steel support at passenger elevator machine room roof 1 LS $0 $0 $12,573.00 $12,573 $12,573
Elevator hoist beams 1 LS $0 $0 $5,166.00 $5,166 $5,166
Lav Counter support at L-8 1 LS $0 $0 $1,693 $1,693 $1,693
TP support at L-8 1 LS $0 $0 $4,588.00 $4,588 $4,588
Steel picket railing at L-1 steps 1 LS $0 $0 $33,769 $33,769 $33,769
Painted Aluminum Column Covers 1 LS $0 $0 $11,355.00 $11,355 $11,355
Galvanized Roof Tie Back Anchors 1 LS $0 $0 $27,046 $27,046 $27,046
Shelf angle at Brick 16,000 LF $0 $0 $7.50 $120,000 $120,000
$0 $0 $0 $0
Misc Steel Adj for Added Floor 14,110 SF $0 $0 $1.00 $14,110 $14,110
SUB TOTAL $0 $0 $1,328,614 $1,328,614
15. STRUCTURAL &
MISC. STEEL
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Units $0 $0 $0 $0
Door Rough Bucks 39,013 lf $1.00 $39,013 $1.00 $39,013 $0 $78,027
In-Wall Blocking @ upper cabinets 8,047 lf $1.00 $8,047 $1.00 $8,047 $0 $16,094
Fair Housting Blocking 11,172 lf $1.00 $11,172 $1.00 $11,172 $0 $22,345
$0 $0 $0 $0
Exterior Building Blocking - allow 371,604 sf $0.10 $37,160 $0.10 $37,160 $0 $74,321
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $95,393 $95,393 $0 $190,786
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
6" Wood Base (was 4") 96,069 lf $0.75 $72,052 $1.00 $96,069 $0 $168,121
$0 $0 $0 $0
Wood Crown Molding 47,488 lf $1.20 $56,986 $1.25 $59,360 $0 $116,346
Single Rod & Shelf - ventilated wire shelving 876 lf $0 $0 $4.50 $3,943 $3,943
Double Rod & Shelf - ventilated wire 4,587 lf $0 $0 $9.00 $41,281 $41,281
Corridors/Common Areas:
6" Wood Base 12,035 $0.75 $9,026 $1.00 $12,035 $21,061
Crown Molding 12,035 $1.20 $14,442 $1.25 $15,044 $0 $29,486
$0 $0 $0 $0
Common Area Millwork Allowance 1 ls $0 $0 $30,000.00 $30,000 $30,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $152,506 $182,508 $75,224 $410,238
17. FINISH CARPENTRY
16. ROUGH CARPENTRY
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Main Lobby Finish Allowance 2,539 sf $0 $0 $80.00 $203,120 $203,120
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $203,120 $203,120
Project: Residential Line Item:
Estimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Waterproofing/Dampproofing 371,604 sf $0 $0 $0 $0
$0 $0 $0 $0
Waterproofing Behind Stone Veneer 11,444 sf $0 $0 $0 $0
Waterproofing Behind Brick Veneer 116,530 sf $0 $0 $0 $0
Vapor Barrier Behind Stucco 1,491 sf $0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Pedestrian Traffic Coating 1 ls $0 $0 $114,531 $114,531 $114,531
Fluid Applied Membrane Air Barriers 1 ls $0 $0 $477,413 $477,413 $477,413
Sheetmetal Flashing and Trim 1 ls $0 $0 $62,542 $62,542 $62,542
Flexible Flashing 1 ls $0 $0 $48,216.26 $48,216 $48,216
Joint Sealants 1 ls $0 $0 $53,422 $53,422 $53,422
Expansion Joint Cover Assemblies 1 ls $0 $0 $108,680 $108,680 $108,680
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $864,805 $864,805
18. MAIN LOBBY
FINISHES
19. WATERPROOFING &
SEALANTS
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Roofing (Chamberlain) 1 LS $0 $0 $493,266.00 $493,266 $493,266
$0 $0 $0 $0
Standing Seam Roof (Low Roof) 2,500 SF $0 $0 $15.00 $37,500 $37,500
$0 $0 $0 $0
Roof Walk Pads 628 LF $0 $0 $14.00 $8,792 $8,792
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $539,558 $539,558
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Entry Canopy 1 ls $0 $0 $96,880 $96,880 $96,880
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $96,880 $96,880
21. ROOFING & SHEET
METAL
22. ENTRY CANOPIES
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
3080 HM Frame 213 ea $175.00 $37,275 $75.00 $15,975 $0 $53,250
4080 HM Frame 3 ea $175.00 $525 $75.00 $225 $0 $750
6080 HM Frame 28 ea $225.00 $6,300 $75.00 $2,100 $0 $8,400
3080 Common Area Doors 211 ea $280.00 $59,080 $75.00 $15,825 $0 $74,905
4080 Common Area Doors 3 ea $280.00 $840 $75.00 $225 $0 $1,065
6080 Double Common Area Doors 27 ea $280.00 $7,560 $75.00 $2,025 $0 $9,585
$0 $0 $0 $0
Unit Entry door Frame 290 ea $175.00 $50,750 $75.00 $21,750 $0 $72,500
$0 $0 $0 $0
1 ls $10,000.00 $10,000 $0 $0 $10,000
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $172,330 $58,125 $0 $230,455
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Lovered Mechanical Room Door 290 ea $187.00 $54,230 $35.00 $10,150 $0 $64,380
Bedroom/Bathroom doors 3080 Wood 757 ea $75.00 $56,800 $35.00 $26,507 $0 $83,307
Closet Doors 3080 Double Door 361 ea $125.00 $45,117 $35.00 $12,633 $0 $57,750
Coat Closet doors 2680 Wood 271 ea $75.00 $20,342 $35.00 $9,493 $0 $29,835
Laundry Room doors 5080 Bifold 96 ea $75.00 $7,198 $35.00 $3,359 $0 $10,557
Closet Doors 3080 Wood 175 ea $75.00 $13,144 $35.00 $6,134 $0 $19,278
Office/Closet Door 4080 Double Door 51 ea $75.00 $3,834 $35.00 $1,789 $0 $5,623
$0 $0 $0 $0
Entry Door Unit 290 ea $250.00 $72,500 $150.00 $43,500 $0 $116,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $273,164 $113,564 $0 $386,729
23. HOLLOW METAL
24. WOOD DOORS
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Entry Door-Hardware Set 290 ea $350.00 $101,500 $35.00 $10,150 $0 $111,650
Res. Interior Door-Hardware Set 2,002 ea $15.00 $30,028 $35.00 $70,064 $0 $100,092
Common Door Hardware 241 ea $350.00 $84,350 $35.00 $8,435 $0 $92,785
$0 $0 $0 $0
Panic Device - Premium 84 ea $400.00 $33,600 $30.00 $2,520 $0 $36,120
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $249,478 $91,169 $0 $340,647
Project: Residential Line Item:
Estimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Steel Coiling Doors 2 ea $0 $0 $6,000.00 $12,000 $12,000
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $12,000 $12,000
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Exterior Balcony Railing/Glass/SS Cap 6,277 LF $0 $0 $180.00 $1,129,811 $1,129,811
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $1,129,811 $1,129,811
25. FINISH HARDWARE
26. SPECIAL DOORS &
DOCK EQUIPMENT
27. BALCONY RAILINGS
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Project: Residential Line Item:
Estimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Storefront 61,762 sf $0 $0 $63.00 $3,891,032 $3,891,032
Residential Windows 15,933 sf $0 $0 $53.00 $844,434 $844,434
Mirrors 20,524 sf $0 $0 $12.00 $246,283 $246,283
Shower Door/Enclosure 61 ea $0 $0 $750.00 $45,971 $45,971
$0 $0 $0 $0
$0 $0 $0 $0
Storefront Doors 13 ea $0 $0 $3,000.00 $39,000 $39,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $5,066,720 $5,066,720
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Interior Walls-3 5/8 x10' 29,672 lf $0 $0 $42.00 $1,246,240 $1,246,240
Low Walls @ Bar 0 lf $0 $0 $0 $0
Sheetrock Ceilings (40% inside unit) 107,453 sf $0 $0 $4.50 $483,537 $483,537
Demising Walls 7,340 lf $0 $0 $95.00 $697,273 $697,273
Common Area Ceilings 91,511 sf $0 $0 $4.50 $411,798 $411,798
Corridor/Elec/Trash Room Walls 10' 0 lf $0 $0 $65.00 $0 $0
Exterior walls 169,323 SF $0 $0 $7.50 $1,269,925 $1,269,925
Exterior walls - thermal insulation 169,323 SF $0 $0 $1.25 $211,654 $211,654
Stair Walls 0 lf $0 $0 $68.00 $0 $0
Interior Walls - 6" x 10' 0 lf $0 $0 $45.00 $0 $0
Skim Coat (Ceilings @ 60% of units) 167,248 sf $0 $0 $0.85 $142,161 $142,161
$0 $0 $0 $0
Common Area Interior Walls 3,745 lf $0 $0 $65.00 $243,395 $243,395
Corridor Walls 11,997 lf $0 $0 $90.00 $1,079,717 $1,079,717
Exterior Stair Walls at Amenity Deck 110 lf $0 $0 $65.00 $7,150 $7,150
$0 $0 $0 $0
Drywall adjustment 371,604 $0 $0 ($0.90) ($334,444) ($334,444)
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $5,458,405 $5,458,405
30. DRYWALL
28. GLASS, GLAZING &
STOREFRONT
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Stucco/Plaster 1,491 sf $0 $0 $13.00 $19,382 $19,382
Stucco/EFIS Soffit 13,141 sf $0 $0 $13.00 $170,833 $170,833
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $190,215 $190,215
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Leasing Office 2,359 sf $0 $0 $65.00 $153,335 $153,335
Gym 2,721 sf $0 $0 $75.00 $204,075 $204,075
Theatre 630 sf $0 $0 $90.00 $56,700 $56,700
Laundry 141 sf $0 $0 $40.00 $5,640 $5,640 Internet Café 1,463 sf $0 $0 $75.00 $109,725 $109,725
Kitchen 311 sf $0 $0 $90.00 $27,990 $27,990
Dining Room 471 sf $0 $0 $80.00 $37,680 $37,680
Bar 1,990 sf $0 $0 $100.00 $199,000 $199,000
$0 $0 $0 $0
Retail Space (see recap sheet for pricing) 0 sf $0 $0 $0 $0
$0 $0 $0 $0
Paver and Pedistal System (PV-4) - at fitness balcony 1 ls $0 $0 $18,597.00 $18,597 $18,597
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $812,742 $812,742
32. STUCCO/EIFS
33. AMENITY, FITNESS,
CLUB ROOMS
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Public Restrooms floor tile 372 sf $0 $0 $7.00 $2,604 $2,604
Public Restrooms Wall Tile 1,125 sf $0 $0 $7.50 $8,438 $8,438
$0 $0 $0 $0
Units $0 $0 $0 $0
Shower/Bath Floors 18,135 sf $0 $0 $7.00 $126,948 $126,948
Tub/Shower Surrounds 36,753 sf $0 $0 $7.50 $275,646 $275,646
Noble Seal Crack Iso & WP Membrane 18,135 sf $0 $0 $3.50 $63,474 $63,474
$0 $0 $0 $0
Kitchen Backsplash 6,036 sf $0 $0 $15.00 $90,536 $90,536
Vanity backsplash 1,969 lf $0 $0 $15.00 $29,542 $29,542
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $597,188 $597,188
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Granite Kitchen Top 12,860 sf $0 $0 $24.00 $308,643 $308,643
Solid Surface Vanity Top 3cm 3,939 sf $0 $0 $22.00 $86,658 $86,658
Unit Desk Tops 424 sf $0 $0 $24.00 $10,165 $10,165
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Plywood Substrate at Countertops 17,223 sf $1.00 $17,223 $1.00 $17,223 $0 $34,445
$0 $0 $0 $0
$0 $0 $0 $0
Common Area Tops-Allowance-Lobbies/Mailrooms 1 ea $0 $0 $10,000.00 $10,000 $10,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $17,223 $17,223 $415,466 $449,911
36. KITCHEN & BATH
COUNTERTOPS
34. CERAMIC TILE
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
$0 $0 $0 $0
Carpet Units 65,960 sf $0 $0 $1.78 $117,410 $117,410
$0 $0 $0 $0
$0 $0 $0 $0
Engineered Wood Plank Floors 130,026 sf $0 $0 $5.50 $715,145 $715,145
$0 $0 $0 $0
Acoustimat 130,026 sf $0 $0 $1.75 $227,546 $227,546
$0 $0 $0 $0
Common Area Carpet (Corridors, Office) 21,884 sf $0 $0 $4.44 $97,164 $97,164
$0 $0 $0 $0
$0 $0 $0 $0
Back of House / Storage 14,755 sf $0 $0 $2.00 $29,509 $29,509
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $1,186,774 $1,186,774
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Paint Walls 0 sf $0 $0 $0.40 $0 $0
Paint Ceilings 0 sf $0 $0 $0.45 $0 $0
Skim Concrete Ceilings (with drywall) 0 sf $0 $0 $0.00 $0 $0
Sealed Concrete Mechanical Room Floor 0 sf $0 $0 $0.25 $0 $0
Deminising Walls (included with Paint Walls) 0 sf $0 $0 $0.40 $0 $0
Corridor Walls 0 sf $0 $0 $0.40 $0 $0
Interior side of Exterior wall (inc.w/ Paint Walls) 0 sf $0 $0 $0.40 $0 $0
Stair Walls 0 sf $0 $0 $0.40 $0 $0
Paint Elec/Trash/Storage/Other Room Walls 0 sf $0 $0 $0 $0
Paint Doors/Frames 0 ea $0 $0 $35.00 $0 $0
Paint Wood Trim 0 lf $0 $0 $2.00 $0 $0
$0 $0 $0 $0
R&M Paint 1 LS $0 $0 $1,049,223.00 $1,049,223 $1,049,223
Paint Adjustment for Added Floors 14,110 SF $0 $0 $2.96 $41,821 $41,821
$0 $0 $0 $0
SUB TOTAL $0 $0 $1,091,044 $1,091,044
37. FLOORING
(CARPET/RESILIENT/WO
OD)
38. PAINT &
WALLCOVERING
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Fire Extinguishers 290 ea $48.00 $13,920 $10.00 $2,900 $0 $16,820
Mailbox/Dropbox/Parcel Locker-Allowance 295 ea $0 $0 $60.00 $17,700 $17,700
Trash Chutes 492 lf $0 $0 $115.00 $56,580 $56,580
Trash Sorter 1 ls $0 $0 $20,000.00 $20,000 $20,000
Dog Wash Sinks 3 ea $0 $0 $3,500.00 $10,500 $10,500
Graphic Allowance 1 LS $0 $0 $30,000.00 $30,000 $30,000
$0 $0 $0 $0
Lockers in Fitness room - allowance 1 LS $0 $0 $2,000.00 $2,000 $2,000
Bike Racks 1 ls $0 $0 $5,000.00 $5,000 $5,000
$0 $0 $0 $0
I Pod Dock & Wiring 290 EA $0 $0 $300.00 $87,000 $87,000
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $13,920 $2,900 $228,780 $245,600
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Toilet Partitions Amenity Deck 8 EA $0 $0 $900.00 $7,200 $7,200
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $7,200 $7,200
39. MISC. SPECIALTIES
40. TOILET PARTITIONS
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Toilet Paper Holder 361 ea $10.00 $3,610 $5.00 $1,805 $0 $5,415
Towel Bar 361 ea $16.00 $5,776 $5.00 $1,805 $0 $7,581
Towel Ring 361 ea $12.00 $4,332 $5.00 $1,805 $0 $6,137
Shower Curtain Rod 331 ea $30.00 $9,930 $5.00 $1,655 $0 $11,585
Medicine Cabinet 361 ea $100.00 $36,100 $10.00 $3,610 $0 $39,710
H/C Grab Bar (4% of units) 14 ea $90.00 $1,300 $10.00 $144 $0 $1,444
Shower Seat (4% of units) 14 ea $50.00 $722 $10.00 $144 $0 $866
$0 $0 $0 $0
$0 $0 $0 $0
Public Area Restrooms 11 ea $700.00 $7,700 $150.00 $1,650 $0 $9,350
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $69,470 $12,619 $0 $82,088
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Cabinets (allowance) 290 ea $0 $0 $2,800.00 $812,000 $812,000
$0 $0 $0 $0
Base Cabinets 5,840 LF $0 $0 $0 $0
Upper Cabinets 5,840 LF $0 $0 $0 $0
Kitchen Pantry 290 EA $0 $0 $0 $0
Bathroom Storage Cabinets 290 EA $0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $812,000 $812,000
43. RESIDENTIAL
CABINETS
41. TOILET
ACCESSORIES
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
Blind-Allowance/Unit 290 ea $0 $0 $280.00 $81,200 $81,200
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $81,200 $81,200
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Appliances 290 ea $0 $0 $2,200.00 $638,000 $638,000
$0 $0 $0 $0
W/D 290 ea $0 $0 $500.00 $145,000 $145,000
$0 $0 $0 $0
Add Beverage Refrigerator 290 ea $0 $0 $450.00 $130,500 $130,500
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $913,500 $913,500
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Passenger Elevators 2 EA $0 $0 $306,000.00 $612,000 $612,000
$0 $0 $0 $0
$0 $0 $0 $0
Freight 1 EA $0 $0 $346,000.00 $346,000 $346,000
$0 $0 $0 $0
Elevator Cab Allowance 3 EA $0 $0 $10,000.00 $30,000 $30,000
Operator / Recertification 1 LS $0 $0 $12,000.00 $12,000 $12,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $1,000,000 $1,000,000
45. RESIDENTIAL
APPLIANCES
46. ELEVATORS
44. BLINDS & SHADES
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Plumbing (Units) 278 Apts $0 $0 $8,167 $2,270,426 $2,270,426
Teal System Structure Allowance 1 LS $0 $0 $20,000 $20,000 $20,000
Added Units 12 EA $0 $0 $7,000.00 $84,000 $84,000
$0 $0 $0 $0
SUB TOTAL $0 $0 $2,374,426 $2,374,426
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
HVAC 278 Apts $0 $0 $11,960 $3,324,880 $3,324,880
Added Units 12 $0 $0 $8,000 $96,000 $96,000
$0 $0 $0 $0
SUB TOTAL $0 $0 $3,420,880 $3,420,880
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Fire Sprinklers 371,604 SF $0 $0 $1.93 $717,196 $717,196
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $717,196 $717,196
47. PLUMBING
48. H.V.A.C.
49. FIRE PROTECTION
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Base Electrical 1 LS $0 $0 $3,750,000 $3,750,000 $3,750,000
Light Fixture Allowance 1 LS $0 $0 $300,000 $300,000 $300,000
Lightning Protection 1 LS $0 $0 $90,000 $90,000 $90,000
Adjust Electrical for Added Floor 14,110 SF $0 $0 $6 $84,660 $84,660
$0 $0 $0 $0
SUB TOTAL $0 $0 $4,224,660 $4,224,660
Line Item:
Project: Residential 2011-Conc
Estimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
$0 $0 $0 $0
Fire Alarm 1 LS $0 $0 $175,000.00 $175,000 $175,000
Telecom 1 LS $0 $0 $100,000.00 $100,000 $100,000
Access Control 1 LS $0 $0 $175,000.00 $175,000 $175,000
Adjust low voltage for added floor 14,110 SF $0 $0 $1.27 $17,936 $17,936
$0 $0 $0 $0
SUB TOTAL $0 $0 $467,936 $467,936
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Swimming Pool 2,032 sf $0 $0 $135.00 $274,320 $274,320
Raised Pool Fountains 1 ls $0 $0 $30,000.00 $30,000 $30,000
Heated Pool Spa 89 sf $0 $0 $125.00 $11,125 $11,125
Integral Pool Fountain 1 ls $0 $0 $30,000.00 $30,000 $30,000
Aerator 1 ls $0 $0 $2,500.00 $2,500 $2,500
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $347,945 $347,945
50. ELECTRICAL
51. IN-UNIT LOW
VOLTAGE CABLING
52. SWIMMING POOL
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
COST TRACKING LOG Original Budget - May 5, 2011 Schematic Design Plus one Floor
$61,398,524
ITEM DATE "Target" TOTAL TOTAL TOTAL STATUS/ DueNO. SUBMITTED DESCRIPTION IMPACT PENDING ACCEPTED REJECTED RESPONSIBILITY Date
1 5/18/2011 Revised bid for Rheinzink Panels ($454,525) Rejected (454,525)$ Included in base number via VE #43 below.
2 5/18/2011 Delete DCI from parking garage ($148,774) Pending (148,774)$
3 5/18/2011 Provide king size brick in lieu of modular brick at all areas ($258,289) Pending (258,289)$
4 5/18/2011 Provide $25,000 screen wall allowance in lieu of masonry wall at entry plaza ($26,056) Pending (26,056)$
5 5/18/2011 Provide Kynar-finished square tube aluminum rail at $60/lf in lieu of glass rail as
shown
($754,657) Pending (754,657)$
6 5/18/2011 Provide 4" MDF base in living units in lieu of 6" MDF base ($19,569) Pending (19,569)$
7 5/18/2011 Remove crown molding in living units ($135,465) Pending (135,465)$
8 5/18/2011 Remove crown molding at common areas ($46,207) Pending (46,207)$
9 5/18/2011 Delete pedestrian traffic coatings at balconies ($113,432) Pending (113,432)$
10 5/18/2011 Provide Hamilton oval baths in lieu of Sterling ($24,347) Pending (24,347)$
11 5/18/2011 Provide galvanized flashing in lieu of stainless steel flashings ($13,479) Pending (13,479)$
12 5/18/2011 Provide urethane masonry sealant in lieu of silicone masonry sealant ($5,387) Pending $ (5,387)
13 5/18/2011 Provide chainlink at storage in lieu of drywall and hollow metal frames ($28,825) Pending (28,825)$
14 5/18/2011 Provide mid range cabinets in lieu of specified cabinets ($172,330) Pending (172,330)$
15 5/18/2011 Delete Low Emitting Paint Requirement ($53,233) Pending (53,233)$
16 5/18/2011 Delete wine coolers ($129,248) Pending (129,248)$
17 5/18/2011 Provide Pioneer brush nickle faucets with 20 gauge kitchen sinks ($82,974) Pending (82,974)$
18 5/18/2011 Provide Pioneer brushed nickel faucet in lieu of Danze ($33,910) Pending (33,910)$
19 5/18/2011 Provide Pioneer brushed nickel tub and shower valves in lieu of Danze ($15,859) Pending (15,859)$
20 5/18/2011 Provide sub metering per PDI - Install Only $15,659 Pending 15,659$
21 5/18/2011 LED Lighting in lieu of Metal Halide at Garage $78,295 Pending 78,295$
22 5/18/2011 Allowance to provide builders risk insurance $254,908
23 5/18/2011 GOAL: Achieve $80,000 Landscape Allowance for Project ($330,609) Pending (330,609)$
24 5/18/2011 Deduct phone wiring $0 Pending $ -
25 5/18/2011 Remove utility relocation from the construction budget ($935,005) Pending (935,005)$
26 5/18/2011 Deduct Payment and Performance Bond ($619,605) Pending (619,605)$
27 5/18/2011 Provide wall barricadeat south side of garage in lieu of barrier cable ($53,077) Pending (53,077)$
28 5/18/2011 Provide Laminate Flooring in lieu of Engineered Wood Flooring ($193,168) Pending (193,168)$
29 5/18/2011 Deduct car charging stations ($206,631) Pending (206,631)$
30 5/18/2011 Delete iPod dock requirements at kitchen ($86,165) Pending (86,165)$
31 5/18/2011 HVAC Option 1: All split system DX 13 SEER ($1,324,980) Pending (1,324,980)$
32 5/18/2011 HVAC Option 2: All DX 14 SEER ($1,204,561)
33 5/18/2011 HVAC Option 3: VRV Tower; Split System DX Midrise ($129,429)
34 5/18/2011 HVAC Option 4: Split DX everywhere possible; VRV where not ($988,330)
35 5/18/2011 HVAC Option 5: VRV Mid-Rise; Split DX Tower ($795,092)
36 5/18/2011 HVAC Option 6: Water source heat pump $244,290
37 5/18/2011 Delete Ducted Outside Air at Units ($50,749) Pending (50,749)$
38 5/18/2011 Delete motorized dampers at outside air ($38,227) Pending (38,227)$
39 5/18/2011 Delete requirement for Superduct ($19,113) Pending (19,113)$
40 5/25/2011 Provide 7 ft. doors in lieu of 8' doors ($44,905) Pending (44,905)$
41 5/25/2011 Amenity Deck Option 2: 1/L1.05 $0
42 5/25/2011 Amenity Deck Option 3: 2/L1.05 $0
43 5/27/2011 Add 21st Floor per E-mail dated 5/27/11 $1,426,321 Rejected 1,426,321$ Included in base number above. Includes VE #1.
44 5/26/2011 Changes in Drawings Dated 5/18/11 $0
45 0 $0
0
GRAND TOTAL: (7,516,737)$ (5,870,320)$ -$ 971,796$
Current Budget with all VE's taken $55,528,204
TOTAL WITH "ACCEPTED" ITEMS: 61,398,524$
May 31, 2011
REVISION DATE:
STATUS
GID West Dallas Apartments
Sheet 1 of 1
Estimate Number: 2011-Conc
Date: 5/17/2007
Estimator: MH
Type of Building: Multi Use
Project: Regent Square- Block D Amenity Deck Break-Out Location: Houston, TX Duration: 87 Weeks
Owner: GID Urban Development Area: 357,494 sf No. of Units 278
Architect: ZeiglerCooper Cost / Unit: $7,028 ENR Cost Index: 4,576.93
ITEMS MATERIAL LABOR SUB TOTAL COST/SF BOND AMOUNT
1. POOL AREA $0 $0 $614,170 $614,170 $1.72 $0
2. LAWN AREA $0 $0 $301,868 $301,868 $0.84 $0
3. ZEN GARDEN $0 $0 $229,253 $229,253 $0.64 $229,253
4. VEGETABLE GARDEN $0 $0 $296,438 $296,438 $0.83 $296,438
5. SWIMMING POOL $0 $0 $347,945 $347,945 $0.97 $347,945
SUB TOTAL $0 $0 $1,789,674 $1,789,674 $5.01 $873,636
Labor Burden 26.50% $0 $0.00
Sales Tax 8.25% $0 $0.00
SUB TOTAL $1,789,674 $5.01
Contractor's Contingency 0.00% $0 $0.00
Builder's Risk Insurance by owner $0 $0.00
GL Insurance & Fees $15,044 $0.04
SDI/Subguard Program 1.50% $26,845 $0.08
Building Permits $3,126 $0.01
SUB TOTAL $1,834,689 $5.13
Payment & Performance Bond 1.0000% $19,538 $0.05
SUB TOTAL $1,854,227 $5.19
General Conditions 2.80% $51,918 $0.15
TOTAL $1,906,146 $5.33
Condo Insurance Premium 0 $0 $0.00
Inflation/Escalation 0 $0 $0.00
Fee 2.50% $47,654 $0.13
GRAND TOTAL $1,953,799 $5.47
Estimate General Summary Sheet
Amenity Deck Break-Out
Print Date: 5/31/2011 Print Time: 3:40 PM
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Pool Terrace Sandwich Slab 25,130 sf $0 $0 $10.00 $251,300 $251,300
$0 $0 $0 $0
Metals: $0 $0 $0 $0
Terrace Trellis (ST-1) 1 LS $0 $0 $11,514.00 $11,514 $11,514
Cabana Trellis (ST-2) 1 LS $0 $0 $21,589.00 $21,589 $21,589
Ornamental Gates (FE-2) 1 LS $0 $0 $2,805.00 $2,805 $2,805
Steel Structure at Level 8 Pool Living 1 LS $0 $0 $21,248.00 $21,248 $21,248
Living Cabana (ST4) 1 LS $0 $0 $50,000.00 $50,000 $50,000
Pool Fencing 1 LS $0 $0 $5,000.00 $5,000 $5,000
Landscape/Irrigation Allowance 1 LS $0 $0 $350,000.00 $350,000 $350,000
Hot Fluid Applied Rubberized Ashphalt WP 1 ls $0 $0 $287,212.00 $287,212 $287,212
Stone Pavers (PV-2) 2,722 sf $0 $0 $15.00 $40,830 $40,830
Outdoor Fireplace (SF-2) 1 ls $0 $0 $40,000.00 $40,000 $40,000
PV 6 Stone pavers 1,383 sf $0 $0 $15.00 $20,745 $20,745
PV7 Precast Concrete pavers 114 sf $0 $0 $25.00 $2,850 $2,850
Landscaping Planter (PL4) 5,966 sf $0 $0 $5.00 $29,830 $29,830
DG Paving (PV-8) 916 sf $0 $0 $5.00 $4,580 $4,580
Cast Stone Hearth (WL-13) 1 ea $0 $0 $20,000.00 $20,000 $20,000
Outdoor Shower (SF-3) 3 ea $0 $0 $3,500.00 $10,500 $10,500
Cast Stone Planter Curb (WL10) 69 lf $0 $0 $75.00 $5,175 $5,175
Cast Stone step curb (WL-5) 245 lf $0 $0 $75.00 $18,375 $18,375
Runnel Fountain Basin (WL-7) 28 lf $0 $0 $100.00 $2,800 $2,800
Spa Screen Wall (WL-9) 312 sf $0 $0 $50.00 $15,600 $15,600
Cast Stone Steps (WL-11) 29 lf $0 $0 $200.00 $5,800 $5,800
Garden Seat Bench 15 X 24 (WL3) 66 lf $0 $0 $300.00 $19,800 $19,800
Rainwater Harvesting System 1,000 gal 1 ls $0 $0 $10,000.00 $10,000 $10,000
Masonry Garden Wall 42" tall (WL2) 920 sf $0 $0 $28.00 $25,760 $25,760
Runnel Wall (WL6) 57 lf $0 $0 $100.00 $5,700 $5,700
Outdoor Bar (SF6) 17 lf $0 $0 $500.00 $8,500 $8,500
Pool Planters (WL14) 623 sf $0 $0 $5.00 $3,115 $3,115
Concrete Wall w/cast stone cap (WL14) 259 lf $0 $0 $50.00 $12,950 $12,950
Outdoor Living Cabanas - small (ST2) 2 ea $0 $0 $10,000.00 $20,000 $20,000
Stainless Gas grilles (ST4) 2 ea $0 $0 $1,200.00 $2,400 $2,400
Sinks (ST4) 2 ea $0 $0 $450.00 $900 $900
Undercounter Refrigerators (ST4) 2 ea $0 $0 $1,400.00 $2,800 $2,800
Masonry raised counters w/ granite tops (ST4) 20 lf $0 $0 $450.00 $9,000 $9,000
Curb 218 lf $0 $0 $10.00 $2,180 $2,180
Gravel 705 sf $0 $0 $5.00 $3,525 $3,525
IPE Wood Deck 207 sf $0 $0 $18.00 $3,726 $3,726
Raised Vegtable Gardens Walls (PL2) 137 sf $0 $0 $50.00 $6,825 $6,825
Masonry Wall with IPE Wood Cap (WL1) 199 lf $0 $0 $75.00 $14,925 $14,925
Colored Concrete Paving @ pool deck 6,187 sf $0 $0 $10.00 $61,870 $61,870
Plumbing at Amenity Deck 1 ls $0 $0 $10,000.00 $10,000 $10,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $1,441,729 $1,441,729
53. TERRACE LEVEL
IMPROVEMENTS
2011_05_31 Added Floor Estimate REVISED.xls, Residential Detail
Line Item: 1. POOL AREA
Project: Residential Estimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
General ConditionsUNIT/ UNIT/ UNIT/
DESCRIPTION QTY UNIT MATERIAL MATERIAL LABOR LABOR SUBCONTRACT SUBCONTRACT TOTAL
$0 $0 $0 $0
Pool Terrace Sandwich Slab 1 LS $0 $0 $62,825.00 $62,825 $62,825
$0 $0 $0 $0
Metals: $0 $0 $0 $0
Terrace Trellis (ST-1) 0 LS $0 $0 $11,514.00 $0 $0
Cabana Trellis (ST-2) 1 LS $0 $0 $21,589.00 $21,589 $21,589
Ornamental Gates (FE-2) 1 LS $0 $0 $2,805.00 $2,805 $2,805
Steel Structure at Level 8 Pool Living 1 LS $0 $0 $21,248.00 $21,248 $21,248
Living Cabana (ST4) 1 LS $0 $0 $50,000.00 $50,000 $50,000
Pool Fencing 1 LS $0 $0 $5,000.00 $5,000 $5,000
Landscape/Irrigation Allowance 1 LS $0 $0 $130,000.00 $130,000 $130,000
Hot Fluid Applied Rubberized Ashphalt WP 1 LS $0 $0 $71,803.00 $71,803 $71,803
Paver and Pedistal System (PV-4) - at fitness balcony 1 LS $0 $0 $0 $0
Stone Pavers (PV-2) 1 LS $0 $0 $32,664.00 $32,664 $32,664
Outdoor Fireplace (SF-2) 1 LS $0 $0 $40,000.00 $40,000 $40,000
PV 6 Stone pavers 1 LS $0 $0 $0 $0
PV7 Precast Concrete pavers 1 LS $0 $0 $0 $0
Landscaping Planter (PL4) 1 LS $0 $0 $0 $0
DG Paving (PV-8) 1 LS $0 $0 $0 $0
Cast Stone Hearth (WL-13) 1 LS $0 $0 $20,000.00 $20,000 $20,000
Outdoor Shower (SF-3) 1 LS $0 $0 $10,500.00 $10,500 $10,500
Cast Stone Planter Curb (WL10) 1 LS $0 $0 $5,175.00 $5,175 $5,175
Cast Stone step curb (WL-5) 1 LS $0 $0 $18,375.00 $18,375 $18,375
Runnel Fountain Basin (WL-7) 1 LS $0 $0 $0 $0
Spa Screen Wall (WL-9) 1 LS $0 $0 $15,600.00 $15,600 $15,600
Cast Stone Steps (WL-11) 1 LS $0 $0 $5,800.00 $5,800 $5,800
Garden Seat Bench 15 X 24 (WL3) 1 LS $0 $0 $3,960.00 $3,960 $3,960
Rainwater Harvesting System 1,000 gal 1 LS $0 $0 $0 $0
Masonry Garden Wall 42" tall (WL2) 1 LS $0 $0 $0 $0
Runnel Wall (WL6) 1 LS $0 $0 $0 $0
Outdoor Bar (SF6) 1 LS $0 $0 $8,500.00 $8,500 $8,500
Pool Planters (WL14) 1 LS $0 $0 $3,115.00 $3,115 $3,115
Concrete Wall w/cast stone cap (WL14) 1 LS $0 $0 $12,950.00 $12,950 $12,950
Outdoor Living Cabanas - small (ST2) 1 LS $0 $0 $20,000.00 $20,000 $20,000
Stainless Gas grilles (ST4) 1 LS $0 $0 $2,400.00 $2,400 $2,400
Sinks (ST4) 1 LS $0 $0 $900.00 $900 $900
Undercounter Refrigerators (ST4) 1 LS $0 $0 $2,800.00 $2,800 $2,800
Masonry raised counters w/ granite tops (ST4) 1 LS $0 $0 $9,000.00 $9,000 $9,000
Curb 1 LS $0 $0 $0 $0
Gravel 1 LS $0 $0 $0 $0
IPE Wood Deck 1 LS $0 $0 $3,726.00 $3,726 $3,726
Raised Vegtable Gardens Walls (PL2) 1 LS $0 $0 $0 $0
Masonry Wall with IPE Wood Cap (WL1) 1 LS $0 $0 $0 $0
Colored Concrete Paving @ pool deck 1 LS $0 $0 $30,935.00 $30,935 $30,935
Plumbing at Amenity Deck 1 LS $0 $0 $2,500.00 $2,500 $2,500
$0 $0 $0 $0
SUB TOTAL $0 $0 $614,170 $614,170
Line Item: 2. LAWN AREA
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Pool Terrace Sandwich Slab 1 LS $0 $0 $62,825.00 $62,825 $62,825
$0 $0 $0 $0
Metals: $0 $0 $0 $0
Terrace Trellis (ST-1) 1 LS $0 $0 $0 $0
Cabana Trellis (ST-2) 1 LS $0 $0 $0 $0
Ornamental Gates (FE-2) 1 LS $0 $0 $0 $0
Steel Structure at Level 8 Pool Living 1 LS $0 $0 $0 $0
Living Cabana (ST4) 1 LS $0 $0 $0 $0
Pool Fencing 1 LS $0 $0 $0 $0
Landscape/Irrigation Allowance 1 LS $0 $0 $75,000.00 $75,000 $75,000
Hot Fluid Applied Rubberized Ashphalt WP 1 LS $0 $0 $71,803.00 $71,803 $71,803
Paver and Pedistal System (PV-4) - at fitness balcony 1 LS $0 $0 $0 $0
Stone Pavers (PV-2) 1 LS $0 $0 $0 $0
Outdoor Fireplace (SF-2) 1 LS $0 $0 $0 $0
PV 6 Stone pavers 1 LS $0 $0 $0 $0
PV7 Precast Concrete pavers 1 LS $0 $0 $2,850.00 $2,850 $2,850
Landscaping Planter (PL4) 1 LS $0 $0 $29,830.00 $29,830 $29,830
DG Paving (PV-8) 1 LS $0 $0 $4,580.00 $4,580 $4,580
Cast Stone Hearth (WL-13) 1 LS $0 $0 $0 $0
Outdoor Shower (SF-3) 1 LS $0 $0 $0 $0
Cast Stone Planter Curb (WL10) 1 LS $0 $0 $0 $0
Cast Stone step curb (WL-5) 1 LS $0 $0 $0 $0
Runnel Fountain Basin (WL-7) 1 LS $0 $0 $0 $0
Spa Screen Wall (WL-9) 1 LS $0 $0 $0 $0
Cast Stone Steps (WL-11) 1 LS $0 $0 $0 $0
Garden Seat Bench 15 X 24 (WL3) 1 LS $0 $0 $15,840.00 $15,840 $15,840
Rainwater Harvesting System 1,000 gal 1 LS $0 $0 $0 $0
Masonry Garden Wall 42" tall (WL2) 1 LS $0 $0 $0 $0
Runnel Wall (WL6) 1 LS $0 $0 $0 $0
Outdoor Bar (SF6) 1 LS $0 $0 $0 $0
Pool Planters (WL14) 1 LS $0 $0 $0 $0
Concrete Wall w/cast stone cap (WL14) 1 LS $0 $0 $0 $0
Outdoor Living Cabanas - small (ST2) 1 LS $0 $0 $0 $0
Stainless Gas grilles (ST4) 1 LS $0 $0 $0 $0
Sinks (ST4) 1 LS $0 $0 $0 $0
Undercounter Refrigerators (ST4) 1 LS $0 $0 $0 $0
Masonry raised counters w/ granite tops (ST4) 1 LS $0 $0 $0 $0
Curb 1 LS $0 $0 $2,180.00 $2,180 $2,180
Gravel 1 LS $0 $0 $3,525.00 $3,525 $3,525
IPE Wood Deck 1 LS $0 $0 $0 $0
Raised Vegtable Gardens Walls (PL2) 1 LS $0 $0 $0 $0
Masonry Wall with IPE Wood Cap (WL1) 1 LS $0 $0 $0 $0
Colored Concrete Paving @ pool deck 1 LS $0 $0 $30,935.00 $30,935 $30,935
Plumbing at Amenity Deck 1 LS $0 $0 $2,500.00 $2,500 $2,500
$0 $0 $0 $0
SUB TOTAL $0 $0 $301,868 $301,868
Line Item: 3. ZEN GARDEN
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Pool Terrace Sandwich Slab 1 LS $0 $0 $62,825.00 $62,825 $62,825
$0 $0 $0 $0
Metals: $0 $0 $0 $0
Terrace Trellis (ST-1) 1 LS $0 $0 $0 $0
Cabana Trellis (ST-2) 1 LS $0 $0 $0 $0
Ornamental Gates (FE-2) 1 LS $0 $0 $0 $0
Steel Structure at Level 8 Pool Living 1 LS $0 $0 $0 $0
Living Cabana (ST4) 1 LS $0 $0 $0 $0
Pool Fencing 1 LS $0 $0 $0 $0
Landscape/Irrigation Allowance 1 LS $0 $0 $50,000.00 $50,000 $50,000
Hot Fluid Applied Rubberized Ashphalt WP 1 LS $0 $0 $71,803.00 $71,803 $71,803
Paver and Pedistal System (PV-4) - at fitness balcony 1 LS $0 $0 $0 $0
Stone Pavers (PV-2) 1 LS $0 $0 $0 $0
Outdoor Fireplace (SF-2) 1 LS $0 $0 $0 $0
PV 6 Stone pavers 1 LS $0 $0 $20,745.00 $20,745 $20,745
PV7 Precast Concrete pavers 1 LS $0 $0 $0 $0
Landscaping Planter (PL4) 1 LS $0 $0 $0 $0
DG Paving (PV-8) 1 LS $0 $0 $0 $0
Cast Stone Hearth (WL-13) 1 LS $0 $0 $0 $0
Outdoor Shower (SF-3) 1 LS $0 $0 $0 $0
Cast Stone Planter Curb (WL10) 1 LS $0 $0 $0 $0
Cast Stone step curb (WL-5) 1 LS $0 $0 $0 $0
Runnel Fountain Basin (WL-7) 1 LS $0 $0 $2,800.00 $2,800 $2,800
Spa Screen Wall (WL-9) 1 LS $0 $0 $0 $0
Cast Stone Steps (WL-11) 1 LS $0 $0 $0 $0
Garden Seat Bench 15 X 24 (WL3) 1 LS $0 $0 $0 $0
Rainwater Harvesting System 1,000 gal 1 LS $0 $0 $0 $0
Masonry Garden Wall 42" tall (WL2) 1 LS $0 $0 $12,880.00 $12,880 $12,880
Runnel Wall (WL6) 1 LS $0 $0 $5,700.00 $5,700 $5,700
Outdoor Bar (SF6) 1 LS $0 $0 $0 $0
Pool Planters (WL14) 1 LS $0 $0 $0 $0
Concrete Wall w/cast stone cap (WL14) 1 LS $0 $0 $0 $0
Outdoor Living Cabanas - small (ST2) 1 LS $0 $0 $0 $0
Stainless Gas grilles (ST4) 1 LS $0 $0 $0 $0
Sinks (ST4) 1 LS $0 $0 $0 $0
Undercounter Refrigerators (ST4) 1 LS $0 $0 $0 $0
Masonry raised counters w/ granite tops (ST4) 1 LS $0 $0 $0 $0
Curb 1 LS $0 $0 $0 $0
Gravel 1 LS $0 $0 $0 $0
IPE Wood Deck 1 LS $0 $0 $0 $0
Raised Vegtable Gardens Walls (PL2) 1 LS $0 $0 $0 $0
Masonry Wall with IPE Wood Cap (WL1) 1 LS $0 $0 $0 $0
Colored Concrete Paving @ pool deck 1 LS $0 $0 $0 $0
Plumbing at Amenity Deck 1 LS $0 $0 $2,500.00 $2,500 $2,500
$0 $0 $0 $0
SUB TOTAL $0 $0 $229,253 $229,253
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Pool Terrace Sandwich Slab 1 LS $0 $0 $62,825.00 $62,825 $62,825
$0 $0 $0 $0
Metals: $0 $0 $0 $0
Terrace Trellis (ST-1) 1 LS $0 $0 $11,514.00 $11,514 $11,514
Cabana Trellis (ST-2) 1 LS $0 $0 $0 $0
Ornamental Gates (FE-2) 1 LS $0 $0 $0 $0
Steel Structure at Level 8 Pool Living 1 LS $0 $0 $0 $0
Living Cabana (ST4) 1 LS $0 $0 $0 $0
Pool Fencing 1 LS $0 $0 $0 $0
Landscape/Irrigation Allowance 1 LS $0 $0 $95,000.00 $95,000 $95,000
Hot Fluid Applied Rubberized Ashphalt WP 1 LS $0 $0 $71,803.00 $71,803 $71,803
Paver and Pedistal System (PV-4) - at fitness balcony 1 LS $0 $0 $0 $0
Stone Pavers (PV-2) 1 LS $0 $0 $8,166.00 $8,166 $8,166
Outdoor Fireplace (SF-2) 1 LS $0 $0 $0 $0
PV 6 Stone pavers 1 LS $0 $0 $0 $0
PV7 Precast Concrete pavers 1 LS $0 $0 $0 $0
Landscaping Planter (PL4) 1 LS $0 $0 $0 $0
DG Paving (PV-8) 1 LS $0 $0 $0 $0
Cast Stone Hearth (WL-13) 1 LS $0 $0 $0 $0
Outdoor Shower (SF-3) 1 LS $0 $0 $0 $0
Cast Stone Planter Curb (WL10) 1 LS $0 $0 $0 $0
Cast Stone step curb (WL-5) 1 LS $0 $0 $0 $0
Runnel Fountain Basin (WL-7) 1 LS $0 $0 $0 $0
Spa Screen Wall (WL-9) 1 LS $0 $0 $0 $0
Cast Stone Steps (WL-11) 1 LS $0 $0 $0 $0
Garden Seat Bench 15 X 24 (WL3) 1 LS $0 $0 $0 $0
Rainwater Harvesting System 1,000 gal 1 LS $0 $0 $10,000.00 $10,000 $10,000
Masonry Garden Wall 42" tall (WL2) 1 LS $0 $0 $12,880.00 $12,880 $12,880
Runnel Wall (WL6) 1 LS $0 $0 $0 $0
Outdoor Bar (SF6) 1 LS $0 $0 $0 $0
Pool Planters (WL14) 1 LS $0 $0 $0 $0
Concrete Wall w/cast stone cap (WL14) 1 LS $0 $0 $0 $0
Outdoor Living Cabanas - small (ST2) 1 LS $0 $0 $0 $0
Stainless Gas grilles (ST4) 1 LS $0 $0 $0 $0
Sinks (ST4) 1 LS $0 $0 $0 $0
Undercounter Refrigerators (ST4) 1 LS $0 $0 $0 $0
Masonry raised counters w/ granite tops (ST4) 1 LS $0 $0 $0 $0
Curb 1 LS $0 $0 $0 $0
Gravel 1 LS $0 $0 $0 $0
IPE Wood Deck 1 LS $0 $0 $0 $0
Raised Vegtable Gardens Walls (PL2) 1 LS $0 $0 $6,825.00 $6,825 $6,825
Masonry Wall with IPE Wood Cap (WL1) 1 LS $0 $0 $14,925.00 $14,925 $14,925
Colored Concrete Paving @ pool deck 1 LS $0 $0 $0 $0
Plumbing at Amenity Deck 1 LS $0 $0 $2,500.00 $2,500 $2,500
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $296,438 $296,438
4. VEGETABLE
GARDEN
Line Item:
Project: ResidentialEstimate #: 2011-Conc
Line Item Summary Sheet #: 1 of 1
UNIT/ UNIT/ UNIT/
DESCRIPTION QTY. UNIT MATERIAL MATERIAL LABOR LABOR SUB SUB TOTAL
$0 $0 $0 $0
Swimming Pool 2,032 sf $0 $0 $135.00 $274,320 $274,320
Raised Pool Fountains 1 ls $0 $0 $30,000.00 $30,000 $30,000
Heated Pool Spa 89 sf $0 $0 $125.00 $11,125 $11,125
Integral Pool Fountain 1 ls $0 $0 $30,000.00 $30,000 $30,000
Aerator 1 ls $0 $0 $2,500.00 $2,500 $2,500
$0 $0 $0 $0
$0 $0 $0 $0
SUB TOTAL $0 $0 $347,945 $347,945
5. SWIMMING POOL
Regent Square Block D - Existing Apartments to Stay
General Conditions 50,125
Demolition 89,685
Earthwork/Asphalt Paving 188,880
Fencing 142,500
Structure @ Existing Walkway 50,000
Replace Existing Elevator 50,000
Plumbing 25,000
Sub total $596,190
Payroll Tax 0
New - Sales Tax On Material 0
Subcontractor Bonds 0
Sub total $596,190
Insurance, Permits, & Fees 9,323
Sub total $605,513
Contractor's Contingency 18,165
Payment & Performance Bonds 9,995
Subtotal $633,673
Fee 15,842
0
GRAND TOTAL $649,515
May 31, 2011
Cost Breakdown
1. Cost above is for work associated with demoltion of existing structures to allow enough
parking for apartments on Block D to remain during construction. Full impacts of phasing and
material management for construction are being investigated, and will be an add to the budget
estimate shown.
1 of 2
Demo two existing buildings with a total of 12 units, fence existing courtyard and pave and stripe area for ~38 parking spaces
Potential for remaining lay-down area
Demo house and pave for 11 parking spaces