Recommissioning Workshop October 2, 2013 Dave Moser, PE Senior Engineer PECI 1 © PECI 2013

Transcript of Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to...

Page 1: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Recommissioning Workshop

October 2, 2013

Dave Moser, PE

Senior Engineer

PECI

1 © PECI 2013

Page 2: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Preview for the Day

2

Topic Start time

What is existing building commissioning (EBCx)?

Costs / benefits

Case studies

EBCx process

Break 9:15

EBCx team

Benchmarking / utility analysis

LEED-EBOM

Xcel Energy Recommissioning program

Break 10:30

Common findings

Persistence of benefits

Resources

Wrap-up 11:45

Class dismissed! 12:00

8:30

9:30

10:45

Page 3: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

The Gist of Energy-Focused EBCx

Going from this…. to this!

3

Page 4: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

But Seriously, EBCx is…

A systematic process for improving an existing building’s performance

Includes a rigorous investigation to identify problems, especially integration issues

Primary focus is on identifying low cost operational improvements

May be done alone or with a retrofit project

Page 5: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Other Terminology You May Hear

Retrocommissioning (RCx)

Recommissioning (ReCx)

Ongoing Commissioning (OCx)

Monitoring-Based Commissioning (MBCx)

5

Note: Xcel Energy’s program covers both RCx and ReCx

Existing Building

Commissioning (EBCx)

Page 6: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

6

Ongoing commissioning

Persistence

Existing building commissioning

New construction commissioning

Tuned, optimized, and documented systems with

training for O&M staff

Tuned, optimized, and documented systems with

training for O&M staff

Performance tracking

Updated documentation

Ongoing training

Page 7: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Is EBCx Needed After Cx?

No, it’s not.*

*As long as:

No changes are ever made to the building

Cx included system optimization

The building operates exactly the same as after construction.

7

Page 8: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Ch-ch-ch-ch-changes

What changes typically occur over time in a commercial building?

______________________________

______________________________

______________________________

______________________________

8

Your Turn!

Page 9: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

How Does EBCx Differ From a Tune-up?

Tune-up

Maintenance

Components and equipment

Capacity

Physical

Savings Opportunities

EBCx

Operation

Systems and Integration

Performance

Mental

More Savings Opportunities

9

EBCx includes and moves beyond tune-up procedures.

Page 10: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Revisiting O&M

Maintenance = Capacity

Caring, cleaning, lubing, repairing

Primarily physical

Operation = Performance

Scheduling, implementing efficient control strategies, sequencing of equipment

Primarily mental

10

Page 11: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Maintenance Issue Example

Upper set of dampers should be open.

Linkage has come loose from actuator.

11

Page 12: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Operational Issue Example

Heaters should be off at OATs above 40°F.

12

Page 13: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

13 Source: Mills 2009

#1

#2

#3

#4

Why EBCx?

Page 14: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

What’s All the Fuss About Energy?

U.S. Energy Usage U.S. Electricity Sales

14 Source: EIA Annual Energy Review 2011

Page 15: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

EBCx Costs & Savings

15

CxA cost = ~45% of

total cost

Source: Mills 2009

Page 16: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Factors Influencing Total Cost

Goals of project

Systems to include in project

Number of systems, zones

System complexity

Ease of obtaining trend data through BAS

More costly if data loggers are needed

Owner / operator involvement

16

Page 17: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Help Reduce the Cost of EBCx

17

EBCx Phase Owner / Operator Action

Planning Compile a list of known problems and possible

improvements.

Gather up-to-date building documentation.

Investigation Perform appropriate preventive maintenance tasks early.

Perform simple repairs as the project progresses.

Assist with diagnostic monitoring and functional testing.

Implementation Assist with implementing the selected improvements.

Hand-Off and Post-EBCx Help facilitate training.

Maintain improved performance of systems.

Page 18: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

18

Case

Studies

Page 19: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

19

Local Case Study – Republic Plaza

Downtown Denver High rise office

56 stories (fully occupied)

1.4MM SF total conditioned space

Key operational findings

Sub-optimal HVAC equipment scheduling (three separate findings)

Excessive strainer cycle operation

High fan speeds due to high duct pressure

Page 20: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

20

Local Case Study – Republic Plaza

Benefits

Energy savings: 817,000 kWh/yr

Total utility cost savings $34,200 / yr

Implementation cost: $30,000

Incentives

Three of the five measures received implementation incentives, reducing cost of implementation to $22,000

Page 21: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

21

Local Case Study – Gates Corporation

Downtown Denver 10-story office

285,000 sf total conditioned space

Six operational findings

Faulty outside air damper operation

Excessive HVAC equipment operation

Heating water system deficiencies

Condenser water system issues

Outside and exhaust fan operation issues

High fan speeds due to high duct pressure

Page 22: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

22

Local Case Study – Gates Corporation

Benefits

Energy savings: 533,000 kWh/yr

Total utility cost savings $48,500 / yr

Implementation cost: $27,000

No implementation incentives paid since all measures had a simple payback of less than one year!

Page 23: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

EBCx Process Overview

23 From the EPA’s “A Retrocommissioning Guide For Building Owners”.

Page 24: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

24

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 25: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Screening

Select good building candidates for EBCx

Ideal building characteristics:

Proactive management philosophy, motivated building operators

Commercial or institutional facility with complex HVAC and lighting systems

Direct digital control (DDC) down to zone level

High energy consumption

Mechanical equipment in relatively good condition and not at end-of-life

Sensor calibration part of preventive maintenance

25

Planning

Page 26: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Most systems are in need of replacement

High energy usage

Motivated operators

Major system design problems

Catastrophic problems (e.g., asbestos)

Complex HVAC and lighting systems

Excessive comfort complaints

Is EBCx Appropriate?

26

Probably Probably not

Planning

Your Turn!

Page 27: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Selecting a Provider

RFQ (Request for Qualifications) process

Request experience for similar projects

Request example work products

Ask if EBCx is a core business service

RFP (Request for Proposal) process

Sample RFP available from California Commissioning Collaborative

27

Planning

Page 28: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Sources of EBCx Providers

Xcel Energy

www.xcelenergy.com/recomm

Building Commissioning Association

www.bcxa.org

California Commissioning Collaborative

www.cacx.org/resources/provider_list.html

28

Planning

Page 29: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Planning Phase - Scoping

Analyze the building’s energy consumption

Assess potential with a site walk through

Review building documentation

Understand the current operational requirements

Interview the operating staff

Identify opportunities

Analyze results

Develop a scope of work to complete EBCx process

29

Planning

Page 30: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Useful Documentation

Utility data – at least 12 months

Control drawings with full points list

Sequences of operation

Full set of as-built drawings/shop drawings

Mechanical

Electrical

Plumbing

Architectural drawings

TAB report(s)

Past energy conservation reports

Original equipment submittals

30

Planning

Page 31: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Building Walk-Through: HVAC

31

Planning

Your Turn!

Page 32: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Building Walk-Through: BAS

32

Planning

Your Turn!

Page 33: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Building Walk-Through: Lighting

33

Planning

Your Turn!

Page 34: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Building Walk-Through: Plug Loads

34

Planning

Your Turn!

Page 35: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Building Walk-Through: Envelope

35

Planning

Your Turn!

Page 36: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

36

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 37: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Investigation Phase Summary

Conduct detailed document review

Interview occupants and operating staff

Evaluate facility performance

Analyze identified measures

37

Investigation

Page 38: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Evaluate Facility Performance

Purpose:

Determine if current facility requirements are met

Identify facility improvement measures

Methods:

Analyze energy usage

Review interview results

Review service requests and complaints

Compare actual conditions to CFR

Perform diagnostic monitoring

Conduct site investigation and testing

38

Investigation

Page 39: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

39

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 40: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Implementation Phase Summary

Select measures for implementation

Prepare implementation plan

Implement measures

Verify successful measure implementation

40

Implementation

Page 41: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

41

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 42: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Hand-Off Phase Summary

Update documentation

Develop persistence strategies

Conduct training

Develop Final Report

42

Hand-off

Page 43: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

43

Planning

Investigation

Implementation

Hand-Off

Post-RCx

Page 44: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Up Next:

15 minute break

When we come back:

EBCx team roles and responsibilities

Discuss LEED-EB

Xcel Energy RCx program overview

44

Page 45: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Owner and designated

representatives

Commissioning Authority

(CxA)

Utility program

representative

The EBCx Team

45

Facility Manager,

O&M personnel Specialty

subcontractors

and consultants

Page 46: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Owner / Staff Role

Management Level

Be open to the process as a learning and improvement process

Coordinate funding

Select EBCx provider

Facilities/Ops Level

Assist the EBCx team

Embrace suggestions for change and improvement

46

Page 47: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

EBCx Service Provider’s Role

Integrate and coordinate the team’s effort

Lead the investigation and hand-off phases of the project

Work with management and operations team

47

Page 48: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Supplier’s and Contractor’s Role

Support investigation as needed

Implement EBCx measures

Integrate EBCx recommendations into ongoing contractual work

48

Page 49: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Energy Benchmarking

Comparison to other buildings

Similar types

Similar size

Similar climate

Big picture indicator of efficiency (or lack of it)

Can use to prioritize projects within portfolio

49

Page 50: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Benchmarking with ENERGY STAR®

How does it work?

Building performance assessment

Scale of 1-100

1 = least efficient, 100 = most efficient, 50 = average

Similar buildings nationwide

50

Page 51: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Benchmarking with ENERGY STAR®

How does it work?

Assessment takes into account:

Weather

Size

Location

Operating characteristics

75 or higher may qualify for an Energy Star® plaque

Why do it?

Quick reality check for scoping

Tracking tool for persistence

51

Page 52: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Analyze Monthly Utility Data

52

Page 53: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

More Useful Utility Data

Interval utility data (e.g., 15 minute data)

Identify base load during unoccupied conditions

Identify operational problems during normal building operating hours

Available through your Xcel Account Manager

53

Page 54: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Using Interval Meter Data

54

‘Good’ profile

Page 55: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Using Interval Meter Data

55

0.00

100.00

200.00

300.00

400.00

500.00

600.00

700.00

800.00

12

:00

AM

2:0

0 A

M

4:0

0 A

M

6:0

0 A

M

8:0

0 A

M

10

:00

AM

12

:00

PM

2:0

0 P

M

4:0

0 P

M

6:0

0 P

M

8:0

0 P

M

10

:00

PM

Bu

ild

ing

po

wer

dra

w, kW

Weekday

Saturday

Sunday

Holiday

Your Turn!

Page 56: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

56

LEED-EB

Page 57: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

LEED and Commissioning

Leadership in Energy and Environmental Design for Existing Buildings: Operations and Maintenance

Or, “LEED-EBOM”

Certifies the sustainability of ongoing operations of existing commercial and institutional buildings

Addresses similar categories as LEED-NC

Current version is LEED 2009, updated in July of 2013

57

Page 58: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

When do you use LEED-EBOM?

Initial certification of existing buildings

Ongoing re-certification of existing buildings first certified under LEED-EBOM (within five years)

Ongoing re-certification of existing buildings first certified under LEED-NC (within five years)

www.usgbc.org

58

Page 59: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Where Does EBCx Fit In?

Energy & Atmosphere

Prerequisite 1: Level 1 energy audit

“Walk-through” audit

Document systems, PM plan, identify savings opportunities

Prerequisite 2: Minimum E* score of 69

Related credits:

Credit 1: Optimize Energy Performance

Based on Energy Star score

Possible 18 points

Compare to 40 minimum points required for LEED-EBOM certification

59

Page 60: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Where Does EBCx Fit In?

Credit 2: Existing Building Commissioning

2.1 Investigation (2 points)

ASHRAE Level 2 audit also allowed

2.2 Implementation (2 points)

2.3 Ongoing Commissioning (2 points)

Develop a plan, and complete some of the work

60

Page 61: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

61

Xcel Energy’s

Recommissioning Program

Page 62: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Topics

Eligibility

Rebates

Process

Resources

62

Page 63: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

63

Who is Eligible?

Xcel Energy electric and natural gas business customers in Colorado with:

Buildings 50,000 square feet or more

Any age building

Small Building Tune-up program scheduled to launch 2014*

Buildings <75,000 square feet

RCx “lite” – smaller list of measures

*Pending regulatory approval

Page 64: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

64

Study Rebates

We’ll provide up to 75% of the cost of the study, not to exceed $25,000

Page 65: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Implementation Rebates

Electric rebates

Up to $400/kW or $0.08/kWh

You earn the higher of the two

Natural gas rebates (for our retail gas customers)

Up to $4/Dth

Maximum rebate is 60% of measure cost

Payback must be between 1-15 years to earn a rebate

65

Page 66: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

66

Process 1. Obtain preapproval before beginning

Submit application with proposal

Proposal should identify building issues, concerns and what the study provider will review

2. Complete the study

Study will contain a list of measures you can implement

Xcel Energy needs to approve the final study before issuing study rebate

3. Implement measures

You choose what to implement

Some measures may require measurement and verification (M&V)

Rebate is paid after M&V is complete (if needed)

Page 67: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

67

Study Providers

You choose your own provider

Provider must submit their qualifications if they haven’t worked with our program

Look at our list of providers who have participated in the past if you need an idea

It’s included in your handout

Page 68: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

68

Fast Track Recommissioning Options

Fast track study

Implementation rebates available for customers who have completed a RCx study on their own (without funding from Xcel Energy)

Fast track proposal

Implementation rebates available for RCx measures that may be identified in a vendor’s proposal

Requires preapproval and energy savings calculations must be included with application

Page 69: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

69

Resources

www.xcelenergy.com/recomm

Xcel Energy case studies

Office, school, hospital, hotel, medical and research center

Video Case study on Responsiblebynature.com – Front Range Community College

Recommissioning guidebook

Provider list

Applications

Page 70: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

70

How Do I Get Started?

Contact your Xcel Energy Account Manager

Call an Energy Efficiency Specialist at

1-800-481-4700

Page 71: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

71

Questions?

Thank you!

Page 72: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Up Next:

72

Up Next:

15 minute break

When we come back:

Common findings and case studies

Persistence of benefits

Available resources

Page 73: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

EBCx Results from the Field

73

122 EBCx projects, most in CA.

Source: PECI, 2009

Page 74: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

EBCx Results – Denver, CO

Prevalent measures (five projects):

Revise control sequence

Add / optimize SAT reset

Reduce equipment runtime

74 Source: PECI, 2009

Page 75: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Common Low-cost Opportunities

Technical Issues and Case Studies

Airside Economizer

Schedules

Setpoints / Reset Schedules

Pumping

Ventilation

75

Page 76: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Economizer dampers

During cool outside air conditions, more outside air can be brought in to help cool the building

‘Free’ cooling

76

Page 77: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

General Economizer Issue Categories

Damper system design (sizing / arrangement)

E.g., oversized dampers

Controls sequences and sensor arrangement

E.g., low economizer damper lockout temperature

Maintenance

E.g., disconnected pneumatic actuator

Both energy and non-energy benefits can be realized

77

Page 78: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Evaluate Airside Economizers

Inspect economizer maintenance

Blade and jamb seals installed, in good condition?

Actuators adjusted for full closure?

Actuators connected to dampers?

78

Page 79: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Schedules – Overview

Scheduling Issues

Often modified for specific, short-term needs

Schedule modifications can be forgotten

Improper system installation can lead to occupant request for modified schedule

How to identify

Trend data

Interval utility data

After hours walk-through if possible

79

Page 80: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Schedules Example – Heat Pumps

As-found situation

Schedules were modified for short-term requests

Heat pumps were operating when building was unoccupied

Water loop circulation pumps ran continuously

Fluid cooler spray pump and fan ran while building was unoccupied

Identified during investigation via system trends and data loggers on the equipment

80

Page 81: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Setpoint Example – As-found Condition

What is wrong with this picture?

81

Heating

AHUs

design:

180 EWT

105 LAT

P6

P7

P8

B5 B4 B3

P3 P4 P5

B1

B2

Hot deck DAT reset:

150°F above 60°F OA

180°F below 48°F OA

P2

P1

95%

95%

95%

Hot deck reset calls for a higher

DAT than the available EWT,

resulting in 100% hot water valve

position and excess pumping.

Hot water reset

140F above 60F OA

180F below 48F OA

3-5ºF ∆T

Mild spring day in

Portland, OR.

Your Turn!

Page 82: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Setpoint Example

Physically impossible for the system to achieve what it’s being asked to do

But it’ll try anyway, which is why all the pumps are on and operating at near 100% speed

82

Page 83: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Hot deck DAT reset:

70°F above 60°F OA

110°F below 48°F OA

Setpoint Example – Proper Operation

83

Heating

AHUs

design:

180 EWT

105 LAT

P6

P7

P8

B5 B4 B3

P3 P4 P5

B1

B2 P2

P1 One pump is OFF and the other

two operate between 0-50%

speed to meet load. Delta-T

across the loop is about 30F.

Hot water reset

140F above 60F OA

180F below 48F OA

30ºF ∆T

Was 150ºF

Was 180ºF

0%

50%

50%

Page 84: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Setpoint Example – Past Project

Savings opportunity

Energy savings: 29,000 kWh/yr and 4,200 therms/yr

Annual cost savings: $4,800 total

84

Page 85: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Pumping Opportunities – Overview

Pumping Issues

Many pumps are oversized

Safety factor

Future expansion

How to identify

Throttled discharge valve

Both parallel pumps on

Low temperature differential across a loop

85

Page 86: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Throttled discharge valve

Sometimes it’s easy to spot a throttled valve …

86

Closed

Open

Page 87: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Throttled discharge valve

87

… othertimes, not so much.

Page 88: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Implementation Options

Option 1 - Trim the existing impeller

Open pump, trim impeller, reassemble

Option 2 – Replace the impeller with a smaller one

Option 3 – Add a VFD

Then dial in speed to match flow

May be more costly, but allows for future capacity

88

Page 89: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Evaluate HVAC Pumps

Parallel pumps – shut one off?

Level of savings depends on pump curve.

89

Shallow curve – less flow increase

Page 90: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Evaluate Ventilation

Ventilation control – typical issues:

Actual occupant load less than design

Space usage changed

Common opportunities:

Add demand-controlled ventilation (DCV)

Reduce OA flow rate

Reduce VAV box min flow rates

Reset VAV box min flow rates

90

Page 91: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Evaluate Ventilation - Clues

Cold complaints in zones with no reheat

Low measured CO2 values

High summertime boiler usage

91

Page 92: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Evaluate Ventilation

Ventilation case study 800,000 sf building.

Issues:

Design occupancy: 6,000 people.

Actual occupancy: 1,850 people.

Implemented measures:

Lower VAV box min flow setpoints

Close VAV boxes during unoccupied times

Financials:

Cost: $10,000

Annual savings: $30,000

92

Page 93: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

93

Persistence

of Benefits

Page 94: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Making Energy Benefits Last

Persistence is an issue with EBCx measures

Operational measures can easily be undone

Various methods for ensuring persistence:

Owner / operator training (key!)

Updated building documentation / systems manuals

Performance tracking

Building benchmarking (Energy Star)

Utility bill / energy use tracking (whole building level)

Trending of key metrics (systems level)

94

Page 95: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Performance Monitoring Tools

Whole-building level

Monitor energy consumption, identify anomalies.

Example used at ASHRAE Headquarters: www.myworksite.com

Username = ashraeguest

Password = welcome

95

Page 96: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Performance Monitoring Tools

System-level

Monitors data from a BAS to continuously identify EBCx opportunities

96

Page 97: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Systems Level Tracking

Fan Speed variation measure

AH serving public areas. 24/7/365, 60 HP fan.

Baseline: VFD had failed, operating in bypass.

Excessive reheat due to overcooling.

Measure: Replace failed VFD. $18,000 annual savings, $5,600 implementation cost.

Tracked during 2007, quarterly reports sent to Owner

97

Page 98: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Systems Level Example

98

Air Handler Supply Fan Performance

0

20

40

60

80

100

120

6/3

0/2

007

7/7

/2007

7/1

4/2

007

7/2

1/2

007

7/2

8/2

007

8/4

/2007

8/1

1/2

007

8/1

8/2

007

8/2

5/2

007

9/1

/2007

9/8

/2007

9/1

5/2

007

9/2

2/2

007

Date

OA

Te

mp

(ºF

), F

an

Sp

eed

(%

ma

x.)

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Du

ct

Sta

tic

Pre

ss

ure

("H

2O

)

Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure

Duct static pressure is stable

Fan speed is less

than pre-EBCx

Summary: System is

operating as expected

Page 99: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Systems Level Example

99

Air Handler Supply Fan Performance

0

20

40

60

80

100

120

6/3

0/2

007

7/7

/2007

7/1

4/2

007

7/2

1/2

007

7/2

8/2

007

8/4

/2007

8/1

1/2

007

8/1

8/2

007

8/2

5/2

007

9/1

/2007

9/8

/2007

9/1

5/2

007

9/2

2/2

007

Date

OA

Tem

p (

ºF),

Fan

Sp

eed

(%

max

.)

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Du

ct

Sta

tic P

ressu

re (

"H

2O

)

Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure

Fan reverts to pre-EBCx condition.

VFD programming was lost as part of a

controls migration project.

Duct static pressure is

now high and unstable.

Problem identified

on 9/10/07.

Page 100: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

System Level Example

100

Air Handler Supply Fan Performance

0

20

40

60

80

100

120

6/3

0/2

007

7/7

/2007

7/1

4/2

007

7/2

1/2

007

7/2

8/2

007

8/4

/2007

8/1

1/2

007

8/1

8/2

007

8/2

5/2

007

9/1

/2007

9/8

/2007

9/1

5/2

007

9/2

2/2

007

Date

OA

Tem

p (

ºF),

Fan

Sp

eed

(%

max

.)

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Du

ct

Sta

tic P

ressu

re (

"H

2O

)

Outside Air Temp Fan Speed Pre-RCx Fan Speed Duct Static Pressure

VFD programming restored on

9/20/07, returned to ‘auto’ operation.

Fan speed reduced, duct pressure is

now normal and stable.

Page 101: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

101

Resources

Page 102: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Resources

Xcel Energy: www.xcelenergy.com/recomm

102

Page 103: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Resources

Mills study (2009): “Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions.”. Meta-study of Cx and EBCx projects.

PECI (2009): “A Study on Energy Savings and Measure Cost Effectiveness of Existing Building Commissioning.” Measure-level study.

EPA’s “A Retrocommissioning Guide for Building Owners.” EBCx desk reference.

Building Commissioning Association (BCA), “Best Practices in Commissioning Existing Buildings.” A summary of the EBCx process.

103

Page 104: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Resources

Additional EBCx training:

PECI

AABC Commissioning Group

Association of Energy Engineers

Building Commissioning Association

National Environmental Balancing Bureau

Testing Adjusting and Balancing Bureau

University of Wisconsin-Madison

CCC’s “Building Performance Tracking Handbook.” Guide for performance tracking.

104

Page 105: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

PECI Cx Training Program 104 Online Lessons

http://learn.peci.org/

Page 106: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

PECI Cx Training Program

One Week Lab

10 real-world exercises, including:

Energy use analysis

Design review

BAS trend data analysis

BAS sensor location and calibration verification

Functional performance test development and observation

Pump performance analysis

Cx Progress Report development

http://learn.peci.org/

Page 107: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Resources

California Commissioning Collaborative (www.cacx.org)

Case studies

Tools and templates

Guidelines

Commercial Building Energy Consumption Survey (CBECS)

Consumption and expenditure data (country-wide)

Energy Star is based on CBECS data

http://www.eia.gov/consumption/commercial/

107

Page 108: Recommissioning Workshop - Xcel Energy · Ease of obtaining trend data through BAS ... Can use to prioritize projects within portfolio 49 . Benchmarking with ENERGY STAR® ... Prerequisite

Questions / Discussion