THE DESIGN PARTNERSHIP REDUCING RISK WITH BIM
Fo r UC Dav i s Des ign & Cons t ruc t i on ManagementOc tober 4 2011
![Page 2: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/2.jpg)
WHO WE ARE
About The Design Partnership
•Founded in 1979•45 Employees•Expertise in Science & Technology, Education, Healthcare, Public, Master Planning•BIM/Lean / IPD Leadership•Over $1 Billion Designed in BIM•Using BIM since 2005; 100% BIM since 2006•2008 AIASF Integrated Practice Honor Award Recipient
![Page 3: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/3.jpg)
REDUCING RISK WITH BIM1 What is Risk?2 Technology Introduction3 Construction Technology4 Case Study: VA Puget Sound5 Case Study: Stanford Cath Labs6 Case Study: Robbins Hall Renovation
![Page 4: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/4.jpg)
The Design Partnership LLP Architects + Planners
WHAT IS RISK?
• Altering “Risk = Cost” Equation
• Increase in Architect’s Exposure
• Decrease in Contractor’s Risk• Decrease in Owner’s Risk• Reduced Risk for All =
Reduced Cost
![Page 5: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/5.jpg)
![Page 6: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/6.jpg)
The Design Partnership LLP Architects + Planners
Unknown Consequences Of Sharing BIM Information
Design Only Information In BIM ModelExtensive Pre-coordinationFabrication From Design Models
Increased Exposure to Risk
Increase in Architect’s Exposure
![Page 7: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/7.jpg)
The Design Partnership LLP Architects + Planners
Reduced Coordination Errors Reduced Unknown Conditions More Efficient Workflow Cooperation & Collaboration Reduced Contingency
Increased Confidence & Reduced Risk
Decrease in Contractor’s Risk
![Page 8: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/8.jpg)
The Design Partnership LLP Architects + Planners
Decrease in Owner’s Risk
Reduced Bidding Costs Due To Reduced Contractor Risks
Reduced Risk Of – Change Orders From Unknown
Conditions– Coordination Changes– Fighting Among AEC Entities
Reduced User Changes Due To Better Pre-visualization And Planning
![Page 9: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/9.jpg)
The Design Partnership LLP Architects + Planners
Reduced Risk for All = Reduced Cost
Architect’s Exposure However
Architect’s Risk
![Page 10: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/10.jpg)
The Design Partnership LLP Architects + Planners
TECHNOLOGY INTRODUCTION
• Building Information Modeling (BIM)
• Virtual Simulation / Pre-visualization
• 3D Laser Survey• Clash Detection &
Coordination
![Page 11: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/11.jpg)
The Design Partnership LLP Architects + Planners
The Big BIM/IPD/Lean Idea
![Page 12: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/12.jpg)
The Design Partnership LLP Architects + Planners
Automatic Document Coordination
3D Systems Coordination
Virtual Building Simulation
Direct Fabrication
Project Delivery Improvement
![Page 13: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/13.jpg)
The Design Partnership LLP Architects + Planners
Building Information Modeling (BIM)
![Page 14: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/14.jpg)
BIM is a 3D Database
The Design Partnership LLP Architects + Planners
![Page 15: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/15.jpg)
Design Visualization
The Design Partnership LLP Architects + Planners
![Page 16: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/16.jpg)
Design Visualization
The Design Partnership LLP Architects + Planners
![Page 17: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/17.jpg)
Virtual Equipment Simulation
The Design Partnership LLP Architects + Planners
![Page 18: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/18.jpg)
The Design Partnership LLP Architects + Planners
![Page 19: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/19.jpg)
The Design Partnership LLP Architects + Planners
3D Laser Survey
![Page 20: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/20.jpg)
The Design Partnership LLP Architects + Planners
Clash Detection & Coordination
Where is the coordination error?
Structural Plan
Mechanical Plan
![Page 21: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/21.jpg)
The Design Partnership LLP Architects + Planners
Clash Detection & Coordination
![Page 22: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/22.jpg)
The Design Partnership LLP Architects + Planners
CONSTRUCTION TECHNOLOGY
• Direct Fabrication• Prefabrication• Capabilities
![Page 23: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/23.jpg)
The Design Partnership LLP Architects + Planners Images courtesy of Marelich Mechanical
Direct Fabrication
![Page 24: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/24.jpg)
The Design Partnership LLP Architects + Planners
Direct Fabrication
![Page 25: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/25.jpg)
The Design Partnership LLP Architects + Planners
Prefabrication
![Page 26: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/26.jpg)
The Design Partnership LLP Architects + Planners Image courtesy of Marelich Mechanical
![Page 27: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/27.jpg)
The Design Partnership LLP Architects + Planners
![Page 28: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/28.jpg)
The Design Partnership LLP Architects + Planners Image courtesy of Marelich Mechanical
![Page 29: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/29.jpg)
The Design Partnership LLP Architects + Planners
![Page 30: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/30.jpg)
The Design Partnership LLP Architects + Planners
3D Capable Trades• HVAC• Plumbing• Structural Steel• Precast Concrete• Rebar• Steel Stud Walls• Curtain Walls, etc.• Millwork• Unit Restrooms• Laboratories
![Page 31: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/31.jpg)
The Design Partnership LLP Architects + Planners
Relative Sophistication DisparityGeneral Contractors (Very Low to Low)Engineers (Very Low to Moderate) Architects (Low to Moderate) Subcontractors (Varies, some extremely high)
Maximize advantage of sophisticated players Enhance process for Subs already using 3D Mentor less advanced members Integrated Project Delivery
![Page 32: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/32.jpg)
The Design Partnership LLP Architects + Planners
CASE STUDY: VA PUGET SOUND
• Design of VA Puget Sound Mental Health & Research Project
![Page 33: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/33.jpg)
VA PUGET SOUND CAMPUS PROJECTCampus expansion of four distinct projects that are linked to Mental Health Treatment and Research. Associate Architect
Mental Health & Research Bldg. $104M 200,000 gsfExisting Hospital Seismic Upgrade $28M 162,000 gsfParking Structure (1000 stalls) $37M 400,000 gsfSite Work $8M 367,000 gsfTotal $177M 1,129,000 gsf
![Page 34: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/34.jpg)
VA PUGET SOUND CAMPUS PROJECTSite Plan
A Mental Health & Research Bldg.B Existing Hospital Seismic UpgradeC Parking StructureD Site Work
A B
C
D
![Page 35: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/35.jpg)
Exterior Renderings
VA PUGET SOUND CAMPUS PROJECTMental Health & Research Building
![Page 36: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/36.jpg)
STRUCTURAL
BUILDING SYSTEMS
![Page 37: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/37.jpg)
MECHANICAL
BUILDING SYSTEMS
![Page 38: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/38.jpg)
MECHANICAL
BUILDING SYSTEMS
![Page 39: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/39.jpg)
ELECTRICAL
BUILDING SYSTEMS
![Page 40: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/40.jpg)
TELECOM
BUILDING SYSTEMS
![Page 41: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/41.jpg)
LABORATORY
BUILDING SYSTEMS
![Page 42: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/42.jpg)
The Design Partnership LLP Architects + Planners
CASE STUDY: STANFORD CATH LABS
• Comparison of Cath Labs 7, 9, & 10
![Page 43: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/43.jpg)
![Page 44: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/44.jpg)
7
![Page 45: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/45.jpg)
Cath Lab 7: Siemens Biplane Cath LabConstruction Start: 2006
BIM Use: CAD Only
7
![Page 46: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/46.jpg)
7
9
![Page 47: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/47.jpg)
Cath Lab 9: Siemens Biplane Hybrid ORConstruction Start: 2009
BIM Use: Laser Scanning & Modeling to 2”
9
![Page 48: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/48.jpg)
3D Laser Scanning
The Design Partnership LLP Architects + Planners
![Page 49: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/49.jpg)
Existing Conditions Model to 2”
The Design Partnership LLP Architects + Planners
![Page 50: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/50.jpg)
New Work Model to 2”
The Design Partnership LLP Architects + Planners
![Page 51: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/51.jpg)
Construct
The Design Partnership LLP Architects + Planners
![Page 52: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/52.jpg)
7
9
10
![Page 53: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/53.jpg)
Cath Lab 10: Siemens Biplane Pediatric Cath LabConstruction Start: 20010
BIM Use: Laser Scanning & Modeling Everything
10
![Page 54: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/54.jpg)
Model Everything
The Design Partnership LLP Architects + Planners
![Page 55: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/55.jpg)
BIM Use $/SF % from CAD
Cath Lab 7 CAD 2,153 $/SFCath Lab 9 2” Standard 1,829 $/SF -15.0%Cath Lab 10 Everything 2,065 $/SF -4.1%
Construction Cost
Change Order Cost
*All figures in 2010 Relative Value
BIM Use $/SF % of Total
Cath Lab 7 CAD 267 $/SF 12.4%
Cath Lab 9 2” Standard 148 $/SF 8.1%
Cath Lab 10 Everything 16 $/SF <0.1%
The Design Partnership LLP Architects + Planners
*All figures in 2010 Relative Value
![Page 56: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/56.jpg)
BIM Use Unit Cost
Cath Lab 7 CAD Only 2,153 $/SFCath Lab 9 2” Standard 1,613 $/SFCath Lab 10 Everything 2,065 $/SF
BIM Use Change Rate
Cath Lab 7 CAD Only 12.4%Cath Lab 9 2” Standard 7.8%Cath Lab 10 Everything <0.1%
Construction Cost
Change Order Cost
*All figures in 2010 Relative Value
![Page 57: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/57.jpg)
The Design Partnership LLP Architects + Planners
ROBBINS HALL RENOVATION
• BIM Use on UC Davis Robbins Hall Phase 1 Renovation
- (E) and (N) Casework Database- Equipment Documentation- Arch/Mech Coordination
![Page 58: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/58.jpg)
![Page 59: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/59.jpg)
First Floor Plan - PROJECT PROGRAM
The Design Partnership LLP Architects + Planners
![Page 60: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/60.jpg)
![Page 61: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/61.jpg)
Casework Documentation
The Design Partnership LLP Architects + Planners
![Page 62: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/62.jpg)
The Design Partnership LLP Architects + Planners
Casework Documentation
![Page 63: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/63.jpg)
The Design Partnership LLP Architects + Planners
Casework Documentation
![Page 64: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/64.jpg)
![Page 65: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/65.jpg)
First Floor - EQUIPMENT PLAN
JORGE DUBCOVSKY
JAN DVORAK
ABHAYA DANDEKAR
DAVID NEALE
JEFFREY IBARRA
PAM RONALD
GENERAL EQUIPMENT
The Design Partnership LLP Architects + Planners
![Page 66: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/66.jpg)
First Floor - EQUIPMENT AXONOMETRIC
JORGE DUBCOVSKY
JAN DVORAK
ABHAYA DANDEKAR
DAVID NEALE
JEFFREY IBARRA
PAM RONALD
GENERAL EQUIPMENT
The Design Partnership LLP Architects + Planners
![Page 67: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/67.jpg)
Construction Cost
Change Order Summary
The Design Partnership LLP Architects + Planners
$ %
Change Orders $812,438 11.60%Final Construction Cost $7,004,281
$ %
User Additions $230,954 3.30%Engineering & Operations $191,182 2.73%Infrastructure Improvements $183,337 2.62%Unforeseen Field Conditions $122,938 1.76%A/E Coordination $84,027 1.20%
![Page 68: Reducing Risk with BIM](https://reader038.fdocuments.net/reader038/viewer/2022103013/54531f34af795984568b4cbf/html5/thumbnails/68.jpg)
THE DESIGN PARTNERSHIP
A R C H I T E C T S + P L A N N E R Swww.dpsf.com
Thanks!Questions?
Find the slides from this presentation on SlideShare.
Search for us by name: TheDesignPartnership
Or by our public profile: http://www.slideshare.net/TheDesignPartnership