1 1 Seminar 70SE01 Slide Phillip Yeung – EE forum Sept 2007 Reducing Energy Costs with Peak Shaving in Industrial Environments Speaker : Phillip Yeung Asia Pacific Business Development Power Monitoring & Control 2 Slide Phillip Yeung – EE forum Sept 2007 Summary I. Introduction II. Monitoring usage III. Load shedding IV. On-site generation V. Returning to « normal » VI. Customer example VII. Conclusion

Transcript of Reducing Energy Costs with Peak Shaving - Schneider

Page 1: Reducing Energy Costs with Peak Shaving - Schneider

1

1

Seminar70SE01

SlidePhillip Yeung – EE forum Sept 2007

Reducing Energy Costs with Peak Shaving in Industrial EnvironmentsSpeaker : Phillip Yeung

Asia Pacific Business DevelopmentPower Monitoring & Control

2SlidePhillip Yeung – EE forum Sept 2007

Summary

I. Introduction

II. Monitoring usage

III. Load shedding

IV. On-site generation

V. Returning to « normal »

VI. Customer example

VII. Conclusion

Page 2: Reducing Energy Costs with Peak Shaving - Schneider

2

3SlidePhillip Yeung – EE forum Sept 2007

I. Introduction

II. Monitoring usage

III. Load shedding

IV. On-site generation

V. Returning to « normal »

VI. Customer example

VII. Conclusion

4SlidePhillip Yeung – EE forum Sept 2007

I. Introduction

� What is peak shaving?• For industrial & commercial customers,

electricity prices are based on two elements:

– actual usage (kWh) – a penalty based on the highest point

of demand (or peak) within billing period (weekly, monthly or annually)

Page 3: Reducing Energy Costs with Peak Shaving - Schneider

3

5SlidePhillip Yeung – EE forum Sept 2007

� Bill breaks down into 2 major parts, energy consumption and demand

� Demand charges can be a large portion of the total bill

� This one of the sections of the bill where it can be controlled or reduced!!

I. Introduction

6SlidePhillip Yeung – EE forum Sept 2007

I. Introduction

� Different Utilities will have different tariff rates

� Classified into different consumer levels• Domestic ie. Residential• General service tariff ie. No demand charge

• Bulk tariff ie. Medium demand charge• Large power taiff ie. High demand charge

� Understanding tariff takes time, some tariff definitions can be from 4 – 15 pages! Know your charges will lead into potential savings

Page 4: Reducing Energy Costs with Peak Shaving - Schneider

4

7SlidePhillip Yeung – EE forum Sept 2007

� Consumption

• A charge based on a price per kWh� Demand

• A charge based on a price per kW, typically the peak kW of the billing period

� But…• Customer charge

• Power factor charge• Loss factor adjustment• Fuel adjustment costs

• Demand response credits/penalties• Many more….

I. Introduction

Main Components of Energy Cost

8SlidePhillip Yeung – EE forum Sept 2007

I. Introduction

� Demand is calculated using demand intervals, a short timeframe (often 15 minutes) during which overall usage is aggregated and tracked as a total

� The average calculated is the kW demand for this period

� Peak shaving is the ability to control your usage from a supplier during intervals of high demand, in order to limit or reduce demand penalties for the billing period

kW

time

Shaved Peak

Demand

Peak Demand

Peak Usage

rescheduled

to fit under

lower threshold

What is Demand?

Page 5: Reducing Energy Costs with Peak Shaving - Schneider

5

9SlidePhillip Yeung – EE forum Sept 2007

I. Introduction Calculation Methods

� Sliding Window block averaging

� Rolling Block, ie. 30mins block with 6 sub intervals

10SlidePhillip Yeung – EE forum Sept 2007

I. Introduction

� For large industrial & commercial customers who have usage levels that can vary significantly, peak shaving can help you:• Save money – by reducing the peak demand

penalty that your utility charges for times of highest usage

• > 10%-30% demand cost savings possible –depending on what type of loads and flexibility of the loads, ie. Loads can be moved to another time.

• Peak shaving systems can pay for itself in less than a year with large consumers, ie. > 5MVA

Page 6: Reducing Energy Costs with Peak Shaving - Schneider

6

11SlidePhillip Yeung – EE forum Sept 2007Initi@tive 2006/2007 - Auteur - Date

I. Introduction

II. Monitoring usage

III. Load shedding

IV. On-site generation

V. Returning to « normal »

VI. Customer example

VII. Conclusion

12SlidePhillip Yeung – EE forum Sept 2007

II. Monitoring Usage

� The first step in being able to control demand is to be able to monitor it

� A Schneider Electric power monitoring system allows you to monitor in real time how much energy you are consuming from the utility during any given demand interval

� With the collected data, you can determine what is your next demand and produce warning signals to avoid potential high charges

Page 7: Reducing Energy Costs with Peak Shaving - Schneider

7

13SlidePhillip Yeung – EE forum Sept 2007

Typicalmonitoring system network

14SlidePhillip Yeung – EE forum Sept 2007

II. Monitoring Usage

� Schneider Electric Power Monitoring systems can be set to predict the demand for the next period

� The predicted demand can give facility operators “time to act”

� Predicted demand is calculated using smart formulas built into the meters, data also uses historical demand data for the estimation

Estimating what is the next demand?

Page 8: Reducing Energy Costs with Peak Shaving - Schneider

8

15SlidePhillip Yeung – EE forum Sept 2007

II. Monitoring Usage

� You can set alarms on the maximum demand level you want to reach during a demand interval, and if that level is met, an alarm can alert system users to take action

� When system users are notified about a near-peak demand level, they can respond manually or allow pre-set control actions to take effect

� There are two possible approaches to peak shaving:

• reducing usage through load shedding • adding capacity with on-site generation

16SlidePhillip Yeung – EE forum Sept 2007Initi@tive 2006/2007 - Auteur - Date

I. Introduction

II. Monitoring usage

III. Load shedding

IV. On-site generation

V. Returning to « normal »

VI. Customer example

VII. Conclusion

Page 9: Reducing Energy Costs with Peak Shaving - Schneider

9

17SlidePhillip Yeung – EE forum Sept 2007

III. Load Shedding

� Facility managers identify sheddable loads as part of the system design

� Sheddable loads are loads that can be easily turned off and restarted, without serious impact on processes or staff

� Typical sheddable loads include HVAC systems, non-sensitive industrial machines, some lighting, etc.

18SlidePhillip Yeung – EE forum Sept 2007

III. Load Shedding

� Loads can be prioritized by the amount of time they can be turned off before they impact productivity or profitability

� For example, a refrigeration unit may be able to be shut down for up to 10 minutes, but must come back online within that timeframe, while lighting in a storage area may be sheddable for up to an hour

Page 10: Reducing Energy Costs with Peak Shaving - Schneider

10

19SlidePhillip Yeung – EE forum Sept 2007

III. Load Shedding

� The system constantly monitors the situation and can shift loads as needed to meet any conditional requirements of individual loads as well as the overall goal of peak reduction

� Schneider Electric’s Power Monitoring system can be programmed with intelligent PLC based logic to re-schedule loads on a user defined schedule

20SlidePhillip Yeung – EE forum Sept 2007

III. Load Shedding

� Loads can be categorized for automated shedding

• Critical – ie. Important processes related to safety • Essential • Non-Essential – ie. Sheddable loads

� Automated shedding can be used to shed by programming the ION Enterprise software

� Or, the meter can directly signal the PLC to shed using PLC’s pre-defined load shedding logic, interfaced via Modbus protocols or digital I/O’s

Prioritize the loads

Communications

Software

Otherdevices

MVrelays

LVbreakers

Circuitmonitors

Page 11: Reducing Energy Costs with Peak Shaving - Schneider

11

21SlidePhillip Yeung – EE forum Sept 2007

III. Load Shedding� Typical Load Shedding Application

setup• ION 7350 orders breakers to

open to cut load

• Communication between Central station

22SlidePhillip Yeung – EE forum Sept 2007

� Total Onboard I/O Available• Analog Inputs

• Analog Ouputs

• Digital Status inputs

• Digital Status ouputs (standard) • Relay outputs (standard)

• DNP, Modbus RTU/TCP, Modbus Master

� Important to select a product with adequate communications and I/O points for the right level of peak shaving task

III. Load Shedding

Communications and I/O

PLC CM4000 ION 7650ION 8800

Page 12: Reducing Energy Costs with Peak Shaving - Schneider

12

23SlidePhillip Yeung – EE forum Sept 2007Initi@tive 2006/2007 - Auteur - Date

I. Introduction

II. Monitoring usage

III. Load shedding

IV. On-site generation

V. Returning to « normal »

VI. Customer example

VII. Conclusion

24SlidePhillip Yeung – EE forum Sept 2007

IV. On-Site Generation

� For sites that have limited sheddableloads, facility managers can start up on-site generation to increase available power without increasing demand

� On-site generation requires• Generator

• Fuel source• Control system

Page 13: Reducing Energy Costs with Peak Shaving - Schneider

13

25SlidePhillip Yeung – EE forum Sept 2007Initi@tive 2006/2007 - Auteur - Date

I. Introduction

II. Monitoring usage

III. Load shedding

IV. On-site generation

V. Returning to « normal »

VI. Customer example

VII. Conclusion

26SlidePhillip Yeung – EE forum Sept 2007

V. Returning to « normal »

� As demand levels start to drop, the system can reverse the peak shaving activities

� System managers can identify the priority of events – whether more sensitive loads come back online first, or whether the on-site generation is shut down to conserve on fuel or emissions

� Usually a manual process

Page 14: Reducing Energy Costs with Peak Shaving - Schneider

14

27SlidePhillip Yeung – EE forum Sept 2007Initi@tive 2006/2007 - Auteur - Date

I. Introduction

II. Monitoring usage

III. Load shedding

IV. On-site generation

V. Returning to « normal »

VI. Customer example

VII. Conclusion

28SlidePhillip Yeung – EE forum Sept 2007

VI. Customer examples

� Customer: Royal Edinburgh Infirmary

� Need: To reduce demand while preserving service to critical systems

� Solution: • A system that sheds loads while

bringing its generators online

• As generator capacity ramps up, the system automatically re-instates the loads in order of importance, without exceeding generator capacity

Page 15: Reducing Energy Costs with Peak Shaving - Schneider

15

29SlidePhillip Yeung – EE forum Sept 2007

VI. Customer examples

� Customer: LG Philips Pa-Joo, Korea

� Need: Monitors next predicted demand for peak avoidance

� Solution: • Synchronization pulse from utility

meter to the facility meter to match the demand periods

• Monitoring current load profiles to shed non-critical loads during on/off-peak hours

30SlidePhillip Yeung – EE forum Sept 2007

VI. Customer examples

� Customer: Automaker in Ohio, USA� Need: Utilize standby generators to avoid peak

penalties� Solution:

• Overall facilities demand is aggregated by different power monitors at different processes

• Calculated predicted demand signals to generator to go ON

• Generator runs for just 2 demand periods and turns off when demand drops to normal

• System controls generator running at minimum, not to exceed EPA’s 500 hours per year emission standard

Page 16: Reducing Energy Costs with Peak Shaving - Schneider

16

31SlidePhillip Yeung – EE forum Sept 2007Initi@tive 2006/2007 - Auteur - Date

I. Introduction

II. Monitoring usage

III. Load shedding

IV. On-site generation

V. Returning to « normal »

VI. Customer example

VI. Conclusion

32SlidePhillip Yeung – EE forum Sept 2007

VI. Conclusion

� Peak shaving can help you save money by reducing your overall energy costs, reducing peak demand charges without impacting your productivity or profitability

� Power monitoring and control is an essential element of any peak demand reduction scheme – you can’t change what you don’t know

� Schneider Electric offers comprehensive systems that enable automatic or manual peak shaving through both load shedding and on-site generation

Page 17: Reducing Energy Costs with Peak Shaving - Schneider

17

33SlidePhillip Yeung – EE forum Sept 2007

Thanks for your attention