Recovery Planning and the Colorado Floods

12
Recovery Planning and the Colorado Floods Iain Hyde, Deputy Chief Recovery Officer

description

Recovery Planning and the Colorado Floods. Iain Hyde, Deputy Chief Recovery Officer. Colorado Disaster History. 1997 – Fort Collins Flood 1999 – Arkansas River Basin Floods 2002 – Wildfires 2008 – Windsor Tornado 2012 – Waldo Canyon and High Park Fires 2013 – Black Forest Fire - PowerPoint PPT Presentation

Transcript of Recovery Planning and the Colorado Floods

Page 1: Recovery Planning and the Colorado Floods

Recovery Planning and the Colorado

FloodsIain Hyde, Deputy Chief Recovery Officer

Page 2: Recovery Planning and the Colorado Floods

Colorado Disaster History

• 1997 – Fort Collins Flood• 1999 – Arkansas River Basin Floods• 2002 – Wildfires• 2008 – Windsor Tornado• 2012 – Waldo Canyon and High Park Fires• 2013 – Black Forest Fire• 2013 – September Floods

Page 3: Recovery Planning and the Colorado Floods

Recovery Frameworks• Presence of a framework enhances coordination and

responsiveness, expands conversation beyond standard FEMA recovery programs

• National Disaster Recovery Framework• Recovery Support Functions – lead and support agencies• Coordination with states, support to locals• Better leverages knowledge and resources across the Federal

Government

• State of Colorado Draft Recovery Plan• Under development before floods; operational• Incorporated lessons from 2012, 2013 wildfires• State Recovery Support Functions – What if FEMA isn’t coming?• Recovery coordination starts at onset of events

Page 4: Recovery Planning and the Colorado Floods

Pre-Disaster Planning

• State Agencies needed to be organized for Long Term Recovery• Function if federal resources are not available• Align with Federal resources when they do come• Focus on:• Capabilities• Structures and Actions• Timing and flexibility

• Local Communities pre-flood: Primarily planned for specific capabilities (debris management, damage assessment, etc.)

• However some starting to develop more comprehensive pre-disaster plans• Assign responsibilities• Develop locally appropriate Recovery Support Functions• Use best practices from other communities, but customize for local

structures, issues, needs, etc.

Page 5: Recovery Planning and the Colorado Floods

RSFs in Colorado

Page 6: Recovery Planning and the Colorado Floods

September Flood Disaster Summary

Page 7: Recovery Planning and the Colorado Floods

By the Numbers• 18,147 evacuated• 16,557 approved for Individual

Assistance• 479 Families in Transitional

Sheltering at peak• 485 miles of damaged or destroyed

roads• 18 Counties approved for Public

Assistance, 11 for Individual Assistance

• NFIP, SBA, Individual Assistance: $430 million

• Public Assistance: Projected $400 Million

• FHWA (Roads): Projected $450 Million

• CDBG: $262 Million

Page 8: Recovery Planning and the Colorado Floods

Local Communities• Driving forces in recovery• Ultimately the ones that live

with the decisions made and actions taken in recovery

• In charge of visioning; Need to be thoughtful, deliberative yet move quickly

• Think about steps to reduce risk from the next event as early as possible

Page 9: Recovery Planning and the Colorado Floods

Post Flood Disaster Recovery Planning and Visioning

• Agencies Involved: Communities(citizens, local governments, businesses), Department of Local Affairs, FEMA Community Planning and Capacity Building, University of Colorado at Denver, Colorado Office of Emergency Management

• Parallel Processes: Stream Corridor Master Plans, Stormwater Master Plans, floodplain mapping/risk assessments

• Important Considerations:• Locally driven• Community engagement• Strategic, tangible and achievable

• Current Status: Some plans under development, some just getting started

Page 10: Recovery Planning and the Colorado Floods

Considerations for Post-Disaster Planning

Page 11: Recovery Planning and the Colorado Floods

Considerations for Post Disaster Planning

• Timing – When is the Community ready? When is it too late?• Urgency – How quickly do you develop a post-disaster plan?• Public Engagement – How do you leverage input and

engagement of community members?• Issues – What sectors impacted? Where are there

opportunities for mitigation, resiliency, enhancements?• Other Plans – Mitigation Plan, Comprehensive Plan, Capitol

Improvements, Zoning, Sustainability• Leverage documents that already exist

• Need for tangible actions

Page 12: Recovery Planning and the Colorado Floods

Questions?

Iain Hyde, CFMDeputy Chief Recovery OfficerColorado Recovery [email protected]