Report run on: March 7, 2014 11:05 AM
RECAPP Facility Evaluation Report
Regional Health CentreB0107ACamrose
Alberta Health Services-Central
Report run on: March 7, 2014 11:05 AM Page 2 of 36
B0107ABuilding Id:
Regional Health CentreBuilding Name:
CamroseLocation:4703 - 53 Street Address:
1,254.00Gross Area (sq. m): $6,912,682Replacement Cost:1977Construction Year:
Evaluation Date: October 7 2013
Farncis Ng Architect Ltd.Evaluation Company:
Francis NgEvaluator Name:
The Regional Health Centre comes under the jurisdiction of Alberta Health Services and was built in Camrose in 1977.The building faces two streets - 53rd Street on the west and 47th Avenue on the south. The 1254.0 square metres building was built in 1977. ABC Group D - Office. The 1977 original building has two storeys and non-combustible construction and isunsprinklered.
General Summary:
Structural Summary:(1977) - has concrete slab on grade, concrete beams on concrete piles along perimeter and interior concrete caps onconcrete piles, steel staircases from lower floor to main floor; lower floor has concrete walls and concrete columns; mainfloor has concrete slab on concrete beams.and steel columns; roof has plywood deck on wood nailers on OWSJ on steelbeams on steel columns. Recommendations for future action include: not required. Overall structural system rating is acceptable.
Envelope Summary:(1977) - has built-up roofing, skylights, trowelled cement finish on exterior walls and soffits, aluminum storefronts,aluminum doors and frame, aluminum windows; metal entrance doors, exterior utility metal doors and metal frames. Recommendations for future action include: replace storefront glass; replace plastic skylight. Overall envelope system rating is acceptable.
Interior Summary:(1977) - has painted concrete ceiling, cement panel ceiling, painted drywall ceiling, textured ceiling finish, suspendedT-bar ceiling system c/w acoustic ceiling tiles, glued on acoustic ceiling tiles; painted gypsum wall board, paintedcement plaster wall finish, plywood wall panels; quarry tile flooring, sheet vinyl flooring, carpet and painted concreteflooring; wood doors and metal frames; an elevator. Recommendations for future action include: provide cat ladder; provide automatic door operators. Overall interior system rating is acceptable.
Mechanical Summary:Building mechanical systems includes 2-gas fired boilers providing hydronic (hot water) heating, dx cooling system,one air handling unit located inside building, roof mounted exhaust fans, one gas fired hot water heater. There is no sprinkler system provided in the buildingl. The HVAC equipment is controlled by a combined pneumaticand DDC control system. Conventional plumbing fixtures The overall the mechanical system appears to be in Acceptable condition.
15.21%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $1,051,450
Camrose - Regional Health Centre (B0107A)
Report run on: March 7, 2014 11:05 AM Page 3 of 36
Electrical Summary:The building has been provided with an underground service obtained from a utility owned pad mounted transformerlocated on the south side of the property. An 800A, 120/208V, 3 phase, 4 wire main distribution centre has beenprovided in the electrical room. Breaker panels are located on the lower and upper levels. Lighting is provided byfluorescent fixtures that are equipped with T12 lamps, which are not energy efficient. It is recommended to replace thefixtures with energy efficient fixtures utilizing T8 lamps and electronic ballasts. The fire alarm system is of the hardwired type complete with detection devices and audible devices. It was installed in 1990. It is still supported by themanufacturer. The intrusion detection system was upgraded in 2004. Overall, the electrical systems are in acceptable condition.
Camrose - Regional Health Centre (B0107A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 7, 2014 11:05 AM Page 4 of 36
A1010 Standard Foundations*
A1030 Slab on Grade*
A2020 Basement Walls (& Crawl Space)*
B1010.01 Floor Structural Frame (Building Frame)*
B1010.02 Structural Interior Walls Supporting Floors (or Roof)*
B1010.03 Floor Decks, Slabs, and Toppings*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Regional Health Centre (B0107A)S1 STRUCTURAL
Foundation - has concrete beams on concrete piles along perimeter and interior concrete caps on concrete piles
Lower floor - has 100 mm concrete slab on grade.
Lower floor - has 200 mm concrete walls.
Lower floor (typical) - has concrete beams on concrete walls along perimeter. Main floor (typical) - has concrete beams on concrete walls along perimeter.
Lower floor (typical) - has concrete columns. Main floor (typical) - has HSS columns.
Lower floor - has 100 mm concrete slab on grade. Main floor - has 150 to 190 mm concrete slab on concrete beams.
Report run on: March 7, 2014 11:05 AM Page 5 of 36
B1010.09 Floor Construction Fireproofing*
B1010.10 Floor Construction Firestopping*
B1020.01 Roof Structural Frame*
B1020.03 Roof Decks, Slabs, and Sheathing*
B1020.04 Canopies*
B1020.06 Roof Construction Fireproofing*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Regional Health Centre (B0107A)
Lower floor - has 100 mm concrete slab on grade. Main floor - has 150 to 190 mm concrete slab on concrete beams.
Lower floor - has 100 mm concrete slab on grade. Main floor - has 150 to 190 mm concrete slab on concrete beams.
Roof - has OWSJ on steel beams on HSS columns.
Roof - has 16 mm plywood deck on wood nailers on OWSJ.
Canopies - have metal frames attached to HSS columns. Overhangs - have extended concrete slab and concrete beams.
Roof - has gypsum board.
Report run on: March 7, 2014 11:05 AM Page 6 of 36
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
B2010.01.13 Paints (& Stains): Ext. Wall**
B2010.01.99 Other Exterior Wall Skin*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
2000
2000
Installed
Installed
Installed
Installed
0
20
15
0
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace joint sealants. (approx. 370 linear metres)
Repaint exterior walls. (approx. 1000 squaremetres)
Lifecycle Replacement
Lifecycle Replacement
2017
2017
$18,500
$50,000
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)S2 ENVELOPE
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
Lower floor - has trowelled cement plaster finish on concrete walls, rigid insulation, gypsum wall board. Main floor - has trowelled cement plaster finish on building paper, plywood sheathing, 92 mm metal studs at 400 mm o.c.,RSI 2.1 batt insulation, poly vapour barrier, gypsum wall board.
Lower floor window and door openings - have joint sealants. (approx. 120 linear metres) Main floor window and door openings - have joint sealants. (approx. 250 linear metres)
Lower floor - has painted trowelled cement plaster finish on concrete walls, rigid insulation, gypsum wall board. (approx.350 square metres) (repainted in approx. 2000) Main floor - has painted trowelled cement plaster finish on building paper, plywood sheathing, 92 mm metal studs at 400mm o.c., RSI 2.1 batt insulation, poly vapour barrier, gypsum wall board. (approx. 600 square metres) (repainted inapprox. 2000) Lower floor (soffits) - have painted trowelled cement plaster finish. (approx. 50 square metres) (repainted in approx. 2000)
Main floor - has aluminum spandrel below window sills. (installed in approx. 2000)
Report run on: March 7, 2014 11:05 AM Page 7 of 36
B2010.02.01 Cast-in-place Concrete: Ext. Wall Const*
B2010.02.04 Load-Bearing-Metal Studs: Ext. Wall*
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*
B2010.05 Parapets*
B2010.06 Exterior Louvers, Grilles, and Screens*
B2010.09 Exterior Soffits*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Regional Health Centre (B0107A)
Lower floor - has cast-in-place concrete walls.
Main floor - has 92 mm metal studs at 400 mm o.c.
Lower floor - has rigid insulation. Main floor - has building paper, RSI 2.1 batt insulation and poly vapour barrier.
Roof - has prefinished metal flashing on wood parapets.
Lower floor (maintenance room C7) - has metal louvre on the east wall.
Lower floor (soffits) - have trowelled cement plaster finish. Main floor (west covered entrance soffit) - has trowelled cement plaster finish.
Report run on: March 7, 2014 11:05 AM Page 8 of 36
B2020.01.01.02 Aluminum Windows (Glass & Frame)**
B2020.02 Storefronts: Windows**
B2030.01.01 Aluminum-Framed Storefronts: Doors**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1977
1977
1977
Installed
Installed
Installed
40
40
30
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Replace aluminum windows. (67 units)
Repair glass. (1 window)
Replace storefront windows. (7 units)
Replace aluminum storefronts and doors. (2 doors)
Lifecycle Replacement
Repair
Lifecycle Replacement
Lifecycle Replacement
2017
2014
2017
2017
$67,000
$1,000
$10,500
$4,000
Unassigned
Medium
Unassigned
Unassigned
Main floor (conference room) - has 1 broken glass on westside.
Concern:
Repair glass. (1 window)Recommendation:
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
MAR-14
Lower floor - has aluminum windows. (19 windows) Main Floor - has aluminum windows. (48 windows)
Main floor (conference room 1 B12, corridor) - have aluminum storefronts. (7 units)
Main floor (west main entrance) - has aluminum storefronts and doors. (2 doors)
Report run on: March 7, 2014 11:05 AM Page 9 of 36
B2030.01.11 Metal Entrance Door**
B2030.02 Exterior Utility Doors**
B3010.01 Roof Vapour Retarder and Insulation*
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1977
1977
Installed
Installed
Installed
Installed
30
40
0
25
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace metal entrance doors. (2 doors)
Replace exterior utility doors. (3 doors)
Replace built-up roofing. (approx. 600 squaremetres)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2017
2017
$2,000
$3,000
$90,000
Unassigned
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
Lower floor (corridor exits) - have metal doors c/w vision panels and metal frames. (2 doors)
Lower floor (north stair, outdoor storage) - have 1.5 hour fire rated metal doors and frames. (3 doors)
Roof - has 50 mm rigid insulation.
Roof - has built-up roofing. (approx. 600 square metres)
Report run on: March 7, 2014 11:05 AM Page 10 of 36
B3010.08.02 Metal Gutters and Downspouts**
B3010.09 Roof Specialties and Accessories*
B3020.01 Skylights**
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
1977
2000
1977
Installed
Installed
Installed
30
0
25
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Replace downspouts. (150 linear metres)
Replace 1 plastic skylight.
Replace skylights. (5 units)
Lifecycle Replacement
Repair
Lifecycle Replacement
2017
2014
2017
$7,500
$1,000
$7,500
Unassigned
Medium
Unassigned
Main floor (conference room 1) - skylight has broken plastic.Concern:
Replace 1 plastic skylight.Recommendation:
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
Roof - has roof drains connecting interior downspouts. (approx. 5 roof drains and downspouts c/w 150 linear metres)
Roof (roof top unit) - has metal pipe railing.
Roof - has 5 domed skylights.
Report run on: March 7, 2014 11:05 AM Page 11 of 36
B3020.02 Other Roofing Openings (Hatch, Vent, etc)*
4 - AcceptableRating
1977Installed
0Design Life
MAR-14Updated
Provide cat ladder. (1 ladder)
Program Functional Upgrade 2014 $1,000 High
Building does not have permanent cat ladder to roof hatch.Concern:
Provide cat ladder. (1 ladder)Recommendation:
Camrose - Regional Health Centre (B0107A)
Event:
Type Year Cost Priority
Updated: MAR-14
Roof - has metal hatch.
Report run on: March 7, 2014 11:05 AM Page 12 of 36
C1010.01 Interior Fixed Partitions*
C1010.05 Interior Windows*
C1010.06 Interior Glazed Partitions and Storefronts*
C1010.07 Interior Partition Firestopping*
C1020.01 Interior Swinging Doors (& Hardware)*
C1020.02 Interior Entrance Doors*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Regional Health Centre (B0107A)S3 INTERIOR
The building - has metal stud partitions c/w gypsum wall boards. Main floor (reception D1) - has glass block wall.
Lower floor (conference room 2 C3) - has wood framed windows c/w clear glass.
Lower and main floors (central staircase) - have metal framed storefronts c/w wired glass. Main floor (conference room 1 B12) - has aluminum framed storefront.
Lower floor (maintenance room C7) - has firestopping.
The building - has wood doors and metal frames. Central stair - have metal door and metal frame.
Main floor (west main entrance vestibule) - has aluminum storefront and doors.
Report run on: March 7, 2014 11:05 AM Page 13 of 36
C1030.01 Visual Display Boards**
C1030.02 Fabricated Compartments (Toilets/Showers)**
C1030.08 Interior Identifying Devices*
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
20
30
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Replace visual display boards. (7 units)
Replace prefinished metal toilet partitions. (5partitions)
Lifecycle Replacement
Lifecycle Replacement
2017
2017
$7,000
$2,500
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
Lower floor (corridors) - have 2 tackboards. Main floor (conference room1 B12) - has 1 whiteboard. Main floor (conference room 3 B11) - has 1 whiteboard and 1 tackboard. Main floor (mail room D2) - has 1 whiteboard. Main floor (copy/printer room B10) - has 1 tackboard.
Main floor (mens washroom, ladies washroom) - have prefinished metal toilet partitions. (5 partitions)
All rooms have interior identifying devices.
Lower floor (archive room C5) - has mobile filing system.
Lower floor (mens washroom, ladies washroom) - have toilet accessories. Main floor (mens washroom, ladies washroom) - have toilet accessories.
Report run on: March 7, 2014 11:05 AM Page 14 of 36
C2010 Stair Construction*
C2020.05 Resilient Stair Finishes**
C2020.06 Carpet Stair Finishes**
C2020.08 Stair Railings and Balustrades*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1977
1977
Installed
Installed
Installed
Installed
0
20
10
0
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace resilient stair finishes. (1 stair)
Replace carpet stair finishes. (1 stair)
Lifecycle Replacement
Lifecycle Replacement
2017
2017
$1,000
$1,000
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
North stair - has metal stair c/w carpet treads and metal handrails. Central stair - have metal stair c/w rubber treads, rubber nosing and metal handrails.
Central stair - have metal stair c/w rubber treads, rubber nosing and metal handrails.
North stair - has metal stair c/w carpet treads and metal handrails.
North stair - has metal stair c/w carpet treads and metal handrails. Central stair - have metal stair c/w rubber treads, rubber nosing and metal handrails.
Report run on: March 7, 2014 11:05 AM Page 15 of 36
C3010.02 Wall Paneling**
C3010.06 Tile Wall Finishes**
C3010.11 Interior Wall Painting*
C3020.01.02 Painted Concrete Floor Finishes*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1977
1977
Installed
Installed
Installed
Installed
30
40
0
0
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace plywood wall panels. (approx. 35 squaremetres)
Replace ceramic wall tile finish. (approx. 3 squaremetre)
Lifecycle Replacement
Lifecycle Replacement
2017
2017
$1,750
$1,000
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
Main floor (server room B14) - has plywood wall panels. (approx. 35 square metres)
Lower floor (mens washroom, ladies washroom) - have ceramic tile wall splashback on the vanities. (approx. 1 squaremetre) Main floor (mens washroom, ladies washroom) - have ceramic tile wall splashback on the vanities. (approx. 1 squaremetre) Main floor (Cleaning Supplies A14) - has ceramic tile finish behind slop sink. (approx. 1 square metre)
The building - has painted gypsum wall boards. Lower floor (corridor around central stair) - has painted plaster wall finish. Main floor (corridor around central stair) - has painted plaster wall finish.
Lower floor (archive room C5, Maintenance Room C7 including telephone room and elevator machine room) - havepainted concrete flooring. Lower floor (outdoor storage) - has concrete flooring.
Report run on: March 7, 2014 11:05 AM Page 16 of 36
C3020.02 Tile Floor Finishes**
C3020.07 Resilient Flooring**
4 - Acceptable
4 - Acceptable
Rating
Rating
1977
2000
Installed
Installed
50
20
Design Life
Design Life
MAR-14
MAR-14
Updated
Updated
Replace tile flooring. (approx. 30 square metres)
Replace sheet vinyl flooring. (approx. 50 squaremetres)
Lifecycle Replacement
Lifecycle Replacement
2027
2020
$4,500
$2,500
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
Main floor (mens washroom, ladies washroom) - have quarry tile flooring. (approx. 30 square metres)
Lower floor (staff room, mens washroom, ladies washroom) - have sheet vinyl flooring. (approx. 10 square metres)(installed in approx. 2000) Main floor (main entrance vestibule, Cleaning Supplies A14, File/Copy Room A16, Server B14) - have sheet vinyl flooring.(approx. 40 square metres) (installed in approx. 2000)
Report run on: March 7, 2014 11:05 AM Page 17 of 36
C3020.08 Carpet Flooring**
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**
4 - Acceptable
4 - Acceptable
Rating
Rating
2000
2000
Installed
Installed
15
25
Design Life
Design Life
MAR-14
MAR-14
Updated
Updated
Replace carpet flooring. (approx. 640 squaremetres)
Replace suspended T-bar ceiling system. (approx.530 square metres)
Lifecycle Replacement
Lifecycle Replacement
2017
2025
$64,000
$39,750
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
Lower floor (Admin. Assistant WHS Business Performance C1, Manager WHS Business Performance C2, ConferenceRoom 2 C3, Office C4, File Room C6, Maintenance Room C7, HR Advisor C8, Disability Management Advisor C9, HRAdvisor & Job Evaluation C10, HR Advisor C11, Admin. Secretary HR C12, Medical Director C15, Office C16,Engagement Advisor WHS Business Performance C19, Manager Medical Officer C23, corridors) - have carpet flooring.(approx. 150 square metres) (installed in approx. 2000) Main floor (HR Assistant A1, Infection Control Professional A2, A7, Consultant Wound Skin Management A3, Office A5,Infection Prevention Control Practitioner A6, A9, Lead EME Job Education A8, Administrative Assistant EMS A10,Manager MFR/EMS A11, Data Integrity Measurement & Deputy A12, Advisor External Leading Partnership A13,Executive Assistant to Medical Officer of Health A15, Director EMS Central A17, Office A18, Learning & Control A19,Office B1, Administrative Assistant B2, Office B3, Health Information Office B4, Medical Officer of Health B5, SupervisorNotifiable Diseases South Education & Practice Development B6, Executive Director B7, Area Director B8, ReceptionistD1, Mail Room D2, Admin. Secretary Health Services D3, D4, Program Secretary Operations D5, Copy/Printer RoomB10, Conference Room 3 B11, Conference Room 1 B12, corridors) - have carpet flooring. (approx. 490 square metres)(installed in approx. 2000)
Lower floor (Admin. Assistant WHS Business Performance C1, Manager WHS Business Performance C2, ConferenceRoom 2 C3, Office C4,File Room C6, , HR Advisor C8, Disability Management Advisor C9, HR Advisor & Job EvaluationC10, HR Advisor C11, Admin. Secretary HR C12, Medical Director C15, Office C16, Engagement Advisor WHS BusinessPerformance C19, Manager Medical Officer C23, staff room, corridors) - have suspended T-bar ceiling system c/wacoustic ceiling tiles. (approx. 400 square metres) (installed in approx. 2000) Main floor (Infection Control Professional A2, A7, Consultant Wound Skin Management A3, Office A5, InfectionPrevention Control Practitioner A6, Lead EME Job Education A8, Administrative Assistant EMS A10, Manager MFR/EMSA11,Director EMS Central A17, Office A18, Learning & Control A19, , Receptionist D1, Mail Room D2, Admin. SecretaryHealth Services D3, D4, Program Secretary Operations D5, Conference Room 3 B11, corridors) - have suspended T-barceiling system c/w acoustic ceiling tiles. (approx. 130 square metres) (installed in approx. 2000)
Report run on: March 7, 2014 11:05 AM Page 18 of 36
C3030.07 Interior Ceiling Painting*
C3030.09 Other Ceiling Finishes* - Acoustic Ceiling Tiles
C3030.09 Other Ceiling Finishes* - Cement Planel Ceiling
D1010.01.02 Hydraulic Passenger Elevators**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1977
1977
Installed
Installed
Installed
Installed
0
0
0
30
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace elevator. (1 elevator)
Lifecycle Replacement 2017 $40,000 Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Type Year Cost Priority
Updated: MAR-14
Low floor (outdoor storage) - has painted concrete ceiling. Low floor (Maintenance Room and elevator machine room C7) - has painted concrete ceiling. Lower floor (Archive Room C5) - has painted drywall ceiling. Main floor (main lobby, main entrance vestibule, Conference Room 1 B12, central stair, Health Information Office B4,Executive Assistant to Medical Officer of Health A15, filing area) - have textured plaster ceiling.
Main floor (HR Assistant A1, Infection Prevention Control Practitioner A9, Data Integrity Measurement & Deputy A12,Advisor External Leading Partnership A13, Office B1, Administrative Assistant B2, Office B3, , Medical Officer of HealthB5, Supervisor Notifiable Diseases South Education & Practice Development B6, Executive Director B7, Area DirectorB8, Copy/Printer Room B10, mens washroom, ladies washroom) - have glued on acoustic ceiling tiles
Lower floor (covered parking area) - has cement panel ceiling.
Elevator (lower floor to main floor) - Otis, 1364kg. (1500 lbs.), egg crate ceiling panels, metal wall panels, carpet flooring,steel handrails, prefinished metal door.
Report run on: March 7, 2014 11:05 AM Page 19 of 36
D2010.04 Sinks**
D2010.08 Drinking Fountains/Coolers**
D2010.10 Washroom Fixtures (WC, Lav, Urnl)**
D2020.01.01 Pipes and Tubes: Domestic Water*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1977
1977
Installed
Installed
Installed
Installed
30
35
35
0
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace 4 S/S sinks and 1 Janitor sink
Replace one refrigerted drinking fountain.
Replace 7 WC's, 6 Lavs & 1 Urinal
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2017
2017
$8,000
$3,500
$16,000
Unassigned
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
Single and two compartment stainless steel sinks with conventional faucets, located in kitchenettes. Floor mounted mopservice basins.
Fully recessed, stainless steel, refrigerated drinking fountain. Located in the corridor.
Floor mounted water closets with manual flush valves, wall mounted urinal with manual flush valves, vitreous china vanitylavs with conventional faucets.
Mainly copper water lines with solder joints throughout building.
Report run on: March 7, 2014 11:05 AM Page 20 of 36
D2020.01.02 Valves: Domestic Water**
D2020.01.03 Piping Specialties (Backflow Preventers)**
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation: Domestic*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1995
2000
1977
Installed
Installed
Installed
Installed
40
20
20
0
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace 20 domestic water valves
Replace 1 boiler make up water line backflowpreventor.
Replace domestic 1 water heater and 1recirculation pump.
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2017
2020
$10,000
$1,500
$3,000
Unassigned
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
Mainly 1/4 turn ball valves and gate valves - isolation service to water meter, hot water tank, and plumbing fixture supplylines.
There is a FEBCO backflow prevention device in place on the boiler feed line. The installation date is estimated.
Natural gas fired domestic water heater located in the mechanical room, as follows: Rheem model PRO40-40FV1, 40Usgal storage capacity, 40 MBH gas input capacity. Installation date is estimated. Includes fractional HP recirculating pump.
Preformed fiberglass pipe insulation on domestic hot and cold water lines. Canvas jacketting in exposed areas.
Report run on: March 7, 2014 11:05 AM Page 21 of 36
D2030.01 Waste and Vent Piping*
D2030.02.04 Floor Drains*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
D3010.02 Gas Supply Systems*
D3020.02.01 Heating Boilers and Accessories: H.W.**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
35
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Updated
Replace 2 hot water boilers and accessoriess.
Lifecycle Replacement 2017 $100,000 Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Type Year Cost Priority
Updated: MAR-14
Mainly cast iron and copper waste and vent piping throughout the building.
Mostly conventional floor drains located in Mechanical rooms, washrooms and service areas throughout the building.
Cast iron piping from roof drains, down and collecting to rainwater leaders which discharge to grade around the perimeterof the building.
Cast iron dome type roof roof drains located in flat roof areas. Minimum one per roof area.
Schedule 40 steel piping from incoming gas service to boilers and domestic water heater.
There are two natural gas fired boilers manufactured by Teledyne Laars. Mighty Therm series, model HH 1010 IN 11 K1C KX, with a gas input capacity of 1,010 MBH each and located in the mechanical room c/w all operating and safetycontrols.
Report run on: March 7, 2014 11:05 AM Page 22 of 36
D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
D3030.06.02 Refrigerant Condensing Units**
D3040.01.01 Air Handling Units: Air Distribution**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
2008
1977
Installed
Installed
Installed
Installed
35
0
25
30
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace Chimney & Comb. Air (1 stack @ 6 M)
Replace 1 roof mounted condensing unit.
Replace the Building AHU.
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2033
2017
$18,000
$60,000
$50,000
Unassigned
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
The heating system has combustion air supply and exhaust flues which extend through the roof. The boilers are jointvented into a single stack.
Pot feeder is connected to the boiler hydronic loop. Water treatment program is provided for the hot water heatingsystem.
Condensing unit on roof serving the DX cooling coil in the main air handling unit. Make / model are unknown (roofinaccessible at the time of site inspection). Cooling capacity (based on building area) is estimated to be 40 tons.
Ventilation in the building is provided by a single air handling system located in the main mechanical room. This unitserves the entire building and includes a heating coil, , DX cooling coil filter section, mixing section, supply fan and axialreturn fan. Name plates have been painted over - make, model & capacity are unknown, although 12,000 CFM isestimated, based on building area.
Report run on: March 7, 2014 11:05 AM Page 23 of 36
D3040.01.02 Fans: Air Distribution (Remote from AHU)*
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets: Air Distribution*
D3040.03.01 Hot Water Distribution Systems**
D3040.04.01 Fans: Exhaust**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
0
0
0
40
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Replace Hot Water Distribution Systems (1,254Sq.M.)
Replace 2 roof mounted exhaust fans.
Lifecycle Replacement
Lifecycle Replacement
2017
2017
$95,000
$4,000
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
Canadian Blower axial return air fan located in the main Mechanical room. Replacement cost included with D3040.01.01Air Handling Units: Air Distribution**.
Galvanized, low velocity steel ductwork throughout building, connecting air handling unit to grilles & diffusers. Mostly runin ceiling spaces.
Mainly ceiling mounted rectangular and linear supply diffusers are used to supply ventilation air to the building. Eggcratereturn grilles.
Hot water heating distribution is through insulated steel piping to finned tube radiation, force flow heaters and, unit heatersin the building. Includes piping & circulation pumps.
There are 2 centrifugal roof mounted exhaust fans serving washrooms
Report run on: March 7, 2014 11:05 AM Page 24 of 36
D3040.04.03 Ducts: Exhaust*
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3050.01.01 Computer Room Air Conditioning Units**
D3050.03 Humidifiers**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
2005
1977
Installed
Installed
Installed
Installed
0
0
30
25
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace ductless split system air conditioningsystem.
Replace steam generator.
Lifecycle Replacement
Lifecycle Replacement
2035
2017
$15,000
$4,000
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
Galvanized, low velocity sheet metal ductwork connecting exhaust fans to exhaust grilles throughout building.
Ceiling mounted grilles serve as exhaust air inlets - located mainly in washrooms.
A Mitsubishi ductless split system air conditioning system serving Server room cooling requirements. Includes matchedremote condensing unit on roof and controls (part of the package). Install date is estimated
DriSteem model VLC-12-1 electric steam generator, providing steam for the air handling unit humidifier.
Report run on: March 7, 2014 11:05 AM Page 25 of 36
D3050.05.02 Fan Coil Units**
D3050.05.03 Finned Tube Radiation**
D3050.05.06 Unit Heaters**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1977
1977
1977
Installed
Installed
Installed
30
40
30
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Replace 3 force flow units.
Replace 200 M of finned tube radiation.
Replace 2 unit heaters.
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2017
2017
$9,000
$60,000
$3,000
Unassigned
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
Wall mounted fan coil units are provided mainly in the entrance vestibules throughout the bulding
Finned tube baseboard and wall mounted radiation units are installed around perimeter zones throughout the building.Varied enclosure styles.
Hot water unit heaters - located in the main mechanical room and basement service area.
Report run on: March 7, 2014 11:05 AM Page 26 of 36
D3060.02.01 Electric and Electronic Controls**
D3060.02.02 Pneumatic Controls**
D3060.02.05 Building Systems Controls (BMCS, EMCS)**
D4020 Standpipes*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
2000
1977
Installed
Installed
Installed
Installed
30
40
20
0
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace unit heater and force flow heater controls.(5 total)
Replace zone valves, air compressor andrefrigerated air dryer (1,254 Sq.M.)
Replace DDC equipment. (1,254 Sq.M.)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2017
2020
$4,000
$20,000
$15,000
Unassigned
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
Line voltage electric control of force flow heaters and unit heaters.
Pneumatic zone control valves, Wilkerson model WRA-0010-1-1 refrigerated air dryer, and duplex air compressor with1/2 HP motors - unknown make.
DDC system of unknown make, controlling air handling unit, boilers and pumps. Pneumatic end-devices coupled with DDC controls are used throughout the building. Install date is estimated.
Fire hose cabinets located mainly in corridors, containing only standpipe valves.
Report run on: March 7, 2014 11:05 AM Page 27 of 36
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - AcceptableRating
1977Installed
0Design Life
MAR-14Updated
Camrose - Regional Health Centre (B0107A)
Handheld fire extinguishers are located in cabinets and on wall mounting brackets throughout the building and arechecked annually.
Report run on: March 7, 2014 11:05 AM Page 28 of 36
D5010.01.02 Main Electrical Transformers (Utility Owned)*
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
D5010.07.02 Motor Starters and Accessories**
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1977
1977
Installed
Installed
Installed
Installed
40
40
30
30
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Replace Main Electrical Switchboard - (1 -800A,120/208V, distribution centre)
Replace Branch Circuit Panelboards - (3 panels)
Replace Motor Starters - (4 starters)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2017
2017
$75,000
$15,000
$4,000
Unassigned
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)S5 ELECTRICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-14
MAR-14
MAR-14
Power to the building is obtained from an on-site, utility-owned pad mounted transformer located on the south side of theproperty.
A CEB LIMITED main distribution centre has been provided. It is located in the electrical room on the lower level. It israted at 800A, 120/208V, 3 phase, 4 wire, and is complete with an 800A main fused disconnect switch, and a distributionsection, complete with fused disconnect switches. There is spare capacity in the distribution section and all feederswitches are adequately identified.
Branch circuit panel boards have been provided on the lower and the upper levels. Panels are approximately 80% full.
Wall mounted individual starters have been provided for motor control. Starters are complete with pilot lights and hand-off-auto selector switches.
Report run on: March 7, 2014 11:05 AM Page 29 of 36
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
D5020.02.02.02 Interior Fluorescent Fixtures**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1977
1977
1977
Installed
Installed
Installed
0
0
30
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Replace Interior Fluorescent Fixtures-(250fixtures)
Upgrade Interior Fluorescent Fixtures-(250fixtures)
Lifecycle Replacement
Energy Efficiency Upgrade
2017
2015
$65,000
$65,000
Unassigned
Low
Lighting fixtures are not energy efficient. Concern:
Replace with energy efficient fixtures utilizing T8 lamps andelectronic ballasts. Pay back is 4 years.
Recommendation:
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
All branch is copper and installed in conduit.
Lighting is controlled by wall mounted line voltage switches; each area is locally controlled.
Lighting is provided by fluorescent fixtures. Depending on the ceiling system, fixtures are either recessed mounted orsurface mounted. Fixtures are complete with T12 lamps.
Consequences of Deferral:High energy costs.
Report run on: March 7, 2014 11:05 AM Page 30 of 36
D5020.02.03.02 Emergency Lighting Battery Packs**
D5020.02.03.03 Exit Signs*
D5020.03.01.01 Exterior Incandescent Fixtures*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
20
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Replace Emergency Lighting Battery Packs-(8battery packs)
Lifecycle Replacement 2017 $8,000 Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Type Year Cost Priority
Updated: MAR-14
Emergency lighting is provided by emergency lighting battery packs and remote heads. All paths and points of egress areadequately illuminated.
Exit signs have been provided to identify all paths and points of egress. Each required exit has been provided with an exitsign. Signs are with incandescent lamps.
Recessed mounted fixtures have been provided under the front entrance canopy.
Bollard type fixtures have been provided along the walkways leading into the building.
Exterior lighting is controlled by photo-cell.
Report run on: March 7, 2014 11:05 AM Page 31 of 36
D5030.01 Detection and Fire Alarm**
D5030.02.02 Intrusion Detection**
D5030.04.01 Telephone Systems*
D5030.04.04 Data Systems*
D5030.04.05 Local Area Network Systems*
4 - Acceptable
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1990
2004
2005
2001
2001
Installed
Installed
Installed
Installed
Installed
25
25
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Replace Detection and Fire Alarm-(1254 Sq. M.)
Replace Intrusion Detection-(1254 Sq. M.)
Lifecycle Replacement
Lifecycle Replacement
2017
2029
$65,000
$20,000
Unassigned
Unassigned
Camrose - Regional Health Centre (B0107A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-14
MAR-14
A Mircom hard wired, zoned fire alarm system has been provided. It is complete with detection devices, audible signaldevices, and manual pull stations, The main control panel is with an integral annunciator and is located in the mainentrance to the building on the upper level. The system is externally monitored and annually tested.
A PC5010 intrusion detection system has been provided. It is complete with motion sensors and key pads. System isexternally monitored.
Telephone service is underground and it terminates on the telephone backboard located in the telephone room. An NECtelephone system has been provided with telephone sets in each office and work station.
Cat 5 data cabling has been provided, with data outlets in each office and work station.
Server room has been provided with a floor mounted data rack, complete with patch panels and switches. Server room islocated on the lower level.
Report run on: March 7, 2014 11:05 AM Page 32 of 36
E1090.04 Residential Equipment*
E2010.03.01 Blinds**
4 - Acceptable
4 - Acceptable
Rating
Rating
1977
1977
Installed
Installed
0
30
Design Life
Design Life
MAR-14
MAR-14
Updated
Updated
Replace blinds. (approx. 83 blinds)
Lifecycle Replacement 2017 $33,200 Unassigned
Camrose - Regional Health Centre (B0107A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Event:
Type Year Cost Priority
Updated: MAR-14
Lower floor (staff room) - has fridges and dishwasher. Main floor (File/Copy Room A16) - has fridge and dishwasher.
Lower floor - has venetian blinds over windows. (approx. 19 blinds) Lower floor (conference room 2 C3) - has venetian blinds over interior windows. (2 blinds) Main floor - has venetian blinds over windows. (approx. 44 blinds) Main floor (executive director B7) - has vertical blind. (approx. 2 blinds) Main floor (conference room 1, office A7) - has vertical blinds and accordion blinds over storefront windows. (approx. 16blinds)
Report run on: March 7, 2014 11:05 AM Page 33 of 36
K4010.01 Barrier Free Route: Parking to Entrance*
K4010.02 Barrier Free Entrances*
K4010.03 Barrier Free Interior Circulation*
K4010.04 Barrier Free Washrooms*
K4030.01 Asbestos*
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Provide automatic door operators. (2 doors)
Barrier Free Access Upgrade 2014 $20,000 Low
Main floor (west main entrance and vestibule) - do not haveautomatic door operators.
Concern:
Provide automatic door operators. (2 doors)Recommendation:
Camrose - Regional Health Centre (B0107A)S8 SPECIAL ASSESSMENT
Event:
Type Year Cost Priority
Updated: MAR-14
Main floor west entrance to lower floor covered parking area - has barrier free route.
Main floor (west main entrance and vestibule) - do not have automatic door operators.
Building corridors are wide enough for wheelchairs. Building (lower floor to main floor) - has elevator.
Main floor (mens washroom, ladies washroom) - have handicapped cubicles.
No asbestos was observed or reported.
Report run on: March 7, 2014 11:05 AM Page 34 of 36
K4030.02 PCBs*
K4030.04 Mould*
K4030.06 Radioactive Compounds*
K4030.07 Ozone Depleting Substances (CFC's, HCFC's, Halon)*
K4030.08 Biohazardous Materials*
K4030.09 Other Hazardous Materials*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1977
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
MAR-14
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Regional Health Centre (B0107A)
No PCBs were observed or reported.
No mould was observed or reported.
No radioactive compounds known or reported
No ozone depleting substances were observed or reported.
No biohazardous materials known or reported
No hazardous materials known or reported
Report run on: March 7, 2014 11:05 AM Page 35 of 36
K5010.01 Site Documentation*
4 - AcceptableRating
2013Installed
0Design Life
MAR-14Updated
Camrose - Regional Health Centre (B0107A)
Prime Consultant Name - Francis Ng Architect Ltd. Date of Site Visit: October 17, 2013 Total building area is 1254.0 square metres. Drawing attached - Site Plan.
Site Plan.
Report run on: March 7, 2014 11:05 AM Page 36 of 36
K5010.02 Building Documentation*
4 - AcceptableRating
2013Installed
0Design Life
MAR-14Updated
Camrose - Regional Health Centre (B0107A)
Prime Consultant Name - Francis Ng Architect Ltd. Date of Site Visit: October 17, 2013 Total building area is 1254.0 square metres. Drawing attached - Main Floor Plan and Lower Floor Plan
Main Floor Plan.