Refractory PPT IN 150 MW CFBC BOILER

download Refractory PPT IN 150 MW CFBC BOILER

of 25

Transcript of Refractory PPT IN 150 MW CFBC BOILER

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    1/25

    Prepared By:K.V.Sagar

    520TPH CFBC BOILER REFRACTORY

    Approved By:B.RaaRao!"#$%PP.

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    2/25

    REFRACTORY IN CFBC BOILER

    Fluidizd bed

    J-sealAsh return pipe

    Cyclone

    Inlet duct

    Combustionchamber

    Screen

    coils

    Lower part

    Outlet Duct

    Burner

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    3/25

    ! First pass.

    a& F'r(a)e

    *& F'r(a)e Bed.

    )& F'r(a)e )or(er+.

    d& Coa, )-'e+.

    e& F'r(a)e o',e.

    /& S)ree( )o,+.

    2& Cyclone zone.

    a& Cy),o(e arge area.

    *& Cy),o(e roo/.

    )& Cy),o(e *',,%(o+e area.

    d& Cy),o(e )o(e.

    "! J-Seal # J-Seal returnle$s.

    %! Cross o&er duct'COD!(

    )e*ractory zones+

    ,! Wind box.

    ! nder bed b!rners..! /nd0ass

    a& Header +ea, *o1.

    *& $a('a, door+ +oo*,o3er +ea, *o1.

    )& Se)o(d pa++ (,e area.

    d& E)o(o4er )a+(g.

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    4/25

    stpass+

    a& F'r(a)e *ed:

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterialas per site

    45ui&alentmaterial

    Fr+ ,ayer: 0 Fr+ ,ayer :65 $dd,e 3eg--ea(+',aedpo'r(gaera,

    $dd,e3eg- -ea(+',aedpo'r(gaera,

    I(+',)a+7700

    F(a,

    Layer: 60

    F(a,

    Layer: 85

    Heavy -g-

    a,'(')a+a*,e

    3ear

    re++a(p,a+)

    P-o+)a+ 80

    9or&P-o+)a+ 0

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    5/25

    *& F'r(a)e :

    1h2 'As

    perdrawin$!

    1h2 'As

    per site!

    3aterial as

    per drawin$

    3aterial as

    per site

    45ui&alent

    material

    60 60 Heavy -g-a,'(')a+a*,ere/ra)ory

    Heavy -g-a,'(')a+a*,ere/ra)ory

    P-o+)a+ 0;R.

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    6/25

    )& F'r(a)e )or(er+:

    1h2 'As

    perdrawin$!

    1h2 'As

    per site!

    3aterial as

    per drawin$

    3aterial

    as per site

    3odi6ed

    material

    60 60 Heavy -g-a,'(a)a+a*,e

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    7/25

    d& COAL CH>TES:

    1h2 'Asper

    drawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterialas per site

    3odi6edmaterial

    80 80 Heavy -g-a,'(a)a+a*,e

    Heavy -g-a,'(a)a+a*,e

    A))oa( ?BS%2

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    8/25

    d& F>R@A@CE O>TLET:

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial asper site

    3odi6edmaterial

    0 0 3ear re++a(p,a+)re/ra)ory

    3earre++a(p,a+)re/ra)ory

    P-o+)a+ 0%;R

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    9/25

    e& SCREE@ COILS:

    1h2 'Asper

    drawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial asper site

    45ui&alentmaterial

    80 80 3ear re++a(p,a+)re/ra)oryHeavy -g-a,,'(('

    )a+a*,ere/ra)ory

    3ear re++a(p,a+)re/ra)ory

    P-o+)a+ 0%;R

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    10/25

    Cyclone 7one+

    a& Targe O@E:

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial asper site

    45ui&alentmaterial

    Fr+ ,ayer: 80

    Fr+ ,ayer :80

    A,'('+,)ae*oard+

    A,'('+,)ae *oard+ Cera) *oard+

    Se)o(dLayer:220

    Se)o(dLayer: 220

    ,g- 3eg--ea(+',aed

    po'r(gaera,

    ,g- 3eg--ea (+',aedpo'r(g

    aera,

    I(+',)a+ % 00

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    11/25

    *& Cy),o(e Roo/:

    1h2 'Asperdrawin$

    !

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial asper site

    45ui&alentmaterial

    Fr+ ,ayer: 80

    Fr+ ,ayer :80

    A,'('+,)ae*oard+

    A,'('+,)ae *oard+ Cera) *oard+

    Se)o(dLayer:

    220

    Se)o(dLayer: 220

    ,g- 3eg--ea

    (+',aedo'r(

    ,g- 3eg--ea (+',aed

    po'r(gaera,

    P-o+)a+ 0%;R P,a+)

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    12/25

    )& Cy),o(e *',,%(o+e area:

    1h2 'Asperdrawin$

    !

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial asper site

    45ui&alentmaterial

    Fr+ ,ayer: 80

    Fr+ ,ayer :80

    A,'('+,)ae*oard+

    A,'('+,)ae *oard+ Cera) *oard+

    Se)o(dLayer:

    220

    Se)o(dLayer: 220

    ,g- 3eg--ea

    (+',aedo'r(

    ,g- 3eg--ea (+',aed

    po'r(gaera,

    I(+',)a+ % 00

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    13/25

    d& Cy),o(e )o(e

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial asper site

    45ui&alentmaterial

    Fr+ ,ayer: 70

    Fr+ ,ayer :70

    A,'('+,)ae*oard+

    A,'('+,)ae *oard+ Cera) *oard+

    Se)o(dLayer:

    75

    Se)o(dLayer: 75

    Lg- 3eg-

    *r)D+

    Lg- 3eg-

    *r)D+

    I(+',)a+ % 00

    F(a, F(a,

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    14/25

    a& %Sea,:

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial as persite

    45ui&alent material

    Fr+ ,ayer

    : 80

    Fr+ ,ayer :

    80

    A,'('

    +,)ae *oard+

    A,'('

    +,)ae *oard+Cera)*oard+

    Se)o(dLayer:

    720

    Se)o(dLayer: 700

    ,g- 3eg--ea (+',aed

    po'r(gaera,

    ,g- 3eg- -ea(+',aed po'r(g

    aera,

    I(+',)a+ %

    00

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    15/25

    *& %Sea, Re'r( Leg+:

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial as persite

    45ui&alent material

    Fr+ ,ayer

    : 20

    Fr+ ,ayer :

    20

    A,'('

    +,)ae *oard+

    A,'('

    +,)ae *oard+

    Cera)

    *oard+

    Se)o(dLayer:

    70

    Se)o(dLayer: 200

    ,g- 3eg--ea (+',aed

    po'r(gaera,

    I(+',)a+ 00 I(+',)a+ %

    00

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    16/25

    CO":

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial asper site

    45ui&alentmaterial

    Fr+ ,ayer: 80 Fr+ ,ayer :80 A,'('+,)ae*oard+

    A,'('+,)ae *oard+ Cera) *oard+

    Se)o(dLayer:220

    Se)o(dLayer: 220

    ,g- 3eg--ea(+',aed

    po'r(gaera,

    ,g- 3eg--ea (+',aedpo'r(g

    aera,

    I(+',)a+ ? 00

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    17/25

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    18/25

    >(der *ed *'r(er+:

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial as persite

    45ui&alent material

    Fr+ ,ayer

    : 50

    Fr+ ,ayer :

    50

    A,'('

    +,)ae *oard+ Cera) *,a(De Cera)*,a(De

    Se)o(dLayer:70

    Se)o(dLayer: 780

    Lg- 3eg--ea (+',aedpo'r(gaera,

    A,'(' *'**,e*a,,

    I(+',)a+ %00

    F(a, F(a, Hg- +re(g- Hyper )a+ %60 P-o+)a+

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    19/25

    Se)o(d Pa++:

    E)o(o4er Ca+(g:

    1h2 'Asperdrawin$

    !

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial as persite

    45ui&alent material

    Fr+ ,ayer: 780

    Fr+ ,ayer :780

    A,'('+,)ae *oard+

    A,'('+,)ae *oard+

    A,'('+,)ae*oard+

    Se)o(dLayer:72

    Se)o(dLayer: 72

    "o,oe*r)D+

    "o,oe *r)D+ "o,oe*r)D+

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    20/25

    Se)o(d Pa++:

    Se)o(d pa++ ( ,e:

    Header Sea, *o1e+:

    1h2 'As

    perdrawin$!

    1h2 'As

    per site!

    3aterial as

    per drawin$

    3aterial as per

    site

    45ui&alen

    t material

    80 80 3ear re++a(p,a+)re/ra)ory

    3ear re++a(p,a+) re/ra)ory

    P-o+)a+80

    1h2 'Asperdrawin$!

    1h2 'Asper site!

    3aterial asper drawin$

    3aterial as persite

    45ui&alent material

    750 750 Hg- +re(g-)a+a*,ere/ra)ory

    A,'(' *'**,e*a,,

    LC%5 =

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    21/25

    $a('a, door Soo *,o3er +ea, *o1e+:

    $a('a, door *r)D+:

    1h2 'As

    perdrawin$!

    1h2 'As

    per site!

    3aterial as

    per drawin$

    3aterial as per

    site

    45ui&alen

    t material

    700 700 Lg- 3eg--ea (+',aedpo'r(g

    aera,

    A,'(' *'**,e*a,,

    LC%5 =

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    22/25

    Sl(8O

    3aterialDescription

    Additi&e 9ater :ty)emar2s

    7

    Lg- +e

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    23/25

    Sl(8O

    3aterialDescription

    Additi&e

    9ater :ty)emar2s

    8 $dd,e

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    24/25

    Sl(8O

    3aterialDescription

    Additi&e 9ater:ty

    )emar2s

    5 A))oe( BS%20.7 % 0.2 5 S-'er o *e

    reoved 72 Hr+.

    2 A))op,a+ % 60@, @,

    P(e'a) -aerreG'red

    P,a+) Cree ? 0"

    I(+',)a+ % 770025 Ler

  • 7/25/2019 Refractory PPT IN 150 MW CFBC BOILER

    25/25

    0)4CA;1IO8S

    Expiry period.

    Proper storage. Proper equipment for mixing and application/cleanliness of mixtures.

    Measuring/batching tools/equipment.

    Mixing procedure.

    Good quality of water.

    Adding addities as per !EM recommendation. "ixing anchors as per drawing and quality of welding.

    #ituminous paint on anchors or P$% caps.

    %leanly ness of area where the lining to be applied.

    Proper shuttering.

    Expansion gaps with suitable materials. Proper application method i.e. ibration during pouring or casting& shuttering

    supports& dismantling procedure.

    Proper dry out as per !EM recommendation.