REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @...
Transcript of REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @...
SCALE 1:100 @ A3 REAR ELEVATION AS PROPOSED (WEST)
SCALE 1:100 @ A3 SECTION AA AS PROPOSED
SCALE 1:100 @ A3 SIDE ELEVATION AS PROPOSED (SOUTH)
Existing cladding to bereplaced under
permitted development
SIDE EXTENSIONSIDE EXTENSION
Vertical timber cladding tomatch the existing house
SIDE EXTENSION
New metal staircasewith glass balustrades
Existing cladding to bereplaced under
permitted development
Existing slattedfence on boudary
1 2 3 4METRES AT 1:50
1 2 3 4 5 6 7 8 9METERS AT 1:100
1 2 3 4 5METERS AT 1:200 METERS AT 1:500
5 10 20 30METERS AT 1:1250
10 20 30 40105
P4B05
Example Project 5
Jan 17
PROJECT TITLE
DRAWING TITLE
DRAWING No.
DATE STATUS
JOB No. SCALE
DRAWN CHECKED
Elevations as proposed
GM
1:100 @ A3
-
REVISION
P4B05-1B Regs
BR06
1 Section AAScale: 1 : 50
SCALE 1:100 @ A3
C1
C2
B1
A2
A5
A6
D1-4
E1-2
E3
AS E
XIST
ING
AS E
XIST
ING
BR10
1
BR10
3
New beams set within depthof existing floor- joists to
be run into the web of steel.
BEAM 4
BEAM 5LINTEL 4
BR10
2
1 2 3 4METRES AT 1:50
1 2 3 4 5 6 7 8 9METERS AT 1:100
1 2 3 4 5METERS AT 1:200 METERS AT 1:500
5 10 20 30METERS AT 1:1250
10 20 30 40105
P4B05
Example Project 5
Jan 17
PROJECT TITLE
DRAWING TITLE
DRAWING No.
DATE STATUS
JOB No. SCALE
DRAWN CHECKED
Section AA as proposed
GM
B Regs
1:100 @ A3
-
REVISION
P4B05-2
BEAM 2
BEAM 1
BEAM 3
LINTEL 1
LINTEL 2
BEAM
4 JOIST 1Span of existing flat roof joists over
Extract run between joists
Beam raised to levelof dining room ceiling
BR07
1 Upper Ground Floor - 1Scale: 1 : 50
Incoming electrics, consumer unit etc
Chimney flue from boilerroom below (being re-usedto feed pipe down from garage)
Circulation, ironingspace etc
Extract in ceiling void above to outside wall
Nib removed
Summary of Structural Elements:
Upper Ground FloorBEAM 1 = 178 X 102 X 19UBBEAM 2 = 178 X 102 X 19UBBEAM 3 = 203 X 102 X 23UBBEAM 4 = 2X 203 X 102 X 23UBLINTEL 1 = Catnic CG90/100LINTEL 2 = PCC 100 x 65 deepLINTEL 8 = Catnic CG90/100LINTEL 9 = PCC 100 x 65 deepJOIST 1 = 50 X 175 C16 @ 400 cc
Lower Ground FloorBEAM 5 = 2x 203 X 102 X 23UBLINTEL 3 = Catnic CG90/100LINTEL 4 = Catnic CG90/100LINTEL 5 = Catnic CG90/100LINTEL 6 = PCC 100 x 65 deepLINTEL 7 = PCC 100 x 65 deepJOIST 2 = 50 X 175 C16 @ 400 cc
Existing opening
LINT
EL 8 Existing window opening blocked
LINTEL 9
Wall and roof continuedover staircase
Existing door removed andopening infilled with cavity
wall as spec item A2
Extract in cooker hoodconcealed in ceiling -
full details to be confirmed
1 2 3 4METRES AT 1:50
1 2 3 4 5 6 7 8 9METERS AT 1:100
1 2 3 4 5METERS AT 1:200 METERS AT 1:500
5 10 20 30METERS AT 1:1250
10 20 30 40105
P4B05
Example Project 5
Jan 17
PROJECT TITLE
DRAWING TITLE
DRAWING No.
DATE STATUS
JOB No. SCALE
DRAWN CHECKED
Upper Ground floor planas proposed
GM
B Regs1:50 @ A3-
REVISION
P4B05-3
LINTEL 3
BEAM
5
LINT
EL 4
BR08
1 Lower Ground Floor Scale: 1 : 50
LINTEL 5
LINTEL 6
LINTEL 7
BEDROOM
TO E
XIST
ING
WIN
DOW
SIZ
E89
0 m
m2400 mm
A2
A3
A6
A8
A9
A13
A15
D1-4
D5
E1
E1
F1
A9
RWP from balcony & new flat roof to discharge to existing gulley
ACO drain at new threshold
Flue from existingboiler modified to suit
G1
G5
JOIST 2
G6
BOILER ROOM
WALK-IN WARDROBE
Opening retainedfor ventilation
Existing tree removed andplanter demolished back to herewith end return rebuilt
Existing oil tank removed (by others) and tank room lined-out:Vandex walls and underside of steps and lay DPM to floor (lappedup 150mm to overlap wall waterproofing). Line walls & ceiling with
63mm Gyproc Thermaline PIR insulated plasterboard . Floor to be linedwith Kingspan insulation and floating T&G boards (as detail BR10/3)
Opening increased and raised as far as possible.
Foundation design to be confirmed
1 2 3 4METRES AT 1:50
1 2 3 4 5 6 7 8 9METERS AT 1:100
1 2 3 4 5METERS AT 1:200 METERS AT 1:500
5 10 20 30METERS AT 1:1250
10 20 30 40105
P4B05
Example Project 5
Jan 17
PROJECT TITLE
DRAWING TITLE
DRAWING No.
DATE STATUS
JOB No. SCALE
DRAWN CHECKED
Lower ground floor planas proposed
GM
B Regs
1:50 @ A3
-
REVISION
P4B05-4
Existing windowrelocated to outer wall
2400
mm
2400
mm
BR09
1 Side ElevationScale: 1 : 50 BR09
2 Rear ElevationScale: 1 : 50
D1-4
D1-4
1500
mm
1500
mm
Frameless glassbalustrade
2400 mm Rendered walls tonew extension
Aluminium coping (colour-matchedto the doors)
1 2 3 4METRES AT 1:50
1 2 3 4 5 6 7 8 9METERS AT 1:100
1 2 3 4 5METERS AT 1:200 METERS AT 1:500
5 10 20 30METERS AT 1:1250
10 20 30 40105
P4B05
Example Project 5
Jan 17
PROJECT TITLE
DRAWING TITLE
DRAWING No.
DATE STATUS
JOB No. SCALE
DRAWN CHECKED
Elevationsas proposed
GM
B Regs
1:50 @ A3
-
REVISION
P4B05-5
BR10
1 Typical parapet upstand detailScale: 1 : 10
BR10
2 Typical first floor junction / window headScale: 1 : 10
BR10
3 Typical ground floor junction / window cillScale: 1 : 10
Ex 50x50mm treated SW fillet
GRP on 18mm OSB
Alumasc aluminium flashing on DPC
120mm Kingston Thermaroof TR26 LPC/FM
Vapour control layer on 18mm play deck
Firing pieces to fall
SW flat roof joists to structural engineers specification
50 x 100mm timber stud upstand on DPC with 100mmmineral wool insulation tightly packed between studs @ 600 centres
100mm Celcon standard block with 10mm polymer render
50mm Celotex CW4050 cavity board with 50mm clear residual cavity
Pack insulation into void between roof joists at top of cavitywall to ensure cold bridge eliminated
100mm Celcon Standard blocks with 12.5mm plasterboardand 3mm skim internally
12.5mm plasterboard & 3mm skim on 25mm Gyproc Casoline MF5 Ceiling Section
3mm skim coat self-levelling compound
14mm Fastlo UFH tubing in 23mm T&G AcoustiPanel 14on 5mm acoustic rubberFlanking / isolation strip
18mm OSB deck on 200 x 50mm C14 timber floor joists @ 400 centres
100mm mineral wool insulation between floor joists hung from Simpson JMH 200/50joist hangers
10mm polymer render on block with expanded metal lathe over studs (lathe to be extended min 100mm past the junction of masonry / timber)
Catnic CG90/100
Manthorpe G950 weep vents @ max 900mm centres (white)
Existing timber window re-fitted into new window opening
170 x 18mm square section pre-finished MDF skirting (fitted over new floor finish)
170 x 18mm square section pre-finished MDF skirting
100mm Celcon Standard blocks with 12.5mm plasterboardand 3mm skim internally
50mm Kingspan K108 cavity board with 50mm clear residual cavity
Kingston Kooltherm Cavity Closer
Existing window frame and cill re-fiited intonew opening
External skin if 100mm Celcon Standard blockwith 10mm polymer render
DPC on internal and external skins
18mm T&G chipboard on vapour control layer over75mm QuinnTherm QF75 rigid insulation board
125mm in-situ concrete slab with A142 mesh on DPM (which is to be dressed-up inner face of clockwork inner skin and dressed under DPC.50mm sand blinding on 150mm clean, well-consolidatedhardcore.
Cavity fill
150 m
m mi
n.
Internal floor finish / thickness TBC
1 2 3 4METRES AT 1:50
1 2 3 4 5 6 7 8 9METERS AT 1:100
1 2 3 4 5METERS AT 1:200 METERS AT 1:500
5 10 20 30METERS AT 1:1250
10 20 30 40105
P4B05
Example Project 5
Jan 17
PROJECT TITLE
DRAWING TITLE
DRAWING No.
DATE STATUS
JOB No. SCALE
DRAWN CHECKED
Junction Detailsas proposed
GM
B Regs
1:10 @ A3
-
REVISION
P4B05-6