Report run on: January 10, 2012 11:57 PM
RECAPP Facility Evaluation Report
Ecole BorealB3421A
Fort McMurray
Greater North Central Francophone Education Region#2
Report run on: January 10, 2012 11:57 PM Page 2 of 47
B3421ABuilding Id:
Ecole BorealBuilding Name:
Fort McMurrayLocation:312 Abasand Drive Address:
3,074.40Gross Area (sq. m): $13,154,000Replacement Cost:1977Construction Year:
Evaluation Date: September 20 2011
Burgess Bredo Architect Ltd.Evaluation Company:
Burgess BredoEvaluator Name:
In 1977 the original one storey building of 2,768 sq. m. was constructed. In 1997 a 306 sq. m. addition was constructed. A small wood-framed storage shed has been located on west side of school. Modernizations to the building occurred in 1997 and 2000. The east wall of the school is currently being upgraded with addition of weeping tile, air seal membrane, insulation,and face brick. Wood siding is also being replaced with metal wall cladding on south elevation. To be completed Fall,2011. The current gross area of the building is 3,074 sq. m. The student capacity is 250, including grades K-12
General Summary:
Structural Summary:Concrete foundation system of grade beams and spread footings. Roof assembly is steel framed bearing on masonry walls and steel beams/columns. Suspended floor assembly at gym stage is concrete bearing on masonry. One steel framed canopy and one cast in place concrete canopy. The structure is in good condition.
Envelope Summary:Exterior walls are typically cavity walls with brick facing and concrete masonry. Single wythe concrete block walls around gym. Prefinished metal cladding on upper walls of 1997 phase. Windows are predominately aluminum-framed with double field glazing. Bulk of roof is original BUR while balance has been replaced with SBS. EIFS or metal wall cladding required to gym and music room walls. Original roofing and hollow metal doors require replacement. The building envelope is in good condition.
Interior Summary:Partitions are a combination of concrete block and metal studs/gypsum board. Ceiling finishes include gypsum board and acoustic tile in T-bar. Floor finishes include seamless epoxy, sheet vinyl, rubber athletic flooring, vinyl tile and carpet. Solid core wood and hollow metal door set in pressed steel frames. Millwork is typically clear finish wood and vanities require replacement. Interior systems are in acceptable condition.
Mechanical Summary:Commercial grade plumbing fixtures, two domestic hot water heaters new in 2006, one natural gas fire hot waterheater boiler, hot water heating system comprising of force flow units, unit heaters, and perimeter radiation.Packaged gymnasium ventilation unit new in 206. Natural gas fired ventilation unit with DX cooling coil for service to1997 addition, and root top condensing unit. Roof top mounted packaged HVAC unit providing ventilation to school.Electric controls to force flow units and unit heaters. Pneumatic and DDC controls to building. Wall mounted fireextinguishers installed in cabinets, and fire suppression system to kitchen range hood in 1997 addition. Projects include replacement of showers and provision of additional heating to Community Office.
20.63%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $2,714,000
Fort McMurray - Ecole Boreal (B3421A)
Report run on: January 10, 2012 11:57 PM Page 3 of 47
Mechanical in acceptable condition.
Electrical Summary:700A-120/208V/3PH/4W main power service, T5 fixtures installed in gym in 2006, T8 fixtures installed in 1997 schooladdition, and T12 fixtures installed in remainder of building. DC emergency lighting system, metal halide light fixturesin 1997 building addition, HPS fixtures along building exterior perimeter, DSC security system, Edwards fire alarmsystem, DC clocks in classrooms, telephone in each classroom, paging system with speakers via telephone system,and cable TV system. Projects include replacing of T12 light fixtures and fire alarm system. Electrical in acceptable condition.
Fort McMurray - Ecole Boreal (B3421A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: January 10, 2012 11:57 PM Page 4 of 47
A1010 Standard Foundations* - 1977 Section
A1010 Standard Foundations* - 1997 Section
A1030 Slab on Grade* - 1977 Section
A1030 Slab on Grade* - 1997 Section
B1010.01 Floor Structural Frame (Building Frame)*
5 - Good
5 - Good
3 - Marginal
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1977
1997
1977
1997
1977
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
MAR-07
Updated
Updated
Updated
Updated
Updated
Mud Jack Concrete Slab (5 sq. m.)
Repair 2012 $3,000 Low
Concrete slab has settled in washrooms; cracking floorsfinishes (+/- 25mm). Believed that 2011 repairs addingweeping tile will minimize the slab settlement issue.
Concern:
Mud jack concrete slab in washrooms and repair crack.Recommendation:
Fort McMurray - Ecole Boreal (B3421A)S1 STRUCTURAL
Event:
Type Year Cost Priority
Updated: JAN-12
Perimeter and interior-grade beams bearing on concrete strip footings.
Perimeter and interior-grade beams bearing on concrete strip footings.
Concrete slab on grade throughout.
Concrete slab on grade throughout. Suspended floor at stage removed and replaced with new slab on grade.
Suspended concrete slab at mechanical fan room adjacent gym bearing on concrete block.
Crack in slab has some displacement.
Report run on: January 10, 2012 11:57 PM Page 5 of 47
B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1977 Section
B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1997 Section
B1010.03 Floor Decks, Slabs, and Toppings*
B1010.09 Floor Construction Fireproofing*
B1010.10 Floor Construction Firestopping*
B1020.01 Roof Structural Frame* - 1977 Section
B1020.01 Roof Structural Frame* - 1997 Section
5 - Good
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1977
1997
1977
1977
1977
1977
1997
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
MAR-07
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Fort McMurray - Ecole Boreal (B3421A)
Concrete block walls supporting roof in areas.
Concrete block walls supporting roof in areas.
Concrete slab at mechanical fan room.
No fire proofing visible on the steel framed floor assembly. Assumed that the building complied with the code at time ofconstruction.
Penetrations through suspended floor assemblies are fire-stopped.
Steel structure bearing on concrete block and steel beams/columns.
Steel structure bearing on concrete block and steel beams/columns.
Report run on: January 10, 2012 11:57 PM Page 6 of 47
B1020.04 Canopies*
B1020.06 Roof Construction Fireproofing*
5 - Good
4 - Acceptable
Rating
Rating
1977
1977
Installed
Installed
0
0
Design Life
Design Life
JAN-12
JAN-12
Updated
Updated
Fort McMurray - Ecole Boreal (B3421A)
Canopy of fabric stretched over light aluminum frame at main entrance.
No fire proofing visible on the steel framed roof assembly. Assumed that the building complied with the code at time ofconstruction.
Report run on: January 10, 2012 11:57 PM Page 7 of 47
B2010.01.02.01 Brick Masonry: Ext. Wall Skin* - 1977 Section
B2010.01.02.01 Brick Masonry: Ext. Wall Skin* - 1997 Section
B2010.01.02.01 Brick Masonry: Ext. Wall Skin* - East Wall
B2010.01.05 Exterior Insulation and Finish Systems (EIFS)*
B2010.01.06.03 Metal Siding** - 1997 Section
5 - Good
4 - Acceptable
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
1977
1997
2011
1997
1997
Installed
Installed
Installed
Installed
Installed
0
0
0
0
40
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace 1997 Section Metal Wall Cladding (450sq. m.)
Lifecycle Replacement 2037 $77,500 Unassigned
Fort McMurray - Ecole Boreal (B3421A)S2 ENVELOPE
Event:
Type Year Cost Priority
Updated: JAN-12
Face brick as exterior wythe in exterior cavity walls on north, west, and south sides of school.
Face brick at bottom of exterior walls. New weeping tile added around school may address this situation.
Repairs currently underway to add face brick as the exterior wythe of east cavity wall will be complete Fall 2011.
Exterior insulation and finish on exterior face of 1997 section above brick wainscot.
Prefinished metal siding applied over upper portions of concrete block walls.
Report run on: January 10, 2012 11:57 PM Page 8 of 47
B2010.01.06.03 Metal Siding** - 2011
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
B2010.01.09 Expansion Control: Ext. Wall*
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
B2010.02.03 Masonry Units: Ext. Wall Const.*
5 - Good
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
2011
1997
1977
1997
1977
Installed
Installed
Installed
Installed
Installed
40
0
0
20
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace 2011 Metal Wall Cladding (250 sq. m.)
Replace Exterior Caulking (225 meters)
Lifecycle Replacement
Lifecycle Replacement
2051
2017
$43,000
$9,200
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Current construction project to be completed Fall 2011. Metal cladding at top of new east wall. Metal cladding to replacewood cladding at fascia on south and west walls.
Stucco finish applied over concrete block walls at exterior gym walls.
Periodic control joints in EIFS and face brick.
Control joints and transitions between dissimilar materials are caulked.
Single wythe concrete block at walls around gymnasium.
Report run on: January 10, 2012 11:57 PM Page 9 of 47
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* - 1977 Section
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* - 1997 Section
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* - 2011
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* - Gym
B2010.06 Exterior Louvers, Grilles, and Screens*
4 - Acceptable
5 - Good
5 - Good
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1977
1997
2011
1977
1977
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
MAR-07
Updated
Updated
Updated
Updated
Updated
Add Metal or EIFS to Gym Walls (410 sq. m.)
Failure Replacement 2012 $82,000 Medium
Evidence of moisture migration through single wythe concreteblock walls.
Concern:
Add metal cladding and insulation or EIFS to walls aroundGym.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Type Year Cost Priority
Updated: JAN-12
Drawings indicate rigid insulation and vapour barrier in cavity walls.
Drawings indicate rigid insulation and vapour barrier in cavity walls.
Air-seal membrane and insulation being added to east wall in Fall 2011 project.
Single wythe concrete block walls around Gym with no visible evidence of air barriers and insulation. At best, block maybe filled with zonolite insulation.
Painted metal louvres throughout.
Report run on: January 10, 2012 11:57 PM Page 10 of 47
B2010.09 Exterior Soffits*
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1977 Section
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1997 Section
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 2011
5 - Good
3 - Marginal
5 - Good
5 - Good
Rating
Rating
Rating
Rating
2011
1977
1997
2011
Installed
Installed
Installed
Installed
0
40
40
40
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace 1977 Section WIndows (85 sq. m.)
Replace 1977 Section WIndows (10 sq. m.)
Replace 2011 Windows (35 sq. m.)
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2012
2037
2051
$130,000
$15,000
$54,000
Low
Unassigned
Unassigned
Windows reported to be drafty.Concern:
Replace windows with aluminum frame double-glazed sealedunits.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Prefinished vented metal soffit panels at soffits of Fall 2011 construction project.
Aluminum frame with double field glazing. Hopper type vent at bottom of most windows.
Double-glazed sealed units set in aluminum framing; vent along bottom of windows in classrooms.
Curtain wall type section used in new windows on east wall of Fall 2011 project.
Report run on: January 10, 2012 11:57 PM Page 11 of 47
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - Northwest
B2030.01.02 Steel-Framed Storefronts: Doors**
B2030.02 Exterior Utility Doors** - 1977 Section
2 - Poor
5 - Good
4 - Acceptable
Rating
Rating
Rating
1977
1997
1977
Installed
Installed
Installed
40
30
40
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace Northwest Windows (35 sq. m.)
Replace Hollow Metal Storefront (4 doors)
Replace 1977 Section Exterior Utility Doors (10doors)
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2012
2027
2017
$64,000
$13,000
$11,000
Medium
Unassigned
Unassigned
Windows area is very large and very drafty. This roombecomes extremely cold in the winter. Refer also tomechanical for heating concerns.
Concern:
Replace northwest windows with a curtain wall system toallow vision area to be replaced with spandrel panels inaddition to vision.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Aluminum-framed windows with double-glazed and field-glazed glass on north wall of former stage area. Oddassortment of 1997 windows below the 1977 windows.
Pressed steel frame with single glazing at sidelites and/or transoms at main entrances.
Insulated hollow metal doors set in pressed steel frames.
Report run on: January 10, 2012 11:57 PM Page 12 of 47
B2030.02 Exterior Utility Doors** - 1997 Section
B3010.01 Deck Vapour Retarder and Insulation* - 1977 Section
B3010.01 Deck Vapour Retarder and Insulation* - 1997 Section
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** - 1977 Section
5 - Good
4 - Acceptable
5 - Good
3 - Marginal
Rating
Rating
Rating
Rating
1997
1977
1997
1977
Installed
Installed
Installed
Installed
40
0
0
25
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace 1997 Section Exterior Utility Doors (2doors)
Replace 1977 Section BUR Roofing (2,769 sq. m.)
Lifecycle Replacement
Failure Replacement
2037
2012
$2,200
$648,000
Unassigned
Medium
Evidence of ponding and reports of past leaks. Ceiling tilesare water stained in areas.
Concern:
Replace original BUR with 2 ply SBS membrane.Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Insulated hollow metal doors set in pressed steel frames.
Vapour retarder and insulation at 1977 roof assembly.
Vapour-retarder and insulation at 1997 roof assembly.
Original BUR membrane still in place.
Report run on: January 10, 2012 11:57 PM Page 13 of 47
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** - 1997 Section
B3020.02 Other Roofing Openings (Hatch, Vent, etc)*
5 - Good
5 - Good
Rating
Rating
1997
1977
Installed
Installed
25
0
Design Life
Design Life
JAN-12
MAR-07
Updated
Updated
Replace 1997 Section BUR Roofing (306 sq. m.)
Lifecycle Replacement 2022 $72,000 Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Type Year Cost Priority
Updated: JAN-12
Original BUR membrane still in place.
Roof latch and ladder located in mechanical room.
Report run on: January 10, 2012 11:57 PM Page 14 of 47
C1010.01 Interior Fixed Partitions* - 1977 Section
C1010.01 Interior Fixed Partitions* - 1997 Section
C1010.02 Interior Demountable Partitions*
C1010.04 Interior Balustrades and Screens, Interior Railings*
C1010.05 Interior Windows*
5 - Good
5 - Good
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1977
1997
1977
1997
1977
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Fort McMurray - Ecole Boreal (B3421A)S3 INTERIOR
Concrete block and metal stud partitions throughout.
Concrete block partitions throughout.
Demountable partitions with battens in party walls between classrooms and staff areas.
Metal railing provided at vertical drop between lunch room and multi-purpose room.
Tempered glazing set in pressed steel frames.
Report run on: January 10, 2012 11:57 PM Page 15 of 47
C1010.07 Interior Partition Firestopping*
C1010.08 Other Partitions*
C1020.01 Interior Swinging Doors (& Hardware)*
C1020.02 Interior Entrance Doors*
C1020.03 Interior Fire Doors*
3 - Marginal
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1977
1997
1977
1997
1977
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
MAR-07
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Repair Fire-stopping at Partitions (3,075 sq.m./gfa)
Repair 2012 $6,000 Low
Openings made in partitions for services and cabling havenot been sealed.
Concern:
Repair fire-stopping at partitions. Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Type Year Cost Priority
Updated: JAN-12
Structure, mechanical, ductwork, and electrical conduit penetrates fire-rated partitions throughout.
Suspended fabric curtain divides the gym into two teaching spaces.
Solid core wood doors set in pressed steel frames.
Glazed hollow metal door set in pressed steel frames at vestibules.
Hollow metal rated door at mechanical room and service rooms.
Report run on: January 10, 2012 11:57 PM Page 16 of 47
C1020.07 Other Interior Doors*
C1030.01 Visual Display Boards**
C1030.02 Fabricated Compartments (Toilets/Showers)**
C1030.08 Interior Identifying Devices*
5 - Good
4 - Acceptable
3 - Marginal
5 - Good
Rating
Rating
Rating
Rating
1997
1997
1977
1997
Installed
Installed
Installed
Installed
0
20
30
0
Design Life
Design Life
Design Life
Design Life
MAR-07
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Visual Display Boards (65 boards)
Replace Fabricated Compartments (12 cubicles)
Lifecycle Replacement
Failure Replacement
2017
2012
$56,000
$19,500
Unassigned
Medium
Shower and toilet compartments in locker rooms aredamaged.
Concern:
Replace shower and toilet compartments.Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Aluminum overhead coiling door over counter to kitchen.
Whiteboards and tackboards throughout.
Floor mounted metal toilet and shower compartments.
Cast metal signage mounted to all doors.
Report run on: January 10, 2012 11:57 PM Page 17 of 47
C1030.10 Lockers**
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010 Stair Construction*
C2020.05 Resilient Stair Finishes**
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1997
1977
1997
1997
1997
Installed
Installed
Installed
Installed
Installed
30
0
0
0
20
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
MAR-07
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace Metal Lockers (88 lockers)
Replace Rubber Treads (62 meters)
Lifecycle Replacement
Lifecycle Replacement
2027
2017
$58,000
$6,000
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Metal lockers with sloped tops in selected corridors and locker rooms.
Painted plywood shelving throughout.
Commercial grade mirrors, soap dispensers, toilet tissue dispensers and paper towel dispensers throughout.
Cast concrete stairs and risers at grade change within Lunch Room.
Rubber treads and risers at stair in Lunch Room.
Report run on: January 10, 2012 11:57 PM Page 18 of 47
C2020.08 Stair Railings and Balustrades*
C3010.04 Gypsum Board Wall Finishes (Unpainted)*
C3010.06 Tile Wall Finishes**
C3010.11 Interior Wall Painting*
C3010.14 Other Wall Finishes*
C3020.01.01 Epoxy Concrete Floor Finishes*
5 - Good
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1997
1977
1997
1997
1997
1977
Installed
Installed
Installed
Installed
Installed
Installed
0
0
40
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Updated
Replace Ceramic Wall Tile (90 sq. m.)
Lifecycle Replacement 2037 $30,000 Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Type Year Cost Priority
Updated: JAN-12
Steel handrail at one section of risers in Lunch Room.
Demountable partition systems utilize gypsum board with vinyl wall coverings.
Ceramic wall tile in kitchen and washrooms.
All interior wall surfaces are painted, including 1997 phase.
Epoxy concrete used as a wall finish around showers in locker rooms.
Seamless epoxy flooring in corridors, vestibules, washrooms and locker rooms. Some cracking but no displacement.
Report run on: January 10, 2012 11:57 PM Page 19 of 47
C3020.01.02 Painted Concrete Floor Finishes*
C3020.07 Resilient Flooring** - 1977 Sheet Vinyl
C3020.07 Resilient Flooring** - 1977 Vinyl Tile
C3020.07 Resilient Flooring** - 1997 Sheet Vinyl
4 - Acceptable
3 - Marginal
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
1997
1977
1977
1997
Installed
Installed
Installed
Installed
0
20
20
20
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace 1977 Sheet Vinyl Flooring (174 sq. m.)
Replace 1977 Vinyl Tile Flooring (35 sq. m.)
Replace 1997 Sheet Vinyl Flooring (135 sq. m.)
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2012
2015
2017
$20,000
$2,500
$18,000
Low
Unassigned
Unassigned
Sheet vinyl flooring is cracked and damaged. Joints areopening up.
Concern:
Replace 1977 sheet vinyl flooring. Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Painted concrete floors in service rooms.
Sheet vinyl flooring in two classrooms.
Vinyl tile flooring in a few storage rooms and janitor rooms.
Sheet vinyl flooring in vestibule at main entrance. Slip-resistant sheet material in washrooms and kitchen.
Report run on: January 10, 2012 11:57 PM Page 20 of 47
C3020.07 Resilient Flooring** - Gym
C3020.07 Resilient Flooring** - Staff Room
C3020.08 Carpet Flooring**
C3030.04 Gypsum Board Ceiling Finishes (Unpainted)*
5 - Good
5 - Good
3 - Marginal
5 - Good
Rating
Rating
Rating
Rating
2007
2008
1990
1997
Installed
Installed
Installed
Installed
20
20
15
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
MAR-07
Updated
Updated
Updated
Updated
Replace Gym Flooring (447 sq. m.)
Replace Staff Room Vinyl Tile Flooring (42 sq. m.)
Replace Carpet Flooring (295 sq. m.)
Lifecycle Replacement
Lifecycle Replacement
Failure Replacement
2027
2028
2012
$60,000
$3,000
$27,000
Unassigned
Unassigned
Low
Carpet is worn and stained in a number of areas.Concern:
Replace carpet in music room, library and administrationoffices.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Special-purpose rubber athletic flooring installed in Gym.
Vinyl tile flooring replaced in Staff room.
Carpet flooring used in music room, staff room (partial), library, and administration offices.
Gypsum board ceilings in service rooms. Gypsum board panels used in T-bar grid in kitchen.
Report run on: January 10, 2012 11:57 PM Page 21 of 47
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1977 Section
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1997 Section
C3030.07 Interior Ceiling Painting*
3 - Marginal
5 - Good
4 - Acceptable
Rating
Rating
Rating
1977
1997
1997
Installed
Installed
Installed
25
25
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace Acoustic Ceiling Tiles (2,250 sq. m.)
Replace 1997 Section Acoustic Ceiling Tiles (225sq. m.)
Failure Replacement
Lifecycle Replacement
2012
2022
$138,000
$14,000
Low
Unassigned
Ceiling tiles in classrooms are original. Tiles have beendamaged or water stained. Some have been replaced withmismatched patterns.
Concern:
Replace ceiling tiles throughout. T-bar suspension to remainin place.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Suspended T-bar grid system with acoustic tiles in corridors, classrooms, and office areas.
Suspended T-bar grid system with acoustic tiles in 1997 phase.
All gypsum board ceilings are painted. Exposed steel structure in gymnasium is painted.
Report run on: January 10, 2012 11:57 PM Page 22 of 47
D2010.04 Sinks** - 1977
D2010.04 Sinks** - 1997
D2010.05 Showers**
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
1977
1997
1977
Installed
Installed
Installed
30
30
30
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace Sinks (12)
Replace Commercial Kitchen Sinks (2)
Replace Showers (10)
Lifecycle Replacement
Lifecycle Replacement
Failure Replacement
2015
2027
2012
$27,000
$15,000
$75,000
Unassigned
Unassigned
Medium
Existing shower valves in poor condition, leaking, and repairparts hard to obtain. In addition, floor drains are located incenter of common showers and do not comply with healthcodes.
Concern:
Replace showers with new (11 showers) including new floorslab and floor drain.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
1 - floor mounted janitor sink, 10 - stainless steel sinks in staff room and science room, and 1 - double tub laundry sink.
Stainless steel sinks in commercial kitchen.
Girls and Boy's showers with temperature controlled valves.
Report run on: January 10, 2012 11:57 PM Page 23 of 47
D2010.08 Drinking Fountains/Coolers**
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1977
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1997
D2020.01.01 Pipes and Tubes: Domestic Water* - 1977
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1997
1977
Installed
Installed
Installed
Installed
35
35
35
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Drinking Fountains (3)
Replace washroom fixtures (23) WC, (1) Urnl, (17)Lav
Replace washroom fixtures (5) WC, (2) Urnl, (6)Lav
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2032
$6,500
$130,000
$40,000
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Wall mounted china drinking fountains.
22 - floor mounted tank type water closets, 1 - floor mounted water closet with flush valve, 1 - floor mounted urinal withflush tank, 2 - wall hung china lavatories, 13 - recess china lavatories, and 2 - recess mounted stainless steel lavatories.
5 - floor mounted tank water closets, 6 - recess mounted stainless steel lavatories, and 2 - wall mounted urinals withflush valves.
Copper water lines.
Report run on: January 10, 2012 11:57 PM Page 24 of 47
D2020.01.01 Pipes and Tubes: Domestic Water* - 1997
D2020.01.02 Valves: Domestic Water**
D2020.01.03 Piping Specialties (Backflow Preventers)**
D2020.02.02 Plumbing Pumps: Domestic Water**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1977
2006
Installed
Installed
Installed
Installed
0
40
20
20
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace domestic water valves (10)
Replace Backflow Preventer (1)
Replace hot water circulation pump (1)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2015
2026
$16,000
$3,000
$1,600
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Copper water lines.
Valves provided at equipment and main water service.
Backflow preventer provided on hot water heating system water make-up.
Grundfos recirculation pump on domestic hot water return.
Report run on: January 10, 2012 11:57 PM Page 25 of 47
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation: Domestic*
D2030.01 Waste and Vent Piping*
D2030.02.04 Floor Drains*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
2006
1977
1977
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
Installed
20
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Replace Domestic Water Heaters (2)
Lifecycle Replacement 2026 $10,000 Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Type Year Cost Priority
Updated: JAN-12
Two A.O. Smith hot water heaters, 376 L, natural gas fired with input of 355 L 94 gal, 52.52 kw.
1977 & 1997. Fiberglass piping insulation.
1977 & 1997. Metallic piping.
1977 & 1997. Floor drains in mechanical room.
Metallic piping.
Roof drains with dome top, minimum two per roof section.
Report run on: January 10, 2012 11:57 PM Page 26 of 47
D3010.02 Gas Supply Systems*
D3020.02.01 Heating Boilers and Accessories: H.W.**
D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1997
1997
1997
Installed
Installed
Installed
Installed
0
35
35
0
Design Life
Design Life
Design Life
Design Life
MAR-07
JAN-12
JAN-12
MAR-07
Updated
Updated
Updated
Updated
Replace heating boiler (1)
Replace chimney (20 meters)
Lifecycle Replacement
Lifecycle Replacement
2032
2032
$45,000
$18,000
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Schedule 40 steel gas piping.
1 - Raypak natural gas fired tube boiler with 322.58 kw natural gas input.
Galvanized steel chimney to boiler.
Side stream filter, chemical pot feeder, and flow indicator.
Report run on: January 10, 2012 11:57 PM Page 27 of 47
D3030.06.02 Refrigerant Condensing Units**
D3040.01.01 Air Handling Units: Air Distribution** - 1997
D3040.01.01 Air Handling Units: Air Distribution** - 2006
D3040.01.04 Ducts: Air Distribution*
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
1997
1997
2006
1977
Installed
Installed
Installed
Installed
25
30
30
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace condensing unit (1)
Replace air handling unit (1)
Replace Air Handling Unit to Gym (1)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2022
2027
2036
$25,000
$42,000
$42,000
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Roof top mounted condensing unit with connection to DX coil in air handling unit serving Community Room. Carriermodel 38AH024500AA. R22 refrigerant.
Roof top mounted packaged natural gas fired ventilation unit complete with DX cooling coil. Unit serves CommunityRoom. Engineered Air DJE100, 264 kw.
Engineered Air model DJ100, 2 speed, natural gas fired packaged ventilation unit for service to gymnasium. Unit has200 kw input.
1977 & 1997. Galvanized sheet metal ductwork.
Report run on: January 10, 2012 11:57 PM Page 28 of 47
D3040.01.07 Air Outlets & Inlets: Air Distribution*
D3040.03.01 Hot Water Distribution Systems** - 1977
D3040.03.01 Hot Water Distribution Systems** - 1997
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1977
1977
1997
Installed
Installed
Installed
0
40
40
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Add radiation to Community Office ( 25 meters ofradiation)
Replace hot water distribution system (2767.9square meters/GFA)
Replace hot water distribution system (306.5square meters/GFA)
Operating Efficiency Upgrade
Lifecycle Replacement
Lifecycle Replacement
2012
2017
2037
$15,000
$360,000
$40,000
High
Unassigned
Unassigned
Insufficient heat to community hall. Complaints of roombeing cold in winter.
Concern:
Add radiation to room complete with associated piping andaccessories.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
1977 & 1997. Ceiling mounted supply and return air grilles.
Schedule 40 steel piping and copper piping.
Schedule 40 steel piping and copper piping.
Report run on: January 10, 2012 11:57 PM Page 29 of 47
D3040.04.01 Fans: Exhaust** - 1977
D3040.04.01 Fans: Exhaust** - 1997
D3040.04.03 Ducts: Exhaust*
D3040.04.05 Air Outlets and Inlets: Exhaust*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1997
1977
1977
Installed
Installed
Installed
Installed
30
30
0
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Exhaust Fans (3)
Replace exhaust fan (2)
Lifecycle Replacement
Lifecycle Replacement
2015
2027
$8,000
$4,000
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Roof mounted dome type exhaust fans.
Upblast exhaust fan for service to commercial range hood and dome type roof mounted exhaust fan for service towashrooms.
1977 & 1997. Galvanized steel ductwork for general exhaust. Stainless steel duct for kitchen exhaust.
1977 & 1997. Ceiling mounted exhaust grilles.
Report run on: January 10, 2012 11:57 PM Page 30 of 47
D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**
D3050.05.01 Convectors**
D3050.05.02 Fan Coil Units** - 1977
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1977
1977
1977
Installed
Installed
Installed
30
40
30
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace HVAC unit (1)
Replace convectors (3)
Replace Force Flow Units (4)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2017
2015
$154,000
$3,000
$28,000
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Roof top mounted packed natural gas fired HVAC unit. Unit provides ventilation to school. Engineered air model DJ-100, 401 kw natural gas input, 5664 L/S supply air capacity. R22 refrigerant.
Convectors located in corridors and washrooms.
Force flow units located in building entrances.
Report run on: January 10, 2012 11:57 PM Page 31 of 47
D3050.05.02 Fan Coil Units** - 1997
D3050.05.03 Finned Tube Radiation** - 1977
D3050.05.03 Finned Tube Radiation** - 1997
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1997
1977
1997
Installed
Installed
Installed
30
40
40
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace force flow unit (1)
Replace finned tube radiation (2767.9 squaremeters/GFA)
Replace finned tube radiation (306.5 squaremeters/GFA)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2027
2017
2037
$7,000
$185,000
$15,000
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Fan coil unit at building entrance.
Finned tube radiation in metal cabinet located around building exterior walls.
Finned tube radiation in metal cabinet located around building exterior walls.
Report run on: January 10, 2012 11:57 PM Page 32 of 47
D3050.05.06 Unit Heaters**
D3060.02.01 Electric and Electronic Controls** - 1977
D3060.02.01 Electric and Electronic Controls** - 1997
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1977
1977
1997
Installed
Installed
Installed
30
30
30
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace Unit Heaters (1).
Replace Electric and Electronic Controls (2767.9square meters/GFA)
Replace electric and electronic controls (306.5square meters/GFA)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2027
$5,000
$6,000
$1,000
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Hot water unit heater in mechanical room.
Electric controls to force flow units and unit heater.
Electric controls to force flow unit.
Report run on: January 10, 2012 11:57 PM Page 33 of 47
D3060.02.02 Pneumatic Controls** - 1977
D3060.02.02 Pneumatic Controls** - 1997
D3060.02.05 Building Systems Controls (BMCS, EMCS)**
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1997
1991
1977
Installed
Installed
Installed
Installed
40
40
20
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Pneumatic Controls (2767.9 squaremeters/GFA)
Replace pneumatic controls (306.5 squaremeters/GFA)
Replace Building DDC Control System (2767.9square meters/GFA)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2037
2015
$23,000
$2,500
$85,000
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Pneumatic control system complete with refrigerated air dryer, air compressor, and pneumatic control valves.
Pneumatic thermostats and control valves.
Johnson Metasis control system
1977 & 1997. ABC type fire extinguishers installed in cabinets.
Report run on: January 10, 2012 11:57 PM Page 34 of 47
D4090.02 Carbon Dioxide Fire Extinguishing Systems**
4 - AcceptableRating
1997Installed
40Design Life
JAN-12Updated
Replace carbon dioxide fire extinguishing system(1)
Lifecycle Replacement 2037 $18,000 Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Type Year Cost Priority
Updated: JAN-12
Fire suppression system to kitchen range hood.
Report run on: January 10, 2012 11:57 PM Page 35 of 47
D5010.01.02 Main Electrical Transformers (Utility Owned)*
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 1977
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** - 1997
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1977
1977
1997
Installed
Installed
Installed
Installed
0
40
30
30
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace main distribution switchboard (1)
Replace Panelboards (10)
Replace Panelboards (2)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2015
2027
$42,000
$70,000
$14,000
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)S5 ELECTRICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Utility pad mounted transformer located at exterior of building.
Federal Pioneer main distribution switchboard, 700 ampere main circuit breaker, 120/208V/3PH/4W.
Federal Pioneer branch circuit panelboards.
Cutler Hammer panelboards.
Report run on: January 10, 2012 11:57 PM Page 36 of 47
D5010.07.02 Motor Starters and Accessories**
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
D5020.02.02.02 Interior Fluorescent Fixtures** - 1977
4 - Acceptable
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
Rating
1977
1977
1977
1977
Installed
Installed
Installed
Installed
30
0
0
30
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Motor Starters and Accessories (10 units)
Replace Light Fixtures (500)
Lifecycle Replacement
Failure Replacement
2015
2012
$20,000
$260,000
Unassigned
High
T12 lamps no longer manufactured. Many fixtures havecracked and yellowing fixtures lens and reflectors.
Concern:
Replace fixtures with new fixtures having T8 lamps.Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
General Electric motor starters.
1977 & 1997. Copper wiring installed in conduit.
1977 & 1997. Line and low voltage switching of light fixtures. Switches to provide individual room control.
Mostly recess mounted light fixtures with T12 lamps.
Report run on: January 10, 2012 11:57 PM Page 37 of 47
D5020.02.02.02 Interior Fluorescent Fixtures** - 1997
D5020.02.02.02 Interior Fluorescent Fixtures** - 2007
D5020.02.02.03 Interior Metal Halide Fixtures*
D5020.02.03.02 Emergency Lighting Battery Packs** - 1977
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1997
2007
1997
1977
Installed
Installed
Installed
Installed
30
30
0
20
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Interior Fluorescent Fixtures (40 fixtures)
Replace fluorescent fixtures to gym (20)
Replace Emergency Lighting (20 battery packs)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2027
2037
2015
$21,000
$11,000
$31,000
Unassigned
Unassigned
Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Recess mounted fluorescent fixtures with T8 lamps and electronic ballasts.
T5 surface mounted fluorescent fixtures provided to gymnasium.
Pendant hung metal halide light fixtures in Community Multi-purpose room.
DC type emergency battery pack units located throughout building complete with remote mounted DC heads.
Report run on: January 10, 2012 11:57 PM Page 38 of 47
D5020.02.03.02 Emergency Lighting Battery Packs** - 1997
D5020.02.03.03 Exit Signs*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1997
1977
1977
1977
Installed
Installed
Installed
Installed
20
0
0
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Replace Emergency Lighting Battery Packs (4battery packs)
Lifecycle Replacement 2017 $7,000 Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Type Year Cost Priority
Updated: JAN-12
DC battery pack units with integral and remote heads.
1977 & 1997. LED type exit signs located at exit doors and in exit corridors.
Wall mounted HPS light fixtures installed around perimeter of building.
Exterior lighting photocell controlled.
Report run on: January 10, 2012 11:57 PM Page 39 of 47
D5030.01 Detection and Fire Alarm**
D5030.02.02 Intrusion Detection**
D5030.03 Clock and Program Systems*
D5030.04.01 Telephone Systems*
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1977
1990
1977
1997
Installed
Installed
Installed
Installed
25
25
0
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
MAR-07
Updated
Updated
Updated
Updated
Replace Fire Alarm System (3074 squaremeters/GFA)
Replace Security System (3074 squaremeters/GFA)
Failure Replacement
Lifecycle Replacement
2012
2015
$130,000
$130,000
High
Unassigned
Existing fire alarm components starting to fail and repair partsfor fire alarm panel no longer manufactured.
Concern:
Replace entire fire alarm system with new system designed tocomply with current codes.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Edwards 6500 fire alarm panel complete with fire detectors and alarm bells.
DSC security alarm system with alarm keypad, motion sensors, and door contacts. System is monitored.
Wall mounted battery clocks in each classroom.
NEC Telephone system with telephone in each classroom.
Consequences of Deferral:System could fail.
Report run on: January 10, 2012 11:57 PM Page 40 of 47
D5030.04.04 Data Systems*
D5030.05 Public Address and Music Systems**
D5030.06 Television Systems*
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1990
1977
1977
Installed
Installed
Installed
0
20
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace Public Address and Music System (3074square meters/GFA)
Lifecycle Replacement 2015 $50,000 Unassigned
Fort McMurray - Ecole Boreal (B3421A)
Event:
Type Year Cost Priority
Updated: JAN-12
Cat 5 data system with wiring installed to patch panel and server.
Recess speakers in corridors and classrooms. Paging using telephone system.
Cable TV system to school complete with amplifier.
Report run on: January 10, 2012 11:57 PM Page 41 of 47
E1090.03 Food Service Equipment*
E1090.04 Residential Equipment*
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
1997
1997
1977
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
MAR-07
JAN-12
MAR-07
Updated
Updated
Updated
Fort McMurray - Ecole Boreal (B3421A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Commercial cooking and serving equipment located in kitchen including grille, fryer, reach-in cooler, ranged hood andfire suppression system.
Refrigerator, dishwasher and microwave in staff lounge.
Wall and ceiling hung plywood basketball backboards in gym. Electric score clock in gym.
Report run on: January 10, 2012 11:57 PM Page 42 of 47
E2010.02 Fixed Casework** - 1977 Section
E2010.02 Fixed Casework** - 1997 Section
4 - Acceptable
5 - Good
Rating
Rating
1977
1997
Installed
Installed
35
35
Design Life
Design Life
JAN-12
JAN-12
Updated
Updated
Replace 1977 Section Casework (2,768 sq. m./gfa)
Replace 1977 Washroom Vanities (5 meters)
Replace 1997 Section Casework (307 sq. m./gfa)
Lifecycle Replacement
Failure Replacement
Lifecycle Replacement
2015
2012
2032
$335,000
$3,000
$38,000
Unassigned
Low
Unassigned
Vanities and casework below are in poor condition. Laminatedamaged or lifting; clear finish wood casework prone to waterdamage and unnecessary.
Concern:
Replace washroom vanities and casework with plasticlaminate clad vanities only.
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Educational Facility Casework: clear finish plywood casework with plastic laminate countertops throughout the school. Library Casework: clear finish plywood shelving and check out desk in library. Kitchen Casework: plastic laminate clad cabinets with plastic laminate countertops in CTS student kitchens. Laboratory Casework: clear finish plywood cabinets with plastic laminate countertops in science rooms. Other Casework: clear finish plywood cabinets with plastic laminate countertops in computer rooms. Clear finishplywood display cases with tempered sliding doors in main entrance. Painted wood display case with sliding glass doors. Corridor coat racks of clear finish wood casework and plasticlaminate on hat shelf.
Plastic laminate-clad counters over clear wood casework. Plastic laminate-clad vanities in washrooms.
Report run on: January 10, 2012 11:57 PM Page 43 of 47
E2010.03.01 Blinds** - 1977 Section
E2010.03.01 Blinds** - 1997 Section
E2010.03.01 Blinds** - Northwest
3 - Marginal
5 - Good
3 - Marginal
Rating
Rating
Rating
1977
1997
1977
Installed
Installed
Installed
30
30
30
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace 1977 Section Window Blinds (85 sq. m.)
Replace 1997 Section Window Blinds (10 sq. m.)
Replace Northwest Window Blinds (35 sq. m.)
Failure Replacement
Lifecycle Replacement
Failure Replacement
2012
2027
2012
$12,500
$1,500
$5,000
Low
Unassigned
Low
Damage to blinds, openers do not work.
Damage to blinds, lites do not work.
Concern:
Concern:
Replace window blinds after windows replaced.
Replace window blinds after windows are replaced.
Recommendation:
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Venetian blinds between the two lites of glazing at windows.
Venetian blinds between the two lites of glazing at windows.
Venetian blinds between the two lites of glazing at upper (1977) windows.
Report run on: January 10, 2012 11:57 PM Page 44 of 47
K2030.06 Acoustical Privacy*
K4010.01 Barrier Free Route: Parking to Entrance*
3 - Marginal
3 - Marginal
Rating
Rating
0
1977
Installed
Installed
0
0
Design Life
Design Life
JAN-12
JAN-12
Updated
Updated
Add Acoustic Wall Panels (330 sq. m.)
Provide BFA Acess to School
Program Functional Upgrade
Barrier Free Access Upgrade
2014
2012
$100,000
$50,000
Low
Low
Acoustic panels not provided in music room and gym; noisyteaching spaces.
Significant grade change (+/- 1,500) and distance (+/- 100meters) from parking to main entrance.
Concern:
Concern:
Add acoustic panels to upper parts of gym and music roomwalls.
Upgrade access to BFA parking by introducing ramp (18meters). Refer also to K4010.02 to address long distance.
Recommendation:
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)S8 SPECIAL ASSESSMENT
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Acoustic panels not provided in music room and gym.
Designated barrier-free stall required adjacent main entrance.
Grade change at parking lot.
Report run on: January 10, 2012 11:57 PM Page 45 of 47
K4010.02 Barrier Free Entrances*
K4010.03 Barrier Free Interior Circulation*
K4010.04 Barrier Free Washrooms*
3 - Marginal
3 - Marginal
5 - Good
Rating
Rating
Rating
1997
1977
1997
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Add Power Door Operator at Northwest Entrance(1 door)
Replace 1977 Section Door Locksets
Barrier Free Access Upgrade
Barrier Free Access Upgrade
2012
2014
$4,500
$27,500
Medium
Low
Distance from parking to main entrance is well beyond the 50meter maximum preferred by BFA advocacy groups. Thisfigure may be stipulated in next building code.
Doors have round knobs on locksets and latchsets wherelever design is required for barrier-free access.
Concern:
Concern:
Develop northwest entrance to 1997 Section as a barrier-freeentrance. This would reduce distance to +/- 55 meters. Addpower door operator.
Replace door locksets with lever design.
Recommendation:
Recommendation:
Fort McMurray - Ecole Boreal (B3421A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Power-door operators provided at main entrance.
Good access to all teaching areas. Doors in 1997 phase have lever-style hardware.
Barrier-free washrooms are provided.
Report run on: January 10, 2012 11:57 PM Page 46 of 47
K4030.01 Asbestos*
K4030.04 Mould*
K4030.09 Other Hazardous Materials*
K5010.01 Site Documentation* - Site Plan
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
Rating
1977
1977
1977
1977
Installed
Installed
Installed
Installed
0
0
0
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Fort McMurray - Ecole Boreal (B3421A)
No asbestos issues known or reported.
No mould was observed or reported.
No other hazardous materials known or reported.
Site was evaluated on September 20, 2011 by Burgess Bredo Architect Ltd. A very sketchy site plan with minimal detailswas obtained. This site plan was supplemented with aerial photographs to help identify and quantify site components. Allareas of the site were evaluated.
B3421A Ecole Boreal P1140158.JPG
Report run on: January 10, 2012 11:57 PM Page 47 of 47
K5010.02 Building Documentation* - Floor Plan
5 - GoodRating
1977Installed
0Design Life
JAN-12Updated
Fort McMurray - Ecole Boreal (B3421A)
Building was evaluated on September 20, 2011 by Burgess Bredo Architect Ltd. A floor plan was obtained from theschool district. The building has an area of 3,074 sq. m. which includes the original permanent construction of 2,768sq.m. and a 1997 addition of 306 sq.m. All areas of the school were evaluated.
Main floor plan supplied by School District.