Rectification List

of 26

  • date post

    06-Jul-2018
  • Category

    Documents

  • view

    218
  • download

    0

Embed Size (px)

Transcript of Rectification List

  • 8/16/2019 Rectification List

    1/26

     RECTIFICATION LIST 

    Basement 1 – Zone 4

  • 8/16/2019 Rectification List

    2/26

    Grouting remaining,

    Support missing as

     per IFC, FR

     filling remaining

  • 8/16/2019 Rectification List

    3/26

    Cladding/ Sleeve and

     FR missing

  • 8/16/2019 Rectification List

    4/26

    Cladding/ Sleeve and

     FR material

  • 8/16/2019 Rectification List

    5/26

    Grouting and FR /

    Sleeve collar not

    made

  • 8/16/2019 Rectification List

    6/26

    Cladding /  Insulation

    on assembly & FR

    material

  • 8/16/2019 Rectification List

    7/26

    Cladding / Grouting

    and Sleeve remaining

  • 8/16/2019 Rectification List

    8/26

  • 8/16/2019 Rectification List

    9/26

    Cladding on  joints

    missing

  • 8/16/2019 Rectification List

    10/26

    Cladding and CDR

    connection missing

  • 8/16/2019 Rectification List

    11/26

  • 8/16/2019 Rectification List

    12/26

    Opening need to

    closed

  • 8/16/2019 Rectification List

    13/26

     FR filling on all

     sleeves

  • 8/16/2019 Rectification List

    14/26

    Unknown  support type

     for PVC  pipes

  • 8/16/2019 Rectification List

    15/26

     Extra clamp hanging

     from ceiling

  • 8/16/2019 Rectification List

    16/26

     Fire cabinet remaining

     for all

  • 8/16/2019 Rectification List

    17/26

    Support damaged

  • 8/16/2019 Rectification List

    18/26

    Support damaged

  • 8/16/2019 Rectification List

    19/26

     Doyma  sleeve

    required on drain pipe

  • 8/16/2019 Rectification List

    20/26

     Fire pipe  sagging

    because of misplaceme

    nt of loop

    hanger

  • 8/16/2019 Rectification List

    21/26

    Core cutting remaining

    on tree pits

  • 8/16/2019 Rectification List

    22/26

    Water  supply

    connection remaining

    with tree pit

  • 8/16/2019 Rectification List

    23/26

     Fire  sprinkler

    not at  specified

    height with

    roof 

  • 8/16/2019 Rectification List

    24/26

     Fire  sprinkler

    not at  specified

    height with

    roof 

  • 8/16/2019 Rectification List

    25/26

     FHR & Cabinet

    missing

  • 8/16/2019 Rectification List

    26/26

     Poor sleeve installation