Report run on: April 4, 2012 3:40 PM RECAPP Facility Evaluation Report Winston Churchill High School B3713A Lethbridge Lethbridge School Dist #51

Transcript of RECAPP Facility Evaluation Report - Alberta · 2013. 5. 29. · drainage and adequate water...

  • Report run on: April 4, 2012 3:40 PM

    RECAPP Facility Evaluation Report

    Winston Churchill High SchoolB3713A

    Lethbridge

    Lethbridge School Dist #51

  • Report run on: April 4, 2012 3:40 PM Page 2 of 47

    B3713ABuilding Id:

    Winston Churchill High SchoBuilding Name:

    LethbridgeLocation:1605 - 15 Avenue N. Address:

    10,345.78Gross Area (sq. m): $34,780,000Replacement Cost:1967Construction Year:

    Evaluation Date: November 30 2011

    Williams Engineering Canada Inc.Evaluation Company:

    Jennifer Lavier JankovicEvaluator Name:

    The school was originally built in 1967 as a one storey building. A small addition to the original gymnasium was addedin 1969. A storage shed shop was added in 1986 to the Industrial Arts area. In 1990, an addition was added to theadministration area and the west classroom areas were renovated. In 2002, the school had an addition with a newgymnasium and adding a second floor of classrooms at the previous gym location and the remainder of the schoolreceived an overall modernization. The school is from grade 9 to 12 with a population of 1,100 students. The overallarea of the school is approximately 10,345.78 m2.

    Overall, the school is in good condition.

    General Summary:

    Structural Summary:Foundations are concrete pile and grade beam with slab on grade. Exterior walls of the original building are steel columnswith concrete block with pre-fabricated concrete panel system infill. Exterior walls of the new gymnasium are concreteblock. The new second floor at the original gymnasium is OWSJ's. The roof of the new gymnasium and most of theoriginal school is open web steel joists supported by steel beams and concrete block. The roof of the northwest part ofthe original building is precast T's.

    Overall, the structural system is in good condition.

    Envelope Summary:The school envelope system consists of brick veneer on concrete block, pre-fabricated concrete panels, stucco andcast-in-place concrete walls. The windows are sealed aluminum with an operable section. The windows are originaland in need of replacement with a more efficient choice. Main glazed entrance systems and utility doors are steel insteel frames. The utility doors are now marginal and replacement is recommended. The previous built-up roofing(BUR) has now been all replaced with an SBS membrane.

    Overall, the envelope system is in acceptable condition.

    Interior Summary:Corridor and classroom walls are painted concrete block. Other partition walls are gypsum framed walls. Classroomsprior to the 2002 addition and renovation are resilient tile. Corridors and classrooms added or renovated in 2002 areresilient sheet material. Carpet is only in the administration, counseling and music room. Replacement isrecommended. The gymnasium floor is maple. Ceramic tile flooring is found at entry lobbies, washrooms andgymnasium change rooms and team rooms. Ceiling finishes are mainly acoustic tile in metal suspension - classrooms,corridors, library, and administration. The industrial arts room has painted precast concrete. The drama room hassprayed exposed structure; the music room has a suspended acoustic grid and the gymnasium has painted acousticsteel deck. Classrooms contain built-in lower cabinets and specialty classrooms including computer labs, food andother sciences have additional built-in millwork. There are custom desks for reception in administration and circulationin the library. Green boards have been replaced with white boards and Smartboards are provided in the classrooms.Equipment includes cafeteria food preparation, industrial arts, gymnasium and food science equipment. Thetelescoping gymnasium bleachers are not functioning as desired and replacement is recommended.

    Overall, the school interior is in good condition.

    Mechanical Summary:Site services consist of: 100 mm diameter water service supplied from south side of building to meter Room #112, 150

    1.73%5 year Facility Condition Index (FCI):

    Facility Details Evaluation Details

    Total Maintenance Events Next 5 years: $603,350

    Lethbridge - Winston Churchill High School (B3713A)

  • Report run on: April 4, 2012 3:40 PM Page 3 of 47

    mm diameter gravity sewer line, storm lines drain by gravity to 15th Avenue and pressure gas line from north side ofbuilding to gas meter Room #123. Water, drain, and vent lines are supplied to all plumbing fixtures with properdrainage and adequate water services. Ventilation is generally provided by roof top ventilation units and roof top makeup air units. Exhaust systems are provided for washrooms, shop, etc. Cast iron sectional boilers are provided in theboiler room. Circulation pumps are provided for circulation hot water to perimeter radiant ceilings, reheat coils in supplyducts, fan coil units,unit heaters, radiation finns, etc. Glycol system is provided for preheat coils in air handling units.

    Overall, the mechanical systems are in good condition.

    Electrical Summary:The main electrical service CDP #1 is a Federal Pioneer 1200 amp, 600/347 volt, 3 phase, 3 wire panel in theelectrical room. There are 3 another CDP's (CDP #2, #3 and #4) in the electrical room, mechanical room and storageroom. CDP #2 in the electrical room is fed from a 450 KVA, 600V - 120/208V transformer for most of 120/208V sub-panels. CDP #3 in the mechanical room is fed from CDP #1 directly for all 600V mechanical equipment. CDP #4 in thestorage room is fed from a 75 KVA, 600V - 120/208V transformer for 120/208V sub-panels M2Z and M2Y. There are33 120/208V sub-panels installed in the mechanical room, storage room and corridors of the facility to provide powerfor lighting and equipment. The interior of the building is lit with a combination of T8 fluorescent and HID fixtures. Theexterior is lit with wall mounted HID wallpacks along the building perimeter. The building has 69KVA, 120/208VHOHLER generator for emergency lighting and exit signs. The building has an EDWARDS Quick Start fire alarmcontrol panel, one annunciator and heat detectors, smoke detectors, pull-stations and horn/strobes throughout. Thebuilding is equipped with Super Net, video surveillance, telephone, call, three music, TV and security systems.

    Overall, the electrical systems are in excellent condition.

    Lethbridge - Winston Churchill High School (B3713A)

    Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

    3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

    Rating Guide

    5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

  • Report run on: April 4, 2012 3:40 PM Page 4 of 47

    A1010 Standard Foundations*

    A1030 Slab on Grade*

    B1010.01 Floor Structural Frame (Building Frame)*

    B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

    B1010.03 Floor Decks, Slabs, and Toppings*

    B1010.05 Mezzanine Construction*

    B1010.06 Ramps: Exterior*

    4 - Acceptable

    4 - Acceptable

    5 - Good

    5 - Good

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    1967

    1967

    1976

    1967

    1967

    1967

    1993

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Lethbridge - Winston Churchill High School (B3713A)S1 STRUCTURAL

    Concrete pile and grade beams on the perimeter and interior.

    Concrete slab on grade.

    Open web steel joists supporting second floor classrooms at previous gymnasium.

    Load bearing concrete block walls support mezzanines for mechanical room and music theater.

    Concrete topping on steel deck on open web steel joists supporting second floor classrooms at previous gymnasium.

    Concrete topping on steel deck on OWSJ's at mechanical (NW) and at music theater (SE) mezzanines. Wood framemezzanine in industrial arts.

    Concrete ramp with steel handrail at main entry.

  • Report run on: April 4, 2012 3:40 PM Page 5 of 47

    B1010.07 Exterior Stairs*

    B1010.09 Floor Construction Fireproofing*

    B1020.01 Roof Structural Frame*

    B1020.04 Canopies*

    5 - Good

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1993

    1993

    1967

    1967

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Lethbridge - Winston Churchill High School (B3713A)

    Concrete stairs with steel handrail at main entry.

    Sprayed fire protection to steel deck and OWSJ's for classroom floors added at old gymnasium. Type X board applied tosupporting columns.

    Open web steel joists supported by steel beams and concrete block. The roof of the northwest part is precast T's.

    Steel frame with pitched roof at main south entrance. Wood frame at exterior door at northeast (industrial Arts). Requirespaint ($1, 000).

  • Report run on: April 4, 2012 3:40 PM Page 6 of 47

    B2010.01.01 Precast Concrete: Exterior Wall Skin*

    B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

    B2010.01.02.02 Concrete Block: Ext. Wall Skin*

    B2010.01.06.03 Metal Siding**

    B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

    B2010.01.09 Expansion Control: Ext. Wall*

    5 - Good

    5 - Good

    4 - Acceptable

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    1967

    1967

    1986

    2002

    2002

    1967

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    40

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    FEB-07

    FEB-07

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace metal siding (145 m2)

    Lifecycle Replacement 2042 $28,500 Unassigned

    Lethbridge - Winston Churchill High School (B3713A)S2 ENVELOPE

    Event:

    Type Year Cost Priority

    Updated: MAR-12

    Pre-cast concrete columns on the exterior facade around the school.

    Face brick on the exterior envelope of the building throughout.

    Receiving and storage addition to Industrial Arts in northeast.

    Metal fascia, north and east on single storey.

    The new gymnasium and 2nd storey new classroom space over old gymnasium are alternating bands of rock dash andacrylic stucco on the upper portion. The lower fascia is also stucco.

    Brick and stucco vertical control joints.

  • Report run on: April 4, 2012 3:40 PM Page 7 of 47

    B2010.01.11 Joint Sealers (caulking): Ext. Wall**

    B2010.01.13 Paints (& Stains): Ext. Wall**

    B2010.02.01 Cast-in-place Concrete: Ext. Wall Const*

    B2010.02.02 Precast Concrete: Ext. Wall Const.*

    B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*

    4 - Acceptable

    4 - Acceptable

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1990

    1986

    1967

    1967

    1967

    Installed

    Installed

    Installed

    Installed

    Installed

    20

    15

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace exterior sealants (1100 m)

    Paint exterior concrete block (180 m2)

    Lifecycle Replacement

    Lifecycle Replacement

    2015

    2015

    $26,000

    $2,400

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    Caulking on control joints and around windows, doors and metal siding.

    Painted concrete block at addition to Industrial Arts.

    Cast in place concrete wall in the existing gymnasium built in 1967.

    Pre-cast window panels around the perimeter of single storey portions.

    Brick cavity walls: rigid insulation on sheet air membrane.

  • Report run on: April 4, 2012 3:40 PM Page 8 of 47

    B2010.06 Exterior Louvers, Grilles, and Screens*

    B2010.09 Exterior Soffits*

    B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1967 Section

    B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 2002 Section

    5 - Good

    4 - Acceptable

    3 - Marginal

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1967

    1967

    1967

    2002

    Installed

    Installed

    Installed

    Installed

    0

    0

    40

    40

    Design Life

    Design Life

    Design Life

    Design Life

    FEB-07

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace classroom and administration windows(62)

    Replace 2002 windows (5)

    Failure Replacement

    Lifecycle Replacement

    2012

    2042

    $145,000

    $12,000

    Low

    Unassigned

    Windows are drafty. They are not thermally broken and manyof the vents are not functioning properly.

    Concern:

    Replace windows. Recommendation:

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    Galvanized and pre-finished louvers and grilles throughout the perimeter of the school.

    Painted plywood exterior soffits.

    Clear anodized sealed units with awning vents. Classrooms and administration.

    Windows at art room in the southeast;upper floor classrooms. Anodized aluminum.

  • Report run on: April 4, 2012 3:40 PM Page 9 of 47

    B2030.01.02 Steel-Framed Storefronts: Doors**

    B2030.02 Exterior Utility Doors** - 1967 Section

    B2030.02 Exterior Utility Doors** - 2002 Section

    4 - Acceptable

    3 - Marginal

    4 - Acceptable

    Rating

    Rating

    Rating

    1990

    1967

    2002

    Installed

    Installed

    Installed

    30

    40

    40

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace main entrances (2)

    Replace exterior utility doors (30)

    Replace gymnasium exterior doors (6)

    Lifecycle Replacement

    Failure Replacement

    Lifecycle Replacement

    2020

    2012

    2042

    $14,000

    $42,000

    $8,400

    Unassigned

    Low

    Unassigned

    Doors have been patched up as far as practical, but areobsolete. They do not provide the desired thermal protectionand security. Hardware locations are non-standard.

    Concern:

    Replace doors with insulated steel.Recommendation:

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    Main south entries. Steel insulated doors with sidelights and transoms on the exterior and in the vestibule.

    Corridor exterior exit doors and exterior access to service rooms.

    Insulated exterior steel door to gymnasium.

  • Report run on: April 4, 2012 3:40 PM Page 10 of 47

    B2030.03 Large Exterior Special Doors (Overhead)*

    B3010.01 Deck Vapour Retarder and Insulation*

    B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**

    B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** - 1967 Section

    4 - Acceptable

    5 - Good

    5 - Good

    N/A

    Rating

    Rating

    Rating

    Rating

    1967

    2003

    1980

    1967

    Installed

    Installed

    Installed

    Installed

    0

    0

    25

    25

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Completed - Replace Asphalt & Gravel

    Completed - Replace Built-up Bituminous Roofing

    Failure Replacement

    Failure Replacement

    2015

    2015

    $658,617

    $1,991,635

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    Two overhead garage doors in the wood shop area.

    New construction: 75 mm rigid insulation on vapour barrier on gypsum board on steel deck.

    A majority of the school still has tar and gravel roofing from the original building.

  • Report run on: April 4, 2012 3:40 PM Page 11 of 47

    B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** - 1993 Section

    B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** - 2003 Section

    B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**

    N/A

    N/A

    5 - Good

    Rating

    Rating

    Rating

    1993

    2003

    2005

    Installed

    Installed

    Installed

    25

    25

    25

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Completed - Replace Bituminous Roofing (Asphalt& Gravel) - 1993 Section

    Completed - Replace Roofing (Asphalt & Gravel) -2003 Section

    Replace SBS roofing (10,000 m2)

    Failure Replacement

    Failure Replacement

    Lifecycle Replacement

    2018

    2028

    2030

    $93,533

    $534,769

    $1,200,000

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    All original built up roofing has been replaced with SBS membrane.

  • Report run on: April 4, 2012 3:40 PM Page 12 of 47

    B3010.07 Sheet Metal Roofing**

    B3010.08.02 Metal Gutters and Downspouts**

    B3020.01 Skylights**

    B3020.02 Other Roofing Openings (Hatch, Vent, etc)*

    4 - Acceptable

    4 - Acceptable

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    1990

    1990

    1993

    2002

    Installed

    Installed

    Installed

    Installed

    40

    30

    25

    0

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace metal roof at entry (24 m2)

    Replace downspouts (65 m)

    Replace skylights (24 m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2030

    2020

    2018

    $4,500

    $3,900

    $38,400

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    Pre-finished standing seam pitched roof at main entrance canopy.

    Downspouts at overflow scuppers.

    Skylights at front main entry of the school.

    Roof access hatch replaced in 2002. Access located in northeast storage room.

  • Report run on: April 4, 2012 3:40 PM Page 13 of 47

    C1010.01 Interior Fixed Partitions*

    C1010.03 Interior Operable Folding Panel Partitions**

    C1010.05 Interior Windows*

    C1010.06 Interior Glazed Partitions and Storefronts*

    C1020.01 Interior Swinging Doors (& Hardware)*

    5 - Good

    4 - Acceptable

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1967

    1990

    1967

    1990

    1990

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    30

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace folding partitions (160 m2)

    Lifecycle Replacement 2020 $64,000 Unassigned

    Lethbridge - Winston Churchill High School (B3713A)S3 INTERIOR

    Event:

    Type Year Cost Priority

    Updated: MAR-12

    1967 and 2002. Concrete block and gypsum board on steel studs.

    Folding panel partitions and vinyl folding partitions. Classrooms B114, B132, C110; B112 (library), B117 office, E100(cafeteria).

    Glass in painted steel frames. Drama office, sound and light booth on drama, art room office, library office, administrationoffices, cafeteria to corridor.

    Aluminum glazed doors and sidelights at entry to administration area and staff lounge.

    1990 and 2002. Solid core wood with clear finish and glazing panels in steel frames to classrooms and administration.Hollow steel in steel frames to service and storage rooms.

  • Report run on: April 4, 2012 3:40 PM Page 14 of 47

    C1020.03 Interior Fire Doors*

    C1030.01 Visual Display Boards**

    C1030.02 Fabricated Compartments (Toilets/Showers)** - 1990

    C1030.02 Fabricated Compartments (Toilets/Showers)** - 2002

    4 - Acceptable

    4 - Acceptable

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    1990

    2002

    1990

    2002

    Installed

    Installed

    Installed

    Installed

    0

    20

    30

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace white boards and tack boards (860 m2)

    Replace boys, girls and staff toilet cubicles (21)

    Replace gymnasium toilet and shower cubicles(16)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2020

    2032

    $144,000

    $21,000

    $24,400

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    1990 and 2002. Corridor fire doors are double rated steel with wired glass glazing panel and magnetic hold open devices.

    Whiteboards, tackboards and Smartboards in classrooms.

    Pre-finished metal toilet partitions, student and staff washrooms.

    Toilet (4) and shower (12) cubicles in gymnasium rooms. Prefinished steel.

  • Report run on: April 4, 2012 3:40 PM Page 15 of 47

    C1030.08 Interior Identifying Devices*

    C1030.10 Lockers**

    C1030.12 Storage Shelving*

    C1030.14 Toilet, Bath, and Laundry Accessories*

    C2010 Stair Construction*

    C2010 Stair Construction* - metal stairs

    4 - Acceptable

    5 - Good

    4 - Acceptable

    4 - Acceptable

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    1990

    2002

    1967

    1990

    1967

    2002

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    30

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace corridor and gymnasium lockers (970)

    Lifecycle Replacement 2032 $388,000 Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Type Year Cost Priority

    Updated: MAR-12

    Composite plastic name signs mounted on walls and doors.

    Pre-finished steel corridor full height lockers, 0.45x0.45x1.8m. Change room wire mesh lockers.

    Painted and clear finish plywood shelving in the classrooms and library and storage rooms.

    Washrooms are equipped with mirrors, soap, towel dispensers, tissue dispensers, grab bars, feminine napkin dispensers,waste receptacles and hand dryers.

    Cast in place concrete stairs to the mechanical room and drama storage mezzanine levels.

    Metal stairs from main floor to second floor in 2002 addition.

  • Report run on: April 4, 2012 3:40 PM Page 16 of 47

    C2020.05 Resilient Stair Finishes**

    C2020.08 Stair Railings and Balustrades*

    C3010.02 Wall Paneling**

    C3010.09 Acoustical Wall Treatment**

    5 - Good

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    2002

    1967

    2002

    1990

    Installed

    Installed

    Installed

    Installed

    20

    0

    30

    20

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace resilient stair finishes (70 m2)

    Replace gymnasium wall panels (110 m2)

    Replace music room acoustic wall treatment (120m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2032

    2015

    $6,400

    $8,800

    $17,500

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    Pre-formed rubber stairs and risers to second floor and to mechanical and drama storage mezzanines.

    Steel pipe top and bottom rails and newels, steel rod verticals, steel pipe rail at walls.

    Fluted painted concrete block wall panels in gymnasium.

    Acoustic panelling to upper portion of music room.

  • Report run on: April 4, 2012 3:40 PM Page 17 of 47

    C3010.11 Interior Wall Painting*

    C3020.02 Tile Floor Finishes** - 1990

    C3020.02 Tile Floor Finishes** -2002

    C3020.04 Wood Flooring** - Drama

    4 - Acceptable

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    2002

    1990

    2002

    2002

    Installed

    Installed

    Installed

    Installed

    0

    50

    50

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace quarry tile (565 m2)

    Replace locker room tile (310 m2)

    Replace drama floor (155 m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2040

    2052

    2032

    $105,000

    $54,000

    $12,300

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    Painted concrete block and gypsum wallboard.

    Quarry tile in the washrooms, 2 main entry corridors and vestibules.

    Porcelain floor tile in change rooms and team rooms at gymnasium.

    Masonite on plywood.

  • Report run on: April 4, 2012 3:40 PM Page 18 of 47

    C3020.04 Wood Flooring** - Gymnasium

    C3020.07 Resilient Flooring** - Sheet

    C3020.07 Resilient Flooring** - Tile

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    2002

    2002

    1990

    Installed

    Installed

    Installed

    30

    20

    20

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace gymnasium flooring (930 m2)

    Replace sheet flooring (2000 m2)

    Replace resilient tile (1750 m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2032

    2022

    2015

    $177,000

    $120,000

    $87,500

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    Maple manufactured with resilient pads.

    2002: New or renovated classrooms.2006: Corridor and library.

    Pre-2002 classrooms and cafeteria.

  • Report run on: April 4, 2012 3:40 PM Page 19 of 47

    C3020.08 Carpet Flooring**

    C3020.14 Other Floor Finishes*

    C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

    3 - Marginal

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    1990

    2002

    1996

    Installed

    Installed

    Installed

    15

    0

    25

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace carpet, administration & music (540 m2)

    Replace acoustic ceiling tiles (5700 m2)

    Replace damaged tile (120 m2)

    Failure Replacement

    Lifecycle Replacement

    Repair

    2012

    2021

    2012

    $32,000

    $150,000

    $3,600

    Low

    Unassigned

    Low

    Carpet is worn in the high traffic areas.

    Tile is stained by water damage in the vicinity of roof top units.Evidently under some wind conditions, rain can pass through.

    Concern:

    Concern:

    Replace carpeting.

    Replace damaged tiles, when required.

    Recommendation:

    Recommendation:

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    Carpet in administration, counseling and music room.

    Rubber and parquet floor in fitness room.

    Acoustic ceiling tiles are replaced as required.

  • Report run on: April 4, 2012 3:40 PM Page 20 of 47

    C3030.07 Interior Ceiling Painting*

    C3030.09 Other Ceiling Finishes*

    D1010.02 Lifts**

    4 - Acceptable

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    1990

    1990

    2002

    Installed

    Installed

    Installed

    0

    0

    25

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace wheelchair lift (1)

    Lifecycle Replacement 2027 $18,000 Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Type Year Cost Priority

    Updated: MAR-12

    Painted gypsum board in kitchen, stairs, storage, staff w/c's, electrical, generator. Painted acoustic deck in gymnasium.Painted precast in mechanical mezzanine and industrial arts.

    Music Room: acoustic panels in suspended wood grid; Drama: acoustical spray on exposed structure.

    Wheel chair lift in the 2002 addition from the main floor to second level.

  • Report run on: April 4, 2012 3:40 PM Page 21 of 47

    D2010.04 Sinks**

    D2010.05 Showers**

    5 - Good

    3 - Marginal

    Rating

    Rating

    2002

    2002

    Installed

    Installed

    30

    30

    Design Life

    Design Life

    MAR-12

    MAR-12

    Updated

    Updated

    Replace valve sets (2)

    Relocate shower head (1) and add additional floordrain (1).

    Replace showers

    Lifecycle Replacement

    Program Functional Upgrade

    Lifecycle Replacement

    2032

    2012

    2032

    $400

    $9,879

    $13,979

    Unassigned

    High

    Unassigned

    When showers are used, water sprays outside of cubical andmust be mopped up after use due to lack of floor drains.

    Concern:

    Relocate shower heads to adjacent wall to prevent waterspraying out of cubical opening. Install additional floor drainoutsides of shower base.

    Recommendation:

    Lethbridge - Winston Churchill High School (B3713A)S4 MECHANICAL

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    (1986, 1990, 1998, 2002)Single bowl stainless steel sink c/w goose neck supply trim.Double stainless steel sink with swing spout supply trim.

    Institutional shower head with limiting valve. Pressure balancing mixing valve with hand shower. Thermostatic mixingvalve for tempering shower water.

    Consequences of Deferral:Water in dressing area must be mopped up after each use.

  • Report run on: April 4, 2012 3:40 PM Page 22 of 47

    D2010.08 Drinking Fountains/Coolers**

    D2010.09 Other Plumbing Fixtures*

    D2010.09 Other Plumbing Fixtures*

    D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

    5 - Good

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    1967

    1967

    1967

    2002

    Installed

    Installed

    Installed

    Installed

    35

    0

    0

    35

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace drinking fountains/ coolers

    Replace enamel on cast iron semi-recessedservice sink (1 sink)

    Replace flush valves (3) and sensors

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2015

    2015

    2037

    $24,157

    $9,220

    $1,200

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    (1998, 2002)Wall mounted vitreous china drinking fountains.Wall hung stainless steel water cooler.Stainless steel wall mounted fountain with back panel.

    Enamel on cast iron semi-recessed service sink.

    (1986, 1998, 2002)Floor mounted service sink and supply trim (2002).Emergency eye wash and shower in science room (1998).Semi-circular stainless steel hand basin (1986).

    Urinals wall hung with battery operated flushometer.

  • Report run on: April 4, 2012 3:40 PM Page 23 of 47

    D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

    D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

    D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1967

    5 - Good

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    2000

    1967

    1967

    Installed

    Installed

    Installed

    35

    35

    35

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace WC (2) and flush valves (4)

    Replace lavatories (2) and valve sets (4)

    Replace stall type urinal and flush system

    Lifecycle Replacement

    Lifecycle Replacement

    Program Functional Upgrade

    2035

    2015

    2015

    $4,000

    $3,300

    $19,759

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    (1990, 2000)Elongated water closet bowl with open front seat and flush valve.Elongated water closet bowl with tank and open front seat for staff and private washrooms.

    Vitreous china wall hung lavatories.Cast iron enamel lavatory in vanity.

    Stall urinals with tank and flush piping.

  • Report run on: April 4, 2012 3:40 PM Page 24 of 47

    D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 2002

    D2020.01.01 Pipes and Tubes: Domestic Water*

    D2020.01.02 Valves: Domestic Water**

    D2020.01.03 Piping Specialties (Backflow Preventers)**

    5 - Good

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    2002

    1967

    1967

    2002

    Installed

    Installed

    Installed

    Installed

    35

    0

    40

    20

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    FEB-07

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace LAV (1) and valve sets (2)

    Replace 2" valves (30)

    Replace valves (2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2037

    2015

    2022

    $2,800

    $32,800

    $5,900

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    Vitreous china lavatories in vanities.

    Copper pipes and tubes for domestic water system.

    (1967, 1998, 2002)Gate, globe, and ball valves used for domestic water system.

    Backflow preventor sprinkler and standpipe system. Backflow preventor on boiler make up water line c/w meter andpressure regulator.

    No backflow preventer on the domestic water main into building. See architectural section K3010.01 for the Code Repair.

  • Report run on: April 4, 2012 3:40 PM Page 25 of 47

    D2020.02.02 Plumbing Pumps: Domestic Water**

    D2020.02.06 Domestic Water Heaters**

    D2020.03 Water Supply Insulation: Domestic*

    D2030.01 Waste and Vent Piping*

    D2030.03 Waste Piping Equipment*

    5 - Good

    5 - Good

    5 - Good

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    2002

    2002

    1967

    1967

    2002

    Installed

    Installed

    Installed

    Installed

    Installed

    20

    20

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    FEB-07

    FEB-07

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace pump (1)

    Replace tanks (2)

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2022

    $3,200

    $72,700

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    Astro-50 domestic hot water recirculation pump.

    (2) State SBF 75 300 NEGGAD 75 gallon storage and 270.0 MBH input c/w damper on vent.

    (1986, 1990, 1998, 2002)Domestic water services insulated.

    Copper and cast iron waste and vent piping for all plumbing services.

    Dilution tanks in science room. Solids interceptor.

  • Report run on: April 4, 2012 3:40 PM Page 26 of 47

    D2040.01 Rain Water Drainage Piping Systems*

    D2040.02.04 Roof Drains*

    D3010.02 Gas Supply Systems*

    D3020.02.01 Heating Boilers and Accessories: H.W.** - Boilers

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    1967

    1967

    1967

    2002

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    35

    Design Life

    Design Life

    Design Life

    Design Life

    FEB-07

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace roof drains

    Replace boiler system (1)

    Lifecycle Replacement

    Lifecycle Replacement

    2015

    2037

    $13,173

    $353,899

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    Cast iron roof drain lines installed.

    Cast iron roof drains installed.

    (1967, 1996, 2002)Low pressure and 5 P.S.I. Gas services installed from gas meter and regulator room to roof top gas fired unit and othergas burning equipment and appliances. Gas supplied to science room gas territs.

    (3) Weil- McLain cast iron sectional boiler c/w blower for combustion air model 1388F. Capacity 4113.0 MBH input.Expansion tank Clemmer 36" dia x 84" L and 36" dia x 90"L

  • Report run on: April 4, 2012 3:40 PM Page 27 of 47

    D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**

    D3020.02.03 Water Treatment: H. W. Boiler*

    D3030.08 Other Refrigeration Systems*

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    2002

    2002

    2002

    Installed

    Installed

    Installed

    35

    0

    0

    Design Life

    Design Life

    Design Life

    MAR-12

    FEB-07

    FEB-07

    Updated

    Updated

    Updated

    Replace Chimney (12m)

    Lifecycle Replacement 2037 $12,500 Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Type Year Cost Priority

    Updated: MAR-12

    Insulated breeching for boilers and domestic hot water heaters. Combustion air supply c/w unit heater to temper air.

    Chemical pot feeder c/w site glass and micron filters.

    Freezer and cooler c/w evaporators inside each compartment and compressor and water cooled condenser mountedabove freezer and cooler.

  • Report run on: April 4, 2012 3:40 PM Page 28 of 47

    D3040.01.01 Air Handling Units: Air Distribution**

    D3040.01.01 Air Handling Units: Air Distribution** - MUA

    5 - Good

    5 - Good

    Rating

    Rating

    2002

    1986

    Installed

    Installed

    30

    30

    Design Life

    Design Life

    MAR-12

    MAR-12

    Updated

    Updated

    Replace 1500 cfm unit (1)

    Replace MUA (1)

    Lifecycle Replacement

    Lifecycle Replacement

    2015

    2015

    $27,700

    $19,300

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    Air handling unit #1 Roof top Eng 'A' LM-15-COWC 13,700 CFM supply air with 15 H.P. motor and 12,200 CFM returnair with 5 H.P. Motor. Ventilation for two floors of southeast wing, etc.

    Air handling unit #2 Roof top Eng'A' LM-8-COWF with 7000 CFM supply fan and 5 H.P. motor, 6400 CFM return fan and3H.P. motor. Used for ventilation of interior zone #172, etc.

    Air handling unit #3 Roof top Eng'A' LM-15-COWC with 19,000 CFM using 15 H.P. motor and 12,700 CFM return air with5 H.P. motor used for gymnasium and related areas.

    Air handling unit #4 Roof top Eng'A' LM-15-COWC with 14,400 CFM supply using 15 H.P. motor and 11,700 CFM returnair with 5 H.P. motor. Used to ventilate classrooms along west wing south exposure.

    Air handling unit #5 Roof top Eng'A' LM-15-COWC with 14,800 CFM supply using 15 H.P. motor and 11,200 CFM returnwith 5 H.P. motor. Unit used to ventilate interior zone and classrooms south exposure of southeast building.

    Air handling unit #6 Roof top Eng'A' LM-21-OCO-WL with 20,500 CFM supply using 20 H.P. motor and 16,200 CFMreturn using 71/2 H.P. Motor. Used to provide ventilation for Home Economics and north wing adjacent to gymnasium.

    Air handling unit #7 Roof top Eng'A' LM-13-COWG with 10,600 CFM supply using 10 H.P. motor and 9,100 CFM returnusing 5 H.P. Motor. Used for ventilation of science rooms 121, 103, 106, 108, etc.

    Air handling unit #8 Eng'A' FWB-212-COWG with 8,500 CFM supply air using 10 H.P. motor and 7,600 CFM return airusing 5 H.P. Motor. Ventilation for interior zones, library, classrooms, etc.

    Units with mixing section, return fan, supply fan, flat filter, heating coil, wet cell and return fan unit.

    (1986) Existing ICG Aerotherme duct heaters MPB-520 ARG make up air unit installed on roof and provides ventilationfor industrial arts room.

    Direct fired make-up air unit for shop area Eng'A' HE-20-C with 1 H.P.

  • Report run on: April 4, 2012 3:40 PM Page 29 of 47

    D3040.01.02 Fans: Air Distribution (Remote from AHU)*

    D3040.01.03 Air Cleaning Devices: Air Distribution*

    D3040.01.04 Ducts: Air Distribution*

    D3040.01.07 Air Outlets & Inlets: Air Distribution*

    D3040.03.01 Hot Water Distribution Systems**

    5 - Good

    4 - Acceptable

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    2002

    1967

    2002

    2002

    2002

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    40

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    FEB-07

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace 25 HP pump (1)

    Lifecycle Replacement 2042 $18,200 Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Type Year Cost Priority

    Updated: MAR-12

    Canarm ceiling fans installed in gymnasium ceiling to circulate air. Unit c/w variable speed controller.

    (2002)50 mm flat filters installed in each roof top air handling unit.(1986)Dust collector for shop located outside industrial arts area. Unit c/w collection ducts and filtered air return duct.

    Galvanized supply ducts installed from roof top air handling units to ceiling diffusers or registers in respective zones.

    Ceiling supply diffuser and registers provided for outlets. Transfer and return grilles are fixed blade or grid type grilles.

    Armstrong base mounted centrifugal pump P1 & P2 with 71/2 H.P. motor for primary circulation pumps.Armstrong end suction base mounted centrifugal pump with 25 H.P. motor for P3 & P4 for building perimeter radiationand fan coil units.Armstrong vertical in-line centrifugal pump model 4380 with 5 H.P. motor for P5 & P6 for reheat coils.Armstrong end suction base mounted centrifugal pump with 15 H.P. motor for P7 & P8 for circulation of glycol solution topreheat coils.

  • Report run on: April 4, 2012 3:40 PM Page 30 of 47

    D3040.04.01 Fans: Exhaust**

    D3040.04.03 Ducts: Exhaust*

    D3040.04.05 Air Outlets and Inlets: Exhaust*

    D3040.05 Heat Exchangers**

    4 - Acceptable

    4 - Acceptable

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1967

    2002

    2002

    2002

    Installed

    Installed

    Installed

    Installed

    30

    0

    0

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    FEB-07

    FEB-07

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace 5000 cfm fan (1)

    Replace exchanger (1)

    Lifecycle Replacement

    Lifecycle Replacement

    2015

    2032

    $4,800

    $9,521

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    (1998)Fume hoods for science room c/w exhaust fan.(2002)Roof mounted fans for shop spray booth exhaust, CO exhaust system, fume exhaust system and washroom exhaustsystem.

    Exhaust ducts from grilles in ceiling of washrooms, hoods, etc. to roof exhaust fans.

    Grid type grilles or fixed blade registers used for exhaust system.

    Armstrong shell and tube heat exchanger model W-129-2-2.Hot water to glycol solution heat exchanger.Glycol solution feed tank S.T.S.-P45-50.76M with poly 45 gal tank.

  • Report run on: April 4, 2012 3:40 PM Page 31 of 47

    D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**

    D3050.02 Air Coils**

    D3050.05.02 Fan Coil Units**

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    1990

    2002

    2002

    Installed

    Installed

    Installed

    30

    30

    30

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace 5 ton unit (1)

    Replace unit (1)

    Replace unit (1)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2015

    2015

    2015

    $16,800

    $6,300

    $5,100

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    (2002)Packaged roof top cooling unit Trane TSCO-48 AWED. 5 units are for each classroom on second floor. Each 4 tons ofcooling.(1990)Roof top air conditioning units provided for administration and staff areas. York D4CG060N10325ECB.

    Preheat coils installed in all roof top heat and vent units.Reheat coil installed in supply ducts to interior rooms.

    Eng 'A' fan coil units installed in ceiling at vestibules and entrances.

  • Report run on: April 4, 2012 3:40 PM Page 32 of 47

    D3050.05.03 Finned Tube Radiation**

    D3050.05.06 Unit Heaters**

    D3050.05.08 Radiant Heating (Ceiling & Floor)**

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    2002

    2002

    2002

    Installed

    Installed

    Installed

    40

    30

    35

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace finned tube radiation (5 meters)

    Replace unit (1 - 16KW)

    Replace 500 W unit (1)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2015

    2015

    2037

    $2,200

    $3,200

    $900

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    Hot water finned tube radiation in some rooms.

    (1986, 2002)Eng 'A' Horizontal unit heaters installed in mechanical room and shop area.

    Airtex radiant ceiling panels along perimeter of classrooms. Reheat coils installed in ducts where ceiling panels used.

  • Report run on: April 4, 2012 3:40 PM Page 33 of 47

    D3060.02.01 Electric and Electronic Controls**

    D3060.02.05 Building Systems Controls (BMCS, EMCS)**

    D4010 Sprinklers: Fire Protection*

    D4020 Standpipes*

    D4030.01 Fire Extinguisher, Cabinets and Accessories*

    5 - Good

    5 - Good

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    2002

    2002

    2002

    1967

    1967

    Installed

    Installed

    Installed

    Installed

    Installed

    30

    20

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    FEB-07

    FEB-07

    FEB-07

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace controls (5000 sq.m of gfa)

    Replace controls (500 sq.m of gfa)

    Lifecycle Replacement

    Lifecycle Replacement

    2015

    2022

    $7,300

    $11,000

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    Electric controls for unit heaters and fan coil units.

    Convergint controls provided for air handler operation, central boilers, pumps, etc.

    Sprinkler system for all areas of the building renovated or constructed in 2002.

    Standpipe system c/w firehose cabinet and fire extinguisher.

    (1986, 1990, 1988,2002)Dry chemical fire extinguishers mounted on bracket or installed in cabinet.

  • Report run on: April 4, 2012 3:40 PM Page 34 of 47

    D4090.04 Dry Chemical Fire Extinguishing Systems (Kitchen Hood)**

    5 - GoodRating

    2002Installed

    0Design Life

    MAR-12Updated

    Lethbridge - Winston Churchill High School (B3713A)

    Range guard fire extinguishing dry chemical system for Vent Master kitchen range hood. Unit c/w grease trap for hood.

  • Report run on: April 4, 2012 3:40 PM Page 35 of 47

    D5010.01.02 Main Electrical Transformers (Utility Owned)*

    D5010.02 Secondary Electrical Transformers (Interior)**

    D5010.03 Main Electrical Switchboards (Main Distribution)**

    6 - Excellent

    6 - Excellent

    6 - Excellent

    Rating

    Rating

    Rating

    2004

    2004

    2004

    Installed

    Installed

    Installed

    40

    40

    40

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace transformers (2)

    Replace main electrical switchboards (4)

    Lifecycle Replacement

    Lifecycle Replacement

    2044

    2044

    $33,262

    $80,000

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)S5 ELECTRICAL

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    Exterior padmount utility transformer at the west side of the building c/w underground conduit and wire to interior electricalroom.

    There is a Square D 600V delta/208V wye 450kVA transformer for most of 120/208V sub-panels in the electrical room.Another Square D 600V delta/ 208V wye 75 kVA transformer in the storage room for 120/208V sub-panels M2Z and M2Y.

    The main electrical service CDP #1 is a 1200 amp, 600/347 volt, 3 phase, 3 wire panel in the electrical room. CDP #2 inthe electrical room is 120/208V, 3 phase, 4 wire 1600A which fed from a 450 KVA, 600V - 120/208V transformer for mostof 120/208V sub-panels. CDP #3 in the mechanical room is 600V, 3 phase, 4 wire 400A which fed from CDP #1 directlyfor all 600V mechanical equipment. CDP #4 in the storage room is 120/208V, 3 phase, 4 wire 400a which fed from a 75KVA, 600V - 120/208V transformer for sub-panels M2Z and M2Y. The manufacturer of all CDP's is Federal PioneerElectric.

  • Report run on: April 4, 2012 3:40 PM Page 36 of 47

    D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

    D5010.07.01 Switchboards, Panelboards, and (Motor) Control Centers**

    D5010.07.02 Motor Starters and Accessories**

    6 - Excellent

    6 - Excellent

    6 - Excellent

    Rating

    Rating

    Rating

    2004

    2004

    2004

    Installed

    Installed

    Installed

    30

    30

    30

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace electrical branch circuit panelboards (33)

    Replace MCC (1) with 3 sections.

    Replace motor starters (18)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2034

    2034

    2034

    $156,262

    $19,476

    $27,000

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    There are 33 120/208V sub-panels installed in the mechanical room, storage room, corridors and other areas of thefacility to provide power for lighting and equipment. Most of them are 120/208V, 3 phase, 4 wire 225A.

    There is a Telemecanique - 3 sections - 347/600V - 600A horizontal bus - 300A vertical bus for pumps, fans andmechanical valves. MCC is located in the mechanical penthouse.

    There are 18 motor starters in the mechanical room and other area to control mechanical equipment.

  • Report run on: April 4, 2012 3:40 PM Page 37 of 47

    D5010.07.03 Variable Frequency Drives**

    D5020.01 Electrical Branch Wiring*

    D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

    D5020.02.02.01 Interior Incandescent Fixtures*

    D5020.02.02.02 Interior Fluorescent Fixtures**

    6 - Excellent

    6 - Excellent

    6 - Excellent

    6 - Excellent

    6 - Excellent

    Rating

    Rating

    Rating

    Rating

    Rating

    2004

    2004

    2004

    2004

    2004

    Installed

    Installed

    Installed

    Installed

    Installed

    30

    0

    0

    0

    30

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    FEB-07

    MAR-12

    FEB-07

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace VFD's (2)

    Replace fluorescent light fixtures (1360)

    Lifecycle Replacement

    Lifecycle Replacement

    2034

    2034

    $16,800

    $490,783

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    There are two VFDs manufactured by MGI technologies located in the mechanical penthouse. They both feedmechanical pumps.

    Electrical branch wiring consists of wire in conduit and of armored cable drops.

    Local switches control for classroom lighting. Corridors and emergency fixtures are controlled through keyed masterswitches and a contactor system. There is also low voltage lighting control in the gymnasium.

    There are keyless fixtures installed in some closets. There are also track light fixtures installed in some display cases.

    Fluorescent lighting is prominent in all areas of the school. Various fixture types are dispersed throughout. These includesurface, chain suspended and recess mounted fixtures, as well as both direct and indirect lighting applications. Allfluorescent fixtures are installed with T8 lamps. There are also fluorescent potlight fixtures installed in some areas. Thesefixtures use PL replacement lamps.

  • Report run on: April 4, 2012 3:40 PM Page 38 of 47

    D5020.02.02.03 Interior Metal Halide Fixtures*

    D5020.02.03.01 Emergency Lighting Built-in*

    D5020.02.03.03 Exit Signs*

    D5020.02.05 Special Purpose Lighting*

    D5020.03.01.03 Exterior Metal Halide Fixtures*

    D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

    6 - Excellent

    6 - Excellent

    6 - Excellent

    6 - Excellent

    5 - Good

    6 - Excellent

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    2004

    2004

    2004

    2004

    2004

    2004

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    FEB-07

    FEB-07

    MAR-12

    FEB-07

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Lethbridge - Winston Churchill High School (B3713A)

    Metal halide lowbay fixtures are installed in the gymnasium.

    Emergency lighting is provided by the generator. Fixtures used everyday are supplied with emergency power during apower outage.

    Totally 38 exit light fixtures are located throughout the school.

    The drama theater has spotlight fixtures and incandescent potlights which run off a Leviton ENR series dimming panel.

    Metal halide HID wallpacks are installed along the building perimeter.

    A photocell and timeclock system controls the operation of all exterior lighting.

  • Report run on: April 4, 2012 3:40 PM Page 39 of 47

    D5030.01 Detection and Fire Alarm**

    D5030.02.02 Intrusion Detection**

    D5030.02.03 Security Access**

    6 - Excellent

    6 - Excellent

    6 - Excellent

    Rating

    Rating

    Rating

    2004

    2004

    2004

    Installed

    Installed

    Installed

    25

    25

    25

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Replace fire alarm control panel (1), annunciator(1) and fire alarm system devices (104)

    Replace intrusion detection system (1)

    Replace security access system (1)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2029

    2029

    2029

    $50,000

    $35,000

    $5,000

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    The building has an EDWARDS Quick Start fire alarm control panel, one annunciator and heat detectors, smokedetectors, pull-stations and horn/strobes throughout. There is a booster panel installed also. The fire alarm system is anaddressable system.

    There are security keypads located in the electrical room and at the NE entrance. There are motion sensors throughout.Security system cabinet c/w battery back-up is located in the electrical room.

    Key swipe (FAB) access is located at the NE entrance.

  • Report run on: April 4, 2012 3:40 PM Page 40 of 47

    D5030.02.04 Video Surveillance**

    D5030.03 Clock and Program Systems*

    D5030.04.01 Telephone Systems*

    D5030.04.03 Call Systems**

    D5030.04.04 Data Systems*

    6 - Excellent

    6 - Excellent

    6 - Excellent

    6 - Excellent

    6 - Excellent

    Rating

    Rating

    Rating

    Rating

    Rating

    2004

    2004

    2004

    2004

    2004

    Installed

    Installed

    Installed

    Installed

    Installed

    25

    0

    0

    25

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    FEB-07

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace video surveillance system (1)

    Replace call system (1)

    Lifecycle Replacement

    Lifecycle Replacement

    2029

    2029

    $23,000

    $45,000

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    The main security camera cabinet is located in one of the server rooms. There are security cameras throughout theinterior of the school, as well as a few positioned on the exterior.

    A Rauland Telecentre controls the operation of the clocks throughout the facility.

    Main telephone distribution is located in one of the mechanical closets. There are local phone lines distributed to allareas. Outgoing lines are located in the administration areas. There is also a payphone located outside of the front office.

    Annunciation speakers are located throughout the facility. These speakers are tied into the telephone system and theclass bell system through the Rauland Telecentre.

    Fiber Optic cabling is installed to service the school. Cat5 cabling connects all areas of the school to one of the 3 localservers. The servers are all connected. Each server has a battery back-up unit.

  • Report run on: April 4, 2012 3:40 PM Page 41 of 47

    D5030.05 Public Address and Music Systems**

    D5030.06 Television Systems*

    D5090.01 Uninterruptible Power Supply Systems**

    D5090.02 Packaged Engine Generator Systems (Emergency Power System)**

    6 - Excellent

    6 - Excellent

    6 - Excellent

    6 - Excellent

    Rating

    Rating

    Rating

    Rating

    2004

    2004

    2004

    2004

    Installed

    Installed

    Installed

    Installed

    20

    0

    30

    35

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    FEB-07

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace music systems (3)

    Replace UPS units (3)

    Replace packaged engine generator system (1)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2029

    2034

    2039

    $45,000

    $18,000

    $65,000

    Unassigned

    Unassigned

    Unassigned

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-12

    MAR-12

    MAR-12

    There are 3 separate music systems located in the school. They are located in the gymnasium, the drama theater and themusic room. In each case a set of speakers is controlled through a local amplifier and media center.

    There is coax cabling distributed to all areas of the school. Television sets are installed in classrooms and most commonareas. The television system is also connected to the data server.

    There is a small UPS for each of the three local data servers.

    There is a Kohler Power Systems diesel generator which supplies emergency power to the school. Generator supplies 69kVA (standby power) at 120/208V 3-phase.

  • Report run on: April 4, 2012 3:40 PM Page 42 of 47

    E1090.03 Food Service Equipment*

    E1090.04 Residential Equipment*

    E1090.07 Athletic, Recreational, and Therapeutic Equipment*

    E2010.02 Fixed Casework**

    5 - Good

    5 - Good

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    2006

    2009

    2002

    1990

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    35

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Replace fixed casework (10,345 m2 gfa)

    Replace science room countertops (150 m)

    Lifecycle Replacement

    Repair

    2025

    2012

    $662,258

    $22,000

    Unassigned

    Low

    Plastic laminate has lifted from countertops.Concern:

    Replace counter finishes.Recommendation:

    Lethbridge - Winston Churchill High School (B3713A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-12

    MAR-12

    School cafeteria has commercial pizza oven, fryer, pot sink and flat grill.

    Food science classroom and staff kitchen. Ranges, dishwashers, refrigerators and microwaves.

    Gymnasium has 6 retractable basketball backstops (two are glass), floor sockets and nets for volleyball and badminton,scoreboard and motorized divider curtain. Operator identified problem with frequent replacement of limit switches forbackstops and curtain. Therapy room with tub.

    Typical classrooms have end wall countertop with shelving below. Work stations in computer labs, science and foodscience. Reception desk in administration, circulation desk in library. Washrooms have built-in vanities. Upper and lowercabinets in cafeteria kitchen, staff kitchen and food science. Shelving in cafeteria food storage, gymnasium storage andoffices. Fixed casework is plywood with clear finish.

  • Report run on: April 4, 2012 3:40 PM Page 43 of 47

    F1010.02.05 Grandstands and Bleachers**

    F1020.02.13 Paint Booths*

    3 - Marginal

    4 - Acceptable

    Rating

    Rating

    2002

    1990

    Installed

    Installed

    30

    0

    Design Life

    Design Life

    MAR-12

    MAR-12

    Updated

    Updated

    Replace retractable gymnasium bleachers (960seats)

    Operating Efficiency Upgrade 2014 $144,000 Medium

    Difficulty in aligning the bleachers.Concern:

    Replace with electrically operated bleacher system.Recommendation:

    Lethbridge - Winston Churchill High School (B3713A)

    Event:

    Type Year Cost Priority

    Updated: MAR-12

    Steel retractable bleachers with plastic seat covers.

    Paint booth in the woodwork room and art room.

  • Report run on: April 4, 2012 3:40 PM Page 44 of 47

    K3010.01 Plumbing for Program Equipment*

    K4010.01 Barrier Free Route: Parking to Entrance*

    K4010.02 Barrier Free Entrances*

    K4010.03 Barrier Free Interior Circulation*

    K4010.04 Barrier Free Washrooms*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1967

    1967

    1967

    1967

    1967

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    MAR-12

    Updated

    Updated

    Updated

    Updated

    Updated

    Install backflow preventer (1)

    Code Repair 2012 $50,000 Medium

    There is no backflow installed on the domestic water main intothe building. There is little space to install backflow making ithard to install so installation costs will go up.

    Concern:

    Install backflow preventer.Recommendation:

    Lethbridge - Winston Churchill High School (B3713A)S8 SPECIAL ASSESSMENT

    Event:

    Type Year Cost Priority

    Updated: MAR-12

    There is no backflow installed on the domestic water main into the building.

    Access to entrance door from the paved parking area is provided.

    Automatic door opener is provided at two entrances. Distances between doors sufficient.

    A lift is provided to the 2002 second storey addition. Corridor width, doors, etc. appear compliant.

    Barrier free modifications made in 1990 upgrading to existing washrooms and 2002 washrooms constructed barrier free.

    Consequences of Deferral:Not Code compliant.

  • Report run on: April 4, 2012 3:40 PM Page 45 of 47

    K4030.01 Asbestos*

    K4030.02 PCBs*

    K4030.03 Mercury*

    K4030.04 Mould*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1967

    1967

    1967

    1967

    Installed

    Installed

    Installed

    Installed

    0

    0

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    FEB-07

    MAR-12

    MAR-12

    FEB-07

    Updated

    Updated

    Updated

    Updated

    Lethbridge - Winston Churchill High School (B3713A)

    No asbestos found or reported in this facility.

    No PCB's found in this facility.

    No mercury found in this facility.

    No mould found in this facility.

  • Report run on: April 4, 2012 3:40 PM Page 46 of 47

    K5010.01 Site Documentation*

    4 - AcceptableRating

    1967Installed

    0Design Life

    MAR-12Updated

    Lethbridge - Winston Churchill High School (B3713A)

    site plan attached.

    Prime Consultant: Williams Engineering Canada Inc.Site Review Date: November 30, 2011.

    page0001.jpg

  • Report run on: April 4, 2012 3:40 PM Page 47 of 47

    K5010.02 Building Documentation*

    4 - AcceptableRating

    0Installed

    0Design Life

    MAR-12Updated

    Lethbridge - Winston Churchill High School (B3713A)

    Floor Plan Attached

    Prime Consultant: Williams Engineering Canada Inc.Site Review Date: November 30, 2011.

    page0001.jpg