Red jacket

1
“Hot Tamale” Assembly Specifications Season: Spring 2010 Description: Fabric: Date: November 11, 2009 Assembly Overview Pre -assembly : ___ Apply interfacing, __ Prepare Collar ___________________ Component assembly : _____ Jacket and Skirt ______________ Final asse mbly: __ Attach facing, Attach Front and Back Bodice pieces, Attach Sleeves, Attach Collar Pieces, Attach Front and Back Skirt ________________________ _______________________________________ Machine stitching: _____ __ 12 SPI____________ Seam allowance: __ ___5/8 ________________ Task : Sew Darts on Front and Back Bodice Pieces JACKET Sew Front Bodice to Back Bodice JACKET Sew Sleeve to Armhole JACKET Sew on Collar Piece JACKET Apply In terfacing to Front and Back Bodice JACKET Bind all Seems JACKET Hem the edges of the jack and sleeves JACKET

Transcript of Red jacket

Page 1: Red jacket

“Hot Tamale” Assembly Speci�cations Season: Spring 2010 Description: Fabric: Date: November 11, 2009 Assembly Overview Pre -assembly : ___ Apply interfacing, __ Prepare Collar ___________________ Component assembly : _____ Jacket and Skirt ______________ Final asse mbly: __ Attach facing, Attach Front and Back Bodice pieces, Attach Sleeves, Attach Collar Pieces, Attach Front and Back Skirt ________________________ _______________________________________ Machine stitching: _____ __ 12 SPI____________ Seam allowance: __ ___5/8 ________________

Task : Sew Darts on Front and Back Bodice Pieces

JACKET

Sew Front Bodice to Back Bodice

JACKET

Sew Sleeve to Armhole

JACKET

Sew on Collar Piece

JACKET

Apply In terfacing to Front and Back Bodice

JACKET

Bind all Seems

JACKET

Hem the edges of the jack and sleeves JACKET