Reference point eng 2012

16
Integrating Process solutions & Customers’ needs REFERENCE POINT

Transcript of Reference point eng 2012

Page 1: Reference point eng 2012

Integrating Process solutions & Customers’ needs

REFERENCE POINT

Page 2: Reference point eng 2012

Pharmaceutical Regulations and standardsPharmaceutical Regulations and standards

Civil works – Rooms architectural design – HVAC – Lighting and Power Distribution (sockets)Civil works – Rooms architectural design – HVAC – Lighting and Power Distribution (sockets)

Utilities & Factory Automation

REFERENCE POINT is an engineering company in charge of supplying solutions to fit process solutions into Customer needs.Customers usually need to modify existing facilities and they request only one local supplier.RP is the key to have an advantage over competitors to ensure a complete solution for the customers, according to their demands.

Main Scope

Equipment solution

On site Installation

On site Interconnection

REFERENCE POINT

Page 3: Reference point eng 2012

Our experience allows us to provide solutions in several fields:•Engineering development (utilities adaption to new demands)•Mechanical works (Equipment installation and utilities) • Electrical works (Equipment connections and supplies)•Pneumatic works (Equipment connections and supplies)•Automation and control works (BMS, SCADA, MES and automation solutions, 21 CFR PART 11, etc., according to GAMP)•Civil works (Modification, and construction)•Pharma - Architectural works (Room Construction / modification, HVAC, lighting and sockets, electrical distribution, data networks)•Validation activities•Legalization activities

Main Scope

Service Fields

REFERENCE POINT

Page 4: Reference point eng 2012

Case Study for solid dosage

Case study for aseptic processing

Main Scope

Service Fields

Case Examples

REFERENCE POINT

Page 5: Reference point eng 2012

REFERENCE POINT:Granulation Example

REFERENCE POINT

Page 6: Reference point eng 2012

Basic Equipment

REFERENCE POINT

Page 7: Reference point eng 2012

Transportation and unloading

REFERENCE POINT

Page 8: Reference point eng 2012

On site Installation

REFERENCE POINT

Page 9: Reference point eng 2012

Equipment Connection

REFERENCE POINT

Page 10: Reference point eng 2012

Clean Room modification

REFERENCE POINT

Page 11: Reference point eng 2012

REFERENCE POINT:Aseptic Processing Example

REFERENCE POINT

Page 12: Reference point eng 2012

On site installation

REFERENCE POINT

Page 13: Reference point eng 2012

Electrical connection

Power

Pneumatic

REFERENCE POINT

Page 14: Reference point eng 2012

MESPW/WFI Loop

Electrical connection

HVAC

Steam and condensates

Boiler

HVAC instruments

MES connection

Drainage

REFERENCE POINT

Page 15: Reference point eng 2012

Clean Rooms

Floor

Lights

HVAC

REFERENCE POINT

Page 16: Reference point eng 2012

REFERENCE POINT

Contact

C/Jaén, 2 – 1º E28020 MADRID (SPAIN)Tel.: +34 91 579 56 [email protected]

MADRID