REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @...

6
SCALE 1:100 @ A3 REAR ELEVATION AS PROPOSED (WEST) SCALE 1:100 @ A3 SECTION AA AS PROPOSED SCALE 1:100 @ A3 SIDE ELEVATION AS PROPOSED (SOUTH) Existing cladding to be replaced under permitted development SIDE EXTENSION SIDE EXTENSION Vertical timber cladding to match the existing house SIDE EXTENSION New metal staircase with glass balustrades Existing cladding to be replaced under permitted development Existing slatted fence on boudary 1 2 3 4 METRES AT 1:50 1 2 3 4 5 6 7 8 9 METERS AT 1:100 1 2 3 4 5 METERS AT 1:200 METERS AT 1:500 5 10 20 30 METERS AT 1:1250 10 20 30 40 10 5 P4B05 Example Project 5 Jan 17 PROJECT TITLE DRAWING TITLE DRAWING No. DATE STATUS JOB No. SCALE DRAWN CHECKED Elevations as proposed GM 1:100 @ A3 - REVISION P4B05-1 B Regs

Transcript of REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @...

Page 1: REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @ max 900mm centres (white) Existing timber window re-fitted into new window opening

SCALE 1:100 @ A3 REAR ELEVATION AS PROPOSED (WEST)

SCALE 1:100 @ A3 SECTION AA AS PROPOSED

SCALE 1:100 @ A3 SIDE ELEVATION AS PROPOSED (SOUTH)

Existing cladding to bereplaced under

permitted development

SIDE EXTENSIONSIDE EXTENSION

Vertical timber cladding tomatch the existing house

SIDE EXTENSION

New metal staircasewith glass balustrades

Existing cladding to bereplaced under

permitted development

Existing slattedfence on boudary

1 2 3 4METRES AT 1:50

1 2 3 4 5 6 7 8 9METERS AT 1:100

1 2 3 4 5METERS AT 1:200 METERS AT 1:500

5 10 20 30METERS AT 1:1250

10 20 30 40105

P4B05

Example Project 5

Jan 17

PROJECT TITLE

DRAWING TITLE

DRAWING No.

DATE STATUS

JOB No. SCALE

DRAWN CHECKED

Elevations as proposed

GM

1:100 @ A3

-

REVISION

P4B05-1B Regs

Page 2: REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @ max 900mm centres (white) Existing timber window re-fitted into new window opening

BR06

1 Section AAScale: 1 : 50

SCALE 1:100 @ A3

C1

C2

B1

A2

A5

A6

D1-4

E1-2

E3

AS E

XIST

ING

AS E

XIST

ING

BR10

1

BR10

3

New beams set within depthof existing floor- joists to

be run into the web of steel.

BEAM 4

BEAM 5LINTEL 4

BR10

2

1 2 3 4METRES AT 1:50

1 2 3 4 5 6 7 8 9METERS AT 1:100

1 2 3 4 5METERS AT 1:200 METERS AT 1:500

5 10 20 30METERS AT 1:1250

10 20 30 40105

P4B05

Example Project 5

Jan 17

PROJECT TITLE

DRAWING TITLE

DRAWING No.

DATE STATUS

JOB No. SCALE

DRAWN CHECKED

Section AA as proposed

GM

B Regs

1:100 @ A3

-

REVISION

P4B05-2

Page 3: REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @ max 900mm centres (white) Existing timber window re-fitted into new window opening

BEAM 2

BEAM 1

BEAM 3

LINTEL 1

LINTEL 2

BEAM

4 JOIST 1Span of existing flat roof joists over

Extract run between joists

Beam raised to levelof dining room ceiling

BR07

1 Upper Ground Floor - 1Scale: 1 : 50

Incoming electrics, consumer unit etc

Chimney flue from boilerroom below (being re-usedto feed pipe down from garage)

Circulation, ironingspace etc

Extract in ceiling void above to outside wall

Nib removed

Summary of Structural Elements:

Upper Ground FloorBEAM 1 = 178 X 102 X 19UBBEAM 2 = 178 X 102 X 19UBBEAM 3 = 203 X 102 X 23UBBEAM 4 = 2X 203 X 102 X 23UBLINTEL 1 = Catnic CG90/100LINTEL 2 = PCC 100 x 65 deepLINTEL 8 = Catnic CG90/100LINTEL 9 = PCC 100 x 65 deepJOIST 1 = 50 X 175 C16 @ 400 cc

Lower Ground FloorBEAM 5 = 2x 203 X 102 X 23UBLINTEL 3 = Catnic CG90/100LINTEL 4 = Catnic CG90/100LINTEL 5 = Catnic CG90/100LINTEL 6 = PCC 100 x 65 deepLINTEL 7 = PCC 100 x 65 deepJOIST 2 = 50 X 175 C16 @ 400 cc

Existing opening

LINT

EL 8 Existing window opening blocked

LINTEL 9

Wall and roof continuedover staircase

Existing door removed andopening infilled with cavity

wall as spec item A2

Extract in cooker hoodconcealed in ceiling -

full details to be confirmed

1 2 3 4METRES AT 1:50

1 2 3 4 5 6 7 8 9METERS AT 1:100

1 2 3 4 5METERS AT 1:200 METERS AT 1:500

5 10 20 30METERS AT 1:1250

10 20 30 40105

P4B05

Example Project 5

Jan 17

PROJECT TITLE

DRAWING TITLE

DRAWING No.

DATE STATUS

JOB No. SCALE

DRAWN CHECKED

Upper Ground floor planas proposed

GM

B Regs1:50 @ A3-

REVISION

P4B05-3

Page 4: REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @ max 900mm centres (white) Existing timber window re-fitted into new window opening

LINTEL 3

BEAM

5

LINT

EL 4

BR08

1 Lower Ground Floor Scale: 1 : 50

LINTEL 5

LINTEL 6

LINTEL 7

BEDROOM

TO E

XIST

ING

WIN

DOW

SIZ

E89

0 m

m2400 mm

A2

A3

A6

A8

A9

A13

A15

D1-4

D5

E1

E1

F1

A9

RWP from balcony & new flat roof to discharge to existing gulley

ACO drain at new threshold

Flue from existingboiler modified to suit

G1

G5

JOIST 2

G6

BOILER ROOM

WALK-IN WARDROBE

Opening retainedfor ventilation

Existing tree removed andplanter demolished back to herewith end return rebuilt

Existing oil tank removed (by others) and tank room lined-out:Vandex walls and underside of steps and lay DPM to floor (lappedup 150mm to overlap wall waterproofing). Line walls & ceiling with

63mm Gyproc Thermaline PIR insulated plasterboard . Floor to be linedwith Kingspan insulation and floating T&G boards (as detail BR10/3)

Opening increased and raised as far as possible.

Foundation design to be confirmed

1 2 3 4METRES AT 1:50

1 2 3 4 5 6 7 8 9METERS AT 1:100

1 2 3 4 5METERS AT 1:200 METERS AT 1:500

5 10 20 30METERS AT 1:1250

10 20 30 40105

P4B05

Example Project 5

Jan 17

PROJECT TITLE

DRAWING TITLE

DRAWING No.

DATE STATUS

JOB No. SCALE

DRAWN CHECKED

Lower ground floor planas proposed

GM

B Regs

1:50 @ A3

-

REVISION

P4B05-4

Page 5: REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @ max 900mm centres (white) Existing timber window re-fitted into new window opening

Existing windowrelocated to outer wall

2400

mm

2400

mm

BR09

1 Side ElevationScale: 1 : 50 BR09

2 Rear ElevationScale: 1 : 50

D1-4

D1-4

1500

mm

1500

mm

Frameless glassbalustrade

2400 mm Rendered walls tonew extension

Aluminium coping (colour-matchedto the doors)

1 2 3 4METRES AT 1:50

1 2 3 4 5 6 7 8 9METERS AT 1:100

1 2 3 4 5METERS AT 1:200 METERS AT 1:500

5 10 20 30METERS AT 1:1250

10 20 30 40105

P4B05

Example Project 5

Jan 17

PROJECT TITLE

DRAWING TITLE

DRAWING No.

DATE STATUS

JOB No. SCALE

DRAWN CHECKED

Elevationsas proposed

GM

B Regs

1:50 @ A3

-

REVISION

P4B05-5

Page 6: REAR ELEVATION AS PROPOSED (WEST) SIDE ELEVATION AS ...Catnic CG90/100 Manthorpe G950 weep vents @ max 900mm centres (white) Existing timber window re-fitted into new window opening

BR10

1 Typical parapet upstand detailScale: 1 : 10

BR10

2 Typical first floor junction / window headScale: 1 : 10

BR10

3 Typical ground floor junction / window cillScale: 1 : 10

Ex 50x50mm treated SW fillet

GRP on 18mm OSB

Alumasc aluminium flashing on DPC

120mm Kingston Thermaroof TR26 LPC/FM

Vapour control layer on 18mm play deck

Firing pieces to fall

SW flat roof joists to structural engineers specification

50 x 100mm timber stud upstand on DPC with 100mmmineral wool insulation tightly packed between studs @ 600 centres

100mm Celcon standard block with 10mm polymer render

50mm Celotex CW4050 cavity board with 50mm clear residual cavity

Pack insulation into void between roof joists at top of cavitywall to ensure cold bridge eliminated

100mm Celcon Standard blocks with 12.5mm plasterboardand 3mm skim internally

12.5mm plasterboard & 3mm skim on 25mm Gyproc Casoline MF5 Ceiling Section

3mm skim coat self-levelling compound

14mm Fastlo UFH tubing in 23mm T&G AcoustiPanel 14on 5mm acoustic rubberFlanking / isolation strip

18mm OSB deck on 200 x 50mm C14 timber floor joists @ 400 centres

100mm mineral wool insulation between floor joists hung from Simpson JMH 200/50joist hangers

10mm polymer render on block with expanded metal lathe over studs (lathe to be extended min 100mm past the junction of masonry / timber)

Catnic CG90/100

Manthorpe G950 weep vents @ max 900mm centres (white)

Existing timber window re-fitted into new window opening

170 x 18mm square section pre-finished MDF skirting (fitted over new floor finish)

170 x 18mm square section pre-finished MDF skirting

100mm Celcon Standard blocks with 12.5mm plasterboardand 3mm skim internally

50mm Kingspan K108 cavity board with 50mm clear residual cavity

Kingston Kooltherm Cavity Closer

Existing window frame and cill re-fiited intonew opening

External skin if 100mm Celcon Standard blockwith 10mm polymer render

DPC on internal and external skins

18mm T&G chipboard on vapour control layer over75mm QuinnTherm QF75 rigid insulation board

125mm in-situ concrete slab with A142 mesh on DPM (which is to be dressed-up inner face of clockwork inner skin and dressed under DPC.50mm sand blinding on 150mm clean, well-consolidatedhardcore.

Cavity fill

150 m

m mi

n.

Internal floor finish / thickness TBC

1 2 3 4METRES AT 1:50

1 2 3 4 5 6 7 8 9METERS AT 1:100

1 2 3 4 5METERS AT 1:200 METERS AT 1:500

5 10 20 30METERS AT 1:1250

10 20 30 40105

P4B05

Example Project 5

Jan 17

PROJECT TITLE

DRAWING TITLE

DRAWING No.

DATE STATUS

JOB No. SCALE

DRAWN CHECKED

Junction Detailsas proposed

GM

B Regs

1:10 @ A3

-

REVISION

P4B05-6