Genome Organization & Protein Synthesis and Processing in Plants
Refrigerator Processing Plants - Kiesel · Refrigerator Processing Plants Calculation of...
Transcript of Refrigerator Processing Plants - Kiesel · Refrigerator Processing Plants Calculation of...
Refrigerator Processing Plants
From waste to valuable raw materialsTurn-key plants for fridge processing.
Refrigerator processing plant
Fully compliant with EU-Directive No. 2037/2000 (WEEE)
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Definition
Disposal of refrigerators and
commercial freezers.
Drainage of CFC and pentane.
R f t i d t l l ti dRecovery of contained metals, plastics and
polyurethane (PUR) foam.
Gaining granules in exactly defined
sizes and purity levels.
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Input
Pentan and CFC fridges and freezers
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing PlantsRECUSOLV CRYO-CONDENSATION NITROGEN STORAGE
QZ
INFEED SLUICE DRYING AUGER CONVEYORS
MATRIX DEGASSINGUNITS
EDDY CURRENTSEPARATOR
INFEED CONVEYOR
RECEPTION OF STEP IDISCHARGE GATE
AND SCREENSCREEN
SEPARATING PURFE SEPARATOR RECEPTION OF STEP IAND SCREENSEPARATING PURFE-SEPARATOR
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Sep 1: Degassing / Drainage
Preparation for further processing
Recovery of CFC R12Recovery of CFC R12,Iso-Butan (A600) und Iso-Propane
Removal of different components such as l d bl it hglass, wood, cables, mercury switches...
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Step 1: Drainage by drilling
The cooling circuit is tapped and g ppexhausted by grippers and drill heads
Cooling medium (oil) und CFC R12 will beheated and separately filled offheated and separately filled off.
Highest environmental standards
Operational safety (H & S) comes first!
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Why using Nitrogen?Why using Nitrogen?
Excellent absorption of CFC
Used as carrier for efficient separation
p
High degree of moister and water absorptionHigh degree of moister and water absorption
Build for the future: EX-proof operation for Pentane fridges (ATEX)
EX-proof operation to avoid dust explosions (ATEX)
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Reception step 1Infeed conveyorInfeed conveyor
Querstromzerspaneroperating with nitrogenp g g
First time CFC R11 recovery
Moister recovery (water)
EX-Proof (ATEX) operation for Pentane
EX Proof (ATEX) operation for dustEX-Proof (ATEX) operation for dust
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Drying auger conveyors
Additional CFC and Pentane recovery
Screening and separating the PUR foam from material streamfoam from material stream
Matrix degassing unitFinal CFC R11 recovery
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Metal separating
Non-Ferro separating
Plastics Aluminium
Efficient dust (PUR) collection returned to the Matrix for proper CFC degassingp p g g
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
3-stage matrix degassingg g gTo fulfill European legislation
(WEEE-directive)
Rekusolv creo condensation unitLiquefying the CFC’s and PentaneLiquefying the CFC s and Pentane
by freezing and/or compressing
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Input Output
Plastics PUR-foam Quality Control
Aluminium/Copper Steel
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Output
Metal collected in roll-off bins.
Plastics and PU-Foam collected indouble big bags stationsdouble big-bags stations.
Aluminium collected below the NF/Fe-separator
Fully-automated operation andprocess-flow control.
NF/Fe-separator.
p
Monitoring exhaust of CFC and Pentane recovery.
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Liquid nitrogen storage tank withRecusolvs units outside
Liquid CFC and Pentane storage tank.
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Metal Aluminium
Highest purityM PU dh < 0 5 % b i ht
Highest purityMax. PU-adherence < 0,5 % by weightClass 1 cooling steel
max. PU-adherence < 0,5 % by weightGrain size ≤ 80 mm
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Plastics Polyurethane
Approx. 75 - 90 % Polystyrene,G i i 0 50
Residual blowing agent≤ 0 2 % by weightGrain size approx. 0 - 50 mm ≤ 0,2 % by weight
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Technical Specifications
Capacity: 50-60 units / hour (QZ 2000 HD)90-100 units / hour (QZ 2500 HD)(Q )
Space needed: approx. 1.500 to 2.000 m²; Height 9,5 Meters (including small storage area and step1)(including small storage area and step1)
Max. fridge dimensions: 2m (2,5m) x 1m x 1mCommercial freezers: Yes, without manual disassemblingProcessing compressors: depending on technical specificationsFe- and NF-purity: up to 99,8%PU-adherence to metal: ≤ 0,5 % by weighty gPU-adherence to CFC: ≤ 0,2 % by weight
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Advantages of the QZ-Technologie
Single-step processing to final shred size
High quality output material ready for sale
Low Operating Cost => No expensive cutting tools are used
Easy to implement the use of Nitrogen dueEasy to implement the use of Nitrogen dueto one single closed housing
Processing CFC and Pentane fridges at the same time (in any proportion)
Processing domestic and commercial fridges at the same time
at the same time (in any proportion)
Plant can be combined with WEEE-Recycling
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Advantages at a glance
Easy in concept
Highest operational availability of all systems
Constantly high throughputs
Lowest operating cost
High quality output materials guarantee best value
Highest CFC recovery contingents
Worldwide accepted and operated technology
No danger of explosion, even with 100% pentane units
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Calculation of profitability
Basic data
Machine QZ 2000 HDThroughput (units per hour) 60(combined cycle)Working days per year 250
Working hours per day 24
Working hours per year 5 100Working hours per year 5.100
Operational availability 85%
Performance (units per year) 300.000
MACHINES PLANTS PROCESS SOLUTIONS
Refrigerator Processing Plants
Reference plantsUFH RE li G bH Wi t G LtdUFH RE-cycling GmbH
Kematen, Austria
Veolia Propreté
Wincanton Group Ltd.
Billingham, UK
Sims Recycling Ltd. (2 Plants)
Angers, France
ER Elektrorecycling
Banska Bystrica, Slovakia
Newport, Wales
WEEE Recycling AS
Trondheim, Norwayy ,
EMR European Metal Recycling
London, UK
Viridor Electrorecycling Ltd (2 Plants)
, y
Environcom Ltd.
Grantham, UK
Merloni SpAViridor Electrorecycling Ltd. (2 Plants)
Perth, Schottland; St. Helens, UK
EGN Entsorgungsgesellschaft Niederrhein
Merloni SpA
Milano, Italy
Skrotfrag AS
Grevenbroich, Germany Järna, Sweden
MACHINES PLANTS PROCESS SOLUTIONS