4 Foreword and why Atkins?

9 Challenges of maintaining the education estate:

10 Minimisingdisruption17 Managinghiddenrisks19 Carbonmanagement27 MakingthemostofICT

33 Refurbishment and remodelling

47 Reuse and conversion

53 Refresh and repair

59 Our people

Nomatterhowlargeorsmallyourproject,theAtkinsnationalteamoflocalexpertsisheretohelp.WithourpeopleandbreadthofskillsandexperiencebasedinofficesaroundtheUK,weofferanunparalleledrangeofconsultantswhoarededicatedtocreatingthebestlearningandteachingenvironments.Ourexpertisecoverseveryaspectofbuildingrefurbishment–frommasterplanningdecantstrategieswhichhelpminimisecostlytemporaryaccommodationtoboilerandwindowreplacementsorasimpledécorrefresh.Weofferournationalexpertsaspartofalocalpersonalisedservicetoallofourclients.

Weunderstandtherangeofpressuresfacingourclientstoday;whetheritiscreatingmodernfacilitiesonasmallbudget,meetingtargetsaroundincreasingschoolcapacity,aneedtoimproveaccess,reducingcarbonemissionsorimprovingICTfacilities,tonamejustafew.

Thisdrivesourdesiretomakesureaschoolrenewalprojectrunsassmoothlyaspossible,minimisingdisruptiontotheoperationoftheschoolandallowingteachingstaffto‘getonwiththeirdayjob’.

Wehavesubstantialexperienceofschoolestatesrenewalandthisbookletaimstogiveaflavourforthecreativewaysthatwehaveaddressedeachproject.Weattempttoidentifytherecurrentandcommonthemesinthisenvironmentandgivesomeexamplesofhowwehaveovercomesignificantchallengestosavemoney,minimisedisruption,andcreatesafe,welcoming,21stcenturylearningenvironments.

Hopefullythisdocumentwillgiveyouatasteofourapproachandperhapsstimulateideasforyourschoolprojects.

FORewORd By PhiliP wAtsOn, design diReCtOR

Philip watson, design director

tel: 0113 306 6490

[email protected]

44

5

Atkinsisalarge,multi-disciplinarydesignconsultancywithofficesthroughouttheUKandabroad.Itwouldbeeasytothinkthatthismightcreateafacelesscorporateentity;butthiscouldn’tbefurtherfromthetruth.Wearepassionateaboutwhatwedoandcommittedtohelpingourclientsachievetheirambitions.Thisisdoublyresonantinthesphereofeducationdesignandconsultancy.Ourstaffhaveexperiencenotonlyasdesignersandasspecialistintheirchosenfields;theyarealsoex-students,parents,schoolgovernorsandtutors–andeachhasabeliefinthepowerofeducationtopositivelyshapelives.

Weareabletoprovideallofthetechnicalandadvisorysupportrequired,regardlessofthenatureandscaleofproject,fromourdiverseteamsofmulti-disciplinaryresources.Projectsaremanagedandbasedoutofournetworkoflocalregionaloffices,drawingontheskillsofthewiderAtkinsGroupasnecessary.

Ourteamstakeaholisticviewofexistingfacilitiesandbuildingarrangementswhenconsideringtheneedforexpansionand/oradaptation;therebyensuringthatthe‘best’solutionisnotoverlookedinfavouroftheobvioussolution.

Inordertoidentifythe‘best’solution,weworkwithourclientstoidentifyvalueprioritiesandtoselectoptionsthataddthegreatestvaluewithintheavailablebudget.

Ourwealthofexperienceintheeducationsectorincludes:

• Masterplanning;

• Technicaladvisoryservices;

• Buildingsurveysandcondition/sustainabilityassessments;

• Feasibilitystudies;

• Strategicassetmanagement;

• Designofnewandmodified(extended/adapted)facilities;

• Designoflarge-scalerefurbishmentandsmall-scale‘light-touch’decorativeschemes;

• Carbon/energyuseassessmentsandadvice;

• Fundingapplicationadvice;

• ICTadvisoryservices;

• Valuemanagement;

• Adaptationof‘systembuild’buildings.

Insummary,throughourskills,experienceandunderstandingoftheschoolestateandhowitcanbeadaptedandupdated,wearewell-placedtohelpyouwithyourneeds.

ReFResh, ReFuRBish, RemOdel, Reusewhy Atkins?

6

durham university institute of natural Risk Research Centre extension

7

8

Challenges of maintaining the education estate >

Therearemanychallengesassociatedwiththerefurbishmentofexistingbuildingsgenerally.Theseareamplifiedwhenanexistingfacilityhastocontinuetofunctionwhilstworkiscarriedout.Ourexpertiseinthisfieldmeanswecandevelopeffectivestrategiestomakeyourbudgetgofurtherandtominimisedisruption.

Inthissectionwedemonstratehowwehelpourclientsovercomethesechallenges,includinghowweminimisedisruptionanddealwithunforeseenhazards;managecarbonandensurevalueformoney.

9

Whethertherefurbishmentis‘lighttouch’redecoration,repairoffailingelements,oramoresignificantremodellingofexistingspacesandstructurallayouts;oneofthemajorissuesthathastobeaddressedishowtheworkcanbeundertakencost-effectivelywiththeleastdisruptiontoexistingschoolactivities.

Moneyspentontemporaryaccommodationisusuallymoneythatcouldotherwisehavegoneintodirectbuildingimprovementsorintotheschool’sfrontlinedeliveryofeducation.

Althoughitisnotalwayspossibletoavoidtemporaryaccommodation,aconsideredapproachtotheoverallprojectprogrammewillprovidesolutionstominimisebothdisruptionandcost,andmaximisesafety.

Weuseourexpertisetoworkalongsideschoolsandbuildingcontractorstoensurethebestsolutionisadoptedforseamlesseducationdeliverythroughouttheworks.

Wealwaysensurethatsufficientclassroomspaceisavailablewhilstworksareongoinginotherareasoftheschool.

Wheredisruptiontoteachingspacesisnecessary,andtemporaryaccommodationcanbeavoided,weseektoprogrammethisaroundschoolholidaystoavoidschoolclosureandminimiseinterruptionoftheschoolsactivities.

Moreoftenthannot,wefindthatthereisusuallyapracticalsolutiononcethechallengeisfullyunderstoodandalittlecreativityhasbeenapplied.

minimising disRuPtiOn

10

‘Refurbishmentcanoftenbeseenasthepoorrelationtonewbuild,butwithcarewecancreateinspiringandwelcomingsocialspacesforlearnersandthelocalcommunityalike.’

James harrison Architect

11

ThedesignconceptatGreenacrehasbeendrivenbythestronglearningmethodologypractisedbythisSLD(SevereLearningDifficulties)andPMLD(ProfoundandMultipleLearningDifficulties)Schoolandthecomplexityofthesiteonwhichitislocated.

Theobjectiveofthedesignistocreatealearningenvironmentwhichgivesitsuserstheopportunitytoexploretheirskillsandtalentsandallowsforeachpupiltoreachtheirfullpotential.

Thebuildingneededtoincorporateaflexibilitythatcanrespondtochangesinthedeliveryofthecurriculum,andtheincreasingrateofchangeininformationtechnology.

Theschemeconsistsofacrescentoflearningpavilions,makingthemostoftheviewsandallowingforthecreationofprotectedwedgeshapedexternallearningspacesbetweenthem.

Thepartnerandtherapyspaces,whichincludethehydrotherapypool,arereadilyaccessiblefromallareasoftheschoolandforusebythewidercommunity.

Thecurvedcirculationrouteactsasasensorywallandanavigationaltoolthroughoutthebuildingusingtextures,signageanddisplaystogiveeachpartoftheschoolitsownidentity.

Aspartofourdesignapproach,weworkedwiththecontractortocreateaprogrammeofworksforGreenacreSENschoolwhichensuredclassesweremethodicallydecantedintonewclassroomsasoldonesweredemolished,savingthelocalcouncilover£1millionintemporaryaccommodationcosts.Thisminimiseddisruptionforstaffandmostimportantlyforthechildrenwhofindchangetotheirroutineupsetting.

greenacre sen school Barnsley,UK

Client BarnsleyMetropolitanBoroughCouncil

Value Undisclosed

status On-site

date Completionduein2011

min

imisi

ng disR

uPtiO

n

CAse st

udy

12

Red line indicates footprint of existing school, which had to remain fully operational during construction. initial plans demanded over £1m for temporary accommodation. Atkins’ design avoided this need, enabling funds to be directed where they would add value educationally.

13

Client CityofEdinburghCouncil

ValueUndisclosed

status Complete

date 2007

Arecurringchallengefordesignersis:howtocreateadditionalteachingspaceonaverycrampedsitewhilstkeepingaschoolfunctioningnormally?

AtPentland,ourengineerscameupwithanovelsolutionthatsawthecreationofanewteachingwingbyliterallythinking‘outsidethebox’.Insteadofdemolishingtheexistingaccommodation,thesolutionwastobuildanewstructurewhichspannedoverthetopoftheexistingbuilding.Thismeantthatthefootprintofthebuildingwasnotincreased,thuspreservingpreciousplayspace;anditenabledtheschooltoremaininoperationduringconstruction.

Timeon-sitewasalsogreatlyreducedbyusingthistechnique.Allinall,thismadethebuildprocessmuchlessdisruptivetotheschoolandgreatlyenhancedthequalityoftheenvironmentforpupilsandstaff.

Thenewschoolconsistsofatwo-storeyclassroomwingalongtheeast-westaxiswithsharedteachingaccommodationincorporatedintotheblock.Thelinearsinglebankedclassroomplanprovidesalightandairycirculationspaceopeningouttostructuredplayareas.

Thediningroom,kitchen,administration,officeandstaffaccommodationresideswithinasinglestoreyblockextendingtothenorthwhilstthedoubleheightgymnasiumandstagepunchesthoughthesingle-storeyroofandengageswiththeclerestory.

Pentland school Edinburgh,UK

min

imisi

ng disR

uPtiO

n

CAse st

udy

1414

BeFORe duRing AFteR

15

Client EastRidingofYorkshireCouncil

Value£377k

status Complete

date 2008

AtkinswascommissionedtoprovidedesignconsultancyservicesforthenewChildren’sCentrebuildingatBroughPrimarySchool.

Anewbuildingwasneededtomeetthegrowingneedsoftheschool,andtheoveralldesignphilosophywastocreateafacilitythatisinclusiveanduserfriendly.

Tominimisedisruptiontotheschoolcanteen,weusedanoff-sitebuildingsystembasedonstructuralinsulatedpanelstoprovidethecompletestructuralenvelopeoftheextension.Thisalsoaddressedtheproblemoflimitedsitespaceandaccess.Openingswereincorporatedintowallpanelsduringmanufacture,thereforetheydidnotrequirefurtherstructuraltreatmenton-site.

Prefabricatedpanelsenableafasttrackbuildingprocess,whichhelpstosignificantlyreduceconstructiontimeandon-sitewaste.Thepanelsarejoinedtogetherusingauniquesealedjoiningsystemthatminimisestheamountofairthatcanpassthroughthejoints,makingthebuildingveryairtightandenergyefficient.Tominimisetheuseofmechanicalventilation,anaturalcrossventilationsystemisusedtoprovideinternalspaceswithfreshairfromoutside.

Brough Primary school Brough,UK

min

imisi

ng disR

uPtiO

n

CAse st

udy

16

Oneofthebiggestchallengeswithrefurbishmentprojects,isnotknowingwhatyouaregoingtofind.Thisistheriskassociatedwithhiddenconstructiondetailsoftheexistingbuilding,externalworksandservices.Ifdiscoveredon-siteduringconstruction,thesehiddenorunknownelementscanhavesignificantprogrammeandcostimplications.

Inourexperience,arigoroussetofplannedsurveyswillhelpuncoverissuessuchasasbestos,dampandstructuralproblems,whichcanbeplannedforwithinthedesign.Thisavoidscostlydelaysordesignchangestotheprojectlateron.

Oursurveysareusuallyphasedtoavoidunnecessarydisruptionandcontractorcosts.

Aninitialvisualsurveyisundertakentodetermineinformationreadilyavailableandhighlightareaswherefurtherinvestigationmightberequired.Wethendesigntargetedintrusivesurveystoinvestigatehiddendetailswhichneedtobeexposedtobefullyunderstood.

Webelievethatthisphasedapproachisthemostefficient.Itavoidsthecostofacontractorbeinginattendanceduringthevisualsurveyandgivesadequatetimeforthevisualsurveyresultstobefullyconsideredinthecontextoftheproposeddevelopmentbeforeadecisionismadetomovetoanintrusivesurvey.

Thesurveyswhichusuallycreatechallengesare:

• Geo/environmentalsiteinvestigation;

• Asbestossurveys;

• Timberanddampsurveys;

• Structuralsurveys;

• Mechanicalsurveys;

• Electricalsurveys.

Simplyput,themoreweknowinadvance,thelesslikelytheprojectwillbesubjecttocostincreaseandtimedelayslateron.

mAnAging hidden Risks

17

18

Carbon management >

Ourexpertsincarbonmanagementcanprovideourclientswithstrategicadvicetohelpachievelongtermreductionincostsandcarbonemissionsandaccessfundingstreams,aswellashelpschoolsimplementanenergyefficiencyprogramme.

Wecanprovideadviceonadministrativecompliance,suchasregistration,reporting,buyingorsurrenderingallowances;energymanagementsuchasmeteringstrategy;andCarbonReductionCommitmentstrategy,suchasbenchmarksandtriggerpoints.

19

WecurrentlyworkwithSalix,anindependentsocialenterpriseandnotforprofitcompanylimitedbyguarantee,providingfundingforUKpublicsectorbodiestoinstallproventechnologieswhicharecosteffectiveinsavingCO2andenableanyfurtherenergysavingtechnologiestoworkattheirbest.

Salixprojectsincludeinsulation,lightingandheatingupgrades,ITimprovements,swimmingpoolcovers,voltagereductionandbetterboilers.

ThroughamixtureofloansandgrantsSalixhasengagedwitharound640publicsectorbodiesandtodatehasfundedover4,000projects.Wehavealsoimplementedaprogrammeofworksforenergycompanynpower,todeliverasignificantreductioninenergyuseinover300primaryandsecondaryschoolsintheUK.

Aspartofnpower’senergyefficiencyprogrammeinUKschools,weundertooktheprovisionoftechnicalenergysurveystohelpschoolsunderstandhowtheyuseenergyandprovidedsubsequentopportunitiestoimproveenergyefficiency,whilstconsideringhowrenewabletechnologiesmaybeintroducedattheirsite.

Throughourdetailedenergysurveysandcomprehensivereports,wehelpschoolsidentifyhowimprovementscouldbemadetoaspectswhichaffectenergyusesuchasbuildingfabric,lighting,power,meteringcontrolsandenvironmentalconditions.

Weareabletoreviewthepotentialuseofrenewabletechnologiesateachsite,includingwindpower,solarphotovoltaics,solarthermal,combinedheatandpower,heatpumpsorbiomassboilers.

Weprovideclientswithaprioritisedlistofrecommendationsindicatingpotentialsavingsin£,CO2andkWh’s,costtoimplementandpaybacktohelpthemmakeinformedchoicesabouthowtoprogress.

eneRgy sAVing AdViCe

Salix Finance Energy Efficient ICT Workshop –

Nottingham Trent University

23rd September 2010

Our mission is to work with the public sector to reduce carbon emissions through investment in energy efficiency and

renewable technologies.

20

‘AstheTechnicalManagementServicescontractorforSalixsince2008,weprovidetechnicaladvice,duediligence,administrationandotherschemesupportnationallyonacall-offbasis.Thisplacesusinauniquepositiontoprovidedetailed,triedandtrustedadviceaboutenergysavingtechnologiestoourclients.’

ellie horwitch-smith Carbon management Consultant

21

WehavedevelopedatoolcalledCOREMthatestimatesCO2savedasaresultofundertakingplannedessentialmaintenanceprojectstoexistingbuildings.Theideabeingthatwhereprojectsarecarriedoutthataredrivenbyessentialmaintenance,thereisveryoftenacarbonsavingachievedthroughtheinstallationofnewermoreefficientequipment,butthisisoftennotrecordedasitisregardedasmaintenanceratherthan‘carboninitiatives’.

Thereisaneedforauthoritiestorecordanddemonstratetheircarbonsavingsandthankstoourwork,EssexCountyCouncilwereabletodemonstrate22tonnesofCO2savingsontheiressentialmaintenanceprogrammefor2008/9,andover100tonnesin2009/10.

ThistoolcanbeusedasapowerfuldemonstrationofaLocalEducationAuthority’sCarbonReductionCommitmenttoallitsbuiltenvironmentactivities.

CARBOn sAVings And CAlCulAtiOns

holmes Chapel library

22

Atkins’ unique set OF CARBOn tOOls

We’vebeendevelopingacomprehensivesuiteofcarbontoolstohelporganisationsreducecarbonandtohelpourstaffunderstandwherecarboncanbe‘designed-out’.

mAsteRPlAnning

Identifies,quantifiesandvisualisesthecarbonimpactsofdevelopmentmasterplans.

Atkins RemOte teChnOlOgy

RemotelymonitorsandcontrolsplantequipmentandFMsystemstomanageabuildingportfolio’senergyuse.

ROAdmAP

Usesmind-mappingtechniquestoplanbusinessactivitiesinrelationtocarbonconsequences.

knOwledge BAse

Calculates,analysesandassesseslow-carbonoptionsusingalibraryofverifiedcarbondata.

tRAFFiC AnAlysis

Translatesexistingtrafficdataintoestimatesofcarbonemissionswithinamonitoredarea.

RelAtiVity

Createschartstoshowthelinkbetweencarbondeterminantsandthecarbontheyproduce(orsave),andcomparesscenarios.

tRAVel BehAViOuRs

Estimatescarbonforajourneystoaspecificlocation,andproducesjourneyplanstoencourageuseoflow-carbontransport.

Buildings

Useskeybuildingfactors,servicesandoccupancyparameterstoestimateabuilding’soperationalcarbonfootprint.

23

Aspartofourcommitmenttolowcarbondesign,wecontinuouslylookforwaystodemonstratewhatcanbeachievedthroughacarefullyconsidereddesignstrategywhichencompassesallaspectsoffeasiblepassiveandrenewablesustainablesolutions.OnesuchprojectisDeneSchool.

AspartofaresearchprojecttocreateazerocarbonschoolfortheBSFDurhamproject,ourteamofexpertscarefullyanalysedtheexistingbuildingstockatDeneSchool.Itisproposedthattheexistingwestfacingblockisretained,thestructureofwhichcontainsabout30%oftheembodiedenergyofthebuilding.

However,theexistingenvelopecreatesseriousenvironmentalperformanceissueswherethebuildingistoohotinsummerandtoocoldinwinter.

Asolutionhasthereforebeenproposedthatthisisrecladwithagoodquality,welldesignedenvelopetomatchtheproposednewbuildelementsoftheschool.

dene school Durham,UK

Client DurhamCountyCouncil

status Research&Development

date 2010

CARBOn sAVin

g Res

eARCh

CAse st

udy

24

2016Low Carbon Design

9.1

-11.2

2002National Benchmark

44.6

2006Current Design

34.3

2016Low Carbon Design

7.79

-11.2

2002National Benchmark

35.1

2006Current Design

24.8

Regulated Carbon Dioxide Emissions

Unregulated Carbon Dioxide Emissions

Kg

CO

2/m

2 pe

r ye

ar

-20

-10

0

10

20

30

40

50

-20

-10

0

10

20

30

40

50

Kg

CO

2/m

2 pe

r ye

ar

Right:Comparison of carbon emissions of the national benchmark, current design and the proposed low carbon design.

25

26

making the most of iCt >

21stcenturyschoolsareheavilyreliantonaneverdevelopingtechnology.SchoolsoftenneedhelpindevelopingtheirICTstrategy.WebelievethatoureducationICTconsultancyisonepartofawiderchangeprogrammeinvolvedintherefurbishmentofeducationalinstitutions.

WecanadviseindividualschoolsorlocalauthoritiesonthebestuseoftheircapitalbudgettomaximisetheICTeducationalimpact.

WearenotcommerciallylinkedtoanyICTservice,systemorinfrastructureprovidersoouradviceisimpartialandtailoredtosuittheneedsofeachclient.

27

WeunderstandthatanICTstrategymustsupporttheeducationalvisionandbeflexibleenoughtoadoptnewtechnologieswhichwillemergeinfutureyears.

Awell-plannedandeffectiveICTprovisionwillhelpimprovethequalityoflearningandteaching,byprovidinganinclusiveandinnovativelearningenvironmentwhichrespondstotheneedsofschoolpupils,teachersandcommunityusersalike.ICTcanunderpineachschool’sstrategyforpersonalisedlearning,andwecombineourknowledge

oftheeducationalagendawithproventechnologyandbestpracticeprocurementmethodologies.

Thisensuresthatourproposedsolutionsaregoodvalue,workproperlyandmeettherealeducationalneedsoflearnersandteachers.

OurindependenceinthisspheremeansthatwedonothaveanyhiddenagendawhenadvisingonICTsystems,hardwareorsoftware.

west thurrock Primary schooleduCAtiOnAl iCt COnsultAnCy

28

29

‘ThenewICTsuiteatHipperholme&LightcliffeSecondarySchoolinHalifaxisastunningexampleofincorporatingICTintotheheartofthecurriculum.’

Rajinder sanghera iCt Consultant

30

hipperholme & lightcliffe secondary school

31

32

Refurbishment and remodelling > Refurbishmentisoftenamoresustainablesolutioncomparedtonewbuild,becauseitavoidsthereleaseofembodiedcarbonandcreationofwaste.Essentiallyitisaformofrecycling.

Towhatdegreerefurbishmentorremodellingisrequiredwillneedtobeconsideredonacasebycasebasis.Clearlyabalanceneedstobedrawnbetweenretainingembodiedenergyandminimisingwasteagainstensuringthatthebuildingisfitforpurposeandperformsefficientlyoperationally.Schoolbuildingtypescanbegenerallygroupedinto:

• Victorian• Postwarandinterwar• Systembuild• Listedandheritage.

33

ViCtORiAn Buildings

Victoriansexperimentedwithnewformsofconstructionandnewmaterialswhichwereoftenpoorlyunderstoodand,attimes,entirelyinappropriate.Asaconsequence,problemssuchasstresscracksarecommonaswellasvulnerabilitytodifferentialmovementbetweentheframeandthecladding,settlement,vibration,andfreeze/thawmoistureexpansion.

Whilstthecombinationofquirkyarchitectureandoftenstrikingformmeansthatsuchbuildingsareoftenwelllovedbyitsusersandthelocalcommunity,problemswithleakypipes,inflexiblelayoutanddeterioratingstructurecalltimeforanupgrade.ThereareusuallyseveralpositiveaspectsofVictorianbuildingswhichcanhelpintheirtransformation:highceilingswhichcansometimesaccommodatemezzaninefloorsandlargewindowswhichletinanabundanceofnaturallightandofferpotentialfornaturalventilation.

OurprojectforPlymouthHighSchoolforGirlsisagreatexampleofhowwetookanawkwardspacewithinaconstrainedsiteandturneditintoawelllovedandvaluablelearningenvironment.

34

Thisprojectsuccessfullyrejuvenatedandtransformedanunderused,wornoutfacilityintomajorasset.

Onarestrictedandconstrainedinnercitysite,PlymouthHighSchoolforGirlsoccupiesthesiteoftwoformerVictorianeducationestablishments,whichwereamalgamatedandhavebeenextendedovermanydecadesbutinflexibleinlayout.Asaconsequence,theschoolhadtwohallsofsimilarsize,oneofwhichwasusedforavarietyofusesincludingagym,corridorandexaminationroom.Thisneglected,impracticalspacehadthepotentialtobeconvertedintoadecentsizedlibraryandresourcecentrewhichtheschoolsodesperatelyneeded.

AsaGradeIIlistedbuilding,suchchangesneededcarefulconsideration.Theexistingfloorwasnotstrongenoughtotakeonlibraryloadingswithoutstrengthening,buttherewasenoughheighttocreateamezzanine.Thewallsweretestedandfoundstrongenoughtosupportanewstructure,butthechallengewastodevelopastructurethatcouldbeinstalledwithextremelylimitedaccess.

Asteelstructurewasthesolution,whichwasbroughtinthroughanexistingwindowopeningandassembledinthehall.Thedesignphilosophywastocreateacleardifferentialbetweenthenewandtheoldandthenewsteelstructurecreatesan‘industrialchic’tothespace.Integrallightingwasusedandtheshelvingshapedtocreateanopennessandlightnesstothemezzanine.

Thecoloursandmaterialswerecarefullychosentoprovideastimulatingandvibrantspace,witheasilymoveablefurnituresothespacecanbearrangedformallyandinformallyforseminars,presentations,examsorgroups.FullITfacilitiesandlightingwhichcanbecontrolledtosuitactivitiescompletesthisvibrantandadaptableheartoftheschool.

Thisprojecttookaforgottencornerandcreatedplaceoflastingvalueandmostimportantly,iswelllikedandasuccesswiththestudentsandstaff.

Plymouth high school for girls Plymouth,UK

Client PlymouthCityCouncil

Value £1.5m

status Complete

date 2009

CAse study

ViCtORiAn Building

35

‘ProjectssuchasPlymouthHighSchoolforGirls,wherethepracticalitiesof21stcenturylearningandteachingmustworkwithinthelimitsofahistoricbuilding,areperfectopportunitiesforustoapplyourtechnicalexpertise.Innovativesolutionsarecalledforandourteamsareadeptatexploringalternativeapproaches,enablinggoalstobeachievedassensitivelyandefficientlyaspossible.’

matt quick Building surveyor

36

the library installed on a new mezzanine floor inserted within the existing building.

37

POst wAR & inteR wAR

BetweentheFirstandSecondWorldWarsandimmediatelyafterwards,schoolarchitecturewasdominatedbytheinternationalmodernstyle.Thismanifestedasconcreteframedbuildingswithflatroofs,normallynomorethanthreestoreystall.

Theresidualproblemspresentedbythisbuildingstockareassociatedwithpoorthermalperformance,badacoustics,leakywindowsandroofs,summertimeoverheatingandthepresenceofasbestos,tonameafew.

Before

new student social space

After

38

Hipperholme&LightcliffeSecondarySchoolandSixthFormCentrehadapressingneedforextrateachingspace,improvedcirculationand,mostimportantly,abetterself-image.Byengagingwiththeschoolandapplyingimaginativesolutionswehaveprovidedaninspiringdesignthathasredefinedtheschool’simage.

Withinthescopeofthedevelopmentisanew‘hightech’resourcecentre,atwo-storeydesignandtechnologyblock,additionalchangingroomsforincreasedcapacity,improvedsixthformfacilitiesandclassroomsandanewadministrationblockwithentranceatrium.

Themaindesignfeatureoftherevitalisedschoolisanewcurvingwallfaçadewhichencompassesbothnewandexistingbuildings.Thisdeliversthefacilitiestheschoolrequires,createsapositivelearningenvironmentandsendsoutapositivemessagetothecommunity.

Afeature‘lipsculpturedesk’wasthewinningentryinastudentdesigncompetitionwhichgeneratedconsiderableinterestwithintheschool.The‘lipdesk’isnowresidentinthefoyerasyouentertheschool.

Parkingandbusrouteswerealsorevisedtoprovidebetteruseoftheexternalspace,creatingadditionalfacilitiesandallowinglandscapedesignfeaturestobeincorporatedintotheschoolentrance.

hipperholme & lightcliffe secondary school & sixth Form College Halifax,UK

Client CalderdaleCouncil

Value£3.3m

status Complete

date 2007

Left:the existing buildings were linked with this new curving, steel and glass clad structure which solved internal circulation issues and gave the school a new image to its community.

CAse study

POst wAR & inteR w

AR

39

Duringthe1960sand1970safasttrackconstructionsolutionwasoftenusedtoprovideschoolsinresponsetotheBabyBoomandlackofskillsaftertheSecondWorldWar.

Thesesystembuildsolutions,sometimescalledCLASPorSEAC,wereneverintendedtobealongtermsolution,howevermanyauthoritieshavehadtodotheirbesttocontinuetomaintainsuchbuildingstock,duetolackoffunding.

Synonymouswithleakyroofs,structuralproblemsandasbestosissues,manybelievetheonlycosteffectivesolutionistodemolishthisbuildingtypeandreplacewithanewfacility.

Refurbishingasystembuildschoolmayseeminsurmountable,butourexperienceandknowledgeofthesebuildingsshowsthatitispossibletocreateanappropriate,brightandmodernlearningenvironment.Forexample,mostsystemstendedtobebuiltusingasteelframe,givingopportunitiesforinternalremodelling.

system Build

40

GreenbankisaSpecialSchoolwithresidentialprovisionandcatersforupto96pupilsintheagerange6-18.

Atkinswerecommissionedtodeliveranewbuildextensionwithinternaladaptationstotheexistingschool,forchildrenwithAutisticSpectrumdisorder.

Atkinsmulti-disciplinaryteamprovidedArchitecture,StructuralEngineering,BuildingServices,LandscapeDesignandProjectManagement.

Thenewextensionconsistedofathreeclassroomextensionandmajorinternaladaptationsoftheexistingtwostoreyschool.

Thebuildingwasdesignedwith‘sustainability’highontheagendaforthetightbudgetavailable.Atimberframedconstructionwasselectedwithmaterialschosenthatcouldberecycled.

Highlevelsofinsulationwereincorporatedandenergysavingfittingsinstalledtoachieveverylowrunningcosts.

AtkinsworkedcloselywithallstakeholdersandparticularlywiththestaffatGreenbankSchooltoestablishabriefandtodeliverwhatisnowasuccessfulASDdepartment.

Theprojectwascompletedonprogrammeandonbudget.

greenbank Residential special schoolHartford,Cheshire,UK

Client CheshireCountyCouncil

Value£650k

status Complete

date 2006

CAse study

system Build

41

Bytheirveryexistence,eachlistedandheritagebuildinghasuniquerequirementswhenundergoingrenewal.WeundertakeconsultationwithconservationsocietiessuchasEnglishHeritage,toensurethatanychangeswillnotaffectitsspecialcharacteristics.

Byestablishingfrequentopenandhonestcommunicationbetweenallparties,weensurewefullyunderstandtheheritageissues,andthatourdesignresponseissympathetictothebuilding’sspecialaspects.Weworkwiththeconservationofficer,usersandlocalcommunitytohelpthemunderstandtheaimoftheprojectandreachacollectivelyagreed,suitablesolution.Thishelpsensurethateveryoneisworkingtowardsthesamegoals,withanyconcernsorissuesbeingaddressedontheway.

Ouraimistorenewthesecherishedbuildingsothattheyremainusefulandrelevantto21stcenturylearning.

listed And heRitAge Buildings

42

ThisprojectchallengedAtkinstosympatheticallyrefurbishandblendolderlistedbuildingswithbrandnewfacilitiesontheRichmondSchoolcampus,whichcontainsadiverserangeofbuildingsreflectingarchitecturetrendsofthelast70years.TheschoolissituatedonalargesitewithbeautifulviewsacrosstheValeofYorknearRichmondinNorthYorkshire.

AtkinswascommissionedtoundertakeanextensivemasterplanningandremodellingexerciseoftheexistingRichmondschoolcampustocombinetwodisparatesitestocreateaunified,cohesiveschoolforpupilsfromyears7-13.Weareprovidingfullmulti-disciplinarydesignservices(architecture,landscapearchitecture,mechanicalandelectricalengineeringandstructuralengineering);BREEAMassessor;environmentconsultancy;acoustics;ecology;quantitysurveyingandemployers’representative.

Significantelementsoftheexistingbuildingson-sitehavebeenretained,includinga1940sGradeIIlistedbuilding,tobeusedasthenewSixthFormCentrefor300students.Asthisbuildingsitsindependentlywithintheschoolcampus,thishelpscreateaseparate

identityforthesixthformandenhancesitsstatusinspecialistCreativeArts.

Theprojectalsoincludessubstantialnewbuildaccommodationincludingfullyequippedartrooms,sciencelabs,musicrooms,kitchenanddiningfacilitiesanda2,140sqmsixcourtsportshallwithseparatefitnesssuiteandactivityhallprovidesstateoftheartfacilitiesforpupilsand,throughRichmondshireLeisureTrust,communityusealike.

ThedesignteamcloselycoordinatedwithEnglishHeritagetoensuredesigndecisionsmetwiththerigorousrequirementsofbuildinglisting.Forexample,thewindowpatternonthenewbuildingwasselectedtoavoiddistractingfromtheadjacentlisted1940srectilinearblock.Thiswaskeytosecuringplanningapprovalforthisdevelopment.

Thenewdesignopensuppossibilitiesfortheschooltodeliveramoreflexiblecurriculum,offermorefacilitiestothewidercommunity,providehighqualityworkingenvironmentsforstaffandprovidestateoftheartlearningspacesforpupils.

Richmond schoolRichmond,UK

Client NorthYorkshireCountyCouncil

ValueUndisclosed

status On-site

date Completionduesummer2012

Left:Our solution to update this building at Richmond school, north yorkshire needed to be sensitive to the existing grade ii listed, 1940s school building. we created a 21st century specialist sixth form facility which retained its distinctive identity, yet still integrated with the unified campus for the school.

CAse study

listed Building

43

TherefurbishmentandremodellingoffourexistinghallsofresidencebuildingsatReadingUniversityisagoodexampleofthemulti-disciplinarypracticeswithinAtkinsworkingcloselytogether.Thedisciplineswerearchitecture,buildingservicesandprojectmanagement.Extensiveconsultationsbythedesignteamwerekeytothesuccessofthisproject.

Childs hall

ChildsHallhas375studybedroomswithfullcateringand84self-cateredrooms,allwithdatapoints.Thereisalibrary,acomputerroom,abar,twoTVroomsandasnookerroom.

Bridges hall

BridgesHallisanexistingpurpose-builthall,builtin1970.Therefurbishedbuildingnowprovides302roomsinthemainhallwhicharefullycateredforaswellasself-cateredaccommodationinthenewwingwith156rooms.

Theaimoftherefurbishmentwastoincreasetheusabilityofthespaceandallowthestudentstointeractandsocialiseandworktogether.

Thehallnowincorporatesacomputerroom,alibrary,alaundryroom,abar,commonrooms,musicroomandTVroom.Therearealsosquashandtenniscourts.

wantage hall

WantageHallhastwoparts.WantageOldCourtisaGrade2listedbuildingopenedin1908.Itnowaccommodatesmorethanonethirdofthe247students.WantageNewCourtwasaddedin1970tothenorthendofOldCourtandhalfofWantage’sstudentslivehere.

Thereare233singlestudybedroomsand7largesharedrooms,mostofwhichnowhavewashbasinsandallhavedatapoints.Thehallsalsohouseabar,acommonroom,TVroomandmusicpracticeroom.

university of ReadingReading,UK

Client UniversityofReading

Value£2.5m

status Complete

date 2002

CAse st

udy

heRitA

ge Build

ing

44

45

46

Reuse and conversion >

Takingaredundantbuildingandturningitintoathrivingschoolwhichmeetstheneedsofitslocalcommunityisawonderfulwaytorecycleanexistingfacilityandcreateasustainableestate.

Clearly,inordertosucceedinthisway,avarietyofchallengesneedtobemet.Notleastwithregardtotheconsiderableamountoflegislationthatneedstobesatisfiedtoconvertthebuildingforeducationaluse.Atkinshaveconsiderableexpertiseinthisarea.

47

Changingtheuseofanexistingbuildingandturningitintoasuitablelearningenvironmentisnomeanfeat.Themainchallengestobefacedincludethelayoutofexistingbuildings;thecapacityandefficiencyofexistingservicesandsystems;abilitytocomplywithcurrentlegislativerequirements;theenergyefficiencyofthebuildingfabric;overallsitelayoutandconstraintsandhazardoussubstances.

Buteachofthesechallengescanbeovercomewiththeapplicationofourexpertise,creativityandabitofpatiencedrivenbyourclients’passiontomakeithappen.

Reuse And COnVeRsiOn

48

Client DepartmentfortheEnvironment,FoodandRuralAffairs

Value£24m

statusComplete

date 2005

Awards•‘OverallWinner’and

‘SustainabilityWinner’:RICSAwards2006

AtkinswascommissionedtoprovidedesignservicestorefurbishtheGradeIlistedNobelHouse,theninestorey1920sflagshipofficebuildingandprimaryinterfacewiththepublicfortheDepartmentforEnvironment,FoodandRuralAffairs(DEFRA).

Theaimwastoprovideamodernandefficientworkingenvironmentfor750staffcapableofbeingexpandedtoaccommodateafurther120duringacrisisbyembracingbestpractice,safety,design,sustainability,energyefficiencyandcustomercare.

Theexistingcellularofficespaceswereopeneduptocreateanopenplanoffice,assistingthenaturalventilationforthebuildingandprovidingamoreproductiveandcomfortableworkingspace.

Ahi-techtranslucentfabricroofingmaterialhasbeenusedtoconvertthenorthlightwellintoaheatedatriumspace.Thisnewspaceprovidesacentralmeetingareaandabreakoutspace.

Theexistingcanteenwasexpandedintoanewrestaurantcateringfor120people.Thisislinkedtoconferencesuitesontheothersideoftheatriumviaanewbridgelink.

Workwascarriedoutoverninephaseswhilstthebuildingwasfullyoccupiedwithdecantofstaffacrossotherfloors/otherbuildingstoexecutetheworkswithminimumdisruptionandtoensureDEFRA’sbusinesscontinuedunhindered.

Sustainabledesignanduseofmaterialswasahighpriorityandtheprojectachievedan‘Excellent’BREEAMrating.Thebuildingisnaturallyventilatedandcooledbyopeningwindowsthathavebeenretainedonallexternalelevationsandinternallight-wellelevationswhereverpossible.Theatriumspaceprovidesastackeffecttoaidindrawinginfreshairandventilationisfromautomaticventsatthetopoftheatrium.EnergysupplywasmademoreefficientbyusingagasturbineCHPunitproviding25%oftheelectricalload,hotwaterandcoolingviachillers.

nobel house deFRA headquartersLondon,UK

Reuse And COnVeRsiOn

CAse study

49

50

‘Refurbishmentofbuildingfaçadesoffersthesinglebiggestimprovementtointernalenvironmentthananyotherbuildingelement.Improveddaylight,betterventilation,morereliableairquality,reducedheatgainsandlossesallcometogetherresultinginlowcarbon,highqualitylearningenvironments.’

shabna Jobraj Building services engineer

51

52

Refresh and repair >

Fromasingleschoolthatneedsaboilerreplacementorredecorating;totheassessmentofwholeschoolestatestoformulatecosteffectivemaintenanceandrenewalplans,wecanhelp.

Ourexperienceoflongtermstrategicrelationshipswithlocalauthoritiesmeanswehavetheknowledgeandexpertiserequiredtohelpcreateandimplementeffectivestrategicassetmanagementplans.

53

stRAtegiC Asset mAnAgement PlAnning OxFORd sChOOls ReView

AtkinsprovidedaseamlessservicetoOxfordshireCountyCouncilonthereorganisationofeducationinOxfordCityareafromafirst,middleandupperschoolsystemtoaprimaryandsecondarysystemfrominceptiontocompletion.

AtkinsDesignteammembers,PlannersandSurveyorsworkedondifferentaspectsofthereviewforapproximatelysixyears–assistingwitheverystagefrominitialpublicconsultationtodisposalofthefinalsurplussite:

• APrincipalPlannerandaPrincipalArchitectworkedwithOxfordshireCountyCouncilofficersontheinitialstrategytoworkoutthepracticalitiesofthereorganisation.Thisincludedassessmentofexistingschoolsandbuildingsaswellasthealternativedevelopmentoptionsforpotentiallysurplussites.Thisworkwascarriedoutoveratwoyearperiodpriortoimplementationofthestrategy.

• AnumberofAtkinsArchitectsthenworkedonthedesignandconstructionofnewschoolsandnew-buildadditionstoanumberofothersaspartofthereview.

• AtkinsPlannersachievedplanningpermissionfordisposalofthesurplussitesandarrangedalltheapplicationsfor‘disposalconsent’fromthe(then)SecretaryofStateforEducation&Skills.

• Obtainingplanningpermissionincludedagreementofdevelopmentguidelines,overcomingtheissueofdevelopmentonplayingfieldswhichtheCityCouncilhaddesignatedasrecreationlandinitsLocalPlanandachievingsatisfactoryaccessarrangements–whichinsomecasesrequireddetailedworkwiththeHighwayAuthorityandthelayouttoformpartoftheoutlineapplication.

54

• Eachpermissionwasdependentuponacomplexplanningagreement(negotiatedbyAtkinsonbehalfoftheCountyCouncil)coveringaffordablehousing(includingtypeandtenuremix),trafficandtransportpoints(egtrafficcalming,footway/cycleways,junctionimprovements)andcontributionstolocallibraries,communitysport/leisurefacilitiesandpublicart.

• AtkinsValuersproject-managedandimplementedthedisposalofsevensurplusschoolsiteswhichproducednetreceiptsinexcessof£40million,tofundthereorganisationoftheschoolstructureandconstructionofnewpremises.ThisincludedcompletionoftheplanningagreementsandworkingcloselywithSolicitorstoproduceotherlegaldocumentsincludingsalecontractsandtransfers,overageagreements,ransomstripleasesetc.

• Marketingwascarriedoutentirely‘in-house’,andinadvanceofclosureoftheschoolstoavoidtheproblemofemptybuildingsandtoensureaconstantflowoffundingtomatchthedevelopmentprogramme.Thisrequiredstrongprojectmanagementandsensitivityinequalmeasures,astheschoolrelocationsinvolvedfearsanduncertaintiesforthestaffandpupils.Allthereceiptsweredeliveredexactlyontimeandmetallbudgetaryrequirements.

• Throughoutthereview,therewascloseliaisonwithAtkinsBuildingSurveyorstoensurethatemergencyandplannedmaintenanceworksfittedwiththeproposedconstructionprogrammeandthatnounnecessaryworkwasdoneatclosingschools–withoutprejudicingtheproperdeliveryofservicetostaffandpupilsinthoseschools.

55

NorthamptonshireCountyCouncilisengagedinareviewoftheeducationsystemwithinthetownofNorthampton,changingthethree-tierstructureoflower,middleandupperschoolstoatwo-tierstructureofprimaryandsecondaryschools.

Atkins(withLambertSmithHampton)hasadvisedandagreedwiththeCountyCouncilanappropriatestrategyforthedisposalof18surplusschoolsites.AtkinsPlannershavebeenprovidingtechnicalexpertiseinordertoobtainSecretaryofState’sconsenttodisposeofsurplusschoolplayingfields.ThisincludesundertakingdetailedareaassessmentsofschoolplayingfieldprovisionacrossNorthamptonandconsultationwithstakeholders.

AtkinsPlannershavealsosubmittedplanningapplicationsfortheredevelopmentofsurplusschoolsiteswiththesupportofAtkinsDesignteammemberswhohaveproducedindicativelayoutsforredevelopment.Manyofthesitesarelargeandrequireamulti-disciplinaryapproachtotheirdisposal.

Atkinshasco-ordinatedvariousassessmentstosupporttheplanningapplicationsincluding:

• EcologicalAssessments–toidentifypotentialconstraintstodevelopmentandrecommendmitigationmeasures.

• ArchitecturalAppraisals–toassessthearchitecturalsignificanceofsitesandidentifylistedbuildingsofhistoricvalue.

• Geo-DeskStudies–toidentifyground-relatedabnormalcostsandpotentialcontaminationsources.

• TopographicalStudies–toassessthetopographyofsites.

• TransportAssessments–toassessthepotentialimpactoftrafficgeneratedfromredevelopmentandaccesstothewiderhighwaynetwork.

• FloodRiskAssessments–toassesstheimpactofdevelopmentonthesurfacewaterdrainageofthesiteandsurroundingcatchments.

stRAtegiC Asset mAnAgement PlAnning nORthAmPtOn sChOOls ReView

56

AtkinshasalongandcontinuingrelationshipwithEssexCountyCouncilnowextendingbeyond15years.Thisrelationshiphasaffordedustheopportunityofassistingtheauthorityinstrategicallyassessing,improvingandmaintainingitsschoolestatetodeliverbestvalueforthepupils,staffandotherstakeholders.OurrolewithEssexCCinvolvesusinthedaytodaysettingofthestrategicgoals,totheimplementationofeithermulti-siteprogrammesorsingleschemes.

Thisopportunityhasprovideduswithuniqueskillsthatarereadilytransferabletoothersimilarclientsandtheirestatestodeliverbestvaluemaintenanceworks.

Sinceitsinceptioninthelate1990s,AtkinshasundertakenassetmanagementsurveysforEssexCountyCounciltoprovidedatarequiredbycentralgovernmentandtheauthoritytoundertakeshorttomediumtermbudgetplanning.

BothAtkinsandEssexCCsawthisasanopportunitytoenhancethebasicsurveycriteriatoaddressestatewidegenericmaintenanceissues,abilitytoinfluenceandimproveenergyusageandsustainabilityacrosstheestateandtoinformthecapitalprogramme.

Thistargetedapproachhasallowedforthelimitedfundsavailabletotheauthoritytobeusedweretheycanmakethemostimpactorimprovementforthestaffandpupils.

WorkingwiththeLocalEducationAuthority,weadviseontheneedsoftheschoolestatebasedonexpectedrollnumbersanddemographicspreadofpupils,whichthencanbeaddressedinanyplanning.

Weappraisethewholeschoolestatewithasurveyencompassingthecounty’s578schools,comprisingofnumeroustypesofbuilding,fromearlyVictoriantraditionalbuildingsto1960ssystembuiltornewlybuiltschools.

Manyofthesehavebeenextendedoradaptedovermanyyears.Thesesurveyshighlight,throughadetailedscoring/assessmentsystem,alistofprioritisedmaintenanceworkandaddressboththeschoolbuildingfabricandservices.

FollowingcompletionoftheworkweundertakereviewsandhavedevelopedforEssexCCasystemwherewecanvalidatethecarbonsavingsintonnesachievedbyundertakingallaspectsofthemaintenanceplan.Thishasindicatedsavingsofapproximately100tonnesofCO2.

stRAtegiC Asset mAnAgement PlAnning essex COunty COunCil

57

58

Our people >

59

AtAtkinsweprideourselvesonthequalityandcommitmentofourstaff.Ourunparalleledrangeofservicesmeanswehaveexpertsineveryfieldofdesignconsultancyandprocurement.Eachunderstandsthatthesuccessofarefurbishmentandremodellingprojectisdependentuponmakingmostofanexistingbuildinganditsgrounds.

Often,thiswillmeanfindingsolutionsthatenhanceandcelebratethehistoryandcultureofaschool.Inourmostsuccessfulprojectsourclientstalkabouthowwehavegiventheirschoolsgreatercoherence.Theyareoftenrelievedtofindthatwesolvetheireverydayissuesof:

pooraccess;badlylitandcrampedcorridors,andweoftenmakesignificantchangeswithoutlosingtheinherentcharacteranduniquenessoftheschool.

Buildingonthe‘collectivememories’ofaplacegivesusatremendousthrill.

Refurbishmentandremodellingprojectspresentuswiththeopportunitytosustainablyimprovethequalityofthebuiltenvironment.Thisisbothethicallyappealingandsignificantlycontributestothequalityoflifeforthecommunitiesinwhichourstafflive.

Thisiswhywegetoutofbedinthemorning!

Right:the Atkins team in a stakeholder and local community engagement design review.

60

61

south westAndyAlbutt

north westJohnMercer

walesLloydRoberts

north east

PhilipMcGuinness

scotland & northern ireland

StanDoyle

CentralLesleyWaud

london & south east

MalcolmHall

east Anglia

NickCoulson

62

sCOtlAnd & n. iRelAnd

stan doyledirector

Tel:[email protected]

CentRAl

lesley wauddirector

Tel:[email protected]

nORth west

John mercerdirector

Tel:[email protected]

sOuth west

Andy Albuttdirector

Tel:[email protected]

nORth eAst

Philip mcguinnessdirector

Tel:[email protected]

eAst AngliA

nick CoulsonAssociate director

Tel:[email protected]

wAles

lloyd RobertsAssociate director

Tel:[email protected]

lOndOn & sOuth eAst

malcolm halldirector

Tel:[email protected]

63